Kowan (Tosa) WP150 - Appleton Piling Ltd
Kowan (Tosa) WP150 - Appleton Piling Ltd
Kowan (Tosa) WP150 - Appleton Piling Ltd
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2nd Floor, 9 Devonshire Court<br />
Green Lane Trading Estate<br />
Clifton, York, YO30 5PQ<br />
Tel: 0845 869 1010 Fax: 0845 869 1015<br />
info@appletonpiling.com<br />
www.appletonpiling.com<br />
<strong>Appleton</strong><br />
<strong>Piling</strong> <strong>Ltd</strong><br />
<strong>Kowan</strong> (<strong>Tosa</strong>) <strong>WP150</strong> Still Worker<br />
Installation<br />
As piles are installed the Still<br />
Worker is “walked” on and the<br />
three piles the pile press is<br />
positioned on are welded together.<br />
This general principal is adopted<br />
as the installation progresses.<br />
Water jetting may be used to aid<br />
the installation through granular<br />
and cohesive soils.<br />
Specialist Steel <strong>Piling</strong> Contractor
2nd Floor, 9 Devonshire Court<br />
Green Lane Trading Estate<br />
Clifton, York, YO30 5PQ<br />
Tel: 0845 869 1010 Fax: 0845 869 1015<br />
info@appletonpiling.com<br />
www.appletonpiling.com<br />
In order to commence the works<br />
the reaction stand is positioned<br />
and our kentledge placed onto<br />
the reaction stand. The kentledge<br />
gives the reaction force required<br />
to install the first three piles.<br />
The kentledge and the reaction<br />
stand are cleared away from the<br />
working area. The Still Worker<br />
then operates from the top of the<br />
installed sheet piles.<br />
<strong>Appleton</strong><br />
<strong>Piling</strong> <strong>Ltd</strong><br />
<strong>Kowan</strong> (<strong>Tosa</strong>) <strong>WP150</strong> Still Worker<br />
Reaction stand set-up<br />
Once the first three piles are<br />
installed the Still Worker is walked<br />
onto the three piles.<br />
Specialist Steel <strong>Piling</strong> Contractor
<strong>Kowan</strong> (<strong>Tosa</strong>) <strong>WP150</strong> Still Worker<br />
Still Worker is set on the reaction stand for the<br />
installation of the first two or three sheet piles.<br />
Travel carriage then slides forward.<br />
The Still Worker can install sheet piles of 400mm,<br />
500mm and 600mm. The leg clamps are used<br />
in different configurations to install the<br />
different sheet pile sections.<br />
In case of 400mm-pitch, normally 2 clamps<br />
are used. The drawing on the right,<br />
however, shows the use of an optional<br />
No.1 Clamp when enough reaction force<br />
cannot be obtained.<br />
2nd Floor, 9 Devonshire Court<br />
Green Lane Trading Estate<br />
Clifton, York, YO30 5PQ<br />
Tel: 0845 869 1010 Fax: 0845 869 1015<br />
info@appletonpiling.com<br />
www.appletonpiling.com<br />
1 2<br />
3<br />
<strong>Appleton</strong><br />
<strong>Piling</strong> <strong>Ltd</strong><br />
Pile press procedure<br />
Still Worker moves by elevating its travel carriage<br />
while supporting itself on the last installed pile.<br />
4<br />
Travel carriage lowers itself and drops onto the<br />
installed sheet piles and continues its hydraulic<br />
installation process. After the third (or fourth) pile<br />
is driven, Still Worker moves off the reaction<br />
stand to travel independently on the piles.<br />
Clamp configuration<br />
Specialist Steel <strong>Piling</strong> Contractor
<strong>Kowan</strong> (<strong>Tosa</strong>) <strong>WP150</strong> Still Worker<br />
Side view<br />
Front view<br />
2nd Floor, 9 Devonshire Court<br />
Green Lane Trading Estate<br />
Clifton, York, YO30 5PQ<br />
Tel: 0845 869 1010 Fax: 0845 869 1015<br />
info@appletonpiling.com<br />
www.appletonpiling.com<br />
<strong>Appleton</strong><br />
<strong>Piling</strong> <strong>Ltd</strong><br />
Specification WP 150<br />
Model WP-150<br />
Moving System Self-moving<br />
Pressing-in Force 150 metric tons max.<br />
Drawing-out Force 160 metric tons max.<br />
Pressing-in Speed 1.8 - 20 m/min.<br />
Drawing-out Speed 1.9 - 17 m/min.<br />
Stroke 800 mm<br />
Operation System Wireless radio-control<br />
& Cabled remote-control<br />
Tilting Device +5 degrees<br />
Mast Rotation 180 degrees<br />
Applicable sheet piles 400mm (Type IA-IVA)<br />
500mm ( Type VL & VIL)<br />
600mm (IIw, IIIw & IVw)<br />
Weight 9,400kg<br />
Hydraulic Power Unit (Standard Accessory)<br />
Model TE-200<br />
Power Diesel Engine<br />
4-Cycle, Water-Cooled<br />
Direct Injection, Turbo<br />
Output Rating 200PS/1,800RPM<br />
Pump Variable-Capacity Pump<br />
Pressure Rating 350kg/cm2 max.<br />
Fuel Oil Tank 350 Litres<br />
Hydraulic Oil Tank 550 Litres<br />
Dimension<br />
Length 4,020 mm.<br />
Width 1,740 mm.<br />
Height 1,790mm.<br />
Weight 5,080 kg<br />
Reaction Stand (Standard Accessory)<br />
Dimension<br />
Length 3,200 mm.<br />
Width 1,900 mm.<br />
Height 475mm.<br />
Weight 1,400 kg<br />
Specialist Steel <strong>Piling</strong> Contractor