Introduction<br />

General Joist<br />

Information<br />

Economical<br />

Design Guide<br />

Top Chord<br />

Ext., K-Series<br />

KCS <strong>Joists</strong> Joist Substitutes<br />

& Outriggers<br />

Joist LRFD<br />

Load Tables<br />

Joist ASD<br />

Load Tables<br />

Load/Load<br />

Weight Tables<br />

Joist Girder<br />

Weight Tables<br />

SJI St<strong>and</strong>ard<br />

Specifications<br />

SJI Code of<br />

St<strong>and</strong>. Practice<br />

Fire Resistance<br />

Ratings<br />

OSHA Safety<br />

St<strong>and</strong>ards<br />

SJI Bridging Tables<br />

TABLE 5.4-1<br />

NUMBER OF ROWS OF TOP CHORD BRIDGING - K-Series**<br />

Refer to K-Series Load Table <strong>and</strong> Specification Section 6 for required bolted diagonal bridging.<br />

Distances are Joist Span lengths in feet - See “Definition of Span” on page 27.<br />

Section # * Joist Depth One Row Two Rows Three Rows Four Rows<br />

1 All Up thru 17 Over 17 thru 26 Over 26 thru 28<br />

2 All Up thru 21 Over 21 thru 30 Over 30 thru 32<br />

3 All Up thru 18 Over 18 thru 26 Over 26 thru 40<br />

4 All Up thru 20 Over 20 thru 30 Over 30 thru 41 Over 41 thru 48<br />

5<br />

12K thru 24K<br />

26K<br />

Up thru 20<br />

Up thru 28<br />

Over 20 thru 30<br />

Over 28 thru 41<br />

Over 30 thru 42<br />

Over 41 thru 52<br />

Over 42 thru 48<br />

6<br />

14K thru 24K<br />

26K <strong>and</strong> 28K<br />

Up thru 20<br />

Up thru 28<br />

Over 20 thru 31<br />

Over 28 thru 41<br />

Over 31 thru 42<br />

Over 41 thru 54<br />

Over 42 thru 48<br />

Over 54 thru 56<br />

7<br />

16K thru 24K<br />

26K thru 30K<br />

Up thru 23<br />

Up thru 29<br />

Over 23 thru 34<br />

Over 29 thru 44<br />

Over 34 thru 48<br />

Over 44 thru 60<br />

8<br />

24K<br />

26K thru 30K<br />

Up thru 25<br />

Up thru 29<br />

Over 25 thru 39<br />

Over 29 thru 44<br />

Over 39 thru 48<br />

Over 44 thru 60<br />

9<br />

16K thru 24K<br />

26K thru 30K<br />

Up thru 22<br />

Up thru 29<br />

Over 22 thru 34<br />

Over 29 thru 44<br />

Over 34 thru 48<br />

Over 44 thru 60<br />

10<br />

18K thru 24K<br />

26K thru 30K<br />

Up thru 22<br />

Up thru 29<br />

Over 22 thru 38<br />

Over 29 thru 48<br />

Over 38 thru 48<br />

Over 48 thru 60<br />

11<br />

22K<br />

30K<br />

Up thru 24<br />

Up thru 34<br />

Over 24 thru 39<br />

Over 34 thru 49<br />

Over 39 thru 44<br />

Over 49 thru 60<br />

12<br />

24K<br />

26K thru 30K<br />

Up thru 25<br />

Up thru 29<br />

Over 25 thru 43<br />

Over 29 thru 47<br />

Over 43 thru 48<br />

Over 47 thru 60<br />

Joist Depth<br />

TABLE 2.7-3<br />

LH & DLH - SERIES JOISTS<br />

HORIZONTAL PLUS DIAGONAL BRIDGING REQUIREMENTS<br />

Minimum Joist Space for<br />

Diagonal Only Bridging<br />

(0.70 x Joist Depth)<br />

Discover the easiest way to specify steel <strong>joist</strong>s <strong>and</strong> Joist <strong>Girders</strong>:<br />

8 www.newmill.com/digital-tools<br />

Horizontal <strong>and</strong> Diagonal Bridging<br />

Minimum Angle Size Required*<br />

52 3’ - 0” L 1 x 1 x 7/64<br />

56 3’ - 3” L 1 x 1 x 7/64<br />

60 3’ - 6” L 1 x 1 x 7/64<br />

64 3’ - 8” L 1 1/4 x 1 1/4 x 7/64<br />

68 3’ - 11” L 1 1/4 x 1 1/4 x 7/64<br />

72 4’ - 2” L 1 1/4 x 1 1/4 x 7/64<br />

80 4’ - 8” L 1 1/4 x 1 1/4 x 7/64<br />

88 5’ - 1” L 1 1/2 x 1 1/2 x 7/64<br />

96 5’ - 7” L 1 1/2 x 1 1/2 x 7/64<br />

104 6’ - 0” L 1 3/4 x 1 3/4 x 7/64<br />

112 6’ - 6” L 1 3/4 x 1 3/4 x 7/64<br />

120 7’ - 0” L 2 x 2 x 1/8<br />

* When <strong>joist</strong> span is greater than 60’-0” <strong>and</strong> <strong>joist</strong> space is less than space shown (0.70 x Joist Depth), bolted horizontal bridging<br />

is required in addition to bolted diagonal bridging.<br />

TABLE 2.7-4<br />

BOLT SIZES WHICH MEET BOLTED BRIDGING<br />

CONNECTION REQUIREMENTS<br />

Joist Series Section Number* Bolt Diameter <strong>and</strong> Grade<br />

K ALL 3/8” A307<br />

LH/DLH 2 thru 12 3/8” A307<br />

LH/DLH 13 thru 17 1/2” A307<br />

DLH 18 thru 20 5/8” A307<br />

DLH 21 <strong>and</strong> 22 5/8” A325<br />

DLH 23 thru 25 3/4” A325<br />

* Refer to last digit(s) of st<strong>and</strong>ard SJI <strong>joist</strong> designation.<br />

Note: Washers shall be used with slotted or over-sized holes. Bolts shall be tightened to a minimum snug tight condition.<br />

* Refer to last digit(s) of st<strong>and</strong>ard SJI <strong>joist</strong> designation.<br />

** See Section 5.11 for additional bridging required<br />

for uplift design.<br />

OSHA TABLES A <strong>and</strong> B<br />

ERECTION BRIDGING<br />

Joist Span Joist Span<br />

12K1 23’ - 0” 30K9 45’ - 0”<br />

14K1 27’ - 0” 30K10 50’ - 0”<br />

16K2 29’ - 0” 30K11 52’ - 0”<br />

16K3 30’ - 0” 30K12 54’ - 0”<br />

16K4 32’ - 0” 18KCS2 35’ - 0”<br />

16K5 32’ - 0” 20KCS2 36’ - 0”<br />

18K3 31’ - 0” 20KCS3 39’ - 0”<br />

18K4 32’ - 0” 22KCS2 36’ - 0”<br />

18K5 33 - 0” 22KCS3 40’ - 0”<br />

18K6 35’ - 0” 24KCS2 39’ - 0”<br />

20K3 32’ - 0” 24KCS3 44’ - 0”<br />

20K4 34’ - 0” 26KCS2 39’ - 0”<br />

20K5 34’ - 0” 26KCS3 44’ - 0”<br />

20K6 36’ - 0” 28KCS2 40’ - 0”<br />

20K7 39’ - 0” 28KCS3 45’ - 0”<br />

20K9 39’ - 0” 28KCS4 53’ - 0”<br />

22K4 34’ - 0” 28KCS5 53’ - 0”<br />

22K5 35’ - 0” 30KCS3 45’ - 0”<br />

22K6 36’ - 0” 30KCS4 54’ - 0”<br />

22K7 40’ - 0” 30KCS5 54’ - 0”<br />

22K9 40’ - 0” 18LH02 33’ - 0”<br />

24K4 36’ - 0” 20LH02 33’ - 0”<br />

24K5 38’ - 0” 20LH03 38’ - 0”<br />

24K6 39’ - 0” 24LH03 35’ - 0”<br />

24K7 43’ - 0” 24LH04 39’ - 0”<br />

24K8 43’ - 0” 24LH05 40’ - 0”<br />

24K9 44’ - 0” 24LH06 45’ - 0”<br />

26K5 38’ - 0” 28LH05 42’ - 0”<br />

26K6 39’ - 0” 28LH06 46’ - 0”<br />

26K7 43’ - 0” 28LH07 54’ - 0”<br />

26K8 44’ - 0” 28LH08 54’ - 0”<br />

26K9 44’ - 0” 32LH06 47’ - 0”<br />

26K10 49’ - 0” 32LH07 47’ - 0”<br />

28K6 40’ - 0” 32LH08 55’ - 0”<br />

28K7 43’ - 0” 36LH07 47’ - 0”<br />

28K8 44’ - 0” 36LH08 47’ - 0”<br />

28K9 45’ - 0” 36LH09 57’ - 0”<br />

28K10 49’ - 0” 40LH08 47’ - 0”<br />

28K12 53’ - 0” 40LH09 47’ - 0”<br />

30K7 44’ - 0” 44LH09 52’ - 0”<br />

30K8 45’ - 0”<br />

<strong>Joists</strong> not listed above do not require OSHA<br />

erection bridging through spans per SJI<br />

Specifications 5.2 <strong>and</strong> 104.2 or 60’-0”.