FORM EIA-860M MONTHLY UPDATE TO ANNUAL ELECTRIC ...
FORM EIA-860M MONTHLY UPDATE TO ANNUAL ELECTRIC ...
FORM EIA-860M MONTHLY UPDATE TO ANNUAL ELECTRIC ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>FORM</strong> <strong>EIA</strong>-<strong>860M</strong><br />
<strong>MONTHLY</strong> <strong>UPDATE</strong> <strong>TO</strong><br />
<strong>ANNUAL</strong> <strong>ELECTRIC</strong><br />
GENERA<strong>TO</strong>R REPORT<br />
OMB No. 1905-0129<br />
Approval Expires: 12/31/2016<br />
Burden: 0.3 Hours<br />
NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to<br />
comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information<br />
concerning sanctions and disclosure information, see the provisions stated on the last page of the instructions. Title 18<br />
USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or<br />
Department of the United States any false, fictitious, or fraudulent statements as to any matter within its<br />
jurisdiction.<br />
SCHEDULE 1. IDENTIFICATION<br />
Survey Contact<br />
Name:__________________________________________ Title:___________________________________________<br />
Address:__________________________________________________________________________________________<br />
City:___________________________________________<br />
_<br />
State:___________________ Zip:___________________<br />
Phone (include extension):__________________________ Fax:____________________________________________<br />
Email:____________________________________________________________________________________________<br />
Supervisor of Survey Contact<br />
Title:___________________________________________ Title:___________________________________________<br />
Address:__________________________________________________________________________________________<br />
State:___________________ Zip:___________________ State:___________________ Zip:___________________<br />
Fax:____________________________________________ Fax:____________________________________________<br />
Email:____________________________________________________________________________________________<br />
Report For<br />
Operator Name:____________________________________________________________________________________<br />
Operator ID:_______________________________________________________________________________________<br />
Reporting Month/Year:_______________________________________________________________________________<br />
If you are having a problem with logging into or using the e-file system, contact the Help Center at:<br />
<strong>EIA</strong>SurveyHelpCenter@eia.gov or 202-586-9595.<br />
If you have a question about the data requested on this form, email <strong>EIA</strong>-<strong>860M</strong>@eia.gov (preferred) or contact one of the<br />
survey managers listed below.<br />
Vlad Dorjets, 202-586-3141<br />
Suparna Ray, 202-586-5077<br />
Tosha Richardson, 202-287-6597
<strong>FORM</strong> <strong>EIA</strong>-<strong>860M</strong><br />
<strong>MONTHLY</strong> <strong>UPDATE</strong> <strong>TO</strong><br />
<strong>ANNUAL</strong> <strong>ELECTRIC</strong><br />
GENERA<strong>TO</strong>R REPORT<br />
OMB No. 1905-0129<br />
Approval Expires: 12/31/2016<br />
Burden: 0.3 Hours<br />
Legal Name of Entity:_______________________________________________________________________<br />
Entity ID:______________________ State:_________________________ Reporting Month/Year:____________<br />
SCHEDULE 2. <strong>UPDATE</strong>S <strong>TO</strong> PROPOSED NEW GENERA<strong>TO</strong>RS<br />
(Use Additional Pages if Necessary)<br />
Plant Name:_____________________________________ Plant ID:_______________ Plant State:_____________<br />
Line Data Element Last Data<br />
Reported to<br />
<strong>EIA</strong><br />
Check if No Change:___________ Check if No Change:___________<br />
Generator ID:_________________ Generator ID:_________________<br />
This Month’s<br />
Update<br />
Last Data<br />
Reported to<br />
<strong>EIA</strong><br />
1 Status Code [pre-printed] [pre-printed]<br />
2 Prime Mover Code [pre-printed] [pre-printed]<br />
3 Nameplate Capacity(MW) [pre-printed] [pre-printed]<br />
4 Net Summer Capacity (MW) [pre-printed] [pre-printed]<br />
5 Net Winter Capacity (MW) [pre-printed] [pre-printed]<br />
6 Energy Source 1 [pre-printed] [pre-printed]<br />
7 Energy Source 2 [pre-printed] [pre-printed]<br />
8 Planned Current Effective Date<br />
(mm/yyyy)<br />
9 Reason for Change<br />
(Check all that apply; if “Other”<br />
explain in Schedule 4)<br />
[pre-printed] [pre-printed]<br />
This Month’s<br />
Update<br />
Financial Equipment Financial Equipment<br />
Permitting Other Permitting Other
<strong>FORM</strong> <strong>EIA</strong>-<strong>860M</strong><br />
<strong>MONTHLY</strong> <strong>UPDATE</strong> <strong>TO</strong><br />
<strong>ANNUAL</strong> <strong>ELECTRIC</strong><br />
GENERA<strong>TO</strong>R REPORT<br />
OMB No. 1905-0129<br />
Approval Expires: 12/31/2016<br />
Burden: 0.3 Hours<br />
Legal Name of Entity:_______________________________________________________________________<br />
Entity ID:______________________ State:_________________________ Reporting Month/Year:____________<br />
SCHEDULE 3. <strong>UPDATE</strong>S <strong>TO</strong> PROPOSED CHANGES <strong>TO</strong> EXISTING GENERA<strong>TO</strong>RS<br />
(Use Additional Pages if Necessary)<br />
Plant Name:_____________________________________ Plant ID:_______________ Plant State:_____________<br />
Line Data Element Last Data<br />
Reported to<br />
<strong>EIA</strong><br />
Existing Information<br />
Check if No Change:___________ Check if No Change:___________<br />
Generator ID:_________________ Generator ID:_________________<br />
This Month’s<br />
Update<br />
Last Data<br />
Reported to<br />
<strong>EIA</strong><br />
1 Prime Mover (Existing) [pre-printed] [pre-printed]<br />
2 Energy Source 1 [pre-printed] [pre-printed]<br />
3 Energy Source 2 [pre-printed] [pre-printed]<br />
4 Nameplate Capacity (MW) [pre-printed] [pre-printed]<br />
5 Net Summer Capacity (MW) [pre-printed] [pre-printed]<br />
6 Net Winter Capacity (MW) [pre-printed] [pre-printed]<br />
Uprate<br />
7 Is the Uprate Still Planned? [pre-printed] [pre-printed]<br />
8 Planned Uprate Net Summer<br />
Capacity (MW)<br />
9 Planned Uprate Net Winter<br />
Capacity (MW)<br />
[pre-printed] [pre-printed]<br />
[pre-printed] [pre-printed]<br />
10 Planned Uprate Month/Year [pre-printed] [pre-printed]<br />
Derate<br />
11 Is the Derate Still Planned? [pre-printed] [pre-printed]<br />
12 Planned Derate Net Summer<br />
Capacity (MW)<br />
13 Planned Derate Net Winter<br />
Capacity (MW)<br />
[pre-printed] [pre-printed]<br />
[pre-printed] [pre-printed]<br />
This Month’s<br />
Update
<strong>FORM</strong> <strong>EIA</strong>-<strong>860M</strong><br />
<strong>MONTHLY</strong> <strong>UPDATE</strong> <strong>TO</strong><br />
<strong>ANNUAL</strong> <strong>ELECTRIC</strong><br />
GENERA<strong>TO</strong>R REPORT<br />
14 Planned Derate Month/Year [pre-printed] [pre-printed]<br />
New Net Capacity<br />
15 New Net Summer Capacity<br />
(line 5 + line 8 – line 12)<br />
16 New Net Winter Capacity<br />
(line 6 + line 9 – line 13)<br />
Repowering<br />
17 Is the Repowering Still<br />
Planned?<br />
[pre-printed]<br />
[pre-printed]<br />
[pre-printed] [pre-printed]<br />
18 New Prime Mover Code [pre-printed] [pre-printed]<br />
19 New Energy Source [pre-printed] [pre-printed]<br />
20 Planned Repower Month/Year [pre-printed] [pre-printed]<br />
Retirement<br />
21 Is the Retirement Still Planned? [pre-printed] [pre-printed]<br />
22 Planned Retirement<br />
Month/Year<br />
Other Modifications<br />
23 Are Other Modifications Still<br />
Planned?<br />
24 Planned Modifications<br />
Month/Year<br />
25 Reason for Change<br />
(Check all that apply; if “Other”<br />
explain in Schedule 4)<br />
[pre-printed] [pre-printed]<br />
[pre-printed] [pre-printed]<br />
[pre-printed] [pre-printed]<br />
OMB No. 1905-0129<br />
Approval Expires: 12/31/2016<br />
Burden: 0.3 Hours<br />
Financial Equipment Financial Equipment<br />
Permitting Other Permitting Other
<strong>FORM</strong> <strong>EIA</strong>-<strong>860M</strong><br />
<strong>MONTHLY</strong> <strong>UPDATE</strong> <strong>TO</strong><br />
<strong>ANNUAL</strong> <strong>ELECTRIC</strong><br />
GENERA<strong>TO</strong>R REPORT<br />
OMB No. 1905-0129<br />
Approval Expires: 12/31/2016<br />
Burden: 0.3 Hours<br />
Legal Name of Entity:_______________________________________________________________________<br />
Entity ID:______________________ State:_________________________ Reporting Month/Year:____________<br />
SCHEDULE<br />
NUMBER<br />
(a)<br />
LINE<br />
NUMBER<br />
(b)<br />
SCHEDULE 4. COMMENTS<br />
(Use Additional Pages if Necessary)<br />
NOTES<br />
(c)