07.04.2013 Views

A Pavement Preservation Strategy - FACERS

A Pavement Preservation Strategy - FACERS

A Pavement Preservation Strategy - FACERS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CUTLER<br />

CUTLER<br />

CUTLER<br />

CUTLER<br />

Repaving, Inc.<br />

921 East 27th 921 East 27 Street Lawrence, KS 66046<br />

th Street Lawrence, KS 66046<br />

p 785-843-1524 f 785-843-3942<br />

www.cutlerrepaving.com


CUTLER Repaving, Inc.<br />

HOT IN-PLACE<br />

RECYCLING<br />

A PAVEMENT<br />

PRESERVATION<br />

STRATEGY


CUTLER Repaving, Inc.<br />

HISTORY


CUTLER Repaving, Inc.<br />

History<br />

• 1965 – Founded by Earl Cutler<br />

• 1968 – Relocated to Lawrence, Kansas<br />

• 1989 – Acquired by new ownership<br />

• Ten Contract Repaving Spreads in U.S.<br />

History


CUTLER Repaving, Inc.<br />

History<br />

Current United States<br />

Contracting Market<br />

AZ<br />

CO<br />

NM<br />

TX<br />

KS<br />

FL


CUTLER Repaving, Inc.<br />

United States<br />

Over 150 million square yards completed<br />

History<br />

NV<br />

AZ<br />

UT<br />

WY<br />

NM<br />

CO<br />

NE<br />

TX<br />

KS<br />

OK<br />

MN<br />

IA<br />

MO<br />

AR<br />

LA<br />

WI<br />

IL<br />

IN<br />

MI<br />

TN<br />

KY<br />

OH<br />

MS AL GA<br />

WV<br />

FL<br />

MD<br />

DC<br />

NH<br />

MA<br />

CT


CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> <strong>Preservation</strong><br />

The “right “right” right” treatment<br />

<strong>Pavement</strong> <strong>Preservation</strong> Economics<br />

On the “right “right” right” road<br />

At the “right “right” right” time


CUTLER Repaving, Inc.<br />

What Tools Do We Have<br />

• Hot In-place Recycling<br />

• Single Machine Repaving<br />

<strong>Pavement</strong> <strong>Preservation</strong> Economics<br />

In The Toolbox?


CUTLER Repaving, Inc.<br />

Surface Repaving<br />

Heating, reworking and<br />

rejuvenating the top one inch of<br />

an existing asphalt pavement and<br />

simultaneously applying an overlay<br />

while the temperature of the<br />

recycled layer is 200°F.<br />

<strong>Pavement</strong> <strong>Preservation</strong> Economics


CUTLER Repaving, Inc.<br />

The Surface Is The<br />

• Surface Defects<br />

– Ruts, Shoves and Bumps<br />

– Patches and Utility Cuts<br />

– Reflective and Shrinkage Cracks<br />

– Weathering, Bleeding and Raveling<br />

– <strong>Pavement</strong> Geometry<br />

<strong>Pavement</strong> <strong>Preservation</strong> Economics<br />

Critical Area


CUTLER Repaving, Inc.<br />

HIR – A Better Surface<br />

Aged, Cracked<br />

and Deformed<br />

<strong>Pavement</strong><br />

“…1” overlay over the 1” of recycled<br />

material out-performs 2.5” of new<br />

overlay over the original surface…”<br />

Techniques for <strong>Pavement</strong> Rehabilitation<br />

National Highway Institute<br />

<strong>Pavement</strong> <strong>Preservation</strong> Economics<br />

Base<br />

Existing<br />

<strong>Pavement</strong><br />

1” New Hot Mix<br />

Hot Welded Bond<br />

1” of Hot RAP<br />

Base<br />

After Single<br />

Machine Asphalt<br />

Recycling


CUTLER Repaving, Inc.<br />

CUTLER’S<br />

CUTLER S<br />

SINGLE SINGLE MACHINE<br />

MACHINE<br />

PROCESS<br />

PROCESS


CUTLER Repaving, Inc.<br />

Virgin hot mix delivered<br />

A Six Step Process<br />

Existing<br />

pavement heated<br />

<strong>Pavement</strong> scarified<br />

Recycling agent applied and mixed<br />

Cutler’s Single Machine Process<br />

New hot wearing course laid<br />

Recycled<br />

windrow<br />

4-section<br />

paving screed<br />

Recycled mix laid<br />

4-section recycling screed


CUTLER Repaving, Inc.<br />

Cutler Single Machine Repaver<br />

First Step: Heat the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

FIRST FIRST STEP:<br />

STEP:<br />

Heat the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

Cutler R-2000 Pre-heater<br />

First Step: Heat the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

Main Heating Unit of Repaver<br />

First Step: Heat the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

Underside of Heating Hood<br />

First Step: Heat the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

Heating Edge Insures<br />

First Step: Heat the <strong>Pavement</strong><br />

Joint Density


CUTLER Repaving, Inc.<br />

First Step: Heat the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

First Step: Heat the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

First Step: Heat the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

First Step: Heat the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

SECOND SECOND STEP:<br />

STEP:<br />

Scarify the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

Scarifier System<br />

Heating System<br />

Second Step: Scarify the <strong>Pavement</strong><br />

Scarifier System Liquid<br />

Application<br />

System


CUTLER Repaving, Inc.<br />

Carbide Tipped Scarifier Teeth<br />

Second Step: Scarify the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

Second Step: Scarify the <strong>Pavement</strong>


CUTLER Repaving, Inc.<br />

THIRD THIRD STEP:<br />

STEP:<br />

Apply & Mix Emulsified<br />

Recycling Agent


CUTLER Repaving, Inc.<br />

Liquid Application System<br />

Third Step: Apply & Mix Emulsified Recycling Agent


CUTLER Repaving, Inc.<br />

Liquid Application System<br />

Variable<br />

Speed<br />

Spinning<br />

Cup<br />

Third Step: Apply & Mix Emulsified Recycling Agent


CUTLER Repaving, Inc.<br />

Recycling Agent Applied<br />

Variable<br />

Speed<br />

Spinning<br />

Cup<br />

Third Step: Apply & Mix Emulsified Recycling Agent


CUTLER Repaving, Inc.<br />

Recycling Agent Applied<br />

Third Step: Apply & Mix Emulsified Recycling Agent


CUTLER Repaving, Inc.<br />

Moldboard Gathers Recycled<br />

Material Into Recycled Windrow<br />

Scarifier System Moldboard<br />

Third Step: Apply & Mix Emulsified Recycling Agent<br />

Liquid Application System<br />

Recycled<br />

Windrow


CUTLER Repaving, Inc.<br />

Moldboard<br />

Third Step: Apply & Mix Emulsified Recycling Agent


CUTLER Repaving, Inc.<br />

Moldboard and Recycled Windrow<br />

Third Step: Apply & Mix Emulsified Recycling Agent


CUTLER Repaving, Inc.<br />

Recycled Windrow<br />

Third Step: Apply & Mix Emulsified Recycling Agent


CUTLER Repaving, Inc.<br />

FOURTH FOURTH STEP:<br />

STEP:<br />

Lay Recycled<br />

Material With<br />

Recycling Screed


CUTLER Repaving, Inc.<br />

Lay Recycled Material<br />

Recycling<br />

Screed<br />

Heat the pavement<br />

Scarify the pavement<br />

Apply and mix emulsified recycling agent<br />

Recycled windrow<br />

Fourth Step: Lay Recycled Material With Recycling Screed


CUTLER Repaving, Inc.<br />

Recycled Material Distributed<br />

Recycled Windrow<br />

Recycling Screed<br />

Fourth Step: Lay Recycled Material With Recycling Screed


CUTLER Repaving, Inc.<br />

Recycled Material Laid<br />

Recycling Screed Leveling Course<br />

Fourth Step: Lay Recycled Material With Recycling Screed<br />

Paving Screed


CUTLER Repaving, Inc.<br />

FIFTH FIFTH STEP:<br />

STEP:<br />

Lay Virgin Hot Mix<br />

Over Recycled<br />

Material


CUTLER Repaving, Inc.<br />

Laying Virgin Hot Mix<br />

Recycled Material<br />

Fifth Step: Lay Virgin Hot Mix Over Recycled Material<br />

Virgin Hot Mix<br />

Recycling Screed Paving Screed


CUTLER Repaving, Inc.<br />

New Hot Wearing Course Laid<br />

Virgin Hot Mix<br />

Recycling Screed Leveling Course Paving Screed<br />

Fifth Step: Lay Virgin Hot Mix Over Recycled Material<br />

New Hot<br />

Wearing Course


CUTLER Repaving, Inc.<br />

Fifth Step: Lay Virgin Hot Mix Over Recycled Material


CUTLER Repaving, Inc.<br />

SIXTH SIXTH STEP:<br />

STEP:<br />

Final Compaction


CUTLER Repaving, Inc.<br />

Sixth Step: Final Compaction<br />

Final Compaction


CUTLER Repaving, Inc.<br />

ADVANTAGES<br />

ADVANTAGES<br />

AND AND BENEFITS<br />

BENEFITS


CUTLER Repaving, Inc.<br />

Surface Repaving Advantages<br />

• Treats surface to a depth of 1”<br />

• A hot process<br />

• Adds additional binder/modifier<br />

• Adds additional hot mix asphalt<br />

• Increases structural coefficient<br />

Advantages and Benefits


CUTLER Repaving, Inc.<br />

Surface Repaving Benefits<br />

• Repairs distress<br />

• Extends life<br />

• Improves ride quality<br />

• Improves friction coefficient<br />

• Improves appearance<br />

• Improved bonding<br />

• Work completed in a single pass<br />

Advantages and Benefits


CUTLER Repaving, Inc.<br />

Florida Experience from 1987<br />

Customer No. of Projects Square Yards<br />

Orange Co. 12 6,240,339<br />

City of Plantation 3 324,516<br />

City of Orlando 7 595,928<br />

City of St. Petersburg 10 1,256,710<br />

Escambia County 4 451,408<br />

City of Tallahassee 3 344,946<br />

Total 39 9,213,847


CUTLER Repaving, Inc.<br />

Hillsborough County<br />

1,087,790 Squares Since 1977<br />

14 Projects


CUTLER Repaving, Inc.<br />

FOCUS ON<br />

BROADWAY AVE, ARMENIA AVE, WESTSHORE<br />

COLUMBUS DRIVE<br />

CIP NO. 61940<br />

BID ITEMS: HEAT & REWORK EXISTING ASPHALT $1.40/SY<br />

S – III SURFACE COURSE $ 37.50/ TON<br />

HEAT & REWORK 1 INCH $1.40/SY<br />

110#/SQUARES S III SURFACE COURSE $2.06/SY<br />

TOTAL SQUARE PRICE $ 3.46/SY


$3.46<br />

1997<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

PAVEMENT LIFE CYCLE COST PER YEAR $.38<br />

BROADWAY AVENUE EAST COMPLETED FY - 1997


$3.46<br />

1997<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

BROADWAY AVENUE EAST COMPLETED FY 1997


$3.46<br />

1997<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

BROADWAY AVENUE EAST COMPLETED FY - 1997


$3.46<br />

1997<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

ARMENIA AVENUE COMPLETED FY - 1997


$3.46<br />

1997<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

ARMENIA AVENUE COMPLETED FY - 1997


$3.46<br />

1997<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

ARMENIA AVENUE COMPLETED FY - 1997


$3.46<br />

1997<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

WESTSHORE BOULEVARD COMPLETED FY - 1997


$3.46<br />

1997<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

WESTSHORE BOULEVARD COMPLETED FY - 1997


$3.46<br />

1997<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

WESTSHORE BOULEVARD COMPLETED FY - 1997


$3.46<br />

1997<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

WESTSHORE BOULEVARD COMPLETED FY - 1997


$3.46<br />

1998<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

COLUMBUS DRIVE COMPLETED FY - 1998


$3.46<br />

1998<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

COLUMBUS DRIVE COMPLETED FY - 1998


$3.46<br />

1998<br />

CUTLER Repaving, Inc.<br />

<strong>Pavement</strong> lifecycle<br />

cost per year<br />

$.38<br />

2006<br />

COLUMBUS DRIVE COMPLETED FY - 1998


CUTLER Repaving, Inc.<br />

Hot In-Place Recycling<br />

A <strong>Pavement</strong> <strong>Preservation</strong> <strong>Strategy</strong><br />

Questions<br />

&<br />

Answers<br />

Questions?<br />

Answers


Thank You!<br />

CUTLER<br />

CUTLER<br />

CUTLER<br />

CUTLER<br />

Repaving, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!