ADDENDUM NO. 1<br />
TO THE CONSTRUCTION DOCUMENTS<br />
FOR THE<br />
JET BLAST DEFLECTOR (PHASE 1 AND 2)<br />
BOCA RATON AIRPORT<br />
BOCA RATON, FLORIDA<br />
Project funded by:<br />
FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT)<br />
MARCH 6, 2013 PAGE 1 OF 2<br />
TO: ALL HOLDERS OF CONTRACT DOCUMENTS<br />
1. Your attention is directed <strong>to</strong> <strong>the</strong> following interpretations of, changes in, and additions <strong>to</strong> <strong>the</strong> Contract<br />
Specifications and Plans <strong>for</strong> <strong>the</strong> above named project at Boca Ra<strong>to</strong>n Airport, Boca Ra<strong>to</strong>n, Florida.<br />
2. This Addendum is part of <strong>the</strong> Contract Documents and Plans, and <strong>the</strong> bidders are required <strong>to</strong><br />
ack<strong>no</strong>wledge receipt of this Addendum in <strong>the</strong> space provided below.<br />
This <strong>addendum</strong> includes <strong>the</strong> following:<br />
PRE-BID CONFERENCE MEETING MINUTES<br />
1. The Pre-Bid Conference meeting minutes, sign-in sheet and plan holders list are attached <strong>to</strong> this<br />
Addendum No. 1.<br />
CONTRACTOR QUESTIONS (FROM PRE-BID MEETING)<br />
Question 1: Can Requests <strong>for</strong> In<strong>for</strong>mation (RFIs) during <strong>the</strong> bid phase be submitted by E-mail<br />
instead of fax?<br />
Answer 1: Yes, RFIs during <strong>the</strong> bid phase can be submitted by E-mail <strong>to</strong><br />
j_leske@ricondo.com. E-mail is <strong>the</strong> preferred method of submitting RFIs during <strong>the</strong> bid phase.<br />
Question 2: Because <strong>the</strong> Contrac<strong>to</strong>r is responsible <strong>for</strong> submitting engineered design drawings<br />
<strong>for</strong> <strong>the</strong> Jet Blast Deflecting Fence and <strong>the</strong> associated foundation, will <strong>the</strong> Contrac<strong>to</strong>r need <strong>to</strong><br />
submit <strong>the</strong> structural drawings <strong>to</strong> <strong>the</strong> City of Boca Ra<strong>to</strong>n <strong>for</strong> permit?<br />
Answer 2: No, <strong>the</strong> Jet Blast Deflecting Fence and <strong>the</strong> associated foundation are on <strong>the</strong><br />
airfield and are covered under <strong>the</strong> airport land use. The Jet Blast Deflecting Fence and <strong>the</strong><br />
associated foundation are <strong>the</strong>reby excluded from <strong>the</strong> City of Boca Ra<strong>to</strong>n permitting process.<br />
Question 3: Does <strong>the</strong> phrase “an Engineer Approved Equal” mean an alternative must be<br />
submitted <strong>for</strong> approval prior <strong>to</strong> <strong>the</strong> bid?<br />
Answer 3: Technical Specifications, Item 165-3.2, states: “…The Blast Fence shall be a<br />
LYNNCO Type G14NB-3 manufactured by Blast Deflec<strong>to</strong>rs, Inc. of Re<strong>no</strong>, Nevada or an<br />
JET BLAST DEFLECTOR (PHASE 1 AND 2) Addendum No. 1 1<br />
BRAA PROJECT NO.: TASK 12B
approved equal.” This type and manufacturer is provided as an example only, <strong>no</strong>t as an<br />
endorsement of or preference <strong>for</strong> <strong>the</strong> type and/or manufacturer. All submitted designs, including<br />
<strong>the</strong> <strong>for</strong>egoing, must meet all of <strong>the</strong> specifications of <strong>the</strong>se Bid Documents and each<br />
manufacturer and/or designer will be treated equally with regard <strong>to</strong> <strong>the</strong> evaluation of this Bid.<br />
Instructions <strong>to</strong> Bidders (IB) 4.1.2 requires <strong>the</strong> Bidder and its subcontrac<strong>to</strong>rs and/or<br />
suppliers must submit statements of qualifications <strong>to</strong> complete <strong>the</strong> proposed work. The<br />
requirements of IB4.1.2 are in agreement with <strong>the</strong> requirements of Technical Specification Item<br />
165-2.1.A. The Contrac<strong>to</strong>r must satisfy itself as <strong>to</strong> <strong>the</strong> claims of <strong>the</strong> entities submitting<br />
statements of qualification under IB4.1.2 and that <strong>the</strong>se entities can accomplish <strong>the</strong> contracted<br />
work. The submittals <strong>for</strong> Item F-165-1 Install 14-Foot Full Power Jet Blast Fence, Complete –<br />
Per Linear Foot (LF), will be approved through <strong>the</strong> <strong>no</strong>rmal shop drawing process. A bid that<br />
does <strong>no</strong>t meet <strong>the</strong> requirements of IB4.1.2 may be considered <strong>no</strong>nresponsive.<br />
Question 4: What happens if an awarded Bidder/Contrac<strong>to</strong>r can<strong>no</strong>t meet <strong>the</strong> submittal<br />
requirements <strong>for</strong> <strong>the</strong> Jet Blast Deflec<strong>to</strong>r?<br />
Answer 4: The Contrac<strong>to</strong>r would be required by Contract <strong>to</strong> meet <strong>the</strong> requirements of all<br />
specified items. Failure <strong>to</strong> meet <strong>the</strong> requirements of any particular item is grounds <strong>for</strong><br />
termination of contract under failure <strong>to</strong> per<strong>for</strong>m.<br />
Question 5: Does <strong>the</strong> excavation at a 2:1 angle of repose impact <strong>the</strong> adjacent parking lot?<br />
Answer 5: The installation of Blast Fence Foundation as shown on sheet ST-1, section B-B<br />
will <strong>no</strong>t undermine <strong>the</strong> adjacent parking lot. The means and methods employed by <strong>the</strong><br />
Contrac<strong>to</strong>r, such as a 2:1 angle of repose in lieu of a 1:1 angle of repose, are at <strong>the</strong> Contrac<strong>to</strong>rs<br />
discretion. The contrac<strong>to</strong>r must res<strong>to</strong>re at his own expense property damaged outside <strong>the</strong><br />
scope of <strong>the</strong> project <strong>documents</strong>.<br />
Ack<strong>no</strong>wledged: signature of Bidder<br />
Name of Bidder:<br />
END OF ADDENDUM NO. 1<br />
JET BLAST DEFLECTOR (PHASE 1 AND 2) Addendum No. 1 2<br />
BRAA PROJECT NO.: TASK 12B
1. INTRODUCTIONS<br />
MEETING MINUTES<br />
Pre-Bid Conference<br />
<strong>for</strong><br />
Jet Blast Deflec<strong>to</strong>r (Phase 1 and 2) at Boca Ra<strong>to</strong>n Airport<br />
BRAA Task No: Task 12B<br />
PROJECT FUNDED BY:<br />
FLORIDA DEPT. OF TRANSPORTATION (FDOT)<br />
and<br />
Boca Ra<strong>to</strong>n Airport Authority (BRAA)<br />
Thursday, February 28, 2013<br />
11:00 AM Local Time<br />
Boca Ra<strong>to</strong>n Airport Authority<br />
Boca Ra<strong>to</strong>n Airport Authority<br />
3701 FAU Boulevard, Suite 205<br />
Boca Ra<strong>to</strong>n, Florida 33431<br />
2. OWNER OF PROJECT Boca Ra<strong>to</strong>n Airport Authority (BRAA)<br />
Boca Ra<strong>to</strong>n Airport (BCT)<br />
3701 FAU Boulevard, Suite 205<br />
Boca Ra<strong>to</strong>n, Florida 33431<br />
Phone: (561) 391-2202<br />
Fax: (561) 391-2238<br />
Airport Manager Ken A. Day<br />
Assistant Airport Manager Paul McDermott<br />
3. AIRPORT’S GENERAL CONSULTANT<br />
Ricondo & Associates, Inc.<br />
1000 N.W. 57 th Ct.<br />
Miami, FL 33126<br />
Phone: (305) 260-2727<br />
Fax: (305) 260-2728<br />
Project Manager Pete Ricondo, P.E. (p_ricondo@ricondo.com)<br />
Assistant Project Manager Jeff Leske (j_leske@ricondo.com)<br />
4. CIVIL ENGINEER CH2M Hill, Inc.<br />
3001 PGA Boulevard, Suite 300<br />
Palm Beach Gardens, FL 33410<br />
Phone: (561) 904-7510<br />
Fax: (561) 904-7401<br />
Project Manager Dan Tompkins, P.E. (Daniel.Tompkins@CH2M.com)<br />
PAGE 1 OF 5
5. ELECTRICAL ENGINEER Hillers Electrical Engineering, Inc.<br />
23257 State Road 7, Suite 100<br />
Boca Ra<strong>to</strong>n, FL 33428<br />
Phone: (561) 451-9165<br />
Fax: (561) 451-4886<br />
Project Manager Tom Doran (tdoran@hillersee.com)<br />
6. SUBMITTAL DATE<br />
Friday, March 22, 2013 at 2:00pm, Local Time<br />
Boca Ra<strong>to</strong>n Airport (BCT) Task 12B –<br />
Jet Blast Deflec<strong>to</strong>r (Phase 1 and 2)<br />
3701 FAU Boulevard, Suite 205<br />
Boca Ra<strong>to</strong>n, Florida 33431<br />
Attn: Ken A. Day, Airport Manager<br />
Phone: (561) 391-2202 211<br />
Bid proposals must be submitted on <strong>the</strong> <strong>for</strong>ms provided by BRAA and accompanied by a bid<br />
security in <strong>the</strong> <strong>for</strong>m of a certified check, cashier's check, money order or a bid bond submitted<br />
on <strong>the</strong> <strong>for</strong>m provided, in favor of BRAA in <strong>the</strong> amount of <strong>no</strong>t less than five percent (5%) of <strong>the</strong><br />
bid price.<br />
7. PROJECT MANUAL - $100 Cost <strong>for</strong> Plans and Specifications (<strong>no</strong>n-refundable service charge)<br />
Instruction <strong>to</strong> Bidders<br />
Bidding Documents<br />
Contract Documents<br />
Special Provisions<br />
General Provisions<br />
Federal Provisions<br />
Maintenance of Air Operations<br />
Area Traffic<br />
8. PROJECT DATA<br />
Safety and Security<br />
Contract Closeout<br />
Project Record Documents<br />
Warranties and Bonds<br />
Technical Specifications<br />
Drawings<br />
Scope The work generally consists of: installation of temporary security fence, removal of<br />
existing security fence, clearing and grubbing, unclassified excavation, subgrade compaction,<br />
installation of concrete foundations <strong>for</strong> security masonry wall and <strong>jet</strong> <strong>blast</strong> deflec<strong>to</strong>r fence,<br />
landscape and irrigation modifications, electrical and lighting modifications, installation of a<br />
security fence, obstruction lighting, installation of a <strong>jet</strong> <strong>blast</strong> deflec<strong>to</strong>r fence, grading and sodding,<br />
and airfield pavement markings.<br />
8.1. Bid Schedule The project Bid Schedule is a Base Bid with 36 items.<br />
8.2. Total Contract Time 210 Cal Days<br />
No questions were raised about <strong>the</strong> Bid Schedule or Contract Time.<br />
9. SAFETY AND SECURITY - Security badges are required <strong>to</strong> operate on <strong>the</strong> Airport Operations<br />
Area (AOA). Cost is $25 dollars per badge and shall be considered incidental <strong>to</strong> <strong>the</strong> work bid.<br />
PAGE 2 OF 5
General Provisions<br />
Maintenance of AOA Traffic<br />
General and Security Notes - Drawing G-3<br />
Construction Safety Notes - Drawing G-4<br />
Construction Safety and Security Plan – Drawing G-5<br />
10. CONTRACT TERM AND SCHEDULE<br />
9.1 Construction Schedule<br />
Mobilization <strong>to</strong> Substantial Completion 180 Cal Days<br />
Final Completion 30 Cal Days<br />
Total (Cal Days are Cumulative) 210 Cal Days<br />
9.2 Liquidated Damages<br />
LIQUIDATED DAMAGES: OVERALL PROJECT COMPLETION: Five Hundred Dollars<br />
($500) per calendar day of delay in completing <strong>the</strong> contract work beyond <strong>the</strong> above specified<br />
Substantial Completion. Two Hundred and Fifty Dollars ($250) per calendar day of delay in<br />
completing <strong>the</strong> contract work beyond <strong>the</strong> above specified Final Completion.<br />
No questions were asked about <strong>the</strong> contract schedule or liquidated damages.<br />
11. DBE AND FEDERAL REQUIREMENTS<br />
9.9% DBE Goal<br />
The contrac<strong>to</strong>r will need <strong>to</strong> demonstrate good faith ef<strong>for</strong>t <strong>to</strong> meet <strong>the</strong> DBE goal, if <strong>the</strong> good faith<br />
ef<strong>for</strong>t is <strong>no</strong>t demonstrated; <strong>the</strong> failure <strong>to</strong> meet <strong>the</strong> DBE goal or failure <strong>to</strong> sufficiently demonstrate<br />
good faith ef<strong>for</strong>t <strong>to</strong> meet <strong>the</strong> DBE goal is <strong>to</strong> be considered a <strong>no</strong>nresponsive bid. The decision <strong>to</strong><br />
award will be based on lowest responsive bidder only; <strong>no</strong> extra consideration will be given in<br />
regard <strong>to</strong> DBE percentage.<br />
12. CONTRACTOR STAGING AREA<br />
Boca Ra<strong>to</strong>n Airport Authority (BRAA) assumes <strong>no</strong> responsibility <strong>for</strong> security of areas used <strong>for</strong><br />
daily contrac<strong>to</strong>r employee parking and material s<strong>to</strong>rage outside of <strong>the</strong> Airport Operations Area<br />
(AOA).<br />
Parking of Personally Owned Vehicles (POV) will <strong>no</strong>t be permitted on <strong>the</strong> airfield. The area<br />
outside of <strong>the</strong> security fence in <strong>the</strong> vicinity of Gate 1S is available <strong>for</strong> parking POVs, <strong>the</strong><br />
Contrac<strong>to</strong>r shall satisfy himself as <strong>to</strong> <strong>the</strong> adequacy of this area <strong>for</strong> parking and make alternate<br />
arrangements if necessary.<br />
Use of <strong>the</strong> areas of Boomers parking lot outside of those specifically shown on <strong>the</strong> plans has <strong>no</strong>t<br />
been discussed with Boomers.<br />
PAGE 3 OF 5
13. PERMIT FEES<br />
Contrac<strong>to</strong>r shall obtain ALL Permits and Licenses required <strong>for</strong> <strong>the</strong> Construction Work. BRAA pays<br />
<strong>for</strong> <strong>the</strong> permit fees.<br />
The airport security fence relocation as shown on <strong>the</strong> plans follows <strong>the</strong> limits of <strong>the</strong> aviation use<br />
easement. Construction of airport projects on this easement is excluded from <strong>the</strong> City of Boca<br />
Ra<strong>to</strong>n permitting process.<br />
14. CLARIFICATIONS<br />
E-mail all questions <strong>to</strong> Jeff Leske of Ricondo & Assoc. at j_leske@ricondo.com and include<br />
"BRAA Task 12B, Clarifications <strong>for</strong> Jet Blast Deflec<strong>to</strong>r" in <strong>the</strong> subject line. Questions may also be<br />
faxed <strong>to</strong> Ricondo & Assoc. at (305) 260-2728 (ATTN: Jeff Leske, Senior Consultant), but Email<br />
is preferred. Last date <strong>for</strong> questions is Thursday, March 14 th , 2013, 4:00 PM Local Time.<br />
Questions asked at <strong>the</strong> bid pre-bid conference are answered in <strong>no</strong> particular order:<br />
1.) Q: Can Requests <strong>for</strong> In<strong>for</strong>mation (RFIs) during <strong>the</strong> bid phase be submitted by E-mail instead of<br />
fax?<br />
A: Yes, RFIs during <strong>the</strong> bid phase can be submitted by E-mail <strong>to</strong> j_leske@ricondo.com. E-mail<br />
is <strong>the</strong> preferred method of submitting RFIs during <strong>the</strong> bid phase.<br />
2.) Q: Because <strong>the</strong> Contrac<strong>to</strong>r is responsible <strong>for</strong> submitting engineered design drawings <strong>for</strong> <strong>the</strong> Jet<br />
Blast Deflecting Fence and <strong>the</strong> associated foundation, will <strong>the</strong> Contrac<strong>to</strong>r need <strong>to</strong> submit <strong>the</strong><br />
structural drawings <strong>to</strong> <strong>the</strong> City of Boca Ra<strong>to</strong>n <strong>for</strong> permit?<br />
A: No, <strong>the</strong> Jet Blast Deflecting Fence and <strong>the</strong> associated foundation are on <strong>the</strong> airfield and are<br />
covered under <strong>the</strong> airport land use. The Jet Blast Deflecting Fence and <strong>the</strong> associated<br />
foundation are <strong>the</strong>reby excluded from <strong>the</strong> City of Boca Ra<strong>to</strong>n permitting process.<br />
3.) Q: Does <strong>the</strong> phrase “an Engineer Approved Equal” mean an alternative must be submitted <strong>for</strong><br />
approval prior <strong>to</strong> <strong>the</strong> bid?<br />
A: Technical Specifications, Item 165-3.2, states: “…The Blast Fence shall be a LYNNCO<br />
Type G14NB-3 manufactured by Blast Deflec<strong>to</strong>rs, Inc. of Re<strong>no</strong>, Nevada or an approved<br />
equal.” This type and manufacturer is provided as an example only, <strong>no</strong>t as an endorsement<br />
of or preference <strong>for</strong> <strong>the</strong> type and/or manufacturer. All submitted designs, including <strong>the</strong><br />
<strong>for</strong>egoing, must meet all of <strong>the</strong> specifications of <strong>the</strong>se Bid Documents and each manufacturer<br />
and/or designer will be treated equally with regard <strong>to</strong> <strong>the</strong> evaluation of this Bid.<br />
Instructions <strong>to</strong> Bidders (IB) 4.1.2 requires <strong>the</strong> Bidder and its subcontrac<strong>to</strong>rs and/or<br />
suppliers must submit statements of qualifications <strong>to</strong> complete <strong>the</strong> proposed work. The<br />
requirements of IB4.1.2 are in agreement with <strong>the</strong> requirements of Technical Specification<br />
Item 165-2.1.A. The Contrac<strong>to</strong>r must satisfy itself as <strong>to</strong> <strong>the</strong> claims of <strong>the</strong> entities submitting<br />
statements of qualification under IB4.1.2 and that <strong>the</strong>se entities can accomplish <strong>the</strong><br />
contracted work. The submittals <strong>for</strong> Item F-165-1 Install 14-Foot Full Power Jet Blast Fence,<br />
Complete – Per Linear Foot (LF), will be approved through <strong>the</strong> <strong>no</strong>rmal shop drawing process.<br />
A bid that does <strong>no</strong>t meet <strong>the</strong> requirements of IB4.1.2 may be considered <strong>no</strong>nresponsive.<br />
4.) Q: What happens if an awarded Bidder/Contrac<strong>to</strong>r can<strong>no</strong>t meet <strong>the</strong> submittal requirements <strong>for</strong><br />
<strong>the</strong> Jet Blast Deflec<strong>to</strong>r?<br />
A: The Contrac<strong>to</strong>r would be required by Contract <strong>to</strong> meet <strong>the</strong> requirements of all specified items.<br />
Failure <strong>to</strong> meet <strong>the</strong> requirements of any particular item is grounds <strong>for</strong> termination of contract<br />
under failure <strong>to</strong> per<strong>for</strong>m.<br />
PAGE 4 OF 5
5.) Q: Does <strong>the</strong> excavation at a 2:1 angle of repose impact <strong>the</strong> adjacent parking lot?<br />
A: The installation of Blast Fence Foundation as shown on sheet ST-1, section B-B will <strong>no</strong>t<br />
undermine <strong>the</strong> adjacent parking lot. The means and methods employed by <strong>the</strong> Contrac<strong>to</strong>r,<br />
such as a 2:1 angle of repose in lieu of a 1:1 angle of repose, are at <strong>the</strong> Contrac<strong>to</strong>rs<br />
discretion. The contrac<strong>to</strong>r must res<strong>to</strong>re at his own expense property damaged outside <strong>the</strong><br />
scope of <strong>the</strong> project <strong>documents</strong>.<br />
PAGE 5 OF 5
$100.00<br />
Set # Date Company Name Contact Name Street Address City, State, Zip Phone Fax Email<br />
1 2/14/2013 South Florida iSqFt Planroom Nancy Whitmyer 801 N. Andrews Ave. Ft. Lauderdale, Fl 33311 800-364-2059 866-570-8187 nwhitmyer@isqft.com<br />
2 2/15/2013 All-Site Construction, Inc. Ezra Saffold 2915 E Tamarind Ave. West Palm Beach, FL 33407 561-848-1110 561-848-1132 ezra@allsite.net<br />
3 2/19/2013 OnPower Energy Services Rick Dardas 7676 Jean Blvd. Fort Myers, FL 33967 239-288-7965 239-288-7969 rdardas@onpowerusa.com<br />
4 2/21/2013 Williams Paving Co Alan Rodriquez 11300 N.W South River Drive Medley, FL 33178 305-882-1950 305-882-1966 estimating@williamspaving.com<br />
5 2/21/2013 Bliss Construction Dutch Bliss 111E. Boca Ra<strong>to</strong>n Road Boca Ra<strong>to</strong>n, FL 33432 561-391-0212 561-391-6702 dutch@bliss<strong>construction</strong>.com<br />
6 2/22/2013 West Construction Racquel Barrett 318 Dixie Hwy Suite #4-5 Lake Worth, FL 33460 561-588-2027 561-582-9419 rbarrett@west<strong>construction</strong>inc.net<br />
7 2/26/2013 Smith Fence Jenn Zahner 4699 110th Ave. N. Clearwater, FL 33762 727-573-5440 727-573-2075 jzahner@smithfence.com<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
15<br />
Jet Blast Deflec<strong>to</strong>r Wall - Bid Tracking Sheet<br />
Bid Packages