Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Hull & Machinery Accident Cases 08-June-2011<br />
4th June 2011<br />
(All times in Local Time unless otherwise state)<br />
1130h - Noticed one link chaffing <strong>and</strong> slt deformed.<br />
1140h - Heaved up 5 mtrs cable <strong>and</strong> brought weak link on<br />
deck<br />
1410h - Got call from 2nd <strong>of</strong>ficer, vessel experiencing<br />
stronger current peaking upto 6 knots.<br />
1415h - Gave bold engine <strong>and</strong> helm moments<br />
1435h - Eased weight on the cable.<br />
1445h - <strong>Cable</strong> short stay with weight, continued engine<br />
<strong>and</strong> helm<br />
1450h - <strong>Cable</strong> growing rapidly with too much weght.<br />
1453h - Port anchor cable parted.Announced on PA<br />
VTS informed<br />
1500h ~ 1800h - Held vessel position stemming current<br />
waiting for next change <strong>of</strong> tide<br />
1815h lt - Re anchored at a position 1 mile south <strong>of</strong> previous<br />
position using stbd anchor.<br />
Environmental conditions<br />
Daylight<br />
Sea State-Moderate sea <strong>and</strong> swell<br />
Good Visibility<br />
Strong Flooding Tide<br />
Sea bed- S<strong>of</strong>t mud <strong>and</strong> free s<strong>and</strong><br />
Sea bed known to have several anchor chains lying from previous<br />
incidents <strong>of</strong> loss <strong>of</strong> anchor from other vessels in past.<br />
Strong Northerly tidal currents peaking up to 6.0 knots.<br />
Accident details<br />
Time <strong>and</strong> date : 4 June 2011, 1453 LT<br />
Location <strong>of</strong> incident : Dahej anchorage, 21 37.7 N 072 25.2 E<br />
Page 3 <strong>of</strong> 11