rolling IPL - Messmer The Brain House
rolling IPL - Messmer The Brain House
rolling IPL - Messmer The Brain House
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
zOS mainframe – highlights 4nd quarter<br />
unplanned<br />
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
♦ November 3.: sysplex-wide shutdown due to a hardware-related problem<br />
♦ November 3.: crash of 4 LPAR due to a hardware related problem<br />
♦ November 5.: crash of 8 LPAR due to a hardware-related problem<br />
♦ November 11./ 12.: 2 sysplex wide shutdown due to SRB problem<br />
planned<br />
♦ several <strong>IPL</strong>'s needed to solve storage-problems for DB2 DBM1 adress space<br />
♦ November 19.: <strong>rolling</strong> POR (HCD change) all 6 prod CEC during the day<br />
♦ December 4.: sysplex-wide shutdown need due to DB2 catalog reorg<br />
♦ December 10.: move SSE Lpar's to new CEC<br />
13