<strong>EIA</strong> of The Nam Ngiep 1 Hydropower Project Draft Report: Chapter 2<br />

valve section needs to be limited to within 10 m /s under any conditions in order to avoid<br />

harmful vibrations. Considering these conditions, one (1) row of 0.8 m diameter discharge<br />

pipe and two (2) sluice valves, each 1.1 m in diameter, are installed inside the dam body.<br />

The upstream slide valve is for back-up. The sill level of the gate chamber is set at EL.<br />

244.600 m, which is lower than MOL 296.0m and higher than the assumed sedimentation<br />

level of EL. 233.0 m. The discharge is designed for a 5.5 m 3<br />

/s discharge of riparian release.<br />

2.4.8 MAIN POWER STATION<br />

The layout of main power station and the spillway are designed so that they are closer to the<br />

river center, considering that water from the spillway and the tailrace merge into the river.<br />

The upstream end of the main power station elongated from the dam axis is 143.5 m long.<br />

The main power station, a four-storey building, is approximately 25.0 m long, 62.5 m wide,<br />

and 47.2 m high. The tailrace is 48.5 m long.<br />

Two (2) Francis turbine units will be installed at the main power station, which will<br />

generate energy for delivery to EGAT. (Table 2-2)<br />

Table 2-2 Turbine Technical Data<br />

Main Power Station<br />

Type of turbines Francis turbine Vertical shaft<br />

Number of turbines 2 (synchronous)<br />

Nominal rotational speed 214 rpm<br />

Nominal capacity at substation 272.0 MW (to be revised)<br />

Generator terminal voltage 16.5 kV<br />

Transformer Special three-phase Set-up to 230 kV<br />

All generating units will be isolated and protected from the pressurized water supply by<br />

inlet valves within the main power station. Draft tube gates of Francis turbine units will also<br />

permit the isolation of a unit for inspection and maintenance, allowing the other units to<br />

remain in service.<br />

Power supply to the main power station, including the power generating equipment, will<br />

be tapped from each of the Francis unit’s busbars through auxiliary transformers.<br />

The power transformers will be arranged next to the power station building. The power<br />

transformers of the main power station will be connected to the 230kV substation by means<br />

of overhead lines.<br />

2-11