25.03.2013 Views

Roof Armor Ice and Water Shield Installation ... - Best Buy Metals

Roof Armor Ice and Water Shield Installation ... - Best Buy Metals

Roof Armor Ice and Water Shield Installation ... - Best Buy Metals

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DESCRIPTION<br />

Poly Surfaced Self-Adhesive Underlayment<br />

for Metal <strong>Roof</strong>ing<br />

KEY PROPERTIES<br />

Superior Slip-Resistant Polyester Surface • Cooler Working Surface<br />

High Temperature Applications (up to 260 o F, 126.67 o C) • 45 Day Exposure Time<br />

Self-Adhesive <strong>and</strong> Cold-Applied • Rugged Barrier Against Foot Traffic<br />

Guardian <strong>Roof</strong> <strong>Armor</strong> TM Poly <strong>Ice</strong> & H20 is a durable self<br />

adhesive composite underlayment, specifically designed to<br />

withst<strong>and</strong> the rigors of a commercial construction site.<br />

The strong, slip-resistant, polyester surface provides a rugged<br />

barrier to physical damage, UV degradation, weather <strong>and</strong><br />

moisture. The unique, modified asphalt adhesive layer offers<br />

the application benefits of cold temperature adhesion <strong>and</strong><br />

exceptional thermal stability under high heat. The self-adhesive<br />

layer is covered with a high temperature release sheet which is<br />

removed during installation.<br />

Guardian <strong>Roof</strong> <strong>Armor</strong> TM Poly <strong>Ice</strong> & H20 composite is 40 mils<br />

(1 mm) thick <strong>and</strong> is supplied in one square (3’ x 33.3’) (0.91m x<br />

10.15m) <strong>and</strong> two square (3’ x 66.6’) (0.91m x 20.30m) rolls.<br />

The product is self-adhesive <strong>and</strong> cold applied, requiring no<br />

special adhesives, heat or equipment for installation.<br />

USES<br />

B B M<br />

<strong>Roof</strong>ing That Lasts<br />

Guardian <strong>Roof</strong> <strong>Armor</strong> TM Poly <strong>Ice</strong> & H20 is an excellent<br />

underlayment for metal roofs, designed to prevent moisture<br />

entry into structures by sealing uniformly to the deck <strong>and</strong><br />

around nail penetrations. Guardian <strong>Roof</strong> <strong>Armor</strong> TM Poly <strong>Ice</strong> &<br />

H2O can serve as a temporary roof to protect the structure until<br />

the primary roofing system is installed <strong>and</strong> may be left exposed<br />

for a maximum of 45 days.<br />

APPLICATION<br />

• Guardian <strong>Roof</strong> <strong>Armor</strong>TM Poly <strong>Ice</strong> & H2O can only be<br />

recommended for roof decks with a pitch of 3/12 or greater.<br />

It can be installed on lower slopes, but the warranty will not apply.<br />

• Guardian <strong>Roof</strong> <strong>Armor</strong> TM Poly <strong>Ice</strong> & H2O should be applied<br />

when ambient <strong>and</strong> substrate temperatures are 40 o F (4.4 o C)<br />

or higher. Substrate must be clean <strong>and</strong> dry. Remove all dirt,<br />

dust, loose nails, <strong>and</strong> debris. Do not leave exposed for more<br />

than 45 days.<br />

• Guardian <strong>Roof</strong> <strong>Armor</strong> TM Poly <strong>Ice</strong> & H2O can be installed<br />

directly to the structural deck. Cut the membrane into<br />

manageable lengths, typically 10’ - 12’ (3.05m – 3.66m).<br />

On the eaves, align the membrane parallel to the roof edge,<br />

extending over by ¼” (6.35mm). On steep slope applications,<br />

it may be necessary to spot nail the top edge of the<br />

membrane temporarily during the installation process.<br />

Fold the membrane away from the edge onto itself <strong>and</strong><br />

remove the lower half of the release sheet, starting at the<br />

middle of the membrane to the edge. Place the membrane<br />

onto the deck with the self-adhesive side down <strong>and</strong> press<br />

firmly into place. Material should be applied over the drip<br />

edge on the eaves. If the top edge is spot nailed, remove the<br />

nails <strong>and</strong> fold membrane toward the roof edge, over itself.<br />

Remove the release sheet <strong>and</strong> lay the top half of the<br />

membrane flat on the deck, self-adhesive side down.


APPLICATION continued<br />

• Press firmly into place. Repeat process as needed,<br />

overlapping additional courses at least 3” (7.62cm)<br />

on the edges <strong>and</strong> at least 6” (15.24cm) on end laps.<br />

For added protection, <strong>and</strong> to enhance end lap<br />

integrity, a modified bitumen adhesive should be<br />

used under all overlaps.<br />

• On rake edge, overlap eave material a minimum<br />

of 6”. Align the membrane parallel to the rake,<br />

extending over the roof edge by ¼” (6.35mm).<br />

Install per instructions above. Apply drip edge over<br />

membrane after material is adhered.<br />

• Smooth shank galvanized nails are recommended<br />

for fastening shingles. Do not overdrive nails.<br />

DETAILS<br />

PROPERTY TEST METHOD MINIMUM VALUE*<br />

Tensile Strength ASTM D 412 30 lbs/in (psi)<br />

Elongation<br />

(rubberized asphalt)<br />

ASTM D 412 250%<br />

Low Temperature Flexibility<br />

-25<br />

ASTM D 1970 Unaffected<br />

oF (-32oC) Adhesion to Plywood ASTM D 903 9 lbs/in (528 N/M)<br />

Permeance ASTM E 96 0.01 perms (max)<br />

* All values are approximate<br />

• At valleys, a continuous sheet shall be centered in<br />

the valley <strong>and</strong> overlapped by each course a minimum<br />

of 6” (15.24 cm).<br />

• When Guardian <strong>Roof</strong> <strong>Armor</strong> TM Poly <strong>Ice</strong> & H2O is<br />

to be adhered to any metal surface, priming with<br />

asphalt primer meeting ASTM D41 is required.<br />

• All roof penetrations shall be sealed with a modified<br />

bitumen adhesive.<br />

TECHNICAL DATA<br />

Guardian <strong>Roof</strong> <strong>Armor</strong> TM Poly <strong>Ice</strong> & H20<br />

B B M<br />

<strong>Roof</strong>ing That Lasts<br />

DETAILS continued<br />

• Proper roof ventilation per applicable local <strong>and</strong> state<br />

building codes is required.<br />

• Where vertical walls meet the roof, Guardian <strong>Roof</strong><br />

<strong>Armor</strong> TM Poly <strong>Ice</strong> & H2O shall turn up a minimum of<br />

8” on to the vertical wall.<br />

SAFETY, STORAGE AND HANDLING<br />

• Pallets of Guardian <strong>Roof</strong> <strong>Armor</strong> TM Poly <strong>Ice</strong> & H2O shall<br />

not be double stacked on the job site. Provide cover<br />

on top <strong>and</strong> sides, allowing for adequate ventilation.<br />

• Store in an upright position.<br />

• Consult the Material Safety Data Sheet for best<br />

available information on the safe h<strong>and</strong>ling, storage,<br />

personal protection, health <strong>and</strong> environmental<br />

considerations.<br />

STANDARDS AND CODE LISTINGS<br />

• ASTM D 1970 St<strong>and</strong>ard <strong>Ice</strong> Dam Underlayment<br />

• Florida Building Code Approved: 9840.1<br />

WARRANTY INFORMATION<br />

1652 South Lee Hwy., Clevel<strong>and</strong>, TN 37311<br />

1-800-728-4010 FAX: 423-728-3066 www.bestbuymetals.com<br />

Warranty information is posted on www.bestbuymetals.com.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!