06.04.2013 Views

UKRAINE Guideline Closure of Refuse Chutes - Ekopro.biz

UKRAINE Guideline Closure of Refuse Chutes - Ekopro.biz

UKRAINE Guideline Closure of Refuse Chutes - Ekopro.biz

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Capacity Building in Donetsk Oblast for Waste Management - Ukraine <strong>Guideline</strong>: <strong>Closure</strong> <strong>of</strong> <strong>Refuse</strong> <strong>Chutes</strong><br />

Consortium SOGREAH – PÖYRY GKW - ADEME Page 16 <strong>of</strong> 27<br />

7.2. Switch to a container system<br />

The scheme proposed by the project does not preview the use <strong>of</strong> refuse chutes and presupposes a<br />

transition to a SHW container system.<br />

The scheme in question can be introduced in 2 stages. During the first stage there will be an experiment<br />

at the selected territory. In future, provided that the results are positive, the scheme can be introduced at<br />

all buildings equipped with a refuse chute. The main actions to be taken in order to switch to this system<br />

are considered below.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!