<strong>Gascat</strong> – Indústria e Comércio Ltda<br />

<strong>GIPS</strong> - <strong>Fail</strong> <strong>Close</strong> <strong>Series</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual


<strong>Gascat</strong> Ind Com Ltda<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

CONTENTS<br />

1 – RELEVANT INSTRUCTIONS PRIOR TO COMMISSIONING Page 3<br />

2 – HEALTH AND SAFETY Page 3<br />

3 – INTRODUCTION Page 4<br />

MI-34<br />

4 – PRINCIPLE OF OPERATION Page 4 and 5<br />

5 – CHARACTERISTICS Page 6<br />

6 – INSTALLATION Page 6 and 7<br />

7 – OPERATION (START-UP) Page 7 to 19<br />

8 – STORAGE Page 20<br />

9 – GENERAL RECOMMENDATIONS Page 20<br />

10 – MAINTENANCE Page 21<br />

11 – WARRANTY Page 21<br />

12 – VALVE DRAWING AND SPARE PART LIST Page 22 to 24<br />

13 – SET POINT ADJUSTMENT TOOLS Page 25 to 27<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 2 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

1 – RELEVANT INSTRUCTIONS PRIOR TO COMMISSIONING<br />

It shall be clearly understood that the information given in the Commissioning Instructions that follows do not<br />

intend to revoke or substitute the instructions set by any pertinent entity. References will be made to applicable<br />

Standards and/or existing recommendations on the subject.<br />

Before commissioning starts the execution of applicable “Cleaning and Purification Procedures” are implied,<br />

which are applicable to all instructions on “Pressurization” and the “Standards for Labor Health and Safety”, which<br />

shall be strictly adhered to.<br />

Valve suppliers advices, such as: “open slowly”, or “open very slowly”, shall be strictly followed.<br />

2 – HEALTH AND SAFETY<br />

Regulators, valves and other pressurized components containing poisonous or flammable gases, or other<br />

hazardous products, are potentially dangerous if not correctly operated and maintained. It is mandatory that all<br />

users of such equipment are properly trained and guided on potential dangers, and assurance is necessary that all<br />

personnel responsible for installation, testing, commissioning, operation, and maintenance of the plant are qualified<br />

to do their jobs. Instruction manuals are provided to guide operators, but it is supposed that the same already have<br />

a basic knowledge level. If any doubt remains, or if there is ambiguity on the correct procedures, ask <strong>Gascat</strong> on the<br />

correct proceeding. We will be pleased to explain the corresponding instructions or provide the corresponding<br />

service. TAKE NO RISKS. Our telephone, fax number and e-mail follows:<br />

<strong>Gascat</strong> Indústria e Comércio Ltda.<br />

Rodovia SP 73, 1141 – Indaiatuba, SP, Brazil.<br />

13347-390 – Brazil<br />

Phone: 55 19 3936-9300<br />

Fax: 55 19 3935-6009<br />

Email: vendas@gascat.com.br<br />

The comments below, although abridged, provide guidance on possible hazards to health and safety.<br />

2.1 – NOISE<br />

Regulators, valves and other pressure reducers can produce high noise levels, which can be harmful to<br />

person exposed to them for long time periods. Users shall assure themselves that appropriate precautions are<br />

taken to provide safety to employees’ health and/or third parties, according to applicable standards and<br />

recommendations in force.<br />

2.2 – INSTALLATION<br />

All equipments, piping and vessels are designed to support mechanical stresses, as torque and bending<br />

moment, in addition to the internal pressure. However, great care shall be exercised during installation not to apply<br />

excessive strain that could cause cracks that may result in serious break down when the regulator is put into<br />

operation. Excessive stress can also be caused by unbearable length of piping, which should be appropriately<br />

supported.<br />

All regulators, shutoff valves, relief valves, etc., shall be installed with the correct flow direction.<br />

Impulse lines are important components in any control system and it is essential for them to be correctly<br />

installed according to instructions.<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 3 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Impulse lines should be appropriately supported to reduce excessive vibration, which can cause fatigue<br />

breaking. They should also be positioned in such manner that they cannot serve as support to feet or hands.<br />

Impulse lines shall have a slight slope for liquids and condensates drain towards the main piping.<br />

Auxiliary systems should not be changed or modified without knowing the operation conditions and after<br />

permission of the responsible superior.<br />

2.3 – OPERATION<br />

Depending on the regulator type, its valve can be positioned as fully open. Consequently, when putting a<br />

regulator into operation, the shutoff valves shall be opened slowly so that the regulator valve to assume its<br />

regulating position. If valves are quickly opened, the upstream pressure can pass downstream through the<br />

regulator and over-pressurize downstream of the main line.<br />

All regulators, etc., shall operate with the regulating spring specified by the manufacturer. That is particularly<br />

important in relief or shutoff valves operation, since incorrect springs can hinder a relief valve to open, or a shutoff<br />

valve to close.<br />

Precautions should be taken to avoid water from entering through venting and breathing apertures.<br />

2.4 – MAINTENANCE<br />

Regulators and valves restrain gases with pressures several times larger than the atmospheric pressure.<br />

Before trying to investigate any problem or performing maintenance service in the equipment, they should be safely<br />

depressurized. Furthermore, as most gases can be flammable, poisonous, corrosive, i.e. dangerous, it may be<br />

necessary to purge the installation with an inert gas, as nitrogen. Special precautions are necessary for operation<br />

with gases as oxygen or hydrochloric gas and the user shall be sure that appropriate procedures were<br />

implemented.<br />

Eventually, it is not enough to isolate high-pressure device, since high pressures can be trapped downstream<br />

of the insulation valves. Do not try to remove covers, plugs, etc., before the item is properly freed. Even so, it is<br />

advisable to consider that high-pressure gas can be trapped when removing covers and plugs.<br />

Most regulators use spiral springs as the loading device. It is important to reduce the load on these springs by<br />

moving their pressing device backward as much as possible. In some cases, a residual load may be left, even with<br />

the spring released to the end of its housing.<br />

3 – INTRODUCTION<br />

<strong>GIPS</strong> valves function is to protect gas nets, equipment, and downstream installations, from a pressure<br />

increase, away from the adjusted set point. Also is a fail close valve, in case the pressure at the sense connection<br />

(actuator) droops, the <strong>GIPS</strong> will instantly closes. This set can be adjusted up to 6 bar. This characteristic protects<br />

the installation from a pressure droop at the line or a damage at the sense connection.<br />

<strong>GIPS</strong> valves have instantaneous shut-off, complete tightness, manual reset, low load loss, wide regulation<br />

range, and easy installation.<br />

4 – PRINCIPLE OF OPERATION<br />

The valve mechanism (see detail drawing on page 5, below). Where the porthole lock is not linked to the<br />

actuator stem, which, in this case, cannot be regulated. This mechanism is independent of the lock and insulated<br />

from the valve body internal pressure, with its movement being transmitted by the actuator block to the actuator pin<br />

as a hammer.<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 4 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

The security shut-off valves <strong>GIPS</strong>-FC have an actuator with spheres holder accomplish connected to<br />

the sensor Setting element the adjustment and this nut oneallows is sensitive precision to the adjustment downstream of the pressure set point and for the reset. following Basic setting cases: is made at the<br />

a) factory. downstream However, increase in case pressure of maintenance, beyondor thespring set limit, change, it will be necessary to readjust the regulating nut.<br />

b) in case For initial of diaphragm adjustment, rupture, we suggested the following procedure:<br />

c) in case of sensing tubings ruptures,<br />

d) downstream With pressure an assembled bellow the set, setbut limit. without the spring cover, pressing the diaphragm assembly, reset the<br />

As pervalve. the sense of any above case under the diaphragm/piston the tripping bush moves to the release<br />

position with the Keeping ball mechanism the diaphragm disengaging assembly the pressed, valve stem turn diaphragm to close thenut control counterclockwise, element. until it becomes<br />

After normal disarmed. external control pressure has been restored the valve actuator must be manually reset<br />

and after that, Adjust the valve the must height be of rearmed the regulating to thenut, open turning position diaphragm .To able nut the now reset in the theclockwise upstreamdirection, and downstream by three<br />

pressures must to be eight equalized turns. by a bypass valve.<br />

Note: The instruction for adjustment of the regulating nut given above does not apply to the 12” model.<br />

For valves with Ø3” and 4” there is a retention device used as a limit for the reset lever that during set point<br />

and repeatability adjustments, may be used to avoid total valve blocking and flow interruption, therefore allowing<br />

tests performance without suspending gas supply.<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 5 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

5 – CHARACTERISTICS<br />

Self-operated by a spring;<br />

Manual reset;<br />

Internal or external bypass (depending on the pressure class and on the valve size);<br />

Fittings: 1”, 2”, 3”, 4”, 6”, 8” and 12” flanged body for classes 150/300/600# RF or RTJ, according to<br />

ANSI B.16.5, and 1” NPT – F taped body (BSP or BSPT as option);<br />

<strong>GIPS</strong>H – <strong>Close</strong>s by pressure increase in the range of 0,2 to 16 bar;<br />

<strong>GIPS</strong>PH – <strong>Close</strong>s by pressure increase in the range of 12,2 to 57 bar;<br />

6 – INSTALLATION<br />

MI-34<br />

6.1 – Filter<br />

We recommended the installation of a basket type filter of 150 mesh (minimum), as close as possible to the<br />

inlet of the <strong>GIPS</strong> blocking valve. A careful filter installation is essential to the perfect operation of the equipment,<br />

because eventual particles existing in the piping can lodge themselves between the seat and the shutter, damaging<br />

them and provoking direct flow passage.<br />

6.2 – Cleaning<br />

Check pipe cleaning before the regulator installation. We recommended a complete purge of the line with<br />

nitrogen or compressed air.<br />

6.3 – Flow direction and recommended installation<br />

Check the valve flow direction before installation.<br />

Check in the schematic drawing below, the typical recommended assembly option.<br />

6.4 – Impulse intake<br />

Install the <strong>GIPS</strong> impulse intake downstream of the pressure regulator (Ø 3/8” or ½” tube fitting) at a minimum<br />

distance of 3 times the nominal pipe diameter, in a piping section free from obstructions, at a pipe diameter position<br />

where the gas speed does not surpass 20 m/s (considering the minimum output pressure and maximum flow).<br />

6.5 – Other important devices for a safe installation (see ABNT NBR 12313, DIN EN 12279, DIN EN<br />

12186)<br />

A safe installation shall contain, at least (see outline drawing proposed below):<br />

1. Manual blocking valve (ball type, or similar).<br />

2. Filter with drain.<br />

3. Pressure gauge to read the input pressure.<br />

4. Automatic shut-off valve (<strong>GIPS</strong> model).<br />

5. Pressure regulator.<br />

6. Partial relief valve (<strong>Gascat</strong> Junior model).<br />

7. Pressure gauge to read the output pressure.<br />

8. Purge valve, Ø ½”.<br />

9. Manual blocking valve (ball type, or similar).<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 01 00 6 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

7 – OPERATION (START-UP)<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

The <strong>GIPS</strong> is supplied with the obturator and actuator on the closed position (disarmed). The springs are<br />

regulated at factory. See Detail drawing 1.<br />

To set the valve to the armed position or open position (ready to run), connect the sense line on the<br />

actuator chamber until the pressure reach 1bar above the fail close set point. Pull the stem, M5 thread to<br />

up until a slight ‘click’ sound. See Detail drawing 2. See picture 1.<br />

At this position, the top of the stem extremity will be almost parallel to the cover face. See Detail drawing 3.<br />

Use the handspike supplied with the valve to make the obturator rearm. See Detail drawing 4.<br />

To make the valve disarm for over pressure, increase the pressure at the sense line until the set point pre<br />

adjusted at factory, at this moment should occur the obturator disarm, blocking the gas passage. See<br />

Detail drawing 5.<br />

To rearm the actuator and the obturator, droop the pressure from 1 to 2 bar bellow the high set point, and<br />

pull the actuator stem up until a slight ‘click’ sound. Use the lever to rearm turning it ¼ lap.<br />

Picture 1 and 2. illustrate the adjustment to the armed position.<br />

Pictures 3 and 4 illustrate the low (fail close) set point adjustment (from 4 to 6 bar)<br />

Pictures 5 and 6 illustrate the high (over pressure) set point adjustment.<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 01 00 7 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

IMPORTANT NOTICE:<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

Do not try rearm (reset) the obturator, without first rearm the actuator.<br />

Do not try rearm the actuator if the pressure is bellow 25% from the high pressure set point.<br />

MI-34<br />

For the Ø12" model the reset lever was substituted by a handwheel coupled to a reduction box, in order to<br />

ease the effort of the reset operation. Before the reset operation, the actuador stem shall be repositioned.<br />

To do this, with the aid of the upper part of the external cap thread assembled in the threaded end of the<br />

actuator stem, to pull the assembly until it locks in the upper position. Confirm the stem repositioning by<br />

forcing the stem down (it should not return to its initial position – the position it had before repositioning).<br />

It will not be possible to reset the valve if the line is under pressure. In this case, it will be necessary to<br />

equalize the shutter pressure by opening the bypass valve in its body, which can be of push-button or ball<br />

type (depending on the valve size and pressure class).<br />

The valve (<strong>GIPS</strong>) can be reset if the pressure at the impulse input (control line), is approximately 10%<br />

below the adjustment pressure or lower.<br />

Open the gas inlet slowly.<br />

7.1 – Blocking adjustment and tightness verification<br />

Press the shut-off valve spring, by approximately 70% of the spring total travel, through the pressing disk,<br />

which is accessed by the cap located in the upper part of the cover (for low pressure shut-off valves) or by<br />

the regulating screw in upper part of the cover (for high pressure shut-off valves).<br />

Reset the shut-off valve (see item 7 procedures)<br />

With the purge valve closed, adjust the regulator output pressure to trigger at the desired blocking value.<br />

Slowly release the spring pressing disk of the shut-off valve, until it triggers. This can be noticed by the<br />

rotation of the reset lever.<br />

Open the Purge Valve, depressurizing the system downstream of the regulator.<br />

<strong>Close</strong> the Purge Valve, await for approximately for 2 minutes, to check tightness of the shut-off valve.<br />

Under this condition, no pressure increase can occur, and the downstream pressure gauge shall indicate<br />

zero pressure.<br />

For <strong>GIPS</strong>, reduce the regulator adjustment pressure.<br />

Open the by pass valve, located in the shut-off valve for pressure equalization.<br />

Reset the shut-off valve with the reset lever.<br />

Repeat the valve trigger operation, to certify the repeatability of the same and make minor adjustment until<br />

get ascertained that the valve is operating satisfactorily.<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 01 00 8 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

Detail drawing 1.<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 01 00 9 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

Detail drawing 2.<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 01 00 10 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

Detail drawing 3.<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 01 00 11 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

Detail drawing 4.<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 12 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

Detail drawing 5.<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 01 00 13 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

Picture 1.<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 01 00 14 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

Picture 2.<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 15 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

Picture 3.<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 01 00 16 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

Picture 4.<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 01 00 17 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

Picture 5.<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 18 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

Picture 6.<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 19 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

8 – STORAGE<br />

Regulators and valves shall not suffer mechanical shocks, under risk of damaging internal components.<br />

Regulators and valves shall be stored in a clean and dry place, protected from bad weather.<br />

MI-34<br />

9 – GENERAL RECOMMENDATIONS<br />

We test all our regulators and valves at the requested operation conditions.<br />

The criteria and maintenance steps are contained in handbooks, however, in case of any usage, operation<br />

or maintenance doubt contact <strong>Gascat</strong>’s technical department that will provide proper guidance.<br />

<strong>Gascat</strong> can supply, on request, the complete replacement kit.<br />

10 – MAINTENANCE<br />

For the requested supply conditions to be maintained unaffected, the <strong>GIPS</strong>/GDPS valves should be submitted<br />

to preventive revisions, whose frequency will be a function of flow, the gas dirt, and the work regime of the<br />

installation.<br />

Direct passage (pressure<br />

increase after the valve<br />

blocking).<br />

Defect Probable Cause Solution<br />

Gas passage through the cover<br />

vent.<br />

Gas passage through the<br />

bypass pressure-equalizing<br />

valve.<br />

Gas passage through the seal<br />

sealing ring.<br />

Seat O-ring (Item 12)<br />

Stem obturator O-ring<br />

(Item 4)<br />

Gas passage between seat and<br />

shutter. Obturator (Item 17),<br />

Seat (Item 16)<br />

Piston O´rings damage (Items<br />

5, 7 and 15)<br />

If the bypass is of the internal push-button type<br />

substitute the valve o-rings.<br />

If the bypass is external substitute the bypass ball<br />

valve.<br />

Replace the O-ring.<br />

Clean the seat and shutter. Check for any damage<br />

signal, or for irregular deformation.<br />

If confirmed, substitute the damaged part.<br />

Replace O´ring. (Not necessary remove pressure<br />

and valve from pipeline)<br />

11 – WARRANTY<br />

We warrant our products, for a 12 months period from the date of invoicing, if the products are in operation,<br />

extending the warrant up to 18 months, in case they are in stock. Such warranty only covers those cases for which<br />

the occurrence of production defects are evidenced, which remained unnoticed at the time the product delivery.<br />

To present warranty is not valid if it is found that the defect or mishap was caused by accident, normal wear,<br />

inadequate installation, improper maneuvering or use, inadequate storage, assembly disregarding technical<br />

standards or if the buyer undertook repairs or changes in equipment by himself, without the manufacturer's<br />

previous authorization.<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 20 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

MI-34<br />

The information contained in this manual contains <strong>Gascat</strong>'s supply conditions, independently of the verified<br />

performance.<br />

The information herein contained shall not be interpreted or suggest performance warranty in relation to the<br />

final products, or the system usage purpose, nor should they serve as usage recommendation for any product or<br />

process mentioned in the specifications. This system should only be operated by qualified technician trained for<br />

this purpose; and no changes that may affects the system safety can be executed without our previous<br />

authorization.<br />

<strong>Gascat</strong> Ind e Com. Ltda. withholds the right to make changes without notice, introducing improvements in the<br />

described products drawings or specifications.<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 21 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

12 – VALVE DRAWING AND SPARE PART LIST<br />

<strong>GIPS</strong> 6” N.D.<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 01 00 22 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

NOTE: Items of the spare kit<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

<strong>GIPS</strong> 6” N.D.<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 23 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

532<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

<strong>GIPS</strong> 6” N.D. – MAIN DIMENSIONS<br />

505<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 24 of 27<br />

309


<strong>Gascat</strong> Ind Com Ltda<br />

13 – SET POINT ADJUSTMENT TOOLS<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

REARM TOOL<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 25 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

LOW SET POINT ADJUSTMENT TOOL<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 26 of 27


<strong>Gascat</strong> Ind Com Ltda<br />

<strong>GIPS</strong> <strong>Series</strong> – <strong>Fail</strong> <strong>Close</strong> <strong>Shut</strong>-<strong>Off</strong> <strong>Valves</strong><br />

<strong>Installation</strong>, Maintenance, and Operation Manual<br />

HIGH SET POINT ADJUSTMENT TOOL<br />

MI-34<br />

Prepared by Ver. / Approved by Quality Control (CSQ) Date Revision Page<br />

Gustavo Nieto Vanizio Lizo / C.S. Rubens Ribeiro August August01, 13,2008<br />

2007 00 01 27 of 27