10.04.2013 Views

City of Appleton On-Street Bike Lane Plan

City of Appleton On-Street Bike Lane Plan

City of Appleton On-Street Bike Lane Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHAPTER 4: RECOMMENDATIONS<br />

4.2.1 System Improvements (Master List)<br />

This section details all on-street bicycle facilities recommendations for the <strong>City</strong> <strong>of</strong> <strong>Appleton</strong>.<br />

Careful consideration was used when determining the best connections between origins and<br />

destinations within the existing transportation network. These routes and facilities also<br />

recognize how mobility will be expanded through continued connections to the <strong>of</strong>f-road<br />

network (CE Trail, Newberry Trail, etc.) and how increased access to this and other regional<br />

trails and bicycle routes will benefit bicyclists throughout the Fox Cities. Maps delineating the<br />

proposed bicycle network can be found in Appendix E. The improvements table (Table 4-1)<br />

includes the following information:<br />

Term<br />

1-5 ................................. targeted for implementation in the next five years<br />

5-10 ............................... targeted for implementation in the next ten years<br />

10-15 ............................ long-term recommendation that should be evaluated when plan<br />

is updated<br />

15-20 ............................ long-term recommendation that may require substantial<br />

reconstruction or intergovernmental coordination<br />

Note: facilities phasing maps (Maps 7A, 7B, 7C and7D) show the bicycle network in 5-<br />

year increments over the next twenty years. See Appendix G.<br />

Project<br />

Name <strong>of</strong> street segment<br />

Limits<br />

Project limits from beginning to end<br />

Facility<br />

Suggested improvement (<strong>Bike</strong> <strong>Lane</strong> or TBD – To Be Determined)<br />

Length (in feet)<br />

The approximate length <strong>of</strong> the project within defined limits; “TBD” used when the extent<br />

<strong>of</strong> the project is unknown<br />

Total Cost<br />

$ figures ........................ represent estimated total cost <strong>of</strong> project, unless unit costs are<br />

shown<br />

TBD ................................. costs to be determined because project scope is unknown at this<br />

time<br />

Map<br />

The map number where the project is delineated or described<br />

Funding<br />

Potential funding sources (see Chapter 5 for complete list)<br />

TE: Transportation Enhancement<br />

BPFP: Bicycle and Pedestrian Facilities Program<br />

STP-U: Surface Transportation Program – Urban<br />

SRTS: Safe Routes to School<br />

A PPLETON O N -STREET B IKE L ANE P LAN<br />

PAGE 4 - 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!