APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf
APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf
APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Ba-Phalaborwa Municipality<br />
Approved <strong>IDP</strong> Document<br />
<strong>2011</strong> - 2016<br />
The Home of Marula and Wildlife Tourism<br />
1
Cllr GD Mudunungu<br />
Mayor of Ba-Phalaborwa Municipality<br />
This <strong>2011</strong>/16 <strong>IDP</strong> provides the strategic direction of the municipality, including the projects that will<br />
be undertaken in the municipality over the next five years until 2016. Except the difference in the<br />
format with the previous <strong>IDP</strong>s, there has also been a difference in the way we engage our partners in<br />
both community development and service extension. This includes having the Foskor and PMC<br />
undertaking to fund infrastructure upgrade in support of economic development and sustainability of<br />
the municipality.<br />
The public participation and stakeholder engagement process also reached and mobilized<br />
participation of more communities and stakeholders including the civic movement as the<br />
communities and our stakeholders actualize the spirit of “working together we can do more”.<br />
Therefore this <strong>IDP</strong> is an embodiment of the following:<br />
• A consolidated partnership in with stakeholders in service delivery and the pursuit of our<br />
Vision and Mission.<br />
• A deepened community-centred approach to development<br />
• A coordinated and integrated approach to planning and development of the municipality.<br />
The implementation of this <strong>IDP</strong> and its supportive Budget will result in ‘a better life for all’.<br />
Cllr. Gloria Dzunisani Mudunungu<br />
Mayor: Ba-Phalaborwa Municipality<br />
2
TABLE OF CONTENTS<br />
Section A<br />
3<br />
Page No<br />
A1. Ba-Phalaborwa Municipality: Overview 07<br />
A2. The Current Situation 07<br />
A3. Key Challenges and Opportunities 07<br />
A4. Municipal Strategies 08<br />
A5. Powers and Functions of the Municipality 08<br />
A6. <strong>IDP</strong> Process Plan 10<br />
A6.1 Phases and Activities of the <strong>IDP</strong> Process Plan 11<br />
A6.2 Structures that manage/drive <strong>IDP</strong>/Budget and PMS Process 12<br />
A6.4 <strong>IDP</strong>, Budget and PMS Calendar 31<br />
Section B<br />
Situational Analysis<br />
B1. The Internal Environment 46<br />
B1.1 Corporate Structure 46<br />
B1.2 Corporate Culture 47<br />
B1.3 Organisational Resources 48<br />
B1.4 Marketing 48<br />
B1.5 Finance 49<br />
B1.6 Municipal Operations 49<br />
B1.7 Human Resources Management 49<br />
B1.8 Information Systems (IS) 50<br />
B2. The External Environment 51<br />
B2.1 Spatial Analysis 51<br />
B2.1.1 Geographic Location 51
B.2.1.2 Mopani District SDF – An Overview 55<br />
B2.1.3 Guidelines for Land Use Management 55<br />
B2.1.4 Spatial Planning and Land Use 55<br />
B2.2 Demographics 64<br />
B2.2.1 Population 64<br />
B2.3 Local Economic Development and Tourism 70<br />
B2.4 Safety and Security 91<br />
B2.5 Environmental Considerations 92<br />
B2.7 Disaster Management 93<br />
B3. Institutional Arrangements 95<br />
B4. Governance and Financial Viability 95<br />
B5. Municipal Backlogs 100<br />
B5.1 Water 100<br />
B5.2 Sanitation 102<br />
B5.3 Electricity/Energy 109<br />
B5.4 Waste Management 115<br />
B5.5 Housing 116<br />
B5.6 Roads and Transport 120<br />
B5.7 Thusong Services Centre 131<br />
B5.8 Libraries 132<br />
B5.9 Recreational Facilities 135<br />
B5.10 Health Facilities 137<br />
B5.11 HIV/Aids 142<br />
B5.12 Educational Facilities 147<br />
B5.13 Special Groups 147<br />
B6. Problem Statement 148<br />
B7. Recommendations 148<br />
4
B8. Community Needs 148<br />
Section C<br />
Strategic Intent<br />
C1. Introduction 170<br />
C2. 2009/10 <strong>IDP</strong> Implementation Report 171<br />
C3. Analysis 176<br />
C4. Strategic Intent 184<br />
C4.1 Vision 190<br />
C4.2 Mission 191<br />
C4.3 Values 192<br />
C4.4 Strategy Map 192<br />
C4.5 Strategic Objectives 194<br />
C6 Ba-Phalaborwa Turnaround Strategy 217<br />
Section D<br />
Projects<br />
D1. Introduction 234<br />
D2 Operational and Maintenance 235<br />
D3. Programmes, Strategies and Plans 251<br />
D4. Capital Projects 262<br />
D5. MIG Projects 270<br />
D6. NDPG Projects 274<br />
D7. Mopani District Municipality Projects 275<br />
D8. Sector Departments Projects 277<br />
D9. Libsa Projects 287<br />
5
D10. Foskor Projects 288<br />
D11. Rio Tinto Palabora Foundation Projects 291<br />
D12. Rio Tinto SLP Projects 292<br />
D13. SA Airlink Project 293<br />
Section E<br />
Summaries of Sector Plans<br />
E1. Ba-Phalaborwa <strong>IDP</strong> Housing Chapter 295<br />
E2. Land Use Management Scheme 299<br />
E3. Anti-Corruption Strategy 301<br />
E4. Local Economic Development Strategy 306<br />
E5. Spatial Development Framework 308<br />
E6. Integrated Waste Management Plan 311<br />
E7. Recruitment and Retention Strategy 313<br />
E8. Municipal Institutional Plan 314<br />
E9. Risk Management Strategy 316<br />
E10. Disaster Management Plan 317<br />
SECTION F<br />
Addedum: Organogram of the Municipality<br />
6
A1. Ba-Phalaborwa Municipality: An Overview<br />
SECTION A<br />
Executive Summary<br />
Ba-Phalaborwa Municipality is a Category B municipality established in terms of Section 155 of the<br />
Constitution and strives to achieve the following objects of local government (as enshrined in Section<br />
152 of the Constitution):<br />
• To provide democratic and accountable government for local communities;<br />
• To ensure the provision of services to communities in a sustainable manner;<br />
• To promote social and economic development;<br />
• To promote a safe and healthy environment; and<br />
• To encourage the involvement of communities and community organisations in the matters of<br />
local government.<br />
The Municipality is situated in the North-Eastern part of South Africa in the Limpopo Province. It is one<br />
of the five local municipalities in the Mopani District family of municipalities. It has a geographical area<br />
of that constitutes 27% of the Mopani District. It serves as a convenient gateway to the<br />
Kruger National Park and the Transfrontier Park through the Mozambique Channel.<br />
A2. The Current Situation<br />
The current municipal Council is the third since the establishment of transitional local councils in 1995.<br />
The 1995 Council had 12 wards. Unlike the 2000 Council which had 14 wards and 28 councilors, the<br />
current Council (inaugurated in 2006) has 16 Wards with 32 councilors. The current term of this Council<br />
will expire in <strong>2011</strong>. The new Council that will be inaugurated in <strong>2011</strong> will have 18 wards with 36<br />
councillors, this after the addition of two wards from the existing 16 wards.<br />
A3. Key Challenges and Opportunities<br />
The Municipality has a developmental mandate to fulfill, but is currently threatened by the downscaling<br />
of the mining sector (the main contributor to the local GDP). The mining sector is expected to shed jobs<br />
in the near future as a result of Palabora Mining Company (PMC) stopping copper mining and the<br />
7
esultant closure of other related operations in the area. The Municipality’s main challenge is to<br />
stimulate the local economy and attract sustainable investment into the area. There is an abundance of<br />
a variety of minerals within the Phalaborwa area and the Gravelotte Greenstone Belt and that further<br />
presents an opportunity for small scale mining. The close proximity of the Municipality to the Kruger<br />
National Park Gate also presents an opportunity to grow the tourism industry.<br />
A4. Municipal Strategies<br />
The Municipality has taken a decision to focus on growing the Tourism industry in an attempt to<br />
mitigate for any losses from the mining sector. The strategic intent of the Municipality is, therefore,<br />
around economic development through tourism.<br />
A5. Powers and Functions of the Municipality<br />
In terms of the Municipal Demarcation Board’ assessment of the capacity of municipalities to perform<br />
their functions, Ba-Phalaborwa Municipality is authorized to exercise and perform the following powers<br />
functions:<br />
Table A5.1: Powers and functions of the Municipality<br />
POWERS & FUNCTIONS AUTHORISATION RESPONSIBLE DEPARTMENT<br />
Air pollution Yes Community Services<br />
Building regulations Yes Technical Services<br />
Child care facilities Yes Community Services<br />
Electricity reticulation Yes Technical Services<br />
Fire fighting No -<br />
Local tourism Yes Planning and Development<br />
Municipal airport Yes Community Services, Strategic Planning<br />
Municipal planning Yes Planning and Development<br />
Municipal health services Yes Community Services<br />
Municipal public transport Yes Community Services<br />
8
POWERS & FUNCTIONS AUTHORISATION RESPONSIBLE DEPARTMENT<br />
Pontoons & ferries Yes Community Services<br />
Storm water Yes Technical Services<br />
Trading regulations Yes Community Services<br />
Water (potable) No -<br />
Billboards & the display of<br />
advertisements in public<br />
places<br />
Cemeteries, funeral parlous<br />
and crematoria<br />
Yes Corporate Services, Planning & Community<br />
Services<br />
Yes, including<br />
District<br />
Municipality<br />
function<br />
Community Services<br />
Cleansing Yes Community Services<br />
Control of public nuisance Yes Community Services<br />
Control of undertakings that<br />
sell liquor to the public<br />
Facilities for the<br />
accommodation, care and<br />
burial of animals<br />
Yes Community Services<br />
Yes Community Services<br />
Fencing & fences Yes Technical Services<br />
Licensing and control of<br />
undertakings that sell food to<br />
the public<br />
Yes Community Services<br />
Local amenities Yes Community Services, Corporate Services<br />
Local sport facilities Yes Community Services, Corporate Services<br />
Markets Yes Community Services, Planning<br />
Municipal abattoirs Yes Community Services<br />
Municipal parks & recreation Yes Community Services<br />
Municipal roads Yes Technical Services, Community Services<br />
9
POWERS & FUNCTIONS AUTHORISATION RESPONSIBLE DEPARTMENT<br />
Noise pollution Yes Community Services<br />
Pounds Yes Community Services<br />
Public places Yes Community Services, Corporate Services<br />
Refuse removal, refuse<br />
dumps and solid waste<br />
disposal<br />
Yes, including<br />
District<br />
Municipality<br />
function<br />
Community Services<br />
Street trading Yes Planning & Community<br />
Street lighting Yes Technical Services<br />
Traffic and Parking Yes Community Services<br />
Source: Municipal Demarcation Board, 2008<br />
A6. <strong>IDP</strong> Process Plan<br />
Section 28 of the Municipal Systems Act, Act 32 of 2000 requires that each Municipal Council adopts a<br />
process plan that would guide the planning, drafting, adoption and review of the <strong>IDP</strong> and Budget. In line<br />
with the provisions of the above-mentioned Act, Ba-Phalaborwa Municipality has adopted the District<br />
<strong>IDP</strong> Framework and Process Pan in reviewing its <strong>2011</strong>/12 <strong>IDP</strong>. The Process Plan was amended in January<br />
<strong>2011</strong> to be in line with Option 1of the MFMA Circular 54 of 2010, which advises municipalities on the<br />
planning and budget issues to accommodate the <strong>2011</strong> local government elections.<br />
10
A6.1Phases and Activities of the <strong>IDP</strong> Process<br />
The table below shows the phases/stages of the <strong>IDP</strong> Process and Activities entailed for the review of the<br />
<strong>2011</strong>/12 <strong>IDP</strong>:<br />
Stages/Phases of the <strong>IDP</strong> Process<br />
<strong>IDP</strong> Phases Activities<br />
Preparatory Phase<br />
Analysis Phase<br />
Strategies Phase<br />
Projects Phase<br />
Integration Phase<br />
Approval Phase<br />
- Identification and establishment of stakeholders and/or<br />
structures and sources of information.<br />
- Development of the <strong>IDP</strong> Framework and Process Plan.<br />
- Compilation of levels of development and backlogs that<br />
suggest areas of intervention.<br />
- Reviewing the Vision, Mission, Strategies and Objectives.<br />
- Identification of possible projects and their funding<br />
sources<br />
- Sector plans summary inclusion and programmes of action<br />
- Submission of Draft <strong>IDP</strong> to Council<br />
- Road-show on Public Participation and publication<br />
- Amendments of the Draft <strong>IDP</strong> according to comments;<br />
- Submission of final <strong>IDP</strong> to council for approval and<br />
adoption<br />
11
A6.2 Structures that manage/drive the <strong>IDP</strong>, Budget and PMS process<br />
The following diagram is a schematic representation of the organisational structure that drives the <strong>IDP</strong> Process:<br />
Advisory Board<br />
Council<br />
Mayor<br />
Municipal Manager<br />
<strong>IDP</strong>, Budget & PMS Steering<br />
Committee<br />
<strong>IDP</strong>, Budget & PMS Technical<br />
Committee<br />
<strong>IDP</strong>, Budget & PMS Operational<br />
Task Team Meeting<br />
12<br />
Stakeholder Structures<br />
<strong>IDP</strong>, Budget & PMS Rep Forum<br />
Exco<br />
Public/Communit<br />
y Structures<br />
Ward<br />
Committees/LAP<br />
Facilitators
The following structures were responsible to develop, implement and monitor the <strong>IDP</strong>, Budget and PMS of Ba-Phalaborwa. Ba-Phalaborwa<br />
Municipality <strong>IDP</strong>, Budget and PMS process has been aligned with that of the District Municipality as indicated in the table below:<br />
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Mopani District<br />
Municipality<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
• District Council<br />
• <strong>IDP</strong> Unit<br />
13<br />
• Approve and adopt a<br />
District-wide <strong>IDP</strong><br />
Framework and Process<br />
Plan<br />
• Participate in the <strong>IDP</strong><br />
Process<br />
• Provide methodological<br />
and technical assistance<br />
• Coordinate and support<br />
<strong>IDP</strong> activities<br />
• Ensure <strong>IDP</strong> alignment to<br />
district, provincial and<br />
national requirements.
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Council Members of Council<br />
Mayoral Committee/<br />
EXCO<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
(Chair: Speaker)<br />
Mayor, Portfolio Heads,<br />
Municipal Manager,<br />
Directors, and <strong>IDP</strong><br />
Manager<br />
(Chair: The Mayor)<br />
Members of Council<br />
(Chair: Speaker)<br />
Executive Mayor,<br />
Portfolio Heads,<br />
Municipal Manager and<br />
Senior<br />
Managers/Directors<br />
(Chair: Executive Mayor)<br />
14<br />
• Deliberate and adopt <strong>IDP</strong><br />
Framework and Process<br />
plan.<br />
• Deliberate, adopt and<br />
approve the <strong>IDP</strong>.<br />
• Provide political oversight<br />
in the development of the<br />
<strong>IDP</strong><br />
• Approve/adopt <strong>IDP</strong><br />
• Assign responsibilities to • Submit draft <strong>IDP</strong> to Council<br />
Municipal Manager.<br />
• Deliberate and adopt <strong>IDP</strong><br />
Framework and Process<br />
Plan.<br />
• Political oversight<br />
• Assign responsibilities to<br />
Municipal Manager
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Advisory Board An independent board<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
of senior leaders<br />
representing various<br />
sectors.<br />
15<br />
• Responsible for the<br />
overall management, co-<br />
ordination and monitoring<br />
of the planning process<br />
and drafting process, as<br />
delegated to the<br />
Municipal Manager and<br />
the <strong>IDP</strong> Technical Team.<br />
• Submit draft <strong>IDP</strong> to<br />
Council.<br />
• Oversee the<br />
implementation of the<br />
Development Charter.<br />
• Advice the <strong>IDP</strong><br />
representative forum and<br />
mobilise resources for
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Portfolio Committee Chairperson and<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
members of Portfolio<br />
Committee – Planning &<br />
Development. (Chair:<br />
Head of Portfolio<br />
Committee)<br />
Ward Committees Ward councillors; Ward<br />
committee members;<br />
Local Area Planning<br />
Facilitators (LAPs); and<br />
Community<br />
Development Workers<br />
Councillors and Director<br />
Planning and<br />
Development. (Chair:<br />
Portfolio Head,<br />
Planning)<br />
16<br />
development<br />
programmes and projects<br />
• Manage the drafting of<br />
the <strong>IDP</strong> on behalf of the<br />
Executive Committee<br />
• Provide political oversight.<br />
• Collect, discuss and<br />
prioritise ward needs.<br />
• Submit ward needs to <strong>IDP</strong><br />
Unit Link the planning<br />
process to their respective<br />
constituencies, wards and<br />
Ward Committees.<br />
• Manage the drafting of<br />
the <strong>IDP</strong> on behalf of the<br />
Mayoral Committee
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
(CDWs). Chair: Ward<br />
Councillor)<br />
Municipal Manager The Municipal Manager<br />
17<br />
• Responsible for organizing<br />
public consultation and<br />
participation.<br />
• Ensure the annual<br />
business plans and<br />
municipal budget are<br />
linked to and based on<br />
the <strong>IDP</strong>.<br />
• Ensure the <strong>IDP</strong> is aligned<br />
with provincial and<br />
national departments’<br />
budgets.<br />
• Responsible for the<br />
overall management,
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
18<br />
coordination and<br />
monitoring of the<br />
planning process, as<br />
delegated to the<br />
Municipal Manager and<br />
the <strong>IDP</strong>/Budget Technical<br />
Team.<br />
• Coordinates the<br />
implementation of the<br />
<strong>IDP</strong>/Budget planning<br />
process.<br />
• Prepares the programme<br />
for the planning process.<br />
• Undertakes the overall<br />
management and co-<br />
ordination of the planning
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
19<br />
process, ensuring that all<br />
relevant actors are<br />
appropriately involved.<br />
• Assign persons in charge<br />
of different roles.<br />
• Ensures an efficient and<br />
effectively managed and<br />
organised planning<br />
process.<br />
• Responsible for the day-<br />
to-day management of<br />
the drafting process.<br />
• Ensures that planning<br />
process is participatory,<br />
strategic and<br />
implementation-
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
20<br />
orientated and is aligned<br />
to and satisfies sector-<br />
planning requirements.<br />
• Responds to comments<br />
on the draft <strong>IDP</strong>/Budget<br />
from the public,<br />
horizontal alignment and<br />
other spheres of<br />
government to the<br />
satisfaction of the<br />
Municipal Council.<br />
• Ensures that MEC for local<br />
government’s proposals<br />
are responded to and <strong>IDP</strong><br />
relevantly adjusted.
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
<strong>IDP</strong>/Budget & PMS<br />
Steering Committee<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
Mayor, Chairpersons of<br />
Portfolio Committees,<br />
Municipal Manager,<br />
Directors, Assistant<br />
Financial Officer:<br />
Budget, Asst Director:<br />
SP, <strong>IDP</strong> Manager, Ass<br />
Accountant Budget.<br />
(Chair: Mayor)<br />
Municipal Manager,<br />
Directors, <strong>IDP</strong> Manager,<br />
Middle Managers<br />
(Chair: Municipal<br />
Manager)<br />
21<br />
• Provide political oversight<br />
in the development of the<br />
<strong>IDP</strong>/Budget.<br />
• Supervises the<br />
implementation of<br />
<strong>IDP</strong>/Budget planning<br />
process.<br />
• <strong>IDP</strong>/Budget consultation<br />
with various sectors.<br />
• Oversee that<br />
amendments made to the<br />
draft <strong>IDP</strong>/Budget are to<br />
the satisfaction of the<br />
Municipal Council.<br />
• Responsible for the<br />
drafting of the <strong>IDP</strong>.<br />
• Alignment of process &<br />
plans<br />
• <strong>IDP</strong> consultation with<br />
various sectors<br />
• Preparations for all <strong>IDP</strong><br />
meetings
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
<strong>IDP</strong> /Budget & PMS<br />
Technical Committee<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
Municipal Manager, All<br />
Directors, All Ass<br />
Directors, Middle<br />
Managers, Ass. Acc:<br />
22<br />
• Be responsible for the<br />
submission of the<br />
<strong>IDP</strong>/Budget to EXCO (for<br />
recommendation to<br />
Council) and MEC for local<br />
government (for<br />
alignment).<br />
• Undertakes<br />
responsibilities, in<br />
response to proposals<br />
made by the MEC.<br />
• Contribute technical<br />
expertise in the<br />
consideration and<br />
finalisation of strategies<br />
and identification of
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
Budget and <strong>IDP</strong><br />
Manager (Chair:<br />
Municipal Manager)<br />
23<br />
projects.<br />
• Provide departmental,<br />
operational and capital,<br />
budgetary information.<br />
• Be responsible for project<br />
proposals.<br />
• Be responsible for the<br />
preparation and<br />
integration of projects<br />
and sector programmes.<br />
• Be responsible for<br />
preparing amendments<br />
for the <strong>IDP</strong>/Budget<br />
review.<br />
• Responsible for organising<br />
public consultation and
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
<strong>IDP</strong>/Budget & PMS<br />
Operational Task Teams<br />
<strong>IDP</strong><br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
Asst Director: SP, <strong>IDP</strong><br />
Manager, LED Manager,<br />
PMS Manager, Public<br />
Participation Officer.<br />
(Chair: Deputy Director<br />
SP)<br />
Government<br />
Departments, Local<br />
Municipalities, District<br />
Management Area,<br />
Traditional Leaders,<br />
CBOs, SOEs, NPOs,<br />
CDWs, Associations,<br />
Interest groups, and<br />
Resource Persons. (Chair:<br />
Executive Mayor)<br />
24<br />
participation.<br />
<strong>IDP</strong><br />
• Implements the Process<br />
Plan.<br />
• Provide analysis of<br />
relevant technical and<br />
sector information.<br />
• <strong>IDP</strong> consultation with<br />
various sectors.<br />
• Preparations for all <strong>IDP</strong><br />
meetings.<br />
• Ensures documentation of<br />
the results of the review<br />
of the <strong>IDP</strong> document.<br />
• Ensures amendments are<br />
• <strong>IDP</strong> consultation with<br />
various sectors.<br />
• Preparations for all <strong>IDP</strong><br />
meetings
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Budget<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
CFO, Ass. Fin. Officer:<br />
Budget, Ass Acc:<br />
Budget, All Assistant<br />
Directors: (Chair:<br />
Budget & Treasury<br />
Manager)<br />
25<br />
Budget<br />
made to the draft <strong>IDP</strong> to<br />
the satisfaction of the<br />
Technical Committee<br />
• Implements the budget<br />
Process Plan.<br />
• Provides analysis of<br />
relevant technical, sector<br />
and financial information.<br />
• Ensure Departmental<br />
Budget Committees are<br />
functional<br />
• Ensures proper<br />
documentation of the
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Advisory Board<br />
(Development Charter)<br />
<strong>IDP</strong>, Budget & PMS<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
An independent board<br />
of senior leaders<br />
representing various<br />
sectors.<br />
26<br />
results of the drafting of<br />
Budget document.<br />
• Ensures amendments are<br />
made to the draft Budget<br />
to the satisfaction of the<br />
Technical Committee.<br />
• Oversee the<br />
implementation of the<br />
Development Charter.<br />
• Advice the <strong>IDP</strong><br />
representative forum and<br />
mobilise resources for<br />
development<br />
programmes and projects<br />
• Stakeholders forum • Government • Participate and ratify the • Debate and confirm the
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Representative Forum comprising,<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
amongst others,<br />
community<br />
structures, non-<br />
profit making<br />
organisations,<br />
Traditional Leaders,<br />
Ward Councillors,<br />
Associations,<br />
Interest Groups,<br />
Government<br />
departments,<br />
Church leaders,<br />
Ward Committee<br />
Members. (Chair:<br />
departments, local<br />
municipalities,<br />
district management<br />
area, traditional<br />
leaders, CBOs, SOEs,<br />
NPOs, CDWs,<br />
Associations, Interest<br />
groups and Resource<br />
Persons. (Chair:<br />
Executive Mayor)<br />
27<br />
completion of each phase of<br />
the <strong>IDP</strong> development and<br />
review process.<br />
• Represent the communities<br />
at strategic decision-making<br />
level.<br />
priorities of the<br />
municipality.<br />
• Represent the<br />
communities at decision-<br />
making level
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Public Participation<br />
Team<br />
Cluster Technical<br />
Committee<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
The Mayor)<br />
• Representatives<br />
from all directorates<br />
and the office of the<br />
Speaker (Chair:<br />
Assistant Director<br />
Strategic Planning)<br />
• Economic Technical<br />
Committee (Chair:<br />
Director Planning<br />
28<br />
• Coordination of the public<br />
participation programme.<br />
• Mobilise the involvement<br />
and commitment of<br />
stakeholders.<br />
• Ensure participation of<br />
previously disadvantaged<br />
groups, e.g. women, the<br />
disabled, etc.<br />
• Implement the <strong>IDP</strong><br />
• Develop sector plans
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
and Development)<br />
• Social and<br />
Infrastructure<br />
Technical Committee<br />
(Chair: Director<br />
Community Services)<br />
• Governance and<br />
Administration<br />
Technical Committee<br />
(Chair: Chief<br />
Financial Officer)<br />
Performance Audit Audit Committee Members of the Audit<br />
29<br />
• <strong>IDP</strong>/Budget/PMS • <strong>IDP</strong>/Budget/PMS
Structures that manage/drive the <strong>IDP</strong> Process<br />
Structure Composition Role<br />
Committee members, PMS<br />
District Development<br />
Planning Forum<br />
Dept, Local<br />
Government and<br />
Housing<br />
Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />
Coordinator, and<br />
Internal Auditor (Chair:<br />
Chairperson of the<br />
Audit Committee)<br />
Committee, PMS<br />
Coordinator, Internal<br />
Auditor<br />
MDM: District Sector Departments, SOEs, Youth<br />
commission, LMs<br />
MEC for Local Government and Housing<br />
30<br />
monitoring monitoring<br />
• Assess/Evaluate the <strong>IDP</strong><br />
• Alignment of planning,<br />
National, Provincial & Local<br />
Government<br />
• Comment and Monitor <strong>IDP</strong> implementation
A6.3 <strong>IDP</strong>, Budget and PMS Calendar<br />
Ba-Phalaborwa Municipality followed the above calendar in reviewing its <strong>IDP</strong>, Budget and PMS in line with the Approved District Framework.<br />
Month Activity Time-Frame<br />
July 2010 Preparatory Phase:<br />
<strong>IDP</strong><br />
• Portfolio Committee (<strong>IDP</strong><br />
Framework and Process Plan).<br />
• Mayor tables <strong>IDP</strong>/Budget<br />
Framework & Process Plan in<br />
(Special Council)<br />
Budget<br />
• Establish Departmental Budget<br />
Committees (include councillors &<br />
officials).<br />
PMS<br />
• Compilation of 2009/10 4 th<br />
quarterly report<br />
• Conclude 2010/11 annual<br />
31<br />
MDM only<br />
MDM only<br />
Ba-Phalaborwa Mopani<br />
• 23/07/2010 – 03/09/2010<br />
• 01/07/2010 - 11/07/2010<br />
31 July 2010
August 2010<br />
Month Activity Time-Frame<br />
performance agreements<br />
• Compilation of 2009/10 <strong>IDP</strong><br />
Implementation Report<br />
• Submit final approved SDBIP<br />
2010/11<br />
<strong>IDP</strong><br />
• <strong>IDP</strong>/Budget Operational Teams<br />
meetings (Process Plan)<br />
• <strong>IDP</strong>/Budget Technical Committee<br />
meeting (Process Plan)<br />
• <strong>IDP</strong>/Budget Steering Committee<br />
meeting (Process Plan)<br />
• Establish appropriate committees<br />
and consultation forums. Adopt a<br />
schedule for community<br />
involvement<br />
• <strong>IDP</strong> Representative (Rep) Forum<br />
(Process Plan)<br />
• Mayor tables <strong>IDP</strong>/Budget/PMS<br />
Process Plan in Council<br />
Budget<br />
32<br />
Ba-Phalaborwa Mopani<br />
• 01/07/2010 - 31/07/2010<br />
• 01/07/2010 - 31/08/2010<br />
• 31/07/2010<br />
• 12/08/2010<br />
• 16/08/2010<br />
• 18/08/2010<br />
• 18/08/2010<br />
• 24/08/2010<br />
• 31/08/2010
Month Activity Time-Frame<br />
• 2009/10 internal analysis of<br />
financial and non-financial<br />
performance. Determine financial<br />
position and assess financial<br />
capacity against future strategies.<br />
August 2010 PMS<br />
• Place 2009/10 quarterly (section 52)<br />
report on budget implementation<br />
on the municipal website.<br />
• Make public the 2010/11 SDBIP<br />
• Make public 2010/11 annual<br />
performance agreements and<br />
ensure copies are provided to<br />
council and MEC: DLGH<br />
• Submission of 2009/10<br />
Departmental Annual Performance<br />
Reports.<br />
• Place 2010/11 annual performance<br />
agreements on the municipal<br />
website.<br />
33<br />
Ba-Phalaborwa Mopani<br />
• 31/08/2010<br />
• 04/08/2010<br />
• 11/08/2010<br />
• 11/08/2010<br />
• 12/08/2010<br />
• 16/08/2010<br />
September 2010 <strong>IDP</strong> 30 September 2010
Month Activity Time-Frame<br />
Analysis Phase:<br />
• 2009/10 <strong>IDP</strong> implementation<br />
feedback: First Quarter Mayoral<br />
Imbizo<br />
• Data collection (ward-based<br />
planning)<br />
• Data analysis and interpretation<br />
Budget<br />
• Determine the funding revenue<br />
envelope potential (tariff review by<br />
departments)<br />
• Prepare initial allocation based on<br />
financial capacity & future outlook<br />
• Table indicative allocations to<br />
financial committee<br />
• Conclude initial consultation review<br />
and establish direction and policy,<br />
confirm priorities, identify other<br />
financial and non-financial budget<br />
parameters. Submission of priorities<br />
by departmental budget committees.<br />
PMS<br />
34<br />
Ba-Phalaborwa Mopani<br />
• 01/09/2010 – 10/09/2010<br />
• 01/09/2010 – 30/09/2010<br />
• 01/09/2010 – 08/10/2010<br />
• 03/09/2010 – 26/09/2010<br />
• 08/09/2010–26/09/2010<br />
• 17/09/2010<br />
• 29/10/2010
Month Activity Time-Frame<br />
• Submission of draft 2009/10<br />
departmental annual reports<br />
35<br />
• 25/09/2010<br />
Ba-Phalaborwa Mopani<br />
September 2010 Budget 30 September 2010<br />
• Circulate budget schedules to all<br />
departments<br />
• Consolidate draft core departments<br />
business plans & budgets<br />
• Review resources frames and<br />
financial strategies<br />
October 2010 <strong>IDP</strong><br />
ANALYSIS & STRATEGIES PHASES<br />
• <strong>IDP</strong>/Budget Operational Teams<br />
(Analysis Phase)<br />
• <strong>IDP</strong>/Budget Technical Committee<br />
(Analysis Phase)<br />
• Portfolio Committee meeting<br />
(Analysis Phase)<br />
• Advisory Board meeting with<br />
Municipal Manager<br />
• 30/09/2010 – 05/11/2010<br />
• 30/09/2010 – 05/11/2010<br />
• 30/09/2010 – 05/11/2010<br />
• 08/10/2010<br />
• 12/10/2010<br />
• 14/10/2010<br />
• 11/10/2010 - 14/10/2010
Month Activity Time-Frame<br />
• <strong>IDP</strong>/Budget Steering Committee<br />
(Analysis Phase)<br />
• Rep. Forum (Data presentation &<br />
prioritization of needs)<br />
• Strategic session<br />
Budget<br />
• Commence preparation for the<br />
2010/14 departmental operational<br />
plans and service delivery and budget<br />
implementation plan aligned to<br />
strategic priorities in <strong>IDP</strong> and inputs<br />
from other stakeholders including<br />
government and bulk service<br />
providers (and NERSA)<br />
• Submission of departmental<br />
adjustment budgets<br />
• Departmental budgets inputs for<br />
<strong>2011</strong>/14<br />
36<br />
• 19/10/2010<br />
• 21/10/2010<br />
Ba-Phalaborwa Mopani<br />
• 28/10/2010 – 29/10/2010<br />
• 15/12/2010<br />
• 15/12/2010<br />
• 15/12/2010<br />
31 October 2010
November 2010<br />
Month Activity Time-Frame<br />
PMS<br />
• Individual Performance assessments<br />
(First Quarter)<br />
• Continuation of preparations for the<br />
2009/10 annual report utilizing<br />
financial and non-financial<br />
information first reviewed as part of<br />
the budget and <strong>IDP</strong> analysis.<br />
• Compilation of first quarter<br />
performance report.<br />
• Mayoral Imbizo on first quarter<br />
performance<br />
STRATEGIES PHASE<br />
• <strong>IDP</strong>/Budget Operational Teams<br />
(Strategies)<br />
• Develop list of projects (Strategies)<br />
• <strong>IDP</strong>/Budget Technical Committee<br />
(Strategies)<br />
• Advisory Board meeting with<br />
37<br />
Ba-Phalaborwa Mopani<br />
• 01/10/2010 – 30/10/2010<br />
• 01/10/2010 – 30/10/2010<br />
• 01/10/2010 – 30/10/2010<br />
• 14/11/2010<br />
<strong>IDP</strong> November 2010<br />
• 02/11/2010<br />
• 02/11/2010 – 16/11/2010<br />
• 04/11/2010
Month Activity Time-Frame<br />
Municipal Manager<br />
• <strong>IDP</strong>/Budget Steering Committee<br />
(Strategies)<br />
• <strong>IDP</strong>/Budget Rep Forum (Strategies)<br />
Budget<br />
• Community and stakeholder<br />
consultation process, review inputs,<br />
financial models, assess impacts on<br />
tariffs and charges and consider<br />
funding decisions including<br />
borrowing. Adjust estimates based<br />
on plans and resources. Commence<br />
consultation on the proposed tariffs.<br />
Check the tariff submission date and<br />
align<br />
December 2010 <strong>IDP</strong><br />
PROJECTS PHASE<br />
• Review project design sheets<br />
38<br />
• 11/10/2010<br />
• 18/11/2010<br />
Ba-Phalaborwa Mopani<br />
• 02/11/2010 – 27/11/2010<br />
• 01/12/2010 – 23/12/2010
January <strong>2011</strong><br />
Month Activity Time-Frame<br />
Budget<br />
• Finalise the <strong>2011</strong>/14 inputs from bulk<br />
resource providers (and NERSA) and<br />
agree on proposed price increase.<br />
(Align after submission of proposed<br />
tariffs)<br />
PMS<br />
• Oversight Training of all councillors<br />
for probing the 2009/10<br />
• Finalise the draft 2009/10 annual<br />
report incorporating financial and<br />
non-financial information on<br />
performance, audit reports and<br />
annual financial statements.<br />
• Present Draft Annual Report to EXCO<br />
39<br />
• 01/12/2010<br />
Ba-Phalaborwa Mopani<br />
• 01/12/2010 – 14/12/2010<br />
• 14/12/2010<br />
• 17/12/2010<br />
<strong>IDP</strong> 31 January <strong>2011</strong><br />
PROJECTS<br />
PHASE<br />
PHASE & INTEGRATION<br />
• Projects prioritization task • 11/01/<strong>2011</strong> – 13/01/<strong>2011</strong><br />
team(Projects prioritization)<br />
• <strong>IDP</strong>/Budget Technical Committee • 18/01/<strong>2011</strong><br />
(Projects prioritization)
Month Activity Time-Frame<br />
• Advisory Board meeting with<br />
Municipal Manager<br />
• <strong>IDP</strong>/Budget Steering Committee<br />
(Projects Prioritization)<br />
• Joint Portfolio Committees seating<br />
(Priority list)<br />
• <strong>IDP</strong> Representative Forum (priority<br />
list)<br />
40<br />
• 20/01/<strong>2011</strong><br />
• 25/01/<strong>2011</strong><br />
• 27/01/<strong>2011</strong><br />
Budget<br />
• Mid-Year Performance Assessment<br />
and recommend and adjustment<br />
budget, if necessary.<br />
• 25/01/<strong>2011</strong><br />
• Incorporate priorities from the<br />
President’s State of the Nation • 21/01/<strong>2011</strong> – 25/02/<strong>2011</strong><br />
Address, National Treasury and<br />
SALGA for further budget<br />
•<br />
consideration.<br />
Review all aspects of the <strong>2011</strong>/14<br />
budget including any unforeseen and<br />
unavoidable expenditure in light of<br />
need for an adjustment budget.<br />
• 11/01/<strong>2011</strong> – 25/01/<strong>2011</strong><br />
• Tabling and approval of an<br />
adjustments budget (if necessary) • 25/01/<strong>2011</strong><br />
• Submit the <strong>2011</strong>/14 approved<br />
adjustments budget to the Provincial • 11/03/<strong>2011</strong><br />
Ba-Phalaborwa Mopani
Month Activity Time-Frame<br />
& National Treasury & any other<br />
affected organ of state (10 days after<br />
approval.)<br />
PMS<br />
• Compilation of 2010/11 Mid-year<br />
report<br />
• Mayor tables 2009/10 annual report<br />
to council.<br />
• Make public the 2009/10 annual<br />
report and invite comments from<br />
local community, submit report to<br />
the Auditor-General, Provincial<br />
Treasury & DLGH<br />
• Consider monthly & mid-year reports<br />
for the period ended 31 December,<br />
review implementation of budget<br />
and service delivery and budget<br />
implementation plan, identify<br />
problems and amend or recommend<br />
appropriate amendments. Submit<br />
report to council and make public<br />
any amendment to the SDBIP – due<br />
end of month.<br />
• Mayor reports to Council the status<br />
of next three year budget, 2009/10<br />
annual report (including AFS & audit<br />
41<br />
Ba-Phalaborwa Mopani<br />
• 03/01/<strong>2011</strong> – 21/01/<strong>2011</strong><br />
• 31/01/<strong>2011</strong><br />
• 31/01/<strong>2011</strong><br />
• 31/01/<strong>2011</strong><br />
• 31/01/<strong>2011</strong>
February <strong>2011</strong><br />
Month Activity Time-Frame<br />
report) and summarizes overall<br />
findings of 2009/10 annual<br />
performance report.<br />
• Individual Performance Assessments<br />
(Second Quarter)<br />
APPROVAL PHASE(DRAFT <strong>IDP</strong>, BUDGET<br />
& PMS)<br />
• <strong>IDP</strong>/Budget Operational Teams (Draft<br />
<strong>IDP</strong>, Budget & PMS)<br />
• <strong>IDP</strong>/Budget Technical Committee<br />
(Draft <strong>IDP</strong>/Budget)<br />
• Advisory Board meeting with<br />
Municipal Manager<br />
• <strong>IDP</strong>/Budget Steering Committee<br />
Meeting (Draft <strong>IDP</strong> document)<br />
• <strong>IDP</strong>/Budget Representative Forum<br />
• Establishment of Public Participation<br />
Project Team<br />
• Mayor table the Draft <strong>IDP</strong>, Budget &<br />
PMS in Council for adoption<br />
42<br />
Ba-Phalaborwa Mopani<br />
• 13/01/<strong>2011</strong> – 31/01/<strong>2011</strong><br />
<strong>IDP</strong> 28 February <strong>2011</strong><br />
PMS<br />
• 08/02/<strong>2011</strong><br />
• 10/02/<strong>2011</strong><br />
• 15/02/<strong>2011</strong><br />
• 22/02/<strong>2011</strong><br />
• 28/02/<strong>2011</strong><br />
• 28/02/<strong>2011</strong>
Month Activity Time-Frame<br />
• Place the 2009/10 annual report on<br />
the municipal website.<br />
43<br />
• 05/02/<strong>2011</strong><br />
Ba-Phalaborwa Mopani<br />
March <strong>2011</strong> <strong>IDP</strong><br />
APPROVAL PHASE( DRAFT <strong>IDP</strong>, BUDGET<br />
& PMS)<br />
31 March <strong>2011</strong><br />
• Publicizing<br />
schedule.<br />
public participation • 28/02/<strong>2011</strong><br />
March <strong>2011</strong><br />
Budget 31 March <strong>2011</strong><br />
• Consultation on tabled <strong>IDP</strong>, Budget &<br />
PMS, publicise and conduct public<br />
hearings and meetings within wards.<br />
• 19/03/<strong>2011</strong> – 25/03/<strong>2011</strong><br />
• Consider the views of the community • 19/03/<strong>2011</strong> – 25/03/<strong>2011</strong><br />
and other stakeholders on the<br />
•<br />
<strong>2011</strong>/14 budget.<br />
Respond to submissions received & if<br />
necessary revise the budget and<br />
• 28/03/<strong>2011</strong><br />
table amendments for council<br />
•<br />
consideration.<br />
<strong>IDP</strong>/Budget Operational Teams • 28/03/<strong>2011</strong><br />
(Analysis & integration of public<br />
comments)<br />
• <strong>IDP</strong>/Budget Technical Committee • 29/03/<strong>2011</strong><br />
(Analysis & integration of public<br />
comments)
April <strong>2011</strong><br />
June <strong>2011</strong><br />
Month Activity Time-Frame<br />
• <strong>IDP</strong>/Budget Steering Committee<br />
(Analysis and integration of public<br />
comments)<br />
44<br />
• 31/03/<strong>2011</strong><br />
Ba-Phalaborwa Mopani<br />
<strong>IDP</strong>, BUDGET & PMS Adoption of Final <strong>IDP</strong>, Budget &<br />
APPROVAL PHASE (Final <strong>IDP</strong>, Budget<br />
& PMS<br />
PMS 18 April <strong>2011</strong><br />
• <strong>IDP</strong>/Budget & PMS Rep Forum<br />
(Analysis & Integration of public<br />
comments<br />
• 06/04/<strong>2011</strong><br />
• Adjustment of <strong>IDP</strong>/Budget in • 06/04/<strong>2011</strong><br />
•<br />
accordance with public comments<br />
and Budget<br />
EXCO considers Draft <strong>IDP</strong>/Budget and<br />
PMS<br />
• 11/04/<strong>2011</strong><br />
• Mayor tables Final <strong>IDP</strong>/Budget and • 18/04/<strong>2011</strong><br />
PMS in Council for final<br />
approval/adoption.<br />
<strong>IDP</strong><br />
• Summary of <strong>IDP</strong><br />
• Public notice on adoption of<br />
<strong>IDP</strong>/Budget<br />
Budget<br />
• Submit approved <strong>IDP</strong>/Budget to<br />
National & Provincial Treasury, DLGH<br />
• 01/06/<strong>2011</strong> – 15/06/<strong>2011</strong><br />
• 15/06/<strong>2011</strong><br />
• 30/06/<strong>2011</strong>
Month Activity Time-Frame<br />
and District<br />
PMS<br />
• Submit draft SDBIP to the Mayor<br />
• Submit draft annual performance<br />
agreements to the Mayor<br />
• Approve the <strong>2011</strong>/12 SDBIP - final<br />
date under legislation 28 July<br />
45<br />
• 16/06/<strong>2011</strong><br />
• 28/06/<strong>2011</strong><br />
• 30/06/<strong>2011</strong><br />
Ba-Phalaborwa Mopani
B1. THE INTERNAL ENVIRONMENT<br />
SECTION B<br />
SITUATIONAL ANALYSIS<br />
The internal environment presents the strengths and weaknesses of the Municipality’s corporate<br />
structure, corporate culture and corporate resources:<br />
B1.1 Corporate Structure<br />
The overview of the organisational structure (organogram) of the Municipality indicates a<br />
hierarchical arrangement (See Figure B1.1 below). The structure has two divisions, namely the<br />
political division and the administrative division. The political division is led by the Mayor, whilst the<br />
administrative one is led by the Municipal Manager. The Executive Committee serves as a link<br />
between the two divisions.<br />
Although the Municipal Manager is the accounting officer, decision making authority is to a certain<br />
extent decentralized to the various departments or directorates. The directorates are organised on<br />
the basis of powers and functions allocated to each department (e.g. Corporate Services is<br />
responsible for, amongst other functions, administrative, human resources and legal matters).<br />
The structure is expected to be constantly aligned to current corporate objectives, strategies,<br />
policies, programmes and projects. The alignment and re-alignment processes are however costly to<br />
the Municipality since they require regular restructuring and job analysis. Resultantly, the present<br />
structure is not fully consistent with current corporate objectives, strategies, policies, programmes<br />
and projects. The Municipality is however going to address the challenge through a comprehensive<br />
institutional plan.<br />
46
The structure of the Municipality is basically similar to those of other municipalities.<br />
Figure B1.1: Basic Layout of the Municipality’s organisational structure<br />
B1.2 Corporate Culture<br />
The emerging and shared culture within the organisation is founded on cleanliness. The Municipality<br />
won the 2005 National Cleanest Town Competition. Table B1 presents the Municipality’s<br />
performance in the awards since the inception of the Cleanest Town Competition in 2005. The<br />
competition has been renamed the Greenest Municipality Competition in 2009. The Municipality has<br />
performed consistently in the new competition as indicated in the table below.<br />
Table B.1: The Municipality’s performance in the Cleanest 1 Town (Greenest Municipality)<br />
Competition between 2005 and 2010<br />
YEAR POSITION HELD<br />
2005 1, National<br />
2006 2, Provincial<br />
1 Cleanest Town competition’s name have changed to Greenest Town competition. The<br />
competition also focuses on all aspects of service delivery and not only on waste management<br />
47<br />
Political<br />
Division<br />
Admin<br />
Division
YEAR POSITION HELD<br />
2007 2, Provincial<br />
2008 1, Provincial<br />
2009 2, Provincial<br />
2010 1, District & Provincial<br />
This emerging culture still has to be communicated to and shared by all internal stakeholders. The<br />
culture of cleanliness supports the Municipality’s strategic intent of being the best tourism<br />
destination in Limpopo by 2020. Organisational values will have to be developed around the<br />
emerging corporate culture.<br />
The Municipality has to embrace the greenest culture such that it gets inculcated into day-to-day<br />
municipal productivity and service delivery matters.<br />
B1.3 Organisational Resources<br />
The Municipality has invested in human resources, municipal buildings and other organisational<br />
assets as per the municipal asset register. There is a need for in-service training workshops and<br />
programmes to improve personnel capacity in line with the demands of the local government<br />
environment. There is also a need for a comprehensive strategy on the maintenance of physical<br />
infrastructure.<br />
B1.4 Marketing<br />
The marketing objectives, strategies, policies and programmes of the Municipality are not clearly<br />
stated but implied from performance and through municipal budgets (e.g. through Public<br />
participation and municipal imbizos).<br />
There is a need to ensure that marketing objectives, strategies, policies, programmes and projects<br />
are clearly articulated and consistent with the Municipality’s vision, mission and strategic objectives.<br />
The Municipality is not doing well in terms of analyzing the market position and the market mix<br />
(services, prices, place, and promotion).<br />
The Municipality’s strategic position to the Kruger National Park offers a marketing competitive<br />
advantage over other municipalities focusing on tourism. The municipality is still to develop the<br />
48
marketing strategy that will guide the marketing of the municipality in line with the vision and<br />
mission.<br />
B1.5 Finance<br />
The Municipality’s current financial objectives, strategies, policies, and programmes are clearly<br />
stated under municipal strategies. There is however a need to ensure that they are consistent with<br />
the organisation’s vision, mission, and strategic objectives. They also have to respond to both<br />
internal and external challenges.<br />
B1.6 Municipal Operations<br />
The Municipality’s current service objectives, strategies, policies, and programs are clearly stated<br />
and expressed through the following Key performance areas of local government:<br />
Spatial Rationale;<br />
Basic Service Delivery;<br />
Local Economic Development;<br />
Municipal Transformation and Organisational Development;<br />
Municipal Financial Viability and Management; and<br />
Good Governance and Public Participation.<br />
Municipal operations are consistent with the organisation’s vision, mission, objectives, strategies,<br />
and policies and respond to the needs of both the internal and external environments. The efficiency<br />
of services rendered needs to be improved and clients’ waiting period for municipal services<br />
reduced. There is also a need to regularly analyse the efficiency municipal services with the view to<br />
informing decision making at strategic management level.<br />
B1.7 Human Resources Management (HRM)<br />
Human resources management objectives, strategies, policies, and programmes are clearly stated,<br />
but there is still a need for an institutional plan in order to address both current and future<br />
personnel demands. The Municipality is gradually adopting strategic human resources planning to<br />
ensure that HR objectives are consistent with the organisation’s vision, mission, objectives,<br />
strategies, policies and programmes.<br />
49
B1.8 Information Systems (IS)<br />
The Municipality’s current IS objectives, strategies, policies, and programmes are not clearly stated<br />
and not consistent with the vision, mission, objectives, strategies, and policies of the organisation.<br />
The information system is not able to:<br />
Provide a useful database;<br />
Automate routine clerical operations;<br />
Assist managers in decision making;<br />
The Municipality’s IS performance and stage of IS development do not compare well with those of<br />
similar institutions.<br />
50
B2. THE EXTERNAL ENVIRONMENT<br />
The Municipality has scanned both the task and societal environments with the view to identifying<br />
threats and opportunities in the external environment. This subsection presents an in-depth analysis<br />
of the external environment.<br />
B2.1. Spatial Analysis<br />
B2.1.1 Geographic Location<br />
Ba-Phalaborwa Municipality is in the African continent and therefore affected by the political, social<br />
and economic realities of the continent. One of the fundamental ills inherited from the continent is<br />
underdevelopment, hence the local municipality’s mandate to be a developmental sphere of<br />
government.<br />
Map B1: The African Continent<br />
Ba-Phalaborwa Municipality is situated in the North-Eastern part of South Africa in the Limpopo<br />
Province (See Maps B1 and B2). South Africa is a democratic country and therefore adheres to<br />
democratic principles, such public participation in government. Local government processes,<br />
51<br />
Ba-
including the <strong>IDP</strong> process are therefore characterised by public participation. South Africa, as the<br />
economic hub in Southern Africa, has the responsibility to trade with and support neighbouring<br />
countries with the view to overcoming underdevelopment in the region. Ba-Phalaborwa’ close<br />
proximity to Mozambique implies that the Municipalities has to forge socio-economic relationships<br />
with its sister municipality (Xai-Xai) across the border.<br />
Map B2: The Republic of South Africa<br />
Ba-Phalaborwa Municipality is situated in Mopani District of Limpopo Province, where<br />
unemployment and poverty are rife. In executing its developmental mandate, the Municipality is<br />
mindful of the developmental challenges facing the African continent and has to adopt<br />
democratically acceptable local economic development strategies and measures in addressing<br />
(amongst other challenges) unemployment and poverty. The National Spatial Development<br />
Perspective (NSDP) endorsed by National Cabinet in March 2003 purports the following<br />
development principles:<br />
PRINCIPLE 1: Rapid economic growth that is sustained and inclusive is a pre-requisite for the<br />
achievement of other policy objectives, amongst which poverty is key<br />
PRINCIPLE 2: Government has a constitutional obligation to provide basic services to all citizens (e.g.<br />
water, energy, health and educational facilities, wherever they reside<br />
52<br />
Ba-<br />
Phalaborwa
PRINCIPLE 3: Government spending on fixed investment should be focused on localities of economic<br />
growth and/or economic potential<br />
PRINCIPLE 4: Efforts to address past and current social inequalities should focus on people not<br />
places<br />
PRINCIPLE 5: Future settlement and economic development opportunities should be channeled into<br />
activity corridors and nodes that are adjacent to or link the main growth centres<br />
Map B3 below shows the geographic location of Ba-Phalaborwa Municipality in both the Province<br />
and Mopani District. Without losing sight of National Spatial Development Perspective guidelines,<br />
development at municipal level has to be informed by the Limpopo Province’s Provincial Growth<br />
and Development Strategy (PGDS). Principles of the PGDS:<br />
PRINCIPLE 1: An integrated and developmental approach that brings together strategies and<br />
programmes of different spheres of government together towards achieving<br />
sustainable economic growth, poverty reduction, and unemployment;<br />
PRINCIPLE 2: Contributing to national and international commitments e.g. Reconstruction and<br />
Development Programme’s objectives, the outcomes of the World Summit on<br />
Sustainable Development, United Millennium Development Goals, etc;<br />
PRINCIPLE 3: Building of relationships, sharing of information and a shared vision between spheres<br />
of government, between municipalities and between departments;<br />
PRINCIPLE 4: Participatory development and good governance to ensure transparency and<br />
accountability in shaping the future of the Province.<br />
53
Map B3: Limpopo Province<br />
Thabazimbi<br />
&V<br />
Thabazimbi<br />
Ba-Phalaborwa<br />
Lephalale<br />
&V<br />
Lephalale<br />
Waterberg<br />
Mogalakwena<br />
Blouberg<br />
Dendron<br />
&V<br />
Aganang<br />
Vhembe<br />
Messina<br />
Makhado<br />
Makhado<br />
&V<br />
54<br />
&V<br />
Musina<br />
Thohoyandou<br />
&V<br />
Thulamela<br />
&V<br />
Giyani<br />
&V Greater Letaba<br />
Soekmekaar<br />
Molemole<br />
&V Modjadjikloof<br />
Greater<br />
Giyani<br />
Polokwane<br />
&V Tzaneen<br />
Ba-Phalaborwa<br />
&V Polokwane Greater Tzaneen<br />
&V Phalaborwa<br />
Capricorn<br />
&V<br />
Vaalwater<br />
Modimolle<br />
Modimolle<br />
&V<br />
Bela-Bela<br />
&V<br />
Mokopane<br />
&V<br />
Lepelle-Nkumpi<br />
Maruleng<br />
&V<br />
Fetakgomo Hoedspruit &V<br />
Lebowakgomo Tubatse<br />
&V<br />
Mookgopong Sekhukhune<br />
&V Burgersfort Bushbuckridge<br />
Mookgopong Makhudutamaga &V &V<br />
Steelpoort Ohrigstad<br />
Marble Hall<br />
Bela-Bela<br />
&V<br />
Marble Hall<br />
&V<br />
Mkhuhlu 'A'<br />
&V Groblersdal<br />
Groblersdal<br />
Mutale<br />
Mopani<br />
Bohlabela<br />
It is one of the five local municipalities in the Mopani District. The Municipality has a geographical<br />
area of 3 004.88 km 2 and that constitutes 27% of the total Mopani District area. The Municipality<br />
serves as a convenient gateway to the Kruger National Park and the Transfrontier Park through to<br />
the Mozambique Coast.<br />
Map B4 shows the boundaries of the municipal area together with the natural environment -<br />
minerals and mining in the municipal area.<br />
Kruger<br />
National<br />
Park
Map B4: Ba-Phalaborwa Municipal Boundaries<br />
B2.1.2 Mopani District SDF – An Overview<br />
Ba-Phalaborwa Municipality is a predominantly rural medium capacity local Municipality. It consists<br />
of 23 villages and four towns (namely Gravelotte, Namakgale Lulekani and Phalaborwa). The<br />
Municipality adopts the Mopani District SDF as well as district guidelines for land use management<br />
to inform the local Land Use Management Scheme.<br />
B2.1.3 Guidelines for Land Use Management<br />
The Municipality has adopted a Land Use Management Scheme (LUMS). All land use issues in the<br />
municipal area are dealt with according to the adopted LUMS.<br />
B2.1.4 Spatial Planning and Land Use<br />
The purpose of conducting a spatial analysis is to ensure that the Municipality’s spatial strategies<br />
and land use management decisions are based on a general awareness of:<br />
Spatial constraints, problems, opportunities, trends and patterns;<br />
55
The necessity for spatial restructuring;<br />
The need for land reform; and<br />
The spatial dimension of development issues.<br />
Ba-Phalaborwa Municipality covers an area of 3 004,88km² with farms covering an enormous area of<br />
land belonging to private farmers followed by the tribal land that is under the control of Traditional<br />
Leaders (namely, Majeje Traditional Authority, Ba-Phalaborwa Traditional Authority, Maseke<br />
Traditional Authority and Selwane Traditional Authority). The other areas are proclaimed towns<br />
(Phalaborwa, Lulekani, Namakgale, and Gravelotte) and farms. Most of the farms belong to private<br />
owners and are used for game and citrus farming. Table below indicates the number of towns,<br />
villages and farms in Ba-Phalaborwa area.<br />
Table B.2: Settlements in Ba-Phalaborwa<br />
Towns Villages Farms<br />
4 23 109<br />
Mapping<br />
All towns within the Ba-Phalaborwa Municipality area are having lay-out plans and general plans<br />
approved by the Surveyor General. All new demarcations for stands are now done to the same<br />
standard and lay-out plans and general plans are prepared and the establishment of a township is<br />
also done.<br />
During the last 5 years several towns were completed in the rural areas namely:<br />
Area Section Number of Stands Vacant Sites Occupation Status<br />
Maseke Ext 1 500 500 Not occupied yet (new)<br />
Majeje Lulekani South 403 403 Not occupied (private<br />
developer)<br />
Mashishimale R3 East 209 - Occupied<br />
Makhushane Malungane<br />
Village<br />
630 300 70% occupied<br />
Mashishimale Tlapeng 508 250 50% occupied<br />
Mashishimale R3 Resevoir 312 230 Busy with allocation 20%<br />
Maseke South of tar<br />
road<br />
225 200 Less than 10% (no water)<br />
Boyelang Makhushane 516 400 20% allocated<br />
56
Area Section Number of Stands Vacant Sites Occupation Status<br />
Majeje Benfarm<br />
Lulekani road<br />
Mashishimale<br />
R3<br />
522 - Occupied<br />
West of R3 200 150 20% occupied<br />
Majeje Matikoxikaya 630 - Occupied<br />
Selwane New<br />
Development<br />
- n/a New<br />
Benfarm C - n/a new<br />
Formalisation of Villages<br />
Several villages need formalization in order to provide stands with numbers and allocate sites. This is<br />
also required in order to provide plans for installation of services (Eskom, etc).<br />
The following settlements listed below were identified to be formalized and provided to the<br />
Department of Human Settlements and Mopani District Municipality to assist the Municipality.<br />
Tribal Authority<br />
Name of Area No of Sites Priority<br />
Majeje Humulani (balance) +-500 5<br />
Majeje Matikoxikaya +-500 6<br />
Ba-Phalaborwa<br />
Municipality<br />
Majeje Benfarm (North West<br />
Kurhula +-700 1<br />
of Tribal Authority<br />
Offices)<br />
57<br />
+-300 2<br />
Majeje Benfarm next to R71 +-400 7<br />
Makhushane North East of<br />
Namakgale Hospital<br />
+-300 10<br />
Makhushane Dairy, next to Dairy +-400 3<br />
Makhushane Nyakelang not settled<br />
according to plan<br />
Makhushane Mbambamencisi next<br />
to access road<br />
+-600 4<br />
+-500 8
Tribal Authority<br />
Name of Area No of Sites Priority<br />
Selwane Selwane East +-500 8<br />
Selwane Selwane North of Road +-200 11<br />
Development Control<br />
As previously mentioned a Land Use Management Scheme (LUMS) was adopted by Council. There is<br />
a definite lack of understanding/communication by Traditional Authorities on how the new LUMS<br />
will affect any land use change in their areas.<br />
In order to implement the LUMS, a prescribed procedure must be followed and professional people<br />
(Town Planners and Land Surveyors) are involved. This is a lengthy and costly process. The result of<br />
this is that most of the applicants (businesses) in rural areas are not able to afford to follow the<br />
procedure for land use changes.<br />
Land Claims<br />
Spatial planning in Ba-Phalaborwa is seriously affected by land claims. Development initiatives are<br />
also hampered by lack of land. There are 109 farms in the municipal area. 77 of the farms (i.e. about<br />
72% of them) are under land claim. There are seven claimants on the farms. Two community claims<br />
have so far been partially restored on 14 farms. The remainder of the claims is likely to be protracted<br />
as a result of counter and multiple claims.<br />
The following seven claims have been lodged in the Ba-Phalaborwa municipal area:<br />
Mashishimale community is claiming 16 adjoining farms;<br />
Selwane community is claiming 15 adjoining farms;<br />
Makhushane community is claiming 22 adjoining farms;<br />
Maseke community is claiming 7 adjoining farms;<br />
The above four communities are also claiming the five farms on which Phalaborwa town and<br />
its mines are situated;<br />
Again, the above four communities and the Makhuva-Mathevula Royal Council, are claiming<br />
three adjoining farms and a portion of the Kruger National Park;<br />
58
Maenetja and Balapye-Kgoatla communities are claiming 22 adjoining farms in the western<br />
part of the Municipal area.<br />
The abovementioned claims are reflected on the Ba-Phalaborwa Land Claims Map (see next page).<br />
The claims are on 77 farms out of the total 101 farms in the municipal area. In some cases different<br />
communities are claiming the same farm(s). The land restoration process to community property<br />
associations (CPAs) has been completed on fourteen farms (11 farms for the Mashishimale<br />
community during 2005 and 3 farms for Selwane during 2006). The willingness of the owners to sell<br />
expedited the process.<br />
The Settlement Support and Development Unit within the Regional Land Claims Commission is<br />
providing limited assistance to the CPAs. The provision of support was never intended to be a<br />
function of the Land Claims Commissioner’s Office, but has become a practical necessity. The<br />
Mashishimale community has been identified as a pilot project for the sustainable Restitution<br />
Support Programme that will be managed by the University of Pretoria from August 2007 to<br />
December 2008.<br />
The tables below provide some information on the Mashishimale Selwane land claims. All the other<br />
claims are still under investigation. The view of the Regional Land Claims Commissioner is that Ba-<br />
Phalaborwa Municipality should play a more active role in resolving conflicts among claimants and<br />
facilitating agreements among them within the context of a development strategy that is beneficial<br />
for all stakeholders.<br />
59
Map B.5<br />
SENOBELA 362<br />
RUNNYMEDE 426<br />
MEADOW BANK 429<br />
MAMITWAS LOCATION 461<br />
D3247<br />
TAGANASHOEK 465<br />
DELHI 520<br />
THE NECK 565<br />
LANGUE<strong>DOC</strong> 563<br />
Greater Tzaneen<br />
NOVENGILLA 562<br />
BERLYN 670<br />
D3768<br />
D3247<br />
D3767<br />
BONN 671<br />
P43/ 3<br />
DUSSELDORP 22<br />
D21<br />
D3246<br />
SEDAN 672<br />
RIVERSIDE 514<br />
LA GRATITUDE 513<br />
JANETSI 463<br />
ROOIWATER 673<br />
Farms<br />
Land Claims Status<br />
LUXEM BURG 24<br />
No Claims<br />
Maenetja & Balapye-Kgoatla Claims Pending<br />
HARMONY 140<br />
Makhushane Claims Gazetted<br />
Mashishimale Claims Pending<br />
NAT IONAAL 29<br />
Selwane Claims Finalised, 2006<br />
LOFDAL 42<br />
Selwane Claims Pending<br />
Roads<br />
Type<br />
Maruleng<br />
LORRAINE 73<br />
D3252<br />
EUREKA 564<br />
LA MO TTE 464<br />
MAKUBE 425<br />
SIRULURUL 427<br />
MAM ITWAS KOP 462<br />
THE PLAIN S 519<br />
ALSACE 74<br />
WOMGOLOLO 428<br />
NAGUDE 517<br />
BELLE OMBRE 518<br />
THE PLAIN S 828<br />
BELLE OMBRE 827<br />
P1 81/1<br />
D3215<br />
CARPEDIEM Paved 76<br />
D3186<br />
D1292<br />
P142/1<br />
P112/2<br />
MOLATLE<br />
D263<br />
D3249<br />
Legend<br />
MARANDA 675<br />
D3253<br />
LABORIE 515<br />
COTTONDALE 674<br />
GAMELA 679<br />
RADOO 682<br />
JASI 731<br />
DEESIDE 733<br />
BEESPLAAS 676<br />
Joint Ba-Phalaborwa & Makhuva Claims Gazetted<br />
D3235<br />
Joint Ba-Phalaborwa Claims Gazetted<br />
Maseke Claims Gazetted<br />
Mashishimale Claims Finalised, 2005<br />
Unpaved<br />
Leydsdorp<br />
HOSPITAL SITE 778<br />
D202<br />
BISMARCK 174<br />
D1826<br />
OOCHOCK 683<br />
THIERGARTEN 531<br />
RUBBERVALE 784<br />
D202<br />
MAWA 680<br />
GUNYULA 730<br />
LAURAI NE 742<br />
QUAGGA 759<br />
KAPIRI RANCH 760<br />
LA PARISA 729<br />
HENLEY 734<br />
EDEN 757<br />
GRAVELOTTE 783<br />
VALLAMBROSA 681<br />
MATUMA 735<br />
LEYDSDORP DORPSGRONDE 779<br />
MIRAGOMA 684<br />
LETABA DRIFT 727<br />
LA COTTE 736<br />
LANGALANGA 141<br />
Greater Letaba<br />
CHESTER 756<br />
THE BEACON 769<br />
MON DESI R 782<br />
MI AM I 732<br />
GRAVELOTTE SIDING 785<br />
GRAVELOTTE SIDING 785<br />
BLACK HILLS 740<br />
SOLO MONS MINE 762<br />
CONSTANTIA 685<br />
FARRELL 781<br />
MABETE 726<br />
RIVERHEAD 755<br />
MAZUNGA 142<br />
BLACK HILLS 737<br />
FREE STATE 763<br />
CLAIMLAND 780<br />
Table B.3: Mashishimale Claim<br />
D3200<br />
D202<br />
D3198<br />
D1827<br />
D3229<br />
D1828<br />
D3187<br />
GROO T-LETABA<br />
D3202<br />
MOUNGWANE<br />
D1597<br />
Eiland<br />
EILAND 725<br />
MASHET 4<br />
Ba - Phalaborwa Land Claims<br />
Greater Giyani<br />
M'BAULA RANCH 6 -<br />
GROOTFONTEIN 738<br />
WI LLIE 787<br />
MALATI 764<br />
Murchison<br />
P17/3<br />
D1267<br />
SELATI RANCH 143<br />
JOSEPHINE 777<br />
D3844<br />
VYGEBOOM 739<br />
VO LSTRUIS 753<br />
MAKALALI 601<br />
ARUNDEL 788<br />
PRIESKA 723<br />
LESH OGOLE<br />
DANIE 789<br />
BEGIN 765<br />
MANANTJI 166<br />
Prieska<br />
MASALAL 722<br />
PLATVELD 752<br />
KOEDOES RAND 790<br />
MPANDE 165<br />
D1100<br />
THANKERTON 144<br />
LAMULA 162<br />
B.V.B. RANCH 776<br />
CORUNDUM 147<br />
LUTOPI 164<br />
VLAKLAAGTE 751<br />
D1655<br />
KONDOWE 741<br />
HUJA 791<br />
TRANSPO RT 145<br />
SHOBI 161<br />
D3849<br />
D2512<br />
D3847<br />
WATERBO K 721<br />
KASTEEL 766<br />
LEKKERGOED 160<br />
MAGW ENA 750<br />
VORSTER 775<br />
LEKKERGOED 158<br />
LEKKERSMAAK 792<br />
HOED 146<br />
HOOF PYN 269<br />
INYOKU 159<br />
D1656<br />
OXFORD 183<br />
60<br />
NONDWENE 720<br />
MASHAWA 748<br />
D1191<br />
HARTBEEST 743<br />
Ba-Phalaborwa<br />
LANDRAAD 774<br />
BOSBOK 793<br />
LILLIE 148<br />
ELLENBO OG 794<br />
ARCHIE 169<br />
CAMBRIDGE 184<br />
Nondweni<br />
GRANVILLE 767<br />
EXCELLENCE 157<br />
D3848<br />
HAMMAN 747<br />
BREAKFAST 773<br />
GLIP 797<br />
HOPE 149<br />
ARCHIE 156<br />
HARDEKOOL 190<br />
Maruleng<br />
Gaselwana<br />
SILWANA' S LOCATION 719<br />
LOSKOP 744<br />
BROOK 772<br />
BRAND 798<br />
PARSONS 155<br />
ROME 185<br />
MAKUBA'S LOCATI ON 700<br />
Mukhwanana<br />
SQUARE 150<br />
Nyakalane Mahale<br />
ALONBRIDG E 768<br />
WI LDEBEEST 745<br />
SCHEIDING 746<br />
ZIEK 771<br />
RAM 799<br />
PUNT 151<br />
MAGDALENA 154<br />
MAHALE 718<br />
D3260<br />
TRY 153<br />
D3980<br />
D3187<br />
D3981<br />
MADRID 39<br />
BELASTI NG 7<br />
LEEUW KOP 10<br />
ZEBRA 19<br />
CELHARD 20<br />
D3781<br />
Mashishimale R 3<br />
MASHISI MALI LOCAT ION 800<br />
Mashishimale R 2<br />
LEEUWSPRUIT 18<br />
GRIETJE 6<br />
D3794<br />
MORELAG 5<br />
DROEBULT 27<br />
Namakgale<br />
Maseke<br />
Mashishim ale R1<br />
MASEKI LOCATION 2<br />
D2263<br />
GROOTDRAAI 38<br />
D3966<br />
BADEROUKWE 11<br />
BEN 26<br />
PAUL 7<br />
LISBON 37<br />
LETABA RANCH 17<br />
Matiko-Xikaya Lulekani A&B<br />
QUAGGA 21<br />
Farm Name Land USe Value in R’ RLCC Action<br />
Landraad 774 LT<br />
Portion 1 2<br />
MOLOMAHLAPI<br />
MAKH UTSWI<br />
MOLOTOTSI<br />
GA-SELATI<br />
D3187<br />
OLIFANT SRIVIER<br />
MOHLABETSI<br />
GROOT-LETABA<br />
MBH AWU LA<br />
Ben AB C<br />
D3782<br />
MAKUSHANE LOCATION 28<br />
Makhusane R2<br />
Makhusane R1<br />
D3786<br />
D4424<br />
Humulani<br />
P112/1<br />
SCHALK 3<br />
KLIPHEUVEL 36<br />
D3790<br />
DOREEN 8<br />
POMPEY 16<br />
N'DOLE 12<br />
Kharula<br />
D726<br />
D86<br />
WEGSTEEK 30<br />
IRON<br />
MOSCOW 41<br />
D2105<br />
SABLE 13<br />
SCHIETTOCHT 25<br />
RHODA 9<br />
DOVER 29<br />
GENOEG 15<br />
SILONQUE 23<br />
D3264<br />
Phalab orwa<br />
LAASTE 24<br />
LOOLE 31<br />
SHEILA 10<br />
LAASTE 24<br />
KLEIN-LETABA<br />
OLIFANT SRIVIER<br />
OLIFANT SRIVIER<br />
DUNDEE 32<br />
PITLO CHRY 14<br />
MERENSKY 32<br />
ZEEKOEGAT 12<br />
VEREENIGING 11<br />
Scale 1 : 35 00 0<br />
LETABA<br />
SHIPIKANI<br />
OLIFANTSRIVIER<br />
KLASERIE MO ND 15<br />
POLOKWANE<br />
No 1 DIEPKLOOF Propark 406<br />
Baobab Place, Hampton Court<br />
Bendor Drive<br />
Polokwan e<br />
Suite 77<br />
0699<br />
Private Bag 9676<br />
Polokwane<br />
P O Box 3519<br />
0700<br />
Polokwan e<br />
South Africa<br />
Tel: +27 15 29 6 0361<br />
RIETVLEY 28<br />
Fax: +27 15 296 0363<br />
NORTHUM BERLAND 31<br />
Tel: +27 15 297 2418<br />
Fax: +27 15 297 242 8<br />
DURHAM 30<br />
NDLOPHU 102<br />
0 5 10 15<br />
km<br />
Game Lodge 9,000,000 Restored to CPA in<br />
Jul. 2005<br />
Ellenboog 794 LT Game Farming 7,500,000 Restored to CPA in<br />
Jul. 2005<br />
Bosbok 793 LT Game Farming 21,000,000 Restored to CPA in<br />
Oct. 2006<br />
Hope 149 KT Game Farming 23,620,000 Restored to CPA in<br />
Oct. 2006<br />
2 A settlement planning grant of R2, 714million and a restitution discretionary grant of R5, 655million<br />
were awarded for the farms Landraad and Ellenboog.
Game Vest Croc<br />
Ranch 3<br />
Game Lodge 104,000,000 Restored to CPA in<br />
Oct. 2006<br />
Hoed 146 KT Unwilling seller<br />
Lekkersmaak 792 LT Unwilling seller<br />
Kasteel 830 LT Unwilling seller<br />
Vorster 775 LT Unwilling seller<br />
Table B.4: Selwane Claim<br />
Farm Name Land Use Value in R’ RLCC Action<br />
Waterbok 4 721 LT<br />
Ptns 4,5 & 6<br />
Nondwene 720 LT Ptn<br />
6<br />
Game, citrus & cash<br />
crops<br />
Game, citrus<br />
Kondwe 741 LT Game, citrus<br />
Belasting 7 LU<br />
Mahale 718 LT<br />
Wildebeest 745 LT<br />
Magwena 750 LT<br />
Hartebeest 743 LT<br />
State farms; Gazankulu<br />
3,850,00 Restored to CPA in<br />
2006<br />
12,550,000<br />
61<br />
Restored to CPA in<br />
2006<br />
3 The property includes the farms Ram 799 LT, Glip 797 LT, Punt 151 KT and remaining portions of<br />
Ziek 771 LT, Brook 772 LT, Breakfast 773 LT<br />
4 A settlement planning grant of R1, 172million and a restitution discretionary grant of R2, 442<br />
million were also awarded for the farms waterbok, Nondwene and Kondowe
Farm Name Land Use Value in R’ RLCC Action<br />
Loskop 744LT<br />
Granville 767 KU<br />
Leeukop 10 LU<br />
Letaba 8 LU<br />
Hamman 747 LT<br />
Stands demand and supply<br />
Table B.5: Types and number of consumer units<br />
Consumer Units %<br />
Households/stands 32 253<br />
Household density/ha 0.11<br />
Residential units 12 283<br />
Formal residential stands 15 233<br />
Non-residential stands 2 170<br />
Non-residential stands (vacant) 190<br />
Formal consumer units 32 123<br />
Backyard units 262<br />
Total consumer units 32 384<br />
The current supply of low cost residential stands is represented in below:<br />
Table B.6: Supply of low cost residential stands<br />
Projects No. of Stands Approximate Land Required<br />
2787 239<br />
62
Potential infill projects<br />
(Namakgale)<br />
Housing projects (Provincial<br />
database)<br />
1055 79<br />
2457 123<br />
TOTAL 6299 441<br />
Other: Phalaborwa Ext. 7, 9,<br />
10, etc.<br />
1420<br />
The demand for residential sites is always escalating. The table below presents the demand for low<br />
cost residential sites:<br />
Table B.7 Demand for low cost residential stands (Projected: 2012)<br />
Scenario Traditional Informal Backyard Total<br />
demand<br />
per<br />
traditional;<br />
informal;<br />
backyard<br />
63<br />
No. of units<br />
in provincial,<br />
projects, site<br />
demarcation,<br />
potential<br />
infill<br />
2012<br />
Estimated<br />
need<br />
Minimum 3036 1491 435 4962 6299 -1337 0<br />
Additional<br />
land<br />
required<br />
Maximum 6072 1491 435 7998 6299 1699 169.0<br />
Other (Planned and potential) 1420<br />
Allocations for business sites in rural areas<br />
In rural areas the allocation of land for business is done by Traditional Authorities. Applications are<br />
forwarded to the Municipality, which in turn forwards same to the Department of Local Government<br />
and Housing (DLGH) for processing. Actual site demarcation is only made after the approval of the<br />
application by the department. However, reality indicates that there are many informal businesses<br />
that are mushrooming in the rural areas. The tendency defeats attempts to have an integrated<br />
approach to spatial planning and land use management<br />
Key issues with regard to spatial planning:<br />
There is a need to regulate mushrooming informal businesses;<br />
Land allocation needs to be done in a planned and coordinated manner between the<br />
Municipality and the traditional authorities;<br />
(ha)
The red tape involved in the land application process frustrates potential land owners/users;<br />
Local area planning is needed in the rural areas to ensure pro-active land use;<br />
There is a high demand for residential sites;<br />
Lack of a common town planning scheme causes delays in processing applications, and<br />
confusion and dissatisfaction amongst members of the community.<br />
B2.2. DEMOGRAPHICS<br />
2.2.1. Population<br />
The table below compares municipal demographics as presented by Statistics South Africa (STATS<br />
SA) in the 2001 Census and the 2007 Community Survey.<br />
Table B.8: Municipal Demographics based on 2001 Census and 2007 Community Survey<br />
ISSUE 2001 CENSUS 2007 CS Difference<br />
Population 131 098 127 304 -3 794<br />
Households 33 529 33 792 263<br />
Average per Household 3.9 3.8 -0.1<br />
Blacks 91.50% 94.27% 2.77%<br />
Whites 8.17% 5.33% -2.84%<br />
Coloureds 0.26% 0.40% 0.33%<br />
Indians/Isians 0.07% 0% -0.07%<br />
Male 48.91% 50.94% 2.03%<br />
Female 51.09% 49.06% -2.03%<br />
Source: STATS SA (2001 Census & 2007 CS)<br />
The table below presents the population size, household size and gender.<br />
Table B.9: Population size and number of households<br />
Description Number %<br />
Population 131 522<br />
Household size 4.06<br />
64
Male 61 807 47%<br />
Female 69 717 53%<br />
Total 131 524 100%<br />
Source: The Development Partnership, 2008<br />
The table below presents the nature and number of consumer units in the municipal<br />
Table B.10: The nature and number of consumer units<br />
Types of consumer Units Number of Units<br />
Households/stands 32 253<br />
Household density/ha 0.11<br />
Residential units 12 283<br />
Formal residential stands 15 233<br />
Non-residential stands 2 170<br />
Non-residential stands (vacant) 190<br />
Formal consumer units 32 123<br />
Backyard units 262<br />
Total consumer units 32 384<br />
Source: The Development Partnership, 2008<br />
Interpretation and Implications to the developmental mandate of the Municipality<br />
Figures from the 2007 CS indicate a population decrease from the situation in 2001. The population<br />
has decreased by 2.89% (about 3 794 people). This implies a household decrease of 2.9% (i.e. 973<br />
households) based on the 3.9 average per household. However, the 2007 CS presents a 0.78%<br />
increase in the number of households (about 263 new households). Reality on the ground indicates a<br />
significant increase in the number of households. The Municipality renders services to households<br />
and therefore adopts the layman’s view that the number of households has increased significantly<br />
between 2001 and 2007.<br />
65
The increase in the number of households, particularly in the rural areas where there are minimal<br />
services has increased backlogs in electricity provision, housing needs, roads, access to water,<br />
sanitation needs, etc.<br />
There are arbitrary differences in figures with regard to racial groups’ representations for the two<br />
accounting years in question. Although racial integration is gradually being achieved through a few<br />
blacks moving from the traditional black towns and rural areas to settle in Phalaborwa, there is a<br />
widening gap between the rich and the poor. Racial segregation is replaced by socio-economic<br />
segregation. There is therefore a need to speed up integrated human settlement in order to<br />
proactively address resultant social ills (such as crime, and skewed unsustainable development).<br />
The following table presents the number of households and estimated population in the population<br />
concentration points of the municipality.<br />
Table B.11: Number of consumer units (or service delivery points) and population size per<br />
municipal population concentration point.<br />
Population Concentration<br />
Point<br />
Number of<br />
consumer units<br />
66<br />
Average per<br />
Consumer<br />
Unit<br />
Population % of<br />
Municipal<br />
Population<br />
Phalaborwa Town 4 152 3.9 16 192 12.7%<br />
Namakgale Town 9 348 4 37 392 29.4%<br />
Lulekani Town 3 909 4 15 636 12.3%<br />
Gravelotte Town 690 3.8 2 622 2.1%<br />
Selwane Village 2 700 5.5 14 850 11.7%<br />
Total 20 799 4.2 86 692 68.1%<br />
Source: Ba-Phalaborwa Municipality – Strategic Planning and Information Management<br />
The following table presents population concentration points in the municipal area.<br />
Table B.12: Population concentration points in the municipal area<br />
Concentration/Growth Point Surrounding areas % of Municipal Population<br />
Lulekani Matiko-Xikaya
Concentration/Growth Point Surrounding areas % of Municipal Population<br />
Humulani<br />
Kurhula<br />
Biko<br />
Namakgale Makhushane<br />
Mashishimale<br />
Maseke<br />
Boelang<br />
Phalaborwa Schittoch<br />
Silonque<br />
Selwane Mahale<br />
Prieska<br />
Nondweni<br />
Gravelotte Gravelotte Ext.1<br />
Manerva Mine<br />
Murchison Mine<br />
Rubberville<br />
Farms:<br />
Leon Thom<br />
Pringa<br />
Selati<br />
Makhoma<br />
Source: Ba-Phalaborwa Municipality – Strategic Planning and Information Management<br />
In general, Ba-Phalaborwa Municipality presents a good model of population densification, with 94%<br />
of the municipal population staying in or around the Phalaborwa urban complex. The remaining 6%<br />
67
comprises the populations of the Gravelotte and Selwane areas. The 94% leaves within a distance of<br />
15km from Phalaborwa town. The map below illustrates how the 94% population is distributed<br />
within the Phalaborwa urban complex. Namakgale and Lulekani, together, account for 49% of the<br />
population within the Complex; whereas Phalaborwa town accounts for 20% and the remainder<br />
(31%) is made up of rural population.<br />
Map B6: Population distribution within the Phalaborwa urban complex<br />
The following table presents population distribution according to home language. Xitsonga (at<br />
45.4%) and Sepedi (40.3%) are the most spoken languages in the municipal area. These (together<br />
with English) are the main languages the Municipality uses for public participation purposes<br />
Table B.13: Population by home language<br />
Persons %<br />
Afrikaans 6.8<br />
English 2.0<br />
IsiNdebele 0.1<br />
IsiXhosa 0.2<br />
IsiZulu 0.9<br />
68
Persons %<br />
Sepedi 40.3<br />
Sesotho 2.2<br />
Setswana 0.3<br />
SiSwati 1.0<br />
Tshivenda 0.7<br />
Xitsonga 45.4<br />
Other 0.3<br />
Total 100.0<br />
Source: Demarcation Board, 2003<br />
The following table shows population distribution according to age:<br />
Table B.14: Population distribution according to age<br />
AGE GROUP NUMBER % OF POPULATION<br />
0 – 4 13 693 10.8%<br />
5 - 14 27 934 21.9%<br />
15 – 34 46 191 36.3%<br />
35 – 64 35 264 27.7%<br />
OVER 65 4 227 3.3%<br />
TOTAL 127 304 100%<br />
Source: STATS SA (2007 CS)<br />
The majority (36.3%) of the population is aged between 15 and 34, which suggests that the<br />
municipality is dominated by people who are both socially and economically active. The Municipality<br />
has to prioritize social programmes and projects which will be able to address the socio-economic<br />
needs of the people. For example, there is a need to increase the number and improve the quality of<br />
social amenities in the municipal area, preferably within the municipal growth points (See table B<br />
above on Municipal growth points). There is also a high probability of the spread of sexually<br />
transmitted diseases, such as HIV/AIDS. The Municipality should therefore encourage and support<br />
69
HIV/AIDS programmes in at least all the nodal points. Attention should also be paid to local<br />
economic development initiatives in these population concentration points.<br />
Key Issues with regard to the population:<br />
• Very young population (almost 70% of the population is aged below 35 years)<br />
• Employment creation has to be a priority in order to address the economic needs of the<br />
population<br />
• The Municipality should focus on improving both the quantity and quality of social amenities<br />
to meet the social needs of the young population.<br />
• The municipal area is a high risk area for sexually transmitted diseases and HIV/AIDS<br />
B2.3. Local Economic Development and Tourism<br />
Global economic trends indicate fluctuations in interest rates, fuel prices, inflation, and cost of<br />
energy. These factors are expected to negatively affect underdeveloped and developing countries<br />
the most. Resultantly, layoffs and high unemployment rates may soon hit the local economy. The<br />
unstable value of the rand against foreign currencies will affect, amongst other sectors the mining<br />
industry and tourism. The economy of Ba-Phalaborwa Municipality is highly dependent on mining<br />
and there are moves to grow the tourism sector as an alternative to mining.<br />
Local economic development in Ba-Phalaborwa Municipality has to be founded on and guided by the<br />
principles and objectives of the National Spatial Development Perspective (NSDP), the Provincial<br />
Spatial Development Strategy (PGDS), the District Local Economic Development (LED) Strategy,<br />
recommendations of the District Growth and Development Summit, and the local Spatial<br />
Development Framework (SDF) (See Spatial Analysis above for NSDP and LEGDP).<br />
In order for economic development to be coordinated it is suggested that development be primarily<br />
focused on areas of high population concentration. The table below indicates population<br />
concentration points or growth points as identified in the Limpopo Province Spatial Rationale (2002):<br />
Table B2.15: Growth points identified in the Limpopo Province Spatial Rationale<br />
LOCATION CLASSIFICATION OF GROWTH POINT<br />
Phalaborwa Provincial growth point<br />
Namakgale District growth point<br />
70
Gravelotte District growth point<br />
Lulekani Municipal growth point<br />
A growth point is a high population concentration point and an economic hub in the area. The<br />
implication to the Municipality is that infrastructure in the growth points be strengthened in order to<br />
support economic development.<br />
2.3.1 District Growth and Development Summit Recommendations<br />
Mopani District Municipality convened a district growth and development summit from the 26 to<br />
27 th of February 2007 at the Hans Merensky in Ba-Phalaborwa Municipality. The aim of the summit<br />
was to determine and agree on:<br />
“A development path and programme for the district and what each social partner (government,<br />
business, labour and community sector) should contribute to the implementation of the<br />
programme”<br />
The following limitations to local economic growth were identified:<br />
Scattered human settlement patterns<br />
A limited manufacturing base<br />
Widespread poverty and high levels of unemployment<br />
Limited human resource base<br />
Outstanding land claims.<br />
High prevalence of HIV/AIDS.<br />
The summit acknowledged a district comparative advantage in the following sectors of the economy:<br />
Tourism;<br />
Agriculture;<br />
Forestry; and<br />
Mining.<br />
Ba-Phalaborwa Municipality has a fully developed mining industry and a high potential of growing<br />
the tourism industry into a competitive sector. The Selwane area, along the Groot Letaba River, has<br />
71
a potential of becoming a formidable agricultural cluster with a tourism element in the Eland and<br />
Letaba Ranch.<br />
The following anchor programmes and projects were identified by the district summit to accelerate<br />
economic development and job creation:<br />
District Fresh Produce Market<br />
Greater Giyani Natural Resource Programme<br />
Tunnel dried Tomato Project<br />
Small-scale mining projects across the District.<br />
Tiles from Clay,<br />
Moshupatsela Programme<br />
Sapekoe Tea Estates<br />
Modjadji Nature Reserve Initiative<br />
Shangoni gate Transfrontier park development<br />
Successful implementation of these programmes and projects is dependent on the availability and<br />
quality of basic services such as electricity, sanitation, water, and roads. In order for the district<br />
summit recommendations to be realised, the summit:<br />
Re-affirmed the implementation of the District LED Strategy.<br />
Resolved that a systemic partnership between the District Municipality and the Private<br />
Sector should be strengthened. This partnership is critical to ensure economic growth, job<br />
creation and poverty eradication.<br />
Resolved to develop a district-wide Human Resource Development Strategy to enhance<br />
emerging competitive sectors of the economy; and<br />
Finally, resolved to implement a comprehensive land reform that ensures a symbiotic<br />
balance between addressing a historic injustice and the imperatives of food security, and<br />
economic development.<br />
Comparative Contribution of Ba-Phalaborwa Municipality to the District Economy<br />
The table below presents a comparative GDP contribution of the Municipality to the Mopani District<br />
economy:<br />
72
Table B.16: Comparative contribution of local municipalities to the district economy<br />
MUNICIPALITY % GDP CONTRIBUTION TO THE DISTRICT<br />
Ba-Phalaborwa 47.4%<br />
Tzaneen 20.3%<br />
Giyani 16.7%<br />
Letaba 8.9%<br />
Maruleng 6.7%<br />
Source: Global Insight<br />
2.3.2 Economic Sectors<br />
The District LED Strategy identifies the following key economic Sectors for Ba-Phalaborwa<br />
Municipality:<br />
Agriculture;<br />
Mining;<br />
Manufacturing; and<br />
Tourism<br />
a. Mining Sector<br />
Ba-Phalaborwa has the highest concentration of minerals in the Mopani District hence mining is the<br />
largest economic sector in the Municipality and is also the largest employer. The table below shows<br />
mining’s percentage contribution to the municipal GDP and to employment.<br />
Table B.17: Ba-Phalaborwa mining sector’s contribution to municipal GDP and employment<br />
DESCRIPTION % CONTRIBUTION BY MINING SECTOR<br />
District GDP 59.6%<br />
District Employment 45.8%<br />
District Mining Sector Employment 91.2%<br />
Source: Mopani District Economic Data Baseline Study - 2008<br />
73
The Municipality’s mining sector contributes 92.5% to the District’s mining sector GDP. This<br />
contribution translates to 59.6% of the total district GDP. Mining gives Ba-Phalaborwa a competitive<br />
edge over other municipalities in the District. Unfortunately, copper mining (which constitutes the<br />
backbone of the mining sector in the municipal area) is destined to stop before 2020.<br />
The most mined resources in the Municipal area are copper and phosphate in the Phalaborwa area,<br />
with gold and antimony in the Murchison Greenstone Belt.<br />
The table below presents the range of minerals available in the municipal area<br />
Table B.18: Minerals available in the Phalaborwa Area and the Murchison Range<br />
<strong>PHALABORWA</strong> AREA MURCHISON RANGE<br />
Magnetite Mineral sand<br />
Copper Antimony<br />
Vermiculite Gold<br />
Nickel Zinc<br />
Apatite Mercury<br />
Zirconium Paving and clad stones<br />
Titanium Emeralds<br />
Uranium Ilmenite<br />
Mica<br />
Clay<br />
Key Mining operations in Ba-Phalaborwa<br />
Palabora Mining company: Palabora Mining Company, situated in the Ba-Phalaborwa area of<br />
Mopani, operates South Africa's largest copper mine. Daily production from the underground<br />
mine averaged 30,780 tons per day and the total mine production was 11,020,496 tons in 2006.<br />
Most of the finished copper product is for local consumption, while most of the vermiculite is<br />
exported. Palabora is the only producer of refined copper in South Africa and supplies the<br />
country with the majority of its copper needs. The mine has been operational for over forty<br />
years. The primary product of the company is copper, together with by-products, which include<br />
74
magnetite, nickel sulphate, anode slimes, sulphuric acid and vermiculite. A major exporting<br />
country of the Pabalabora mining company is Switzerland.<br />
Foskor: Foskor is the world’s largest producer of phosphate and phosphoric acid. Foskor<br />
produces phosphate rock, copper concentrate, magnetite and fused zirconia’s through a<br />
smelting furnace process. The Foskor group has two mining operations, namely a phosphate<br />
rock mine and beneficiation plant situated in Phalaborwa; and a phosphoric acid plant situated<br />
in Richards Bay. The major exporting countries of Foskor are India, Japan and Brazil.<br />
Consolidated Murchison Mine (Metorex Group): Situated at Gravelotte close to Phalaborwa in<br />
the Limpopo province, Consolidated Murchison is the single largest antimony orebody known in<br />
the world, having produced in excess of nine million tons of high-grade stibnite ore. Gold is<br />
produced at Consolidated Murchison as a co-product of antimony. The top exporting countries<br />
of Consolidated Murchison Mine are Mexico, India and China.<br />
Copper is mined and processed by Phalaborwa Mining Company (PMC) into copper rods. The by-<br />
products of the mining of copper are phosphate and sulphate, which are further processed by<br />
Foskor. There are opportunities for small scale mining in the municipal area. Possible mining projects<br />
in the Ba-Phalaborwa area include:<br />
Expansion of rock phosphate by Foskor;<br />
Phlogopite processing facility<br />
Koalin clay project<br />
Surface strip mining of mineral sand in Gravelotte<br />
Steel production plant (Magnetite processing)<br />
Red River Mining (Mining of Ilmenite)<br />
Iscor/Kumba (Mining of Ilmenite)<br />
The following table portrays the development potential as identified within the mining sector of Ba-<br />
Phalaborwa.<br />
Table B.19: Development potential within the mining sector in Ba-Phalaborwa<br />
DEVELOPMENT POTENTIAL POTENTIAL PROJECTS<br />
Large variety of mineral deposits<br />
• Local mineral processing<br />
beneficiation activities<br />
and<br />
• Small scale mining operations<br />
75
DEVELOPMENT POTENTIAL POTENTIAL PROJECTS<br />
Production of copper<br />
• Increase in SMME development projects<br />
relating to the metal<br />
Production of clay<br />
•<br />
•<br />
Clay processing plant<br />
Brick manufacturing<br />
• Roof & floor tile manufacturing<br />
• Tile and cement products<br />
• Ceramic and sanitary ware<br />
Magnetite processing<br />
• Steel production plant<br />
Paving and cladding stones<br />
•<br />
•<br />
Processing of stones<br />
Increase in SMME development projects<br />
relating to paving and cladding stones<br />
Mining’s GDP contribution to the South African economy is less than 10%, while in the Limpopo<br />
Province it is estimated at 20%. In Ba-Phalaborwa Municipality, mining contributes 80% to the GDP<br />
and employs about 30% of the total labour force.<br />
The conclusions for the titano-magnetites are that both the Gravelotte and Red River deposits are<br />
major prospects for the production of ilmenite and possibly also iron and vanadium. Available<br />
information indicates that most of the parameters are in the range that would define a recoverable<br />
deposit. Little information has been found to indicate unsurmountable technical problems, though<br />
some possible problems in physical separation and smelting have been met during Mintek work on<br />
similar applications. One would expect the Iscor deposit to be the most likely to be developed but<br />
only a small amount of information is available to support this conclusion. An additional problem is<br />
the intellectual property situation covering relevant smelting technology. For antimony and gold,<br />
Metorex considers that the Murchison belt has potential and is trying to structure a joint venture to<br />
fund exploration. The possibility of a centralized gold processing plant in the area should be<br />
examined.<br />
Known reserves of zinc and copper in the Phalaborwa SDI are limited and do not justify a zinc or<br />
copper smelter, or even expansion of the mine, but there are reasonably high expectations of new<br />
finds which could be used to extend Maranda's life. No other significant deposits of zinc or copper<br />
have been identified. There may be a potential for small-scale mining of zinc or copper in the SDI,<br />
but this would not include artisanal operations. Should spare capacity arise at Phalaborwa Mining<br />
Company's smelter there may be an opportunity for Maranda to sell its copper concentrate to PMC<br />
at a considerable saving in transportation cost.<br />
76
The Mohale quartz deposit appears on the basis of initial information to be viable as a mine to<br />
supply the Pietersburg smelter of Silicon Smelters and/or exports. It would not be used for a silicon<br />
metal smelter in the SDI but it could be linked with other enterprises such as glass manufacture,<br />
SMME pegmatite producers or forestry operations. More exploration is needed on the Mohale<br />
deposit, the Marais deposit and for high quality quartz elsewhere in the SDI and the country<br />
generally.<br />
It is recommended that the factors impeding the development of the projects discussed be<br />
investigated in detail to see if any of them can be facilitated by government. This includes the<br />
administrative factors mentioned by Iscor as hindering the Gravelotte project. The Council for<br />
Geoscience should be asked to investigate the Marais deposit.<br />
The principle finding of a related study on small scale mining was that although there are 560<br />
identified mineral deposits in the Phalaborwa SDI, only two, slate and quartz offer a reasonable<br />
opportunity for small scale exploitation. While there are many reasons for this brief list including<br />
high capital cost, poor mineral markets, low grades, etc. it is evident that economically workable<br />
deposits are scarce. This is due, at least in part, to the fact that mining has been conducted in the<br />
area for over 100 years and many deposits are mined out. Secondly, although many suitable<br />
deposits may remain in regions such as the Murchison belt, insufficient geological information is<br />
available in the public domain to make a reasonable judgment. Nor has the study been able to<br />
identify sufficient deposits of one type and of good quality, to justify a central processing plant.<br />
The mineral rights holders have been identified for the five selected prospects. Further to this, a<br />
preliminary investigation on the mineral rights status of other deposits in the Limpopo revealed that<br />
many mineral rights belonged to the State. Yet, mining authorisations were granted in cases of up to<br />
55 subdivisions on each farm. Because the mining authorisations are granted in perpetuity the<br />
license holders are deemed to be “claim” holders. In such circumstances, the NSC will identify the<br />
specific holders concerned should this become necessary in terms of project development.<br />
An observation from a brief study of certain operating mines in the region is that although mines<br />
create permanent employment opportunities, relatively few jobs are created when compared with<br />
the considerable capital investment.<br />
77
. Agricultural Sector<br />
A broad scoping exercise was undertaken by the CSIR Food and Technology Division during 1999 to<br />
establish the current agricultural production and processing operations within the Phalaborwa<br />
Spatial Development Initiative (SDI). The aim of the scope was to identify current and possible<br />
future production and processing opportunities of agricultural produce in the area.<br />
The scope focused on subtropical fruit, vegetables, nuts and ornamentals. A wide variety of<br />
agricultural products are currently grown in the area. Fruit and vegetables are mostly destined for<br />
fresh consumption by the local and export markets. Farmers and private companies are responsible<br />
for some value addition. Value addition includes: manufacture of fruit juices, drying of fruit and<br />
vegetables, manufacture of atchaar.<br />
The table below presents the percentage contribution of the agricultural sector to the GDP and<br />
employment of both the Municipality and the District.<br />
Table B.20: Ba-Phalaborwa agricultural sector’s contribution to municipal GDP and employment<br />
DESCRIPTION % CONTRIBUTION BY AGRICULTURAL SECTOR<br />
District GDP<br />
District Employment<br />
District Tourism Sector Employment<br />
Source: Global Insight<br />
78<br />
1.1%<br />
15.6%<br />
15.9%<br />
The District LED Strategy identifies the following development opportunities and potential projects<br />
that can be undertaken in Ba-Phalaborwa:<br />
Table B.21: Development opportunities and potential projects in the agricultural sector<br />
DEVELOPMENT OPPORTUNITIES POTENTIAL PROJECTS<br />
Existing production of citrus and vegetables Juice making<br />
Existing livestock farming (Cattle, poultry, pigs,<br />
etc.<br />
Vegetable processing<br />
Meat processing plants<br />
Establishment of abattoirs<br />
Dairy products (Cheese, yoghurt,<br />
mass, etc.)<br />
Poultry processing and packaging<br />
Egg production and packaging
Game farming Game farming for selling and hunting<br />
c. Manufacturing Sector<br />
Manufacturing focuses on beneficiation of and value addition to products from the primary sector of<br />
the economy, namely mining and agriculture. It is, therefore, classified as the secondary sector of<br />
the economy. The manufacturing activities in the Municipality are mainly focused on the mining<br />
sector. There is, however, a potential for the processing and packaging of agricultural related<br />
products such as Cattle, poultry, vegetables, eggs, etc.<br />
The table below presents the percentage contribution of the manufacturing sector to the GDP and<br />
employment of both the Municipality and the District.<br />
Table B.22: Ba-Phalaborwa manufacturing sector’s contribution to municipal GDP and<br />
employment<br />
% CONTRIBUTION BY MANUFACTURING<br />
SECTOR<br />
District GDP<br />
District Employment<br />
District Manufacturing Sector Employment<br />
Source: Global Insight<br />
79<br />
0.5%<br />
1.9%<br />
14.4%<br />
The Municipality employs 14.4% of the total district labour force that is in the manufacturing<br />
industry and hence contributes only 0.5% to the overall District GDP. Manufacturing does not give<br />
the Municipality a competitive advantage over the other sister municipalities in the District. It then<br />
implies that the production of mining raw materials is not equally complemented with local<br />
beneficiation and value chain addition. In order to grow the manufacturing industry, the<br />
Municipality needs to strengthen support services, such as transport network, electricity and<br />
technology. It is also important to unblock land claims disputes to free land for development.<br />
Products currently manufactured in Ba-Phalaborwa include:<br />
Bricks for building and paving;<br />
Industrial chemical products;
Rubber products (lining);<br />
Printing;<br />
Pipe and tube manufacturing,<br />
Extracting oil from marula pips;<br />
Processing of Marula pulp;<br />
Food canning; and<br />
Protective clothing.<br />
The table below presents potential projects in the manufacturing sector:<br />
Table B.23: Potential projects in the manufacturing sector<br />
DEVELOPMENT POTENTIAL POTENTIAL PROJECTS<br />
Available local agricultural produce • Fruit and vegetable processing plant<br />
80<br />
• Meat processing<br />
• Packaging of eggs and other products<br />
• Dairy products like cheese<br />
• Poultry factory processing<br />
• Canned fruit and vegetables<br />
Available mining products • Clay processing plant<br />
• Brick manufacturing<br />
• Roof and floor tile manufacturing<br />
• Tile and cement manufacturing<br />
• Ceramic and sanitary ware<br />
manufacturing<br />
• Manufacturing of steel products<br />
Other natural products • Processing of extracted oil from Marula<br />
pips<br />
d. Tourism Sector<br />
• Processing of extracted marula pulp<br />
The decline of the mining industry forces the Municipality to venture into other economic sectors.<br />
The geographic position of Ba-Phalaborwa and the abundance of wildlife in the Kruger National Park
present an opportunity for diversification into tourism. Tourism is the economic sector with the<br />
most potential for development in the Municipality as a result of the Municipality’s ideal location<br />
and climate.<br />
The Mopani Local Economic Development Strategy indicates the following with regard to<br />
Tourism in Ba-Phalaborwa:<br />
The Municipality has high business tourism flows – especially linked to commerce, industry<br />
and the mines.<br />
Leisure traffic stops briefly in and around the town usually en route to and from the Kruger<br />
National Park (KNP).<br />
There is a limited amount of traffic that stays outside the Park to make day visits into the<br />
Park.<br />
Similarly, very few KNP visitors spend a night in Phalaborwa before or after their visits to the<br />
Park.<br />
Stay-over leisure traffic is growing as far as the golf estate is concerned.<br />
Tourism operators believe that the opportunity to travel to the Mozambican coast via Ba-<br />
Phalaborwa represents a significant tourism advantage. Archeological sites and the history of the<br />
arrival of the Malatji clan are also believed to hold tourism potential. The area has a particularly<br />
pleasant winter climate. The concept of converting former mine hostels into educational facilities or<br />
youth academies is another possibility. The fact that the local labour force comprises a high<br />
proportion of single persons reflects a need for leisure facilities that are not sufficiently available.<br />
The Ba-Phalaborwa Tourism Development Strategy as compiled by Grant Thornton in February 2006<br />
recommends, in order of priority, the following market:<br />
Domestic general leisure tourists<br />
Foreign general leisure tourists<br />
Domestic transit tourists<br />
Foreign transit tourists<br />
The Grant Thornton strategy recommends that the following tourism products be explored,<br />
developed and marketed:<br />
Phalaborwa as a base for exploring KNP;<br />
Phalaborwa as a base to explore Greater Limpopo Trans-frontier Park (GLTP);<br />
81
Phalaborwa as a transit to KNP and GLTP;<br />
A destination for general leisure experience;<br />
An interesting transit stop; and<br />
A convenient conferencing venue<br />
According to the Grant Thornton study, there is a need for tourism support infrastructure. The<br />
strategy recommends that upgrading of roads, electricity, water supply and sanitation be done.<br />
Grant Thornton further recommends that the Municipality:<br />
Maintains public amenities;<br />
Ensures the safety of tourists at visiting points;<br />
Provides infrastructure in support of tourism; and<br />
Standardises tourism related signage.<br />
Ba-Phalaborwa is a popular tourist destination and many opportunities exist to expand the income<br />
generated from the tourism economic sector. A scoping report on tourism opportunities in the<br />
Phalaborwa Corridor by KPMG concluded that priority should be given to:<br />
Development of the Hans Merensky Club into an international resort,<br />
Construction of an international mid-range hotel at the gate to the Kruger Park,<br />
Promotion of the Marula industry.<br />
The following are existing tourist attraction points in Ba-Phalaborwa:<br />
Hans Merensky Golf Course and Estate;<br />
46 accommodation facilities;<br />
Bonlati Game Ranch;<br />
Water based activities in the lower Olifants River;<br />
Tours to the ‘Big Hole’ at the copper mine in Phalaborwa;<br />
Big baobab tree of Gravelotte;<br />
Eiland Resort;<br />
Tsonga Kraal;<br />
Letaba Game Ranch<br />
Mashishimale Croch Ranch<br />
The table below portrays the identified development potential and potential projects for stimulating<br />
development within the tourism sector of the Municipality.<br />
82
Table B.24: Development potentials and potential projects<br />
DEVELOPMENT POTENTIAL POTENTIAL PROJECTS<br />
Various local tourist products, services and<br />
activities<br />
Existing attractions to be upgraded<br />
Development of cultural activities<br />
83<br />
Tourist services, product and activity<br />
packaging and marketing<br />
Development of a tourism development<br />
strategy<br />
Linking the existing tourist products and<br />
services to surrounding products and<br />
services<br />
Development of an anchor tourism<br />
site/facility<br />
The Big Boabab Tree in Gravelotte,<br />
interpretation of site and marketing<br />
development<br />
Road to Tsonga Kraal upgraded for better<br />
access<br />
Development of facilities at the Letaba<br />
Ranch<br />
Village tours and cultural activities south<br />
of Letaba Ranch<br />
Arts and crafts market<br />
Tourism infrastructure in the municipal area is presented in the table below and followed by a SWOT<br />
analysis of the tourism sector.<br />
Table B.25: SWOT analysis of the tourism sector<br />
Strengths Weaknesses<br />
Proximity to the Kruger National Park<br />
Abundant tourist accommodation<br />
Game Farms<br />
Open areas/parks and green belts<br />
Opportunities Threats<br />
Mopani worms<br />
Marula nuts<br />
Road to Mozambique via Phalaborwa gate<br />
Greater Ba-Phalaborwa trade and tourism<br />
forum<br />
Mopani District LED and tourism forum<br />
Eco-tourism<br />
Hunting<br />
Malaria area<br />
High temperatures in summer<br />
Deteriorating road infrastructure<br />
Increasing petty crime due to<br />
increased unemployment<br />
Pollution from mining activities<br />
Deforestation<br />
Over - development of parks and<br />
open spaces<br />
Land claims
Mining<br />
Birdlife South Africa initiative<br />
There is a rich potential of historical-cultural tourism with the existing archaeology and culture of<br />
ancient mining dating back from 800 AD to about 1350 AD.<br />
Bollanoto<br />
Bollanoto is a municipal property, a few metres from the Phalaborwa Gate. It was established with<br />
the view to making tourists destined for KNP to stop, spend and possibly stay in Phalaborwa town. It<br />
was meant to afford the previously disadvantaged (called beneficiaries) an opportunity to<br />
participate in the tourism industry. The existing structure is not functioning at its utmost potential.<br />
Assessment revealed that Bollanoto did not achieve its objectives as a result of, amongst other<br />
factors, the following:<br />
Beneficiaries felt it was too far from home and too costly to travel every day;<br />
No “champion”;<br />
Not enough feet passing through the Centre;<br />
Craft on sale along roadside and at KNP Gate (Hlanganani);<br />
Provincial support not sustained;<br />
Municipality was not interested in subsidizing the Centre, and the private sector did not see it as<br />
a viable project.<br />
Environmental and tourism education facilities – small lecture rooms and displays;<br />
Indigenous Tree Garden;<br />
“Touch and Feel” wildlife centre.<br />
A new approach has been suggested towards the physical upgrading and expansion of the Centre.<br />
The approach aims at ensuring that Bollanoto becomes the ‘heart and soul’ of tourism in Ba-<br />
Phalaborwa Municipality. The concept is to enclose the present buildings within a decorated wall<br />
and to construct all new facilities, such as gift shops, restaurants etc. facing outwards from this wall.<br />
This would create a flow of feet within the central circle and would ensure that a visitor heading for<br />
the restaurant, for example, would also see and pass the other facilities on offer.<br />
84
There is a possibility of creating a traffic roundabout (traffic circle) where there are traffic lights at<br />
present, and this would not only ease vehicle flow but would also assure higher visibility of the<br />
Centre.<br />
There is unused land (part of the Bollanoto property) extending to the north and northeast and this<br />
would be used for the Living Tree Museum, walks and trails, and some of the “touch and feel”<br />
animal experiences. Additional land may be available - at a price.<br />
The Municipality is currently considering the establishment of a legal municipal entity, which will be<br />
charged with the day to day management of Bollanoto tourism centre. The consideration takes into<br />
account the importance of public private partnership to ensure efficiency and sustainability.<br />
Annual Marula Festival<br />
The Marula Festival has become an annual event with Ba-Phalaborwa Municipality declared a<br />
permanent host. The festivities for <strong>2011</strong> were held over a period of three days in the picturesque<br />
town of Phalaborwa. The build-up activities of the festival will start on the 19 February <strong>2011</strong> in all<br />
the five (5) traditional authorities. The main venues for the <strong>2011</strong> activities will be Impala Park<br />
Stadium, Hans Merensky Golf Club and Spekboom Farm.<br />
Key issues with regard to tourism in Ba-Phalaborwa:<br />
Immigration bottlenecks in the Giryondo boarder;<br />
Crime and potential cross-border criminal activities may scare tourists;<br />
Lack of cross referrals between the KNP and accommodation facilities in the Ba-Phalaborwa<br />
area;<br />
Commercial banks meeting the needs of international tourists;<br />
Ensuring that the previously disadvantaged groups join the tourism industry as role players;<br />
Development of suitable infrastructure to meet the different tastes of tourists;<br />
Branding Ba-Phalaborwa as a tourist destination of choice;<br />
Lack of ownership of the tourism products by the stakeholders; and<br />
Cluttered signage<br />
e. Trade<br />
Currently, the trade situation in the Ba-Phalaborwa municipal area is segmented between the formal<br />
and the Informal sectors. There are currently 189 registered formal businesses in Phalaborwa town;<br />
85
whereas data on businesses in the two townships and the rural areas is still to be collated. The<br />
existent gap between the first and the second economies is evident from the operations of the<br />
businesses in both the formal and the informal sectors.<br />
Formal businesses in rural nodes, such as Makhushane, Maseke, Mashishimale, Majeje and Selwane<br />
are not well established. The businesses mainly serve as bread distributors with basic products not<br />
well stocked to the benefit of their customers.<br />
The Municipality’s concern is to close the gap between the first and the second economies by<br />
improving the informal economic sector without devaluing the formal sector. Glen Steyn &<br />
Associates’ analysis of the informal sector will assist the Municipality to understand the<br />
fundamentals of the informal sector and craft a relevant intervention strategy.<br />
f. Informal Economic Sector<br />
A survey was conducted, by Glen Steyn & Associates, to create a database on the state of informal<br />
trading in Ba-Phalaborwa. The above table represents the findings:<br />
Table B.26: Summary of the Traders and Trading Areas<br />
TRADING PLACE NUMBER OF TRADERS TRADERS INTERVIEWED<br />
Checkers Car Park 27 26<br />
Phalaborwa Taxi Rank 60 60<br />
Namakgale 143 12<br />
Majeje/Lulekani 68 5<br />
Mashishimale 37 24<br />
Makhushane 28 -<br />
Maseke 20 13<br />
Seloane 24 8<br />
Gravelotte 7 5<br />
Boelang 3 3<br />
TOTAL 417 156<br />
Source: Glen Steyn & Associates, 2007 Survey<br />
86
Needs identified by informal economy businesses.<br />
• The greatest need identified is the issue of decent trading structures and storage facilities at<br />
the places where they are currently trading.<br />
• Most traders in the Checkers Car Park indicated that they need access to micro-finance in<br />
order to increase their stock levels and variety.<br />
• Some Spaza owners mentioned the need for advertising materials (boards), to attract/ alert<br />
potential buyers<br />
• Electricity connections were requested by some traders.<br />
Employment<br />
The labour force in Phalaborwa was 51,510 persons in 2001 according to the strict definition. This<br />
indicates a participation rate of more than 39% (on a total population of 131,091), which is very high<br />
by South African standards. The average labour force participation rate in Limpopo was 24.6% in<br />
2001. This is an indication that Ba-Phalaborwa is a destination for labour migration.<br />
There was a modest increase in the number of employed persons between 1996 and 2001, but a<br />
considerable increase in the number of unemployed persons. The strict unemployment rate<br />
therefore increased from 29.2% in 1996 to 40.4% in 2001. The labour force participation rate in<br />
Phalaborwa was 34.6% in 1996, but increased to 39% as indicated above. More than half of the<br />
increase in the number of unemployed persons therefore originates as labour seekers from outside<br />
the municipal area.<br />
The following table presents employment of individuals per economic sector. Employment per<br />
sector:<br />
Table B2.27: Employment for individuals per employment sector<br />
Economic Sector Population %<br />
Primary 6 685 5.1%<br />
Secondary 12 424 9.4%<br />
87
Tertiary 14 507 11.0%<br />
Not applicable 97 868 74.4%<br />
Total 131 485 100%<br />
Source: Development Partnership, 2008<br />
The above table indicates a shift towards the services (Tertiary) sector. This may augur well for<br />
tourism development. At the same time, a sharp decline in the primary sector may greatly affect<br />
both the secondary and tertiary sectors, since their sustainability is dependent on the primary<br />
sector.<br />
The table below presents household heads’ occupations per sector<br />
Table B2:28 Household heads’ occupations per sector<br />
Occupations Number % of Household Head<br />
Population<br />
Legislators, Senior Officials and<br />
Managers<br />
1 541 4.6%<br />
Professionals 1 638 4.8%<br />
Technicians 1 217 3.6%<br />
Clerks 753 2.2%<br />
Service Workers, Shop &<br />
market Sales Workers<br />
Skilled Agricultural & Fishery<br />
Workers<br />
Crafts & related Trades<br />
Workers<br />
Plant & Machine Operators &<br />
assembly<br />
2 034 6.0%<br />
753 2.2%<br />
3 823 11.3%<br />
2 842 8.4%<br />
Elementary Occupations 3 946 11,7%<br />
Occupations unspecified 1 828 5.4%<br />
Not applicable 13 417 39.7%<br />
Total 33 792 100%<br />
Source: STATSA SA (2007 CS)<br />
88
The majority of household heads are employed in elementary occupations, do craft and related<br />
trade work or as plant and machine operators. It should therefore be noted that the forced shift of<br />
focus from mining to tourism will have to be complimented by the necessary workforce. Strategies<br />
need to be developed to train and/or retrain people in the different fields of the hospitality sector<br />
and support sectors.<br />
2.3.3 Employment Status and Income<br />
a. Employment Status<br />
The rate of unemployment in South Africa is currently at 43%. This analysis focuses on the<br />
employment status per household head in the municipal area (see the tables below).<br />
Table B.28: Employment status per household head in the municipal area<br />
2001<br />
EMPLOYMENT STATUS NUMBER %<br />
Employed 30704 54%<br />
Unemployed 20806 36%<br />
Could not find work 5830 10%<br />
100%<br />
Total 57340<br />
Source: STATS SA 2001 census Source: STATS SA 2007 CS<br />
According to the 2007 CS results, unemployment is at 11% per household head as compared to the<br />
36% in 2001. The difference may be attributed to the definitions of a household adopted in each of<br />
the studies and that the 2007 CS focused on household heads.<br />
b. Income Distribution and Categories<br />
Table B.29: Monthly income distribution per person in the municipal area in 2007<br />
CATEGORY NUMBER % OF POPULATION<br />
No Income 54 960 43.2%<br />
R1 – R400 30 753 24.2%<br />
R401 – R800 6 815 5.3%<br />
2007<br />
EMPLOYMENT STATUS NUMBER %<br />
Employed 19 913 59%<br />
Unemployed 3 842 11%<br />
Not economically active 7 282 22%<br />
Not applicable 2 755 8%<br />
Total 33 792 100<br />
89
R801 – R1 600 13 467 10.6%<br />
R1 601 – R3 200 5 893 4.6%<br />
R3 201 – R6 400 3 678 2.9%<br />
R6 401 – R12 800 3 123 2.5%<br />
R12 801 – R25 600 2 090 1.6%<br />
R25 601 – R51 200 587 0.5%<br />
R51 201 – R102 400 18 0.01%<br />
R102 401 – R204 800 - -<br />
R204 801 or more - -<br />
Response not given 3 845 3.0%<br />
Institution 2 079 1.6%<br />
Total 127 309 100%<br />
The per person income distribution in the municipal area indicates that about 83.3% of the<br />
municipal population earn a monthly income of R1 600 or less. If these figures are to translate to<br />
monthly household income, it can be surmised that the majority of household heads are either<br />
unemployed or under-employed and qualify to be declared indigents.<br />
The proportion of people without any income increased from 63.8% in 1996 to 69.6% in 2001.<br />
Factors that contributed to this picture were principally, the downscaling of mines and the fact that<br />
many people join the informal economy and are classified as not having income. The 2007 CS<br />
indicates a decrease in the percentage of people without an income from 69.6% in 2001 to 43.2%.<br />
Although the decrease is welcome, the figures are still unacceptably high and the situation warrants<br />
intervention.<br />
c. Dependence on social grants<br />
The following table shows distribution of food parcels by the Department of Social Development<br />
(Community Development section)<br />
90
Table B.30: Distribution of food parcels to needy families between 2006 and 2008<br />
YEAR NUMBER OF BENEFICIARIES<br />
(HOUSEHOLDS) IDENTIFIED PER<br />
WARD<br />
91<br />
NUMBER OF FOOD PARCELS DISTRIBUTED<br />
LULEKANI<br />
AREA<br />
NAMAKGALE AREA TOTAL<br />
2006/07 32 160 256 416<br />
2007/08 20 107 207 314<br />
B2.4 Safety and Security<br />
Greater Phalaborwa Cluster consists of 5 police stations, namely Phalaborwa Police Station,<br />
Namakgale Police Station, Lulekani Police Stations, Hoedspruit Police Station and Gravelotte Police<br />
Station. The Cluster is serving two municipalities, Ba-Phalaborwa Municipality and Maruleng Local<br />
Municipality. There are four police stations under Ba-Phalaborwa Municipality, namely, Phalaborwa<br />
Police Station, Namakgale Police Station, Lulekani Police Station and Gravelotte Police Station.<br />
Hoedspruit Police falls under Maruleng Local Municipality.<br />
B2.4.1 Analysis of Crime Trends<br />
An analysis of the Greater Phalaborwa Cluster crime situation is facilitated by grouping the crime<br />
tendencies into the following:<br />
• Contact crime<br />
• Contact related crime<br />
• Property crimes<br />
• Other serious crimes and<br />
• Crimes heavily dependent on police action for detection<br />
During the period 1 January 2008 until 1 January 2009 a total of 7366 crimes were registered in the<br />
Greater Phalaborwa cluster. 671 crimes were reported during 1 st January 2009 until 1 st January 2010.<br />
There is a decrease of 395 reported crimes.
B2.5 Environmental Considerations<br />
In terms of the National Environmental Management Act (Act 107 of 1998), Ba-Phalaborwa<br />
Municipality has to provide for co-operative environmental governance by establishing principles for<br />
decision-making on matters affecting the environment and to provide for matters connected<br />
therewith. This act works hand in hand with Environmental Conservation Act, 1989. Both Acts<br />
stipulate the provision of environmental impact assessments and exemption, noise control areas etc.<br />
and for the effective protection and controlled utilization of the environment and for matters<br />
incidental thereto.<br />
The purpose of environmental analysis is to ensure that municipal development strategies and<br />
projects take existing environmental problems and threats into consideration. It also aims at creating<br />
awareness about environmental assets that require protection or management. The Municipality,<br />
through the <strong>IDP</strong>, has to ensure sustainable development – development that meets the needs of the<br />
present generation without compromising the ability of future generations to meet their own needs<br />
(definition by the World Commission on the Environment and Development). According to the<br />
National Environmental Management Act (Act 107 of 1998), sustainable development should be<br />
perceived as the integration of social, economic and environmental factors into planning,<br />
implementation and decision making so as to ensure that development serves present and future<br />
generations.<br />
A number of wild animals roam freely within the area. Given the position of the area next to the<br />
National Park and private reserves, this is not an unnatural phenomenon and adds to the ambiance<br />
and attractiveness of the town. The provincial department responsible handles problem animals in<br />
conjunction with council and other role players. However, the area in general is under severe<br />
pressure from alien and invader plant species. The removal and control of such plants is the<br />
responsibility of government structure, the council and private landowners. Current legislation<br />
dictates us to control such plants according to their grading in the schedule to the act. Ba-<br />
Phalaborwa is regarded as an ecologically sensitive zone given its water sources and proximity to the<br />
Kruger National Park.<br />
Air pollution:<br />
The municipality does not have reliable information on the severity of air pollution in the area,<br />
taking into consideration the mining activities. At present, the Municipality does not have the<br />
capacity to perform air quality management.<br />
92
Water pollution:<br />
Mainly the mines, pit latrines and other sewage spillage cause the pollution of surface as well as<br />
underground water sources. Water pollution is also worsened by acid rain caused by air pollution.<br />
Water pollution poses a health risk to households that are dependant on water from rivers and/or<br />
boreholes.<br />
Deforestation:<br />
Deforestation is identified as major environmental problem in areas surrounding townships and<br />
villages. Deforestation is caused mainly by the creation of small farming plots, the use of firewood<br />
as main source of energy, uncontrolled veldfires and overgrazing.<br />
Veldfires:<br />
Veldfire is an environmental problem in the area, due to the fact that the majority of the area<br />
consists of game farms and borders on the Kruger National Park. Veldfires have a negative impact<br />
on biodiversity and contribute to soil erosion.<br />
Soil erosion:<br />
Soil erosion, although not so vast and confined mainly to areas around the villages, is due to<br />
deforestation and over-grazing.<br />
Chemical spills and hazardous accidents:<br />
A large area bordering the Kruger Park is utilized by the mining industry to dump their sludge and<br />
other waste products produced by mines. This, however, is well managed and does not pose an<br />
immediate threat to the environment.<br />
B2.7 Disaster Management<br />
The following hazards found to pose the greatest risks in the Municipal area on the economy,<br />
cultural, welfare, sustained development and sustained livelihoods.<br />
93
Natural Hazards<br />
B2.7.1 Hydro Meteorological Hazards<br />
• Drought<br />
• Cyclone<br />
• Floods<br />
• Fire<br />
• Hailstorm<br />
• Lightning<br />
• Severe storms<br />
• Wind storms<br />
• Tornado<br />
B2.7.2 Geological Hazards<br />
• Earthquake<br />
• Landslide/mudflow<br />
B2.7.3 Biological Hazards<br />
• Food poisoning<br />
• Foot and mouth disease<br />
• Malaria<br />
• Rabies (animals)<br />
• Communicable diseases<br />
B2.7.4 Technological Hazards<br />
• Dam failure<br />
• Hazardous installations<br />
• Hazardous material by rail<br />
• Hazardous material by road<br />
• Aircraft accidents<br />
B2.7.5 Environmental degradation<br />
• Air pollution<br />
• Deforestation<br />
• Soil pollution<br />
• Siltation<br />
• Land degradation<br />
94
B3. Institutional Arrangements<br />
The institutional arrangements of the Municipality are best presented through the organisational<br />
chart (organogram). See Annexure A for the Organogram of the Municipality.<br />
B4. Governance and Financial Viability<br />
B4.1 Financial Viability<br />
Budget and Management<br />
The Municipality has volunteered to table its budget in new reporting formats and fully complied.<br />
The municipality has fully complied with the provisions of the MFMA in preparing its 2009/10<br />
budget, compliance to the <strong>IDP</strong>/Budget Process Plan, submissions of MFMA and compliance to DoRA.<br />
Supply Chain<br />
The Municipality is at 93% in compliance the Supply Chain Management priorities as set out by the<br />
National Treasury. Supply Chain reports are tabled in council and submitted to National and<br />
Provincial Treasury. Through the Supply Chain Management, the Municipality has supported SMMEs.<br />
The Municipality has improved its fleet management; all Municipal vehicles are fitted with tracking<br />
devices that assist in tracking irregular issues. The tracking devices reports are printed on monthly<br />
basis and analysed. The Municipality has completed the GRAP compliant asset register.<br />
Revenue and Debt Management<br />
The Municipality has implemented a uniform tariff in the 2009/10 financial year. The Municipality<br />
has supported 3754 indigent households who qualified. The Municipality was able to collect R208<br />
million (R201 million budget) from own revenue sources. There is an improved average payment<br />
rate of services from 67% to 87%, an improved payment rate in town from 63% to 83%. An<br />
improvement was also noticed in the billing and customer care.<br />
Financial related Policies<br />
The Municipality has improved its business processes and developed and implemented 14 financial<br />
related policies:<br />
95
Debt Policy<br />
All the policies were public participated in all the wards in the Municipality.<br />
Revenue Enhancement Strategy<br />
Description Adjusted Budget Receipts to Date Variance Amount Percentage<br />
Collection<br />
Property rates 30 470 000 47 187 505 16 717 505 155%<br />
Electricity<br />
revenue<br />
62 508 000 40 458 677 -22 049 323 65%<br />
Water revenue 65 920 240 72 185 458 6 265 218 110%<br />
Sanitation<br />
revenue<br />
7 091 232 10 761 516 3 670 284 152%<br />
Refuse removal 4 530 924 6 126 709 1 595 785 135%<br />
Interest on<br />
outstanding debts<br />
4 908 742 26 222 137 21 313 395 534%<br />
Fines 780 000 524 404 -255 596 67%<br />
Licences and<br />
permits<br />
Service charges<br />
other<br />
5 468 813 4 396 182 -1 072 631 80%<br />
18 837 373 0 -18 837 373 0%<br />
Total 200 515 324 207 862 588 7 347 264 104%<br />
Grants and Subsidies received<br />
Grant Allocation Adjusted Budget Receipts to Date Percentage Allocation<br />
FMG 750 000 750 000 100%<br />
MSIG 500 000 500 000 100%<br />
MIG 12 812 000 12 335 000 96%<br />
NDPG 10 000 000 10 000 000 100%<br />
NDPG – Technical 2 500 000 - 0%<br />
96
Grant Allocation Adjusted Budget Receipts to Date Percentage Allocation<br />
Equitable Shares 39 033 100 39 033 100 100%<br />
FBS-MDM 4 849 085 4 849 085 100%<br />
Provincial Grant –<br />
Excess Employees<br />
2 440 000 2 440 000 100%<br />
DBSA Grant Funding 2 000 000 1 313 9191 66%<br />
MDM-GRAP<br />
Conversion<br />
0 1 000 000 100%<br />
Total 74 884 185 72 221 104 96%<br />
Budget Spending<br />
Standard Item Adjusted Budget Actual Year to<br />
date<br />
Employee related<br />
cost<br />
97<br />
Variance Amount Percentage Spent<br />
R R R<br />
Remuneration 62 183 975 63 664 435 -1 480 460 102%<br />
Employee related<br />
cost: social<br />
contributions<br />
Remuneration of<br />
councillors<br />
11 219 330 11 409 170 -189 840 102%<br />
11 617 000 8 345 349 3 271 651 72%<br />
Finance charges 795 780 1 708 796 -913 016 215%<br />
Bulk purchases 86 666 959 73 964 714 12 702 245 85%<br />
Repairs and<br />
Maintenance<br />
Contracted<br />
services<br />
Goods and<br />
services<br />
12 691 924 4 292 075 8 399 849 34%<br />
10 964 063 14 374 846 -3 410 783 131%<br />
25 797 780 30 712 160 -4 914 380 119%<br />
Vehicle expenses 5 300 512 5 045 048 255 464 95%<br />
Capital 16 000 000 350 000 15 650 000 2%
Standard Item<br />
expenditure from<br />
own revenue<br />
Adjusted Budget Actual<br />
date<br />
Year to<br />
Capital<br />
expenditure from<br />
grants funding<br />
98<br />
Variance Amount Percentage Spent<br />
25 312 000 30 679 245 -5 367 245 121%<br />
Other Express 2 849 085 5 888 513 -1 039 428 121%<br />
Total 273 398 408 250 434 351 22 964 057 92%<br />
Audit Opinion<br />
The Municipality has a history of receiving disclaimers from the Auditor General’s report. Even for<br />
the 2009/10 financial year the municipality has received a disclaimer opinion. The opinion has a<br />
serious bearing on the performance of the municipality. The municipality must come up with plans<br />
to address the audit challenges raised in the Auditor General’s report. The municipality has a target<br />
to get the clean audit be 2014 in line with the mandate of the current government.<br />
B4.2 Audit Committee<br />
The Municipality has appointed the Internal Auditor and Manager responsible for Risk. The<br />
Municipality does not have its own Audit Committee; Mopani District Municipality has appointed a<br />
shared Audit Committee that audits all local municipalities in the District. The District Audit<br />
Committee has been appointed for a three (3) year term. The District Audit Committee is part of the<br />
performance assessment of senior managers in the municipality.<br />
B4.3 Free Basic Services:<br />
Community Survey, 2007 5 indicates a total number of households as 33,791 of which 15,353 is<br />
indigent. No indication of number of households with access to free basic water is indicated. A total<br />
number of 2,638 indigent households are served with free basic electricity. Eskom is responsible for<br />
providing free basic electricity in townships. The Municipality has an Indigent Policy, which deals<br />
5 Basic Services Publication, 2009, Comparative information on basic services: Department of<br />
Cooperative Governance and Traditional Affairs
with the households that qualifies to be registered in the Indigent Register. Households that qualify<br />
to be registered in the Indigent Register qualify for free basic water, free basic electricity, free refuse<br />
removal, free sewerage and assessment rates.<br />
B4.4 Good Governance<br />
B4.4.1 Public Participation<br />
The Municipality has 16 ward committees, which is in line with the number of wards, a Public<br />
Participation Officer located in the Office of the Speaker and 13 appointed CDWs. All the 16 Ward<br />
Committees are functional. After the <strong>2011</strong> local government elections, the municipality will be<br />
having two additional wards and the total number of wards will be 18. Ward Committee reports are<br />
submitted on monthly basis to the Public Participation Officer in the office of the Speaker. The<br />
reports are processed through the Planning and Development Directorate Portfolio Committee.<br />
Ward Committee Reports forms part of agenda items in the Senior Management, Portfolio<br />
Committees, Exco and Council.<br />
B4.4.2 IGR Structures<br />
The Municipality is part of the established IGR structures in the Mopani District and the Limpopo.<br />
The established IGR structures include the following:<br />
District Ward Committee’s Forum<br />
District Municipal Manager’s Forum<br />
Speakers Forum<br />
Mayor’s Forum<br />
Premier’s Inter-Governmental Forum<br />
The forums provide a platform for the municipality to interactive with other governmental<br />
structures that has a bearing on its functionality.<br />
99
B5. Municipal Backlogs<br />
B5.1 Water<br />
The Selwane/Nondweni Water Scheme currently supplies 0,237MI/d to the Middle Letaba area and<br />
0,064Ml/d to Nondweni (See table below).<br />
Table B.31: Water Supply by the Selwane/Nondweni Water Scheme<br />
AREA CAPACITY (In<br />
Ml/d)<br />
SOURCE: Africon, 2007<br />
CALCULATED<br />
DEMAND<br />
100<br />
CURRENT SUPPLY (In Ml/d)<br />
MIDDLE<br />
LETABA<br />
AREA<br />
NONDWENI TOTAL<br />
1 0.340 0.237 0.064 0.301<br />
The total actual supply is 0,301MI/d compared to the calculated demand of 0,340Ml/d. There is a<br />
variance of 0,039MI/d. The implication is that there is an under supply of about 11.5%. In real terms,<br />
it implies that there are households in the areas which do not have access to RDP standard water.<br />
Water supply from the Namakgale/Lulekani Water Scheme is presented in the following table:<br />
Table B.32: Water supply from the Namakgale/Lulekani Water Scheme<br />
Capacity (MI/d) Actual (MI/d) Unutilized capacity (MI/d)<br />
Raw 72 66 6<br />
Potable 76 62 14<br />
Total 148 128 20<br />
Source: Africon, 2007<br />
Most of the water supply infrastructure is owned by Lepelle Northern Water Board. However, the<br />
Municipality owns some reservoirs, 78km of distribution lines and 512km of reticulation lines.
The following tables show access by households to water services:<br />
Table B.33: Households access to water<br />
SERVICE LEVEL DESCRIPTION NUMBER OF HOUSEHOLDS %<br />
Piped water in dwelling 12 251 36.3<br />
Piped water inside yard 17 082 50.6<br />
Piped water from access point<br />
outside yard<br />
3 812 11.3<br />
Borehole water 413 1.2<br />
Spring water - -<br />
Bam/Pool - -<br />
River/Stream - -<br />
Water vendor - -<br />
Rain water tank - -<br />
Other 234 0.7<br />
Total 33 792 100<br />
Source: STATS SA (2007 CS)<br />
Table B.34: Water services<br />
Service Level Description Number of Households %<br />
In-house 10 057 31.3%<br />
Yard tap 12 535 39.0%<br />
Communal stand pipe 200m 4 379 13.6%<br />
No water 178 0.6%<br />
Total 32 123 100%<br />
Source: The Development Partnership, 2008<br />
101
Access to water through communal stand pipes outside the yard is estimated at 11% to 29% of the<br />
households in the area. The above tables are not able distinguish between availability of water<br />
infrastructure and access to water.<br />
The Municipality conducted a Quality of Life Survey in 2008 that indicated a shortage of water in<br />
most of the wards. The Local Area Planning (LAP) process conducted by the Independent<br />
Development Trust (IDT, 2007) also confirms shortage of water as the number one complaint in the<br />
wards. The implication of these findings is that although infrastructure reticulation in the municipal<br />
area is at 98%, but water supply remains a challenge.<br />
B5.2 Sanitation<br />
The Municipality currently supplies water borne sanitation to Phalaborwa Town, Namakgale and<br />
Lulekani. The table below shows the sanitation infrastructure capacity in the three areas:<br />
Table B.35: Sanitation infrastructure capacity<br />
Area Capacity Current Inflow Spare Capacity<br />
Phalaborwa Town 4.8 7.0 -2.2<br />
Lulekani 4.0 1.2 2.8<br />
Namakgale 8.0 6.0 2.0<br />
Source: Africon, 2007<br />
Sanitation infrastructure capacity in Phalaborwa Town needs attention in order to accommodate<br />
current inflow as well as future demands. The development of Extension 7 is one example that<br />
requires upgrading of sanitation infrastructure or an alternative sustainable system.<br />
Table B.35a: Access to sanitation facilities by households<br />
TYPE OF FACILITY NUMBER OF HOUSEHOLDS %<br />
Flush toilet (connected to<br />
sewerage system)<br />
14 056 41.6%<br />
Flush toilet (with septic tank) 1 090 3.2%<br />
Dry toilet facility 208 0.6%<br />
102
TYPE OF FACILITY NUMBER OF HOUSEHOLDS %<br />
Pit toilet with ventilation (VIP) 2 868 8.5%<br />
Pit toilet without ventilation 8 958 26.5%<br />
Chemical toilet 0 0%<br />
Bucket toilet 0 0%<br />
None 6 612 19.6%<br />
Total 33 792 100%<br />
Source: STATS SA (2007 CS)<br />
STATS SA estimates that about 20% of the households do not have sanitation facilities, whereas The<br />
Development Partnership study puts the backlog at 40% (12 987 households out of an estimated 32<br />
123) It is evident from the above table that about 20% of the households in the municipal area does<br />
not have access to any type of toilet facility. The following table classifies households’ access to<br />
toilet facilities according to population group. The 20% population with no access to a toilet facility<br />
comprises of black people only. This confirms that access to some basic services, such as sanitation,<br />
is still skewed according to racial groups.<br />
Table B.36: Toilet facilities per household by population group:<br />
TYPE OF FACILITY %<br />
Flush toilet<br />
(connected to<br />
sewerage system)<br />
Flush toilet (with<br />
septic tank)<br />
BLACKS COLOUREDS INDIANS/ASIANS WHITES TOTAL<br />
32.4% 0.3% - 8.9% 41.6%<br />
3.0% - - 0.3% 3.3%<br />
Dry toilet facility 0.6% - - - 0.6%<br />
Pit toilet with<br />
ventilation (VIP)<br />
Pit toilet without<br />
ventilation<br />
8.0% - - 0.5% 8.5%<br />
26.5% - - - 26.5%<br />
Chemical toilet 0% - - - 0%<br />
Bucket toilet 0% - - - 0%<br />
103
TYPE OF FACILITY %<br />
BLACKS COLOUREDS INDIANS/ASIANS WHITES TOTAL<br />
None 19.6% - - - 19.6%<br />
Total 90% 0.3% - 9.7 100%<br />
104
The following table presents water and sanitation challenges faced by the communities in the various wards:<br />
Table B.37: Sanitation challenges faced in the wards<br />
WARD AFFECTED AREA<br />
(Village/Section)<br />
NATURE OF CHALLENGE INTERVENTION<br />
REQUIRED<br />
1 Haniville Partially reticulated with water<br />
network at RDP standard<br />
Water reticulation at<br />
high level of service with<br />
water meters<br />
Nyakelang 1 & 2 No water network Water reticulation at RDP<br />
standard<br />
2 Mahale Partially reticulated with water<br />
network at RDP standard<br />
Nondweni Partially reticulated with water<br />
network at RDP standard<br />
Prieska Partially reticulated at RDP<br />
standard with Borehole water<br />
Water reticulation at<br />
high level of service with<br />
water meters<br />
Water reticulation at<br />
high level of service with<br />
water meters<br />
Water reticulated at high<br />
level of service with cost<br />
recovery<br />
105<br />
NO. OF HOUSEHOLDS<br />
AFFECTED<br />
ESTIMATED<br />
COST<br />
RESPONSIBLE<br />
ENTITY<br />
1 109 R6.7m Mopani<br />
1 163 R7.0m Mopani<br />
650 R4.0m Mopani<br />
500 R3.0m Mopani<br />
200 R1.2m Mopani<br />
3 - - - - - -<br />
4 Matiko-Xikaya<br />
Ext. A,B,C & D<br />
No water network Water reticulation to RDP<br />
standard<br />
Humulani No water network Reticulation with water<br />
network at RDP standard<br />
800 R4.8m Mopani<br />
500 R3.0m Mopani
WARD AFFECTED AREA<br />
(Village/Section)<br />
NATURE OF CHALLENGE INTERVENTION<br />
REQUIRED<br />
106<br />
NO. OF HOUSEHOLDS<br />
AFFECTED<br />
ESTIMATED<br />
COST<br />
5 - - - - - -<br />
6 - - - - - -<br />
7 Namakgale E<br />
(Topville)<br />
8 Benfarm A, B &<br />
C<br />
9 Mashishimale R3<br />
new Ext.<br />
10 Maseke<br />
Extensions<br />
Mashishimale R1<br />
Extensions<br />
Uncompleted sewer projects Outstanding works to be<br />
completed<br />
No sewer. Waste water is all over<br />
the areas, polluting the<br />
environment and promoting<br />
mosquitoes breeding<br />
Sewer reticulation to all<br />
planned areas<br />
No water network Water reticulation at RDP<br />
standard<br />
No water network Water reticulation at RDP<br />
standard<br />
No water network Water reticulation at RDP<br />
standard<br />
Boelang Partial reticulation at RDP<br />
standard<br />
Gravelotte (New<br />
development<br />
sites)<br />
Water reticulation at<br />
higher level of service<br />
with water meters<br />
No water network Water reticulation at<br />
high level of service with<br />
water meters<br />
RESPONSIBLE<br />
ENTITY<br />
R3.0m Mopani<br />
1 840 R15.6m Mopani<br />
1 000 R6.0m Mopani<br />
300 R1.8m Mopani<br />
350 R2.1m Mopani<br />
550 R3.3m Mopani<br />
224 R1.4m Mopani
WARD AFFECTED AREA<br />
(Village/Section)<br />
11 Makhushane<br />
Ntswelemotse<br />
Makhushane<br />
Gardenview<br />
Makhushane<br />
kanana<br />
NATURE OF CHALLENGE INTERVENTION<br />
REQUIRED<br />
No water network Water reticulation at<br />
high level of service with<br />
water meters<br />
No water network Water reticulation at RDP<br />
standard<br />
No formal water network (Partial<br />
self reticulation and connections)<br />
Water reticulation at RDP<br />
standard<br />
107<br />
NO. OF HOUSEHOLDS<br />
AFFECTED<br />
ESTIMATED<br />
COST<br />
RESPONSIBLE<br />
ENTITY<br />
80 R0.5m Mopani<br />
250 R1.5 Mopani<br />
500 R3.0m Mopani<br />
12 - - - - - -<br />
13 - - - - - -<br />
14 Benfarm -<br />
Nobody<br />
Benfarm -<br />
Extensions<br />
Namakgale –<br />
Developed 323<br />
sites<br />
15 Makhushane-<br />
Maune<br />
No water network Water reticulation to RDP<br />
standard<br />
No water network Water reticulation to<br />
RDP standard<br />
Unmetered water connections Provision of water<br />
meters<br />
Unmetered and unauthorized<br />
water connection at RDP standard<br />
Water reticulation at<br />
high level of service with<br />
water meters<br />
200 R1.2m Mopani<br />
200 R1.2m Mopani<br />
323 R0.2m Ba-<br />
Phalaborwa<br />
Municipality<br />
900 R6.0m Mopani<br />
Makhushane - Unmetered and unauthorized Water reticulation at 700 R5.0m Mopani
WARD AFFECTED AREA NATURE OF CHALLENGE INTERVENTION<br />
(Village/Section)<br />
REQUIRED<br />
Mabikiri water connection at RDP standard high level of service with<br />
water meters<br />
Makhushane -<br />
Sebera<br />
Mashishimale R1<br />
- Nguvo<br />
16 Kurhula (New<br />
Extensions)<br />
No water network Water reticulation at RDP<br />
level of service<br />
No water network Water reticulation at RDP<br />
level of service<br />
No water network Water reticulation to RDP<br />
level of service<br />
Lulekani A No sewer, waste water is all over<br />
the area, encouraging mosquitoes’<br />
breeding<br />
Lulekani –<br />
Stadium Ext.<br />
(New planned<br />
sites)<br />
Sewer reticulation should<br />
be provided to well<br />
planned stands<br />
No water network. No sewer. Water and sewer<br />
reticulation to a higher<br />
level of service with<br />
water meters<br />
108<br />
NO. OF HOUSEHOLDS<br />
AFFECTED<br />
ESTIMATED<br />
COST<br />
RESPONSIBLE<br />
ENTITY<br />
400 R2.4m Mopani<br />
100 R0.6 Mopani<br />
528 R3.2m Mopani<br />
2 000 R17.m Mopani<br />
400 R6.0m Mopani
Key Issues with regard to water and sanitation:<br />
Ba-Phalaborwa Municipality is not a water services authority;<br />
The current water backlog requires about R34 million to correct, up to RDP level;<br />
R80 million is required to correct the backlog to yard connection status;<br />
Management of Nondweni Augmentation Scheme is a challenge;<br />
The distribution infrastructure is more than 35 years old;<br />
Supply to Phalaborwa town is operating at full capacity (25,6Ml/d);<br />
There is unbalanced water distribution caused by over utilization in unmetred areas as well as<br />
system capacity;<br />
There is over consumption (About 10MI/d due to non-metering, loss of income is estimated at<br />
R30 000 per day);<br />
Loss of income due to non-payment is about 5Ml/d or R15 000 per day;<br />
Service below RDP standard is at 23%;<br />
Communities that rely on boreholes complain about boreholes that are not working;<br />
Daily water supply interruptions are common in more that 75% of the wards;<br />
Some households in Wards 2, 11, and 16 still have to travel more than 200m to access water;<br />
Two Clinics, one in Ward 9 and the other in Ward 11 do not have piped water;<br />
Two schools in Ward 8 and one in Ward 12 do not have toilets;<br />
Delays in the approval of technical reports by DWA; and<br />
Cost recovery and the non-payment of services.<br />
Management supply problems affect water in the Selwane/Nondweni Water Scheme.<br />
Sanitation infrastructure in Phalaborwa Town needs to be upgraded in order to accommodate<br />
new developments<br />
B5.3 Electricity/Energy<br />
The National Electricity Regulator has licensed the Municipality to supply electricity within the<br />
boundaries of the old Phalaborwa area. ESKOM is the license holder within the Municipality for all<br />
the out-laying areas, which includes Namakgale, Lulekani, and all the villages such as Makhushane,<br />
Selwane, Nondweni, etc.<br />
109
The table below gives an indication of the backlog with regard to electrification within the<br />
Municipality’s area of jurisdiction.<br />
Table B.38: Electricity backlog<br />
Priority<br />
Village<br />
1 Selwane, Mahale<br />
Nondweni, Prieska<br />
Type of connection<br />
Grid Non-grid Post conn Total no of units<br />
3 Gravelotte 276 276<br />
110<br />
1050<br />
6 Makhushane 1650 1650<br />
7 Kurhula<br />
Lulekani<br />
500 500<br />
10 Maseke 100 100<br />
11 Matiko-Xikaya 700 250<br />
Total 3956 3826<br />
Source: Ba-Phalaborwa Energy Forum, <strong>2011</strong><br />
According to STATS SA figures, the municipality has 2 780 households (i.e. 8.2% of municipal<br />
households) that do not have electricity.<br />
The following table shows energy usage per energy source by households.<br />
Table B.39: Energy usage per energy source by households<br />
ENERGY SOURCE ENERGY USAGE<br />
COOKING HEATING LIGHTING<br />
Electricity 20 315 (60.1%) 20 353 (60.1%) 31 012 (91.8%)<br />
Gas 320 (0.9%) 149 (0.4%) -
Paraffin 2 684 (7.9%) 1 741 (5.2%) 182 ((0.5%)<br />
Candles - - 2 541 (7.5%)<br />
Wood 10 413 (30.8%) 11 285 (33.4%) -<br />
Coal 60 (0.2%) 60 (0.2%) -<br />
Animal Dung - - -<br />
Solar - - -<br />
Other - 203 (0.6%) 58 (0.2%)<br />
Total 33 792 33 792 33 792<br />
Source: STATS SA (2007 CS)<br />
Although 91.8% of the municipal population (in households) has access to electricity (and do use<br />
electricity for lighting), only 60% use electricity for cooking and heating. Wood is used as an<br />
alternative source of energy for cooking and heating (used by about 33% of the population). The<br />
wide spread use of wood constitutes a grave danger to the environment as the aggressive denuding<br />
of the natural bush is evident over large areas. One of the main thrusts of the electrification<br />
campaign was to drastically reduce the dependence of the poorer sections of the population on the<br />
use of firewood as a source of cooking energy. From observation this has had very little impact on<br />
the use of wood and it would seem that a lot more intense use of electricity will have to be made<br />
before any significant reduction in the present rate of deforestation will be evident. The anticipated<br />
increases in electricity tariffs will increase the percentage dependant on firewood for heating and<br />
cooking. The Municipality may have to investigate the use of another energy source, such as solar, as<br />
an alternative to both electricity and firewood.<br />
Electricity Supply in Phalaborwa Town<br />
The Phalaborwa network supplies the town business, commercial, industrial and residential areas<br />
and has approximately four thousand connections varying from normal residential connections to<br />
three phase LV business connections to 11kv bulk supplies to large consumers. The Phalaborwa<br />
electricity distribution network is in dire need of reinforcement and refurbishment. A large<br />
percentage of the 11kv switchgear and transformer equipment has been in constant service for<br />
over 40 years. Some 11kV circuit breakers no longer meet modern safety requirements and in fact<br />
111
are positively dangerous to operate under certain fault conditions. Some of the mechanisms are<br />
inconsistent and erratic in their speed of operation, probably due to mechanical wear, with the<br />
result that the performance of the protection systems is not reliable. The redundant capacity of a<br />
number of 11 kV cable ring supplies are no longer capable of meeting the increased loads placed<br />
upon them during fault conditions. There are a number of faults scenarios which, should they<br />
occur, will result in a severe and prolonged curtailment of electricity supply to large areas of the<br />
town, including the central business district and industrial area. Furthermore, the capacity to<br />
transfer sufficient power from the Selati main in-take substation is not adequate during periods of<br />
heavy loading should one of the present lines be lost. The line feeding the whole northern area is<br />
critical and needs to be augmented by means of an additional line.<br />
The increased demand for electricity over the past number of years is set to continue and the point<br />
has been reached where significant parts of the network are no longer able to ensure a reliable<br />
supply. There is therefore a definite and urgent requirement for selective up grading of the network<br />
as well as ongoing refurbishment and replacement of ageing and obsolete equipment.<br />
Street Lighting<br />
The present situation regarding public lighting within the area of jurisdiction of the Ba-Phalaborwa<br />
Municipality for the main towns is as follows:<br />
Phalaborwa Town<br />
All streets in both the business and residential areas are well lit using roadside luminaries ranging<br />
from 125-watt mercury vapour lamps to 250-watt high-pressure sodium lighting. The sport stadium<br />
is also fully equipped with flood lighting. There is however a major part of the main thoroughfare to<br />
the Kruger Park Gate, namely Hendrik Van Eck road which does not have street lighting.<br />
Namakgale<br />
A total 7.7km of roads within the township is equipped with roadside lighting of good quality. In<br />
addition there are a total of 41 highmast lights spread throughout the township, which gives<br />
acceptable area coverage. The sport stadium is equipped with flood lighting. However, there are<br />
still a number of roads that need to have roadside street lighting installed.<br />
112
Lulekani<br />
A total of 9.75 km of roads within the township has roadside street lighting installed together with<br />
7 high mast lights providing area lighting. The sports stadium is also equipped with flood lighting.<br />
At a number of identified dangerous intersections street lighting has been installed on an ad-Hoc<br />
basis. There are however many areas, which need to have lighting, installed.<br />
Out Laying Villages<br />
With regard to the out laying villages of the municipal area, street lighting is non-existent. Some of<br />
these villages have not as yet been electrified and therefore no street lighting can be installed.<br />
Solar-based highmast lighting may be a solution.<br />
Table B.40: Number of households without electricity per Ward<br />
1<br />
Ward Area/Location No. of Households Estimated cost 6<br />
Nyakelang 4 225 2250<br />
2 Selwane 89 890<br />
10 Boelang 100 1.000<br />
Maseke/Mashishimale<br />
R1 492 4.920<br />
Gravelotte 392 3.920<br />
11 Maune 11 110<br />
6 Estimations at R10 000, 00 per Household<br />
Ntswelemotse 41 410<br />
Kananana 509 5.090<br />
Garden View 580 5.800<br />
113<br />
R’000
Ward Area/Location No. of Households Estimated cost 6<br />
Tipeng 69 690<br />
Boelang & Tselang<br />
Gape 500 500<br />
14 Namakgale Zone 2 1 100 111.000<br />
15 Makhushane 280 2.800<br />
16<br />
Source: Electricity Department 2009<br />
Key issues with regard to electricity supply:<br />
Maseke 81 810<br />
Kurhula / Pondo /<br />
Mlambo 84 840<br />
Total 7355 73.550.000<br />
Lack of street/area lighting in the rural areas promotes crime;<br />
Highmast lights are not properly maintained;<br />
Rates income not enough to cover both capital and operational costs;<br />
114<br />
R’000<br />
LAP information reveal that there are three schools, two in Ward 4 and 1 in Ward 11 that do not<br />
have electricity;<br />
Wards 2, 8, 12, and 13 complain about power cuts by the supplier without prior warnings;<br />
Electricity easily cuts-off during windy and rainy days;<br />
Cable theft, particularly in Wards 9 an 16, is a serious concern to electricity users;<br />
There is an urgent need for refurbishment of old network in Phalaborwa in order to attract<br />
investment.
B5.4 Waste Management<br />
The Municipality is providing waste management services to 22 553 households of its total<br />
households of 33 793. The number represents 67% of the total households in the Municipality that<br />
receives the services. The following areas are serviced on weekly basis:<br />
• Phalaborwa<br />
• Namakgale<br />
• Lulekani<br />
• Gravelotte<br />
• Mahishimale R1, R2, R3<br />
• Mandela Village (Namakgal<br />
Waste Management Backlog in the Municipality<br />
The solid waste management backlog is standing at 11 240 which represents 33% of the total<br />
households without the service. The Municipality has a five (5) year plan to extend the service to all<br />
the rural areas in the Municipal area. The following table represents the waste management backlog<br />
in the Municipal area:<br />
Table B.41<br />
Five Year Plan Area Number of Households Percentage<br />
2009/10 Matiko Xikaya & Humulani 2 673 8%<br />
2010/11 Selwane, Prieska, Nondweni,<br />
Silonque, Grietjie<br />
115<br />
2 873 9%<br />
<strong>2011</strong>/12 Makhushane 2 383 7.5%<br />
2012/2013 Kurhula, Maseke & Boyelang 3 311 8.5%<br />
Total 11 240 33%
Key Issues with regard to Waste Management<br />
• Ageing infrastructure.<br />
• Inadequate staffing.<br />
• Land claims in the Phalaborwa dumping site.<br />
• Licensing of new landfill site.<br />
• Rehabilitation and closing of Namakgale, Lulekani and Phalaborwa landfill sites.<br />
Waste Management Recycling<br />
The Municipality is able to recycle 20% of its waste in the Phalaborwa dumping site. The percentage as it is<br />
currently is very low. The challenge with recycle is the distance from Phalaborwa to Gauteng where waste<br />
recycle materials are sold and the lack of transport thereof.<br />
Other recycling in the Municipality is done by private companies in the Phalaborwa Industrial area. They<br />
receive most of their recyclables from the local mines and industrial factories. Sorting of recyclables is done<br />
in the yard as well as outside the yard.<br />
B5.5 Housing<br />
Ba-Phalaborwa Municipality is not a housing authority. The table below presents an overview of the<br />
housing situation in the municipal area over the years.<br />
Table B.42: Housing delivery, 2002/03 to 2007/08<br />
Year Allocation Delivery % Delivered<br />
2002/03 800 486 60.75<br />
2003/04 720 682 94.72<br />
2004/05 561 161 28.7<br />
2005/06 385 385 100
Year Allocation Delivery % Delivered<br />
2006/07 300 300 100<br />
2007/08 No new allocation<br />
(Except for 223<br />
Blocked housing<br />
units)<br />
2008/09 623 (300 rural and<br />
323 urban –<br />
Namakgale)<br />
Source: Department of Local Government and Housing<br />
Table B.43: Types of dwellings for households<br />
179 80.27<br />
TYPE OF DWELLING NUMBER OF HOUSEHOLDS % OF HOUSEHOLDS<br />
House or brick structure on a<br />
separate stand or yard<br />
Traditional<br />
dwelling/hut/structure made of<br />
traditional materials<br />
29 780 88.1%<br />
1 183 3.5%<br />
Flat in block of flats - -<br />
Town/cluster/semi-detached<br />
house<br />
217 0.6%<br />
House/flat/room in backyard 116 0.3%<br />
Informal dwelling/shack in<br />
backyard<br />
Informal dwelling/shack NOT in<br />
backyard (e.g. in an<br />
informal/squatter settlement)<br />
Room/flatlet not in backyard<br />
but on a shared property<br />
302 0.9%<br />
58 0.2%<br />
566 1.7%<br />
117
TYPE OF DWELLING NUMBER OF HOUSEHOLDS % OF HOUSEHOLDS<br />
Caravan or tent - -<br />
Private ship/boat - -<br />
Workers hostel (bed/room) 1 570 5.0%<br />
Other - -<br />
Total 33 792 100%<br />
Source: STATS SA (2007 CS)<br />
Based on the above information, the housing backlog in the municipal area is estimated at 4 012, which is<br />
about 11.9% of the household population. This figure is arrived at by regarding any other type of<br />
dwelling which is not a house or brick structure on a separate stand or yard as a substandard dwelling<br />
type for a formal household. Some of the households with access to a house or structure on a separate<br />
stand may be exceeding the average household size of the municipality (which is at 3.8 people per<br />
household). It is evident from the table below that more than 50% of the households with access to a<br />
house or brick structure on a separate stand or yard have an above average household size. That may<br />
imply more housing needs in the near future.<br />
Table B.44: Household size per type of dwelling:<br />
TYPE OF<br />
DWELLING<br />
House or brick<br />
structure on a<br />
separate stand<br />
or yard<br />
Traditional<br />
dwelling/hut/str<br />
ucture made of<br />
traditional<br />
materials<br />
Flat in block of<br />
flats<br />
01 02 03 04 05 06 07 08 09 10+ Total<br />
5 134 5 352 3 858 5 026 4 026 2 797 1 266 851 754 716 29 780<br />
333 173 238 155 116 54 - 57 57 - 1 183<br />
- - - - - - - - - - -<br />
118
TYPE OF<br />
DWELLING<br />
Town/cluster/se<br />
mi-detached<br />
house<br />
House/flat/roo<br />
m in backyard<br />
Informal<br />
dwelling/shack<br />
in backyard<br />
Informal<br />
dwelling/shack<br />
NOT in backyard<br />
(e.g. in an<br />
informal/squatt<br />
er settlement)<br />
Room/flatlet not<br />
in backyard but<br />
on a shared<br />
property<br />
01 02 03 04 05 06 07 08 09 10+ Total<br />
62 64 92 - - - - - - - 217<br />
- - - - - 59 - - 57 - 116<br />
121 61 - - 120 - - - - - 302<br />
58 - - - - - - - - - 58<br />
504 62 - - - - - - - - 566<br />
Caravan or tent - - - - - - - - - - -<br />
Private<br />
ship/boat<br />
Workers hostel<br />
(bed/room)<br />
- - - - - - - - - - -<br />
1 436 74 60 - - - - - - - 1 570<br />
Other - - - - - - - - - - -<br />
Total 7 648 5 786 4 248 5 181 4 262 2 910 1 266 908 867 716 33 792<br />
119
Key issues with regard to RDP houses:<br />
• Wards 3, 4, 9, 10, and 11 complain about poor quality houses (problem areas include cracking<br />
walls, leaking roofs, peeling plastering, and poor foundations;<br />
• The housing backlog in the municipal area indicates 4500 households in the waiting list based on<br />
latest database registration done in 2009;<br />
• The Housing Audit indicated unoccupied houses in Namakgale (3), Lulekani (3), Selwane (1) and<br />
Gravelotte (15).<br />
B5.6 Roads and Transport<br />
The Municipality is responsible for the rehabilitation and maintenance of 310Km of municipal road. In the<br />
past two financial years, 9km of new roads was build. In the 2005/06 and 2006/07 financial years; R800<br />
000, 00 and R1 360 000, 00; respectively was allocated from operational budget to maintain the roads. In<br />
the same period, a total of R12 000 000, 00 from capital budget was spent to build municipal roads. Most<br />
of the municipal roads are still dirt roads and in bad condition. The municipality is struggling with road<br />
maintenance, given that there is no enough earthwork equipment.<br />
The table below shows the main roads in the municipal area. All the roads are provincial roads and<br />
therefore maintained by the Department of Roads and Transport.<br />
Table B.45: Main roads in the municipal area<br />
NAME OF ROAD DESCRIPTION CLASSIFICATION CONDITION<br />
R71 Phalaborwa to<br />
Polokwane via<br />
Gravelotte and<br />
Tzaneen<br />
Provincial Satisfactory<br />
R526 Gravelotte to Mica Provincial Satisfactory<br />
R40 Phalaborwa to<br />
Nelspruit via Mica<br />
R529 Western boarder.<br />
Links Greater<br />
Provincial Satisfactory<br />
Provincial Satisfactory<br />
120
Giyani to Greater<br />
Tzaneen<br />
Giyani to<br />
Phalaborwa via<br />
Letaba Ranch<br />
Figure B5.1 Major Roads in the municipal area<br />
Provincial Under construction<br />
(Upgrading from gravel<br />
to tar)<br />
121
Source: Draft Ba-Phalaborwa SDF<br />
The following are the most common needs associated with municipal roads:<br />
• Stormwater control and culverts<br />
• Regravelling<br />
• Street paving<br />
• Potholes repairs<br />
Each of the highlighted needs is presented separately according to location and estimated cost<br />
Table B.46: Backlog on Stormwater Control and Culverts<br />
WARD LOCATION QTY COST ESTIMATE<br />
1 Makhushane - Nyakelang 1 Struct. R180,000.00<br />
Makhushane - Haniville 2 Struct. R260,000.00<br />
Sub - total R440,000.00<br />
2 Selwane 1 Struct. R70,000.00<br />
Selwane - Mohale 2 Struct. R260,000.00<br />
Sub –total R330,000.00<br />
3 Namakgale Zone D 1 Struct. R50,000.00<br />
Sub – total R50,000.00<br />
4 Matiko-Xikaya 1 Struct. R130,000.00<br />
Sub - total R130,000.00<br />
5 - - -<br />
6 Lulekani 2 Structures R300,000.00<br />
Sub – total R300,000.00<br />
7 Namakgale - T/Mshong 1 Struct. R160,000.00<br />
Namakgale – Top Ville 1 Struct. R130,000.00<br />
122
WARD LOCATION QTY COST ESTIMATE<br />
Sub- total 290,000.00<br />
8 Majeje - Nanana 1 Struct. R160,000.00<br />
Sub – total R160,000.00<br />
9 Mashishimale R3 – Nkweshe 1 1 Struct. R180,000.00<br />
Mashishimale R3 – Nkweshe 2<br />
1 Struct. R130,000.00<br />
Mashishimale R3 - Tlapeng 1 Struct. R100,000.00<br />
Sub – total R410,000.00<br />
10 Gravelotte 1 Struct. R160,000.00<br />
Maseke 1 Struct. R160,000.00<br />
Mashishimale R1 1 Struct. R160,000.00<br />
Sub – total R480,000.00<br />
11 Makhushane - Changaan 1 Struct. R160,000.00<br />
Makhushane - Thlakisi 1 Struct. R160,000.00<br />
Sub – total R320,000.00<br />
12 Namakgale Zone D 1 Struct. R160,000.00<br />
Sub – total R160,000.00<br />
13 - - -<br />
14 Majeje 1 Struct. R160,000.00<br />
Sub – total R160,000.00<br />
15 Mashishimale R1 1 Struct. R140,000.00<br />
Mashishimale R2 - MPCC 1 Struct. R80,000.00<br />
Makhushane - Sebera 1 Struct. R160,000.00<br />
Sub – total R380,000.00<br />
123
WARD LOCATION QTY COST ESTIMATE<br />
16 Kurhula 2 Struct. R320,000.00<br />
Sub – total R320,000.00<br />
GRAND TOTAL R3,930,000.00<br />
The Municipality requires about four million rand (R3, 930,000.00) to address identified stormwater control<br />
and culverts challenges identified. Lack of proper stormwater control and culverts affect the socio-<br />
economic life of the municipality during rainy seasons. Amongst the services sacrificed during rainy seasons<br />
is schooling and hence the education of the municipal area.<br />
The follow table presents municipal roads, per location that need to be re-graveled<br />
Table B.47: Municipal roads per location that need upgrading<br />
WARD LOCATION QTY COST ESTIMATE<br />
1 Makhushane - Haniville 2km R4,000,000.00<br />
Sub - total R4,000,000.00<br />
2 Selwane 3km R6,000,000.00<br />
Sub –total R6,000,000.00<br />
3 Namakgale Zone A & D 4km R8, 000,000.00<br />
Sub – total R8, 000,000.00<br />
4 Matiko-Xikaya 2km R4,000,000.00<br />
5 -<br />
Humulani 2km R4,000,000.00<br />
Sub - total R8,000,000.00<br />
6 Lulekani – Far East 2km R4,000,000.00<br />
Sub – total R4, 000,000.00<br />
124
WARD LOCATION QTY COST ESTIMATE<br />
7 Namakgale - Aaron Dim 0.6km R1,200,000.00<br />
Namakgale – Zone E 1km R2,000,000.00<br />
Sub- total R3,000,000.00<br />
8 Majeje – Block C 2km R4,000,000.00<br />
Sub – total R4,000,000.00<br />
9 Mashishimale R3 - Tlapeng 1km R2,000,000.00<br />
Sub – total R2,000,000.00<br />
10 Gravelotte 2km R4,000,000.00<br />
Maseke 1km R2,000,000.00<br />
Mashishimale R1 1km R2,000,000.00<br />
Sub – total R8,000,000.00<br />
11 Makhushane - Maune 1km R2,000,000.00<br />
Makhushane - Thlakisi 1km R2,000,000.00<br />
Sub - total R4,000,000.00<br />
12 Namakgale Zone D 2.5km R5,000,000.00<br />
Sub – total R5,000,000.00<br />
13 Namakgale Zone C 2.5km R5,000,000.00<br />
Sub – total R5,000,000.00<br />
14 Namakgale Zone B 3km R6,000,000.00<br />
Majeje 2km R4,000,000.00<br />
Sub – total R8,000,000.00<br />
15 Mashishimale R1 - Phatamas 3km R6,000,000.00<br />
Mashishimale R2 - Mchongol 2km R4,000,000.00<br />
125
WARD LOCATION QTY COST ESTIMATE<br />
Makhushane - Patamedi 1.5km R3,000,000.00<br />
Sub – total R13,000,000.00<br />
16 Kurhula 2km R4,000,000.00<br />
Pondo 2km R4,000,000.00<br />
Sub - total R8,000,000.00<br />
GRAND TOTAL R291,000,000.00<br />
The Municipality has over 46.1km or dirt road to regravel at an estimated cost of R38, 675,000.00.<br />
regravelled roads are expected to improve mobility and access to various places and enhance socio-<br />
economic activities.<br />
There are certain priority roads, especially in high population concentration points (municipal growth<br />
points) that need to be upgraded from gravel to paved roads. The table below presents streets that are<br />
earmarked for paving.<br />
Table B.48: Streets earmarked for paving per location<br />
WARD LOCATION QTY COAST ESTIMATE<br />
1 Phalaborwa Extension 5 3km R3, 450,000.00<br />
Sub - total R3, 450,000.00<br />
2 - - -<br />
3 Namakgale Zone A & D 3km R3, 450,000.00<br />
Sub – total R3, 450,000.00<br />
4 Matiko-Xikaya 1.8km R2, 070,000.00<br />
Humulani 0.8km R920,000.00<br />
Sub - total R2, 990,000.00<br />
126
WARD LOCATION QTY COAST ESTIMATE<br />
5 Phalaborwa - Bataleur 0.5km R425,000.00<br />
Sub-total R425,000.00<br />
6 Lulekani – CBD 1km R1, 150,000.00<br />
Sub – total R1, 150,000.00<br />
7 Namakgale – Zone C 1km R1, 150,000.00<br />
Sub- total R1, 150,000.00<br />
8 Majeje – Block C 1.7km R1, 955,000.00<br />
Sub – total R1, 955,000.00<br />
9 - - -<br />
10 Gravelotte 2km R2, 300,000.00<br />
Sub – total R2, 300,000.00<br />
11 - - -<br />
12 Namakgale Zone A&D 3km R3, 500,000.00<br />
Sub – total R3, 500,000.00<br />
13 Namakgale Zone A&D 1km R1, 150,000.00<br />
Sub – total R1, 150,000.00<br />
14 Namakgale Zone A&D 2km R2, 300,000.00<br />
Sub – total R2, 300,000.00<br />
15 - - -<br />
16 - - -<br />
GRAND TOTAL 20.8km R23, 820,000.00<br />
127
The streets prioritized for paving in the population concentration points, as per the table above, are<br />
expected to improve access to government and other services. To achieve this objective, the Municipality<br />
has to pave about 21km of streets at an estimated cost of R24, 000,000.00.<br />
The table below shows Municipal roads that need maintenance (potholes repairs)<br />
Table B.48: Streets per location that need maintenance (Potholes Repairs)<br />
WARD LOCATION QTY COAST ESTIMATE<br />
1 Phalaborwa - CBD<br />
R112,000.00<br />
Sub - total R112,000.00<br />
2 - - -<br />
3 Namakgale Zone A & D<br />
R63,000.00<br />
Sub – total R63,000.00<br />
4 Matiko-Xikaya<br />
R8,400.00<br />
Sub - total R8,400.00<br />
5 Phalaborwa - Bataleur<br />
6 Lulekani<br />
R112,000.00<br />
Sub-total R112,000.00<br />
R63,000.00<br />
Sub – total R63,000.00<br />
7 Namakgale – Zone C<br />
8 Majeje<br />
R14,000.00<br />
Sub- total R14,000.00<br />
R7,000.00<br />
Sub – total R7,000.00<br />
9 - - -<br />
10 Gravelotte<br />
R8,400.00<br />
128
WARD LOCATION QTY COAST ESTIMATE<br />
Maseke - Boelang 60m 2<br />
R8,400.00<br />
Sub – total R16,800.00<br />
11 Makhushane – Main Road 120m 2<br />
R16,800.00<br />
Sub-total R16,800.00<br />
12 Namakgale Zone A&D 150m 2<br />
R21,000.00<br />
Sub – total R21,000.00<br />
13 Namakgale Zone B&C 150m 2<br />
R21,000.00<br />
Sub – total R21,000.00<br />
14 Namakgale Zone B 180m 2<br />
Majeje 20m 2<br />
R25,200.00<br />
R2,800.00<br />
Sub – total R28,000.00<br />
15 Mashishimale - Maune 40m 2<br />
R5,600.00<br />
Sub – total R5,600.00<br />
16 - - -<br />
GRAND TOTAL 3,490m 2 R488,600.00<br />
Public Transport<br />
The table below presents modes of transport in the municipal area.<br />
Table B.49: Percentage population utilizing different modes of transport<br />
Mode of Transport Number utilizing transport mode % Utilizing the<br />
Transport Mode<br />
Foot/bicycle 45 577 34.7%<br />
Private 12 527 9.5%<br />
Bus 6 144 4.7%<br />
129
Taxi 7 405 5.6%<br />
Not applicable 59 832 45.5%<br />
Total 131 485 100%<br />
The Development Partnership, 2008<br />
The majority of people in the Municipal area do not own and use private transport. They rely on public<br />
transport to commute in and out of town on a daily basis. However there is no link between taxi and bus<br />
services as the two measure forms of public transport. There is a need for an inter-modal public transport<br />
system. This will require integrated bus and taxi ranks at strategic points in the municipal area. The other<br />
concern raised in the 2006/07 <strong>IDP</strong> review was the roadworthiness of the buses used to transport<br />
commuters. The buses have since been replaced by 22 brand new ones. This is a major contribution<br />
towards bettering the lives of people.<br />
Rail Transport<br />
Rail infrastructure in Ba-Phalaborwa is under utilised. The table below captures rail utilisation and cargo<br />
distribution from Ba-Phalaborwa:<br />
Table B.50: Rail utilisation and cargo distribution<br />
Rail Utilisation Cargo Source Cargo<br />
Distribution<br />
Areas<br />
Capacity 12 Megatons per<br />
annum (Mton/a)<br />
Mostly<br />
Phalaborwa<br />
Town<br />
Richardsbaai<br />
Sasolburg<br />
Broodsnyers<br />
Plaas<br />
Accessible Ports<br />
Maputo<br />
Richardsbaai<br />
Durban<br />
(International<br />
Capacity)<br />
Utilisation 8 Mton/a Bottle neck<br />
between<br />
Hoedspruit &<br />
Maputo<br />
130
Spare Capacity 4 Mton/a<br />
90% of wagons to Phalaborwa are<br />
empty<br />
Air Transport<br />
There is one airport in the Municipality. The airport only accommodates small air crafts, but proves to be<br />
useful to the local mines and other businesses. There is a need to improve the airport and number of flights<br />
in order to add value to the tourism sector in the area.<br />
Key issues, with regard to roads and transport:<br />
There is a need to upgrade existing roads;<br />
The Giyani - Phalaborwa and Eiland - Letaba Ranch roads have the potential to boost tourism in the<br />
area.<br />
Road maintenance is not satisfactory because of lack of enough equipment.<br />
The capacity by the Municipality to upgrade and maintain roads.<br />
The current rail link and service out of Phalaborwa is also inadequate to support the potential for<br />
magnetite beneficiation<br />
The air flights schedule for Phalaborwa Airport is not that responsive to the needs of the people who<br />
use the service. The Airport only offers afternoon flights; there are no morning flights from Phalaborwa<br />
and to Phalaborwa.<br />
B5.7 Thusong Service Centres<br />
The Municipality does not have a functional Thusong Service Centre (TSC). Mashishimale and Ben-Farm<br />
MPCCs / TSCs are not functional - given that there are no services rendered at the centres. The South<br />
African Social Security Agency (SASSA) and the South African Police Service (SAPS) are the only sectors that<br />
actively provide periodic services in the two centres.<br />
People living in and around the operational areas of Mashishimale and Ben-Farm TSCs do receive various<br />
forms of government services. The services include primary health care, traditional authority services, etc.<br />
131
in addition to security services and social grants. The challenge is that service delivery happens in a<br />
disintegrated manner and may not be sustainable. The Municipality is a process to revitalize both centres<br />
and officially launch them as second generation MPCCs or TSCs.<br />
The Municipality has built a TSC at Selwane. The TSC is complete and is expected to be officially launched<br />
by the Office of the Premier in April <strong>2011</strong>. The TSC will house the following government departments,<br />
Home Affairs, Sassa, Agriculture, and Social Development, SAPS, SA Post Office and the Selwane Traditional<br />
Authority offices. There are still office spaces to accommodate more government departments.<br />
Key issues with regard to TSCs:<br />
The Mashishimale TSC needs to be revitalized;<br />
The Ben-Farm TSCs also needs to be revitalized;<br />
SelwaneTSC still to be officially launched by Office of the Premier.<br />
B5.8 Libraries<br />
The Municipality manages four fully established community libraries based in Phalaborwa, Gravelotte,<br />
Namakgale and Lulekani. The Municipality provides mobile library service (school/community library) to<br />
Mashishimale. The services are rendered at Lebeko and Makikele High Schools, respectively. Selwane<br />
library is complete and operations are at the pilot stage.<br />
Backlogs<br />
The following areas need library infrastructure in order for the Municipality to achieve the objective of<br />
increased access to library services:<br />
Mashishimale,<br />
Majeje,<br />
Makhushane,<br />
Maseke and<br />
Humulani/Matiko-Xikaya.<br />
132
Phalaborwa Library needs to be extended to include children’s section, a study hall, three offices,<br />
storeroom, and activity room. The extension will help the main library to support branch libraries.<br />
Table B.51. A synopsis of library services rendered in the municipal area<br />
Name of Library Ward Location Services Rendered<br />
Phalaborwa Town<br />
Library<br />
Leboneng Library 14 Namakgale<br />
Rixile Library 6 Lulekani<br />
Lebeko High School<br />
Library<br />
Makikela High School<br />
Library<br />
1 Phalaborwa Town Internet service (Phalaborwa only);<br />
9 Mashishimale<br />
2 Selwane<br />
Gravelotte Library 10 Gravelotte<br />
Tourist information (Phalaborwa only);<br />
Online public access library<br />
catalogue(Phalaborwa, Namakgale and<br />
Lulekani); User education<br />
Study space<br />
Advisory service to school libraries (at<br />
request)<br />
Community outreach programmes (all<br />
libraries)<br />
There is a need to enhance current municipal IT infrastructure to ensure that library services are able to<br />
achieve the objective of bridging the digital divide through library IT services. Gravelotte library and<br />
Mashishimale mobile library need IT network infrastructure to facilitate access to planned electronic<br />
information resources and for general library services administration. The five seconded library officials<br />
from the Limpopo Department of Sport, Arts and Culture have enhanced library service delivery.<br />
The table below presents statistics on the distribution and use of community libraries within the municipal<br />
area for the 2008/09 financial year.<br />
Table B.52: Library statistics: July 2008 – June 2009<br />
Activity Phalaborwa Leboneng Rixile Gravelotte Mashishimal<br />
e<br />
Selwane Total<br />
Membership 10537 1679 1127 15 450 87 13895<br />
133
Activity Phalaborwa Leboneng Rixile Gravelotte Mashishimal<br />
e<br />
Circulated<br />
items<br />
Tourist<br />
community<br />
information<br />
Reference /<br />
reader<br />
guidance<br />
Internal<br />
users<br />
New<br />
information<br />
resources<br />
Service<br />
income<br />
Selwane Total<br />
101068 20978 5453 1250 4312 2461 135522<br />
15768 16725 3934 135 216 189 36967<br />
30832 20323 5745 221 6894 546 64561<br />
46320 63597 41491 841 1941 11041 165231<br />
4259 2055 1912 1081 1761 1934 13002<br />
R54 968 R15<br />
889.50<br />
Key issues with regard to libraries:<br />
R11<br />
385,50<br />
R345,00 R250,00 R18,00 R82<br />
856,00<br />
Libraries need to be within walking distance to ensure that increased access to library services;<br />
Improved library services through IT infrastructure to enhance the objective of bridging the digital<br />
divide;<br />
Lack of resources makes it a challenge to maintain and upgrade current service levels and<br />
infrastructure;<br />
There is a need to ensure public participation in community library service delivery through<br />
sustainable library and information service committee;<br />
Lack of libraries and/or information centres makes it difficult for people to access government services<br />
and information that they are entitled to;<br />
134
There is a need for public participation in community library service delivery through establishing a<br />
library and information service committee;<br />
Improved collection development management to ensure library information resources continuously<br />
responds to the changing information needs for socio-economic development in the Municipality;<br />
Training and development of personnel to improve service standard levels as well as increased<br />
utilisation of all libraries;<br />
Finalisation of the library personnel structure to increase its capacity to deliver services;<br />
Improved relations with the Provincial Library Services and Palabora Foundation as key stakeholders in<br />
the development of library services.<br />
B5.9 Recreational Facilities<br />
Current sporting codes include golf, tennis, long distance running, squash, netball, cricket, soccer, long<br />
distance swimming, basketball, shooting, snooker, darts and rugby. The table below presents formalised<br />
sports infrastructure in the Municipal area in the municipal growth points.<br />
Table B.53: Formalised Sports infrastructure per municipal growth point<br />
Town Tennis<br />
court<br />
Soccer/Rugby field Swimming pool Athletics track<br />
Gravelotte - - - -<br />
Selwane - - - -<br />
Lulekani 2 1 - 1<br />
Namakgale - 1 - 1<br />
Phalaborwa - 3 - -<br />
Total 2 5 0 2<br />
Source: Municipality, 2004<br />
135
Sports infrastructure is concentrated within the Phalaborwa Urban Complex, namely, Phalaborwa,<br />
Namakgale and Lulekani. There are no recreational facilities in outlying areas, such as Selwane and<br />
Gravelotte.<br />
The condition of existing sports facilities is not satisfactory and therefore there is no value addition to<br />
tourism in the area. The Municipality has to increase both the quantity and quality of sports infrastructure<br />
in order to attract national and international events to the area and benefit local tourism.<br />
Phalaborwa<br />
The Impala Park, along with privately owned initiatives such as Hans Merensky club, provides sufficient<br />
sporting facilities to cater for the current population of the town and the various activities currently<br />
prevalent. The park is well maintained.<br />
Lulekani<br />
Lulekani stadium provides a well-developed infrastructure relatively suitable for large sports events, social<br />
gatherings and meetings. The soccer field and the athletics track are well maintained, although not up to<br />
international standards (in terms of size and pitch layout). The tennis and netball courts are currently being<br />
upgraded by Foskor. As soccer is the prevalent sport of choice, a number of areas have been graded to<br />
serve as practice areas. These areas, however, need to be formalised.<br />
Namakgale<br />
The Namakgale stadium has areas for soccer and athletics that are not convenient. Infrastructure for other<br />
sporting codes, that was previously provided, has fallen into disrepair as a result of non-use and insufficient<br />
funding for maintenance. The municipality planned to do renovations and built an indoor sports centre at<br />
the stadium through the NDPG grant. A contractor was appointed to commence with the renovations and<br />
the construction of the indoor sports centre, however the project was not approved by the National<br />
Treasury (NDPG). The municipality will in the meantime regularly do maintenance on the stadium until<br />
funding is secured to do the renovations and construction of the indoor sports centre.<br />
136
Gravelotte and Selwane<br />
There are no formalised sporting facilities in the Selwane and Gravelotte areas except for poorly<br />
maintained and under-utilised soccer pitches. There is a need to provide these population concentration<br />
points with recreational facilities.<br />
Rural Areas:<br />
The provision of sporting facilities is virtually non-existent in the rural areas. Basic soccer fields provided<br />
by the communities are insufficient in both quantity and quality, and do not meet the needs of the<br />
communities. Schools do not have sport fields and hence learners are denied their right to participate in<br />
sporting activities.<br />
Key issues with regard to sports infrastructure and activities:<br />
Sports is not properly marketed;<br />
Obtaining land and developing facilities across the area on an equitable basis, and prioritized according<br />
to needs;<br />
Sports council is not fully representative of all the sporting codes;<br />
There are no long term plans for sports development;<br />
Limited budget set aside for sports activities.<br />
B5.10 Health Facilities<br />
There are two hospitals in the municipal area, one in Phalaborwa town and another in Namakgale<br />
(Maphutha L Malatji Hospital). The Phalaborwa Hospital has been reduced to the status of a health centre.<br />
The current arrangement has put more strain on the Maphuta Hospital. There is a need to improve the<br />
quality of health facilities in order to accommodate the needs of tourists within the area. The nearest<br />
health facility that offers specialists’ services is Letaba Hospital and the Medi-Clinic in Greater Tzaneen<br />
Municipality.<br />
The table below presents the number of beds, occupancy rate and staff availability in the local health<br />
facilities.<br />
137
Table B.54: Number of beds, occupancy rate and staff availability in the local health facilities<br />
INDICATOR NO% REMARKS<br />
Number of beds 117<br />
UBUR 57.6% Occupacy is kept low due to limited<br />
capacity in Phalaborwa Health<br />
Centre, which is temporarily used for<br />
Maternity patients. Maphuta Malatji<br />
Maternity ward is under<br />
construction.<br />
Doctors: Permanent 9 1 terminating end of February 2010<br />
Doctors: Part time 5<br />
Doctors: Community Service 1<br />
Professional Nurses 62 Inclusive of Nursing Manager<br />
Staff Nurses 21<br />
Nursing Assistants 50<br />
Source: Dept. Health, 2010<br />
The Clinix group has acquired Phalaborwa Hospital and converted it into a private clinic. The clinic has not<br />
yet been officially opened to service the community. It is hoped that the private clinic will assist in<br />
improving health services in the municipal area. The improved health services will assist the Municipality’s<br />
intention to attract investors and professionals into the area.<br />
The table below shows the number of clinics per Ward, the level of service rendered and the estimated<br />
population served by each clinic.<br />
Table B.55: Number of clinics, level of service rendered and estmated population served<br />
WARD LOCATION NUMBER OF<br />
CLINICS<br />
1 Phalaborwa 1(Phalaborwa Bus<br />
stop)<br />
LEVEL OF SERVICE<br />
RENDERED<br />
ESTIMATED<br />
POPULATION<br />
SERVED<br />
PHC 14 243<br />
138
WARD LOCATION NUMBER OF<br />
CLINICS<br />
2 Selwane 2<br />
Selwane<br />
Mahale<br />
LEVEL OF SERVICE<br />
RENDERED<br />
PHC<br />
PHC<br />
ESTIMATED<br />
POPULATION<br />
SERVED<br />
1 867<br />
5 356<br />
3 Namakgale 1 (Namakgale A) PHC 7 479<br />
4 - - - -<br />
5 - - - -<br />
6 - - - -<br />
7 Namakgale 1 (Namakgale B) PHC 22 140<br />
8 Humulani 1 (Humulani) PHC 19 554<br />
9 - - - -<br />
10 Murchison Mine 1 (Murchison<br />
Mine)<br />
Step-Down health<br />
facility<br />
1 429<br />
11 Makhushane 1 (Makhushane) PHC 12 408<br />
12 - - - -<br />
13 - - - -<br />
14 Ben-Farm 1 (Ben-Farm) PHC 8 501<br />
15 - - - -<br />
16 Lulekani 1 (Lulekani CHC) PHC 25 376<br />
total 10 clinics 119 714<br />
Source: Department of Health<br />
The above table shows that 119 714 people out of a total population of 127 304 have access to health<br />
services through clinics in their wards. Although the picture painted here is that 94% of the municipal<br />
population has access, there are still challenges with regard to distances that residents have to walk to the<br />
nearest health facility as well as the standard of services rendered in the facilities.<br />
139
There are three mobile teams serving the mobile points in the Municipality. The Mobile service points<br />
have structures and are situated at Mashishimale Nkoana, Mashishimale Moshate and Maseke Moshate ,<br />
with populations of 7 419; 4 102; and 6 988, respectively. Serious illnesses that are prevalent in Ba-<br />
Phalaborwa are HIV/AIDS, tuberculosis (TB) and Malaria. Out of the 2 019 people tested for HIV/AIDS in<br />
2000, almost 35 % were HIV positive.<br />
Malaria<br />
The prevalence of malaria in the area is a threat to tourism. The table below presents recorded malaria<br />
cases for Limpopo per district between January 2005 and January 2009:<br />
Table B.56: Malaria cases for Limpopo per district between January 2005 and January 2009<br />
District 2005 2006 2007 2008 Jan. 2009<br />
Mopani 652 2 121 699 1 036 16<br />
Capricorn 54 54 71 47 1<br />
Sekhukhune 13 60 54 46 -<br />
Vhembe 2 545 4 283 2 399 3 739 73<br />
Waterberg 197 234 92 112 3<br />
Source: Department of Health and Social Development Malaria Control<br />
Mopani District Municipality comes second in the Province with regard to reported malaria cases. The table<br />
below presents monthly statistics for Ba-Phalaborwa Municipality.<br />
Table B.57: Monthly malaria cases in Ba-Phalaborwa Municipality between January 2005 and January<br />
2009<br />
Month 2005 2006 2007 2008 2009<br />
January 28 99 22 36 7<br />
February 13 93 11 61<br />
March 16 47 9 25<br />
April 27 32 33 8<br />
May 11 17 11 18<br />
140
June 7 7 0 14<br />
July 1 5 2 1<br />
August 1 13 6 2<br />
September 23 14 33 27<br />
October 15 15 39 25<br />
November 13 32 7 7<br />
December 34 44 24 5<br />
Total 189 418 197 229 7<br />
Source: Department of Health and Social Development Malaria Control<br />
Social Grants<br />
With respect to welfare, Ba-Phalaborwa Municipality has the Christelike Maatskaplike Raad (CMR) based at<br />
the Dutch Reformed Church in Phalaborwa town, the Maroela house which serves as a house of safety for<br />
abused women and children. The number of people receiving social grants, as provided by the Lulekani<br />
office, is presented in Table below. The figures for the Disability Grant and the Child Support still needs to<br />
be confirmed since these figures do not seem realistic taking into consideration the monthly amounts paid<br />
for these grants<br />
Table B.58: Number of people receiving social grants, 2004<br />
Type of Grant Number of people Amount Rand value<br />
Old Age 4292 780 3 347 760<br />
Disability 2040 780 1 591 200<br />
Veteran (war) 4 780 3 120<br />
Granting Aid 48 180 8 640<br />
Foster Care 604 500 302 000<br />
141
Type of Grant Number of people Amount Rand value<br />
Child Support 21 749 180 34 943 220<br />
Dependency Grant<br />
(disabled under 18)<br />
Source: Department of Social Development<br />
Key Issues with regard to health and welfare:<br />
221 780 172 380<br />
Increasing number of people dependent on social grants, in particular the child support grant;<br />
Need for reducing incidences of malaria, diarrhea and other diseases;<br />
Need for developing and maintaining up-to-date databases at all health centres and linking this with<br />
the <strong>IDP</strong> office in the Municipality;<br />
Shortage of health facilities, coupled with low staff retention and high staff overload.<br />
B5.11 HIV/Aids<br />
It is recorded that serious illnesses that are prevalent in the Ba-Phalaborwa Municipality are HIV & AIDS, TB<br />
and Malaria. The connection between TB and HIV & AIDS cannot be overemphasized.<br />
The current District prevalence rate is at 25.2% which represents an increase from the previous rate of<br />
23.8%. However, the local prevalence rate is not yet known. These points to the fact that as a<br />
municipality, we have to do more to contribute towards the reduction of the prevalence rate by 5%, and<br />
also develop programmes to reduce the infection rate. In keeping with the NSP 2007-<strong>2011</strong>, all efforts are<br />
being made to reduce the HIV incidence rate by 50% by <strong>2011</strong>.<br />
To this end, we have prevention programmes run by different stakeholders providing HIV & AIDS related<br />
services. The Ba-Phalaborwa Comprehensive Care, Management, Treatment and Support Programme,<br />
managed by Phelang, covers areas which include Mashishimale, Majeje, Namakgale, Humulani, Gravelotte,<br />
Selwane, Mahale, Prieska, Buyela, Nondweni, and Phalaborwa workplaces.<br />
142
Community Radio Station Educational discussions are also conducted, which include topics like positive use<br />
of male condoms and femidoms (female condoms), importance of VCT, abstinence, etc. Other<br />
stakeholders in the Local AIDS Council, which include sector departments, are doing more in their<br />
respective fields to respond to the pandemic. Programmes include:<br />
Awareness Campaigns like World AIDS Day,<br />
Candlelight Memorial,<br />
TB Awareness,<br />
Awareness in High Transmission Areas (HTA’s), E<br />
ducation and Training,<br />
School visits.<br />
ARV sites that provide treatment, care and support.<br />
Khanyisa Clinic – MPL Malatji;<br />
Lulekani Health Centre and<br />
Phelang Community Centre.<br />
Challenges on HIV/Aids treatment<br />
Self referred clients without relevant documents,<br />
Accessing the services very late,<br />
Self de-registration after commencement of the treatment,<br />
Individual ill-discipline,<br />
Substance abuse by clients on ARV’s.<br />
The Municipality is in partnership with other organizations and individuals, including other Municipalities.<br />
Through the Centre for Municipal Research and Advise (CMRA) and SALGA, the Municipality is<br />
mainstreaming HIV & AIDS in service provision. This is based on the understanding that HIV & AIDS is not a<br />
health issue but a developmental challenge facing Local Government, hence the involvement of SALGA.<br />
The SALGA Country Guide and the DPLG Framework assist municipalities to mainstream HIV & AIDS into all<br />
municipal services. The Municipality is also in the process of partnering with other municipalities like<br />
Greater Tubatse Municipality, Greater Tzaneen Municipality and Intsika Yethu (Eastern Cape) in developing<br />
143
the HIV & AIDS Municipal Strategy, HIV & AIDS Workplace Programme and Ward AIDS Councils<br />
respectively.<br />
Through the Local AIDS Council, the municipality will be able to respond appropriately to the scourge of HIV<br />
& AIDS and consequently reduce the HIV incidence rate through focusing on the priority areas identified in<br />
the NSP 2007 – <strong>2011</strong>.<br />
The strength of the current response for our Municipality is that all interventions are beginning to have the<br />
requisite political and management support.<br />
Community Drop-In Centres<br />
Drop in centres have been established in communities with the aim of caring for orphans and vulnerable<br />
children, particularly as a result of HIV/AIDS. The orphans in the centres are between 3 and 18 years of age.<br />
The table below shows the caregiver-orphan ration per centre<br />
Table B.59: Caregiver – orphan ratio per centre<br />
NAME OF CENTRE NUMBER OF<br />
ORPHANS<br />
Tswelopele<br />
(Makhushane – Maune)<br />
NUMBER OF CARE<br />
GIVERS<br />
252 12 1:21<br />
Mashishimale (Tshubje) 155 11 1:14<br />
Lesedi 107 10 1:11<br />
Makhushane 182 10 1:18<br />
Majeje 97 7 1:14<br />
Maseke 125 12 1:10<br />
Total 918 62 1:15<br />
CARE-GIVER –<br />
ORPHAN RATIO<br />
144
The Drop-In centres are funded by the Department of Health and Social Development as well as<br />
Phalaborwa Rotary Club. Sediba Gymnasium also offers free subscriptions to clients. Some of the centres<br />
do not have proper buildings from which to practice their care-giving chores. The established centres are<br />
not sustainable given that the care-givers work on voluntary basis.<br />
Other strategies employed to fight HIV/AIDS<br />
A team of 30 young females conduct home visits on a regular basis to educate families and the youth on:<br />
• Sexually Transmitted Infections (STIs);<br />
• The importance of knowing one’s health status; and<br />
• The use of condoms<br />
Taverns in Namakgale, Majeje, Humulani, Matiko-Xikaya, Lulekani, Mashishimale, Maseke, and<br />
Makhushane have been identified as high transmission areas for HIV.<br />
Ba-Phalaborwa Municipality Drop-In-Centres<br />
The following table presents the Drop-In-Centres in the municipal area according to their numbers of<br />
orphans-and-vulnerable children and caregivers.<br />
Table B.60: Drop in centers in the municipal area<br />
DROP-IN-CENTRE No. OF<br />
ORPHANS<br />
Mashishimale<br />
(Tshube)<br />
AGE RANGE No. OF CARE-<br />
GIVERS<br />
216 6 - 18 11 20:1<br />
Lesedi 97 7 - 16 10 10:1<br />
Makhushane<br />
(Tshangana)<br />
253 5 - 18 10 25:1<br />
Majeje (Ben- 97 2 - 16 7 14:1<br />
ORPHAN:CARE-GIVER<br />
RATIO<br />
145
DROP-IN-CENTRE No. OF<br />
ORPHANS<br />
Farm)<br />
AGE RANGE No. OF CARE-<br />
GIVERS<br />
Maseke 144 3 - 16 12 12:1<br />
Tswelopele<br />
(Makhushane-<br />
Maune)<br />
278 6 - 12 15 18:1<br />
The centers perform at least the following services:<br />
• Provide daily nutritious meals;<br />
• Teach life skills to children;<br />
• Assist with children’s school and cultural activities.<br />
The following general challenges are experienced in the different centres:<br />
• The challenge faced is lack of funding to sustain the centre;<br />
• Lack of proper accommodation;<br />
• Lack of storage facilities;<br />
Key issues on HIV/AIDS:<br />
• 2 125 orphans and vulnerable children benefited from the HIV/AIDS programme;<br />
ORPHAN:CARE-GIVER<br />
RATIO<br />
• Funding is needed to support the individuals (Care-givers) who risk their own lives caring for both the<br />
infected and affected;<br />
• More stakeholders need to be brought on board in the fight against HIV/AIDS.<br />
146
B5.12 Educational Facilities<br />
Table B.61: Number and type of schools per circuit office in the municipal area<br />
Circuit Office Public Primary<br />
Schools<br />
Public<br />
Secondary<br />
Schools<br />
Combined<br />
Private<br />
schools<br />
Combined<br />
Public Schools<br />
Lulekani 19 7 5 1 32<br />
Namakgale 18 7 0 0 25<br />
Total 37 14 5 1 57<br />
Source: Department of Education<br />
B5.13 Special Groups<br />
The special groups in the municipality consist of the youth, women, child, the disable and the elderly<br />
people. The municipality has a desk that caters for the needs of the special groups. The desk is located in<br />
the Office of the Mayor. The municipality has appointed a full time coordinator to head the special groups’<br />
desk. The desk is responsible for the coordination of all the activities of the special groups in the<br />
municipality. Special groups’ needs are projects are well captured in the <strong>IDP</strong> document and they are part of<br />
the <strong>IDP</strong> process.<br />
Key issues with regard to the special groups:<br />
• Unemployment<br />
• Access of government and municipal buildings<br />
• Lack skills<br />
• Limited economic opportunities<br />
• Inadequate Learnership and Internship opportunities<br />
The Municipality participates in the intergovernmental structures coordinated by the Mopani District<br />
Municipality and the Limpopo Provincial Government. The Municipality is able to raise issues with sector<br />
departments through the IGR structures.<br />
Total<br />
147
B6. Problem Statement<br />
The problem faced by the Ba-Phalaborwa Municipality is on the downscaling of mining activities as a result<br />
of the depleted copper body, ageing infrastructure and demand for more services . This has serious<br />
ramifications on the local labour force and the general economy of the area. The Municipality has to grow<br />
the local economy and promote job creation, whilst addressing backlogs in basic service delivery.<br />
B7. Recommendations<br />
In line with the NSDP, the LEGDS, the District Local Economic Development Plan and the Spatial<br />
Development Framework; it is recommended that the Municipality investigates the possibility of growing<br />
the tourism industry to boost the local economy. In order to achieve this strategic intent, the Municipality<br />
has to establish partnerships with both the public and private sectors.<br />
B8. Community Needs<br />
The Municipality held ward meetings in all the wards to identify community needs and their priorities<br />
for the <strong>2011</strong>/12 financial year.<br />
Ward challenges identified through the above processes were confirmed during public participation<br />
processes in the wards. Public participation processes included, Imbizos, ward report back sessions on<br />
service delivery and ward reports submitted monthly in the Municipality.<br />
The table below presents prioritized community needs. Ward councilors played a crucial role in confirming<br />
ward priority needs:<br />
Table B.62 Community Needs as per Ward submissions<br />
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
1 Water supply Makhushane – Nyakelany 1-4 Mopani/ Dwaf<br />
Electrification Makhushane – Nyakelang 4 ESKOM<br />
Formalization of settlement Makhushane – Nyakelang BPM<br />
Site demarcation – Makhushane<br />
Nyakelang<br />
Makhushane – Nyakelang 4 Makhushane Tribal<br />
148
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
Street maintenance -Phalaborwa<br />
Demarcation and fencing of<br />
cemetery<br />
Sewerage flowing through the<br />
community<br />
-Makhushane<br />
-Nyakelang<br />
BPM<br />
Makhushane Traditional<br />
Authority/BPM<br />
Makhushane Nyakelang BPM<br />
Upgrading of Haniville road Makhushane Nyakelang BPM<br />
Culverts Between graveyard and<br />
Haniville 3<br />
From Nyakelang 1 to<br />
Graveyard<br />
BPM<br />
Extension of graveyard Tipeng Makhushane<br />
Overhead walkway Phalaborwa Taxi Rank BPM<br />
Rehabilitation of Taxi rank Phalaborwa Taxi Rank BPM<br />
Opening of streets -Kanana<br />
-Tshelang Gape to Gardenview<br />
BPM<br />
Apollo lights Ward BPM<br />
Primary School Kanana Dept of Education<br />
Speed humps Ward BPM<br />
Community Hall Showground BPM<br />
Mobile Clinic Kanana Dept of Health<br />
Repair of toilets in graveyard Graveyard Tshangaan BPM<br />
Bridge Makhushane Dairy BPM<br />
2 Water supply Ward BPM/Mopani<br />
149
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
Water infrastructure Prieska Mopani<br />
Tar road Eiland to Letaba Ranch RAL<br />
Prieska Clinic Preiska Health<br />
Upgrading of cemeteries Mahale, Nondweni & Prieska BPM<br />
Paving and culverts Ward BPM<br />
Electricity Selwana Eskom<br />
RDP houses Ward DLGH<br />
High school Nondweni Education<br />
Renovation of Selwane stadium Nondweni BPM<br />
Upgrading of Selwana clinic to<br />
become health<br />
Selwane Clinic Dept of Health<br />
Bus stop shades Ward BPM<br />
Refuse removal Ward BPM<br />
Community Hall renovation Selwane BPM<br />
3 Street paving and tarring Ward BPM<br />
RDP Houses Ward DLGH<br />
Sports facilities and play ground Ward BPM<br />
Speed humps Magogo street<br />
Dikhafing road<br />
Mega bus/ Makhushane road<br />
Sono/clinic road<br />
Mavuso/Foskor street<br />
150
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
Site demarcation Ward BPM/DLGH<br />
Street maintenance Namakgale BPM<br />
High mast street lights Namakgale BPM<br />
Waste removal (Littering) Namakgale BPM<br />
Storm water drainage system Namakgale BPM<br />
High crime rate Namakgale BPM<br />
Upgrading of street Maphuta – Tshelang Gape BPM<br />
New residential sites Ward BPM<br />
Land for agriculture ward BPM<br />
Illegal Taxi Rank at Mega bus to<br />
be removed<br />
Mega bus BPM<br />
Graveyard Ward BPM<br />
Land for staff accommodation<br />
at clinic A<br />
Unhealthy Environment at<br />
Dekefing<br />
Namakgale Clinic A BPM/Dept of Health<br />
Namakgale Dikhefing BPM<br />
4 Water supply Ward BPM<br />
Stand pipes Matiko-Xikaya A-D<br />
Humulani A-C<br />
BPM<br />
Community library Matiko-Xikaya BPM<br />
Formalisation of Informal<br />
settlements<br />
Matiko-Xikaya Block C &D DLGH/BPM<br />
Illegal Dumping Ward BPM<br />
De-bushing crime hot spots Ward BPM<br />
Maintenance of streets Ward BPM<br />
151
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
Clinic Matiko-Xikaya Dept of Health<br />
Demarcation of new sites Humulani DLGH/BPM/Majeje<br />
Tribal<br />
Cattle grazing land Matiko-Xikaya Majeje Tribal Office<br />
Public Transport Humulani BPM/Taxi Association<br />
Water Infrastructure Matiko-Xikaya D Ext & B Ext BPM/MDM<br />
Opening of streets Matiko-Xikaya Block A Ext & D<br />
Ext<br />
BPM<br />
High School Humulani Dept of Education<br />
Culverts to cemetery Humalani Cemetery BPM<br />
Grading of streets Ward BPM<br />
Water shortages Humulani Clinic BPM<br />
Fence, Toilets & Water Matiko-Xikaya new graveyard BPM<br />
Apollo lights Ward BPM<br />
Satellite Police Station Ward SAPS<br />
Land Development (donated<br />
land for the clinic visiting point)<br />
Matiko-Xikaya BPM<br />
Primary School Matiko-Xikaya Block D Ext Dept of Education<br />
RDP Houses Ward DLGH<br />
Maintenance of Lulekani to<br />
Matiko-Xikaya Road (road<br />
becoming narrow)<br />
Ward BPM<br />
VIP Toilets Ward MDM<br />
Boreholes for farmers Ward<br />
Culverts (Lulekani Old<br />
Graveyard)<br />
Boundary of Ward 6 & 4 BPM<br />
152
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
Unfinished RDP Houses (3<br />
houses)<br />
Matiko-Xikaya Block A, B, C &<br />
D<br />
Matiko-Xikaya DLGH<br />
Tarring or paving of road Humulani to Lulekani CBD<br />
road<br />
BPM<br />
Road sign (pedestrian crossing) Ward (next to all schools) BPM<br />
Speed humps Ward (next to all schools) BPM<br />
5 Water supply (pressure) High lying areas Mopani<br />
Electricity Network (Old<br />
infrastructure)<br />
Ward BPM<br />
Roads & Maintenance Ward BPM<br />
Sewerage Services (leakages) Ward BPM<br />
Refuse Removal (Dumping site) Ward BPM<br />
Public parks and sidewalks<br />
(Maintenance)<br />
Ward BPM<br />
Moving of Skukuza Ward Mopani<br />
Hospital Ward BPM<br />
Tourism Ward BPM, LEDET<br />
Crime Ward SAPS<br />
6 Poor water pressure Biko BPM<br />
Speed humps and pedestrian<br />
crossing<br />
Lulekani P School<br />
B1 Ext<br />
Chris Hani street<br />
BPM<br />
Culverts Lulekani Graveyard BPM<br />
153
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
Police Station street<br />
Lulekani Health Centre<br />
Paving B1 Ext BPM<br />
Fencing of graveyard new and<br />
old<br />
De-bushing of empty spaces and<br />
parks<br />
Lulekani graveyard BPM<br />
Ward BPM<br />
Crèche Biko East & West Department of<br />
Education<br />
Funding for Lulekani Homebased<br />
Care<br />
Thambo Section Social Development<br />
7 High mast street lighting Mandela village & Topville BPM<br />
Recreational facilities Ward BPM<br />
Repair and maintenance of<br />
Apollo light no 34,35 &40<br />
Ward BMP<br />
Grading of Sports fields Refentse and other in the<br />
ward<br />
BPM<br />
De-bushing Crime hot spot BPM<br />
Potholes Namakgale BPM<br />
Cleaning of streets Namakgale BPM<br />
High school Ward Dept of Education<br />
Upgrading of streets Ward BPM<br />
Repair of bridges/culverts Mxongo/Topville<br />
Namakgale E & D<br />
BPM<br />
Recreational facilities Ward BPM<br />
600 Houses & sites Ward Department of Housing<br />
154
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
Culverts Ward BPM<br />
Checking of water meters Ward BPM<br />
Storm water drainage Section C (From Mpholo to<br />
former Mayor )<br />
4 Houses without sewerage<br />
system<br />
BPM<br />
Mshenguville BPM<br />
One block without water system Bosveld BPM<br />
Street cleaning (Illegal dumping) Ward BPM<br />
High School Ward Department of<br />
Education<br />
Tar road -Tambo street to Mashikinya<br />
to Score to Long Till/ Chicken<br />
farm<br />
-Chicken farm to Topville to<br />
ward 12 RDP<br />
-Archie’s Tavern to Mashikinya<br />
-Zama zama via unit E RDP<br />
houses<br />
BPM<br />
Sewer maintenance Zama zama Topville bridge BPM<br />
8 Cleaning Sports grounds Ward BPM<br />
Water shortage Ext C1 F BPM<br />
Community Library Majeje MPCC BPM<br />
Gravelling of road Ward BPM<br />
Tar road Mokoena road BPM<br />
Access streets Majeje section F BPM<br />
VIP Toilets Ward Mopani<br />
155
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
RDP Houses Ward Local Government<br />
Graveyard digging services and<br />
toilets<br />
Site demarcation for sports<br />
centre<br />
Majeje MPCC SAPS<br />
Ward Majeje Tribal<br />
Culverts Nana/ward Eskom / BPM<br />
9 Water New Ext and old BPM<br />
Tar road Mashishimale Road R2 & R3 Mopani<br />
Speed hump Ward Mopani<br />
Fencing , water & toilets for<br />
cemetery<br />
Ward BPM<br />
Community Library Ward BPM<br />
Indoor sports centre Ward BPM<br />
Primary school Dept of Education<br />
Satellite Police Station Mashishimale SAPS<br />
Bridge Mohlabeng to cemetery BPM<br />
Tar road Makhushane Mashishimale Mopani<br />
Upgrading of streets ward BPM<br />
Infrastructure for Home based<br />
care<br />
Electricity Eskom<br />
RDP Houses Ward DLGH<br />
Sanitation Ward Mopani<br />
10 Water supply Gravelotte (Water<br />
reticulation)<br />
Department of Social<br />
Mopani<br />
156
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
Electrification Boyelang<br />
Mashishimale R1 (Booster<br />
pump )<br />
Maseke<br />
Eskom<br />
Paving Phase 3 Gravelotte BPM<br />
RDP Houses Ward Department of Local<br />
government<br />
Culverts / speed humps Maseke<br />
Mashshimale<br />
Gravelotte<br />
BPM<br />
Secondary School Gravelotte Dept of Education<br />
Transfer of Primary School from<br />
JCI mine<br />
Gravelotte Dept of Education<br />
Maintenance of street Ward BPM<br />
Transfer of clinic from JCI mine<br />
premises<br />
Gravelotte Dept of Health<br />
Residential sites Gravelotte BPM<br />
Recreational facilities Gravelotte BPM<br />
Fencing of Cemeteries Mashishimale R1<br />
Maseke<br />
Boelang<br />
BPM<br />
Food parcels Ward Department of Social<br />
Apollo lights Ward BPM<br />
Opening of roads Boyelang BPM<br />
157
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
Demarcation of new sites Gravelotte BPM<br />
Shopping complex Gravelotte BPM<br />
Water reticulation & Electricity<br />
connections<br />
New stand & Maseke BPM & ESKOM<br />
Fruit Market Gravelotte BPM<br />
Site demarcation for churches Gravelotte BPM<br />
Community hall Gravelotte BPM<br />
Drop-in centre Gravelotte BPM<br />
Paving phase 3&4 Gravelotte BPM<br />
Agricultural projects Gravelotte BPM<br />
Culverts and speed humps Maseke<br />
Mashishimale R1<br />
Gravelotte<br />
BPM<br />
Public Transport Gravelottee BPM<br />
RDP Houses Maseke<br />
Gravelotte<br />
Boyelang<br />
Mashishimale R1<br />
DLGH<br />
Creche Gravelotte Dept of Education<br />
11 High School Between Kanana and<br />
Gardenview<br />
Dept of Education<br />
Poverty alleviation Projects Ward BPM (LED Unit)<br />
Water reticulation and<br />
Metering<br />
Gardenview<br />
Ntswelemotse<br />
MDM<br />
158
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
Electricity Gardenview<br />
Ntswelemotse<br />
Culverts Ward BPM<br />
Speedhumps/rumbles Ward BPM<br />
Eskom/DMER<br />
Community Library Ward BPM/DSAC<br />
Community Hall Ward BPM<br />
Flowing Sewerage streams Ward BPM<br />
Repair of Sekwete Bridge Ward BPM<br />
Erection of Stop Sign or (one<br />
vehicle width) at Sekwete<br />
bridge<br />
Ward BPM<br />
12 Street maintanamce Ward BPM<br />
Storm water drainage Ward BPM<br />
High crime rate Namakgale SAPS<br />
Poverty alleviation projects Ward Social Development<br />
Streets lights Ward BPM<br />
Street paving -Nazareth<br />
-Vuxeni<br />
-Dr Aphane’s street<br />
BPM<br />
De-bushing Sir Val Ducan FET College BPM<br />
High mast light Ward BPM<br />
Residential site Kholofelo BPM<br />
13 Street maintenance Namakgale BPM<br />
Storm water drainage Namakgale (Calvin Ngobeni) BPM<br />
159
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
De-bushing crime hot spots Namakgale BPM<br />
High crime rate Namakgale SAPS<br />
High poverty rate Ward Social Development<br />
Establishment of parks Ward BPM<br />
Paving of streets Ward BPM<br />
High mast light Zone B BPM<br />
Residential land Zone C BPM<br />
Sports Facilities Zone C (Lepato) BPM<br />
14 Unplanned settlements Nobody BPM<br />
Water supply Ward Mopani<br />
Sanitation Ward Mopani<br />
School renovation Zamani Primary School<br />
(Namakgale)<br />
Sewerage system Ben-farm<br />
Electrification -Nobody<br />
RDP Houses (Connection)<br />
-Makhushane construction<br />
camp<br />
-Polar park RDP<br />
-Ben-farm Ext A<br />
High mast street lights -Nobody<br />
Upgrading Maphutha-Malatji –<br />
Tshelang Gape road<br />
-Ben-farm B Ext<br />
-Namakgale B<br />
Department of<br />
Education<br />
BPM<br />
ESKOM<br />
BPM<br />
Namakgale B BPM<br />
160
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
Tarring of streets -Ben-Farm A Clinic – Business<br />
area<br />
-Streets to school : Namakgale<br />
& Ben-Farm A<br />
Construction of new roads Nobody Makhushane<br />
unplanned settlements<br />
BPM<br />
BPM<br />
Street maintenance Ward BPM<br />
Storm water drainage Namakgale B BPM<br />
Pedestrian Crossing R71 – Majeje (Mondweni) BMP<br />
Culverts -Ackson Malatji & Zakes<br />
Ngweshen street: Namakgale<br />
B<br />
-Sekwe River: Between Benfarm<br />
A & Ben-farm B Ext<br />
BPM<br />
De-bushing open spaces Ward BPM<br />
Vegetable Garden Park 3516B : Namakgale BPM<br />
15 Water supply -Maseke<br />
-Mashishimale R1<br />
-Makhushane Maune<br />
-Makhushane Mapikiri<br />
Mopani<br />
Wobbly water tank (Reservoir) Makhushane Nyakelang BPM<br />
Electrification -Maseke Ext<br />
-Mashishimale R1, R2 & Ext<br />
-Boelang<br />
-Phatamashako<br />
ESKOM<br />
161
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
-Sebereka Ext<br />
Sanitation (VIP toilets) -Mashishimale R1 & R2<br />
Upgrading of Makhushane -<br />
Mashishimale road<br />
- Makhushane Maune<br />
-Makhushane Mapikiri<br />
-Sebera<br />
-Makhushane<br />
-Maseke<br />
-Mashishimale<br />
Construction of new road Makhushane Mapikiri –<br />
Mashishimale R2<br />
Mopani<br />
BPM<br />
BPM<br />
Street road grading Ward BPM<br />
Maintenance of sports grounds Ward BPM<br />
24 Hours clinic services Maseke Department of Health<br />
Demarcation of sites Maseke BPM<br />
Community Hall -Maseke<br />
-Mashishimale<br />
BPM<br />
Fencing -Ward BPM<br />
16 Electrification Kurhula ESKOM<br />
Free Basic Electricity Ward BPM/Eskom<br />
Houses Ward DLGH<br />
Sanitation Ward Mopani<br />
Water supply Kurhula Mopani<br />
High HIV/AIDS prevalence Ward Health/BPM<br />
Primary school Kurhula Education<br />
162
Ward Community Needs/Challenges Location/Area Responsible Institution<br />
RDP Houses Ward Department of Housing<br />
Bridges/Culverts Pondo, Mlambo & Kurhula BPM<br />
Access street Kurhula BPM<br />
Apollo lights Ward Eskom/BPM<br />
Clinic Kurhula Departmental<br />
VIP Toilets -Pondo<br />
-Mlambo<br />
-Kurhula<br />
Mopani<br />
Grading of Roads Ward BPM<br />
Sports facilities Ward BPM<br />
Table B.63 Community Priorities as per Ward submissions<br />
Ward No. Ward Priority Location Responsible Institution<br />
1 Electrification Kanana Eskom<br />
Water reticulation Nyakelang 1 to 4 BPM<br />
Culverts -From Nyakelang 1 to<br />
Graveyard<br />
- Dairing<br />
Opening of street From Tshelang Gape<br />
via Kanana<br />
Streets lights Hendricks Van Eck road<br />
(Phalaborwa)<br />
BPM<br />
BPM<br />
2 Water supply Ward BPM<br />
163
Ward No. Ward Priority Location Responsible Institution<br />
Paving and culverts Ward BPM<br />
Tar road Eiland to Letaba Ranch RAL<br />
Prieska Clinic Preiska Health<br />
Upgrading of cemeteries Mahale, Nondweni &<br />
Prieska<br />
BPM<br />
3 Paving of roads and street Ward BPM<br />
Speed humps Magogo street<br />
Demarcation of new sites (Zone D<br />
Foskor)<br />
Dikhafing road<br />
Mega bus/<br />
Makhushane road<br />
Sono/clinic road<br />
Mavuso/Foskor street<br />
Ward BPM/DLGH<br />
Sport facilities and play grounds Ward BPM<br />
Stormwater drainage Ward BPM<br />
4 Water supply/stand pipes Ward BPM<br />
Culverts Humulani Cemetery BPM<br />
Formalisation of Informal<br />
settlements<br />
Matiko-Xikaya DLGH/BPM<br />
RDP Houses Ward DLGH<br />
VIP Toilets Ward MDM<br />
5 Sewerage Phalaborwa BPM<br />
Water Phalaborwa BPM<br />
164
Ward No. Ward Priority Location Responsible Institution<br />
Electricity Phalaborwa BPM<br />
Refuse removal Phalaborwa BPM<br />
Roads and Maintenance Phalaborwa BPM<br />
6 Grading and paving of roads Ward BPM<br />
Fencing of graveyard (old & new) Lulekani Graveyard BPM<br />
Speed humps and pedestrian<br />
crossing<br />
Lulekani School<br />
B1 Ext<br />
Chris Hani street<br />
Culverts Lulekani graveyard<br />
Police station street<br />
Lulekani Heal care<br />
centre<br />
BPM<br />
Demarcation of new residential sites Ward BPM/DLGH<br />
7 Storm water drainage Section C (Mpholo to<br />
former Mayor street)<br />
BPM<br />
Apollo lights Ward BPM<br />
Tar road Tambo street to<br />
Mashiskinya to Score<br />
to Long till/Chicken<br />
farm<br />
Tar road Chicken farm to<br />
Topville to ward 12<br />
RDP<br />
BPM<br />
BPM<br />
Tar road Zama zama via unit E BPM<br />
165
Ward No. Ward Priority Location Responsible Institution<br />
8 Water shortage (vandalism of water<br />
meters)<br />
RDP Houses<br />
Section C Ext Mopani<br />
Access streets Section F BPM<br />
Paving / Tar road Mokoena Road BPM<br />
R71 to Tribal office (New Road) BPM<br />
Digging services Majeje Graveyard BPM<br />
9 Water New Ext and Old BPM<br />
Tar Road Mashishimale road R2<br />
& R3<br />
Mopani<br />
Fencing, water & toilet Cemetery Ward BPM<br />
Speed hump Ward Mopani<br />
Community Library Ward BPM<br />
10 Water shortage Gravelotte (Water<br />
reticulation)<br />
Mashishimale R1<br />
(Booster pump )<br />
Electrification Boyelang<br />
Maseke<br />
Eskom<br />
Paving phase 3 Gravelotte BPM<br />
RDP Houses Ward Department of Local<br />
government<br />
Culverts / speed humps Maseke<br />
Mashshimale<br />
166
Ward No. Ward Priority Location Responsible Institution<br />
Gravelotte<br />
11 Water reticulation(Meters ) -Garden view<br />
-Ntswelemotse<br />
BPM<br />
Culverts Ward BPM<br />
Speed humps/rumbles Ward BPM<br />
Electricity Garden view<br />
-Ntswelemotse<br />
Eskom<br />
High mast light Ward BPM<br />
12 Residential site Kholofelo BPM<br />
Paving of streets Ward BPM<br />
High mast lights RDP site BPM<br />
Storm water drainage Ward BPM<br />
De-bushing -Sir Val Duncan<br />
-Behind Lemi’s tavern<br />
BPM<br />
13 Street tarring & paving Ward BPM<br />
Storm water drainage Calvin Ngobeni Road<br />
Phumulong Street<br />
BPM<br />
Apollo lights Namakgale Zone B BPM<br />
Establishment recreational park Zone C 7 B BPM<br />
Sport facilities Ward BPM<br />
14 Water supply Nobody BPM<br />
167
Ward No. Ward Priority Location Responsible Institution<br />
Electrification -Nobody<br />
-RDP<br />
ESKOM<br />
Paving and Grading of internal roads Ward BPM<br />
Storm water drainage Ward BPM<br />
Apollo light -Nobody next zama<br />
bottle store<br />
-Maphutha and two<br />
mountain<br />
-Ben-farm A<br />
15 Water supply (new reservoir) -Mapikiri<br />
-Mashishimale R1<br />
BPM<br />
Mopani<br />
Tar roads Ward BPM<br />
Culverts -Maseke<br />
-Makhushane – Maune<br />
-Makhushane –<br />
Mapikiri<br />
RDP Houses -Maseke<br />
-Mashishimale R1 & R2<br />
-Makhushane – Maune<br />
-Makhushane –<br />
Mapikiri<br />
-Mashishimale R1&R2<br />
-Sebera<br />
BPM<br />
168
Ward No. Ward Priority Location Responsible Institution<br />
VIP Toilets Ward Mopani<br />
16 Water Infrastructure Kurhula Mopani<br />
Electrification Kurhula Eskom<br />
RDP Houses Ward DLGH<br />
Opening of streets & gravelling of<br />
roads<br />
Kurhula & ward BPM<br />
Tar roads Nyota road to Kurhula BPM<br />
169
C1. Introduction<br />
SECTION C<br />
Strategic Intent<br />
This document is the strategic plan for Ba-Phalaborwa Municipality that was developed on 27 – 29 October<br />
2010 at the strategic planning session that was held in Mopani Rest Camp, Kruger National Park. The<br />
strategic planning session was attended by the Acting Municipal Manager, S57 managers, Assistant<br />
Directors, Internal Auditor, Risk Manager, <strong>IDP</strong> Manager, Manager Tourism, the Performance Management<br />
Officer, Speaker, the Executive Committee and union representatives.<br />
The content of this strategic plan draws meaning from the Analysis Phase of the integrated development<br />
planning process of the Municipality; and is meant to inform and give meaning to the Projects Phase. The<br />
strategic planning session was held to ensure that the Municipality remains relevant and responsive to the<br />
needs of the community and form a base for monitoring progress and assessing results and impact.<br />
The strategic planning team focused on assessing the Municipality’s current business environment, defining<br />
the organisation’s purpose, and deciding on what the organisation should look like in the next decade or so.<br />
The Municipality further recognised its strengths, weaknesses, opportunities and threats. It resultantly<br />
mapped out a course of action to be undertaken in order to move from the current situation to the desired<br />
position.<br />
A picture of the current situation in the Municipality was painted with the view to presenting the status<br />
quo and laying a sound foundation for future plans. The following presentations were made in an attempt<br />
to present the current state of development amid interventions undertaken in the previous financial years:<br />
• Progress made in the implementation of the 2009/10 <strong>IDP</strong>;<br />
• Situational analysis focusing on both the internal and external environments of the Municipality;<br />
and<br />
• Line function performance reports, goals and strategies by heads of departments.<br />
170
Based on the environmental scan, the strengths, weaknesses, threats and opportunities that prevail were<br />
identified through a SWOT Analysis exercise. The strategic intent of the Municipality was confirmed,<br />
without changes, by reviewing the vision and mission statements as well as the guiding principles (values).<br />
A set of strategic goals (broad goals) was developed and strategies formulated over the short to long term<br />
period. It was agreed that the strategic goals be refined and aligned to at least the following strategic<br />
documents:<br />
• The Provincial Development Growth Strategy (PGDS);<br />
• The Medium Term Strategic Framework (MTSF);<br />
• The Municipal Turn Around Strategy (MTAS); and<br />
• The Outputs of Outcome 9 in the Minister of COGTA’s Delivery Agreement.<br />
C2. 2009/2010 <strong>IDP</strong> Implementation Report<br />
A shift in strategic focus can be seen from 2008/2009 and 2009/2010 through the following:<br />
The 2008/09 vision statement was amended during the previous (2009) strategic session from “Growing<br />
the economy and creating employment through tourism” to read “Best tourist destination in Limpopo by<br />
2020”. The mission was expanded to include focus on the mining industry and Ba-Phalaborwa as a<br />
destination of choice and an additional value (continuous learning) was identified and included in the<br />
strategic values.<br />
Annual Performance<br />
Performance in the implementation of the strategic objectives as contained in the strategy map was as<br />
follows:<br />
Under the community perspective, Community well-being reached target and the perspective and<br />
objective scored 3. Under the financial perspective, two objectives, Facilitate the growth of the local<br />
economy and to provide for mobility and access, did not reach targets and scored, respectively, 2.46 and<br />
2.78. Become financially viable exceeded target and scored 3.14 and the financial perspective in total<br />
scored 2.77 and therefore did not reach target. All four strategic objectives in the institutional processes<br />
171
perspective reached target. Ensure environmental sustainability scored 3.85, to maintain and upgrade<br />
municipal assets and services scored 3.43, Develop effective and sustainable stakeholder relationships and<br />
partnerships scored 3 and to develop and implement integrated management and governance systems<br />
scored 3.29 which resulted in an overall score in this perspective of 3.39. In the learning and growth<br />
perspective the strategic objective to attract, develop and retain human capital scored 3.51 which resulted<br />
in the same score for this perspective<br />
With regard to the overall performance of the strategic scorecard and the SDBIP and LSDBIP, the overall<br />
performance per quarter can be broken down as follows:<br />
September 09 December 09 March 2010 June 2010<br />
Overall Performance 3.20 3.01 2.83 3.04<br />
Strategic 3.18 3.45 3.04 3.11<br />
SDBIP & LSDBIP 3.22 2.57 2.61 2.97<br />
Table C. 1: Annual Performance<br />
Strategic scorecard performance exceeded target in all four quarters, but SDBIP and LSDBIP exceeded<br />
target in the first quarter but did not reach target for the rest of the quarters<br />
Performance with regard to the National Key Performance Indicators is as follows:<br />
% municipal budget used for WSP the target of 1% was reached, % households with access to solid waste<br />
removal, the target was exceeded from 54.57% to 66.74%, % households with access to electricity in town<br />
the target of 100% was reached, % households with access to free basic water the target of 51% was<br />
exceeded to 85% and the number of households with access to free basic electricity, the target of 6000<br />
households was reached. % Capital spending on projects in <strong>IDP</strong> also reached the target of 100%. Annual<br />
revenue received for services exceeded the target of R270, 000,000 to R285,000,000. Two national<br />
indicators did not reach target, number of jobs created through LED and EPWP, only 13 permanent and 361<br />
172
temporary jobs were created against the target of 200 permanent and 750 temporary. % outstanding<br />
service debtors did not reach the target of 50%.<br />
With regard to SDBIP and LSDBIP performance, Corporate Services Directorate and the Office of the<br />
municipal manager exceeded targets in all the four quarters, whereas the rest of the directorates only<br />
managed to reach their performance targets.<br />
Interventions on priority needs per ward:<br />
An analysis of the extent of municipal interventions on ward priorities revealed the following:<br />
Ward Priority Need % Intervention<br />
1 Water, sanitation, electricity 60%<br />
2 Water, bridge and culverts, job creation, clinics 40%<br />
3 Streets, cemetery, residential sites, job creation 40%<br />
4 Electrification, water, transport/roads,<br />
formalization of settlements<br />
5 Sewerage, water, electricity, refuse removal, road<br />
maintenance<br />
6 Cemetery, electrification, culverts, speeds humps,<br />
new sites<br />
7 Street lights, roads, new sites, recreational<br />
facilities, storm water<br />
60%<br />
100%<br />
40%<br />
8 Water, roads, cemetery, library 40%<br />
9 Roads, water, bridge, cemetery 20%<br />
10 Water, electrification, roads, houses, culverts 80%<br />
0%<br />
173
Ward Priority Need % Intervention<br />
11 Culverts, library, hall, sports r, roads 0%<br />
12 Storm water, sites, debushing, roads, street lights 40%<br />
13 Roads, storm water, street lights, parks, sports<br />
facilities<br />
20%<br />
14 Roads, electrification, street lights, library 40%<br />
15 Water, roads, culverts, houses, toilets 0%<br />
16 Water, electrification, houses, roads 20%<br />
Table C. 2: Ward Priority Needs<br />
Average intervention 33%<br />
Rating on achievement of strategic values:<br />
A community satisfaction survey conducted by the Municipality revealed that the Ba-Phalaborwa<br />
Community is dissatisfied with the performance of the Council on all strategic values (with the exception of<br />
fairness) as per the <strong>IDP</strong>.<br />
Assessment of quality of service:<br />
The survey allowed the community to present its perceptions on the performance of the Municipality in the<br />
provision of different municipal services. The table below presents the ratings by those who participated in<br />
the survey:<br />
Type of Service Rating<br />
Water Inadequate<br />
Sanitation Inadequate<br />
174
Type of Service Rating<br />
Refuse Removal Adequate<br />
Traffic Control Adequate<br />
Licensing Inadequate<br />
Electricity Supply Adequate<br />
Approval of Building Plans Inadequate<br />
Land Use Applications Inadequate<br />
Libraries Adequate<br />
Community Halls Adequate<br />
Storm-Water Drainage Inadequate<br />
Sports Fields & Stadia Inadequate<br />
Streets, Roads & Pavements Inadequate<br />
Economic Development Bad Service<br />
Parks and Open Spaces Inadequate<br />
Promotion of Tourism Adequate<br />
Public Participation Inadequate<br />
Monthly Billing System Inadequate<br />
Table C. 3: Survey on quality of services<br />
The outcomes of the 2009/2010 <strong>IDP</strong> implementation report and community perceptions, expressed<br />
through the ratings, on the strategic values and quality of services rendered were taken into account when<br />
175
conducting the SWOT Analysis and crafting the strategic goals and strategies for implementation in the<br />
future.<br />
C3. Analysis<br />
C3.1 Situational Analysis<br />
7 S152 of the Constitution sets out the objects of local government:<br />
a) to provide democratic and accountable government for local communities;<br />
b) to ensure the provision of services to communities in a sustainable manner;<br />
c) to promote social and economic development;<br />
d) to promote a safe and healthy environment; and<br />
e) to encourage the involvement of communities and community organisations in the matters of local<br />
government.<br />
The provision of sustainable services includes i.e. access to water and sanitation, electricity, refuse removal,<br />
transport facilities, housing, education and primary health services.<br />
To deliver on the objects of local government and to achieve the ultimate goal of improving the lives of the<br />
community a developmental approach is necessary. Due regard should be given to spatial planning and<br />
development as all development in South Africa finds expression in space economy. Development and<br />
service provision should be concentrated on growth points to ensure that the poorest of the poor have<br />
access to services and job opportunities. The following assumptions are contained in the National Spatial<br />
Development Perspective:<br />
1. Location is critical for the poor to exploit opportunities for growth<br />
2. The poor, concentrated around economic centers have greater opportunity to gain from economic<br />
growth<br />
3. Areas with demonstrated economic potential provide greater protection due to greater diversity of<br />
income sources<br />
7 Constitution of the Republic of South Africa, 108 of 1996<br />
176
4. Areas with demonstrated economic potential are most favourable for overcoming poverty<br />
5. The poor are making rational choices about relocating to areas of opportunity<br />
With regard to Ba-Phalaborwa municipal area the population is concentrated around the following areas:<br />
• Phalaborwa with Schittoch and farm Silonque<br />
• Namakgale with Makhushane, Mashishimale, Maseke and Boelang<br />
• Gravelotte<br />
• Lulekani with Matiko-Xikaya, Humulani, Kurhula and Biko section<br />
• Seloane with Mahale, Prieska and Nondweni, and<br />
In terms of the Limpopo Spatial Rationale, Phalaborwa town is a provincial growth point, Namakgale and<br />
Gravelotte district growth points and Lulekani a municipal growth point<br />
Ba-Phalaborwa municipal area consists of 2 town centers, 3 townships, 11 villages and 101 farms<br />
The following issues needs to be taken into consideration in developmental planning:<br />
Established areas:<br />
Urban management areas:<br />
• Maintenance of infrastructure<br />
• Zoning/Land use management<br />
• Clean, green and safe areas<br />
• Infill development<br />
Consolidation residential areas:<br />
• Infrastructure backlogs<br />
• New housing development<br />
• Economic infrastructure<br />
• Accessibility<br />
• Infill development<br />
177
Rural Village areas:<br />
Provision of basic services:<br />
• Water<br />
• Electricity<br />
• Sanitation<br />
• Roads accessibility<br />
• Facilitate subsistence/commercial farming<br />
Conservation area:<br />
Mining areas:<br />
• Protect from urban development<br />
• Air pollution<br />
• Beneficiation<br />
Economic nodes and industrial areas:<br />
• Demarcate industrial areas with potential<br />
• Small business development in all economic sectors<br />
• Provide appropriate infrastructure and maintain<br />
• Provide an environment for the growth and development of various economic sectors<br />
In applying the spatial rationale in the development of Ba-Phalaborwa areas means the following:<br />
1. Undertaking rigorous analysis of the space economy to identify areas of economic significance<br />
and concentrations of poverty and relative and dynamic comparative advantage of localities<br />
2. Providing a common platform for structured dialogue<br />
In applying the above the municipality will be able to:<br />
1. Focus investment and development interventions to ensure maximum and sustainable impact<br />
2. Capitalise on complementarities and facilitate consistent and focused decision-making<br />
178
3. Move beyond mere focusing on integration and coordination procedures towards strategic<br />
coordination, interaction and alignment<br />
All the above factors were taken into account during the strategic planning session in identifying priorities<br />
and planning developmental and institutional programmes. The Ba-Phalaborwa Sustainable Development<br />
Initiative, will go a long way in ensuring sustainable development and economic growth within the<br />
municipal area.<br />
C3.1 Ba-Phalaborwa Sustainable Development Initiative<br />
Ba-Phalaborwa Municipality, together with its strategic partners has embarked on an initiative, The Ba-<br />
Phalaborwa Sustainable Development Initiative, to expedite inclusive economic growth of all communities<br />
within the municipal area to ensure a better life for all.<br />
C3.2 SWOT Analysis<br />
SWOT analysis is a strategic planning tool used to discuss and evaluate the Strengths, Weaknesses,<br />
Opportunities and Threats in the municipality. It identifies the internal and external factors that influence<br />
the strategic intent which assist the municipality to better align itself with existing conditions so as to<br />
maximise its ability to function optimally.<br />
The SWOT Analysis provides a better understanding of environmental influences on the municipality,<br />
enabling it to effectively plan for the future and make strategic decisions based on this analysis. The<br />
information which is developed through the analysis will help to bring opportunities to the fore. Resources<br />
can be more effectively allocated when a thorough understanding of the factors affecting the municipality<br />
are taken into account as well as factors that are hindering the municipality are discovered and addressed.<br />
Taking into account the 2009/2010 <strong>IDP</strong> Implementation Report, community needs, situational analysis and<br />
2009 SWOT, the following SWOT Analysis was determined:<br />
179
SWOT ANALYSIS<br />
Strengths Weaknesses Opportunities Threats<br />
Billing Maintenance of infrastructure, infrastructure<br />
backlogs, ageing infrastructure<br />
Healthy and green<br />
Service backlog and new basic services, non<br />
environment<br />
provision of services<br />
Peaceful and stable<br />
community<br />
Beneficiation of byproducts<br />
and value chain<br />
Land Claims<br />
Marula Industry Poverty<br />
Water and electricity losses Agriculture Negative economic growth<br />
Institutional knowledge Water provision and service level agreement Tourism potential Economic infrastructure<br />
Quality of <strong>IDP</strong> document ICT infrastructure Land availability Social infrastructure<br />
Implementation and<br />
compliance to policies and<br />
strategies<br />
Project Management Infill development Accessibility (ITP)<br />
Implementation of plans Housing accreditation Pollution (air and water)<br />
Table C. 4: SWOT Analysis<br />
Non-functionality of the GIS Water Service Authority<br />
Status<br />
Landfill site<br />
Financial viability, financial management, Audit<br />
history, Personnel budget, revenue collection and<br />
locked finances, maintenance budget, failure to<br />
maximise revenue collection<br />
Availability of grants Non payment for services<br />
Contract management Budget for water maintenance<br />
Risk management and internal controls Alignment of plans with sector<br />
departments and traditional authorities<br />
Monitoring and evaluation Co-operation with Traditional<br />
Transparency and openness
Strengths<br />
The billing system has become strength within the municipality as all services are billed for and that was<br />
not possible previously. Data cleaning also ensures that billing information is correct and up to date. The<br />
municipality has a vast institutional knowledge of people in strategic position being employed for a long<br />
time. Through this capacity building and skills transfer is excelled. The <strong>IDP</strong> of the municipality was rated as<br />
one of the best within the Limpopo Province. This is a great improvement since the <strong>IDP</strong> document was<br />
identified as a weakness during 2009 strategic planning session. Another weakness that has become<br />
strength is implementation and compliance of policies and strategies. This also indicates of how the<br />
municipality has improved within the 2009/2010 financial year. The municipality won the 2010 Greenest<br />
Municipality Award in the Province, the strength also lay in the fact that for the past few years the<br />
municipality was one of the best performing municipalities competing for this reward. One of the greatest<br />
strengths of the municipality is the peaceful and stable community which is indicative of a stable and well<br />
performing municipality.<br />
Weaknesses<br />
The municipality’s mandate is to provide services to the community, and if there are challenges of<br />
infrastructure maintenance, infrastructure backlogs, ageing infrastructure and service provision backlogs<br />
and non provision of services, it poses huge challenges for the municipality as it will not be able to deliver<br />
on its mandate. It is therefore crucial that these challenges and weaknesses are addressed to ensure<br />
sustainable quality services to the community. Information and Communication Technology is the way in<br />
which information is stored, how the municipality conducts its business and how it communicates<br />
internally within the organization and externally with its customers and the community. It is therefore<br />
crucial that sound information and communication technologies are practiced to ensure sound governance<br />
and the provision of services. Project management and implementation of plans are important to ensure<br />
that services are provided as planned. Projects and plans not implemented not only cause delays in service<br />
provision but also wastage of money and revenue within the municipality which directly impacts on<br />
planning within the municipality. A lot of time and money is wasted due to a non-functional GIS. GIS is the<br />
most important planning tool for the municipality. If the GIS is functional, all assets, project planning,<br />
maintenance, replacement of infrastructure, budget planning can be aligned. The fact is, if you don’t know<br />
where you are at the moment, how can you plan for the future? One of the biggest challenges in most<br />
municipalities is financial viability. Identified weaknesses under financial viability include financial<br />
management, audit history, personnel budget, revenue collection and locked finances, maintenance<br />
181
udget and failure to maximise revenue collection. There is a great need to put strategies in place to<br />
overcome this weakness because if a municipality is not financially viable, it cannot exist. The municipality<br />
has improved, i.e. the billing system, but revenue collection and all relevant identified weaknesses needs to<br />
be addressed to ensure a sustainable future for the municipality and the community. Contract<br />
management and risk management and internal controls are other identified weaknesses. Contract needs<br />
to be managed to ensure that monies are not paid for expired contracts, it needs to be monitored to<br />
ensure that the service providers deliver as expected. Risk management and internal controls entails that<br />
with every decision that is made within the municipality a risk assessment be done to ensure that all risks<br />
are managed and mitigated. Regarding the communication as identified weakness, although the<br />
municipality has improved greatly in internal and external communication, there is still room for<br />
improvement as not all decisions are communicated bottom up and top down within the municipality.<br />
Monitoring and evaluation and transparency and openness go hand in hand. The weakness openness and<br />
transparency was identified in a survey conducted on the performance of the strategic values of the<br />
municipality. This also links to communication. Strategies should be put in place to ensure that<br />
transparency and openness and therefore monitoring and evaluation be addressed.<br />
Opportunities<br />
Opportunities within Ba-Phalaborwa municipality are directly linked with economic development, i.e.<br />
beneficiation of by-products and value chain, the marula industry, agriculture and tourism potential. Land<br />
availability could be exploited through negotiations with traditional leaders. There is no urban sprawl in<br />
the municipal area and the municipality should infill development along the routes between the major<br />
economic nodes within the municipal area. The municipality should endeavour to obtain housing<br />
accreditation and water services authority. Through this the municipality could by itself provide very<br />
necessary needs in the community without being reliant on other sector departments. If obtained, the<br />
revenue stream will also be increased. Grants are available to municipalities and the municipality should<br />
ensure that it adheres to the terms and conditions of grants to ensure that all avenues to provide the<br />
necessary services to the community are exploited.<br />
Threats<br />
As per the previous year’s SWOT analysis, land claims are a huge risk for the municipality. It is therefore<br />
crucial that a sound relationship exist between the municipality, the community and traditional leaders to<br />
ensure that land, when restituted is utilized in the best way possible. Co-operation with traditional leaders<br />
182
in this regard is very important and also to ensure that land is not utilized for purposes that it is not<br />
intended to. Negative economic growth and poverty go hand in hand and strategies and plans should be<br />
put in place to ensure that economic growth is speeded up to alleviate poverty. It is also important to<br />
ensure that planning is done according to the SDF to ensure that aspects of nodes are addressed. The<br />
municipality must ensure that economic and social infrastructure be provided for sustainable development<br />
within the municipal area. Accessibility is an identified weakness in that the area is not accessible to all and<br />
the development of the Integrated Transport Plan should receive preference. Due to mining activity,<br />
pollution (air and water) is a challenge and should be monitored and managed. Ba-Phalaborwa has a lack<br />
of water resources and cannot afford to have the little resource to be polluted. The landfill site needs to be<br />
rehabilitated and new landfill site established. In this regard the municipality has to negotiate with one of<br />
its strategic partners, Foskor, regarding the closure and rehabilitation of the site. A weakness that impacts<br />
greatly on the revenue stream of the municipality is the non payment for services. It is important that all<br />
services rendered be paid for by the community. Here the municipality has the responsibility to ensure<br />
that the services provided are of a standard that can enforce payment from the community. A great<br />
challenge for Ba-Phalaborwa is the fact that the budget for water lies with the district municipality. It is<br />
crucial for the municipality to, as identified as an opportunity, to become the water services authority to<br />
ensure independence from other entities for the provision and revenue stream of water. Strategies need<br />
to be put in place to improve the participation and co-operation of sector departments and traditional<br />
leaders in planning and therefore alignment of plans in the <strong>IDP</strong>.<br />
C3.3 Developmental Priorities<br />
In analysing the SWOT some areas were grouped together into definite “constraints and enablers”.<br />
Constraints are those areas which impede, and enablers are those areas which facilitate the municipality’s<br />
successful operation. It is also called Key Priority Focus areas. The process of identification of the pains<br />
and enablers forms an integral part of the development of the municipality’s priorities and objectives. It<br />
also contributes materially to the ongoing effective and efficient management of people and processes that<br />
have a direct impact on the quality of services delivered.<br />
The following constraints were identified in analysing the SWOT:<br />
Constraints Enablers<br />
Non-sustainable service delivery Integrated sustainable infrastructure<br />
183
Constraints Enablers<br />
Revenue generation Financial viability<br />
Lack of integrated planning Integrated planning<br />
Poor governance Good corporate governance<br />
Lack of community involvement Empowered communities<br />
Non sustainable development Integrated sustainable infrastructure and planning<br />
Environmental management Environmental sustainability<br />
Table C. 5: Constraints and Enablers<br />
In the review of its Strategic Intent, Ba-Phalaborwa Local Municipality considered the realities of its Status<br />
Quo Analysis and the developmental needs of the community, its internal SWOT Analysis, the constraints it<br />
faces as well as the identified priority focus areas above, while also aligning itself to the National and<br />
Provincial Development Priorities. Six strategic goals were identified for which short, medium and long<br />
term strategies were developed and will be discussed under strategic intent.<br />
C4. Strategic Intent<br />
C4.1 Background<br />
Section 152 (1) of the Constitution of the Republic of South Africa (1996) states that the objects of local<br />
government are:<br />
(a) to provide democratic and accountable government for local communities;<br />
(b) to ensure the provision of services to communities in a sustainable manner;<br />
(c) to promote social and economic development;<br />
(d) to promote a safe and healthy environment; and<br />
184
(e) to encourage the involvement of communities and community organisations in the matters of local<br />
government.<br />
Section 152(2) prescribes that a municipality must strive, within its financial and administrative capacity, to<br />
achieve the objects set out in subsection (1).<br />
Section 153 determines that to fulfill its developmental duties a municipality must-<br />
(a) structure and manage its administration and budgeting and planning processes to give priority to<br />
the basic needs of the community, and to promote the social and economic development of the<br />
community; and<br />
(b) participate in national and provincial development programmes.<br />
This implies that the local sphere of government should align its strategies and priorities to that of national<br />
and provincial government. A number of key documents and role players influence the setting of strategies<br />
and priorities within municipalities. These will be described in more detail below.<br />
The new Medium Term Strategic Framework (MTSF) which outlines the priorities, strategic objectives and<br />
targets of government for the period 2009 – 2014, indicates National Government’s Strategic intent is to<br />
improve the quality of life of South African communities. An extraction of these priorities as provided in a<br />
document issued by the Office of the Presidency: Together Doing more and Better Medium Term Strategic<br />
Framework: A framework to guide government’s programmes in the electoral mandate period (2009-<br />
2014) 8 , can be summarised as follows:<br />
Strategic Priority 1: Speeding up growth and transforming the economy to create decent work and<br />
sustainable livelihoods.<br />
Strategic Priority 2: Massive programme to build economic and social infrastructure.<br />
Strategic priority 3: Comprehensive rural development strategy linked to land and agrarian reform and<br />
food security.<br />
Strategic Priority 4: Strengthen the skills and human resource base.<br />
8 The Presidency Republic of South Africa. 2009. Together doing more and better. Medium term strategic<br />
framework. Available at: http://www.thepresidency.gov.za/docs/pcsa/planning/mtsf_july09.<strong>pdf</strong><br />
185
Strategic Priority 5: Improve the health profile of all South Africans<br />
Strategic Priority 6: Intensify the fight against crime and corruption.<br />
Strategic Priority 7: Build cohesive, caring and sustainable communities.<br />
Strategic Priority 8: Pursuing African advancement and enhanced international cooperation.<br />
Strategic Priority 9: Sustainable Resource Management and use.<br />
Strategic Priority 10: Building a developmental state including improvement of public services and<br />
strengthening democratic institutions.<br />
In addition to the above, the Office of the Presidency published the Green Paper on National Strategic<br />
Planning (2009) 9 which provides ideas on planning and co-ordination with the aim of achieving the<br />
identified national priorities. In relation to the above, the South African government is taking drastic steps<br />
toward improving strategic planning, performance and monitoring within all spheres of government.<br />
This was symbolised by its decision to establish the following two crucial institutions:<br />
• National Planning Commission – to do the overall planning and give direction to all spheres of<br />
government<br />
• Performance Monitoring, Evaluation and Administration in the Office of the Presidency – to<br />
monitor and evaluate the performance of government in all three spheres.<br />
At the onset of the fourth democratic government, The Department of Provincial and Local Government<br />
was re-structured as the Department of Co-operative Governance and Traditional Affairs (COGTA). In terms<br />
of the Green Paper COGTA is placed at the centre of Government as a key partner to the National Planning<br />
Commission and the Monitoring and Evaluation Unit in the Presidency. COGTA is further responsible for<br />
aligning its priorities to that of National Government. Its key priority areas as set out in the MTSF and<br />
Strategic Plan 2009-2014 10 include:<br />
9 The Presidency. Republic of South Africa. 2009. Green Paper: National Strategic Planning. Available at:<br />
http://www.thepresidency.gov.za.<br />
10<br />
Department Cooperative Governance and Traditional Affairs. 2009. Strategic Plan FY 2009-2014. Available at:<br />
http://www.thedplg.gov.za/index.php?option=com_docman&task=cat_view&gid=118&Itemid=27<br />
186
• Building the Developmental State in Provincial and Local Government that is efficient, effective and<br />
responsive.<br />
• Strengthen Accountability and Clean Government.<br />
• Accelerating Service Delivery and supporting the vulnerable.<br />
• Improving the Developmental Capability of the Institution of Traditional Leadership.<br />
• Fostering Development Partnerships, Social Cohesion and community mobilisation.<br />
Cabinet approved a comprehensive Local Government Turnaround Strategy (LGTAS) on the 2 nd of<br />
December 2009 11 .<br />
The five strategic objectives of the LGTAS are to:<br />
1. Ensure that municipalities meet basic needs of communities. This implies that an environment is<br />
created, support provided and systems built to accelerate quality service delivery within the<br />
context of each municipality’s conditions and needs;<br />
2. Build clean, responsive and accountable local government. Make sure that systems and structures<br />
and procedures are developed and enforced to deal with corruption, maladministration and ensure<br />
that municipalities communicate and account more to communities;<br />
3. Improve functionality, performance and professionalism in municipalities. Ensure that the core<br />
administrative and institutional systems are in place and are operational to improve performance;<br />
4. Improve national and provincial policy, support and oversight to local government.; and<br />
5. Strengthen partnerships between local government, communities and civil society. Ensure that<br />
communities and other development partners are mobilized to partner with municipalities in<br />
service delivery and development.<br />
11 Department Cooperative Governance and Traditional Affairs’ Local Government Turnaround Strategy, November<br />
2009. Available at: http://www.dplg.gov.za/index.php?option=com_docman&task=doc_download&gid=476<br />
187
In response to the national priorities, the Limpopo Department of Local Government and Housing has also<br />
aligned their priorities and objectives to that of National Government as contained in the Provincial<br />
Employment Development and Growth Plan. These priorities include:<br />
Creating decent work and sustainable livelihoods by way of competitive industrial cluster<br />
promotion, infrastructure construction, and various national development programmes.<br />
Improving the quality of life of citizens through effective education (including skills development),<br />
reliable health care, alert policing, comfortable housing, social grants and sport, with specific<br />
emphasis on their own participation in these processes.<br />
Promoting rural development, food security and land reform in order to spread the benefits of<br />
economic growth beyond the urban areas.<br />
Raising the effectiveness and efficiency of the developmental state by way of effective organisation<br />
structuring and recruiting, targeted training and the building of a culture of service and<br />
responsibility, integrated development management; and co-operation between all organisations<br />
in the development process.<br />
Giving specific attention and allocate sufficient resources to the high-priority challenges of:<br />
Regional Co-operation<br />
Sustainable Development and Climate Change<br />
Black Economic Empowerment<br />
The Informal Economy<br />
12 Cabinet approved government performance monitoring and evaluation system and the management for<br />
outcomes. This includes 12 outcomes that collectively address the main strategic priorities of government.<br />
Outcome 9, “A responsive, accountable, effective and efficient local government system,” specifically deals<br />
with local government and also needs to be aligned and integrated in other national, provincial, district<br />
priorities and strategies.<br />
12 Guide to the outcomes approach, Version: 1 June 2010<br />
188
13 The Delivery Agreement for Outcome 9, identifies the following 7 outputs with sub outputs that are linked<br />
to Outcome 9 and are as follows:<br />
Output 1: Implement a differentiated approach to municipal financing, planning and support<br />
• Policy framework for differentiation<br />
• More autonomy to six metro's and top 21 municipalities in respect of infrastructure and housing<br />
delivery<br />
• A focused intervention for clearly defined smaller municipalities<br />
Output 2: Improved access to basic services<br />
• Increased access to basic services<br />
• Bulk infrastructure fund established<br />
• Established special purpose vehicle<br />
Output 3: Implement the community work programme and cooperatives supported<br />
• Job creation supported through the community work programme<br />
• Job creation supported through the establishment of cooperatives where feasible<br />
Output 4: Actions supported by the human settlement outcomes<br />
• Increased densities in Metro's and large town supported<br />
• Land acquisition for low income and affordable housing supported<br />
• Informal settlements in 45 priority municipalities upgraded<br />
Output 5: Deepened democracy through a refined ward committee model<br />
• Review and strengthen the legislative framework for Ward Committees and community<br />
participation<br />
• Support measures to ensure that 90% of ward are fully functional by 2014<br />
Output 6: Improved municipal financial and administrative capacity<br />
13 Delivery Agreement for Outcome 9, 30 September 2010<br />
189
• Improved audit outcomes of municipalities<br />
• Reduced municipal debt<br />
• Municipal overspending on opex reduced<br />
• Municipal under spending on capex reduced<br />
• Municipalities spending less than 5% of opex on repairs and maintenance reduced<br />
• Improved administrative and human resource management practices<br />
Output 7: Single window of coordination<br />
• Review local government legislation<br />
• Coordinated support, monitoring and intervention in provinces and municipalities<br />
The alignment of the above-mentioned priorities with that of the Ba-Phalaborwa Local Municipality is<br />
outlined later in this Strategic Plan in the form of a matrix.<br />
C4.1 Vision<br />
A vision statement is the picture of an organisation in the future; it is the organisation’s inspiration and the<br />
framework for all strategic planning. The vision statement answers the question “Where do we want to<br />
go?” When creating a vision statement, dreams and hopes for the organisation is articulated, it reminds<br />
the organisation of what it is trying to build. It focuses on the organisation’s future. A vision statement<br />
does not tell you how you are going to get there, but it set the direction for the organisation’s strategic and<br />
business planning. Unlike a mission statement, the vision statement is for the organisation and its<br />
employees, not for customers and clients.<br />
The vision was confirmed as relevant and no amendments were made:<br />
190
C4.2 Mission<br />
“Best tourist destination in Limpopo by 2020”<br />
SLOGAN<br />
The Home of Marula and Wildlife Tourism<br />
A mission statement is a brief description of an organisation’s fundamental purpose. It answers the<br />
question: “Why do we exist?” It articulates the organisation’s purpose for both those in the organisation<br />
and for the public. Ba-Phalaborwa’s mission addresses the objects of local government as stipulated in<br />
Section 152 of the Constitution: Democratic and accountable governance; sustainable services; social and<br />
economic development; safe and healthy environment; and community involvement. It also supports the<br />
key provisions of the Systems Act that are to: “provide for the core principles, mechanisms and processes<br />
that are necessary to enable municipalities to move progressively towards the social and economic<br />
upliftment of local communities and ensure universal access to essential services that is affordable to all.”<br />
The mission was confirmed with replacement of the fourth bullet to change from “To build the mining<br />
industry for economic growth”<br />
• To ensure financial viability, sound administration and accountable governance for investor<br />
attractiveness<br />
• To render all stakeholders with quality and affordable infrastructure and services for enhancing a<br />
safe and better life for all<br />
• To manage the environment for future sustainable economic growth<br />
• To promote and support mining and agricultural industries for economic growth<br />
• To position Ba-Phalaborwa as a tourism destination of choice<br />
191
C4.3 Values<br />
Values are qualities that are considered worthwhile, they represent the municipality’s highest priorities and<br />
deeply held driving forces. It represents how the municipality will value its customers, suppliers and<br />
internal community and guide the people in the municipality towards the achievement of the mission and<br />
ultimately the vision.<br />
The values were confirmed with one addition, “Effectiveness”:<br />
• Efficiency and effectiveness<br />
• Accountability<br />
• Innovation and creativity<br />
• Professionalism and hospitality<br />
• Transparency and fairness<br />
• Continuous learning<br />
• Conservation conscious<br />
C4.4 Strategy Map<br />
A strategy map is a picture of the strategy of the municipality. It depicts the objectives in support of the<br />
strategy in terms of different perspectives, namely the learning and growth, institutional, the financial and<br />
the customer perspectives. This step in strategy formulation acts as the integration of strategy and<br />
operational planning. The following are the most important benefits of developing a strategy map:<br />
• It offers a differentiated customer value proposition;<br />
• It focuses on the most important institutional processes that need to be addressed;<br />
• It combines a growth strategy as well as a productivity strategy to be sustainable;<br />
• It creates a foundation to be innovative;<br />
• It focuses on both the tangible as well as intangible aspects; and<br />
• It forces change- to do things differently.<br />
The strategy map leads to the development of scorecards at different levels that will be used as the<br />
measurement and management tool to ensure achievement of the vision, mission and objectives of the<br />
192
strategy. In this way the district municipality can ascertain whether it has made any progress towards<br />
attainment of its strategies and the objectives.<br />
The following is a diagrammatical presentation of the strategy map:<br />
STRATEGIC PERSPECTIVES<br />
Institutional Finances Community<br />
Processes<br />
Satisfaction<br />
Learning<br />
and Growth<br />
Figure 1: Strategy Map<br />
Best Tourist destination in Limpopo by 2020<br />
The Home of Marula and Wildlife Tourism<br />
Economic and<br />
Tourism<br />
Development and<br />
Growth<br />
Integrated<br />
sustainable<br />
infrastructure and<br />
services<br />
Environmental<br />
sustainability<br />
Enhance<br />
stakeholder<br />
involvement<br />
Developmental and<br />
performance<br />
orientated planning<br />
Attract, retain<br />
and build human<br />
capital<br />
Financial Viability<br />
Advance Good<br />
Corporate<br />
Governance<br />
The strategy map as shown above identifies the objectives that the Ba-Phalaborwa Local Municipality will<br />
aim to achieve. The strategy map clearly indicates the two different strategies - growth and excellence –<br />
through the colours used for the different strategic objectives (yellow indicates the Growth Strategy and<br />
green indicates the Excellence Strategy). A combination of these colours means that those objectives are<br />
focussing upon both growth and development.<br />
193
1.1. Strategic Objectives<br />
The strategic objectives were reviewed in line with the <strong>IDP</strong> implementation report, SWOT, constraints and<br />
enablers and also measured against the NSDP, PGDS, Green Paper on National Planning, Local Government<br />
Turn Around Strategy and Outcome 9, to ensure alignment and integration of priorities of all three spheres<br />
of government.<br />
Each of the strategic objectives in the strategy map are described in more detail below:<br />
Specific focus on the Learning and Growth Perspective as point of departure is provided.<br />
To attract, retain<br />
and build human<br />
capital.<br />
This is a basic need that requires the municipality to focus effort and resources on<br />
programmes and projects to attract talent, develop employees and ensure that<br />
the best human capital is retained. Included in the retention of the best human<br />
capital, it is important that due regard be given to the strength “Institutional<br />
knowledge” on how the municipality is ensuring that institutional knowledge be<br />
kept within the municipality and transferred to other employees. This objective<br />
will also assist the municipality to more effectively focus on the ‘bigger picture’<br />
and to achieve its ambitions.<br />
Focusing on attracting, developing and retaining the best human capital will enable the municipality to be<br />
better equipped and capacitated and thereby improve the institutional processes.<br />
Advance good<br />
corporate<br />
governance<br />
To enhance unqualified institutional management, institutional processes<br />
should be improved. Cooperative governance deals with policy<br />
implementation, audit, information and communication technology,<br />
intergovernmental relations which should be improved upon and<br />
strengthen. This will lead to open and transparent decision-making and<br />
sound governance practices throughout the municipality<br />
194
Developmental<br />
and performance<br />
orientated<br />
planning<br />
Integrated<br />
sustainable<br />
infrastructure and<br />
services<br />
Environmental<br />
sustainability<br />
All development should be aligned to the SDF to ensure that growth points<br />
are developed. All programmes and projects should be continuously<br />
monitored and evaluated to ensure that they contribute to the future<br />
growth and achievement of the “bigger picture” envisaged for the<br />
municipal area.<br />
Urgent attention needs to be paid to the provision of infrastructure and<br />
services (as per the constitutional requirements) to improve the<br />
accessibility of services to all communities within the municipal area. This<br />
will include, basic services, roads, sports fields, community halls, libraries<br />
and rending of services such as traffic and licensing, safety and security and<br />
the provision of cemeteries<br />
Environmental sustainability must receive due consideration. Ba-<br />
Phalaborwa has scarce water resources, therefore special attention should<br />
be given to the conservation and management of water resources. Due to<br />
the mining activities, water and air pollution should be monitored and<br />
assessed continuously and mitigating actions taken to ensure management<br />
of pollution. Together with this, a great challenge for Phalaborwa is the<br />
establishment of a new landfill site and the closure and rehabilitation of the<br />
current landfill site. The development of parks should also be addressed<br />
under this objective<br />
Corporate governance, sustainable developmental and performance oriented planning, integrated<br />
sustainable infrastructure and services and environmental sustainability will advance the utilisation and<br />
allocation of financial resources.<br />
Economic and<br />
tourism<br />
development and<br />
growth<br />
The best way to alleviate poverty, curb unemployment and address social<br />
problems is to ensure that there are enough jobs so that everybody in the<br />
community can earn a living. Ba-Phalaborwa has various projects and initiatives<br />
to alleviate poverty and stimulate economic growth. Ba-Phalaborwa’s location<br />
has established it as developmental and economic node in tourism, mining,<br />
195
agriculture and a service. The aim with this objective is to ensure that all<br />
community members can participate and share in the growing economy. The<br />
Ba-Phalaborwa Sustainable Development Initiative will go a long way in ensuring<br />
that the poorest communities are included and benefitting through economic<br />
growth within the municipal area.<br />
Financial Viability Weaknesses identified under this objective are financial viability, financial<br />
Enhance<br />
stakeholder<br />
involvement<br />
1.2. Strategic Alignment<br />
management, audit history, personnel budget, revenue collection and locked<br />
finances, maintenance budget, failure to maximise revenue collection.<br />
Strategies have been developed to ensure that challenges regarding financial<br />
viability are addressed<br />
One of the greatest challenges in municipalities is to involve the community in<br />
activities of the municipality and to let the voice of the community be heard.<br />
Two programmes where this can be achieved are through public participation<br />
and ward committees. It is therefore crucial for the municipality to ensure that<br />
ward committees are 100% functional and that the community’s voice be heard<br />
through public participation. Customer relations management needs to be<br />
improved i.e. communication to communities and the customer care desk.<br />
Complaints by the community need to be tracked and reported back to the<br />
community. Programmes to strengthen community empowerment are<br />
HIV/Aids, Youth, Gender, Disability, Arts and Culture, Sports and Recreation,<br />
Libraries and Indigent Support<br />
Ten strategic priority areas which are aligned to the Vision 2014 have been identified by national<br />
government within the MTSF to create a platform for the future development of South Africa as a whole.<br />
Based on these priority areas, the COGTA has identified their own priority areas that will guide national,<br />
local and provincial governance. COGTA has also developed the Local Government Turnaround Strategy<br />
(LGTAS) and identified five Strategic Objectives in addressing the cause and effect of challenges within local<br />
196
government. The Limpopo Province has identified strategic objectives aligned to these priorities. Ba-<br />
Phalaborwa Local Municipality has identified their strategic objectives in response to the strategies<br />
identified by the Limpopo Province. Municipal programmes are translated to these objectives and<br />
subsequently to national and provincial strategic priorities and objectives.<br />
The matrix below indicates the relation between the strategic objectives of Ba-Phalaborwa Local<br />
Municipality and the national and provincial priority areas:<br />
197
Strategic Alignment:<br />
PERSPECTIVE MTSF COGTA MTAS LEGDP (PGDS) Outcome 9 BA-<strong>PHALABORWA</strong><br />
Community<br />
Satisfaction<br />
Financial<br />
Institutional<br />
Improve the health<br />
profile of society<br />
Building of<br />
cohesive, caring<br />
and sustainable<br />
communities<br />
Speed up<br />
economic growth<br />
and transform the<br />
economy to create<br />
decent work and<br />
sustainable<br />
livelihoods.<br />
Fostering<br />
Development<br />
Partnerships,<br />
Social Cohesion<br />
and community<br />
mobilisation<br />
Strengthen<br />
partnerships<br />
between local<br />
government,<br />
communities and<br />
civil society<br />
Access to quality<br />
education<br />
Improved health<br />
care<br />
Ensuring more<br />
inclusive economic<br />
growth, decent<br />
work and<br />
sustainable<br />
livelihoods<br />
Deepened democracy<br />
through a refined<br />
ward committee<br />
model<br />
Implement the<br />
community work<br />
programme and<br />
cooperatives<br />
supported<br />
Improved municipal<br />
financial capacity<br />
Implement a<br />
differentiated<br />
approach to municipal<br />
financing, planning<br />
and support<br />
Improved access to<br />
basic services<br />
Enhance<br />
stakeholder<br />
involvement<br />
Economic and<br />
tourism<br />
development and<br />
growth<br />
Financial viability<br />
Developmental and<br />
performance<br />
orientated planning
PERSPECTIVE MTSF COGTA MTAS LEGDP (PGDS) Outcome 9 BA-<strong>PHALABORWA</strong><br />
Institutional<br />
Programmes to<br />
build economic<br />
and social<br />
infrastructure<br />
Comprehensive<br />
rural development<br />
strategy linked to<br />
land and agrarian<br />
reform and food<br />
security<br />
Sustainable<br />
resource<br />
management and<br />
use<br />
Building of a<br />
developmental<br />
state including<br />
improving of public<br />
services and<br />
strengthening<br />
democratic<br />
Accelerating<br />
service delivery<br />
and supporting the<br />
vulnerable<br />
Building the<br />
Developmental<br />
State in Provincial<br />
and Local<br />
Government that is<br />
efficient, effective<br />
and responsive<br />
Ensure that<br />
municipalities<br />
meet the basic<br />
needs of<br />
communities<br />
Build clean,<br />
responsive and<br />
accountable local<br />
government<br />
Provision of<br />
economic and<br />
social<br />
infrastructure<br />
Cohesive and<br />
sustained<br />
communities<br />
Rural<br />
development, food<br />
security and land<br />
reform<br />
Sustainable<br />
resource<br />
management and<br />
use<br />
A developmental<br />
state including<br />
improvement of<br />
public services<br />
Improved access to<br />
basic services<br />
Actions supportive of<br />
human settlement<br />
outcomes<br />
Single Window of<br />
coordination<br />
Integrated<br />
sustainable<br />
infrastructure and<br />
services<br />
Developmental and<br />
performance<br />
orientated planning<br />
Environmental<br />
sustainability<br />
Good corporate<br />
governance<br />
199
PERSPECTIVE MTSF COGTA MTAS LEGDP (PGDS) Outcome 9 BA-<strong>PHALABORWA</strong><br />
Institutional<br />
institutions<br />
Intensify the fight<br />
against crime and<br />
corruption<br />
Pursuing African<br />
advancement and<br />
enhanced<br />
international<br />
cooperation<br />
Strengthen<br />
Accountability and<br />
Clean Government<br />
Improving the<br />
Developmental<br />
Capability of the<br />
Institution of<br />
Traditional<br />
Leadership.<br />
Improve<br />
functionality,<br />
performance and<br />
professionalism in<br />
municipalities<br />
Improve national<br />
and provincial<br />
policy, support and<br />
oversight to local<br />
government<br />
Fighting crime and<br />
corruption<br />
Creation of a<br />
better Africa and a<br />
better world<br />
Good Corporate<br />
Governance<br />
200
PERSPECTIVE MTSF COGTA MTAS LEGDP (PGDS) Outcome 9 BA-<strong>PHALABORWA</strong><br />
Learning and<br />
Growth<br />
Strengthening of<br />
skills and human<br />
resource base<br />
Table C. 6: Strategic Alignment Matrix<br />
Improved<br />
administrative<br />
capacity<br />
Attract, retain and<br />
build human<br />
capital<br />
201
Local Government: Municipal Performance Regulations R805(2006) prescribes five Key Performance Areas<br />
that relates to the Five Year Local Government Strategic Agenda. The aim of these Performance Areas is to<br />
facilitate ease of all Government planning and performance management . The table below indicates how<br />
the Ba-Phalaborwa Local Municipality’s Strategic Objectives was aligned to the five Key Performance Areas.<br />
Strategic Agenda KPA Strategic Objectives<br />
Municipal Transformation and<br />
Organisational Development<br />
Attract, retain and build human capital<br />
Developmental and performance orientated planning<br />
Basic Service Delivery Integrated sustainable infrastructure and services<br />
Environmental sustainability<br />
Local Economic Development Economic and tourism development and growth<br />
Municipal Financial Viability and<br />
Management<br />
Financial viability<br />
Good Governance and Public Participation Advance good corporate governance<br />
Enhance stakeholder involvement<br />
Table C. 7: STRATEGIC OBJECTIVES AND STRATEGIC AGENDA KPA’S<br />
The following strategies were developed per strategic goal/outcome:
Strategic<br />
Goal<br />
Financial Viability<br />
Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />
Revenue Management<br />
Integrated Financial<br />
management solution<br />
Asset management<br />
Review and implement revenue<br />
enhancement strategy<br />
Develop and implement service<br />
demand management strategy<br />
Implement financial management<br />
system<br />
Develop and implement asset<br />
management plan<br />
Unbundle infrastructure asset<br />
(water, sanitation and electricity)<br />
Five year financial plan Develop and implement a five year<br />
financial plan<br />
Financial risk management<br />
and internal controls<br />
Develop and implement financial risk<br />
management strategy<br />
Develop and implement internal<br />
control procedures<br />
Unqualified audit opinion Develop and implement an audit<br />
action plan to address issues raised<br />
in the audit report<br />
MFMA implementation Develop and implement financial<br />
delegations<br />
Supply chain management<br />
Review and implement revenue<br />
enhancement strategy<br />
Review and implement service demand<br />
management strategy<br />
Review and implement revenue<br />
enhancement strategy<br />
Review and implement service demand<br />
management strategy<br />
Maximise integrated system utilisation Improve system utilisation<br />
Review and implement asset<br />
management plan<br />
Review and implement a five year<br />
financial plan<br />
Review and implement financial risk<br />
management strategy<br />
Review and implement internal control<br />
procedures<br />
Develop and implement an audit action<br />
plan to address issues raised in the<br />
audit report<br />
Review and implement financial<br />
delegations<br />
Integrate asset management plan with<br />
GIS<br />
Review and implement a five year<br />
financial plan<br />
Review and implement financial risk<br />
management strategy<br />
Review and implement internal control<br />
procedures<br />
Develop and implement an audit action<br />
plan to address issues raised in the audit<br />
report<br />
Review and implement financial<br />
delegations<br />
Improve MFMA compliance Full MFMA compliance Full MFMA compliance<br />
Inventory management plan<br />
Develop and implement fleet<br />
management plan<br />
Financial accounting Develop and implement cash flow<br />
management plan<br />
Review and implement fleet<br />
management plan<br />
Review and implement cash flow<br />
management plan<br />
Review and implement fleet<br />
management plan<br />
Review and implement cash flow<br />
management plan<br />
Financial accounting Use financial ratios to management Use financial ratios to management Use financial ratios to management
Strategic<br />
Goal<br />
Good Corporate Governance<br />
Go<br />
od<br />
Cor<br />
por<br />
Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />
Electronic records<br />
management<br />
Complaint management<br />
system<br />
financial performance financial performance financial performance<br />
Training of employees on Munadmin<br />
Development and implementation of<br />
the complaint management system<br />
strategy.<br />
Internal Communication Development and implementation of<br />
the internal communication strategy.<br />
Marketing & branding Development and implementation of<br />
marketing and branding plan<br />
Implementation of electronic records<br />
keeping<br />
Review and implementation of the<br />
complaint management system<br />
strategy.<br />
Review and implementation of the<br />
internal communication strategy<br />
Review and implementation of<br />
marketing and branding plan<br />
Implementation of electronic records<br />
keeping<br />
Review and implementation of the<br />
complaint management system strategy.<br />
Review and implementation of the<br />
internal communication strategy<br />
Internal Auditing Governance audit Governance audit Governance audit<br />
Strategic Planning<br />
Human resource<br />
management<br />
Review and implementation of marketing<br />
and branding plan<br />
Auditing strategic risks Auditing strategic risks Auditing strategic risks<br />
<strong>IDP</strong> review process <strong>IDP</strong> review process <strong>IDP</strong> review process<br />
Develop, review and adopt<br />
outstanding sector plans<br />
Integration of all sector plans Integrated development planning &<br />
management<br />
PMS process PMS process PMS process<br />
PMS policy review and<br />
implementation.<br />
Development & implementation<br />
public participation strategy.<br />
PMS policy review and implementation. PMS policy review and implementation.<br />
Review & implementation public<br />
participation strategy.<br />
Review & implementation public<br />
participation strategy.<br />
Auditing and review of the structure. Review and implement the structure Auditing, review and implement of the<br />
structure.<br />
204
Strategic<br />
Goal<br />
Economic and Tourism<br />
Development and<br />
Growth<br />
Econo<br />
mic<br />
and<br />
Touris<br />
Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />
Review and implementation of<br />
policies and procedures<br />
Implement, assess and review the<br />
improvement in the rating tool<br />
(employee satisfaction survey)<br />
Align & implement WSP to<br />
competency gaps<br />
Contract management Update and manage the contract<br />
register<br />
Training on code of conduct for<br />
employees and terms and conditions<br />
of employment<br />
Risk Management Conduct and implement strategic<br />
risk assessment<br />
Local Economic<br />
Development<br />
Review and implementation of policies<br />
and procedures<br />
Implement, assess and review the<br />
improvement in the rating tool<br />
(employee satisfaction survey)<br />
Competency gap re-assessment and realignment<br />
and implementation<br />
Update and manage the contract<br />
register<br />
Training on code of conduct for<br />
employees and terms and conditions of<br />
employment<br />
Conduct and implement strategic risk<br />
assessment<br />
Review and implementation of policies<br />
and procedures<br />
Improve the level/quality of service to<br />
the communities<br />
Raising productivity<br />
Update and manage the contract register<br />
Training on code of conduct for<br />
employees and terms and conditions of<br />
employment<br />
Conduct and implement strategic risk<br />
assessment<br />
Review the LED Strategy Implementation of the LED Strategy Implementation of the LED Strategy<br />
Revival of the LED Forum Monitor and report on the functionality<br />
of the LED Forum<br />
Develop an Investment Attraction<br />
Plan<br />
Implementation of the Marula<br />
strategy<br />
Tourism Development Review the tourism development<br />
strategy<br />
Implementation of the Investment<br />
Attraction Plan<br />
Monitor and report on the functionality<br />
of the LED Forum<br />
Implementation of the Investment<br />
Attraction Plan<br />
Implementation of the Marula strategy Review of the Marula strategy<br />
Implementation of the tourism<br />
development strategy<br />
Implementation of the tourism<br />
development strategy<br />
205
Strategic<br />
Goal<br />
Integrated sustainable infrastructure and Services<br />
Integr<br />
ated<br />
sustai<br />
nable<br />
Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />
Demand Management<br />
- Water<br />
- Roads<br />
- Electricity<br />
- Cemetery<br />
- Infrastructure<br />
- Housing<br />
Develop the tourism marketing plan Implementation of the tourism<br />
marketing plan<br />
Develop services delivery demand<br />
management plan<br />
Water Service Authority Signing of SLA- MOU with MDM<br />
Application to DWAF<br />
Infrastructure Master Plan Development of infrastructure<br />
master plan<br />
- Electricity<br />
- Roads and storm -<br />
water<br />
- IT<br />
- Parks<br />
- Cemeteries<br />
Review and adopt draft<br />
Infrastructure master Plan<br />
Review the tourism marketing plan<br />
Implementation of plan Review Demand Service Management<br />
Plan<br />
Develop water services master plan Review and expand services<br />
Implementation and Improved water<br />
services provision<br />
Implementation Review of plan<br />
Waste Removal Services Household collection service to all Increased collection frequency Increased waste minimization<br />
206
Strategic<br />
Goal<br />
Developmental and<br />
Performance Orientated<br />
Planning<br />
Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />
Vandalism of<br />
Infrastructure<br />
(Illegal connection)<br />
Awareness<br />
Monitoring<br />
Enforcement of By-laws<br />
Quality Assurance Development of SLA with standards<br />
and specifications<br />
IGR-<br />
Sector departments<br />
Engage and Participate in the sector<br />
Dept (one on one) on <strong>IDP</strong> and sector<br />
departments plans. Include sector<br />
Dept in the <strong>IDP</strong> process plan<br />
EPWP Policy Development and implementation of<br />
a EPWP policy<br />
Housing provision Identification of housing<br />
beneficiaries and application for the<br />
housing accreditation<br />
Tribal Authorities - Enforcement of bylaws?<br />
-Include the tribal authority’s plans<br />
in <strong>IDP</strong><br />
Continuous enforcement and<br />
monitoring<br />
Enforcement and monitoring<br />
(Standards and specifications)<br />
Continuous enforcement and monitoring<br />
Continuous enforcement and monitoring<br />
(Standards and specifications)<br />
Continuous engagements Continuous engagements<br />
Review housing strategy Implementation of the housing strategy<br />
Land Use Management Verify land uses and ownership Managing land use and ownership Managing land use and ownership<br />
SDF<br />
Infill development in municipal<br />
vacant land<br />
Implementation of the SDF Reviewal of the SDF<br />
207
Strategic<br />
Goal<br />
Environmental<br />
Sustainability<br />
Environmental sustainability<br />
Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />
Demarcation of sites Demarcation of sites Demarcation of sites<br />
Formalisation of informal<br />
settlements<br />
GIS Capturing of data and obtaining of<br />
software<br />
Waste Management<br />
Environmental<br />
Management<br />
Environmental<br />
Management<br />
Formalisation of informal settlements<br />
Capturing and linkage with other<br />
departments<br />
Landfill/recycling site Establish drop off centres<br />
Continuous update<br />
Rehabilitation of old sites Hand over to beneficiaries<br />
Establishment of a land fill site<br />
Obtain Environmental Management<br />
Plan and Framework<br />
Monitoring and reporting pollution Adapt the Environmental Management<br />
Plan and Framework<br />
Expansion of Phalaborwa<br />
environmental committee<br />
Green economy programme<br />
Greening and beautification (global<br />
warming)<br />
Alien plant and pest control<br />
Strategic partnerships<br />
Parks, gardens and open space<br />
maintenance<br />
Review State of Environment report Establish Environmental Management<br />
unit<br />
Sustainable use, assistance and<br />
preservation of game farms (land claims)<br />
Implement EMP recommendations Guidance on alternative use of land<br />
claimed<br />
208
Strategic<br />
Goal<br />
Enhanced stakeholder<br />
involvement<br />
Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />
Municipal Development<br />
Charter<br />
Advisory Board and<br />
Development Clusters<br />
A Comprehensive<br />
Stakeholder Involvement<br />
Strategy<br />
Community involvement and<br />
education<br />
Development, adoption and<br />
execution of implementation plan<br />
Establishment of key development<br />
clusters under the auspices of the<br />
Advisory Board<br />
Development of a Comprehensive<br />
Stakeholder Involvement Strategy<br />
and implementation plan<br />
Table C. 8: Short, Medium, Long Term Strategies per strategic goal<br />
Execution and review of<br />
implementation plan<br />
Consolidation and reinforcement of the<br />
Advisory Board and development<br />
clusters<br />
Review of the Development Charter,<br />
implementation plan<br />
Review of the Advisory Board and<br />
development clusters<br />
Implementation of the strategy Review and implementation of the<br />
Strategy<br />
209
1.3. Strategic Scorecard<br />
In the development of the strategic scorecard, the next step is to establish the end result, what the<br />
municipality wants to achieve with the objective. It is important to always have the end in mind when<br />
setting measurements and targets for objectives. After the results were established, measures and targets<br />
were set and projects identified.<br />
• Results are the ultimate impact that we would like to see with regards to the objective<br />
• Key Performance indicators are measurable results of the objectives, projects and programmes.<br />
• Strategies are unique and sustainable ways though which the municipality creates value<br />
• Projects are the specific initiatives undertaken by the municipality to support the objective.<br />
The purpose of the Strategic Scorecard is for Council and the Municipal Manager to focus on the real<br />
strategic measurements and projects that must be attained and implemented during the course of the next<br />
financial year. Strategic Key Performance Indicators are the measurements identified that will enable<br />
Council to ascertain whether the Municipality is moving towards the attainment of the strategic objectives<br />
as contained in the strategy map. Strategic projects are identified as those critical projects that the<br />
Municipality must implement to address the constraints as indicated in the table reflecting constraints and<br />
priority focus areas. Strategic projects are also projects that were identified as a “quick win” option to pave<br />
the way for implementation of other initiatives or projects.<br />
The strategic scorecard is indicated on the following page. Strategies as developed will be cascaded to<br />
operational plans and projects to facilitate implementation of strategic direction of the municipality.<br />
210
Objective Outcome Strategic Key<br />
Performance<br />
Indicator<br />
Enhance<br />
stakeholder<br />
involvemen<br />
t<br />
Economic<br />
and<br />
tourism<br />
developme<br />
Participatory<br />
communities<br />
An inclusive<br />
growing<br />
economy<br />
% issues<br />
raised at<br />
ward<br />
committees<br />
processed<br />
through<br />
Portfolio<br />
Committees<br />
%<br />
development<br />
clusters<br />
established (<br />
8 clusters)<br />
% queries<br />
from<br />
customers<br />
tracked<br />
three weeks<br />
after receipt<br />
%<br />
procurement<br />
from local<br />
enterprises<br />
Five Year<br />
Strategic<br />
Intent<br />
(2006-<br />
<strong>2011</strong>)<br />
All ward<br />
committee<br />
s are<br />
functioning<br />
effectively<br />
As per Ba-<br />
Phalaborw<br />
a<br />
objectives<br />
As per Ba-<br />
Phalaborw<br />
a<br />
objectives<br />
As per Ba-<br />
Phalaborw<br />
a<br />
objectives<br />
Statu<br />
s<br />
2010<br />
/<br />
<strong>2011</strong><br />
Target<br />
<strong>2011</strong>/<br />
2012<br />
Target<br />
Sept<br />
2010<br />
Target<br />
Dec<br />
2010<br />
Target<br />
Mar<br />
<strong>2011</strong><br />
Target<br />
June<br />
<strong>2011</strong><br />
Target<br />
2012<br />
Target<br />
2013<br />
Target<br />
2014<br />
Target<br />
2015<br />
100% 100% 100% 100% 100% 100% 100% 100% 100%<br />
211<br />
Strategic<br />
Projects /<br />
Initiatives<br />
YR 1<br />
100% 25% 50% 75% 100% 100% 100% 100% 100% Ba-<br />
Phalabor<br />
wa<br />
Developm<br />
ent<br />
Charter<br />
100% 100% 100% 100% 100% 100% 100% 100% 100% Complain<br />
ts<br />
Managem<br />
ent<br />
System<br />
40% 40% 40% 40% 40% 40% 40% 40% 40% Review of<br />
LED<br />
Strategy<br />
Budge<br />
t<br />
<strong>2011</strong>/<br />
2012
Objective Outcome Strategic Key<br />
Performance<br />
Indicator<br />
nt and<br />
growth<br />
Economic<br />
and<br />
tourism<br />
developme<br />
nt and<br />
growth<br />
Financial<br />
viability<br />
An inclusive<br />
growing<br />
economy<br />
Financially<br />
sustained<br />
institution<br />
%<br />
infrastructur<br />
e projects<br />
that are<br />
EPWP<br />
# jobs<br />
created<br />
through<br />
municipal<br />
initiatives<br />
% revenue<br />
received /<br />
billed<br />
revenue<br />
% debt<br />
coverage<br />
% cost<br />
coverage<br />
% service<br />
debtors<br />
Five Year<br />
Strategic<br />
Intent<br />
(2006-<br />
<strong>2011</strong>)<br />
As per Ba-<br />
Phalaborw<br />
a<br />
objectives<br />
Halve<br />
unemploy<br />
ment b<br />
2014<br />
Implement<br />
ation of<br />
revenue<br />
enhanceme<br />
nt plan<br />
Financial<br />
sustainabili<br />
ty<br />
Financial<br />
sustainabili<br />
ty<br />
Financial<br />
sustainabili<br />
Statu<br />
s<br />
2010<br />
/<br />
<strong>2011</strong><br />
Target<br />
<strong>2011</strong>/<br />
2012<br />
Target<br />
Sept<br />
2010<br />
Target<br />
Dec<br />
2010<br />
Target<br />
Mar<br />
<strong>2011</strong><br />
Target<br />
June<br />
<strong>2011</strong><br />
308 250 63 126 189 250<br />
Target<br />
2012<br />
Target<br />
2013<br />
Target<br />
2014<br />
Target<br />
2015<br />
212<br />
Strategic<br />
Projects /<br />
Initiatives<br />
YR 1<br />
Review of<br />
Tourism<br />
Developm<br />
ent<br />
Strategy<br />
95% 75% 80% 85% 95% 95% 95% 95% 95% Review of<br />
Revenue<br />
Enhance<br />
ment<br />
Strategy<br />
133% 133% 133% 133% 133% 130% 125% 120% 115% Five Year<br />
Financial<br />
Plan<br />
100% 100% 100% 100% 100% 100% 100% 100% 100%<br />
153% 153% 153% 153% 153% 150% 145% 140% 135%<br />
Budge<br />
t<br />
<strong>2011</strong>/<br />
2012
Objective Outcome Strategic Key<br />
Performance<br />
Indicator<br />
Integrated<br />
sustainable<br />
infrastructu<br />
re and<br />
services<br />
All<br />
households<br />
have access<br />
to basic and<br />
other<br />
services<br />
GRAP<br />
compliant<br />
AFS<br />
% internal<br />
audit<br />
recommenda<br />
tions on SCM<br />
implemented<br />
%<br />
households<br />
connected to<br />
national grid<br />
- Phalaborwa<br />
Town<br />
%<br />
households<br />
to have<br />
access to at<br />
least once-aweek<br />
refuse<br />
removal<br />
services<br />
Five Year<br />
Strategic<br />
Intent<br />
(2006-<br />
<strong>2011</strong>)<br />
ty<br />
Unqualified<br />
audit by<br />
<strong>2011</strong><br />
As per Ba-<br />
Phalaborw<br />
a<br />
objectives<br />
Eradicate<br />
basic<br />
service<br />
backlogs by<br />
2014<br />
Eradicate<br />
basic<br />
service<br />
backlogs by<br />
2014<br />
Statu<br />
s<br />
2010<br />
/<br />
<strong>2011</strong><br />
67.0<br />
0%<br />
Target<br />
<strong>2011</strong>/<br />
2012<br />
Target<br />
Sept<br />
2010<br />
Target<br />
Dec<br />
2010<br />
Target<br />
Mar<br />
<strong>2011</strong><br />
Target<br />
June<br />
<strong>2011</strong><br />
Target<br />
2012<br />
Target<br />
2013<br />
Target<br />
2014<br />
Target<br />
2015<br />
100% 100% 100% 100% 100% 100% 100% 100% 100%<br />
100% 100% 100% 100% 100% 100% 100% 100% 100%<br />
213<br />
Strategic<br />
Projects /<br />
Initiatives<br />
YR 1<br />
100% 100% 100% 100% 100% 100% 100% 100% 100% Water<br />
Services<br />
Authority<br />
75% 75% 84% 91.5% 100% 100% Service<br />
Delivery<br />
Demand<br />
Managem<br />
ent Plan<br />
Budge<br />
t<br />
<strong>2011</strong>/<br />
2012
Objective Outcome Strategic Key<br />
Performance<br />
Indicator<br />
Environme<br />
ntal<br />
sustainabili<br />
ty<br />
Environme<br />
ntal<br />
sustainabili<br />
ty<br />
Clean and<br />
healthy<br />
communities<br />
Clean and<br />
healthy<br />
communities<br />
%<br />
households<br />
registered in<br />
Indigent<br />
Register with<br />
access to<br />
free basic<br />
water<br />
%<br />
households<br />
registered on<br />
Indigent<br />
Register with<br />
access to<br />
free basic<br />
electricity<br />
Rehabilitatio<br />
n of landfill<br />
site<br />
New landfill<br />
site<br />
established<br />
Five Year<br />
Strategic<br />
Intent<br />
(2006-<br />
<strong>2011</strong>)<br />
Ensure that<br />
all indigent<br />
households<br />
are<br />
supported<br />
Ensure that<br />
all indigent<br />
households<br />
are<br />
supported<br />
As per Ba-<br />
Phalaborw<br />
a<br />
objectives<br />
As per Ba-<br />
Phalaborw<br />
a<br />
objectives<br />
Statu<br />
s<br />
2010<br />
/<br />
<strong>2011</strong><br />
Target<br />
<strong>2011</strong>/<br />
2012<br />
Target<br />
Sept<br />
2010<br />
Target<br />
Dec<br />
2010<br />
Target<br />
Mar<br />
<strong>2011</strong><br />
Target<br />
June<br />
<strong>2011</strong><br />
Target<br />
2012<br />
Target<br />
2013<br />
Target<br />
2014<br />
Target<br />
2015<br />
100% 100% 100% 100% 100% 100% 100% 100% 100%<br />
100% 100% 100% 100% 100% 100% 100% 100% 100%<br />
100% 100% 100% 100% 100% 100%<br />
100% 100% 100% 100% 100% 100%<br />
214<br />
Strategic<br />
Projects /<br />
Initiatives<br />
YR 1<br />
Budge<br />
t<br />
<strong>2011</strong>/<br />
2012
Objective Outcome Strategic Key<br />
Performance<br />
Indicator<br />
Developme<br />
ntal and<br />
performanc<br />
e<br />
orientated<br />
planning<br />
Advance<br />
good<br />
corporate<br />
governance<br />
Attract,<br />
retain and<br />
build<br />
human<br />
capital<br />
Liveable<br />
neighbourho<br />
ods<br />
Corporate<br />
Governance<br />
Skilled and<br />
capacitated<br />
workforce<br />
Prevention<br />
of<br />
mushroomin<br />
g of informal<br />
settlements<br />
%<br />
compliance<br />
to<br />
<strong>IDP</strong>/PMS/Bu<br />
dget Process<br />
Plan<br />
Unqualified<br />
audit Report<br />
% of<br />
employees<br />
from<br />
previously<br />
disadvantage<br />
d groups<br />
Five Year<br />
Strategic<br />
Intent<br />
(2006-<br />
<strong>2011</strong>)<br />
As per Ba-<br />
Phalaborw<br />
a<br />
objectives<br />
As per Ba-<br />
Phalaborw<br />
a<br />
objectives<br />
Unqualified<br />
audit by<br />
<strong>2011</strong><br />
Annually<br />
achieve the<br />
targets set<br />
out in the<br />
municipalit<br />
y's EE plan<br />
Statu<br />
s<br />
2010<br />
/<br />
<strong>2011</strong><br />
Target<br />
<strong>2011</strong>/<br />
2012<br />
Target<br />
Sept<br />
2010<br />
Target<br />
Dec<br />
2010<br />
Target<br />
Mar<br />
<strong>2011</strong><br />
Target<br />
June<br />
<strong>2011</strong><br />
Target<br />
2012<br />
Target<br />
2013<br />
Target<br />
2014<br />
Target<br />
2015<br />
215<br />
Strategic<br />
Projects /<br />
Initiatives<br />
YR 1<br />
100% 100% 100% 100% 100% 100% 100% 100% 100% Housing<br />
Accredita<br />
tion<br />
100% 100% 100% 100% 100% 100% 100% 100% 100%<br />
100% n/a 100% n/a n/a 100% 100% 100% 100%<br />
Budge<br />
t<br />
<strong>2011</strong>/<br />
2012
Objective Outcome Strategic Key<br />
Performance<br />
Indicator<br />
Attract,<br />
retain and<br />
build<br />
human<br />
capital<br />
appointed in<br />
the three<br />
highest<br />
levels of<br />
management<br />
as per the<br />
approved EE<br />
plan (NKPI)<br />
% personnel<br />
budget<br />
allocated to<br />
skills<br />
development<br />
spent<br />
Five Year<br />
Strategic<br />
Intent<br />
(2006-<br />
<strong>2011</strong>)<br />
Achieve<br />
national<br />
norms and<br />
standards<br />
by 2014 in<br />
terms of<br />
the %<br />
budget to<br />
be spent on<br />
implementi<br />
ng the<br />
workplace<br />
skills plan<br />
Statu<br />
s<br />
2010<br />
/<br />
<strong>2011</strong><br />
Target<br />
<strong>2011</strong>/<br />
2012<br />
Target<br />
Sept<br />
2010<br />
Target<br />
Dec<br />
2010<br />
Target<br />
Mar<br />
<strong>2011</strong><br />
Target<br />
June<br />
<strong>2011</strong><br />
Target<br />
2012<br />
Target<br />
2013<br />
Target<br />
2014<br />
Target<br />
2015<br />
216<br />
Strategic<br />
Projects /<br />
Initiatives<br />
YR 1<br />
Budge<br />
t<br />
<strong>2011</strong>/<br />
2012
C5. Ba-Phalaborwa Turnaround Strategy<br />
The Department of Cooperative Governance and Traditional Affairs (CoGTA) compiled a State of the<br />
Local Government Report on Service Delivery. The report highlighted governance and service delivery<br />
challenges within municipality. It further identified five strategic objectives to guide municipalities in<br />
the development of their Turnaround Strategies, which are 14 :<br />
1. Ensure that municipalities meet the basic service needs of communities<br />
2. Build clean, effective, efficient, responsive and accountable local government<br />
3. Improve performance and professionalism in municipalities<br />
4. Improve national and provincial policy, oversight and support<br />
5. Strengthen partnerships between local government, communities and civil society<br />
The municipal Turnaround Strategy should be incorporated within the <strong>IDP</strong> process and adopted by<br />
Council with the <strong>IDP</strong>.<br />
Ba-Phalaborwa Municipality has developed its Turnaround Strategy which comprises the following table:<br />
14 Local Government Turnaround Strategy, November 2009<br />
217
C6: Ba-Phalaborwa Local Municipality Turnaround Strategy<br />
No.<br />
Priority Turn Around<br />
Focal Area<br />
1. Basic Service Delivery<br />
1.1 Access to water<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
1. Infrequent supply of<br />
water at: Gravelotte<br />
& all villages (11)<br />
2. Aged infrastructure<br />
(asbestos pipes) and<br />
no refurbishment<br />
plan for PHB,<br />
Lulekani &<br />
Namakgale<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
1. Functional<br />
Boreholes at<br />
Selwane,<br />
Mashishimale,<br />
Gravelotte<br />
2. Section of<br />
pipeline<br />
replaced on<br />
every financial<br />
Municipal<br />
Action<br />
1. Monitor the<br />
functionalit<br />
y of the<br />
boreholes<br />
2. PHB<br />
refurbished<br />
reticulation<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
1. MDM (WSA)to<br />
equip the<br />
boreholes<br />
2. MDM (WSA)<br />
must provide<br />
budget for<br />
rehabilitation<br />
45<br />
Human<br />
Resource<br />
allocated<br />
(-24 DWAE)<br />
218<br />
Budget<br />
Allocated Projected<br />
1. MDM<br />
2. MDM<br />
&<br />
BPM
No.<br />
Priority Turn Around<br />
Focal Area<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
1.2 Access to sanitation Existing sewer<br />
reticulation aged<br />
(asbestos) in PHB,<br />
Namakgale and Lulekani<br />
1.3 Access to electricity<br />
1. Electrification<br />
backlog of 3826<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
year<br />
Planning of N’kgale<br />
sewer treatment<br />
works upgrade &<br />
PHB pump station<br />
1. Electrify Kanana,<br />
Namakgale RDP,<br />
Ntswelemotse,<br />
Gardenview &<br />
Sebera<br />
Municipal<br />
Action<br />
line<br />
Replacement of<br />
sewer<br />
reticulation in<br />
PHB<br />
1. Apply for<br />
additional<br />
funds to<br />
implement<br />
electricity<br />
projects<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
of water<br />
infrastructure<br />
MDM (WSA) to<br />
fast-track the<br />
planning &<br />
upgrade of the<br />
N’kgale sewer<br />
treatment works &<br />
PHB pump station<br />
1. Dept of Energy<br />
must grant<br />
sufficient<br />
allocations to<br />
meet the<br />
electricity MDG<br />
by 2014<br />
Human<br />
Resource<br />
allocated<br />
35 (-30<br />
DWAE)<br />
40 (-3 from<br />
Eskom, 2<br />
from INEG)<br />
219<br />
Budget<br />
Allocated Projected<br />
MDM<br />
<strong>2011</strong>/<br />
12<br />
MTEF<br />
1. R4 m<br />
(Esko<br />
m &<br />
BPM/<br />
INEG)
No.<br />
Priority Turn Around<br />
Focal Area<br />
1.4 Refuse removal and solid<br />
waste disposal<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
2. PHB aged<br />
infrastructure<br />
Removal of solid waste<br />
in PHB, N’kgale,<br />
Lukekani, Gravelotte,<br />
Mashishimale R1, 2 &<br />
3, Mandela villages<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
2. Complete 2<br />
refurbishment/<br />
upgrading<br />
projects<br />
Extension of waste<br />
removal services to<br />
Matiko-Xikaya &<br />
Lulekani A<br />
Municipal<br />
Action<br />
2. Improve<br />
collection of<br />
electricity<br />
service<br />
charges<br />
Hire more<br />
labourers for<br />
the extension of<br />
services<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
Human<br />
Resource<br />
allocated<br />
220<br />
Budget<br />
Allocated Projected<br />
2. BPM<br />
<strong>2011</strong>/<br />
12<br />
MTEF<br />
None 60 BPM<br />
<strong>2011</strong>/ 12<br />
MTEF
No.<br />
Priority Turn Around<br />
Focal Area<br />
1.5 Access to municipal roads<br />
1.6 Formalisation of informal<br />
settlements<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
1. No maintenance<br />
budget & plan for<br />
provincial and<br />
district roads<br />
2. Insufficient<br />
allocation to<br />
eradicate the<br />
backlog by 2014<br />
informal settlements in<br />
Matikoxikaya, Benfarm,<br />
Namakgale, Lulekani &<br />
Makhushane<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
1. Complete the<br />
Integrated Roads<br />
Master Plan<br />
2. Implement all<br />
MIG-funded<br />
projects & finish<br />
in time<br />
Application for the<br />
formalization of all<br />
informal settlements<br />
Municipal<br />
Action<br />
1. Integrated<br />
planning &<br />
maintenanc<br />
e with<br />
sector<br />
department<br />
s<br />
2. Fast-track<br />
the<br />
implementa<br />
tion of the<br />
MIG<br />
projects<br />
Prevent the<br />
mushrooming of<br />
informal<br />
settlements<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
1. Province &<br />
District roads<br />
maintenance<br />
budgets be<br />
transferred to<br />
LMs<br />
2. COGTA to<br />
increase MIG<br />
allocation for<br />
infrastructure<br />
development<br />
DLGH to refrain<br />
from requests for<br />
demarcation of<br />
sites from<br />
traditional<br />
authorities without<br />
23<br />
Human<br />
Resource<br />
allocated<br />
221<br />
Budget<br />
Allocated Projected<br />
1. DoRT<br />
&<br />
MDM<br />
2. R17<br />
m<br />
4 DLGH
No.<br />
Priority Turn Around<br />
Focal Area<br />
2. Public Participation<br />
2.1 Functionality of Ward<br />
Committees<br />
2.2 Broader public<br />
participation policies and<br />
plans<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
All ward committees<br />
functional<br />
Public participation<br />
done in line with <strong>IDP</strong>/<br />
Budget process plan<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
All ward committees<br />
functional<br />
Finalise the<br />
Stakeholder Forum<br />
and sign social<br />
compact with all<br />
stakeholders.<br />
Municipal<br />
Action<br />
Process issues<br />
raised at ward<br />
committee<br />
meetings<br />
through<br />
Portfolio<br />
Committees<br />
Finalise<br />
Stakeholder<br />
Forum<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
the consent of LMs<br />
The municipality is<br />
paying all ward<br />
committee<br />
members a<br />
stipends<br />
Meaningful<br />
participation of<br />
Sector<br />
Departments in the<br />
<strong>IDP</strong>/ Budget<br />
Human<br />
Resource<br />
allocated<br />
3 BPM<br />
<strong>2011</strong>/ 12<br />
MTEF<br />
4 BPM<br />
2010/ 11<br />
MTEF<br />
222<br />
Budget<br />
Allocated Projected
No.<br />
Priority Turn Around<br />
Focal Area<br />
2.3 Public Communication<br />
systems<br />
2.4 Complaints management<br />
systems<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
Adoption of Public<br />
Participation Policy<br />
Not effective Improve the<br />
effectiveness of the<br />
public<br />
communication<br />
system<br />
Functional but not<br />
effective – lacks<br />
timeous tracking of all<br />
queries<br />
2.5 Front Desk Interface Front Desk serve as<br />
switchboard<br />
Functional &<br />
effective complaint<br />
management system<br />
Integrated front desk<br />
function<br />
Municipal<br />
Action<br />
Strengthen the<br />
Communication<br />
unit with skilled<br />
personnel<br />
Timeous<br />
tracking of all<br />
received queries<br />
Integrate the<br />
front desk<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
Process Plan<br />
Government<br />
Communicators<br />
Forum to be<br />
relevant to<br />
supporting<br />
municipal needs<br />
District-wide<br />
complaint<br />
management<br />
system to be<br />
established as per<br />
D-IGF resolution<br />
Human<br />
Resource<br />
allocated<br />
1 BPM<br />
<strong>2011</strong>/ 12<br />
MTEF<br />
0 BPM<br />
<strong>2011</strong>/ 12<br />
MTEF<br />
None 1 BPM<br />
<strong>2011</strong>/ 12<br />
223<br />
Budget<br />
Allocated Projected
No.<br />
3.Governance<br />
Priority Turn Around<br />
Focal Area<br />
3.1 Political Management and Oversight<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
Municipal<br />
Action<br />
3.1.1 Stability of Councils Functional Council Functional Council Functional<br />
Council<br />
3.1.2 Delegation of functions<br />
between political and<br />
administration<br />
Delegation system in<br />
place<br />
3.1.3 Training of Councillors Councillors trained as<br />
per WSP<br />
Review the<br />
delegation system<br />
Councillors trained<br />
as per WSP<br />
Review the<br />
delegation<br />
system<br />
Councillors<br />
trained as per<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
Human<br />
Resource<br />
allocated<br />
224<br />
Budget<br />
Allocated Projected<br />
MTEF<br />
None 5 BPM<br />
<strong>2011</strong>/ 12<br />
MTEF<br />
None All staff None<br />
LG-SETA must<br />
develop better<br />
3 BPM<br />
<strong>2011</strong>/ 12
No.<br />
Priority Turn Around<br />
Focal Area<br />
3.2 Administration<br />
3.2.1 Recruitment, Selection<br />
and Suspension of<br />
employees<br />
3.2.2 Vacancies (Top 4- MM,<br />
CFO, Planner, Engineer)<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
Municipal<br />
Action<br />
All critical posts filled All vacant posts filled No employees<br />
on suspension<br />
1 vacancy of MM No vacancies Retention<br />
Strategy in place<br />
3.2.3 Vacancies in other levels 196 Half the vacancy rate Half the vacancy<br />
rate<br />
3.2.4 Top 4 appointed with<br />
signed Performance<br />
Top 6 appointed with<br />
performance<br />
Top 6 sign annual<br />
performance<br />
agreements by due<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
WSP training courses for<br />
Councillors<br />
Annual<br />
Performance<br />
Plans completed<br />
Human<br />
Resource<br />
allocated<br />
225<br />
Budget<br />
Allocated Projected<br />
MTEF<br />
n/a 5 BPM<br />
<strong>2011</strong>/ 12<br />
MTEF<br />
n/a n/a BPM<br />
<strong>2011</strong>/ 12<br />
MTEF<br />
5 None<br />
n/a 1 BPM<br />
<strong>2011</strong>/ 12
No.<br />
Priority Turn Around<br />
Focal Area<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
Municipal<br />
Action<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
Human<br />
Resource<br />
allocated<br />
Agreements agreements date by 30 June <strong>2011</strong> MTEF<br />
3.2.5 Organisational<br />
Performance<br />
Management System<br />
3.2.6 Skills development for<br />
employees<br />
3.3 Labour Relations<br />
3.3.1 Functionality of Local<br />
Labour Relations<br />
Organisational<br />
Performance<br />
Management System<br />
cascaded to Assistant<br />
Directors<br />
Workplace Skills Plan<br />
(WSP) in place and<br />
implemented<br />
Local Labour Forum in<br />
place, functional and<br />
constructive<br />
engagements<br />
Cascade<br />
organisational<br />
performance<br />
management system<br />
to post level 6<br />
Enhance training<br />
programmes for<br />
semi-professional<br />
staff (artisans)<br />
Maintain<br />
functionality and<br />
constructiveness of<br />
LLF<br />
Quarterly<br />
performance<br />
assessments<br />
<strong>2011</strong>/12 WSP<br />
more focused<br />
on artisan<br />
training<br />
Meaningful<br />
consultation at<br />
LLF on all labour<br />
related matters<br />
n/a 1 BPM<br />
<strong>2011</strong>/ 12<br />
MTEF<br />
None 03 BPM<br />
<strong>2011</strong>/ 12<br />
MTEF<br />
Elimination of<br />
conclusion of<br />
onerous collective<br />
agreement at<br />
07 n/a<br />
226<br />
Budget<br />
Allocated Projected
No.<br />
Priority Turn Around<br />
Focal Area<br />
4. Financial Management<br />
4.1 Revenue enhancement<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
1. Revenue<br />
Enhancement<br />
Strategy in place<br />
2. No cost recovery in<br />
rural, townships and<br />
sector departments.<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
1. Improve<br />
implementation<br />
of Revenue<br />
Enhancement<br />
Strategy<br />
2. Institute cost<br />
recovery in rural<br />
areas and<br />
enforce credit<br />
control<br />
measures in<br />
Municipal<br />
Action<br />
1. Complete<br />
data<br />
cleansing<br />
project of<br />
municipal<br />
accounts<br />
2. Improve<br />
enforcemen<br />
t of credit<br />
control<br />
measures<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
SALGBC<br />
Treasury must<br />
enforce provisions<br />
of the PFMA &<br />
MFMA on nonpaying<br />
sector<br />
departments<br />
Human<br />
Resource<br />
allocated<br />
40 BPM <strong>2011</strong>/<br />
12 MTEF<br />
227<br />
Budget<br />
Allocated Projected
No.<br />
Priority Turn Around<br />
Focal Area<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
4.2 Debt management Unfunded mandates in<br />
relation to operations<br />
and maintenance for<br />
water and sanitation<br />
affecting cash flow<br />
4.3 Cash flow management working capital<br />
4.4 Repairs and maintenance<br />
provision<br />
15% of operational<br />
budget allocated to<br />
repairs & maintenance<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
townships and<br />
on sector<br />
departments<br />
Eliminate unfunded<br />
mandates<br />
Improve working<br />
capital<br />
Improve revenue<br />
collection<br />
15% of operational<br />
budget allocated to<br />
repairs &<br />
Municipal<br />
Action<br />
Improve<br />
revenue<br />
collection for<br />
working capital<br />
Have working<br />
capital<br />
Expend on<br />
repairs and<br />
maintenance<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
MDM must gazette<br />
operations &<br />
maintenance<br />
allocations for LMs<br />
Human<br />
Resource<br />
allocated<br />
228<br />
Budget<br />
Allocated Projected<br />
2 MDM &<br />
BPM <strong>2011</strong>/<br />
12 MTEF<br />
None 2 n/a<br />
MDM & DoRT to<br />
allocate funds for<br />
maintenance of<br />
district & provincial<br />
02 BPM <strong>2011</strong>/<br />
12 MTEF<br />
MDM &
No.<br />
Priority Turn Around<br />
Focal Area<br />
4.5 Capital expenditure MIG @ 42%<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
Own funds@ 72%<br />
4.6 Clean Audit Disclaimed opinion<br />
Audit Issues Action Plan<br />
in place<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
Municipal<br />
Action<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
maintenance roads (gazette the<br />
allocation)<br />
2009/10 MIG@<br />
100% by March 2010<br />
2010/11 MIG@ 70%<br />
Implement the<br />
Action Plan on issues<br />
raised by the AG<br />
Eliminate recurring<br />
issues<br />
Improve MIG<br />
expenditure<br />
Full<br />
implementation<br />
of action plan &<br />
eliminate<br />
recurrence of<br />
issues<br />
Interim audit by<br />
the AG<br />
Human<br />
Resource<br />
allocated<br />
229<br />
Budget<br />
Allocated Projected<br />
DoRT<br />
2 PMU R12 m<br />
(09/10)<br />
R14 m<br />
(10/11)<br />
R17m<br />
(11/12)<br />
All staff BPM <strong>2011</strong>/<br />
12 MTEF<br />
4.7 Submission of Annual Submitted by 31 August Submit by 31 August Compile GRAP- Interim audit by 1 BPM <strong>2011</strong>/
No.<br />
Priority Turn Around<br />
Focal Area<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
Municipal<br />
Action<br />
Financial Statements <strong>2011</strong> <strong>2011</strong> compliant AFS<br />
4.8 Asset management Asset Register not<br />
compliant to GRAP<br />
4.9 Credibility and<br />
transparency of Supply<br />
Chain Management<br />
SCM Policy and<br />
Procedures in place<br />
GRAP-compliant<br />
Asset Register<br />
SCM audit<br />
completed<br />
SCM Risk Register in<br />
place<br />
Resourcing the<br />
Financial<br />
Controls unit<br />
Unbundling of<br />
infrastructure<br />
assets (roads)<br />
underway<br />
Implement<br />
Internal Audit<br />
recommendatio<br />
ns on SCM<br />
Manage the<br />
SCM<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
Human<br />
Resource<br />
allocated<br />
the AG 12 MTEF<br />
MDM to assist with<br />
Asset Register as<br />
per D-IGF<br />
Resolution<br />
230<br />
Budget<br />
Allocated Projected<br />
3 R1 mil<br />
(unbundling<br />
of assets)<br />
MDM<br />
(Asset<br />
register)<br />
none 5 BPM <strong>2011</strong>/<br />
12 MTEF
No.<br />
Priority Turn Around<br />
Focal Area<br />
5. Local Economic Development<br />
5.1 Municipal contribution to<br />
LED<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
Plans to formalise the<br />
Marula industry in place<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
Complete &<br />
operationalize the<br />
Marula Extraction<br />
Hub & consolidation<br />
of Marula Women<br />
cooperatives<br />
(MWCs)<br />
Municipal<br />
Action<br />
operational risks<br />
1. Fast-track the<br />
construction<br />
of the Marula<br />
Oil Extraction<br />
Hub<br />
2. Outline the<br />
business<br />
process and<br />
plant design<br />
to<br />
manufacture<br />
other<br />
products on<br />
the Marula<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
4. Completion of<br />
Marula Product<br />
Strategy<br />
including<br />
consolidation<br />
of the Marula<br />
Value Chain<br />
studies by<br />
LEDET<br />
5. Training of<br />
MWCs into<br />
Marula byproduct<br />
manufacturing<br />
Human<br />
Resource<br />
allocated<br />
4 R8 m<br />
231<br />
Budget<br />
Allocated Projected
No.<br />
Priority Turn Around<br />
Focal Area<br />
5.2 LED Plan aligned to the<br />
LEGDP and adopted by<br />
Council<br />
April <strong>2011</strong> (Current<br />
Situation/ Baseline)<br />
Approved LED Strategy<br />
Target for December<br />
<strong>2011</strong> (Changed<br />
Situation)<br />
LED Strategy aligned<br />
to SDF, LEDGDP<br />
Municipal<br />
Action<br />
value chain<br />
3. SABS &<br />
FMASA<br />
accreditation<br />
&<br />
certification<br />
Implementation<br />
of the LED<br />
Strategy<br />
Unblocking Action<br />
Needed from other<br />
Spheres and<br />
Agencies (e.g.<br />
intervention or<br />
technical support)<br />
by Agriculture,<br />
Mopani FET &<br />
LIBSA<br />
6. Source market<br />
for Marula<br />
Extraction Hub<br />
products by TIL<br />
Human<br />
Resource<br />
allocated<br />
232<br />
Budget<br />
Allocated Projected<br />
None 4 BPM <strong>2011</strong>/<br />
12 MTEF
C7.CONCLUSION:<br />
The afore-mentioned consists of the strategic intent of the municipality that was developed by taking<br />
National and Provincial priorities and strategies into consideration. The vision, mission and values were<br />
reviewed and amended. Strategic objectives and objective strategies were reviewed and amended and<br />
programme strategies developed through which the strategic objectives are operationalised. Projects<br />
have been identified and prioritized and will be dealt with in the next chapter. The strategic intent will<br />
be implemented through development of scorecards on different levels which will be monitored,<br />
evaluated, assessed and review on annual basis. The implementation will be dealt with under the<br />
section Organisational Performance Management.<br />
233
D1. Introduction<br />
Projects are identified through the following:<br />
SECTION D<br />
PROJECTS<br />
Needs experienced by the community and councilors in their areas or villages<br />
Municipal Departments and officials from departmental plans, sector plans, specialist studies and<br />
maintenance programmes<br />
Strategic planning exercises might identify projects of strategic importance<br />
The municipality must ensure that projects are in line with principles, objectives and strategies of the<br />
municipality. Also due to limited financial and human resources it is necessary that project proposals be<br />
prepared in order to assist the municipality to ensure transparent and realistic distribution of resources<br />
between priority issues and routine expenditure. It is also necessary that the community is involved in the<br />
planning of projects to ensure that planned projects are in line with community needs as well as that the<br />
community accepts ownership of projects. Public participation is also necessary to avoid bias to certain<br />
community groups. Public participation could be achieved through the <strong>IDP</strong> Representative Forum.<br />
234
D2. Operational and Maintenance Projects<br />
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Corporate Services IT Equipments, Furniture & Office Equipments<br />
Corp/01 Interactive web BPM BPM 300<br />
Corp/02 Computer Notebook (30) BPM BPM 350<br />
Corp/03 Business Plan (IT & FMS) BPM BPM 300<br />
Corp/04 GPS (1) BPM BPM 75<br />
Corp/05 ICT Infrastructure BPM BPM 4.000<br />
Corp/06 Data Projector (4) BPM BPM 150<br />
Corp/07 Project Screen- fixed (2) BPM BPM 10<br />
Corp/08 Projection Screen portable BPM BPM 2500<br />
Corp/09 Digital Voice Recorder +<br />
Transcription<br />
Software(mobile)<br />
Corp/10 Internet Solution ASDL<br />
Accounts (12)<br />
BPM BPM 42<br />
BPM BPM 30<br />
235
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Corp/11 Disaster Recovery Plan BPM BPM 200<br />
Corp/12 Team mate Software(audit) BPM BPM 200<br />
Corp/13 Notebook Computer spares<br />
(1)<br />
Corp/14 Desktop Computer spares<br />
(1)<br />
Corp/15 Network Infrastructure<br />
maintenance<br />
BPM BPM 30<br />
BPM BPM 30<br />
BPM BPM 20<br />
Corp/16 Bulk Shredder Ba-Phalaborwa BPM 10<br />
Corp/17 Steel Cabinets (4) (Legal) Ba-Phalaborwa BPM 20<br />
Corp/18 Desk & Credenza (legal) (1) Phalaborwa BPM 30<br />
Corp/19 Desks (3) Ba-Phalaborwa BPM 50<br />
Corp/20 High back Chairs (3) Ba-Phalaborwa BPM 10<br />
Corp/21 Visitors Chairs (6) Ba-Phalaborwa BPM 30<br />
Corp/22 Filling Cabinets (3) (Safety) Ba-Phalaborwa BPM 30<br />
236
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Corp/23 Desks, Chairs, & Filling<br />
Cabinets (Records)<br />
Corp/24 Mobile Filling System 3x3<br />
(Human Resources) Zippel<br />
Lulekani BPM 50<br />
Ba-Phalaborwa BPM 150<br />
Corp/25 Vacuum Cleaners x 2 Ba-Phalaborwa BPM 20<br />
Corp/26 Toilet Roll Holder Steel Ba-Phalaborwa BPM 10<br />
Corp/27 Soap Holders Ba-Phalaborwa BPM 10<br />
Corp/28 Shelves Steel Lulekani BPM 100<br />
Technical Services Furniture & Office Equipments<br />
Tech/01 Desks (new staff) 7 BPM BPM 150<br />
Tech/02 High back Chairs 7 Ba-Phalaborwa BPM 30<br />
Tech/03 6 Single base sets (Standby<br />
Electrical)<br />
Tech/04 Steel Filling Cabinet<br />
(Zippel)<br />
Phalaborwa BPM 15<br />
Ba-Phalaborwa BPM 150<br />
237
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Planning<br />
Development<br />
&<br />
Furniture & Office Equipments<br />
Plan/01 Desks (new staff) 1 Phalaborwa BPM 5<br />
Plan/02 High back Chair (1) Phalaborwa BPM 3<br />
Municipal<br />
Manager<br />
Furniture & Office Equipments<br />
Mun/01 Desks (3) Phalaborwa BPM 50<br />
Mun/02 High back Chairs (3) Phalaborwa BPM 10<br />
Mun/03 Visitors Chairs (4) Phalaborwa BPM 12<br />
Mun/04 Desks (new staff) 2 Phalaborwa BPM 30<br />
Mun/05 Chairs (new staff) 2 Phalaborwa BPM 10<br />
Mun/06 Filling Cabinet Steel Phalaborwa BPM 30<br />
Mun/07 Office Furniture (Audit) 2<br />
Workstations<br />
Mun/08 Wall Unit- Shelves<br />
(Communication) (1)<br />
Phalaborwa BPM 30<br />
Phalaborwa BPM 10<br />
238
Implementing<br />
Dept<br />
Mun/09 Furniture (Disaster<br />
Management)<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Ba-Phalaborwa BPM 30<br />
Mun/10 Filling Cabinets Wood (3) Ba-Phalaborwa BPM 20<br />
Community<br />
Services<br />
Com/01 High back Swivel Chairs (7)<br />
Cashiers<br />
Furniture & Office Equipments<br />
Phalaborwa BPM 30<br />
Com/02 Cabinet Wood (1) Ba-Phalaborwa BPM 10<br />
Com/03 Steel Cabinets 4 Drawer (3) Ba-Phalaborwa BPM 12<br />
Com/04 Shelves (Licensing &<br />
Library)<br />
Ba-Phalaborwa BPM 30<br />
Com/05 Replacement of 2<br />
Computers (Prosecution)<br />
Ba-Phalaborwa BPM 20<br />
Com/06 Mobile Filling (Traffic &<br />
Licensing)<br />
Ba-Phalaborwa BPM 30<br />
Mayor & Council Venues upgrade & Equipment<br />
May/01 Chairs (50) Council Chamber BPM 200<br />
May/02 Mayor’s Office Furniture Office of the Mayor BPM 60 - - - -<br />
239
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
May/03 Curtains Council Chamber BPM 70<br />
May/04 Curtains Lulekani Town Hall BPM 100<br />
May/05 Curtains Mayoral Parlour BPM 120<br />
May/06 Carpets Council Chamber Council Chamber BPM 50<br />
May/07 Carpets Activity Hall Activity hall BPM 50<br />
May/08 Blinds (steel) Namakgale BPM 50<br />
May/09 Steel tables New Venues BPM 200<br />
May/10 Table clothes BPM BPM 50<br />
May/11 Chairs (100) Activity Hall BPM 200<br />
May/12 Air Conditioners Lulekani Town Hall BPM 100<br />
May/13 Air Conditioners Namakgale Council<br />
Chamber<br />
BPM 15<br />
May/14 Air Conditioners Namakgale Town Hall BPM 100<br />
May/15 Air Conditioners Lulekani Archives BPM 200<br />
240
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
May/16 Air Conditioners Licensing Revenue BPM 15<br />
May/17 Sprinkler system – fire<br />
prevention<br />
May/18 Air Conditioners Namakgale Town Hall<br />
Rates Offices<br />
Lulekani Archives BPM 80<br />
BPM 100<br />
May/19 Sound System (Chamber) Ba-Phalaborwa BPM 220<br />
May/20 Tables & Chairs Gravelotte BPM 30<br />
May/21<br />
Tables & Chairs Selwane Community<br />
Hall<br />
May/22 Water Cooler Fountain Impala Park Sports<br />
Hall<br />
BPM 30<br />
BPM 15<br />
May/23 Water Cooler Fountain Lulekani Stadium BPM 15<br />
May/24 Water Cooler Fountain Namakgale Stadium BPM 15<br />
May/25 Water Cooler Fountain Licensing Phalaborwa BPM 15<br />
May/26 Centralised Records Phalaborwa Records BPM 400<br />
241
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Section & Lulekani<br />
Archives<br />
May/27 Mobile PA Phalaborwa Main<br />
Office<br />
Community<br />
Services<br />
Com/07 Replacement of 3 patrol<br />
cars<br />
Com/08 Replacement of 2<br />
computers – Prosecution<br />
Com/09 Play detector – Vehicle<br />
Testing Centre (VTC)<br />
BPM 70<br />
Traffic Section<br />
Traffic BPM 900 3m<br />
Traffic BPM 20. 000<br />
Traffic & Licensing BPM 200. 000<br />
Com/10 Upgrade of computer VTC Traffic & Licensing BPM 20. 000<br />
Com/11 Replace Clifford brake<br />
tester VTC<br />
Traffic & Licensing BPM 200. 000<br />
Com/12 Road marking machine Traffic BPM 90. 000<br />
Com/13 Replacement of electronic Traffic & Licensing BPM 15. 000<br />
242
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
clipboard motor cycle tests<br />
Com/14 Speed measuring device Traffic BPM 100. 000<br />
Com/15 Replacement of 2 Road<br />
marking LDV’s<br />
Traffic BPM 400 000<br />
Com/16 Mass Meter (x2) Traffic & Licensing BPM 158 000<br />
Com/17 Replacement of 2 Road<br />
marking LDV’s<br />
Com/18 Replacement of speed<br />
measuring device<br />
Traffic BPM 600 000<br />
Traffic BPM 150 000<br />
Waste Management<br />
Com/19 Domestic Refuse Services Humulani, Matiko-<br />
Xikaya & Lulekani A<br />
BPM 550.000<br />
Com/20 Domestic Refuse Services Maseke and Boyelang BPM 570.000<br />
Com/21 Domestic Refuse Services Makhushane BPM 600.000<br />
Com/22 Domestic Refuse Services Prieska, Mahale,<br />
Nondweni, Silonque<br />
BPM 640.000<br />
243
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Com/23 Domestic Refuse Services All new Settlements BPM 680.000<br />
Com/24 Landfill Compactor Landfill Site MDM 3m<br />
Com/25 New Landfill Site Development and<br />
Infrastructure<br />
MDM 3m 5m 5m<br />
Com/26 DSN430N<br />
Replace Refuse Compactor<br />
Refuse removal BPM 1.7m<br />
Com/27 Mass Containers (Skips) Namakgale and Drop<br />
off Centres<br />
BPM 96.000 135.000 160.000<br />
Com/28 DKR237N<br />
Tractor and Trailer<br />
Replacement for<br />
refuse<br />
dumping<br />
and illegal<br />
Com/29 Wheely Bins Waste Management<br />
Street Cleansing<br />
Com/30 Fencing (Landfill Facility) Phalaborwa Dumping<br />
Site<br />
BPM 600.000 820.000<br />
BPM 24.000 30.000 36.000 42.000 50.000<br />
MDM 200.000 240.000<br />
Com/31 Dustbins (Pavement) Provide on sidewalks BPM 32.000 40.000 45.000 47.000 53.000<br />
Com/32 Pole bins 20L Install on pole BPM 40.000 50.000 62.000 68.000 74.000<br />
244
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Environmental Health<br />
Com/33 Spray pumps<br />
Vector control<br />
BPM BPM 6 000 8 000 11 000<br />
Com/34 Medical containers BPM BPM 30 000 35 000 40 000 46 000 50 000<br />
Com/35 Litter Pickers BPM BPM 24 000 30 000 34 000 38 000 42 000<br />
Com/36 Camera (Digital) BPM BPM 4 000<br />
Parks Section<br />
Com/37 Cemetery fencing &<br />
Stadium fencing<br />
Ba-Phalaborwa BPM 1.5 1.6 500 600 600<br />
Com/38 Computerized cemetery<br />
system<br />
Ba-Phalaborwa BPM 210 - - - -<br />
Com/39 Replacement of 2 tractors Ba-Phalaborwa BPM 950 - - 1.2 -<br />
Com/40 Water Tanker & Trailer Ba-Phalaborwa BPM 850 - 900 - -<br />
Com/41 Front-end loader/Back hoe Ba-Phalaborwa BPM 1.1 - - - -<br />
Com/42 1 New LDV (Cemeteries) Ba-Phalaborwa BPM 200 - - - -<br />
Com/43 Medium Tip Truck Ba-Phalaborwa BPM 600 - - - -<br />
245
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Com/44 Small Equipment (new and<br />
replacement)<br />
Com/45 Wheelbarrow Poison Spray<br />
Unit<br />
Ba-Phalaborwa BPM 300 300 350 350 400<br />
Ba-Phalaborwa BPM 75 - - - -<br />
Com/46 Tractor – Mounted Slashers Ba-Phalaborwa BPM 120 135 145 160 180<br />
Com/47 Ride-on mowers (2) Ba-Phalaborwa BPM 160 - 200 - 220<br />
Com/48 Parks and recreational<br />
area furniture<br />
Com/49 Nursery plant development<br />
and purchase<br />
Com/50 4 X Refridgerators Selwane, Rixile ,<br />
Leboneng And<br />
Gravellote Libraries<br />
Com/51 IT Network connectivity Selwane, Gravelotte,<br />
& Mashishimale<br />
Libraries<br />
Com/52 2 X Photocopier Machines Selwane &<br />
Mashishimale<br />
Libraries<br />
Parks and Cemeteries BPM 100 110 120 130 140<br />
Nursery BPM 60 70 80 90 100<br />
Library Services<br />
BPM 20 000<br />
BPM 150<br />
BPM lease<br />
246
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Com/53<br />
1000 X Bookholders<br />
All Libraries BPM 15 000<br />
Com/54<br />
6 X Water coolers<br />
All Libraries BPM 18 000<br />
Com/55<br />
Mashishimale BPM 6000<br />
5 X Microwave oven excluded<br />
Com/56<br />
6 X Flat screen TV<br />
All Libraries BPM 20 000 12000 14000 15000 16000<br />
Com/57<br />
6 X DVD Players<br />
All Libraries BPM 6 000 3500 3500 3500 4000<br />
Com/58 Window Blinds All Libraries BPM 15 000 15 000 15000<br />
Planning &<br />
Development<br />
Plan/03 Formalisation of Informal<br />
areas<br />
Makhushane<br />
(Opposite<br />
Maphuta Hospital<br />
Area before<br />
Namakgale<br />
cemetery<br />
Area between<br />
Benfarm and R71<br />
Matiko Xikaya C<br />
Selwane<br />
(Matshilapate)<br />
Planning & Land Use<br />
DLGH/MDM 500 500 500 500 500<br />
247
Implementing<br />
Dept<br />
Plan/04 Marula Oil Extraction<br />
depots<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Kurhula<br />
Ba-Phalaborwa<br />
Makhushane<br />
Maseke<br />
Majeje<br />
Seloane<br />
Mashishimale<br />
LED & Tourism<br />
Rio Tinto 1000<br />
Plan/05 Waterbok Crop Farm Seloane Rio Tinto 1000<br />
Plan/06 Street paving depot Makhushane FOSKOR 1000<br />
Plan/07 Upgrading of Bollanoto Phalaborwa FOSKOR 1000<br />
Plan/08 SMME Development Ba-Phalaborwa BPM/LIBSA 100<br />
Plan/09 Hawkers facility, curio shop<br />
& rest station<br />
Budget & Treasury<br />
Budg/01 Electricity vending<br />
machines<br />
Budg/02 Replacement of fleet<br />
vehicles (40)<br />
Gravelotte Murchison Mine 150 150<br />
Ba-Phalaborwa BPM - - - - -<br />
Ba-Phalaborwa BPM 3120 3307 3505 3715 -<br />
248
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Budg/03 Integrated Financial<br />
Management System<br />
Ba-Phalaborwa BPM 4000 - - - -<br />
Technical Services Buildings<br />
Tech/05 Extension of Supply Chain<br />
Offices<br />
Tech/06 Erection of (shades)<br />
parking area<br />
Phalaborwa BPM 950 - - - -<br />
Lulekani Municipal<br />
Offices<br />
Tech/07 Backup Generator (sewer Phalaborwa, Lulekani<br />
pump station)<br />
& Namakgale<br />
Tech/08 Backup Generator Phalaborwa<br />
(Municipal Main<br />
Offices)<br />
BPM 400 - - - -<br />
Electrical<br />
BPM 1.5<br />
BPM 300<br />
Roads & Storm Water<br />
Tech/09 Storm water drainage Namakgale BPM 500 1.000 - - -<br />
Tech/10 Storm water drainage Lulekani BPM 500 1.000 - - -<br />
Tech/11 Storm water drainage<br />
Repairs<br />
Phalaborwa BPM 1.000 - - - -<br />
249
Implementing<br />
Dept<br />
Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Tech/12 Culverts Humulani Cemetery BPM 500 - - - -<br />
Buildings Sections<br />
Tech/13 Replacement of Handrails Phalaborwa Sewer<br />
Plant<br />
BPM 860<br />
Municipal<br />
Manager<br />
Communications Unit<br />
Mun/11 Calendars & Diaries Ba-Phalaborwa BPM 300 - - - -<br />
Disaster Management<br />
Mun/12 Disaster Relief Tents Ba-Phalaborwa BPM 60 - - - -<br />
Mun/13 Disaster Relief – Disaster<br />
Response Trailer (fully<br />
equipped)<br />
Mun/14 Potable drinking water<br />
trailer<br />
Ba-Phalaborwa BPM 180 - - - -<br />
Ba-Phalaborwa BPM 20 - - - -<br />
250
D3. Programmes, Strategies and Plans<br />
Implementing<br />
Dept.<br />
Technical Services<br />
Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />
Name Location<br />
Tech/14 Water Conservation/Water<br />
Demand Strategy<br />
MDM 600<br />
Tech/15 Road Master Plan Ba-Phalaborwa BPM 1.300<br />
Tech/16<br />
Corporate Services<br />
Electricity Master Plan Ba-Phalaborwa BPM 900<br />
Corp/28 Skills Training<br />
- WSP (5% of the<br />
workforce undergo inservice<br />
training)<br />
Ba-Phalaborwa<br />
BPMLGSETA 930<br />
Municipal HIV/Aids<br />
<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
251
Implementing<br />
Manager<br />
Dept.<br />
Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />
Name Location<br />
<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Mun/15 World Aids Day Ba-Phalaborwa BPM 80 100 110 120 130<br />
Mun/16 Candlelight Ba-Phalaborwa BPM 80 100 110 120 130<br />
Mun/17 HIV/Aids Workshop Ba-Phalaborwa BPM 40 45 50 55 60<br />
Mun/18 Workplace HIV/Aids Programme Ba-Phalaborwa BPM - - - - -<br />
Mun/19 Workplace HIV/Aids Programme Ba-Phalaborwa BPM 80<br />
Mun/20 Local Aids Council Activities Ba-Phalaborwa BPM 50 60 70 80 90<br />
252
Implementing<br />
Dept.<br />
Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />
Name Location<br />
Mun/21 HIV/Aids Workplace Policy<br />
Review<br />
<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Ba-Phalaborwa BPM - - - - -<br />
Sports, Arts & Culture<br />
Mun/22 Ba-Phalaborwa Sports Day Ba-Phalaborwa BPM 70<br />
Mun/23 Junior Dipapadi Local, District,<br />
Provincial &<br />
National<br />
Mun/24 Cultural Day Ba-Phalaborwa BPM 25<br />
Mun/25 Development of Local Sports<br />
Strategy<br />
BPM 40 55 60 70 90<br />
Ba-Phalaborwa BPM 10<br />
Mun/26 Senior Citizens Tournament Ba-Phalaborwa BPM 20<br />
253
Implementing<br />
Dept.<br />
Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />
Name Location<br />
<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Mun/27 OR Tambo Games Ba-Phalaborwa BPM 40 55 60 70 90<br />
Mun/28 Women in Sports Ba-Phalaborwa BPM 30 35 40 45 50<br />
Mun/29 Indigenous Games Ba-Phalaborwa BPM 40 55 60 70 90<br />
Mun/30 Sports Council Training Ba-Phalaborwa BPM 40 60 80 100 120<br />
Mun/31 Strategy Planning workshop Ba-Phalaborwa BPM 80<br />
Youth, Women, Children & Disability<br />
Mun/32 Women’s Month Ba-Phalaborwa BPM 100 90 90 - -<br />
254
Implementing<br />
Dept.<br />
Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />
Name Location<br />
<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Mun/33 Children’s Day Ba-Phalaborwa BPM 60 70 70 - -<br />
Mun/34 Disability Day Ba-Phalaborwa BPM 120 130 130 - -<br />
Mun/35 16 Days of Activism against<br />
Children and Women Abuse<br />
Ba-Phalaborwa BPM 70 80 80 - -<br />
Mun/36 Back to School Campaign Ba-Phalaborwa BPM 2.500 3 3 - -<br />
Mun/37 Elderly Day Ba-Phalaborwa BPM 60 70 70 - -<br />
Mun/38 SAYC Bi-Annual Assembly Ba-Phalaborwa BPM 100 130 130 - -<br />
Mun/39 Ba-Phalaborwa Disadvantages<br />
groups Economic Summit<br />
Ba-Phalaborwa BPM 90 100 100 - -<br />
255
Implementing<br />
Dept.<br />
Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />
Name Location<br />
<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Mun/40 Youth Month Activities Ba-Phalaborwa BPM 120 120 130 - -<br />
Mun/41 <strong>IDP</strong> Review Process and Public<br />
Participation/Imbizos<br />
Mun/42<br />
Mun/43<br />
Strategic Planning Unit<br />
Ba-Phalaborwa 950 950 950 950 950 950<br />
Community Satisfaction Survey Ba-Phalaborwa BPM/DLGH 300 150<br />
Greenest Municipality<br />
Programme<br />
Ba-Phalaborwa BPM 100 100 150 170 200<br />
Internal Audit Unit<br />
Mun/44 Specialised Audit Services Ba-Phalaborwa BPM 700<br />
Communications<br />
256
Implementing<br />
Dept.<br />
Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />
Name Location<br />
<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Mun/45 Local Communicators Forum Ba-Phalaborwa BPM 77 84 93 102 -<br />
Mun/46 Professional<br />
bodies/membership fees<br />
Ba-Phalaborwa BPM 2 2 2 2 -<br />
Mun/47 Branding and Marketing Ba-Phalaborwa BPM 220 242 266 292 -<br />
Mun/48 Risk/Hazard Analysis of fire<br />
hydrants<br />
Planning &<br />
Development<br />
Plan/10 Development of Municipal<br />
Informal Economy Support<br />
Strategy<br />
Disaster Management<br />
Ba-Phalaborwa BPM 30 - - - -<br />
LED & Tourism<br />
Ba-Phalaborwa BPM 250 250<br />
Plan/11 Annual Christmas Tree Ba-Phalaborwa Rio Tinto 100 110 120 130 140<br />
257
Implementing<br />
Dept.<br />
Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />
Name Location<br />
Plan/12 Investment Attraction Plan Ba-Phalaborwa BPM 100<br />
Plan/13 Ba-Phalaborwa Development<br />
Agency<br />
Plan/14 Economic Summit Ba-Phalaborwa BPM 90<br />
Plan/15 Annual Marula Festivities<br />
Plan/16 Annual September Tourism<br />
Month Activities<br />
Plan/17 Local and National Tourism<br />
Shows<br />
<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Ba-Phalaborwa BPM/Strategic Partners 600 400 3000 4000 6000<br />
• Makhushane<br />
• Mashishimale<br />
• Maseke<br />
• Majeje<br />
• Seloane<br />
• Phalaborwa<br />
BPM 650 650 650 700 700<br />
Ba-Phalaborwa BPM 200 220 240 250 260<br />
Durban, JHB,<br />
Hoedspruit,<br />
Tzaneen, Giyani,<br />
Cape Town<br />
BPM 180 190 200 210 220<br />
258
Implementing<br />
Dept.<br />
Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />
Name Location<br />
Plan/18 Promotion and Marketing<br />
materials of Tourism products<br />
and routes (Ba-Phalaborwa)<br />
Plan/19 Operationalisation of:<br />
• Flea Market<br />
• Cultural Village<br />
• Namakgale & Lulekani Taxi<br />
Ranks<br />
• Freedom & Memorial<br />
Precinct<br />
• Bollanoto Tourism &<br />
Information Centre<br />
• Seloane TSC (Curio Shop)<br />
Plan/20 Development of Ba-Phalaborwa<br />
Marula Village Hub<br />
<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Ba-Phalaborwa BPM 800 850 900 950 1000<br />
Namakgale<br />
Phalaborwa<br />
Lulekani<br />
Makhushane<br />
Mashishimale<br />
Seloane<br />
BPM 200<br />
Ba-Phalaborwa BPM 500<br />
Plan/21 Poverty Alleviation Projects Ba-Phalaborwa BPM/Sector Departments - - - - -<br />
259
Implementing<br />
Dept.<br />
Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />
Name Location<br />
Plan/22 Poverty Reduction, Improved<br />
Service Delivery & Integrated<br />
Development Programme<br />
Ba-Phalaborwa Embassy of the Kingdom<br />
of Belgium<br />
<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Plan/23 Community Development Plan Selwane Kondowe - - - - -<br />
Planning and Land Use<br />
Plan/23 GIS Strategy/Policy Ba-Phalaborwa BPM/OTP 300<br />
Plan/24 Landfill site (Professional Study) Ba-Phalaborwa BPM 300 200 200 200 200<br />
Com/59<br />
Environmental Management<br />
Plan<br />
Community Services<br />
480<br />
Ba-Phalaborwa BPM 1.000 500 600<br />
Com/60 Arbor Day Ba-Phalaborwa BPM 30 35 40 45 50<br />
260
Implementing<br />
Dept.<br />
Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />
Name Location<br />
<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Com/61 De-bushing Ba-Phalaborwa BPM 250 250 300 300 400<br />
Com/62 Alien Plan Campaigns Ba-Phalaborwa BPM 120 130 145 160 175<br />
Com/63 Premiers Greening Project<br />
(Foskor)<br />
Com/64 Premiers Greening Project<br />
Budget & Treasury<br />
(PMC)<br />
Budg/04 Infrastructure Assets<br />
Unbundling – (water, sanitation<br />
& electricity)<br />
Ba-Phalaborwa<br />
Foskor 150. 150. 150.<br />
Ba-Phalaborwa PMC 75. 75. 75.<br />
Ba-Phalaborwa BPM 6.000 -<br />
261
D4. Capital Projects<br />
Implementing<br />
Dept<br />
Capital Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Technical Services Roads & Storm water<br />
Tech/18 PHB Street Rehabilitation Phalaborwa Town BPM 1.000 1.500 1.500 2.000 2.500<br />
Tech/19 New 4 Ton Drop Side<br />
Truck (Roads Section)<br />
Tech/20 Replacement of 3 Ton<br />
Truck (Roads Section)<br />
Tech/21 Low Bed Trailer<br />
Tech/22 Silongue Road<br />
Rehabilitation<br />
Ba-Phalaborwa BPM 400 - - - -<br />
Ba-Phalaborwa BPM 400 - - - -<br />
Ba-Phalaborwa BPM 350 - - - -<br />
Phalaborwa BPM 150 150 - - -<br />
Electrical Section<br />
262
Implementing<br />
Dept<br />
Tech/23 Maintenance &<br />
refurbishment of<br />
overhead lines<br />
Tech/24<br />
Capital Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Upgrading of electrical<br />
network at Ext 01 Phase 3<br />
From Selati Sub to<br />
Main Sub (3). From<br />
Selati Sub to Ext 7<br />
Sub (1)<br />
From main Sub to<br />
Ext 7 Sub (1). Main<br />
Sub to Cleveland Sub<br />
(1). From Ext 7 Sub<br />
to Ext 8A and B Sub<br />
(2). From M/Sub<br />
8B/D to Airport<br />
beacon. Selati to Ext<br />
5. Main to<br />
Schietocht. Main<br />
pump to KNP.<br />
BPM 1.500 1.500 1.000<br />
Phalaborwa Town BPM 4.500<br />
263
Implementing<br />
Dept<br />
Capital Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Tech/25 Erect second feeder to<br />
Ext 5 Substation<br />
Tech/26 Replacement of<br />
electricity three phase<br />
meters (KVA & KWH)<br />
Tech/27 Installation of High Mast<br />
lights<br />
Tech/28 Streetlights Maintenance<br />
Truck (Cherry Picker)<br />
Tech/29 Installation of ring main<br />
units and replace 3 phase<br />
mini-subs<br />
Extension 5 BPM 0.500<br />
Phalaborwa Town BPM 1.500<br />
Ba-Phalaborwa BPM 1.500<br />
Ba-Phalaborwa BPM 0.550<br />
Ext 1,2 ,3,4 & 6 BPM 1.000 1.200 1.400 1.500 1.700<br />
264
Implementing<br />
Dept<br />
Capital Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Tech/30 Maintenance of<br />
substations Transformers,<br />
switch gears and<br />
protection relays<br />
Tech/31 Installation of 300 street<br />
lights at Hendrik Van Eck<br />
Road<br />
Tech/32 Electrification<br />
Infrastructure<br />
reticulations 1100 units<br />
Tech/33 Electrical Infrastructure<br />
reticulation - 600 units<br />
Tech/34 Electrification of 350 RDP<br />
units at Namakgale<br />
Selati and Main<br />
Substations<br />
BPM 1.000 - 1.200<br />
Phalaborwa BPM 1.000 1.200 1.440 - -<br />
Kanana Eskom/DME 11.000 - - - -<br />
Selwane Eskom/DME 6.000 - - - -<br />
Namakgale New RDP<br />
Houses<br />
Eskom/DME 2.450 - - - -<br />
265
Implementing<br />
Dept<br />
Tech/35 Electrification of 500<br />
units at Matshilapata<br />
(unoccupied)<br />
Capital Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Tech/36 Electrification of 200<br />
units at Boyelang/Maseke<br />
Tech/37 Electrification of<br />
“Nobody”<br />
Tech/38 Electrification of 950<br />
units at Maseke Ext &<br />
Mashishimale R1, R2<br />
Tech/39 Electrical Infrastructure<br />
Reticulation – 600 units<br />
Matshilapata Ext Eskom/DME - 5.000<br />
Boyelang/Maseke Eskom (approved) 1.161 - - - -<br />
“Nobody”<br />
Namakgale<br />
Maseke Ext &<br />
Mashishimale R1, R2<br />
Eskom/DME 11.000 - - - -<br />
Eskom/DME 9.500 - - - -<br />
Kurhula BPM 6.000<br />
266
Implementing<br />
Dept<br />
Capital Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Tech/40 Electricity Switch gears Phalaborwa BPM 3.000<br />
Tech/41 Installation of ring main<br />
units<br />
Tech/42 Electrical Infrastructure<br />
Reticulation 276<br />
Tech/43 Upgrading rising sewer &<br />
pump station<br />
Phalaborwa Ext 2, 3<br />
& 4<br />
Mabikiri 88<br />
Sebera 130<br />
Maune 36<br />
Tshube 22<br />
Existing Pump<br />
Station Phalaborwa<br />
Plant<br />
BPM 2.800 3.360 4.032 - -<br />
Eskom/DME 2.760<br />
Water & Sanitation<br />
MDM 6.500 6.500 6.500<br />
Tech/44 Matiko Xikaya waterline Matiko Xikaya MDM 1.300<br />
Tech/45 Sewer Reticulation Lulekani A MDM 5.000 5.000 5.000 5.000 -<br />
267
Implementing<br />
Dept<br />
Tech/46<br />
Capital Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Sanitary House<br />
connections<br />
Tech/47 Lebeko Regional Resevoir<br />
& Related works<br />
Lulekani Ext 2 MDM 200 200 200 200 -<br />
Mashishimale R3 Ext<br />
1<br />
LNW & MDM 6.000 - - - -<br />
Tech/48 Benfarm Link Line Benfarm B & C MDM - 2.000 - - -<br />
Tech/49 Benfarm A, B & C Sewer<br />
Reticulation & Outfall line<br />
Benfarm A, B & C MDM - 5.000 5.000 - -<br />
Tech/50 Honey Sucker Tanker Phalaborwa BPM 250 - - - -<br />
Tech/51 Mobile Water Tanker<br />
(Technical)<br />
Community Parks Section<br />
Ba-Phalaborwa BPM 500 - - - -<br />
268
Implementing<br />
Dept<br />
Services<br />
Capital Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Com/64 Cemetery Establishment<br />
and construction (new)<br />
Lulekani BPM 2m 2m 2m 2m 2m<br />
Com/65 Cemetery upgrading Namakgale BPM 3m 2m 2m 2m 2m<br />
Com/66 Cemetery<br />
establishment/land<br />
identification and<br />
procurement (new)<br />
Com/67<br />
Gravelotte<br />
Cemetery Fencing Lulekani, Namakgale<br />
& Phalaborwa<br />
BPM 2m 2m 2m 2m 2m<br />
BPM 1.000<br />
Library Services<br />
Com/68 Mashishimale Library Mashishimale BPM 6m - - - -<br />
Com/69 Majeje Library Majeje Tribal BPM - - 6.5m - -<br />
269
Implementing<br />
Dept<br />
Capital Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Com/70 Makhushane Library Makhushane BPM - - - - 7m<br />
Planning &<br />
Development<br />
Planning & Land Use<br />
Plan/25 Development of Ext 7 Phalaborwa BPM 700 - - - -<br />
D5. MIG Projects<br />
Implementing Dept MIG Projects Source(s) of Funds O & M Budget (R’000)<br />
MIG/01 Phalaborwa<br />
Upgrading of Taxi<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Phalaborwa MIG 1.353 - - - -<br />
270
Implementing Dept MIG Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Rank Facilities<br />
MIG/02 Tshelang Kgape<br />
Maphuta Street<br />
paving Phase 4<br />
MIG/03 Nyakelang Street<br />
paving<br />
MIG/04 Matiko Xikaya –<br />
Humulani Street<br />
paving<br />
MIG/05 Kurhula Street<br />
paving Phase 1<br />
MIG/06 PHB Taxi Rank<br />
Overhead Walkway<br />
Namakgale MIG 2.736 1.987 2.000 - -<br />
Namakgale MIG 300 3.000 - - -<br />
Lulekani MIG 3.000 2.500 - - -<br />
Lulekani MIG 2.500 2.100 2.000 - -<br />
Phalaborwa MIG 1.800 - - - -<br />
271
Implementing Dept MIG Projects Source(s) of Funds O & M Budget (R’000)<br />
MIG/07 Gravelotte RDP<br />
Street paving Phase<br />
2<br />
MIG/08 Makhushane Street<br />
Paving<br />
MIG/09<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Selwane Street<br />
Paving<br />
MIG/10 Majeje Subsoil<br />
Drainage<br />
Gravelotte MIG - - 200 - -<br />
Makhushane MIG 2.674<br />
Selwane MIG 200 2.000 2.100 2.500 2.500<br />
Majeje MIG 2.740 1.500 1.500 1.500<br />
MIG/11 Thepe Trust Bridge Mashishimale R3 MIG 2.593 - - - -<br />
MIG/12 Majeje Street Paving Majeje MIG - 150 2.850 1.500 1.500<br />
272
Implementing Dept MIG Projects Source(s) of Funds O & M Budget (R’000)<br />
MIG/13 Mashishimale Street<br />
Paving R1,2,3<br />
MIG/14 Lulekani Street<br />
Paving (Biko & B1<br />
Ext)<br />
MIG/15 Namakgale Street<br />
Paving (Score & Zone<br />
D)<br />
MIG/16 Tipeng Stormwater<br />
Culverts Phase 3 & 4<br />
MIG/17 Lulekani upgrading<br />
of Hlekani Str to<br />
tar/side kerbs<br />
Amazon Str.<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Mashishimale MIG - 200 700 2.000 2.100<br />
Lulekani MIG - 150 3.450 2.400 2.100<br />
Namakgale MIG - 150 2.450 2.400 2.000<br />
Makhushane/<br />
Mashishimale<br />
MIG - 200 3.800 2.000 2.000<br />
Lulekani MIG 2.450 - - - -<br />
273
Implementing Dept MIG Projects Source(s) of Funds O & M Budget (R’000)<br />
MIG/18 Installation of High<br />
Mask Lights &<br />
Energy Serving<br />
Street Lights at Ba-<br />
Phalaborwa<br />
D6. NDPG Projects<br />
Implementing<br />
Dept<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
Ba-Phalaborwa MIG 3.00 5.000 7.000 3.000<br />
NDPG Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
NDPG/01 Speed humps Ba-Phalaborwa NDPG 370<br />
NDPG/02 Street Paving & Stormwater<br />
Drainage<br />
Namakgale, Lulekani &<br />
Gravelotte<br />
NDPG 4.000 4.200 - - -<br />
274
Implementing<br />
Dept<br />
NDPG Projects Source(s) of Funds O & M Budget (R’000)<br />
Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />
NDPG/03 Namakgale Sports Complex<br />
Phase 1<br />
NDPG/04 Lulekani Sport Precinct<br />
Phase 1<br />
D7. Mopani District Municipality Projects<br />
Namakgale NDPG (unregistered) 5000 12000 20000 30000 -<br />
Lulekani NDPG (unregistered) 5000 13000 25000 45000<br />
Project Name Project Location Description Implementing Budget<br />
Upgrading of water reticulation and<br />
extensions<br />
Phalaborwa Ext 5, Water supply Phase<br />
2<br />
Water<br />
Ba-Phalaborwa Upgrading of water<br />
reticulation and<br />
extensions<br />
MDM -<br />
Phalaborwa Extension 5 Water supply MDM -<br />
275
Project Name Project Location Description Implementing Budget<br />
Selwane water scheme Selwane Water supply MDM -<br />
Makhushane reservoir Makhushane Construction of<br />
reservoir<br />
Namakgale sewerage works<br />
rehabilitation<br />
Sanitation<br />
Namakgale Sewerage works<br />
rehabilitation<br />
MDM -<br />
MDM -<br />
Mopani rural households sanitation Ba-Phalaborwa Sanitation infrastructure DWA -<br />
Upgrading of Phalaborwa sewage<br />
plant<br />
Phalaborwa Upgrading of<br />
Phalaborwa sewage<br />
plant<br />
MDM -<br />
RDP Houses sewerage Matiko Xikaya Sanitation MDM -<br />
Harmony to Gravelotte road Harmony/Gravelotte 29.78km paving/tar MDM -<br />
Makhushane – Maune Road Makhushane/Maune Paving/tar MDM -<br />
Upgrading of Maseeke to<br />
Mashishimale road phase V<br />
Roads<br />
Maseke/Mashishimale 13km paving/tar MDM<br />
Apollo lights Ba-Phalaborwa Light in crime prone MDM<br />
276
Project Name Project Location Description Implementing Budget<br />
areas<br />
Educational Infrastructure<br />
Two crèche buildings Locations to be identified ECD Support to LMS MDM -<br />
D8. Sector Departments<br />
Project Name Project Location Project Description Implementing<br />
Agent<br />
Seloane (Pty) LTD Seloane Drip Irrigation for<br />
10ha<br />
Mponeng, Tipfuxeni<br />
eggs<br />
Miami plot no. &<br />
Itekeng Batub<br />
Overall<br />
Budget<br />
Land Reform Programme<br />
Phalaborwa Broiler LDA 97 032<br />
Planning &<br />
Design<br />
FY Budget <strong>2011</strong>-<br />
2012<br />
LDA 595000 - - 595000<br />
Implementing Period & Budget<br />
2012-<br />
2013<br />
2013-<br />
2014<br />
2014-<br />
2015<br />
277<br />
2015-<br />
2016
Project Name Project Location Project Description Implementing<br />
Agent<br />
Khomanani swi tiya,<br />
Regodisheng, Titirheleni<br />
Community Garden,<br />
Kurhula Community<br />
Garden, Mmone,<br />
Batswenyegi, Mantshe<br />
community garden,<br />
Tivekani farm,<br />
Raleputso farm,<br />
Mogoleng farm,<br />
Solester farm,<br />
Langutani, Tlharihani<br />
community gardeni &<br />
waterbok<br />
Overall<br />
Budget<br />
Phalaborwa Vegetables LDA 1 172<br />
460<br />
Cattle Handling Ba-Phalaborwa Construction of a<br />
basic cattle<br />
handling facility<br />
Animal Health Programme<br />
LDA 60000 10-<br />
11<br />
Planning &<br />
Design<br />
FY Budget <strong>2011</strong>-<br />
2012<br />
- 60 000<br />
Implementing Period & Budget<br />
2012-<br />
2013<br />
2013-<br />
2014<br />
2014-<br />
2015<br />
278<br />
2015-<br />
2016
Project Name Project Location Project Description Implementing<br />
Agent<br />
Oasis nursery for<br />
indeginous<br />
National School<br />
Nutrition<br />
Learner Support<br />
Materials<br />
Maphuta Malatji<br />
Hospital Revitalisation<br />
Benfarm Planting of<br />
indigenous tress<br />
Head Office Provision of<br />
Learners with<br />
Nutritional food<br />
All Schools Provision of<br />
Learner Support<br />
Materials to all<br />
schools<br />
Overall<br />
Budget<br />
Planning &<br />
Design<br />
FY Budget <strong>2011</strong>-<br />
2012<br />
DoA 950 000 950 000<br />
Limpopo Department of Education<br />
DoE - - - 659,233<br />
,000<br />
DoE 650,069<br />
,919<br />
Limpopo Department of Health and Social Development<br />
Namakgale Hospital District DPW 128,660 Multi<br />
ple<br />
Mashishimale Clinic Mashishimale Clinic Sakhiwo SH 6,777 2010<br />
/11<br />
Implementing Period & Budget<br />
2012-<br />
2013<br />
829,669,0<br />
00<br />
681,320,8<br />
20<br />
2013-<br />
2014<br />
892,96<br />
4,000<br />
745,72<br />
5,864<br />
25,732 40,878 35,500 10,000<br />
678 788<br />
2014-<br />
2015<br />
279<br />
2015-<br />
2016
Project Name Project Location Project Description Implementing<br />
Agent<br />
Phalaborwa Bus Stop<br />
Clinic<br />
Multi-Purpose Traffic<br />
Centre<br />
Routine Road<br />
Maintenance<br />
Tzaneen to Dan to<br />
Burgersdorp to<br />
Gravelotte<br />
Giyani – Phalaborwa<br />
road<br />
Overall<br />
Budget<br />
Phalaborwa Clinic Sakhiwo SH 12,600 2010<br />
/11<br />
Lulekani Multi-Purpose<br />
Traffic Centre<br />
All The whole road<br />
maintenance under<br />
the control of the<br />
Department<br />
Tzaneen/Ba-<br />
Phalaborwa<br />
Planning &<br />
Design<br />
FY Budget <strong>2011</strong>-<br />
2012<br />
Limpopo Department of Roads and Transport (Traffic Management)<br />
Road preventative<br />
maintenance and<br />
rehabilitation<br />
Ba-Phalaborwa Upgrading gravel to<br />
tar<br />
LDRT 16m 2010<br />
/11<br />
Implementing Period & Budget<br />
2012-<br />
2013<br />
1,260 2,000 10,000<br />
693,10<br />
0,80<br />
3 157<br />
459,20<br />
LDRT - - - 401<br />
324,000<br />
LDRT 25,200,<br />
000<br />
Road Agency Limpopo<br />
RAL 16,000,<br />
000<br />
2013-<br />
2014<br />
135 965 264<br />
787<br />
2014-<br />
2015<br />
280<br />
2015-<br />
2016
Project Name Project Location Project Description Implementing<br />
Agent<br />
Letsitele – Eiland –<br />
Letaba Ranch<br />
Shonalanga Water<br />
Resort<br />
Establishment of<br />
monitoring 2 air quality<br />
stations<br />
Limpopo Mukumbi<br />
Industries<br />
Ba-Phalaborwa LM<br />
water reticulation &<br />
extension<br />
Ba-Phalaborwa Upgrading gravel to<br />
tar<br />
Overall<br />
Budget<br />
Planning &<br />
Design<br />
FY Budget <strong>2011</strong>-<br />
2012<br />
Implementing Period & Budget<br />
2012-<br />
2013<br />
RAL 50,000,00<br />
0<br />
Limpopo Department of Economic Development, Environment & Tourism<br />
Phalaborwa Water resort LTP 40m<br />
Ba-Phalaborwa 2 Air Quality<br />
Stations<br />
Ba-Phalaborwa Mukumbi<br />
Industries<br />
Ba-Phalaborwa Ba-Phalaborwa<br />
water reticulation<br />
& extension<br />
2013-<br />
2014<br />
70,000<br />
,000<br />
2014-<br />
2015<br />
59,000,<br />
000<br />
LEDET - - - - - - - -<br />
LEDET 1,5m - - - - - -<br />
DWAF<br />
DWAF 15,000,<br />
000<br />
281<br />
2015-<br />
2016<br />
30,000<br />
,000
Project Name Project Location Project Description Implementing<br />
Agent<br />
Upgrading basic<br />
sanitation to<br />
waterborne system in<br />
dense settlements (e.g.<br />
Lulekani “A”)<br />
Benfarm A, B, C:<br />
reticulation (wards 8 &<br />
14)<br />
Benfarm A, B, C:<br />
reticulation (wards 8 &<br />
14)<br />
Lulekani RDP house<br />
sewer reticulation<br />
Lulekani Upgrading basic<br />
sanitation to<br />
waterborne system<br />
in dense<br />
settlements<br />
Benfarm A, B, C Benfarm A, B, C :<br />
reticulation<br />
Benfarm A, B, C Benfarm A, B, C :<br />
reticulation<br />
Lulekani D Lulekani D RDP<br />
house sewer<br />
reticulation<br />
Lulekani Stadium area Lulekani Lulekani Stadium<br />
area<br />
Overall<br />
Budget<br />
Planning &<br />
Design<br />
FY Budget <strong>2011</strong>-<br />
2012<br />
DWAF 17,000,<br />
000<br />
DWAF 3,000,0<br />
00<br />
DWAF 7,000,0<br />
00<br />
Implementing Period & Budget<br />
7,000,0<br />
00<br />
2012-<br />
2013<br />
DWAF - - - - - -<br />
DWAF 3,000,0<br />
00<br />
2013-<br />
2014<br />
2014-<br />
2015<br />
282<br />
2015-<br />
2016
Project Name Project Location Project Description Implementing<br />
Agent<br />
Kurhula water supply<br />
(ward 16)<br />
Makhushane (Maune,<br />
Mabikiri, Sebera)<br />
Mashishimale (Nguvo)<br />
Makhushane<br />
(ntswelemotse,<br />
Gardenview, Kanana)<br />
Mashishimale Bulk<br />
water operational plan<br />
Maseke<br />
Matiko Xikaya water<br />
supply operational<br />
Kurhula Kurhula water<br />
supply<br />
Makhushane/M<br />
ashishimale<br />
Makhushane<br />
(Maune, Mabikiri,<br />
Sebera)<br />
Mashishimale<br />
(Nguvo)<br />
Makhushane Makhushane<br />
(Ntswelemotse,<br />
Gardenview,<br />
Kanana)<br />
Mashishimale Mashishimale bulk<br />
operational plan<br />
Maseke<br />
Matiko Xikaya Matiko Xikaya<br />
water supply<br />
Overall<br />
Budget<br />
Planning &<br />
Design<br />
FY Budget <strong>2011</strong>-<br />
2012<br />
DWAF 3,500,0<br />
00<br />
DWAF 5,000,0<br />
00<br />
DWAF 3,000,0<br />
00<br />
DWAF 2,000,0<br />
00<br />
Implementing Period & Budget<br />
2012-<br />
2013<br />
6,000,000<br />
2013-<br />
2014<br />
2014-<br />
2015<br />
DWAF - - - - - - - -<br />
283<br />
2015-<br />
2016
Project Name Project Location Project Description Implementing<br />
Agent<br />
Namakgale E sanitation<br />
(Topville)<br />
Namakgale D sewer<br />
reticulation raising<br />
sewer, additional pump<br />
mains and secondary<br />
bulk<br />
Mahale, Nondweni,<br />
Prieska water<br />
reticulation<br />
Humulani/Matiko<br />
Xikaya water<br />
reticulation phase 2<br />
operational<br />
Namakgale E Namakgale E<br />
sanitation<br />
(Topville)<br />
Namakgale D Namakgale D<br />
sewer<br />
Mahale,<br />
Nondweni,<br />
Prieska<br />
Humulani/Matik<br />
o Xikaya<br />
Mahale, Nondweni,<br />
Prieska water<br />
reticulation<br />
Humulani/Matiko<br />
Xikaya water<br />
reticulation phase<br />
2<br />
Overall<br />
Budget<br />
Planning &<br />
Design<br />
FY Budget <strong>2011</strong>-<br />
2012<br />
Implementing Period & Budget<br />
2012-<br />
2013<br />
2013-<br />
2014<br />
2014-<br />
2015<br />
DWAF - - - - - - - -<br />
DWAF 4,000,0<br />
00<br />
DWAF 5,000,0<br />
00<br />
DWAF 3,000,0<br />
00<br />
4,000,000<br />
284<br />
2015-<br />
2016
Project Name Project Location Project Description Implementing<br />
Agent<br />
Nyakelang/Makhushane<br />
/Haniville water supply<br />
Mopani STW: Ba-<br />
Phalaborwa<br />
Maintenance of Muti<br />
wa Vatsonga<br />
Sports Development<br />
Nyakelang/Mak<br />
hushane/Hanivil<br />
le<br />
Nyakelang/Makhus<br />
hane/Haniville<br />
water supply<br />
Ba-Phalaborwa Mopani STW: Ba-<br />
Phalaborwa<br />
Eiland Maintenance of<br />
Muti wa Vatsonga<br />
Clubs Establishment All Locals Establish one rugby<br />
club per local<br />
Overall<br />
Budget<br />
Planning &<br />
Design<br />
FY Budget <strong>2011</strong>-<br />
2012<br />
DWAF 5,000,0<br />
00<br />
DWAF 5,700,0<br />
00<br />
Department of Sports, Arts & Culture<br />
Museum & Heritage<br />
DSAC 1,200,0<br />
00<br />
DSAC 12,000<br />
per local<br />
School Sports & Recreation<br />
Implementing Period & Budget<br />
2012-<br />
2013<br />
5,000,000<br />
2013-<br />
2014<br />
300.000 400,000 500,00<br />
0<br />
12,000<br />
2014-<br />
2015<br />
285<br />
2015-<br />
2016
Project Name Project Location Project Description Implementing<br />
Agent<br />
Ba-Phalaborwa Hubs Namakgale &<br />
Mashishimale<br />
Ba-Phalaborwa Hubs Namakgale &<br />
Mashishimale<br />
Ba-Phalaborwa Hubs Namakgale &<br />
Mashishimale<br />
School Sport Mass<br />
Participation<br />
Programme<br />
Training of 32<br />
Coordinators<br />
Training of educators as<br />
coaches & technical<br />
officials<br />
Overall<br />
Budget<br />
Planning &<br />
Design<br />
FY Budget <strong>2011</strong>-<br />
2012<br />
Hubs DSAC 10,000<br />
Hubs DSAC 20,000<br />
Hubs DSAC 33,760<br />
Ba-Phalaborwa Establishment &<br />
support to leagues<br />
Ba-Phalaborwa Training of 32<br />
Coordinators<br />
Ba-Phalaborwa Training of<br />
educators as<br />
coaches &<br />
technical officials<br />
Implementing Period & Budget<br />
2012-<br />
2013<br />
DSAC 360,000 378,000<br />
DSAC 26,800<br />
DSAC 37,000<br />
2013-<br />
2014<br />
2014-<br />
2015<br />
286<br />
2015-<br />
2016
D9. Libsa Projects<br />
Strategic Objectives Measurable<br />
Objectives<br />
Provision of strategic<br />
marketing and<br />
communication<br />
services to internal<br />
and stakeholders<br />
To facilitate 2<br />
business seminars<br />
across five districts<br />
To participate in 100<br />
workshop across five<br />
districts<br />
To participate in 12<br />
radio campaigns<br />
Distribution of 6 000<br />
LIBSA newsletters<br />
Key Performance<br />
Indicators<br />
2 Business<br />
seminars to be<br />
conducted<br />
100 workshops to<br />
participate in<br />
12 adverts and<br />
radio talk shows<br />
to be participated<br />
in<br />
6 000 newsletters<br />
to be distributed<br />
Baseline<br />
2009/10<br />
3 business<br />
seminars<br />
conducted<br />
Participate<br />
d in 191<br />
workshops<br />
Participate<br />
d in 8 radio<br />
campaigns<br />
2 700<br />
newsletters<br />
distributed<br />
Budget<br />
2010/11<br />
R50 000 1 business<br />
seminars<br />
conducted<br />
Quarter 1 Quarter 2 Quarter 3 Quarter 4<br />
30<br />
workshops<br />
3 radio<br />
adverts<br />
1 500<br />
newsletters<br />
No business<br />
seminars<br />
conducted<br />
30<br />
workshops<br />
3 radio<br />
adverts<br />
1 500<br />
newsletters<br />
1 business<br />
seminars<br />
conducted<br />
30<br />
workshops<br />
3 radio<br />
adverts<br />
1 500<br />
newsletters<br />
No seminars to<br />
be conducted in<br />
this quarter<br />
10 workshops<br />
3 radio adverts<br />
1 500<br />
newsletters<br />
287
Strategic Objectives Measurable<br />
Objectives<br />
TOTAL<br />
GRAND TOTAL<br />
D10. Foskor Projects<br />
Distribution of 3 000<br />
LIBSA brand booklets<br />
Key Performance<br />
Indicators<br />
3 000 brand<br />
booklets to be<br />
distributed<br />
Baseline<br />
2009/10<br />
1 813<br />
brand<br />
booklets<br />
distributed<br />
Budget<br />
2010/11<br />
Quarter 1 Quarter 2 Quarter 3 Quarter 4<br />
750<br />
booklets<br />
750 booklets 750 booklets 750 booklets<br />
R550 000 R137 500 R137 500 R137 500 R137 500<br />
Name of Project Purpose of the Project Brief Description of the Project Budget<br />
Charity Golf Donations Community Up liftment Foskor has hosted this event for 21 years and in 2010 R300, 000 will be distributed<br />
to charities from the funds raised. 270,000.00<br />
Protec Educational Support Protec is a leader at motivating youth towards technical careers. Foskor is a cosponsor<br />
with PMC and Sasol Agri in the local programme for an investment by 540,000.00<br />
288
Name of Project Purpose of the Project Brief Description of the Project Budget<br />
HIV & AIDS Health: HIV & AIDS Support<br />
Foskor of R350,000 a year.<br />
Foskor has a joint community HIV& Aids project with PMC and Department of Health<br />
, managed by the Phalaborwa Foundation. R258,940 was invested by Foskor during<br />
the period under review. 258,940.00<br />
Traditional Authorities Stakeholders Relations Local traditional leaders are important stakeholders for the company and each year<br />
a donation of up to R100,000 is made for projects they put forward. 100,000.00<br />
Bursaries (University<br />
and Technikon)<br />
Educational Support Foskor’s Tertiary Bursary programme is targeted at external candidates studying<br />
towards various engineering disciplines. Up to R600, 000 is spent annually on this<br />
bursary scheme. 450,000.00<br />
Sports Development Sports Development The company has always supported its people in their endeavours on the sports<br />
field. The Socce and Athletics Team is a proud part of Foskor’s history and each year<br />
receives about R80,000 each. 160,000.00<br />
Marula Festival<br />
Foskor sponsors the Marula Festival with an annual donation of R20,000. 30,000.00<br />
Foskor Open Pit Race Sports Development The open pit race starts at the open pit mine and is a 21 km race, the annual<br />
sponsorship for which is R100,000.<br />
100,000.00<br />
Foskor Community<br />
Centre<br />
Small Scale Community<br />
Project / Entrepreneural<br />
Development<br />
Foskor built a community centre in Namakgale 20 years ago. Foskor has undertaken<br />
the restoration of the centre in partnership with local government and business. 260,000.00<br />
Media Centre Educational Support This facility is a resource centre for local schools, operating in the Foskor Community<br />
Centre in Namakgale. It provides administrative back-up for 55 local schools. Foskor<br />
provides the venue, pays for the rental of the equipment and employs a temporary<br />
worker to manage the facility – a cost of about R240,000 a year. 240,000.00<br />
Museum This is located in the very first house that was built in Phalaborwa. It is a record of a<br />
town that grew up around its unique mineral wealth and presents a live history of a<br />
mining town. The intention is to continue expanding the appeal of the museum, by 220,000.00<br />
289
Name of Project Purpose of the Project Brief Description of the Project Budget<br />
Cleaning of Streets in<br />
getting it onto the South African tourism map and adding a coffee shop for visitors.<br />
This is one of the projects that we undertake to clean the streets in the local area of<br />
Ba-Phalaborwa area<br />
Ba-Phalaborwa 100,000.00<br />
Foskor 21 Marathon Sports Development Foskor invests R500,000 each year towards the half marathon, which attracts<br />
professional athletes. 500,000.00<br />
Nutri Suppl (Cel Food) Health Support Initiative Foskor provides nutritional supplements to all its workforce and their immediate<br />
family members to boost their immune systems 320,000.00<br />
Foskor Primary School Educational Support Foskor will be adopting the Stanbury Primary School with the hope of helping in<br />
improving the standard of teaching and learning at the school 292,000.00<br />
Dinaledi Schools Educational Support Foskor supports the development of maths and science which are a requirement for<br />
skills that are identified as critical for the future of our operations 200,000.00<br />
SPCA Community Community Support Foskor undertakes to support the local Municipality and the SPCA in assisting and Operational cost:<br />
Outreach Programme<br />
educating households that do not have direct access or the means to provide 1,169,700.00<br />
sufficient animal care<br />
Capital cost:<br />
150, 252.00<br />
Miscellaneous<br />
Donations<br />
190,236.00<br />
290
D11. Rio Tinto Palabora Foundation Projects<br />
Name of Project Forecast 2010 Budget <strong>2011</strong><br />
Community Health Services 3 263 815.00 3 443 752.00<br />
Skills Development 4 106 131.00 5 006 248.00<br />
Education – Student Support 8 820 886.00 9 806 537.00<br />
Business Development 1 580 912.00 1 676 943.00<br />
LED & Tourism 1 115 906.00 2 647 406.00<br />
ELC & Communities 1 882 802.00 1 601 173.00<br />
Management & Support 7 984 550.00 8 750 817.00<br />
Capital & Projects 5 644 154.00 4 360 949.00<br />
Total 34 399 156.00 37 293 949.00<br />
Marula Festival – 1 st Testing by Traditional Authorities<br />
Mashishimale Clinic<br />
Other Projects Supported Projects<br />
291
Name of Project Forecast 2010 Budget <strong>2011</strong><br />
Infrastructure for Lesedi Drop-In Centre<br />
Tourism Projects:<br />
• Bollanoto Tourism Centre<br />
• Annual Durban Tourism Indaba<br />
• Branding & Marketing of Ba-Phalaborwa<br />
D12. Rio Tinto Palabora Social Labour Plan (SLP) Projects<br />
Name of Project Project Location Project Value Budget<br />
Farm Waterbok Selwane 5.0m In progress<br />
Marula Beneficiation Ba-Phalaborwa 5.0m<br />
Electrical Upgrade Phalaborwa 3.50m Completed<br />
292
D13. South African Airlink Project (s)<br />
Name of Project Project Location Source of Funding Year Budget (R)<br />
Upgrading of Phalaborwa Airport Phalaborwa SAA Airlink <strong>2011</strong>/12 65.000 000.00<br />
293
SECTION E<br />
Summaries of Sector Plans<br />
For the <strong>IDP</strong> to be credible, the document should have sector plans aligned to the main document. The table<br />
below lists all the necessary sector plans and the status of each plan.<br />
Name of Sector Plan/Strategy Status RESPONSIBLE DEPARTMENT<br />
Anti-Corruption Strategy Yes Office of the Municipal Manager<br />
Disaster Management Plan Yes Office of Municipal Manager<br />
Environmental Management<br />
Plan<br />
No Community Services<br />
Five-Year Financial Plan No Budget & Treasury<br />
<strong>IDP</strong> Housing Chapter Yes Planning & Development<br />
LED Strategy Yes Planning & Development<br />
LUMS Yes Planning & Development<br />
Waste Management Plan Yes Community Services<br />
Risk Management Strategy Yes Office of the Municipal Manager<br />
SDF Yes Planning & Development<br />
Recruitment & Retention<br />
Strategy<br />
Yes Corporate Services<br />
Municipal Institutional Plan Yes Corporate Services<br />
Revenue Enhancement<br />
Stratery<br />
Yes Budget & Treasury<br />
Community Safety Plan No Community Services & SAPS<br />
HIV/AIDS Strategy No Municipal Manager<br />
294
E1. Ba-Phalaborwa Municipality <strong>IDP</strong> Housing Chapter<br />
Housing Strategy<br />
Table below reflects the proposed housing strategy for the Ba-Phalaborwa Municipality. From this it is<br />
evident that there is sufficient land available to deal with the entire housing demand in the Municipal area<br />
and there is even spare capacity of about 5126 in terms of land identified.<br />
295
PROJEC<br />
TS<br />
SETTLE<br />
MENT<br />
NAME<br />
1 Ben<br />
Farm<br />
2 Lulekani<br />
A<br />
3 Makhus<br />
hane<br />
PROJECTS<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
Lulekani 1A<br />
Mashishimale<br />
R3<br />
Tlapeng<br />
Maseke<br />
Boelang<br />
Makhushane<br />
Malungani<br />
village<br />
403 318 508 280 430 220 628 1154 110 - 1070 1000 - 6121<br />
150 135 15 150 0<br />
268 268 268 0<br />
197 197 197 0<br />
4 Mashishi 198 198 198 0<br />
Namakgale<br />
Phalaborqa x7<br />
Phalaborwa x10<br />
Phalaborwa x9<br />
Leydsorp<br />
Murchison<br />
Mining Town<br />
Total<br />
DEFICIT (-)<br />
296
male<br />
5 Maseke 197 197 197 0<br />
6 Matiko-<br />
Xikaya<br />
394 0 0<br />
7 Selwana 198 0 0<br />
TOTAL<br />
ALLOC<br />
ATED<br />
SURPLU<br />
S (+)<br />
1602 403 213 0 197 0 197 0 0 0 0 0 0 - 1010 0<br />
0 120 508 83 430 23 628 1154 110 - 1070 1000 - 5126 995<br />
297
Proposed Priority Projects<br />
Following from the above information, the proposed priority housing projects for Ba-Phalaborwa<br />
Municipality can be summarised as follows:<br />
• Matiko-Xikaya<br />
• Ben Farm<br />
• Lulekani A<br />
• Selwane<br />
• Maseke<br />
• Mashishimale<br />
• Makhushane<br />
• Phalaborwa<br />
The current housing backlog of 1925 can be easily addressed within the areas of town, Lulekani,<br />
Namakgale, Mashishimale and Makhusane area. This number is very minimal, and can be addressed in less<br />
than the stipulated five years.<br />
Remarks<br />
Apart from some prevalent institutional problems, the Ba-Phalaborwa Municipality has a clear and well-<br />
directed vision as to how it will meet the existing and projected future housing demand in its area of<br />
jurisdiction. The housing strategy caters for public and private housing, and projects are aimed at<br />
consolidating the urban structure, optimising the utilisation of existing infrastructure, and enhancing the<br />
sustainability of the livelihoods of all of its residents.<br />
298
E2. Land Use Management Scheme of Ba-Phalaborwa<br />
The Ba-Phalaborwa Local Municipality or its successor in title shall be the authority responsible for the<br />
enforcing and execution of the provisions of this land-use scheme.<br />
Authority of Land-Use Scheme<br />
This land-use scheme has been prepared in terms of the provisions of Section 18 of the Town Planning and<br />
Townships Ordinance, 1986 (Ordinance No. 15 of 1986), and will be the only land-use scheme for the<br />
municipal area.<br />
Title of Land-Use Scheme<br />
This scheme shall be known as the Ba-Phalaborwa Land-use Scheme, 2008.<br />
Area of the Land-Use Scheme<br />
The area to which the land-use scheme applies is the area of the municipality.<br />
Administration of Land-Use Scheme in Area<br />
The local municipality to determine the use of land and land-uses, which is deemed to be agricultural and<br />
shall be either formal rural settlement, an informal rural settlement or a semi formal rural settlement<br />
(where relevant), for which the land-uses to be permitted have not been depicted by notations for the use<br />
zones on the map.<br />
Substitution<br />
The Scheme substitutes any existing scheme in operation only regarding the relevant area of this Scheme<br />
and Regulations.<br />
Conflict between provisions of this land-use scheme, conditions of title and legislation<br />
A consent granted by the local municipality by virtue of provisions of this scheme does not entitle any<br />
person the right to use any land, or to erect or use buildings thereon in any manner or for any purpose<br />
which is prohibited by the provisions of any condition registered against the title deed under which such<br />
land is held, or imposed by legislation in respect of such land.<br />
299
Statutory related definitions<br />
• Communal Property Registration Act, No. 28 of 1996.<br />
• The Environment Conservation Act, (Act No. 73 of 1989), National Environmental Management Act,<br />
1998 (Act 107 of 1998), and later amendments.<br />
• Municipal Systems Act (Act 32 of 2000).<br />
• Town Planning and Townships Ordinance, 1986 (Ordinance No. 15 of 1986) and is a component of land-<br />
use management.<br />
• Limpopo Environmental Management Act, 2003.<br />
• National Environmental Management Act, 1998 (Act 107 of 1998).<br />
• National Environmental Management Biodiversity Act, 2004 (Act 10 of 2004).<br />
Protection of Land and Environment<br />
• No person may spoil or damage land in any Use Zone so as to impair its use or the purpose for which it<br />
was zoned.<br />
• No person may develop land without complying with the requirements of the Environment<br />
Conservation Act, (Act 73 of 1989) and National Environmental Management Act, 1998 (Act 107 of<br />
1998) as amended from time to time and without observing the requirements relating to listed<br />
activities.<br />
Placing and Development of Buildings<br />
• The siting of buildings, including outbuildings erected on the erf, as well as exits and entrances to a<br />
public street system shall be to the satisfaction of the local municipality.<br />
• No building of any nature shall be erected on that portion of the property which is likely to be<br />
inundated by the floodwater of a public stream on an average of 100 years, as determined by the<br />
relevant legislation from time to time and the local municipality.<br />
300
Erection and Use of Buildings or Use of Land<br />
The purposes for which buildings and land in each of the use zones:<br />
• may be erected and/or used;<br />
• may be erected and/or used only with the special consent of the local municipality, permanently or for<br />
a specified period;<br />
• may be erected and/or used only with the written consent of the local municipality; or<br />
• may not be erected and/or used.<br />
E3. Anti-Corruption Strategy (Adopted)<br />
Introduction<br />
The primary objective of this strategy is to prevent fraudulent conduct before it occurs by encouraging a<br />
culture within the Municipality where all employees, members of the public and other stakeholders<br />
continuously behave with and promote integrity in their dealings with, or on behalf of municipality.<br />
To encouraging all employees and other stakeholders to strive toward the promotion of integrity and the<br />
prevention and detection of unethical conduct, fraud and corruption impacting or having the potential to<br />
impact on the Municipality.<br />
To improving accountability, efficiency and effective administration within municipality, including decision-<br />
making and management conduct which promotes integrity.<br />
Principles of the strategy<br />
The main principles upon which the strategy is based are the following:<br />
• Creating a culture within municipality which is intolerant to unethical conduct, fraud and corruption;<br />
• Strengthening community participation in the fight against corruption in municipality;<br />
• Strengthening relationships with key stakeholders, e.g. SALGA, SAPS Employee representative unions<br />
and Communities, that are necessary to support the actions required to fight corruption in<br />
municipality;<br />
• Deterrence of unethical conduct, fraud and corruption;<br />
301
• Preventing unethical conduct, fraud and corruption which cannot be deterred;<br />
• Detection of unethical conduct, fraud and corruption;<br />
• Investigating detected unethical conduct, fraud and corruption;<br />
• Taking appropriate action in the event of such irregularities, e.g. disciplinary action, recovery of losses,<br />
prosecution, etc; and<br />
• Applying sanctions, which include redress in respect of financial losses.<br />
• improving the application of systems, policies, procedures and regulations;<br />
• Changing processes of the Municipality that facilitate corruption/fraud and allow it to go unnoticed<br />
or unreported.<br />
All aspects of the strategy will be:<br />
• Supported by comprehensive education, training and awareness campaigns;<br />
• Coordinated with other the spheres of government and community;<br />
• Subjected to continuous fraud risk assessments; and<br />
• Expressed in terms of measurable and time-bound implementation plans.<br />
Statement of attitude to fraud<br />
Fraud represents a significant potential risk to the Municipality’s assets, service delivery efficiency and<br />
reputation. The Institution will not tolerate corrupt or fraudulent activities, whether internal or external to<br />
the Institution, and will vigorously pursue and prosecute any parties, by all legal means available, which<br />
engage in such practices or attempt to do so.<br />
Regulatory legislation.<br />
The Public Service Anti-Corruption Strategy.<br />
During 1997, Government initiated a national anti-corruption campaign. This campaign progressed to a<br />
National Anti-corruption Summit held in April 1999 at which all sectors of society (public and private)<br />
committed themselves to establishing sectoral anti-corruption strategies. At the same time, they also<br />
committed to the co-responsibility for fighting corruption through the coordination of these sectoral<br />
strategies.<br />
302
The Local Government Anti-Corruption Strategy.<br />
Local Government developed the Local Government Anti-Corruption Strategy (LGACS), which is modelled<br />
around the Public Service Anti-Corruption Strategy.<br />
Prevention and Combating of Corrupt Activities Act, 12 of 2004 (PRECCA)<br />
Aimed at the strengthening of measurement to prevent and combat corrupt activities.<br />
Prevent of Organized Crime Act 121 of 1998 (POCA)<br />
As amended contained provisions that are aimed at combating of organized crime, money laundering and<br />
criminal gang activities .<br />
Protection Disclosure Act 20 of 2000 (PDA)<br />
The act was promulgated to facilitate reporting by employees (whistle blowers) of fraud, corrupt or other<br />
unlawful or irregular action by other employers(s) or co-employers without fear of any discrimination or<br />
reprisal by their employers or co-employees.<br />
Municipal Finance Management Act (MFMA)<br />
The act was promulgated to facilitate the formal management Municipal finances and associated activities.<br />
Certain aspects of the Act refer especially to activities which might be regarded as being corrupt or<br />
fraudulent in nature e.g. Unauthorized, irregular and fruitless and wasteful expenditure.<br />
Municipal System Act 32 of 2000 ( MSA)<br />
The MSA sets out procedure to be adopted by municipal management with regard to a number of aspects<br />
affecting the management of municipality. The Act also stipulates procedures to be adopted with regard to<br />
certain aspects related to misconduct and investigation thereof.<br />
Ba-Phalaborwa Municipality anti-fraud and corruption strategy.<br />
This Anti-Corruption Strategy has been developed as a result of the expressed commitment of Government<br />
to fight corruption. It is also an important contribution to the National Anti-Corruption Strategy of the<br />
303
country and supplements both the Public Service Anti-Corruption Strategy and the Local Government Anti-<br />
Corruption Strategy.<br />
Definition of fraud and corruption<br />
In South Africa, the Common Law offence of fraud is defined as “the unlawful and intentional making of a<br />
misrepresentation which causes actual and or potential prejudice to another”. The term “fraud” is also<br />
used in a wider sense by the general public.<br />
In this regard, the term is used in this document in its widest possible meaning and is intended to include<br />
all aspects of economic crime and acts of dishonesty. In other words, fraud can be described as any<br />
conduct or behaviour of which a dishonest representation and/or appropriation forms an element.<br />
The general offence of corruption is contained in Section 3 of The Prevention and Combating of Corrupt<br />
Activities Act. This section provides that any person who gives or accepts or agrees or offers to accept /<br />
receive any gratification from another person in order to influence such other person in a manner that<br />
amounts to:<br />
• The illegal or unauthorised performance of such other person’s powers, duties or functions;<br />
• An abuse of authority, a breach of trust, or the violation of a legal duty or a set of rules;<br />
• The achievement of an unjustified result; or<br />
• Any other unauthorised or improper inducement to do or not to do anything is guilty of the<br />
offence of Corruption.<br />
Forms of corruption<br />
Corruption takes various forms in the public service and elsewhere in society. The following are examples<br />
of different types of corruption:<br />
Bribery<br />
Bribery involves the promise, offering or giving of a benefit that improperly affects the actions or decisions<br />
of public servants.<br />
304
Embezzlement<br />
This involves theft of resources by persons who control such resources.<br />
Fraud<br />
Any conduct or behaviour of which a dishonest representation and/or appropriation forms an element.<br />
Extortion<br />
Coercion of a person or entity to provide a benefit to a public servant, another person or an entity, in<br />
exchange for acting (or failing to act) in a particular manner.<br />
Abuse of power<br />
The use by a public servant of his or her vested authority to improperly benefit another public servant,<br />
person or entity (or using vested authority to improperly discriminate against another public servant,<br />
person or entity).<br />
Conflict of interest<br />
The failure by a public servant to act or to consciously fail to act on a matter where the public servant has<br />
an interest or another person or entity that has some form of relationship with the public servant has an<br />
interest.<br />
Abuse of privileged information<br />
This involves the use, by a public servant of privileged information and knowledge that a public servant<br />
possesses as a result of his/ her office to provide unfair advantage to another person or entity to obtain a<br />
benefit.<br />
Favouritism<br />
The provision of services or resources according to personal affiliation (for example cultural or religious) of<br />
a public servant.<br />
305
Nepotism<br />
A public servant ensuring that family members are appointed to public service positions or that family<br />
members receive contracts from the state is regarded as nepotism.<br />
These manifestations are by no means exhaustive as corruption appears in many forms and it is virtually<br />
impossible to list all of these.<br />
E4. Local Economic Development Strategy (Approved)<br />
Purpose<br />
The purpose of this document is to recommend strategic interventions to create integrated and sustainable<br />
communities for Ba-Phalaborwa Local Municipality where social well-being, economic development and<br />
the environment are in harmony. This forms part of the DBSA sustainable community programme, which is<br />
currently being piloted at six places in South Africa, including Ba-Phalaborwa.<br />
Localised strategic guidelines for local economic development adopted to inform specific LED strategies<br />
and employment generation strategies which have to be designed to address unemployment and lack of<br />
income sources. The strategic guidelines will also inform strategies and the design of project proposals in<br />
other fields, which may have an impact on local economic development. These may include issues such as<br />
labour-intensive means of construction and procurement approaches.<br />
Motivation:<br />
The achievement of <strong>IDP</strong> objectives is largely dependant on the local economic development (LED) strategy<br />
that needs to incorporate elements of local economic promotion.<br />
Source documents for local economic guidelines:<br />
• The Constitution of the Republic of South Africa – mandate to promote social and economic<br />
development;<br />
• White paper on Local Government;<br />
• Growth, Employment and Redistribution Programme (GEAR), and<br />
306
• ASGISA (Accelerated and Shared Growth Initiative for South Africa).<br />
Relevant guidelines / principles:<br />
• Poverty alleviation through creation of employment opportunities by primarily utilizing local<br />
resources<br />
• Introduction of LED support programmes through strategies<br />
• Focal economic sectors for promotion;<br />
• Basic principles of promotion;<br />
• Major instruments of promotion;<br />
• Major target groups and intended beneficiaries;<br />
• Focal geographic areas.<br />
• LED should aim at creating employment opportunities and redistribution of economic resources and<br />
opportunities for the benefit of all residents (thereby contributing to alleviation of poverty) through<br />
economic growth and development based primarily on local resources. Local government is supposed<br />
to play a crucial role in promoting LED.<br />
• <strong>IDP</strong> is considered to be the tool to plan LED support programmes, assuming that some of the socio-<br />
economic needs (i.e. priority issues) will be best addressed through LED initiatives.<br />
• <strong>IDP</strong> has to ensure proper consideration of LED objectives in other strategies and initiatives (e.g.<br />
infrastructure development);<br />
• <strong>IDP</strong> should provide guidelines for the promotion of sector-specific or location-specific economic<br />
development initiatives (such as tourism development strategies) in the municipal area.<br />
Application of principles:<br />
The strategies for LED should incorporate the following elements:<br />
• The vigorous identification and sourcing of resources, public and private, for LED enhancement (i.e.<br />
attraction of investment, lobbying for government allocations etc.);<br />
• Consideration of employment creation possibilities for municipal projects; and<br />
• The advancement of facilitation of development of local economic potential.<br />
307
Key issues in the LED Strategy<br />
The strategy provides baseline information on the current:<br />
• Socio-economic situation<br />
• Spatial development situation<br />
• Infrastructure situation<br />
• State of the environment<br />
• Institutional capacity, and<br />
• Development policy in the Municipality<br />
It also projects future development scenarios and provides implementation plans for:<br />
• Mining<br />
• Tourism<br />
• Agriculture<br />
• Manufacturing<br />
• Housing<br />
• Entrepreneurship; and<br />
• Social investments.<br />
E5. Summary of Ba-Phalaborwa Municipality SDF (Approved)<br />
Purpose and Scope<br />
As a minimum legal requirement of the Municipal Systems Act (Act 32 of 2000), all Municipalities are<br />
required to prepare a Spatial Development Framework (SDF) as part of the Integrated Development<br />
Planning Process. The Spatial Development Framework for the Ba-Phalaborwa Local Municipality comprises<br />
of approximately 3001 km² that extends from Rubbervale in the West to Phalaborwa in the East and up to<br />
the Letaba River in the North and Grietjie in the South.<br />
308
Legislation<br />
Key legislation that guides, influences and impacts on the SDF.Name of Act/Policy/Guideline Short Name<br />
No of Act<br />
• Constitution of South Africa Constitution Act 108 of 1996<br />
• Municipal Systems Act Systems Act 32 of 2000<br />
• Municipal Structures Act Structures Act 117 of 1998<br />
• Municipal Demarcation Act Demarcation Act 27 of 1998<br />
• Development Facilitation Act DFA Act 67 of 1995<br />
• Transvaal Town Planning and Townships Ordinance O.15 of 1986 Ordinance 15 of 1986<br />
• Division of Land Ordinance O.20 of 1986 Ordinance 20 of 1986<br />
• Roads and Ribbon Development Act - Act 21 of 1940<br />
• Subdivision of Agricultural Land Act 70 of 1970<br />
• National Environmental Management Act NEMA Act 107 of 1998<br />
• Environmental Conservation Act (amended) ECA Act 50 of 2003<br />
• Extension of Security of Tenure Act ESTA Act 62 of 1997<br />
• Housing Act HA Act 107 of 1997<br />
• Interim Protection of Informal Land Rights Act IPILRA Act 31 of 1996<br />
• Less Formal Township Establishment Act LFTE Act 113 of 1991<br />
• Provision of Land and Assistance Act PLA Act 126 of 1993<br />
• National Spatial Development Perspective NSDP 2002<br />
• Limpopo Provincial Growth Development Strategy LGDS 2005<br />
• Limpopo Spatial Development Framework LSDF 2000<br />
• Mopani District Spatial Development Framework MSDF 2007<br />
• Mopani District Municipality <strong>IDP</strong> <strong>IDP</strong> 2007/8<br />
• Ba-phalaborwa <strong>IDP</strong> <strong>IDP</strong> 2007/8<br />
• Public Resort Ordinance Resort Ordinance Ord 18 of 1969<br />
• Ba-phalaborwa Town Planning Scheme TPS<br />
309
Land use management within the Municipality area is dealt with in terms of the existing Town Planning<br />
Ordinance, the Phalaborwa Town Planning Scheme, Proclamation R293 AND R 188,<br />
The objectives of the SDF are to:<br />
• Define desired patterns of land use within Ba-Phalaborwa municipal area.<br />
• Promote the spatial integration of the Municipal area in terms of defining:<br />
a) Integration of formerly disadvantaged areas.<br />
b) The identification of development nodes.<br />
c) Direction of growth.<br />
d) Major transport and movement routes.<br />
e) Conservation of the natural and built environment.<br />
f) Identification of specific development zones and densities.<br />
g) Proposed nature areas and location of future development in conjunction with the<br />
h) Integrated Environmental Programme of the Ba-Phalaborwa Municipality.<br />
i) Basic guidelines for a land use management system within the Municipal area.<br />
The Scope of work of the SDF includes:<br />
• Formulation of a policy of development to define desired patterns of land use and the spatial<br />
reconstruction of the municipal area.<br />
• Formulation of a Spatial Framework indicating the desired spatial form.<br />
• Development of Guidelines for a Land Use Management System.<br />
• Strategic Environmental Assessment of the impact of development proposals contained in the SDF.<br />
• Implementation plan of the SDF.<br />
• Institutional arrangement for effective implementation and management of the SDF.<br />
Key Deliverables of the SDF for Ba-Phalaborwa municipality are:<br />
• Spatial and updated spatial analysis<br />
• Reviewing of the Legal framework and land use plans which impacts on the Spatial<br />
• Development<br />
310
• Gathering of information to fill existing gaps.<br />
• Investigation of land use patterns, trends, tendencies and spatial imbalances.<br />
• Evaluation and assessment of vacant land.<br />
• Audit of land availability and ownership.<br />
• Visual presentation (GIS) of spatial issues and trends emanating from detailed investigation<br />
E6. Integrated Waste Management Plan<br />
Legislative and Policy Framework<br />
The Integrated Waste Management Plan is informed by the following legislative framework:<br />
• National legislation<br />
• National Policy<br />
• Intergovernmental Relations<br />
• Waste Related Legislation<br />
• National Initiatives<br />
• International Obligations<br />
Waste Management is a holistic approach to waste focusing on prevention and minimisation of both the<br />
generation of waste and any negative impact it may have on human health and the environment.<br />
Integrated Waste Management Plan is based on the concept of waste hierarchy, aims for universal service<br />
and requires separation at source to be effective.<br />
Cleaner production: Waste prevention and minimization<br />
Cleaner production focuses on production processes in order to ensure that the volume of waste over the<br />
life cycle of the product is reduced and minimised. Cleaner production also focuses on the efficient use of<br />
311
natural resources including water and energy, e.g a more energy efficient production process can reduce<br />
the need to burn coal for electricity and reduce the generation of ash from power plants.<br />
Collection<br />
• Ba-Phalaborwa removes waste from the following areas:<br />
• Phalaborwa town<br />
• Namakgale<br />
• Lulekani<br />
• Gravelotte<br />
Treatment<br />
Waste can treated after it is collacted and prior to final disposal. The goal of treatment is to reduce the<br />
volume of waste and to reduce its potential cause to harm to human health and the environment.<br />
Treatment for general includes incineration or biological processes. Other treatment options are available<br />
for specialised waste, e.g. the preferred treatment for infectious waste is steam sterilisation in an<br />
autoclave.<br />
Final Disposal of Waste<br />
The Phalaborwa waste disposal site is the one site that is currently used. The site is open from 07h00 in the<br />
morning to 18h00 in the evening. The dumping is site is not licensed landfill site.<br />
312
E7. Recruitment and Retention Strategy<br />
Preamble<br />
Staff recruitment and retention is currently regarded as one of the top priorities for strategic planning in an<br />
organization. This is focused on attracting employees to join the organization through focused recruitment<br />
and selection strategies and retaining those who are already employed especially those with crucial skills to<br />
the organization. The strategy will cover both the psychological aspects of employees, the operational<br />
aspects attached to the job or tasks where an employee is appointed and of utmost importance is about<br />
motivating staff.<br />
The strategy will address intentions to retain staff, classification of skills and the key aspects of staff<br />
recruitment and retention. The strategy will further highlight on what will make employees to stay in the<br />
municipality and what interventions measures to put in place to minimise staff turnover.<br />
Objectives<br />
• To become the employer of choice.<br />
• To ensure a conducive and harmonious working environment for employees.<br />
• To ensure employees health and wellness.<br />
• To attract and retain competent staff.<br />
• To retain key staff members whose services are regarded as critical or classified as scarce skills.<br />
• To ensure career development for staff.<br />
• To reduce annual staff turnover rate.<br />
Legislative framework<br />
• Basic conditions of employment Act<br />
• Employment Equity Act 55 of 1998<br />
• Skills Development Act 97 of 1998<br />
313
Principles that underpins the recruitment and Retention strategy<br />
• The policy is developmental rather than subjective.<br />
• Classification of posts into scarce skills, valued skills and high risk skills.<br />
• The culture of continually developing staff shall be maintained in line with the Skills Development Act<br />
and Performance Management System.<br />
• The culture of creating and sustaining a pleasant and humane working environment where employees<br />
are given a chance to thrive shall be a norm.<br />
• The potential and reasons for leaving the Ba-Phalaborwa municipality shall be determined by<br />
conducting exit interviews and staff morale assessment surveys.<br />
• The Recruitment and Retention policy should by no means be construed to be creating expectations for<br />
either promotion or monetary rewards.<br />
E8. Municipal Institutional Plan<br />
Ba-Phalaborwa Municipality is a Category B Municipality in terms of section 4 of the Municipal Structures<br />
Act of 1998 and was established in the year 2000. It is a municipality with a Mayoral Executive System<br />
contemplated in section 3(b) of the Northern Province Determination of Types of Municipality Act, 2000.<br />
The name of the Local municipality is Ba-Phalaborwa Local Municipality.<br />
The Municipal Institutional Plan is an internal plan that enables the municipality to organize and deploy its<br />
human resources and systems to achieve its strategic objectives.<br />
Purpose and benefits<br />
• The Municipal Institutional Plan ensures amongst others the following:<br />
• Ensure that there are resources properly arranged to implement the <strong>IDP</strong>.<br />
314
• Ensures that there is focus in the desired goals as stipulated in the <strong>IDP</strong> document are achieved without<br />
failure.<br />
• Better service delivery because you will be having the right people with skills.<br />
• Assists the municipality to drive its objectives.<br />
• Improves organizational effectiveness and efficiency.<br />
• It allows for integrated implementation of the <strong>IDP</strong>.<br />
• Optimal utilization of human capital.<br />
• It could contribute towards a clean audit.<br />
• Improves client relations.<br />
• Assists municipalities to do a realistic assessment of its capacity.<br />
• Assist municipalities to comply with legislative compliance.<br />
• It will assist the municipality to perform all its functions.<br />
• It contributes towards the alignment of the vision.<br />
• It should contribute towards the allocation of powers and functions<br />
Objectives<br />
• To become the employer of choice.<br />
• To ensure a conducive and harmonious working environment for employees.<br />
• To ensure employees health and wellness.<br />
• To attract and retain competent staff.<br />
• To retain key staff members whose services are regarded as critical or classified as scarce skills.<br />
• To ensure career development for staff.<br />
• To reduce annual staff turnover rate.<br />
Legislative framework<br />
• Basic conditions of employment Act<br />
• Employment Equity Act 55 of 1998<br />
• Skills Development Act 97 of 1998<br />
315
Principles that underpins the recruitment and Retention strategy<br />
• The policy is developmental rather than subjective.<br />
• Classification of posts into scarce skills, valued skills and high risk skills.<br />
• The culture of continually developing staff shall be maintained in line with the Skills Development Act<br />
and Performance Management System.<br />
• The culture of creating and sustaining a pleasant and humane working environment where employees<br />
are given a chance to thrive shall be a norm.<br />
• The potential and reasons for leaving the Ba-Phalaborwa municipality shall be determined by<br />
conducting exit interviews and staff morale assessment surveys.<br />
• The Recruitment and Retention policy should by no means be construed to be creating expectations for<br />
either promotion or monetary rewards.<br />
E9. Risk Management Policy<br />
The Accounting Officer has committed the Ba-Phalaborwa Municipality to a process of risk management<br />
that is aligned to the principles of good corporate governance, as supported by the Municipal Finance<br />
Management Act (MFMA), Act no 56 of 2003.<br />
Risk management is recognised as an integral part of responsible management and the Institution<br />
therefore adopts a comprehensive approach to the management of risk. The features of this process are<br />
outlined in the Institution’s Risk Management Strategy. It is expected that all departments / operations<br />
and processes will be subject to the risk management strategy. It is the intention that these departments<br />
will work together in a consistent and integrated manner, with the overall objective of reducing risk, as far<br />
as reasonably practicable.<br />
Effective risk management is imperative to the Institution to fulfill its mandate, the service delivery<br />
expectations of the public and the performance expectations within the Institution.<br />
316
The realization of our <strong>IDP</strong> depends on us being able to take calculated risks in a way that does not<br />
jeopardize the direct interests of stakeholders. Sound management of risk will enable us to anticipate and<br />
respond to changes in our service delivery environment, as well as take informed decisions under<br />
conditions of uncertainty.<br />
We subscribe to the fundamental principles that all resources will be applied economically to ensure:<br />
• The highest standards of service delivery;<br />
• A management system containing the appropriate elements aimed at minimizing risks and costs in the<br />
interest of all stakeholders;<br />
• Education and training of all our staff to ensure continuous improvement in knowledge, skills and<br />
capabilities which facilitate consistent conformance to the stakeholders expectations; and<br />
• Maintaining an environment, which promotes the right attitude and sensitivity towards internal and<br />
external stakeholder satisfaction?<br />
An entity-wide approach to risk management has been adopted by the municipality as out lined in the<br />
Municipal Risk Management Strategy, which means that every key risk in each part of the Municipality will<br />
be included in a structured and systematic process of risk management. Risk management processes have<br />
become embedded into the Institution’s systems and processes, ensuring that our responses to risk remain<br />
current and dynamic. All risk management efforts has been focused on supporting the Municipal’s<br />
objectives. Equally, they must ensure compliance with relevant legislation, and fulfill the expectations of<br />
employees, communities and other stakeholders in terms of corporate governance.<br />
E10. Disaster Management Plan<br />
This plan has been developed in order to provide key officials, role players and departments in the Ba-<br />
Phalaborwa Municipality as a general guideline for the expected initial response to an emergency and an<br />
overview of their responsibilities during an emergency or disaster.<br />
For this plan to be effective, it is important that all concerned parties be made aware of its provisions and<br />
that every official, role player, and department at personnel be prepared to carry out their assigned<br />
317
functions and responsibilities before, during and after emergency. The following paragraphs provide an<br />
overview of the background and some of the highlights of this plan.<br />
This plan serves to confirm the arrangements in the Phalaborwa Disaster Management approach to<br />
effectively prevent disasters from occurring and to lessen the impact of those hazards that cannot be<br />
avoided.<br />
Disaster Management is a continuous and integrated multi-sect oral and multi-disciplinary process of<br />
planning and implementation of measures aimed at disaster prevention, mitigation, preparedness,<br />
response, recovery, and rehabilitation (Disaster Management Act 57 of 2002)<br />
The preventative elements of this plan must be implemented and maintained on a continuous basis. The<br />
emergency or reactive elements of this plan will be implemented in the Ba-Phalaborwa Municipality<br />
whenever a major incident or disaster occurs or is threatening in its area of jurisdiction.<br />
The responsibility for the coordination of the overall implementation of the plan is that of the Head of the<br />
Disaster Management Centre.<br />
The Disaster Management Act requires the municipality to take the following actions:<br />
• Prepare a disaster management plan for its area according to the circumstances prevailing in the<br />
area.<br />
• Co-ordinate and align the implementation of its plan with those of other organs of state and<br />
institutional role players, and<br />
• Regularly review and update its plan.(section 48)<br />
The plan must:<br />
• Form an integral part of the municipal <strong>IDP</strong><br />
• Anticipate the likely types of disaster that might occur in the Municipal area and their possible<br />
effects.<br />
• Identify the communities at risk.<br />
• Provide for appropriate prevention and mitigation strategies.<br />
• Identify and address weaknesses in capacity to deal with possible disasters.<br />
• Facilitate maximum emergency preparedness/prevention/Mitigation<br />
• Establish the emergency management policy framework and organization that will be utilized to<br />
mitigate any significant emergency or disaster affecting the Phalaborwa Municipal area.<br />
• Establish the operational concepts & procedures associated with day to day operational response<br />
to emergencies by Municipal areas and municipal departments.<br />
• Contain contingency plans and emergency procedures in the event of a disaster, providing for-<br />
318
(i) The allocation and co-ordination of responsibilities allocated to the various role players.<br />
(ii) Prompt disaster response and relief,<br />
(iii) Disaster recovery and rehabilitation focused on risk elimination or mitigation.<br />
(iv) The procurement of essential goods and services,<br />
(v) The establishment of strategic communication links.<br />
(vi) The dissemination of information.<br />
Current Reality<br />
The Corporate Plan makes provision in a generic sense of hazards that will impact on the Municipal area<br />
economy, cultural, welfare, sustainable development and sustainable livelihoods.<br />
Hazard profiles, associated vulnerabilities and risk (probability or lost) will determine the priorities for<br />
Disaster Management programmes and projects. The possible cost benefit to be derived from a project in<br />
terms of lives protected, livelihoods secured and property or natural resources defended, will be the<br />
criteria that determines priorities.<br />
The following hazards found to pose the greatest risks in the Municipal area on the economy, cultural,<br />
welfare, sustained development and sustained livelihoods.<br />
Natural hazards<br />
Geological Hazards.<br />
Biological Hazards<br />
Technological Hazards and Environmental Degradation<br />
319
SECTION F<br />
Addedum: Municipal Organogram<br />
320
321