rolling IPL - Messmer The Brain House
rolling IPL - Messmer The Brain House
rolling IPL - Messmer The Brain House
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
zOS mainframe (SSP & IB) – monthly <strong>IPL</strong>'s<br />
Bruno Sauser<br />
January 1, 2006<br />
FOR INTERNAL USE ONLY
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
zOS mainframe - monthly <strong>IPL</strong> statistic since march 2002<br />
(1'954 <strong>IPL</strong>) (1'981 <strong>IPL</strong>)<br />
(~ 2'050 <strong>IPL</strong>)<br />
1
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
zOS mainframe - monthly <strong>IPL</strong>'s 2005 planned vs. unplanned<br />
17.6%<br />
unplanned<br />
23.3%<br />
unplanned<br />
33.1%<br />
unplanned<br />
2
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
zOS mainframe - monthly <strong>IPL</strong>'s 2005 by aereas<br />
3
zOS mainframe – explanation<br />
<strong>The</strong> specified details are self-describing<br />
planned unplanned<br />
<strong>The</strong> following details are represented more exactly here.<br />
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
Expl. DB2 musst be stopped completely on the sysplex, it is easier to do an <strong>IPL</strong><br />
Expl. <strong>IPL</strong> for time-change<br />
Expl. <strong>IPL</strong> necessary in case of problems with the infrastructure (power problems, etc.)<br />
4
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
zOS mainframe – 2nd quarter 2005 - planned <strong>IPL</strong>'s<br />
<strong>rolling</strong> <strong>IPL</strong> without impact on services<br />
UPLEX Cascading + CTC Recabling for all CEC's<br />
5
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
zOS mainframe – 2nd quarter 2005 - unplanned <strong>IPL</strong>'s<br />
Incidents (green = 100% service outage)<br />
Connectivity lost to CF on DV01/02<br />
OMVS latches on U-Plex<br />
Varius SW errors on different LPAR<br />
sysplex-wide shutdown = 100% service impact<br />
OMVS latches on U-Plex<br />
Varius SW errors on different LPAR<br />
System hang TB02<br />
Storage problem on JPLEX1 (PTF UA10959)<br />
6
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
zOS mainframe – highlights 2nd quarter 2005<br />
unplanned<br />
♦ April 9. : OMVS latches on U-Plex, sysplex wide shutdown<br />
♦ Mai 13. : OMVS latches on U-Plex, sysplex wide shutdown<br />
♦ Mai 16. : OMVS latches on U-Plex, sysplex wide shutdown<br />
♦ June 06. : SS02 crashed, re-<strong>IPL</strong> SS02 was not sucsessfull, PSA is overlayed<br />
planned<br />
♦ June: POR incl. 55 <strong>IPL</strong>'s for UPLEX Cascading + CTC recabling for all CEC's<br />
7
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
zOS mainframe – 3nd quarter 2005 - planned <strong>IPL</strong>'s<br />
<strong>rolling</strong> <strong>IPL</strong> without impact on services<br />
ISU05/06/07 Channel Recabling / ISF01/ICF04 Microcode Upgrade<br />
Setup Kplex, IQH Checking for waiter lock, Microcode Installation<br />
8
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
zOS mainframe – 3nd quarter 2005 - unplanned <strong>IPL</strong>'s<br />
Incidents (green = 100% service outage)<br />
USS latches on NPLEX1<br />
Varius SW errors on different LPAR<br />
CEC ISF07 crashed<br />
Problem with signaling CF structures UPLEX1<br />
Varius SW errors on different LPAR<br />
9
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
zOS mainframe – highlights 3nd quarter 2005<br />
unplanned<br />
♦ August 21. : Problem with signaling structures on U-Plex, sysplex wide shutdown<br />
♦ August 22. : CEC ISF07 crashed during concurrent patch apply<br />
♦ August 28. : Problem with signaling CF structures U-Plex, sysplex wide shutdown<br />
planned<br />
♦ August: POR incl. 43 <strong>IPL</strong>'s (channel recabling, change VTS, Setup K-Plex, new MC<br />
♦ September: POR's incl. 37 <strong>IPL</strong>'s, new MC<br />
♦ September: Faulty book replacement on CEC ISF07<br />
♦ August / September: Maintenance Rel. 4.0.1. and Minor Rel. 4.1.0.<br />
10
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
zOS mainframe – 4nd quarter planned <strong>IPL</strong>'s<br />
<strong>rolling</strong> <strong>IPL</strong><br />
defining HDS4020, new FICON Switches, new HW activation<br />
sysplex-wide shutdown need due to DB2 catalog reorg<br />
11
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
zOS mainframe – 4nd quarter unplanned <strong>IPL</strong>'s<br />
Incidents (green = 100% service outage)<br />
Varius SW errors on different LPAR<br />
Link problem between Flur and Urdorf<br />
sypslex-wide shutdown due to a hardware-and SRB related problem<br />
Varius SW errors on test-/ developement systems<br />
12
zOS mainframe – highlights 4nd quarter<br />
unplanned<br />
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
♦ November 3.: sysplex-wide shutdown due to a hardware-related problem<br />
♦ November 3.: crash of 4 LPAR due to a hardware related problem<br />
♦ November 5.: crash of 8 LPAR due to a hardware-related problem<br />
♦ November 11./ 12.: 2 sysplex wide shutdown due to SRB problem<br />
planned<br />
♦ several <strong>IPL</strong>'s needed to solve storage-problems for DB2 DBM1 adress space<br />
♦ November 19.: <strong>rolling</strong> POR (HCD change) all 6 prod CEC during the day<br />
♦ December 4.: sysplex-wide shutdown need due to DB2 catalog reorg<br />
♦ December 10.: move SSE Lpar's to new CEC<br />
13
zOS mainframe – Summary 2005<br />
view zOS Operations<br />
°<br />
+<br />
� More then 2'100 <strong>IPL</strong>'s in 2005<br />
� ~ 176 <strong>IPL</strong> per month<br />
� Based on 58 installed LPAR each LPAR was <strong>IPL</strong>'d 3 times<br />
� 7 UBS-releases implemented in 2005 on all LPAR's<br />
S:\OPERATIONS\Leadership\Statistics\2005\zOS Mainframe <strong>IPL</strong> statistic_2005.ppt<br />
� We are using the sysplex funcionality to implement changes with<br />
<strong>rolling</strong> <strong>IPL</strong> (or POR) without service impact<br />
� Expl: services 100% available with 4 LPAR after a crash of 8 images<br />
(November) and the restart of all 8 affected DB instances on another<br />
LPAR (service impact 27 minutes)<br />
- � Total 8 unplanned sysplex-wide shutdown to solve a incident<br />
� 3 month (Mai, August, November) with more then 15% unplanned<br />
<strong>IPL</strong><br />
� Total 209 unplanned <strong>IPL</strong>'s in 3 quarters (April – December) in 2005<br />
� DB2 instances needs to be restartet due to a known DBM1 storage<br />
problem<br />
14