c. Provide certainty of execution that result from the presence of existing site<br />

infrastructure, the availability of gas <strong>and</strong> electric interconnections, <strong>and</strong> a<br />

beneficial location within the transmission system.<br />

3.<br />

Capable developers, operators <strong>and</strong> owners – A key goal of the <strong>Energy</strong> <strong>Highway</strong> initiative<br />

is to maximize the role of private investment in developing new energy infrastructure<br />

in new York. In general, new York should seek to partner with private companies<br />

that possess strong balance sheets, have excellent reputations within the banking<br />

community, <strong>and</strong> are willing to <strong>and</strong> capable of making financial commitments to the<br />

projects that they propose for inclusion in the <strong>Energy</strong> <strong>Highway</strong> initiative.<br />

Additional Information<br />

pRopeRty<br />

The site on which <strong>Bowline</strong> 3 will be constructed is part of the existing <strong>Bowline</strong> generation<br />

facility <strong>and</strong> is owned by a wholly-owned, indirect subsidiary of <strong>GenOn</strong> <strong>Energy</strong>, <strong>Inc</strong>.<br />

In general, the <strong>Bowline</strong> 3 site is ideally suited for large-scale construction <strong>and</strong> efficient<br />

operations that minimize the facility’s impact on neighboring communities given the<br />

following site characteristics:<br />

•<br />

•<br />

•<br />

•<br />

•<br />

•<br />

The <strong>Bowline</strong> 3 site has already been cleared, which will allow for the immediate<br />

commencement of foundation <strong>and</strong> other construction-related work;<br />

marine barges carrying heavy equipment have easy access to the site given<br />

<strong>Bowline</strong> 3’s direct frontage on the Hudson River;<br />

The plant’s existing bulkhead dock on <strong>Bowline</strong> Pond (which opens directly to the<br />

Hudson River) allows for safe, efficient unloading of heavy equipment delivered to the<br />

site via marine barge;<br />

<strong>Bowline</strong> 3 is located within 1 mile of csX rail siding, which provides an additional<br />

means of delivering other equipment to the site;<br />

Fuel is supplied to the site by an existing, fully permitted, 24 inch natural gas pipeline<br />

on property either owned by <strong>GenOn</strong> or part of existing utility rights of ways or easements<br />

granted to <strong>GenOn</strong>; <strong>and</strong><br />

Power from the site can be delivered to the electrical grid via a 345 kV transmission<br />

interconnect to be constructed on property either owned by <strong>GenOn</strong> or part of<br />

existing utility rights of ways or easements granted to <strong>GenOn</strong>.<br />