<strong>From</strong>: <strong>Laura</strong> <strong>Rainey</strong><br />
<strong>To</strong>: <strong>Jennings</strong>, <strong>Stephanie</strong>; <strong>Jones</strong>, John<br />
CC: Bain, Andrew; Malinowski, Mark; Tidwell, Matthew<br />
Date: Tuesday - September 13, 2011 11:30 AM<br />
Subject: Fwd: Addendum #6 to Master Field Sampling Plan<br />
Stephie,<br />
The Department of <strong>To</strong>xic Substances Control (DTSC) reviewed Addendum No. 6 to the Master Work<br />
Plan/Field Sampling and Analysis Plan, Co-Located Chemical Soil Sampling at Area IV, Santa Susana Field<br />
Laboratory (SSFL), EPA Subareas 3, 5D South, 7, and 8 South, Soil Sampling (Addendum No. 6, CDM<br />
Federal Programs Corporation, September 2011). Addendum No. 6 supports field implementation of the<br />
soil sampling program described in the DTSC-approved Master Work Plan/Field Sampling and Analysis<br />
Plan (FSAP), Co-Located Chemical Sampling at Area IV, SSFL (CDM, 2011).<br />
The draft Addendum No. 6 was submitted to DTSC for review on August 31, 2011. Addendum No. 6 was<br />
revised to incorporate DTSC's <strong>com</strong>ments, and was resubmitted on September 13, 2011 for DTSC<br />
concurrence and approval. DTSC concurs with the revisions and approves the final Addendum No. 6 for<br />
implementation. Please note, EPA and DTSC are copied on this email for posting of this DTSC-approved<br />
Addendum No. 6 to their respective web sites.<br />
Due to the expedited schedule for preparation, review and implementation of the Addendum No. 6, the<br />
document may contain minor omissions or errors. If additional relevant information be<strong>com</strong>es available<br />
that warrants changes, and/or changes to the field implementation, or quality assurance efforts are<br />
made in the field, those changes shall be coordinated with DTSC, documented, and provided in the<br />
associated data report.<br />
If you have any questions regarding this approval, please don't hesitate to contact me at (714) 484-5434<br />
or Mr. Mark Malinowski at (916) 255-3717.<br />
Thank you,<br />
<strong>Laura</strong> <strong>Rainey</strong>
<strong>Laura</strong> <strong>Rainey</strong>, P.G.<br />
Senior Engineering Geologist<br />
California Department of <strong>To</strong>xic Substances Control<br />
Brownfields and Environmental Restoration Program<br />
Cleanup Program, Office of Geology<br />
5796 Corporate Avenue<br />
Cypress, CA 90630<br />
(714) 484-5434 (phone)<br />
(714) 484-5411 (fax)<br />
lrainey@dtsc.ca.gov (email)<br />
>>> "<strong>Jennings</strong>, <strong>Stephanie</strong>" 9/13/2011 10:56 AM >>><br />
<strong>Laura</strong>:<br />
Attached to this email is Addendum No. 6 to the Master Field Sampling Plan for the chemical co-located<br />
sampling in HSA Groups 3, 7, 8S, and 5DS. This addendum reflects the incorporation of all DTSC and<br />
stakeholder <strong>com</strong>ments from our meeting on August 17, 2011 with stakeholders. It also incorporates all<br />
of DTSC's additional <strong>com</strong>ments.<br />
If you concur and approve, please forward this Addendum to EPA for placement on their Sharepoint,<br />
place on DTSC's website and we will place on DOE's website.<br />
Thanks,<br />
Stephie <strong>Jennings</strong>, PMP<br />
Deputy Federal Project Director<br />
DOE-ETEC<br />
818-466-8162