Non-Avionic CNS Systems - Training Zone - Eurocontrol
Non-Avionic CNS Systems - Training Zone - Eurocontrol
Non-Avionic CNS Systems - Training Zone - Eurocontrol
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
V1.0<br />
<strong>Non</strong>-<strong>Avionic</strong> <strong>CNS</strong> <strong>Systems</strong> (WP15)<br />
Part 2 – COM<br />
Agenda<br />
1) COM systems: Today - Baseline<br />
2) Future Aeronautical Communications – Key Assumptions<br />
3) Future COM developments (data links) in the SESAR context<br />
• LDACS: SESAR project P15.2.4<br />
• Satellite system: SESAR project P15.2.6<br />
• AeroMACS: SESAR projects P15.2.7 and P9.16<br />
• PENS: SESAR project P15.2.10<br />
GEN-FUT<br />
Bretigny, 16 September 2010<br />
Nikos Fistas<br />
SWP15.2 Manager<br />
The European Organisation for the Safety of Air Navigation<br />
• Civil/Military Interoperability (short term): SESAR project P15.2.8<br />
4) ICAO - International Coordination<br />
GEN-FUT Course - Bretigny 16/09/10 1<br />
2
COM systems - today<br />
G/G Voice<br />
G/G Data<br />
A/G Voice<br />
A/G Data<br />
G/G data: X.25 >> IP<br />
International data:<br />
• OLDI over X.25<br />
• ASTERIX over X.25<br />
• AFTN/CIDIN over X.25<br />
• CRCO over public X25<br />
Many national services:<br />
• Internal ATM applications<br />
• X25 Links to SITA/ARINC<br />
• Management, etc..<br />
•FMTP IR<br />
GEN-FUT Course - Bretigny 16/09/10 2<br />
3<br />
4
Aircraft<br />
En-Route En Route & approach<br />
ATC<br />
Aerodrome ATC<br />
PENS: SWIM Enabler (from Data<br />
Collection to Information Sharing)<br />
Airport Airside Ops<br />
Air-Ground<br />
Air Ground<br />
Datalink<br />
Management<br />
G/G voice<br />
• ATS-R2, ATS-QSIG >> VoIP<br />
• Analogue, 64K and E1 lines<br />
Applications<br />
• Inter Centre Telephony<br />
(controller to controller)<br />
• Ground component of a/g<br />
voice<br />
PENS<br />
AOC ATM<br />
Aeronautical Information<br />
Management<br />
Network Operations<br />
Via NOP Portal<br />
Airspace Design<br />
GEN-FUT Course - Bretigny 16/09/10 3<br />
5<br />
6
AOC ATM<br />
SWIM<br />
A/G Datalink Ground Management<br />
Ground FABi router<br />
Data-link applis<br />
Air/Ground services<br />
A-G IOP/SWIM Management<br />
Airport Airside<br />
Operations<br />
A/G Datalink<br />
Ground<br />
Management<br />
• Enabler - NOT Driver<br />
• Need for global standards<br />
Aerodrome ATC<br />
Aircraft<br />
Sub-syst 1 ...<br />
A-G IOP/SWIM management<br />
Air/Ground services<br />
Data-link applis<br />
Aircraft router<br />
Surveillance data<br />
Aeronautical data<br />
ATFCM scenario data<br />
Demand & Capacity data<br />
Ground/Ground SWIM<br />
GEN-FUT Course - Bretigny 16/09/10 9<br />
Air/Ground SWIM<br />
Flight data<br />
Meteo data<br />
En-route /<br />
Approach ATC<br />
A/G Datalink Ground Management<br />
Ground FABj router<br />
Data-link applis<br />
Air/Ground services<br />
A-G IOP/SWIM Management<br />
A/G Datalink<br />
Ground<br />
Management<br />
Network<br />
Information<br />
Management<br />
Aeronautical<br />
Information<br />
Management<br />
FCI: Future Com Infrastructure<br />
Advanced<br />
Airspace<br />
Management<br />
17<br />
18
Target Concept &<br />
Architecture Maintenance<br />
Network<br />
Operation<br />
WP 4<br />
En Route<br />
Operation<br />
SESAR Programme<br />
SJU WBS<br />
Master Plan<br />
Maintenance<br />
SESAR Programme<br />
WP B WP C WP D<br />
WP 7<br />
WP 3<br />
Validation<br />
Infrastructure<br />
ATM Network R&D<br />
Programme<br />
WP 16<br />
R&D Transversal<br />
Areas<br />
WP 5 WP 8 WP 14 W 11 WP 15 WP 13<br />
TMA<br />
Operation<br />
Information<br />
Management<br />
SWIM F/WOC <strong>CNS</strong> Network<br />
Information<br />
SWIM Thread<br />
Management<br />
<strong>Systems</strong><br />
(NIMS)<br />
WP 6<br />
Airport<br />
WP 9<br />
Operation Aircraft<br />
WP 10<br />
En-route<br />
APP<br />
ATC<br />
<strong>Systems</strong><br />
GEN-FUT Course - Bretigny 16/09/10 10<br />
19<br />
WP 12<br />
Airport<br />
<strong>Systems</strong><br />
20
Communication Projects in<br />
SESAR (1/2)<br />
WP 9: Aircraft<br />
• Project 9.16: New Communication Technology at Airport<br />
• Project 9.19: Swim Air-Ground Capability<br />
• Project 9.20: Military data link accommodation<br />
• Project 9.21: ADS-B - 1090 Higher Performance Study<br />
• Project 9.22: Mid & Full ADS-B Capability<br />
• Project 9.24: ADS-B In/Out for military aircraft<br />
• Project 9.44: Flexible Communication <strong>Avionic</strong>s<br />
• Project 9.49: <strong>Avionic</strong>s Architecture and Interoperability<br />
Roadmap<br />
Communication Projects in<br />
SESAR (2/2)<br />
WP 15: Ground <strong>CNS</strong> Infrastructure<br />
• Project 15.1.6: Spectrum Management & Impact<br />
Assessment<br />
• SWP 15.2: Communication<br />
• Project 15.2.4: Future Mobile data Link system definition<br />
• Project 15.2.6: Future Mobile Satellite Communication<br />
• Project 15.2.7: Airport Surface Data link<br />
• Project 15.2.8: Civil-Military Data Link Interoperability<br />
• Project 15.2.10: Terrestrial communication infrastructure -<br />
SWIM backbone<br />
GEN-FUT Course - Bretigny 16/09/10 11<br />
21<br />
22
New<br />
Terrestrial<br />
System(s)<br />
FCI and SJU projects<br />
15.2.4<br />
15.2.7/9.16<br />
9.21/9.22<br />
9.44/9.49<br />
9.19<br />
VHF<br />
NETWORK<br />
9.20/9.24/15.2.8<br />
GEN-FUT Course - Bretigny 16/09/10 12<br />
15.2.10<br />
VHF<br />
15.2.6<br />
Project P 15.2.4:<br />
Future Mobile Data Link System Definition<br />
23<br />
24
P15.2.4: Project in brief<br />
Partners<br />
Airbus, Alenia, DFS, DSNA, EUROCONTROL, Frequentis,<br />
Honeywell, INDRA, NORACON and Thales<br />
Project scope<br />
• General system aspects of future data link systems<br />
• L band system definition (LDACS)<br />
Divided into two steps<br />
• Step 1: Early Tasks (up to March 2011)<br />
• Step 2: Follow on activities (2011-2016)<br />
Project Activities<br />
• Task 1: Operational requirements (refined COCR)<br />
• Task 2: Transport layer management specification<br />
• Task 3: Recommendation for the terrestrial a/g data link system<br />
• Task 4: Description of work for Phase 2 (development of<br />
terrestrial a/g data link)<br />
GEN-FUT Course - Bretigny 16/09/10 13<br />
25<br />
26
Project P15.2.6: Main objective<br />
ESA Iris Programme aims to<br />
design, develop, validate<br />
a satellite-based communication system for ATM safety Coms<br />
supporting the future ATM Concept of Operations<br />
for 2020 and beyond.<br />
P15.2.6 aims to develop requirements,<br />
perform complementary activities of validation<br />
and support standardization.<br />
Project P15.2.6 Specific<br />
objectives<br />
• Define operational concept for future Satellite system in a multilink<br />
environment<br />
• Identify and characterise interfaces and interoperability aspects of the<br />
satellite component within the overall SESAR infrastructure.<br />
• Develop elements of Test-Beds for end-to-end validation and<br />
integration with other tests beds developed in Iris project and other<br />
SESAR WPs in accordance with SESAR Operational Concept.<br />
• Validate the Iris development from an end-to-end point of view,<br />
verifying the compliance between the EATM Performance Target and<br />
the SATCOM system Concept of Operation in a simulated real time<br />
environment.<br />
• Support and promote satellite communication system standardization<br />
process in regional international standardizations bodies (EUROCAE,<br />
ICAO etc.)<br />
GEN-FUT Course - Bretigny 16/09/10 16<br />
31<br />
32
Projects P15.2.7 and 9.16 in<br />
Brief<br />
• Partners:<br />
• P15.2.7: AENA, DSNA, INDRA, NATMIG, Selex, Thales<br />
Airbus and ECTL<br />
• P9.16: AIRBUS, Selex, Thales and ECTL<br />
• Duration: March 2010 to 2013<br />
Projects P15.2.7 and 9.16:<br />
Overall Aim<br />
Define, validate and demonstrate<br />
a technical profile and architecture<br />
for a new airport surface communication system (AeroMACS)<br />
based on 802.16e IEEE standard<br />
by studying, developing, integrating and testing<br />
system prototypes<br />
• Project 15.2.7 covers overall system aspects and ground<br />
component<br />
• Project 9.16 covers airborne component<br />
GEN-FUT Course - Bretigny 16/09/10 18<br />
35<br />
36
Project P15.2.10 key activities<br />
• Evaluation of PENS end to end performance<br />
• Definition of security policy<br />
• Validation of VoIP multicast - VoIP PENS services<br />
International Coordination<br />
GEN-FUT Course - Bretigny 16/09/10 23<br />
45<br />
46
The Big Picture<br />
EUROCONTROL SJU<br />
ICAO<br />
EUROCAE/RTCA<br />
EC<br />
ESOs (ETSI/CEN/)<br />
EASA JAA<br />
EC: The Standards Framework<br />
• SES initiative: 4 Key Regulations<br />
Interoperability Regulation (IOPR)<br />
Essential Requirements (ER): high level<br />
requirements of ATM network<br />
Implementing Rules (IR): Detailed application<br />
of ER on the various ATM systems<br />
Community Specifications (CS): Voluntary<br />
European standards to ensure conformity to<br />
ER and simplify certification<br />
GEN-FUT Course - Bretigny 16/09/10 24<br />
47<br />
48
ICAO Regional Groups<br />
EUR/NAT Region<br />
EANPG/COG NATSPG<br />
FMG AFSG<br />
Others …<br />
• ECTL/FAA MoC: Action Plans<br />
• EU/US MoC<br />
Planning Group<br />
Operations Group<br />
Coordination with US<br />
GEN-FUT Course - Bretigny 16/09/10 26<br />
…<br />
51<br />
52
The future<br />
Q?<br />
(nikolaos.fistas@eurocontrol.int)<br />
GEN-FUT Course - Bretigny 16/09/10 27<br />
53<br />
54