APPENDIX 8A - National Infrastructure Planning
APPENDIX 8A - National Infrastructure Planning
APPENDIX 8A - National Infrastructure Planning
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
station. The ponds within the route corridor are fishing ponds and considered to provide suboptimal<br />
conditions for newts. The pond east of the power station appears to be a SuDS<br />
waterbody related to the roundabout, this has a mix a reed and open water and appears to<br />
provide potentially suitable newt habitat. To date no records of great crested newt have been<br />
identified in the area.<br />
1907.054 3