IWMP JODHPUR-40 SAI PANCHAYAT SMITI-SHERGARH<br />

ESTIMATE OF VEGETATIVE BUND IN ARABLE LAND<br />

Estimate <strong>of</strong> One ha.<br />

Length per ha. = 80 mtr<br />

S. no. Name <strong>of</strong> work No Length<br />

Width<br />

(TW+BW)<br />

/2 Hight Qty Unit Rate Amount<br />

1 Earth work Excavation for making <strong>of</strong> bund,<br />

laying in layers <strong>of</strong> 15 cm, breaking <strong>of</strong> clods,<br />

sorting <strong>of</strong> grass pebbles, disposal <strong>of</strong><br />

excavated material up to 1.5 mt Hight <strong>and</strong><br />

lead up to 50 m including dressing <strong>and</strong><br />

compaction<br />

1 80 1.85 1 148.00 Cum 85.00 12580.00<br />

2 Sowing <strong>of</strong> seeds on the constructed bund in<br />

three rows<br />

3 80 240 meter 0.60 144.00<br />

3 Supply <strong>of</strong> Stylo/Dhaman seed @ 4 gm / m in<br />

three rows<br />

Construction <strong>of</strong> Waste Weir Work<br />

Earth work Excavation for making <strong>of</strong> bund,<br />

3 80 Cazri Rate 0.96 Kg 150.00 144.00<br />

12868.00<br />

laying in layers <strong>of</strong> 15 cm, breaking <strong>of</strong> clods,<br />

sorting <strong>of</strong> grass pebbles, disposal <strong>of</strong><br />

excavated material up to 1.5 mt Hight <strong>and</strong><br />

lead up to 50 m including dressing <strong>and</strong><br />

compaction<br />

1<br />

{(2X3.55+2.2X.45)/2}+<br />

{(2X1.30+0.40X.30)/2}=3.1<br />

0<br />

3.1 Cum 85 263.5<br />

Dry Stone Pitching work on Earth bund in<br />

(15 to 23cm)<br />

1<br />

{2(.65+.65+2.2)X.23}<br />

=1.61<br />

1.61 Cum 715 1151.15<br />

Total(1+2) per 2 Hac 1414.65<br />

COST PER Hac 707.325<br />

13575.33<br />

Add 3% contingency 407.25975<br />

Total 13982.58<br />

Say 13980<br />