english<br />

C i r C u l a r f o r m w o r k<br />

<strong>monotub</strong>


©<br />

MONOTUB<br />

SYSTEM<br />

Smooth<br />

• Inner coating made of PVC foil<br />

Spiral<br />

• Smooth concrete surface showing<br />

spiral structure<br />

Exceptional Advantages<br />

Flexibility<br />

Any size from Ø 150mm up to Ø 1,200mm of any length is<br />

available within 2 or 3 business days. Delivery to construction<br />

site in customised dimensions.<br />

Quality<br />

Outstanding quality of fair faced concrete. 100% waterproof, so<br />

open air storage is possible. Installation is possible regardless to<br />

weather conditions. With formwork tubes from Ø 650mm on, 2<br />

vertical butt joints are visible as PVC insert.<br />

Cost-Effective<br />

One pouring date for many columns: This ensures - optimal<br />

building progress. Extremely light and handy in transport and<br />

installation. No crane is necessary in most cases. The column<br />

can be demoulded by ripcord. There is no risk of damaging the<br />

surface of the fair faced concrete.<br />

Eco-Friendly<br />

Circular Formwork<br />

No cleaning and return transport of the formwork. No realese<br />

agent necessary. Simple disposal as recyclable waste.


©<br />

MONOTUB<br />

SYSTEM<br />

Dimensions<br />

Ø<br />

mm<br />

Customised solutions<br />

with self-compacting concrete at<br />

lengths up to 13m.<br />

Technical Data of Monotub<br />

Wall thickness<br />

Different column formworks (Brochure available on request)<br />

mm<br />

Speed of casting<br />

m/h<br />

Required amount<br />

of concrete<br />

ca. m³/m<br />

Weight<br />

150 3 6 0,018 1,3<br />

200 3 6 0,032 1,7<br />

240 3 6 0,045 2,0<br />

250 3 6 0,049 2,1<br />

300 3 6 0,07 2,5<br />

350 4 6 0,096 3,6<br />

400 4 5 0,126 4,1<br />

450 4 4 0,159 4,6<br />

500 4 3 0,196 5,1<br />

550 5 3 0,238 6,3<br />

600 5 3 0,283 6,9<br />

650 5 3 0,334 7,5<br />

700 5 3 0,385 8,0<br />

800 5 3 0,515 9,3<br />

kg/m<br />

900 5 2 0,650 10,5<br />

1000 6 2 0,785 11,5<br />

1200 6 2 1,131 13,7<br />

Angular struts<br />

in different styles.


Application-Specific Information<br />

Transport:<br />

To avoid gouges, give MONOTUB formwork tubes large-area support at all times. Damage caused by<br />

transport or other faults must recorded on the dispatch notes upon delivery. Our warranty applies only to<br />

faults recorded in the transport documents immediately upon arrival.<br />

Storage:<br />

MONOTUB formwork tubes are 100% waterproof, which allows open air storage. Installation is possible<br />

regardless of weather conditions. Do not cover; avoid heat accumulation because of inner foil coating.<br />

Installation:<br />

Do not force MONOTUB formwork over reinforcement or spacers, wich may be bent too<br />

widely. Spacers or reinforcement may damage the formwork.<br />

Put MONOTUB formwork in pivot foundation-sided and fix with wooden cross. Straighten<br />

out perpendicularly ceiling-sided with lashing strap and customer-provided stabilisers to<br />

exclude traction, pressure, and buoyant forces.<br />

Pour concrete (following DIN 1045):<br />

MONOTUB formwork can be poured in one progress. Fill with concrete pump or hose in<br />

steps of about 0,5m and vibrate. This should be made only internal. Pump hose or vibrator<br />

must not tuch the inner surface of the formwork. The drop hight of the concrete while<br />

pouring must be restricted to about 1,5m (see DBV fact sheet). Finally check plumb line<br />

and dimensions.<br />

Removal:<br />

Can be opened fast and easily with the ripcord. Efficient removal of the formwork from<br />

the concrete column. Inner coating may remain on concrete column during further time of<br />

construction for protection.<br />

Disposal:<br />

Simple as recyclable waste.<br />

Caution: In case with non-compliance of our “Application-specific information“<br />

all warranty claims are excluded!<br />

<strong>Nevoga</strong> GmbH, Znaimerstr. 4, D•83395 Freilassing, Tel: +49 (0)8654/4731 0, Fax: +49 (0)8654/4731 18<br />

Mail: info@nevoga.de, Web: www.nevoga.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!