07.04.2013 Views

Non-Avionic CNS Systems - Training Zone - Eurocontrol

Non-Avionic CNS Systems - Training Zone - Eurocontrol

Non-Avionic CNS Systems - Training Zone - Eurocontrol

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

V1.0<br />

<strong>Non</strong>-<strong>Avionic</strong> <strong>CNS</strong> <strong>Systems</strong> (WP15)<br />

Part 2 – COM<br />

Agenda<br />

1) COM systems: Today - Baseline<br />

2) Future Aeronautical Communications – Key Assumptions<br />

3) Future COM developments (data links) in the SESAR context<br />

• LDACS: SESAR project P15.2.4<br />

• Satellite system: SESAR project P15.2.6<br />

• AeroMACS: SESAR projects P15.2.7 and P9.16<br />

• PENS: SESAR project P15.2.10<br />

GEN-FUT<br />

Bretigny, 16 September 2010<br />

Nikos Fistas<br />

SWP15.2 Manager<br />

The European Organisation for the Safety of Air Navigation<br />

• Civil/Military Interoperability (short term): SESAR project P15.2.8<br />

4) ICAO - International Coordination<br />

GEN-FUT Course - Bretigny 16/09/10 1<br />

2


COM systems - today<br />

G/G Voice<br />

G/G Data<br />

A/G Voice<br />

A/G Data<br />

G/G data: X.25 >> IP<br />

International data:<br />

• OLDI over X.25<br />

• ASTERIX over X.25<br />

• AFTN/CIDIN over X.25<br />

• CRCO over public X25<br />

Many national services:<br />

• Internal ATM applications<br />

• X25 Links to SITA/ARINC<br />

• Management, etc..<br />

•FMTP IR<br />

GEN-FUT Course - Bretigny 16/09/10 2<br />

3<br />

4


Aircraft<br />

En-Route En Route & approach<br />

ATC<br />

Aerodrome ATC<br />

PENS: SWIM Enabler (from Data<br />

Collection to Information Sharing)<br />

Airport Airside Ops<br />

Air-Ground<br />

Air Ground<br />

Datalink<br />

Management<br />

G/G voice<br />

• ATS-R2, ATS-QSIG >> VoIP<br />

• Analogue, 64K and E1 lines<br />

Applications<br />

• Inter Centre Telephony<br />

(controller to controller)<br />

• Ground component of a/g<br />

voice<br />

PENS<br />

AOC ATM<br />

Aeronautical Information<br />

Management<br />

Network Operations<br />

Via NOP Portal<br />

Airspace Design<br />

GEN-FUT Course - Bretigny 16/09/10 3<br />

5<br />

6


AOC ATM<br />

SWIM<br />

A/G Datalink Ground Management<br />

Ground FABi router<br />

Data-link applis<br />

Air/Ground services<br />

A-G IOP/SWIM Management<br />

Airport Airside<br />

Operations<br />

A/G Datalink<br />

Ground<br />

Management<br />

• Enabler - NOT Driver<br />

• Need for global standards<br />

Aerodrome ATC<br />

Aircraft<br />

Sub-syst 1 ...<br />

A-G IOP/SWIM management<br />

Air/Ground services<br />

Data-link applis<br />

Aircraft router<br />

Surveillance data<br />

Aeronautical data<br />

ATFCM scenario data<br />

Demand & Capacity data<br />

Ground/Ground SWIM<br />

GEN-FUT Course - Bretigny 16/09/10 9<br />

Air/Ground SWIM<br />

Flight data<br />

Meteo data<br />

En-route /<br />

Approach ATC<br />

A/G Datalink Ground Management<br />

Ground FABj router<br />

Data-link applis<br />

Air/Ground services<br />

A-G IOP/SWIM Management<br />

A/G Datalink<br />

Ground<br />

Management<br />

Network<br />

Information<br />

Management<br />

Aeronautical<br />

Information<br />

Management<br />

FCI: Future Com Infrastructure<br />

Advanced<br />

Airspace<br />

Management<br />

17<br />

18


Target Concept &<br />

Architecture Maintenance<br />

Network<br />

Operation<br />

WP 4<br />

En Route<br />

Operation<br />

SESAR Programme<br />

SJU WBS<br />

Master Plan<br />

Maintenance<br />

SESAR Programme<br />

WP B WP C WP D<br />

WP 7<br />

WP 3<br />

Validation<br />

Infrastructure<br />

ATM Network R&D<br />

Programme<br />

WP 16<br />

R&D Transversal<br />

Areas<br />

WP 5 WP 8 WP 14 W 11 WP 15 WP 13<br />

TMA<br />

Operation<br />

Information<br />

Management<br />

SWIM F/WOC <strong>CNS</strong> Network<br />

Information<br />

SWIM Thread<br />

Management<br />

<strong>Systems</strong><br />

(NIMS)<br />

WP 6<br />

Airport<br />

WP 9<br />

Operation Aircraft<br />

WP 10<br />

En-route<br />

APP<br />

ATC<br />

<strong>Systems</strong><br />

GEN-FUT Course - Bretigny 16/09/10 10<br />

19<br />

WP 12<br />

Airport<br />

<strong>Systems</strong><br />

20


Communication Projects in<br />

SESAR (1/2)<br />

WP 9: Aircraft<br />

• Project 9.16: New Communication Technology at Airport<br />

• Project 9.19: Swim Air-Ground Capability<br />

• Project 9.20: Military data link accommodation<br />

• Project 9.21: ADS-B - 1090 Higher Performance Study<br />

• Project 9.22: Mid & Full ADS-B Capability<br />

• Project 9.24: ADS-B In/Out for military aircraft<br />

• Project 9.44: Flexible Communication <strong>Avionic</strong>s<br />

• Project 9.49: <strong>Avionic</strong>s Architecture and Interoperability<br />

Roadmap<br />

Communication Projects in<br />

SESAR (2/2)<br />

WP 15: Ground <strong>CNS</strong> Infrastructure<br />

• Project 15.1.6: Spectrum Management & Impact<br />

Assessment<br />

• SWP 15.2: Communication<br />

• Project 15.2.4: Future Mobile data Link system definition<br />

• Project 15.2.6: Future Mobile Satellite Communication<br />

• Project 15.2.7: Airport Surface Data link<br />

• Project 15.2.8: Civil-Military Data Link Interoperability<br />

• Project 15.2.10: Terrestrial communication infrastructure -<br />

SWIM backbone<br />

GEN-FUT Course - Bretigny 16/09/10 11<br />

21<br />

22


New<br />

Terrestrial<br />

System(s)<br />

FCI and SJU projects<br />

15.2.4<br />

15.2.7/9.16<br />

9.21/9.22<br />

9.44/9.49<br />

9.19<br />

VHF<br />

NETWORK<br />

9.20/9.24/15.2.8<br />

GEN-FUT Course - Bretigny 16/09/10 12<br />

15.2.10<br />

VHF<br />

15.2.6<br />

Project P 15.2.4:<br />

Future Mobile Data Link System Definition<br />

23<br />

24


P15.2.4: Project in brief<br />

Partners<br />

Airbus, Alenia, DFS, DSNA, EUROCONTROL, Frequentis,<br />

Honeywell, INDRA, NORACON and Thales<br />

Project scope<br />

• General system aspects of future data link systems<br />

• L band system definition (LDACS)<br />

Divided into two steps<br />

• Step 1: Early Tasks (up to March 2011)<br />

• Step 2: Follow on activities (2011-2016)<br />

Project Activities<br />

• Task 1: Operational requirements (refined COCR)<br />

• Task 2: Transport layer management specification<br />

• Task 3: Recommendation for the terrestrial a/g data link system<br />

• Task 4: Description of work for Phase 2 (development of<br />

terrestrial a/g data link)<br />

GEN-FUT Course - Bretigny 16/09/10 13<br />

25<br />

26


Project P15.2.6: Main objective<br />

ESA Iris Programme aims to<br />

design, develop, validate<br />

a satellite-based communication system for ATM safety Coms<br />

supporting the future ATM Concept of Operations<br />

for 2020 and beyond.<br />

P15.2.6 aims to develop requirements,<br />

perform complementary activities of validation<br />

and support standardization.<br />

Project P15.2.6 Specific<br />

objectives<br />

• Define operational concept for future Satellite system in a multilink<br />

environment<br />

• Identify and characterise interfaces and interoperability aspects of the<br />

satellite component within the overall SESAR infrastructure.<br />

• Develop elements of Test-Beds for end-to-end validation and<br />

integration with other tests beds developed in Iris project and other<br />

SESAR WPs in accordance with SESAR Operational Concept.<br />

• Validate the Iris development from an end-to-end point of view,<br />

verifying the compliance between the EATM Performance Target and<br />

the SATCOM system Concept of Operation in a simulated real time<br />

environment.<br />

• Support and promote satellite communication system standardization<br />

process in regional international standardizations bodies (EUROCAE,<br />

ICAO etc.)<br />

GEN-FUT Course - Bretigny 16/09/10 16<br />

31<br />

32


Projects P15.2.7 and 9.16 in<br />

Brief<br />

• Partners:<br />

• P15.2.7: AENA, DSNA, INDRA, NATMIG, Selex, Thales<br />

Airbus and ECTL<br />

• P9.16: AIRBUS, Selex, Thales and ECTL<br />

• Duration: March 2010 to 2013<br />

Projects P15.2.7 and 9.16:<br />

Overall Aim<br />

Define, validate and demonstrate<br />

a technical profile and architecture<br />

for a new airport surface communication system (AeroMACS)<br />

based on 802.16e IEEE standard<br />

by studying, developing, integrating and testing<br />

system prototypes<br />

• Project 15.2.7 covers overall system aspects and ground<br />

component<br />

• Project 9.16 covers airborne component<br />

GEN-FUT Course - Bretigny 16/09/10 18<br />

35<br />

36


Project P15.2.10 key activities<br />

• Evaluation of PENS end to end performance<br />

• Definition of security policy<br />

• Validation of VoIP multicast - VoIP PENS services<br />

International Coordination<br />

GEN-FUT Course - Bretigny 16/09/10 23<br />

45<br />

46


The Big Picture<br />

EUROCONTROL SJU<br />

ICAO<br />

EUROCAE/RTCA<br />

EC<br />

ESOs (ETSI/CEN/)<br />

EASA JAA<br />

EC: The Standards Framework<br />

• SES initiative: 4 Key Regulations<br />

Interoperability Regulation (IOPR)<br />

Essential Requirements (ER): high level<br />

requirements of ATM network<br />

Implementing Rules (IR): Detailed application<br />

of ER on the various ATM systems<br />

Community Specifications (CS): Voluntary<br />

European standards to ensure conformity to<br />

ER and simplify certification<br />

GEN-FUT Course - Bretigny 16/09/10 24<br />

47<br />

48


ICAO Regional Groups<br />

EUR/NAT Region<br />

EANPG/COG NATSPG<br />

FMG AFSG<br />

Others …<br />

• ECTL/FAA MoC: Action Plans<br />

• EU/US MoC<br />

Planning Group<br />

Operations Group<br />

Coordination with US<br />

GEN-FUT Course - Bretigny 16/09/10 26<br />

…<br />

51<br />

52


The future<br />

Q?<br />

(nikolaos.fistas@eurocontrol.int)<br />

GEN-FUT Course - Bretigny 16/09/10 27<br />

53<br />

54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!