- Page 1 and 2:
INTEGRATED WATERSHED MANAGEMENT PRO
- Page 3 and 4:
CHAPTER PARTICULARS CHAPTER - 1 1.1
- Page 5 and 6:
3 Estimate Of Tanka 4 Estimate Of E
- Page 7 and 8:
Location CHAPTER - I INTRODUCTION J
- Page 9 and 10:
1. Average Annual Rainfall (mm) lim
- Page 11 and 12:
Details of infrastructure in the pr
- Page 13 and 14:
Details of Watershed Committees (WC
- Page 15 and 16:
Water Harvesting User Group S.No. N
- Page 17 and 18:
Hoticulture User Group S.No. Name/F
- Page 19 and 20:
Watershed Committee wise Details of
- Page 21 and 22:
Gram Panchayat wise/ Watershed Comm
- Page 23 and 24:
employment given under MNREGS but i
- Page 25 and 26:
CHAPTER - II SOCIO ECONOMIC FEATURE
- Page 27 and 28:
Table 2.1 Population & Household De
- Page 29 and 30:
Table 2.4 .a Agriculture and Hortic
- Page 31 and 32:
Table 2.4.c Productivity Gap Analys
- Page 33 and 34:
Moth Productivity (Kg./Ha) Botanica
- Page 35 and 36:
Analysis of the above table indicat
- Page 37 and 38:
Setting of Vermi Compost Units: Kee
- Page 39 and 40:
Table 2.8 Existing area under fodde
- Page 41 and 42:
Table 2.11 Migration Details Name o
- Page 43 and 44:
Table 2.13(a) Status of Existing SH
- Page 45 and 46:
II. Technical Features Table 2.14 G
- Page 47 and 48:
Table 2.19 Soil details S. No. Majo
- Page 49 and 50:
CHAPTER- III IWMP JODHPUR 42 TENA 4
- Page 51 and 52:
The PRA exercise was carried out in
- Page 53 and 54:
IWMP Jodhpur-42 P.S.Shergarh S.No.
- Page 55 and 56:
(III) Animal Health Animal Health c
- Page 57 and 58:
(B) Natural Resource Management (56
- Page 59 and 60:
(D) Livelihood (9%) S. No. Activity
- Page 61 and 62: Total Amount(Lacs) 368.70 368.70 IW
- Page 63 and 64: COMPONENTWISE & VILLAGEWISE FINANCI
- Page 65 and 66: (B) PRODUCTION MEASURE FOR NON ARAB
- Page 67 and 68: CHAPTER:-V ANNUAL ACTION PLAN IWMP
- Page 69 and 70: ANNUAL ACTION PLAN (I) Natural Reso
- Page 71 and 72: 2 (C) Animal Health S. No. Activity
- Page 73 and 74: EXPECTED OUT COMES 1 2 3 4 5 6 S. N
- Page 75 and 76: (a) Natural resource management Are
- Page 77 and 78: Project outcomes (C) Milk Productio
- Page 79 and 80: IWMP Jodhpur 42 Tena PANCHAYAT SMIT
- Page 81 and 82: 13 (d) 50 mm coping on wall in cm 1
- Page 83 and 84: 7 8 9 10 11 12 Stone Pati for slab
- Page 85 and 86: TANKA MATERIAL ANALYSIS IWMP Jodhpu
- Page 87 and 88: 2' csjÌk iRFkj dh
- Page 89 and 90: DESIGN OF VEGETATIVE BUND IN ARABLE
- Page 91 and 92: IWMP Jodhpur 42 Tena (A) Name Of Wo
- Page 93 and 94: IWMP Jodhpur 42 Tena Name Of Work :
- Page 95 and 96: MODEL COST ESTIMATE OF D.C.B. IWMP
- Page 97 and 98: 9 ikuh dh ykxr e; ifjogu 5 fd-eh- r
- Page 99 and 100: IWMP Jodhpur 42 Tena PANCHAYAT SMIT
- Page 101 and 102: I - INPUTS A - Crop : Bajra Crop-De
- Page 103 and 104: S.No. Inputs Recommended Qty/demo I
- Page 105 and 106: S.No. Inputs Recommended Qty/demo I
- Page 107 and 108: General Medicine:- o Antibiotic :-
- Page 109 and 110: TANKA (CONVERGENCE WITH MNREGA) DET
- Page 111: TENA NAGJI KA BERA PHATONE KI DHANI