- Page 2 and 3: CSIR - February 2012 pg 1
- Page 4 and 5: PART A: FINAL ENVIRONMENTAL IMPACT
- Page 8 and 9: I. Inleiding iNca Vredendal Wind (E
- Page 10 and 11: III. Behoefte aan die Projek Die We
- Page 12 and 13: V. Voorgestelde Infrastruktuur Die
- Page 14 and 15: Die totale aantal turbines en die g
- Page 16 and 17: verskaf deur plaaslike landvorme so
- Page 18 and 19: I. INTRODUCTION 18 II. THE PROPONEN
- Page 20 and 21: (Google Earth image) Figure 2: Prov
- Page 22 and 23: during the project’s operational
- Page 24 and 25: VI. Summary of Impact Assessment A.
- Page 26 and 27: Considering data collected up to no
- Page 28: All agricultural impacts are consid
- Page 32 and 33: CSIR - February 2012 pg 1-2 Chapter
- Page 34 and 35: 1.1 PROJECT OVERVIEW CSIR - Februar
- Page 36 and 37: 1.6 EIA TEAM CSIR - February 2012 p
- Page 38: SECTION REQUIREMENT FOR EIA REPORT
- Page 41 and 42: CSIR - February 2012 pg 2-2 Chapter
- Page 43 and 44: A B i ii CSIR - February 2012 pg 2-
- Page 45 and 46: CSIR - February 2012 pg 2-6 Chapter
- Page 47 and 48: CSIR - February 2012 pg 2-8 Chapter
- Page 49 and 50: CSIR - February 2012 pg 2-10 Chapte
- Page 51 and 52: 2.3.2 Operation and maintenance CSI
- Page 53 and 54: CSIR - February 2012 pg 2-14 Chapte
- Page 55 and 56: IS THE PROPOSED ACTIVITY NEEDED? CS
- Page 58 and 59:
CSIR - February 2012 pg 3-1 Chapter
- Page 60 and 61:
3. PROJECT ALTERNATIVES CSIR - Febr
- Page 62 and 63:
CSIR - February 2012 pg 3-5 Chapter
- Page 64 and 65:
CSIR - February 2012 pg 3-7 Chapter
- Page 66 and 67:
CSIR - February 2012 pg 3-9 Chapter
- Page 69 and 70:
Chapter 4: Approach to the EIA Phas
- Page 71 and 72:
4. APPROACH TO THE EIA PHASE Chapte
- Page 73 and 74:
Chapter 4: Approach to the EIA Phas
- Page 75 and 76:
4.5 AUTHORITY CONSULTATION DURING T
- Page 77 and 78:
Chapter 4: Approach to the EIA Phas
- Page 79 and 80:
4.7.1 Birds 4.7.2 Bats The bird stu
- Page 81:
Chapter 4: Approach to the EIA Phas
- Page 84 and 85:
CSIR - February 2012 pg 5-2 Chapter
- Page 86 and 87:
Figure 5-1 Locality map and feature
- Page 88 and 89:
5.2 CLIMATE CSIR - February 2012 pg
- Page 90 and 91:
Temperature - Mean maximum annual T
- Page 92 and 93:
Rainfall - Mean annual Towns Propos
- Page 94 and 95:
5.4 CRITICAL BIODIVERSITY AREAS CSI
- Page 96 and 97:
Chapter 5: Receiving Environment 5.
- Page 98 and 99:
Chapter 5: Receiving Environment Fi
- Page 100 and 101:
Chapter 5: Receiving Environment Fi
- Page 102 and 103:
CSIR - February 2012 g 6-2 Chapter
- Page 104 and 105:
CSIR - February 2012 g 6-4 Chapter
- Page 106 and 107:
6.1 INTRODUCTION 6.1.1 Approach to
- Page 108 and 109:
6.2.3 Vegetation 6.2.4 Flora CSIR -
- Page 110 and 111:
CSIR - February 2012 g 6-10 Chapter
- Page 112 and 113:
CSIR - February 2012 g 6-12 Chapter
- Page 114 and 115:
CSIR - February 2012 g 6-14 Chapter
- Page 116 and 117:
CSIR - February 2012 g 6-16 Chapter
- Page 118 and 119:
CSIR - February 2012 g 6-18 Chapter
- Page 120 and 121:
CSIR - February 2012 g 6-20 Chapter
- Page 122 and 123:
Figure 6-9 Transformed area with cu
- Page 124 and 125:
6.5 TERRESTRIAL HABITAT VULNERABILI
- Page 126 and 127:
Table 6-3 Present Ecological State
- Page 128 and 129:
Aspect Description 6.5.2.6 Conserva
- Page 130 and 131:
CSIR - February 2012 g 6-30 Chapter
- Page 132 and 133:
CSIR - February 2012 g 6-32 Chapter
- Page 134 and 135:
CSIR - February 2012 g 6-34 Chapter
- Page 136 and 137:
CSIR - February 2012 g 6-36 Chapter
- Page 138 and 139:
Figure 6-20 Striped Pole Cat (Icton
- Page 140 and 141:
6.7.4 Roads CSIR - February 2012 g
- Page 142 and 143:
Nature of impact CONSTRUCTION PHASE
- Page 144 and 145:
Nature of impact Status (Negative o
- Page 146 and 147:
Nature of impact Status (Negative o
- Page 148 and 149:
Nature of impact Status (Negative o
- Page 150 and 151:
Nature of impact Status (Negative o
- Page 152 and 153:
CSIR - February 2012 g 6-52 Chapter
- Page 154 and 155:
CSIR - February 2012 pg 7-1 Chapter
- Page 156 and 157:
7. BIRD IMPACT ASSESSMENT 7.1 SUMMA
- Page 158 and 159:
CSIR - February 2012 pg 7-5 Chapter
- Page 160 and 161:
CSIR - February 2012 pg 7-7 Chapter
- Page 162 and 163:
Figure 7-2 The location of the prop
- Page 164 and 165:
CSIR - February 2012 pg 7-11 Chapte
- Page 166 and 167:
Common Name Scientific Name Status
- Page 168 and 169:
Common Name Scientific Name Status
- Page 170 and 171:
Common Name Scientific Name Status
- Page 172 and 173:
Common Name Scientific Name Status
- Page 174 and 175:
7.5 IDENTIFICATION OF ISSUES AND IM
- Page 176 and 177:
CSIR - February 2012 pg 7-23 Chapte
- Page 178 and 179:
CSIR - February 2012 pg 7-25 Chapte
- Page 180 and 181:
CSIR - February 2012 pg 7-27 Chapte
- Page 182 and 183:
7.6 PERMIT REQUIREMENTS No specific
- Page 184 and 185:
CSIR - February 2012 pg 7-31 Chapte
- Page 186 and 187:
CSIR - February 2012 pg 7-33 Chapte
- Page 188 and 189:
CSIR - February 2012 pg 7-35 Chapte
- Page 190 and 191:
Nature of impact CONSTRUCTION PHASE
- Page 192 and 193:
Nature of impact Collisions of prio
- Page 194 and 195:
7.8 REVERSIBILITY AND IRREPLACEABIL
- Page 197 and 198:
CSIR - February 2012 pg 8-1 Chapter
- Page 199 and 200:
8 BAT IMPACT ASSESSMENT SUMMARY CSI
- Page 201 and 202:
8.1 INTRODUCTION 8.1.1 Importance o
- Page 203 and 204:
CSIR - February 2012 pg 8-7 Chapter
- Page 205 and 206:
CSIR - February 2012 pg 8-9 Chapter
- Page 207 and 208:
8.3.3 Collision and Barotrauma CSIR
- Page 209 and 210:
Family Species MINIOPTERIDAE Miniop
- Page 211 and 212:
8.5 SITE VISITS DURING AUGUST AND S
- Page 213 and 214:
CSIR - February 2012 pg 8-17 Chapte
- Page 215 and 216:
CSIR - February 2012 pg 8-19 Chapte
- Page 217 and 218:
CSIR - February 2012 pg 8-21 Chapte
- Page 219 and 220:
) Turbine size CSIR - February 2012
- Page 221 and 222:
Figure 8-5 Proposed wind developmen
- Page 223 and 224:
8.8 REVERSIBILITY AND IRREPLACEABIL
- Page 225 and 226:
CSIR - February 2012 pg 8-29 Chapte
- Page 227 and 228:
CSIR - February 2012 pg 8-31 Chapte
- Page 229:
B Post-construction Monitoring CSIR
- Page 232 and 233:
CSIR - February 2012 pg 9-2 Chapter
- Page 234 and 235:
CSIR - February 2012 pg 9-4 Chapter
- Page 236 and 237:
CSIR - February 2012 pg 9-6 Chapter
- Page 238 and 239:
CSIR - February 2012 pg 15 Chapter
- Page 240 and 241:
Table 9-1 Waypoints and description
- Page 243 and 244:
CSIR - February 2012 pg 10-1 Chapte
- Page 245 and 246:
Nature of the Impact Destruction or
- Page 248 and 249:
CSIR - February2012 pg 11-1 Chapter
- Page 250 and 251:
CSIR - February2012 pg 11-3 Chapter
- Page 252 and 253:
11.1.1 Approach to the study CSIR -
- Page 254 and 255:
11.2 PROJECT DESCRIPTION CSIR - Feb
- Page 256 and 257:
Sandveld Cederberg Knersvlkte Table
- Page 258 and 259:
11.3.3 Scenic Resources CSIR - Febr
- Page 260 and 261:
Scenic Resource Illustration Vanrhy
- Page 262 and 263:
Figure 11-1 Landscape types and sen
- Page 264 and 265:
11.3.6 Visual Absorption Capacity F
- Page 266 and 267:
CSIR - February2012 pg 11-19 Chapte
- Page 268 and 269:
11.4.3 Visibility of the Proposed D
- Page 270 and 271:
CSIR - February 2012 pg 11-23 Chapt
- Page 272 and 273:
CSIR - February 2012 pg 11-25 Chapt
- Page 274 and 275:
CSIR - February 2012 pg 11-27 Chapt
- Page 276 and 277:
CSIR - February 2012 pg 11-29 Chapt
- Page 278 and 279:
Viewpoint VP2 Location: S31° 40’
- Page 280 and 281:
Viewpoint VP4 Location: S31° 46’
- Page 282 and 283:
11.6.2 Assessment of Visual Impacts
- Page 284 and 285:
CSIR - February 2012 pg 11-37 Chapt
- Page 286 and 287:
Extent of Impact 11.6.2.8 Assessmen
- Page 288 and 289:
Summary of impacts during construct
- Page 290 and 291:
Extent of Impact Duration of Impact
- Page 292 and 293:
Summary of impacts during operation
- Page 294:
11.7 REVERSIBILITY AND IRREPLACEABI
- Page 297 and 298:
Chapter 12: Agricultural Impact Ass
- Page 299 and 300:
12.1 INTRODUCTION Chapter 12: Agric
- Page 301 and 302:
Chapter 12: Agricultural Impact Ass
- Page 303 and 304:
Chapter 12: Agricultural Impact Ass
- Page 305 and 306:
Chapter 12: Agricultural Impact Ass
- Page 307 and 308:
Chapter 12: Agricultural Impact Ass
- Page 309 and 310:
Table 12-2 Summary table giving ass
- Page 311 and 312:
Chapter 12: Agricultural Impact Ass
- Page 313 and 314:
CSIR - February 2012 pg 13-1 Chapte
- Page 315 and 316:
13. FRESHWATER RESOURCE IMPACT ASSE
- Page 317 and 318:
13.2.2 Natural environment CSIR - F
- Page 319 and 320:
Figure 13-2 CBA map indicating wetl
- Page 321 and 322:
CSIR - February 2012 pg 13-9 Chapte
- Page 323 and 324:
Figure 13-8 Google Earth enlargemen
- Page 325 and 326:
13.3 IDENTIFICATION OF ISSUES AND I
- Page 327:
13.6 CONCLUSIONS CSIR - February 20
- Page 330 and 331:
Chapter 14: Issues and Responses Tr
- Page 332 and 333:
A. COMMENTS RECEIVED AFTER THE RELE
- Page 334 and 335:
NO ISSUES RAISED DATE COMMENTER RES
- Page 336 and 337:
NO ISSUES RAISED DATE COMMENTER RES
- Page 338 and 339:
NO ISSUES RAISED DATE COMMENTER RES
- Page 340 and 341:
NO ISSUES RAISED DATE COMMENTER RES
- Page 342 and 343:
2) Issues related to fauna, flora a
- Page 344 and 345:
NO ISSUES RAISED DATE COMMENTER RES
- Page 346 and 347:
3) Issues related to land-use NO IS
- Page 348 and 349:
NO ISSUES RAISED DATE COMMENTER RES
- Page 350 and 351:
NO ISSUES RAISED DATE COMMENTER RES
- Page 352 and 353:
CSIR - February 2012 pg 15-1 Chapte
- Page 354 and 355:
CSIR - February 2012 pg 15-3 Chapte
- Page 356 and 357:
CSIR - February 2012 pg 15-5 Chapte
- Page 358 and 359:
CSIR - February 2012 pg 15-7 Chapte
- Page 362 and 363:
CSIR - February 2012 pg 1 Appendix
- Page 364 and 365:
CSIR - February 2012 pg 3 Appendix
- Page 366 and 367:
CSIR - February 2012 pg 5 Appendix
- Page 368 and 369:
CSIR - February 2012 pg 7 Appendix
- Page 370 and 371:
CSIR - February 2012 pg 9 Appendix
- Page 372 and 373:
CSIR - February 2012 pg 11 Appendix
- Page 374 and 375:
CSIR - February 2012 pg 13 Appendix
- Page 376 and 377:
BKS Naledzi Environmental Eyethu En
- Page 378 and 379:
CSIR - February 2012 pg 17 Appendix
- Page 380 and 381:
CSIR - February 2012 pg 19 Appendix
- Page 382 and 383:
CSIR - February 2012 pg 21 Appendix
- Page 384 and 385:
CSIR - February 2012 pg 23 Appendix
- Page 386 and 387:
Countries of work experience: South
- Page 388 and 389:
CSIR - February 2012 pg 27 Appendix
- Page 390 and 391:
CSIR - February 2012 pg 29 Appendix
- Page 392 and 393:
CSIR - February 2012 pg 31 Appendix
- Page 394 and 395:
CSIR - February 2012 pg 33 Appendix
- Page 396 and 397:
CSIR - February 2012 pg 35 Appendix
- Page 399 and 400:
CSIR - February 2012 pg 1 B1 - Loca
- Page 402 and 403:
CSIR -February 2012 pg 1 Appendix C
- Page 404 and 405:
CSIR -February 2012 pg 3 Appendix C
- Page 406 and 407:
CSIR -February 2012 pg 5 Appendix C
- Page 409 and 410:
Institution / Farm (Position) Names
- Page 412 and 413:
CSIR -February 2012 pg 1 Appendix E
- Page 414 and 415:
CSIR -February 2012 pg 3 Appendix E
- Page 416 and 417:
CSIR -February 2012 pg 5 Appendix E
- Page 418 and 419:
CSIR -February 2012 pg 7 Appendix E
- Page 420 and 421:
CSIR -February 2012 pg 9 Appendix E
- Page 422 and 423:
CSIR -February 2012 pg 11 Appendix
- Page 424 and 425:
CSIR -February 2012 pg 13 Appendix
- Page 426 and 427:
CSIR -February 2012 pg 15 Appendix
- Page 428 and 429:
CSIR -February 2012 pg 17 Appendix
- Page 430 and 431:
E1_I INCA LETTER RELATING TO WATER
- Page 432 and 433:
CSIR -February 2012 pg 21 Appendix
- Page 434 and 435:
CSIR -February 2012 pg 23 Appendix
- Page 436 and 437:
E2_A CIVIL AVIATION LETTER OF NO OB
- Page 438 and 439:
CSIR -February 2012 pg 27 Appendix
- Page 440 and 441:
CSIR -February 2012 pg 29 Appendix
- Page 442 and 443:
CSIR -February 2012 pg 31 Appendix
- Page 444 and 445:
CSIR -February 2012 pg 33 Appendix
- Page 446 and 447:
CSIR -February 2012 pg 35 Appendix
- Page 448 and 449:
Appendix F: Public Meeting Minutes
- Page 450 and 451:
Nr Name Affiliation 1 Cornelius van
- Page 452 and 453:
Appendix F: Public Meeting Minutes
- Page 454:
CSIR -February 2012 pg 6 Appendix F
- Page 458 and 459:
CSIR - February 2012 pg 1 Section B
- Page 460 and 461:
CSIR - February 2012 pg 3 Section B
- Page 462 and 463:
CSIR - February 2012 pg 5 Section B
- Page 464 and 465:
1.4 MANAGEMENT PLAN FOR DESIGN PHAS
- Page 466 and 467:
1.5 MANAGEMENT PLAN FOR CONSTRUCTIO
- Page 468 and 469:
Construction Phase: Impact Mitigati
- Page 470 and 471:
Construction Phase: Impact Mitigati
- Page 472 and 473:
Impact Mitigation/Management action
- Page 474 and 475:
Construction Phase: 1.5.11 Heritage
- Page 476 and 477:
Impact Mitigation/Management action
- Page 478 and 479:
Operational Phase: Impact Mitigatio
- Page 480 and 481:
Impact Mitigation/Management action
- Page 482 and 483:
Impact Mitigation/Management action
- Page 484 and 485:
Operational Phase: 1.6.10 Agricultu