23.03.2013 Views

FORM EIA-860M MONTHLY UPDATE TO ANNUAL ELECTRIC ...

FORM EIA-860M MONTHLY UPDATE TO ANNUAL ELECTRIC ...

FORM EIA-860M MONTHLY UPDATE TO ANNUAL ELECTRIC ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>FORM</strong> <strong>EIA</strong>-<strong>860M</strong><br />

<strong>MONTHLY</strong> <strong>UPDATE</strong> <strong>TO</strong><br />

<strong>ANNUAL</strong> <strong>ELECTRIC</strong><br />

GENERA<strong>TO</strong>R REPORT<br />

OMB No. 1905-0129<br />

Approval Expires: 12/31/2016<br />

Burden: 0.3 Hours<br />

NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to<br />

comply may result in criminal fines, civil penalties and other sanctions as provided by law. For further information<br />

concerning sanctions and disclosure information, see the provisions stated on the last page of the instructions. Title 18<br />

USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or<br />

Department of the United States any false, fictitious, or fraudulent statements as to any matter within its<br />

jurisdiction.<br />

SCHEDULE 1. IDENTIFICATION<br />

Survey Contact<br />

Name:__________________________________________ Title:___________________________________________<br />

Address:__________________________________________________________________________________________<br />

City:___________________________________________<br />

_<br />

State:___________________ Zip:___________________<br />

Phone (include extension):__________________________ Fax:____________________________________________<br />

Email:____________________________________________________________________________________________<br />

Supervisor of Survey Contact<br />

Title:___________________________________________ Title:___________________________________________<br />

Address:__________________________________________________________________________________________<br />

State:___________________ Zip:___________________ State:___________________ Zip:___________________<br />

Fax:____________________________________________ Fax:____________________________________________<br />

Email:____________________________________________________________________________________________<br />

Report For<br />

Operator Name:____________________________________________________________________________________<br />

Operator ID:_______________________________________________________________________________________<br />

Reporting Month/Year:_______________________________________________________________________________<br />

If you are having a problem with logging into or using the e-file system, contact the Help Center at:<br />

<strong>EIA</strong>SurveyHelpCenter@eia.gov or 202-586-9595.<br />

If you have a question about the data requested on this form, email <strong>EIA</strong>-<strong>860M</strong>@eia.gov (preferred) or contact one of the<br />

survey managers listed below.<br />

Vlad Dorjets, 202-586-3141<br />

Suparna Ray, 202-586-5077<br />

Tosha Richardson, 202-287-6597


<strong>FORM</strong> <strong>EIA</strong>-<strong>860M</strong><br />

<strong>MONTHLY</strong> <strong>UPDATE</strong> <strong>TO</strong><br />

<strong>ANNUAL</strong> <strong>ELECTRIC</strong><br />

GENERA<strong>TO</strong>R REPORT<br />

OMB No. 1905-0129<br />

Approval Expires: 12/31/2016<br />

Burden: 0.3 Hours<br />

Legal Name of Entity:_______________________________________________________________________<br />

Entity ID:______________________ State:_________________________ Reporting Month/Year:____________<br />

SCHEDULE 2. <strong>UPDATE</strong>S <strong>TO</strong> PROPOSED NEW GENERA<strong>TO</strong>RS<br />

(Use Additional Pages if Necessary)<br />

Plant Name:_____________________________________ Plant ID:_______________ Plant State:_____________<br />

Line Data Element Last Data<br />

Reported to<br />

<strong>EIA</strong><br />

Check if No Change:___________ Check if No Change:___________<br />

Generator ID:_________________ Generator ID:_________________<br />

This Month’s<br />

Update<br />

Last Data<br />

Reported to<br />

<strong>EIA</strong><br />

1 Status Code [pre-printed] [pre-printed]<br />

2 Prime Mover Code [pre-printed] [pre-printed]<br />

3 Nameplate Capacity(MW) [pre-printed] [pre-printed]<br />

4 Net Summer Capacity (MW) [pre-printed] [pre-printed]<br />

5 Net Winter Capacity (MW) [pre-printed] [pre-printed]<br />

6 Energy Source 1 [pre-printed] [pre-printed]<br />

7 Energy Source 2 [pre-printed] [pre-printed]<br />

8 Planned Current Effective Date<br />

(mm/yyyy)<br />

9 Reason for Change<br />

(Check all that apply; if “Other”<br />

explain in Schedule 4)<br />

[pre-printed] [pre-printed]<br />

This Month’s<br />

Update<br />

Financial Equipment Financial Equipment<br />

Permitting Other Permitting Other


<strong>FORM</strong> <strong>EIA</strong>-<strong>860M</strong><br />

<strong>MONTHLY</strong> <strong>UPDATE</strong> <strong>TO</strong><br />

<strong>ANNUAL</strong> <strong>ELECTRIC</strong><br />

GENERA<strong>TO</strong>R REPORT<br />

OMB No. 1905-0129<br />

Approval Expires: 12/31/2016<br />

Burden: 0.3 Hours<br />

Legal Name of Entity:_______________________________________________________________________<br />

Entity ID:______________________ State:_________________________ Reporting Month/Year:____________<br />

SCHEDULE 3. <strong>UPDATE</strong>S <strong>TO</strong> PROPOSED CHANGES <strong>TO</strong> EXISTING GENERA<strong>TO</strong>RS<br />

(Use Additional Pages if Necessary)<br />

Plant Name:_____________________________________ Plant ID:_______________ Plant State:_____________<br />

Line Data Element Last Data<br />

Reported to<br />

<strong>EIA</strong><br />

Existing Information<br />

Check if No Change:___________ Check if No Change:___________<br />

Generator ID:_________________ Generator ID:_________________<br />

This Month’s<br />

Update<br />

Last Data<br />

Reported to<br />

<strong>EIA</strong><br />

1 Prime Mover (Existing) [pre-printed] [pre-printed]<br />

2 Energy Source 1 [pre-printed] [pre-printed]<br />

3 Energy Source 2 [pre-printed] [pre-printed]<br />

4 Nameplate Capacity (MW) [pre-printed] [pre-printed]<br />

5 Net Summer Capacity (MW) [pre-printed] [pre-printed]<br />

6 Net Winter Capacity (MW) [pre-printed] [pre-printed]<br />

Uprate<br />

7 Is the Uprate Still Planned? [pre-printed] [pre-printed]<br />

8 Planned Uprate Net Summer<br />

Capacity (MW)<br />

9 Planned Uprate Net Winter<br />

Capacity (MW)<br />

[pre-printed] [pre-printed]<br />

[pre-printed] [pre-printed]<br />

10 Planned Uprate Month/Year [pre-printed] [pre-printed]<br />

Derate<br />

11 Is the Derate Still Planned? [pre-printed] [pre-printed]<br />

12 Planned Derate Net Summer<br />

Capacity (MW)<br />

13 Planned Derate Net Winter<br />

Capacity (MW)<br />

[pre-printed] [pre-printed]<br />

[pre-printed] [pre-printed]<br />

This Month’s<br />

Update


<strong>FORM</strong> <strong>EIA</strong>-<strong>860M</strong><br />

<strong>MONTHLY</strong> <strong>UPDATE</strong> <strong>TO</strong><br />

<strong>ANNUAL</strong> <strong>ELECTRIC</strong><br />

GENERA<strong>TO</strong>R REPORT<br />

14 Planned Derate Month/Year [pre-printed] [pre-printed]<br />

New Net Capacity<br />

15 New Net Summer Capacity<br />

(line 5 + line 8 – line 12)<br />

16 New Net Winter Capacity<br />

(line 6 + line 9 – line 13)<br />

Repowering<br />

17 Is the Repowering Still<br />

Planned?<br />

[pre-printed]<br />

[pre-printed]<br />

[pre-printed] [pre-printed]<br />

18 New Prime Mover Code [pre-printed] [pre-printed]<br />

19 New Energy Source [pre-printed] [pre-printed]<br />

20 Planned Repower Month/Year [pre-printed] [pre-printed]<br />

Retirement<br />

21 Is the Retirement Still Planned? [pre-printed] [pre-printed]<br />

22 Planned Retirement<br />

Month/Year<br />

Other Modifications<br />

23 Are Other Modifications Still<br />

Planned?<br />

24 Planned Modifications<br />

Month/Year<br />

25 Reason for Change<br />

(Check all that apply; if “Other”<br />

explain in Schedule 4)<br />

[pre-printed] [pre-printed]<br />

[pre-printed] [pre-printed]<br />

[pre-printed] [pre-printed]<br />

OMB No. 1905-0129<br />

Approval Expires: 12/31/2016<br />

Burden: 0.3 Hours<br />

Financial Equipment Financial Equipment<br />

Permitting Other Permitting Other


<strong>FORM</strong> <strong>EIA</strong>-<strong>860M</strong><br />

<strong>MONTHLY</strong> <strong>UPDATE</strong> <strong>TO</strong><br />

<strong>ANNUAL</strong> <strong>ELECTRIC</strong><br />

GENERA<strong>TO</strong>R REPORT<br />

OMB No. 1905-0129<br />

Approval Expires: 12/31/2016<br />

Burden: 0.3 Hours<br />

Legal Name of Entity:_______________________________________________________________________<br />

Entity ID:______________________ State:_________________________ Reporting Month/Year:____________<br />

SCHEDULE<br />

NUMBER<br />

(a)<br />

LINE<br />

NUMBER<br />

(b)<br />

SCHEDULE 4. COMMENTS<br />

(Use Additional Pages if Necessary)<br />

NOTES<br />

(c)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!