May 2011 - Rappahannock Electric Cooperative
May 2011 - Rappahannock Electric Cooperative
May 2011 - Rappahannock Electric Cooperative
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Your <strong>Cooperative</strong> Offers<br />
Solutions to Keep Costs Down<br />
For over 30 years, REC has been offering<br />
voluntary demand-response programs that<br />
help control the <strong>Cooperative</strong>’s wholesale power<br />
costs and benefit the environment for future<br />
generations. In 1978, REC was one of the first<br />
electric cooperatives to begin installing load<br />
management switches on electric water heaters<br />
to manage the demand for electricity during<br />
peak periods of electric usage. In 2010, REC<br />
offered another solution to members by<br />
encouraging them to enroll in the air conditioning<br />
load management program. Through members’<br />
voluntary participation, you have helped<br />
save your <strong>Cooperative</strong> over $65 million in<br />
wholesale power costs and reduced the<br />
demand for electricity, which delays the need<br />
for additional power-generation resources.<br />
Load management switches installed on<br />
electric water heaters and air conditioning<br />
compressors allow the <strong>Cooperative</strong> to remotely<br />
cycle the unit on and off when energy is at<br />
its greatest demand. You can make a difference<br />
by participating in these programs.<br />
Over the past few years, REC has been<br />
communicating with you about the rising cost<br />
of wholesale power that we purchase to<br />
deliver electricity to your home. Together we<br />
can work to manage the demand and cost<br />
of wholesale electricity. In turn, our efforts<br />
may also help reduce greenhouse gases.<br />
Please join us by doing your part, then<br />
sit back and enjoy the peace of mind that<br />
comes with knowing you have helped the<br />
environment for this and future generations.<br />
When you receive correspondence from<br />
your <strong>Cooperative</strong> on how to enroll, please<br />
consider taking advantage of the opportunity. ●<br />
OFFICE CLOSING MEMORIAL DAY<br />
In honor of Memorial Day, our offices will be closed on<br />
Monday, <strong>May</strong> 30. If you experience an outage or power<br />
emergency during this time, our dispatch department is<br />
always available 24 hours a day to take your call.<br />
<strong>May</strong> <strong>2011</strong><br />
President &<br />
Chief Executive Officer:<br />
Kent D. Farmer<br />
Board of Directors:<br />
Chairman<br />
Richard C. Oliver<br />
Region VII<br />
Vice Chair<br />
Darlene H. Carpenter<br />
Region III<br />
Secretary<br />
Linda R. Gray<br />
Region VIII<br />
Treasurer<br />
William E. Lane<br />
Region IX<br />
William M. Alphin<br />
Region I<br />
Thomas T. Grady<br />
Region II<br />
A. Nash Johnston<br />
Region IV<br />
Frank B. Boxley, Jr.<br />
Region V<br />
William C. Frazier<br />
Region VI<br />
Michael W. Lindsay<br />
Director-at-Large<br />
Christopher G. Shipe<br />
Director-at-Large<br />
<strong>Rappahannock</strong> Currents:<br />
Local Pages Editor – Ann M. Lewis<br />
Staff Writer – Casey M. Hollins, CCC<br />
Contact Information:<br />
P.O. Box 7388<br />
Fredericksburg, VA 22404<br />
540.898.8500 / 800.552.3904<br />
office@myrec.coop<br />
www.myrec.coop 29