08.03.2013 Views

MPA-BS 6165/583/12 - Materialprüfanstalt für das Bauwesen

MPA-BS 6165/583/12 - Materialprüfanstalt für das Bauwesen

MPA-BS 6165/583/12 - Materialprüfanstalt für das Bauwesen

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

.44PA<br />

<strong>MPA</strong>BRAIJNSCHWEIG<br />

Page 6 of 7 1 Certificate No. <strong>MPA</strong>-<strong>BS</strong> <strong>6165</strong>/<strong>583</strong>/<strong>12</strong><br />

1 TU8RAUNSCHWEIG<br />

C.3 Shaft-walI<br />

FRAMEWORK<br />

Head and base track (size: lOOmm x 6Omm x O.7mm thick) shall be fixed to supporting struc<br />

ture at maximum 600mm centres with steel fixings of a type to suit to the supporting structure.<br />

Studs (size: 98mm x 26mm x O.7mm thick with a special E track profile) shall be positioned<br />

within the head and base tracks at maximum 4lOmm centres and trimmed to allow a lOmm<br />

expansion gap at the head. The friction shall be fitted between head and base track sections.<br />

Intermediate E-studs shall be screwed back to back together using waver head steel screws<br />

(size: l3mm long x 4mm diameter) at 300mm centres along with the full height of studs. Intu<br />

mescent mastic shall be inserted between the studs.<br />

1 NSU LATI ON<br />

3) shall<br />

A cavity insulation mineral rock fibre based siab (6Omm thick, density minimum 33 kg/m<br />

be used with friction fitted in all voids between the studs.<br />

For insulation a FERMACELL Perimeter strip of mineral rock wool (lOmm thick, l000mm long)<br />

shall be used which is clamped by the track section head and base and by the stud fixed along<br />

the vertical edge.<br />

BOARDS<br />

For the exposed face FERMACELL gypsum fibre boards shall be used with the friction fit in<br />

one layer within the E-studs. All edges shall be bedded on intumescent mastic.<br />

For the unexposed face FERMACELL gypsum fibre boards shall be fitted in two layers and<br />

screwed to the framework using FERMACELL dry wall screws (size: 3.9mm x 3Omm) at<br />

250mm centres for the inner layer and FERMACELL dry wall screws (size: 3.9mm x 4Omm) at<br />

250mm centres for the outer layer. Different joint techniques as described in the manufac<br />

turer‘s manual are allowed. Joints must be closed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!