24.03.2013 Views

Rh series coiled tubing hangers - Wellhead Control Products

Rh series coiled tubing hangers - Wellhead Control Products

Rh series coiled tubing hangers - Wellhead Control Products

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RH SERIES COILED TUBING HANGERS<br />

The "RH" <strong>series</strong> was designed to be a highly workable <strong>coiled</strong> <strong>tubing</strong> hanger with greater<br />

reliability and more efficiency than other <strong>coiled</strong> <strong>tubing</strong> hanger systems.<br />

The "RH" hanger system allows the <strong>coiled</strong> <strong>tubing</strong> installer easy access to the slips and<br />

pack-off assembly, through the use of a snubbing window (available from <strong>Wellhead</strong><br />

<strong>Control</strong> <strong>Products</strong>, Inc.) attached to the BOP stack. This design provides customers the<br />

most reliable and efficient way to set or retrieve the slips and pack-off assembly.<br />

<strong>Wellhead</strong> <strong>Control</strong> <strong>Products</strong>, Inc. wrap around segmented slips are designed for maximum<br />

hanging capacity with minimal <strong>tubing</strong> deflection. This field proven design is tested and<br />

has been certified for hanging capacity exceeding the maximum tensile strength of<br />

today's high quality <strong>tubing</strong>.<br />

The "RH" pack-off assembly is a preinstalled lock pin activated primary seal. <strong>Wellhead</strong><br />

<strong>Control</strong> <strong>Products</strong>, Inc. has developed a unique design incorporating two hardened steel<br />

<strong>tubing</strong> guide plates above and below the sealing element virtually eliminating wear to<br />

assure pack-off reliability time after time.


CAPILLARY INJECTOR HEAD<br />

10,000 lbs. Continuous pull<br />

5,000 PSI snubbing capacity<br />

200+ feet per minute continuous speed<br />

Single piece skate design<br />

True hydraulic traction and tension systems<br />

Clearance for 2" OD tools<br />

10,000 PSI top load stripper<br />

Folding gooseneck<br />

Small package<br />

Frame: 3' x 3' x 4' tall<br />

Gooseneck: 2.5' tall<br />

Monkey boards: 2' long


CAPILLARY SHEAR AND SEAL UNIT<br />

The shear and seal unit is completely manual. It is fully reusable, and completely<br />

serviceable. The system can shear up to 3/4" <strong>tubing</strong>, and can handle 2000 psi of well<br />

pressure.


CAPILLARY TUBING COUNTER<br />

The <strong>tubing</strong> counter uses a high precision counting wheel that is directly coupled to<br />

the manual read out. The counting wheel is machined to .0005", making it extremely<br />

accurate. There are 4 pipe rollers to guide the pipe through the box, and provide the<br />

strength to align the <strong>tubing</strong> onto the reel. The rollers ride on sealed bearings for<br />

smooth operation and a long life. Snap in axle shafts make roller changes quick and<br />

easy. The body of the counter is split and hinged so that it can be opened for<br />

removal of the <strong>tubing</strong>.


STAND ALONE CAPILLARY STRIPPER<br />

The stand-alone capillary stripper is designed to be used as a secondary barrier<br />

when running capillary in a live well situation. The unit can be actuated<br />

hydraulically or manually if needed. The manual system also provides a lock in case<br />

the hydraulic system bleeds pressure during operation, or if the unit is left on the<br />

well for extended periods of time.


CAPILLARY HANGER SYSTEMS<br />

RH-C Single String Hanger<br />

This is the RH-C single string capillary<br />

hanger system with the double barrier seal<br />

option.<br />

The RH-C is available in most API<br />

recognized threaded, flanged, and studded<br />

connections. The double barrier seal,<br />

recognizable by it's third set of lockscrews,<br />

is used in extreme situations requiring added<br />

safety measures.<br />

RH-C Dual String Hanger


"Y" SPOOL<br />

WCP Capillary Intervention<br />

System<br />

Capillary <strong>tubing</strong> often becomes stuck in<br />

the well bore because of salt formation,<br />

paraffin, sand and other contaminants.<br />

Due to it's small size, the capillary string<br />

can easily be parted by an over-pull.<br />

Until recently, a costly fishing job was<br />

required to remove the broken string.<br />

WCP's solution to this problem is the<br />

RH-Y<br />

The "Y" spool provides a method to<br />

deploy/suspend capillary <strong>tubing</strong> and an<br />

avenue to run a work string or wireline<br />

simultaneously, without retracting the<br />

capillary tube.


Coil Tubing Units<br />

WCP constructs its coil <strong>tubing</strong> units on an individual basis. Each unit is custom built to<br />

meet the needs and specifications of the customer. This process does take longer than<br />

manufacturing some "cookie-cutter" <strong>tubing</strong> unit, but the end result is a high quality piece<br />

of equipment.<br />

A Hydraulic System will be designed based on the equipment that will be installed on<br />

the trailer.. It can be either a stand alone, power pack driven system, or it can run off of<br />

the tractor's drive train. WCP will install necessary gearboxes and pumps<br />

<strong>Control</strong> Cabins and Instrument Panels are made in-house at WCP. The cabin can be<br />

laid out any way you desire. Doors, windows, and chairs can be installed in any<br />

configuration. The instrument panels are machined in our facility, out of stainless steel, to<br />

hold all of the valves and gauges necessary for unit operation. Our average cabin is 8' x 8'<br />

square, but it can be made to any size depending on space requirements. The cabin can be<br />

built as a fixed unit, or one with a hydraulically lifted outer skin. This system allows the<br />

cabin to be mounted much higher on the trailer, which assists visibility while on site. The<br />

roof is then lowered below legal height for transportation. The cabin can also be outfitted<br />

with a number of extra options including, but not limited to: Air Conditioning, power<br />

converters, special lighting, computer systems, air suspension chairs, video monitoring<br />

systems, P.A. system, and communication radios.


Custom instrument panel<br />

Reels can be built to handle any amount of pipe desired. WCP’s high-end reel is the best<br />

on the market. It is an indestructible piece of equipment that is designed for ease of<br />

operation and extreme reliability.<br />

Hose reels can be added to the unit to significantly reduce rig-up and down time when<br />

compared to the standard "hose tree" setup<br />

The Injector Head can be mounted in any number of ways; from a simple flat mount on<br />

the trailer deck to a hydraulically operated tilting mount on the rear of the trailer.<br />

A crane can also be integrated into the trailer if needed.<br />

Walkways, stairs, handrails, and storage compartments can be installed nearly<br />

anywhere, to provide the workers with easy access to mounted components, equipment<br />

and tools, and for personal safety.


TRAILER MOUNTED NITROGEN UNIT<br />

180K heat recovery unit capable of 10,000 psi operating pressure. Main components<br />

include Detroit MTU engine, 2000-gallon LN2 tank, and control cabin


Large 8’ square control cabin that is fully insulated, air conditioned and heated.


Operations panels for the hydraulic system (above), the engine (below left), and the<br />

air operated valves (below right).


2000 gallon nitrogen tank with proportional air actuators on all control valves for<br />

remote operation. Pump skid with triplex pump, lube oil system, boost pump, and<br />

storage rack on passenger side for plug valves. Aluminum diamond plate fenders<br />

and toolboxes. Swivel racks below the fenders, and flow iron racks above.


YARD SPOOLING STAND<br />

Rotating joint provides means of pumping through the <strong>tubing</strong><br />

Pivoting levelwind arms<br />

Hydraulic chain tension with manual backup and lock<br />

Split pillow block bearings<br />

Manually controlled hydraulic screw type levelwind<br />

Quick reel changes<br />

Lifting eyes and / or forklift pockets<br />

Drip pan and removable chain guard<br />

All spooler skids are custom built to customer requirements<br />

Units can be constructed to hold any size reel desired.<br />

Pictured unit designed for 120" O.D. by 75" wide wood or steel reels


Direct Drive Coil Tubing Counter<br />

Extremely accurate<br />

Rollers available for pipes up to 2-3/8"<br />

Heavy construction handles the thickest walled pipes.<br />

2000 lbs. latch action clamps<br />

5 digit large numeral counter<br />

Output shaft for electronic pulsater<br />

All moving parts ride on high quality sealed bearings<br />

Optional Levelwind <strong>Control</strong> Console<br />

The remote console allows the user to operate<br />

at a safe location with good visibility.<br />

The lightweight aluminum console with wheels<br />

is effortless to setup and transport.<br />

The panel hosts a levelwind motor directional<br />

valve and a system pressure gauge.<br />

Quick disconnects for pump and reel<br />

connections.<br />

Jumper hoses can be supplied for any length.


HYDROSTATIC TEST EQUIPMENT<br />

Below, is our air operated 30,000-PSI hydro testing unit with B.O.P. control system. It<br />

features a skid mounted control panel with chart recorder and control valves for a Quad<br />

B.O.P. or a double B.O.P. and pack-off. The instrument panel, side panels, and protective<br />

cover are made of stainless steel. It has a 4-1/16" 15M test stump with Auto-Clave<br />

fittings. It comes with a D.S.A. to 3-1/16" 10M. It has a 1-1/2-ton Jib-crane on a<br />

swinging arm to assist in loading, unloading, and disassembly of equipment. The skid<br />

also has a blast shield with bulletproof plexi-glass to protect the operator, a grating<br />

covered drip pan, and forklift pockets.


BLOW-OUT PREVENTER REPAIR<br />

We perform all necessary<br />

machine work, and replace all<br />

seals, inserts, hoses, and fittings.<br />

WCP repairs:<br />

TOT<br />

Foley<br />

Bowen<br />

Hydralux<br />

Parveen


OTHER PRODUCTS<br />

ACCESS WINDOW<br />

Reinstallation Dart and One Way Check with Wash Nozzle


1" - 3 1/2" PUMP OUT PLUG<br />

"SUR-GRIP" CONNECTORS


DOUBLE ROLL-ON CONNECTOR<br />

Roll-On connectors are used to connect two joints of <strong>coiled</strong> <strong>tubing</strong>.<br />

Available in sizes from 1" - 3 1/2".<br />

Roll-On connectors are also available for connecting different sizes together.<br />

Velocity Wash Tool


Filter Manifold And Screen


LIVE WELL INSTALLATION<br />

“RH” SERIES COILED TUBING HANGERS<br />

1. Close the lower master valve and bleed off pressure.<br />

2. Remove tree above the lower master valve.<br />

3. Install the “RH” Series hanger on the lower master valve.<br />

4. Place the pack-off assembly in the <strong>tubing</strong> hanger.<br />

5. Rotate the lock pins inward until the lock pin bevels are entirely in contact with the top<br />

plate bevel. DO NOT ENERGIZE THE PACK-OFF. This is to prevent pressure from<br />

displacing the pack-off assembly when the master valve is opened.<br />

CONTINUED...


6. Connect the access window to the<br />

<strong>tubing</strong> hanger.<br />

7. Connect the Blowout Preventer.<br />

8. Connect the Coiled Tubing Unit to<br />

the B.O.P. stack.<br />

9. Connect the flow line to the <strong>tubing</strong><br />

hanger side outlet.<br />

10. Run the <strong>tubing</strong> slowly through the<br />

B.O.P. stack, access window, and<br />

pack-off assembly until the <strong>tubing</strong><br />

reaches the lower master valve.<br />

Have the <strong>tubing</strong> sealed with an end<br />

plug.<br />

11. Close access window.<br />

12. Energize the stripper rubber at the<br />

top of the <strong>coiled</strong> <strong>tubing</strong> unit.<br />

13. Open the lower master valve.<br />

14. Run the <strong>tubing</strong> to the desired<br />

depth.<br />

15. Rotate the lock pins clockwise 3/4<br />

of a turn to energize the pack-off.<br />

NOTE: Additional clockwise rotation<br />

maybe necessary if annular<br />

seal is not achieved initially.<br />

16. Tighten the packing gland nuts.<br />

17. Bleed off pressure from B.O.P.<br />

stack.<br />

18. Raise access window and clean<br />

bowl.<br />

19. Secure slips around <strong>tubing</strong> and release slips into well bore.<br />

CONTINUED...


20. Lower <strong>tubing</strong> into the well until the weight indicator reads “0”<br />

21. Rough cut <strong>tubing</strong> a minimum of 6" above the <strong>tubing</strong> hanger top flange -remove<br />

access window, B.O.P. stack, and <strong>coiled</strong> <strong>tubing</strong> unit.<br />

22. The final cut should be measured accurately. This procedure will assure that the<br />

wireline guide fits properly.<br />

23. Install the tree over the <strong>coiled</strong> <strong>tubing</strong> hanger.<br />

24. Displace the end plug from the <strong>coiled</strong> <strong>tubing</strong>.<br />

25. Remove the lower master valve hand wheel.<br />

INSTALLATION COMPLETE


501 N. Richey<br />

Pasadena, TX 77506<br />

Tel: 713-475-2310<br />

Fax: 713-475-1806<br />

Toll Free: 1-800-457-1198<br />

You can reach us via E-mail<br />

For wellhead and C.T. hanger information please use<br />

wcp@wellheadcontrol.com<br />

For C.T. units or hydraulic system repair please contact<br />

Kevin Hunt- kevin@wellheadcontrol.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!