05.04.2013 Views

SAW CUTTING TENNIS COURTS

SAW CUTTING TENNIS COURTS

SAW CUTTING TENNIS COURTS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>SAW</strong> <strong>CUTTING</strong><br />

<strong>CUTTING</strong><br />

<strong>TENNIS</strong> <strong>TENNIS</strong> <strong>COURTS</strong><br />

Presentation By:<br />

Tom DeRosa<br />

Mike Mike Edgerton<br />

Matt Strom


Typical yp Crack on<br />

Asphalt Tennis Courts


Saw Cutting is<br />

Recommended Recommended for<br />

Courts in in a a Battery<br />

Battery


Stress Stress Relief Relief @ @ Posts<br />

Posts


Net Post Cracking g &<br />

Paving Joint Crack


Why do we want to Saw<br />

C Cut t i into t a new Asphalt A h lt<br />

Court?<br />

• It is the nature of Asphalt to<br />

shrink.<br />

• Asphalt will crack crack at at its its weakest<br />

point.<br />

•Let’s L LLet’s t’ tell t ll it it where h we want t it it to t<br />

crack. cac


Where do we make the Saw<br />

Cuts on a Tennis Court?<br />

• The h purpose of f S Saw C Cutting is to<br />

keep the Playing Area free of cracks.<br />

• At the h NET LINE LINE.<br />

• The most stress on an Asphalt p court<br />

is due to the tension from the Net<br />

Cable.<br />

• In BETWEEN <strong>COURTS</strong> because it is<br />

out of the playing area.


How deep p are the Saw<br />

Cuts?<br />

• It is recommended d d to Saw S Cut C at<br />

least through the Asphalt surface<br />

course.<br />

• It would still relieve relieve stress stress if the<br />

Saw Cut was only through the top<br />

lift to of Asphalt. sp at<br />

• Saw Cuts should be made from<br />

Fence to Fence.<br />

Fence


TYPICAL <strong>SAW</strong><br />

<strong>SAW</strong><br />

<strong>CUTTING</strong> <strong>CUTTING</strong> MACHINE<br />

MACHINE


Typical Typical Caulk Caulk Line Line Layout<br />

Layout


Saw Cutting Cutting Operation


Saw Cutting Cutting Operation<br />

Operation


Saw Cutting Operation


Depth of of Saw Cut?


When should we Saw<br />

Cut?<br />

• Saw Cutting can can be done after after the<br />

Courts are color color-coated. coated.<br />

• Saw Cutting can can be done prior prior to<br />

to<br />

Color Color-Coating. Coating.<br />

• Note: The surface must must be<br />

be<br />

properly cleaned.


Clean up p Operation p


Chain Gang<br />

Gang


What do we do after the<br />

Saw Cuts are made.<br />

• The surface needs to be washed<br />

clean of all dust and dirt.<br />

• A Backer Rod is recommended to put<br />

into into the the crack.<br />

• Sand or Screening may also be used.<br />

• Ca Caulking lking is is then then injected injected into into Saw Sa Cut C t<br />

until refusal.<br />

• More permanent crack overlay fabric<br />

systems


Installation of of Backer Backer Rod<br />

Rod


Completed Cut Cut w/Backer w/Backer Rod


What type yp of Caulking g is<br />

used?<br />

• Silicone Caulking can be used.<br />

• Acrylic Caulking Caulking is is recommended recommended so<br />

so<br />

as to allow the surface to be Painted<br />

with Color Color-Coating. Coating.<br />

• A Colored Caulking can be used but<br />

probably will will not not match match the the Court<br />

Court<br />

Surface.


Repairing Repairing Old Old Saw Saw Cuts<br />

Cuts


1 1 Year Year after after Saw Saw cutting<br />

cutting<br />

• When should the Saw Cuts be<br />

checked checked for maintenance?<br />

• Every Year before the winter.<br />

• It is recommended to Refill all<br />

Saw Cuts Cuts, to not allow water water to<br />

freeze in and under joints.


NO CRACKS ON<br />

PLAYING SURFACE


Saw Cutting g<br />

Between Courts


Saw Cut after resurfacing


Saw Cut before Maintenance


Saw Cut after<br />

Maintenance


Saw Cut @ Net Line


SSaw CCut t RRepair i @<br />

NNet t Line<br />

Li


No Effect to<br />

Playing Area


Intersecting Intersecting Saw Cutting


Battery of 4 Courts<br />

Stress Cracking Cracking began began to<br />

to<br />

occur @ net line after<br />

several years of<br />

i installation t ll ti<br />

Can we still Saw Cut?<br />

And d will ll it still ll help?<br />

h l


Stress Relief @ Net


6 Years After<br />

Saw S SSaw C Cutting<br />

tti


Saw Saw Cut Cut @ @ Net Only


3 Batteries Batteries of 2<br />

Back to Back<br />

Saw Cutting 7 Years Old


Saw Cut Between Courts


½” ½ Crack after 7 years


Relief from Net Post<br />

Footing


No Cracking g on Playing y g<br />

Surface


Saw Cut After 10 Years


22-1/2 1/2” 1/2 Opening


Saw Cut between Playing<br />

y g<br />

Area


Saw Saw Cut Cut After After 20 Years


4” 4 4” 4 Opening


Battery of 6 Courts<br />

14 Years Years Old<br />

Old


Saw Cut Between Courts


Saw Saw Cut Cut @ @ Net Line


11-1/4 1/4’’ 1/4 1/4’’ Opening


No Cracking g on Playing y g<br />

Surface


Saw Cutting g<br />

Asphalt


Questions & Answers

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!