SCHEDULE OF QUANTITY<br />

Part III-<strong>Price</strong> <strong>Bid</strong><br />

ame <strong>of</strong> Work: <strong>Construction</strong> <strong>of</strong> <strong>RCC</strong> <strong>Pedestal</strong> <strong>for</strong> Railway Plat<strong>for</strong>m on Rly. Chord<br />

Line at RCF Trombay Factory.<br />

PART - A<br />

Sr.<br />

No.<br />

Item Qty. Unit Rate<br />

(`/Unit)<br />

Amount (`)<br />

Part A - <strong>Construction</strong> <strong>of</strong> Footing <strong>for</strong> plat<strong>for</strong>m<br />

Part B - <strong>Construction</strong> <strong>of</strong> steps & ucr wall <strong>for</strong> proper access to plat<strong>for</strong>m<br />

1 Excavation upto 2.00 M (including <strong>for</strong><br />

foundation ) in all types <strong>of</strong> soils, such as<br />

Earth, Marine Clay, Marshy Land, Running<br />

25.99 M3 148.95 3870.77<br />

Sand, Garbage, Slush, Murum, Rock<br />

Boulders etc. as directed by Engineer. The<br />

rate includes pumping out water,<br />

backfilling, removing the rank vegetation<br />

and refilling the excavated materials within<br />

a lead <strong>of</strong> 150M as directed including<br />

leveling, ramming etc complete, and<br />

2<br />

measured from the edge <strong>of</strong> cutting including<br />

all lifts and stacking in layers and<br />

removing the surplus excavated materials to<br />

any distance as directed {Records to be<br />

maintained properly}. The rate also includes<br />

supporting public utilities such as cables,<br />

drains services pipes water mains, but shall<br />

not include the cost <strong>of</strong> shoring. Where<br />

unshored trenches are allowed slope as<br />

specified shall be given.<br />

Providing and laying dry rubble stone<br />

packing 230 mm thick hand set in regular<br />

lines, interstices being filled in with small<br />

pieces <strong>of</strong> stones, throughly rammed,<br />

consolidated and watered complete as<br />

directed and specified.<br />

81.13 M2 187.30 15194.66<br />

3 Filling in foundation bedding, backing or<br />

steps upto plinth level etc. with cement<br />

concrete in the proportion 1:4:8 (Metal No.<br />

2 & 3 in proportions as directed)<br />

7.48 M3 2932.57 21935.64<br />

4 Providing & casting M25 R.C.C. footing<br />

in foundation <strong>for</strong> walls or coloumns<br />

(unfinished).<br />

15.02 M3 4318.59 64843.59<br />

5 Supply, cut, bend and fix in position High<br />

Yield strength De<strong>for</strong>med bars <strong>for</strong> all<br />

diameters confirming to IS 1786, including<br />

tying with binding wire (16 SWG Annealed<br />

wire) or welding, tested steel rein<strong>for</strong>cement<br />

1.24 MT 43709.42 54090.41


<strong>for</strong> all rein<strong>for</strong>ced concrete at all locations<br />

and levels, including transporting, handling<br />

etc. complete. No separate payment <strong>for</strong><br />

chairs, laps, wastage and binding wire will<br />

be made.<br />

6 Uncoursed rubble stone masonry in<br />

superstructure in basalt stone <strong>of</strong> varying<br />

shades, medium dressed, in 1:5 cement<br />

mortar with through bond stones,<br />

headers, quoins etc. All stones to be<br />

dressed rectangular on face having not less<br />

than 1:3 proportion in respect <strong>of</strong> height to<br />

length in elevation, minimum height being<br />

75mm; including special features <strong>of</strong> joints<br />

such as sunk cement pointing not<br />

exceeding 20 mm in thickness, as per<br />

design externally and on exposed faces.<br />

The face <strong>of</strong> the work shall be finally<br />

cleaned using wire brush and washed<br />

with water and diluted solution <strong>of</strong><br />

muriatic acid etc complete.<br />

7 Block coping in cement concrete 1:2:4 to<br />

plinth, terrace parapet and compound wall<br />

etc., plain or chamfered without finish as<br />

per detailed drawings, complete as directed<br />

and specified.<br />

Part III-<strong>Price</strong> <strong>Bid</strong><br />

39.60 M3 2930.79 116059.22<br />

1.98 M3 3921.69 7764.95<br />

8 Brickbat concrete in floors, bedding etc.,<br />

in the proportion <strong>of</strong> 2 parts <strong>of</strong> broken<br />

brickbats and one part <strong>of</strong> cement mortar<br />

(1:5) laid to required slopes, properly<br />

rammed and consolidated as directed.<br />

7.26 M3 2669.46 19380.29<br />

Estimated Cost (`) (Excluding <strong>of</strong> Taxes) 3,03,139.52<br />

PART - B<br />

(B. K. Joshi)<br />

CM (C)<br />

VAT Under consumption At 8.00% On all above items<br />

Service Tax Under consumption At 7.416% On all above items<br />

• If successful tenderer is a body corporate (Pvt. Ltd. or Ltd. firm) above service<br />

tax @ 7.416% shall be paid by the party to Indian Govt. And party has to claim it<br />

separately in bills.


Part III-<strong>Price</strong> <strong>Bid</strong><br />

• If successful tenderer is an individual, HUF, partnership firm, AOP. The party has<br />

to pay 50% <strong>of</strong> 7.416% (i.e. 3.708%) to Indian Govt. and same shall be claimed in<br />

bills from RCF. Balance 50% shall be paid by RCFL to Indian Govt. directly.<br />

PART : C<br />

Our Quoted Rates are % above the rates specified in PART A<br />

(In words -----------------------------------)<br />

Our Quoted Rates are % below the rates specified in PART A<br />

(In words -----------------------------------)<br />

Contractors Signature with Seal & Date<br />

(B. K. Joshi)<br />

CM (C)<br />

OTE:<br />

1) Do not put ‘+’ ‘-‘ sign be<strong>for</strong>e the quoted rates.<br />

2) <strong>Bid</strong>der has to quote either Sr. No:1 or Sr. No:2 <strong>of</strong> PART C, if quoted in both the<br />

bid shall be rejected<br />

3) <strong>Bid</strong>der shall confirm taxes and duties in PART B and applicable to bidder as per<br />

type <strong>of</strong> organization in PART C above by ticking the applicable. otherwise bid<br />

shall be rejected.<br />

4) Above bid /<strong>of</strong>fer shall be printed on letter head and signed by authorized person<br />

<strong>of</strong> bidder.