06.04.2013 Views

New Minova Resin and Liner Systems - Minova International Inc.

New Minova Resin and Liner Systems - Minova International Inc.

New Minova Resin and Liner Systems - Minova International Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>New</strong> <strong>Minova</strong> <strong>Resin</strong> <strong>and</strong> <strong>Liner</strong> <strong>Systems</strong><br />

The Ground Support Company


2<br />

CarboPur LT<br />

Advanced resin injection technology<br />

for mining<br />

CarboPur LT is<br />

a major new<br />

advance in resin<br />

injection technology<br />

for mining<br />

applications<br />

where chemical<br />

reaction<br />

temperature is<br />

a concern for<br />

safety.<br />

Major features<br />

Low reaction temperature - safe to use in coal seams<br />

Controlled expansion - better yield + crack penetration<br />

Does not react with water in strata - no uncontrolled<br />

foam expansion<br />

High bonding <strong>and</strong> adhesive strength - improved consolidation<br />

properties<br />

Applied at 1:1 ratio - can use st<strong>and</strong>ard pump system<br />

<strong>New</strong> safe development<br />

<strong>Resin</strong> injection from <strong>Minova</strong> is a proven system for the<br />

consolidation of coal long wall face <strong>and</strong> ‘T’ junctions in<br />

modern mines with the benefits of increasing productivity<br />

<strong>and</strong> improving safety. Some coal seams are known to be<br />

prone to spontaneous combustion <strong>and</strong> in such cases the<br />

choice of injection resin system is crucial to maintain safety<br />

<strong>and</strong> prevent any chance of localised heating. For such difficult<br />

conditions <strong>Minova</strong> has developed a new resin,<br />

CarboPur LT, which offers all the high performance required<br />

of an injection resin but with a much lower <strong>and</strong><br />

controlled reaction temperature.<br />

Controlled foaming <strong>and</strong> expansion<br />

CarboPur LT can be formulated to give a foam factor from<br />

1 to 20 times expansion <strong>and</strong> so can be adjusted to suit individual<br />

customers requirements. Another major feature is<br />

that CarboPur LT is not effected by any water in the strata<br />

<strong>and</strong> so the expansion or foaming factor is not affected <strong>and</strong><br />

remains constant. This is important when uncontrolled<br />

resin expansion might cause collapse of the coal face.<br />

Simple application<br />

To make application easy the ratio of CarboPur LT has<br />

been maintained at 1:1 so that st<strong>and</strong>ard <strong>Minova</strong> injection<br />

pumps <strong>and</strong> equipment can still be used with this new<br />

technology. St<strong>and</strong>ard packers <strong>and</strong> injection accessories are<br />

used <strong>and</strong> the application process is the same as with any<br />

product in the <strong>Minova</strong> injection chemical range.<br />

Carbomine<br />

Ultra safe injection resin<br />

Carbomine, a phenolic injection resin, was first developed<br />

for the Australian coal market to stabilise underground<br />

rock formations. The resin is fully LOBA compliant <strong>and</strong><br />

meets strict safety <strong>and</strong> environmental st<strong>and</strong>ards.<br />

Carbomine has low viscosity to penetrate the fines cracks,<br />

low exothermic temperature <strong>and</strong> high bond strength to<br />

ensure geological stability. The two component system is<br />

mixed at a 4:1 ratio, which makes it ideal in combination<br />

with <strong>Minova</strong>’s cavity fill product, Carbofill, as the same<br />

pumping equipment can be used. The dual use of the<br />

same application pump ensures substantial time saving<br />

in set up for applications where both products are found<br />

advantageous to meet safety <strong>and</strong> production requirement.<br />

Carbomine has a very low exothermic temperature of less<br />

than 60 °C <strong>and</strong> during in underground field trials, neither<br />

phenol nor formaldehyde was detected. The excellent<br />

strata penetration <strong>and</strong> superior bond strength characteristics<br />

make Carbomine an ideal choice for underground<br />

application.<br />

Carbomine has recently had a very successful Australian<br />

underground application at Donaldson Coal’s Tasman Mine<br />

near <strong>New</strong>castle. Carbomine was injected into a rib line<br />

as a precautionary sealing measure to prevent spontaneous<br />

combustion after air passages through the coal pillar<br />

had found elevated heat. The application was successfully<br />

completed by experienced personnel from <strong>Minova</strong>’s NSW<br />

Operations <strong>and</strong> Technology teams.<br />

Advantages<br />

Low viscosity<br />

Low exothermic temperature<br />

High bond strength<br />

Compatible with other <strong>Minova</strong> systems


Tekcrib<br />

Supplementary Roof Support System<br />

The Tekcrib roof support system is designed as a viable al-<br />

ternative to conventional supplementary roof support in<br />

mine roadways <strong>and</strong> working zones. It is based upon <strong>Minova</strong>’s<br />

long experience with pump packing support products.<br />

Tekcrib is a non-combustible, simple <strong>and</strong> innovative roof<br />

support system using minimal installation time. Cylindrical<br />

grout containment bags (Ø 600 mm, 760 mm, or size to<br />

suit conditions) are secured to the mine roof <strong>and</strong> subsequently<br />

filled with Tekcrib foamed cementitious grout.<br />

A specially designed Tekplacer grout pump combines the<br />

Tekcrib pow-der with air <strong>and</strong> water at the correct ratios<br />

to produce the cementitious foam. The foam is typically<br />

pumped a distance of 300 m but much longer distances are<br />

possible. The mix begins to gel within minutes of entering<br />

the containment bag <strong>and</strong> cures to a final strength, typically<br />

from 3 - 6 MPa depending on site requirements.<br />

Advantages<br />

Safety – less exposure time in questionable situations/<br />

areas<br />

Ease of Use – ideal for difficult-to-reach areas<br />

Variable Strength – compressive strength 3 – 6 MPa<br />

Simple<br />

Full Surface Contact – conforms to irregularities on the<br />

roof <strong>and</strong> floor so not affected by point loading forces<br />

Fast Installation Speed – average installation rate of<br />

roughly 15 cribs per hour (600 mm dia. x 2 m height)<br />

High Strength – typical peak strength is 135 tons with<br />

similar residual strength; good yield typically at least<br />

400 mm of convergence is achieved<br />

Terraliner BH<br />

above: Terraliner BH applicated inside a<br />

blasthole<br />

left: Tekcrib, the supplementary roof support<br />

Blasthole lining for improved mining<br />

or tunnelling efficiency<br />

Terraliner is a unique system which can be applied as a<br />

liner to stabilise blastholes. The liner forms a semi-rigid<br />

coating which follows the shape of the blasthole adapting<br />

it’s imperfect shape. The product is applied using a specific<br />

spray application system suitable for upholes <strong>and</strong> downholes<br />

in underground <strong>and</strong> surface mining applications.<br />

Maintaining the integrity of blastholes is an important<br />

factor in efficient mining operations. Blastholes may<br />

become blocked from movements in ground or rock fragments<br />

loosening from nearby blasting activities. Premature<br />

closure of blastholes means additional costs <strong>and</strong> delays are<br />

incurred in redrilling or blast performance is compromised<br />

with associated downstream cost impacts.<br />

Terraliner is compatible with typical blasting agents used<br />

in the mining, tunnelling <strong>and</strong> construction industries. It<br />

has negligible impact on blast performance <strong>and</strong> is applied<br />

to dry <strong>and</strong> de-watered holes.<br />

Advantages<br />

The blasthole can be filled up to 6 months after drilling<br />

has been completed<br />

The membrane will protect the hole from intrusion of<br />

water<br />

Blasthole drilling programs can be executed seperately<br />

to blasting sequences<br />

Productivity <strong>and</strong> safety are improved<br />

3


Application in tunnelling (small picture) <strong>and</strong> mining<br />

Tekflex DS<br />

Innovative coating systems<br />

TEKFLEX DS is a thin sprayed liner used for stabilisation<br />

as well as sealing in tunnelling or underground mine<br />

workings. The polymer based liner features excellent<br />

properties regarding strength <strong>and</strong> flexibility. It increases<br />

the load capacity of the rock <strong>and</strong> forms a persistent<br />

membrane. The powder consists of mineral additives <strong>and</strong><br />

co-polymers <strong>and</strong> is mixed just with water prior to application.<br />

Recommended applications in Tunnelling<br />

Sealing of new shotcrete layers<br />

Sealing of pre-cast tunnel segments<br />

Stabilisation of tunnel portals <strong>and</strong> entries<br />

Recommended applications in Mining<br />

Drift sealing against gas <strong>and</strong> water ingress<br />

Sealing of a drift prior to grout injection<br />

Stabilisation of face <strong>and</strong> roof for securing against rock<br />

<strong>and</strong> coal slides during driving, <strong>and</strong> general maintenance<br />

<strong>and</strong> repair works<br />

Temporary face <strong>and</strong> roof stabilisation against rock <strong>and</strong><br />

coal slides at longwall/drift transition<br />

Securing of rock surface against alteration<br />

Before starting the<br />

application the surface<br />

to be sprayed on<br />

should be thoroughly<br />

cleaned to remove<br />

any dust <strong>and</strong> loose<br />

particles.<br />

TEKFLEX DS can be<br />

applied on dry as<br />

well as on humid<br />

surfaces, but any<br />

Advantages of Tekflex DS<br />

Dry spraying process<br />

Application with st<strong>and</strong>ard pumps<br />

Application on humid <strong>and</strong> dry<br />

surfaces<br />

Material gels within seconds<br />

Elongation at break > 10%<br />

Approved for the German coal<br />

mining<br />

flowing water should be sealed off before spraying.<br />

TEKFLEX DS can be applied with a pump typically used in<br />

tunnelling or mining to spray materials according to the<br />

dry process.<br />

During the spray process the powder is mixed with water<br />

in a specialised nozzle. A suspension, which coagulates<br />

within seconds, is formed building up a continuous membrane<br />

on the sprayed surface.<br />

This membrane is tangible after a few minutes <strong>and</strong> its<br />

stability increases over the next few days resulting in a<br />

compact but elastic coating adhering on most surfaces.<br />

4


5<br />

Long Distance Pumping Technology<br />

<strong>Minova</strong>’s long distance pumping means a change in the<br />

way the miner works. Instead of small pumps or cans<br />

which constantly have to be supplied a long distance<br />

pump can be placed in the mine.<br />

In general, long distance pumps are today installed<br />

centrally in the coalmine in order to supply entire mining<br />

fields from one location. If this is not reasonable, then the<br />

injection unit CT-PM is installed in the main or tailgate<br />

road of the coal face. The coal face is supplied by means of<br />

tubes <strong>and</strong>/or hose lines.<br />

Long distance pump CT-PM<br />

The pump can convey distances up to 5,000 meter <strong>and</strong> it is<br />

remotely operable. It is also electrically driven with radial<br />

piston technology <strong>and</strong> allows for an adjustable flow rate<br />

without pulsation.<br />

The customer can choose between 2,000 or 600 liters resin<br />

containers depending on the expected injection requirement<br />

for the injection shift.<br />

2000 liters storage tank for A (white) <strong>and</strong> B (black) component<br />

The long distance pumping system consists of 3 components:<br />

Long distance pump e.g. CT-PM<br />

Storage tank for each component serving as a reserve<br />

<strong>and</strong> supply tank for the pump<br />

Reusable containers<br />

600 liters storage tank for B (black) component<br />

Introducing long distance pumping allows for an immediate<br />

initiation of measures for rock stabilization as the<br />

injection resin is available constantly.<br />

The integration of this comfortable <strong>and</strong> efficient injection<br />

technology increases the value to the customer. It also increases<br />

productivity, secures production, reduces accidents<br />

due to falling rocks <strong>and</strong> reduces costs in transport, labor<br />

<strong>and</strong> maintenance. The implementation of long distance<br />

pumping improves safety <strong>and</strong> productivity in the mine.<br />

Benefits of long distance pumping technology<br />

<strong>Inc</strong>rease <strong>and</strong> backup of the production by means of<br />

permanent availability of the injection resin with a<br />

high st<strong>and</strong>ard of quality<br />

Injection option during the extraction<br />

Reduction of transport costs<br />

Reduction of maintenance costs<br />

Reduction of personnel requirements<br />

Improvement of ergonomics <strong>and</strong> occupational safety


<strong>Minova</strong> Worldwide<br />

Contact us info@minovaint.com<br />

www.minovainternational.com<br />

<strong>Minova</strong> <strong>International</strong> Ltd.<br />

Melbourne, Australia<br />

Phone +61 3 9665 7111<br />

Email info@minovaint.com<br />

<strong>Minova</strong> Australia Pty Ltd<br />

Nowra, Australia<br />

Phone +61 3 44 214 377<br />

Email solutions@minovaint.com<br />

<strong>Minova</strong> Mai GmbH<br />

Wals-Siezenheim, Austria<br />

Phone +43 662 857 472<br />

Email info.at@minovaint.com<br />

Feistritz/Drau, Austria<br />

Phone +43 4245 651 660<br />

Email info.at@minovaint.com<br />

<strong>Minova</strong> Canada<br />

Stoney Creek ON, Canada<br />

Phone +1 905 643 1166<br />

Email sales.canada@minovaint.com<br />

<strong>Minova</strong> Chile<br />

Santiago, Chile<br />

Phone +56 9 7998 7354<br />

Email william.mussak@minovaint.com<br />

<strong>Minova</strong> Bohemia s.r.o.<br />

Ostrava, Czech Republic<br />

Phone +420 596 232 801<br />

Email minova.cz@minovaint.com<br />

<strong>Minova</strong> SA<br />

Carspach, France<br />

Phone +33 389 089 220<br />

Email info.fr@minovaint.com<br />

<strong>Minova</strong> CarboTech GmbH<br />

Essen, Germany<br />

Phone +49 201 172 1038<br />

Email info.de@minovaint.com<br />

<strong>Minova</strong> BWZ GmbH<br />

Bottrop, Germany<br />

Phone +49 2041 9969 10<br />

Email info.bwz@minovaint.com<br />

The Ground Support Company<br />

<strong>Minova</strong> <strong>International</strong> Ltd.<br />

Global Media & Communication<br />

Am Technologiepark 1<br />

45307 Essen, Germany<br />

<strong>Minova</strong> Weldgrip Ltd.<br />

Chesterfield, Great Britain<br />

Phone +44 1246 857 006<br />

Email weldgrip@minovaint.com<br />

Barnsley, Great Britain<br />

Phone +44 1226 280 567<br />

Email info.uk@minovaint.com<br />

<strong>Minova</strong> Minetek Pvt. Ltd<br />

Hyderabad, India<br />

Phone +91 997 143 22 23<br />

Email info.in@minovaint.com<br />

<strong>Minova</strong> CarboTech Branch Italy<br />

Senna Comasco, Italy<br />

Phone +39 031 56 99 57<br />

Email info.it@minovaint.com<br />

TOO „<strong>Minova</strong> Kasachstan“<br />

Karag<strong>and</strong>a, Kazakhstan<br />

Phone +7 7212 462 538<br />

Email info.kz@minovaint.com<br />

Ruichy <strong>Minova</strong><br />

Beijing, People‘s Republic of China<br />

Phone +86 10 5861 1212<br />

<strong>Minova</strong> CarboTech (Shanghai)<br />

Tunneling Engineering<br />

Shanghai, People‘s Republic of China<br />

Phone +86 21 622 99 229<br />

Email vincent.chien@minovaint.com<br />

<strong>Minova</strong> Ekochem S.A.<br />

Siemianowice Slaskie, Pol<strong>and</strong><br />

Phone +48 32 7503 800<br />

Email minova.ekochem@minovaint.com<br />

<strong>Minova</strong> Arnall sp.z o.o<br />

Truskolasy, Pol<strong>and</strong><br />

Phone +48 34 317 6644<br />

Email minova.arnall@minovaint.com<br />

<strong>Minova</strong> Ksante Sp.zo.o<br />

Polkowice, Pol<strong>and</strong><br />

Phone +48 76 8479 573<br />

Email minova.ksante@minovaint.com<br />

Fon +49 (0)201 172-15 84<br />

Fax +49 (0)201 172-13 24<br />

eMail info@minovaint.com<br />

Internet www.minovainternational.com<br />

<strong>Minova</strong> Romania S.R.L.<br />

Jud. Ilfov, Romania<br />

Phone +40 372 872 436<br />

Email minova.ro@minovaint.com<br />

OOO <strong>Minova</strong> Russia<br />

Kemerovo, Russia<br />

Phone +7 3842 570 092<br />

Email minova-russia@minovaint.com<br />

OOO <strong>Minova</strong> Branch Ural<br />

Severouralsk, Russia<br />

Phone +7 3438 032 045<br />

Email minova-russia@minovaint.com<br />

<strong>Minova</strong> RSA<br />

Is<strong>and</strong>o, South Africa<br />

Phone +27 11 923 1900<br />

Email rsamarketing@minovaint.com<br />

<strong>Minova</strong> Codiv S.L.<br />

Riaño-Langreo, Spain<br />

Phone +34 98 566 9911<br />

Email info.es@minovaint.com<br />

<strong>Minova</strong> AG<br />

Birmensdorf, Switzerl<strong>and</strong><br />

Phone +41 43 344 1060<br />

Email info.ch@minovaint.com<br />

<strong>Minova</strong> Asia Pacific Ltd.<br />

Taipei city, Taiwan R.O.C.<br />

Phone +886 2 289 82221<br />

<strong>Minova</strong> CarboTech Branch Turkey<br />

Ankara, Turkey<br />

Phone +90 312 796 1265<br />

OOO „<strong>Minova</strong> Ukraina“<br />

Makeyevka, Ukraine<br />

Phone +382 062 345 4916<br />

<strong>Minova</strong> USA <strong>Inc</strong>.<br />

Georgetown KY, USA<br />

Phone +1 502 863 6800<br />

Email sales.info@minovaint.com<br />

August 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!