station. The ponds within the route corridor are fishing ponds and considered to provide suboptimal<br />

conditions for newts. The pond east of the power station appears to be a SuDS<br />

waterbody related to the roundabout, this has a mix a reed and open water and appears to<br />

provide potentially suitable newt habitat. To date no records of great crested newt have been<br />

identified in the area.<br />

1907.054 3