05.05.2013 Views

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

APPROVED IDP DOC 2011-16.BA PHALABORWA.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ba-Phalaborwa Municipality<br />

Approved <strong>IDP</strong> Document<br />

<strong>2011</strong> - 2016<br />

The Home of Marula and Wildlife Tourism<br />

1


Cllr GD Mudunungu<br />

Mayor of Ba-Phalaborwa Municipality<br />

This <strong>2011</strong>/16 <strong>IDP</strong> provides the strategic direction of the municipality, including the projects that will<br />

be undertaken in the municipality over the next five years until 2016. Except the difference in the<br />

format with the previous <strong>IDP</strong>s, there has also been a difference in the way we engage our partners in<br />

both community development and service extension. This includes having the Foskor and PMC<br />

undertaking to fund infrastructure upgrade in support of economic development and sustainability of<br />

the municipality.<br />

The public participation and stakeholder engagement process also reached and mobilized<br />

participation of more communities and stakeholders including the civic movement as the<br />

communities and our stakeholders actualize the spirit of “working together we can do more”.<br />

Therefore this <strong>IDP</strong> is an embodiment of the following:<br />

• A consolidated partnership in with stakeholders in service delivery and the pursuit of our<br />

Vision and Mission.<br />

• A deepened community-centred approach to development<br />

• A coordinated and integrated approach to planning and development of the municipality.<br />

The implementation of this <strong>IDP</strong> and its supportive Budget will result in ‘a better life for all’.<br />

Cllr. Gloria Dzunisani Mudunungu<br />

Mayor: Ba-Phalaborwa Municipality<br />

2


TABLE OF CONTENTS<br />

Section A<br />

3<br />

Page No<br />

A1. Ba-Phalaborwa Municipality: Overview 07<br />

A2. The Current Situation 07<br />

A3. Key Challenges and Opportunities 07<br />

A4. Municipal Strategies 08<br />

A5. Powers and Functions of the Municipality 08<br />

A6. <strong>IDP</strong> Process Plan 10<br />

A6.1 Phases and Activities of the <strong>IDP</strong> Process Plan 11<br />

A6.2 Structures that manage/drive <strong>IDP</strong>/Budget and PMS Process 12<br />

A6.4 <strong>IDP</strong>, Budget and PMS Calendar 31<br />

Section B<br />

Situational Analysis<br />

B1. The Internal Environment 46<br />

B1.1 Corporate Structure 46<br />

B1.2 Corporate Culture 47<br />

B1.3 Organisational Resources 48<br />

B1.4 Marketing 48<br />

B1.5 Finance 49<br />

B1.6 Municipal Operations 49<br />

B1.7 Human Resources Management 49<br />

B1.8 Information Systems (IS) 50<br />

B2. The External Environment 51<br />

B2.1 Spatial Analysis 51<br />

B2.1.1 Geographic Location 51


B.2.1.2 Mopani District SDF – An Overview 55<br />

B2.1.3 Guidelines for Land Use Management 55<br />

B2.1.4 Spatial Planning and Land Use 55<br />

B2.2 Demographics 64<br />

B2.2.1 Population 64<br />

B2.3 Local Economic Development and Tourism 70<br />

B2.4 Safety and Security 91<br />

B2.5 Environmental Considerations 92<br />

B2.7 Disaster Management 93<br />

B3. Institutional Arrangements 95<br />

B4. Governance and Financial Viability 95<br />

B5. Municipal Backlogs 100<br />

B5.1 Water 100<br />

B5.2 Sanitation 102<br />

B5.3 Electricity/Energy 109<br />

B5.4 Waste Management 115<br />

B5.5 Housing 116<br />

B5.6 Roads and Transport 120<br />

B5.7 Thusong Services Centre 131<br />

B5.8 Libraries 132<br />

B5.9 Recreational Facilities 135<br />

B5.10 Health Facilities 137<br />

B5.11 HIV/Aids 142<br />

B5.12 Educational Facilities 147<br />

B5.13 Special Groups 147<br />

B6. Problem Statement 148<br />

B7. Recommendations 148<br />

4


B8. Community Needs 148<br />

Section C<br />

Strategic Intent<br />

C1. Introduction 170<br />

C2. 2009/10 <strong>IDP</strong> Implementation Report 171<br />

C3. Analysis 176<br />

C4. Strategic Intent 184<br />

C4.1 Vision 190<br />

C4.2 Mission 191<br />

C4.3 Values 192<br />

C4.4 Strategy Map 192<br />

C4.5 Strategic Objectives 194<br />

C6 Ba-Phalaborwa Turnaround Strategy 217<br />

Section D<br />

Projects<br />

D1. Introduction 234<br />

D2 Operational and Maintenance 235<br />

D3. Programmes, Strategies and Plans 251<br />

D4. Capital Projects 262<br />

D5. MIG Projects 270<br />

D6. NDPG Projects 274<br />

D7. Mopani District Municipality Projects 275<br />

D8. Sector Departments Projects 277<br />

D9. Libsa Projects 287<br />

5


D10. Foskor Projects 288<br />

D11. Rio Tinto Palabora Foundation Projects 291<br />

D12. Rio Tinto SLP Projects 292<br />

D13. SA Airlink Project 293<br />

Section E<br />

Summaries of Sector Plans<br />

E1. Ba-Phalaborwa <strong>IDP</strong> Housing Chapter 295<br />

E2. Land Use Management Scheme 299<br />

E3. Anti-Corruption Strategy 301<br />

E4. Local Economic Development Strategy 306<br />

E5. Spatial Development Framework 308<br />

E6. Integrated Waste Management Plan 311<br />

E7. Recruitment and Retention Strategy 313<br />

E8. Municipal Institutional Plan 314<br />

E9. Risk Management Strategy 316<br />

E10. Disaster Management Plan 317<br />

SECTION F<br />

Addedum: Organogram of the Municipality<br />

6


A1. Ba-Phalaborwa Municipality: An Overview<br />

SECTION A<br />

Executive Summary<br />

Ba-Phalaborwa Municipality is a Category B municipality established in terms of Section 155 of the<br />

Constitution and strives to achieve the following objects of local government (as enshrined in Section<br />

152 of the Constitution):<br />

• To provide democratic and accountable government for local communities;<br />

• To ensure the provision of services to communities in a sustainable manner;<br />

• To promote social and economic development;<br />

• To promote a safe and healthy environment; and<br />

• To encourage the involvement of communities and community organisations in the matters of<br />

local government.<br />

The Municipality is situated in the North-Eastern part of South Africa in the Limpopo Province. It is one<br />

of the five local municipalities in the Mopani District family of municipalities. It has a geographical area<br />

of that constitutes 27% of the Mopani District. It serves as a convenient gateway to the<br />

Kruger National Park and the Transfrontier Park through the Mozambique Channel.<br />

A2. The Current Situation<br />

The current municipal Council is the third since the establishment of transitional local councils in 1995.<br />

The 1995 Council had 12 wards. Unlike the 2000 Council which had 14 wards and 28 councilors, the<br />

current Council (inaugurated in 2006) has 16 Wards with 32 councilors. The current term of this Council<br />

will expire in <strong>2011</strong>. The new Council that will be inaugurated in <strong>2011</strong> will have 18 wards with 36<br />

councillors, this after the addition of two wards from the existing 16 wards.<br />

A3. Key Challenges and Opportunities<br />

The Municipality has a developmental mandate to fulfill, but is currently threatened by the downscaling<br />

of the mining sector (the main contributor to the local GDP). The mining sector is expected to shed jobs<br />

in the near future as a result of Palabora Mining Company (PMC) stopping copper mining and the<br />

7


esultant closure of other related operations in the area. The Municipality’s main challenge is to<br />

stimulate the local economy and attract sustainable investment into the area. There is an abundance of<br />

a variety of minerals within the Phalaborwa area and the Gravelotte Greenstone Belt and that further<br />

presents an opportunity for small scale mining. The close proximity of the Municipality to the Kruger<br />

National Park Gate also presents an opportunity to grow the tourism industry.<br />

A4. Municipal Strategies<br />

The Municipality has taken a decision to focus on growing the Tourism industry in an attempt to<br />

mitigate for any losses from the mining sector. The strategic intent of the Municipality is, therefore,<br />

around economic development through tourism.<br />

A5. Powers and Functions of the Municipality<br />

In terms of the Municipal Demarcation Board’ assessment of the capacity of municipalities to perform<br />

their functions, Ba-Phalaborwa Municipality is authorized to exercise and perform the following powers<br />

functions:<br />

Table A5.1: Powers and functions of the Municipality<br />

POWERS & FUNCTIONS AUTHORISATION RESPONSIBLE DEPARTMENT<br />

Air pollution Yes Community Services<br />

Building regulations Yes Technical Services<br />

Child care facilities Yes Community Services<br />

Electricity reticulation Yes Technical Services<br />

Fire fighting No -<br />

Local tourism Yes Planning and Development<br />

Municipal airport Yes Community Services, Strategic Planning<br />

Municipal planning Yes Planning and Development<br />

Municipal health services Yes Community Services<br />

Municipal public transport Yes Community Services<br />

8


POWERS & FUNCTIONS AUTHORISATION RESPONSIBLE DEPARTMENT<br />

Pontoons & ferries Yes Community Services<br />

Storm water Yes Technical Services<br />

Trading regulations Yes Community Services<br />

Water (potable) No -<br />

Billboards & the display of<br />

advertisements in public<br />

places<br />

Cemeteries, funeral parlous<br />

and crematoria<br />

Yes Corporate Services, Planning & Community<br />

Services<br />

Yes, including<br />

District<br />

Municipality<br />

function<br />

Community Services<br />

Cleansing Yes Community Services<br />

Control of public nuisance Yes Community Services<br />

Control of undertakings that<br />

sell liquor to the public<br />

Facilities for the<br />

accommodation, care and<br />

burial of animals<br />

Yes Community Services<br />

Yes Community Services<br />

Fencing & fences Yes Technical Services<br />

Licensing and control of<br />

undertakings that sell food to<br />

the public<br />

Yes Community Services<br />

Local amenities Yes Community Services, Corporate Services<br />

Local sport facilities Yes Community Services, Corporate Services<br />

Markets Yes Community Services, Planning<br />

Municipal abattoirs Yes Community Services<br />

Municipal parks & recreation Yes Community Services<br />

Municipal roads Yes Technical Services, Community Services<br />

9


POWERS & FUNCTIONS AUTHORISATION RESPONSIBLE DEPARTMENT<br />

Noise pollution Yes Community Services<br />

Pounds Yes Community Services<br />

Public places Yes Community Services, Corporate Services<br />

Refuse removal, refuse<br />

dumps and solid waste<br />

disposal<br />

Yes, including<br />

District<br />

Municipality<br />

function<br />

Community Services<br />

Street trading Yes Planning & Community<br />

Street lighting Yes Technical Services<br />

Traffic and Parking Yes Community Services<br />

Source: Municipal Demarcation Board, 2008<br />

A6. <strong>IDP</strong> Process Plan<br />

Section 28 of the Municipal Systems Act, Act 32 of 2000 requires that each Municipal Council adopts a<br />

process plan that would guide the planning, drafting, adoption and review of the <strong>IDP</strong> and Budget. In line<br />

with the provisions of the above-mentioned Act, Ba-Phalaborwa Municipality has adopted the District<br />

<strong>IDP</strong> Framework and Process Pan in reviewing its <strong>2011</strong>/12 <strong>IDP</strong>. The Process Plan was amended in January<br />

<strong>2011</strong> to be in line with Option 1of the MFMA Circular 54 of 2010, which advises municipalities on the<br />

planning and budget issues to accommodate the <strong>2011</strong> local government elections.<br />

10


A6.1Phases and Activities of the <strong>IDP</strong> Process<br />

The table below shows the phases/stages of the <strong>IDP</strong> Process and Activities entailed for the review of the<br />

<strong>2011</strong>/12 <strong>IDP</strong>:<br />

Stages/Phases of the <strong>IDP</strong> Process<br />

<strong>IDP</strong> Phases Activities<br />

Preparatory Phase<br />

Analysis Phase<br />

Strategies Phase<br />

Projects Phase<br />

Integration Phase<br />

Approval Phase<br />

- Identification and establishment of stakeholders and/or<br />

structures and sources of information.<br />

- Development of the <strong>IDP</strong> Framework and Process Plan.<br />

- Compilation of levels of development and backlogs that<br />

suggest areas of intervention.<br />

- Reviewing the Vision, Mission, Strategies and Objectives.<br />

- Identification of possible projects and their funding<br />

sources<br />

- Sector plans summary inclusion and programmes of action<br />

- Submission of Draft <strong>IDP</strong> to Council<br />

- Road-show on Public Participation and publication<br />

- Amendments of the Draft <strong>IDP</strong> according to comments;<br />

- Submission of final <strong>IDP</strong> to council for approval and<br />

adoption<br />

11


A6.2 Structures that manage/drive the <strong>IDP</strong>, Budget and PMS process<br />

The following diagram is a schematic representation of the organisational structure that drives the <strong>IDP</strong> Process:<br />

Advisory Board<br />

Council<br />

Mayor<br />

Municipal Manager<br />

<strong>IDP</strong>, Budget & PMS Steering<br />

Committee<br />

<strong>IDP</strong>, Budget & PMS Technical<br />

Committee<br />

<strong>IDP</strong>, Budget & PMS Operational<br />

Task Team Meeting<br />

12<br />

Stakeholder Structures<br />

<strong>IDP</strong>, Budget & PMS Rep Forum<br />

Exco<br />

Public/Communit<br />

y Structures<br />

Ward<br />

Committees/LAP<br />

Facilitators


The following structures were responsible to develop, implement and monitor the <strong>IDP</strong>, Budget and PMS of Ba-Phalaborwa. Ba-Phalaborwa<br />

Municipality <strong>IDP</strong>, Budget and PMS process has been aligned with that of the District Municipality as indicated in the table below:<br />

Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Mopani District<br />

Municipality<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

• District Council<br />

• <strong>IDP</strong> Unit<br />

13<br />

• Approve and adopt a<br />

District-wide <strong>IDP</strong><br />

Framework and Process<br />

Plan<br />

• Participate in the <strong>IDP</strong><br />

Process<br />

• Provide methodological<br />

and technical assistance<br />

• Coordinate and support<br />

<strong>IDP</strong> activities<br />

• Ensure <strong>IDP</strong> alignment to<br />

district, provincial and<br />

national requirements.


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Council Members of Council<br />

Mayoral Committee/<br />

EXCO<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

(Chair: Speaker)<br />

Mayor, Portfolio Heads,<br />

Municipal Manager,<br />

Directors, and <strong>IDP</strong><br />

Manager<br />

(Chair: The Mayor)<br />

Members of Council<br />

(Chair: Speaker)<br />

Executive Mayor,<br />

Portfolio Heads,<br />

Municipal Manager and<br />

Senior<br />

Managers/Directors<br />

(Chair: Executive Mayor)<br />

14<br />

• Deliberate and adopt <strong>IDP</strong><br />

Framework and Process<br />

plan.<br />

• Deliberate, adopt and<br />

approve the <strong>IDP</strong>.<br />

• Provide political oversight<br />

in the development of the<br />

<strong>IDP</strong><br />

• Approve/adopt <strong>IDP</strong><br />

• Assign responsibilities to • Submit draft <strong>IDP</strong> to Council<br />

Municipal Manager.<br />

• Deliberate and adopt <strong>IDP</strong><br />

Framework and Process<br />

Plan.<br />

• Political oversight<br />

• Assign responsibilities to<br />

Municipal Manager


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Advisory Board An independent board<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

of senior leaders<br />

representing various<br />

sectors.<br />

15<br />

• Responsible for the<br />

overall management, co-<br />

ordination and monitoring<br />

of the planning process<br />

and drafting process, as<br />

delegated to the<br />

Municipal Manager and<br />

the <strong>IDP</strong> Technical Team.<br />

• Submit draft <strong>IDP</strong> to<br />

Council.<br />

• Oversee the<br />

implementation of the<br />

Development Charter.<br />

• Advice the <strong>IDP</strong><br />

representative forum and<br />

mobilise resources for


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Portfolio Committee Chairperson and<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

members of Portfolio<br />

Committee – Planning &<br />

Development. (Chair:<br />

Head of Portfolio<br />

Committee)<br />

Ward Committees Ward councillors; Ward<br />

committee members;<br />

Local Area Planning<br />

Facilitators (LAPs); and<br />

Community<br />

Development Workers<br />

Councillors and Director<br />

Planning and<br />

Development. (Chair:<br />

Portfolio Head,<br />

Planning)<br />

16<br />

development<br />

programmes and projects<br />

• Manage the drafting of<br />

the <strong>IDP</strong> on behalf of the<br />

Executive Committee<br />

• Provide political oversight.<br />

• Collect, discuss and<br />

prioritise ward needs.<br />

• Submit ward needs to <strong>IDP</strong><br />

Unit Link the planning<br />

process to their respective<br />

constituencies, wards and<br />

Ward Committees.<br />

• Manage the drafting of<br />

the <strong>IDP</strong> on behalf of the<br />

Mayoral Committee


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

(CDWs). Chair: Ward<br />

Councillor)<br />

Municipal Manager The Municipal Manager<br />

17<br />

• Responsible for organizing<br />

public consultation and<br />

participation.<br />

• Ensure the annual<br />

business plans and<br />

municipal budget are<br />

linked to and based on<br />

the <strong>IDP</strong>.<br />

• Ensure the <strong>IDP</strong> is aligned<br />

with provincial and<br />

national departments’<br />

budgets.<br />

• Responsible for the<br />

overall management,


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

18<br />

coordination and<br />

monitoring of the<br />

planning process, as<br />

delegated to the<br />

Municipal Manager and<br />

the <strong>IDP</strong>/Budget Technical<br />

Team.<br />

• Coordinates the<br />

implementation of the<br />

<strong>IDP</strong>/Budget planning<br />

process.<br />

• Prepares the programme<br />

for the planning process.<br />

• Undertakes the overall<br />

management and co-<br />

ordination of the planning


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

19<br />

process, ensuring that all<br />

relevant actors are<br />

appropriately involved.<br />

• Assign persons in charge<br />

of different roles.<br />

• Ensures an efficient and<br />

effectively managed and<br />

organised planning<br />

process.<br />

• Responsible for the day-<br />

to-day management of<br />

the drafting process.<br />

• Ensures that planning<br />

process is participatory,<br />

strategic and<br />

implementation-


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

20<br />

orientated and is aligned<br />

to and satisfies sector-<br />

planning requirements.<br />

• Responds to comments<br />

on the draft <strong>IDP</strong>/Budget<br />

from the public,<br />

horizontal alignment and<br />

other spheres of<br />

government to the<br />

satisfaction of the<br />

Municipal Council.<br />

• Ensures that MEC for local<br />

government’s proposals<br />

are responded to and <strong>IDP</strong><br />

relevantly adjusted.


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

<strong>IDP</strong>/Budget & PMS<br />

Steering Committee<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

Mayor, Chairpersons of<br />

Portfolio Committees,<br />

Municipal Manager,<br />

Directors, Assistant<br />

Financial Officer:<br />

Budget, Asst Director:<br />

SP, <strong>IDP</strong> Manager, Ass<br />

Accountant Budget.<br />

(Chair: Mayor)<br />

Municipal Manager,<br />

Directors, <strong>IDP</strong> Manager,<br />

Middle Managers<br />

(Chair: Municipal<br />

Manager)<br />

21<br />

• Provide political oversight<br />

in the development of the<br />

<strong>IDP</strong>/Budget.<br />

• Supervises the<br />

implementation of<br />

<strong>IDP</strong>/Budget planning<br />

process.<br />

• <strong>IDP</strong>/Budget consultation<br />

with various sectors.<br />

• Oversee that<br />

amendments made to the<br />

draft <strong>IDP</strong>/Budget are to<br />

the satisfaction of the<br />

Municipal Council.<br />

• Responsible for the<br />

drafting of the <strong>IDP</strong>.<br />

• Alignment of process &<br />

plans<br />

• <strong>IDP</strong> consultation with<br />

various sectors<br />

• Preparations for all <strong>IDP</strong><br />

meetings


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

<strong>IDP</strong> /Budget & PMS<br />

Technical Committee<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

Municipal Manager, All<br />

Directors, All Ass<br />

Directors, Middle<br />

Managers, Ass. Acc:<br />

22<br />

• Be responsible for the<br />

submission of the<br />

<strong>IDP</strong>/Budget to EXCO (for<br />

recommendation to<br />

Council) and MEC for local<br />

government (for<br />

alignment).<br />

• Undertakes<br />

responsibilities, in<br />

response to proposals<br />

made by the MEC.<br />

• Contribute technical<br />

expertise in the<br />

consideration and<br />

finalisation of strategies<br />

and identification of


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

Budget and <strong>IDP</strong><br />

Manager (Chair:<br />

Municipal Manager)<br />

23<br />

projects.<br />

• Provide departmental,<br />

operational and capital,<br />

budgetary information.<br />

• Be responsible for project<br />

proposals.<br />

• Be responsible for the<br />

preparation and<br />

integration of projects<br />

and sector programmes.<br />

• Be responsible for<br />

preparing amendments<br />

for the <strong>IDP</strong>/Budget<br />

review.<br />

• Responsible for organising<br />

public consultation and


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

<strong>IDP</strong>/Budget & PMS<br />

Operational Task Teams<br />

<strong>IDP</strong><br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

Asst Director: SP, <strong>IDP</strong><br />

Manager, LED Manager,<br />

PMS Manager, Public<br />

Participation Officer.<br />

(Chair: Deputy Director<br />

SP)<br />

Government<br />

Departments, Local<br />

Municipalities, District<br />

Management Area,<br />

Traditional Leaders,<br />

CBOs, SOEs, NPOs,<br />

CDWs, Associations,<br />

Interest groups, and<br />

Resource Persons. (Chair:<br />

Executive Mayor)<br />

24<br />

participation.<br />

<strong>IDP</strong><br />

• Implements the Process<br />

Plan.<br />

• Provide analysis of<br />

relevant technical and<br />

sector information.<br />

• <strong>IDP</strong> consultation with<br />

various sectors.<br />

• Preparations for all <strong>IDP</strong><br />

meetings.<br />

• Ensures documentation of<br />

the results of the review<br />

of the <strong>IDP</strong> document.<br />

• Ensures amendments are<br />

• <strong>IDP</strong> consultation with<br />

various sectors.<br />

• Preparations for all <strong>IDP</strong><br />

meetings


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Budget<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

CFO, Ass. Fin. Officer:<br />

Budget, Ass Acc:<br />

Budget, All Assistant<br />

Directors: (Chair:<br />

Budget & Treasury<br />

Manager)<br />

25<br />

Budget<br />

made to the draft <strong>IDP</strong> to<br />

the satisfaction of the<br />

Technical Committee<br />

• Implements the budget<br />

Process Plan.<br />

• Provides analysis of<br />

relevant technical, sector<br />

and financial information.<br />

• Ensure Departmental<br />

Budget Committees are<br />

functional<br />

• Ensures proper<br />

documentation of the


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Advisory Board<br />

(Development Charter)<br />

<strong>IDP</strong>, Budget & PMS<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

An independent board<br />

of senior leaders<br />

representing various<br />

sectors.<br />

26<br />

results of the drafting of<br />

Budget document.<br />

• Ensures amendments are<br />

made to the draft Budget<br />

to the satisfaction of the<br />

Technical Committee.<br />

• Oversee the<br />

implementation of the<br />

Development Charter.<br />

• Advice the <strong>IDP</strong><br />

representative forum and<br />

mobilise resources for<br />

development<br />

programmes and projects<br />

• Stakeholders forum • Government • Participate and ratify the • Debate and confirm the


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Representative Forum comprising,<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

amongst others,<br />

community<br />

structures, non-<br />

profit making<br />

organisations,<br />

Traditional Leaders,<br />

Ward Councillors,<br />

Associations,<br />

Interest Groups,<br />

Government<br />

departments,<br />

Church leaders,<br />

Ward Committee<br />

Members. (Chair:<br />

departments, local<br />

municipalities,<br />

district management<br />

area, traditional<br />

leaders, CBOs, SOEs,<br />

NPOs, CDWs,<br />

Associations, Interest<br />

groups and Resource<br />

Persons. (Chair:<br />

Executive Mayor)<br />

27<br />

completion of each phase of<br />

the <strong>IDP</strong> development and<br />

review process.<br />

• Represent the communities<br />

at strategic decision-making<br />

level.<br />

priorities of the<br />

municipality.<br />

• Represent the<br />

communities at decision-<br />

making level


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Public Participation<br />

Team<br />

Cluster Technical<br />

Committee<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

The Mayor)<br />

• Representatives<br />

from all directorates<br />

and the office of the<br />

Speaker (Chair:<br />

Assistant Director<br />

Strategic Planning)<br />

• Economic Technical<br />

Committee (Chair:<br />

Director Planning<br />

28<br />

• Coordination of the public<br />

participation programme.<br />

• Mobilise the involvement<br />

and commitment of<br />

stakeholders.<br />

• Ensure participation of<br />

previously disadvantaged<br />

groups, e.g. women, the<br />

disabled, etc.<br />

• Implement the <strong>IDP</strong><br />

• Develop sector plans


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

and Development)<br />

• Social and<br />

Infrastructure<br />

Technical Committee<br />

(Chair: Director<br />

Community Services)<br />

• Governance and<br />

Administration<br />

Technical Committee<br />

(Chair: Chief<br />

Financial Officer)<br />

Performance Audit Audit Committee Members of the Audit<br />

29<br />

• <strong>IDP</strong>/Budget/PMS • <strong>IDP</strong>/Budget/PMS


Structures that manage/drive the <strong>IDP</strong> Process<br />

Structure Composition Role<br />

Committee members, PMS<br />

District Development<br />

Planning Forum<br />

Dept, Local<br />

Government and<br />

Housing<br />

Ba-Phalaborwa Mopani Ba-Phalaborwa Mopani<br />

Coordinator, and<br />

Internal Auditor (Chair:<br />

Chairperson of the<br />

Audit Committee)<br />

Committee, PMS<br />

Coordinator, Internal<br />

Auditor<br />

MDM: District Sector Departments, SOEs, Youth<br />

commission, LMs<br />

MEC for Local Government and Housing<br />

30<br />

monitoring monitoring<br />

• Assess/Evaluate the <strong>IDP</strong><br />

• Alignment of planning,<br />

National, Provincial & Local<br />

Government<br />

• Comment and Monitor <strong>IDP</strong> implementation


A6.3 <strong>IDP</strong>, Budget and PMS Calendar<br />

Ba-Phalaborwa Municipality followed the above calendar in reviewing its <strong>IDP</strong>, Budget and PMS in line with the Approved District Framework.<br />

Month Activity Time-Frame<br />

July 2010 Preparatory Phase:<br />

<strong>IDP</strong><br />

• Portfolio Committee (<strong>IDP</strong><br />

Framework and Process Plan).<br />

• Mayor tables <strong>IDP</strong>/Budget<br />

Framework & Process Plan in<br />

(Special Council)<br />

Budget<br />

• Establish Departmental Budget<br />

Committees (include councillors &<br />

officials).<br />

PMS<br />

• Compilation of 2009/10 4 th<br />

quarterly report<br />

• Conclude 2010/11 annual<br />

31<br />

MDM only<br />

MDM only<br />

Ba-Phalaborwa Mopani<br />

• 23/07/2010 – 03/09/2010<br />

• 01/07/2010 - 11/07/2010<br />

31 July 2010


August 2010<br />

Month Activity Time-Frame<br />

performance agreements<br />

• Compilation of 2009/10 <strong>IDP</strong><br />

Implementation Report<br />

• Submit final approved SDBIP<br />

2010/11<br />

<strong>IDP</strong><br />

• <strong>IDP</strong>/Budget Operational Teams<br />

meetings (Process Plan)<br />

• <strong>IDP</strong>/Budget Technical Committee<br />

meeting (Process Plan)<br />

• <strong>IDP</strong>/Budget Steering Committee<br />

meeting (Process Plan)<br />

• Establish appropriate committees<br />

and consultation forums. Adopt a<br />

schedule for community<br />

involvement<br />

• <strong>IDP</strong> Representative (Rep) Forum<br />

(Process Plan)<br />

• Mayor tables <strong>IDP</strong>/Budget/PMS<br />

Process Plan in Council<br />

Budget<br />

32<br />

Ba-Phalaborwa Mopani<br />

• 01/07/2010 - 31/07/2010<br />

• 01/07/2010 - 31/08/2010<br />

• 31/07/2010<br />

• 12/08/2010<br />

• 16/08/2010<br />

• 18/08/2010<br />

• 18/08/2010<br />

• 24/08/2010<br />

• 31/08/2010


Month Activity Time-Frame<br />

• 2009/10 internal analysis of<br />

financial and non-financial<br />

performance. Determine financial<br />

position and assess financial<br />

capacity against future strategies.<br />

August 2010 PMS<br />

• Place 2009/10 quarterly (section 52)<br />

report on budget implementation<br />

on the municipal website.<br />

• Make public the 2010/11 SDBIP<br />

• Make public 2010/11 annual<br />

performance agreements and<br />

ensure copies are provided to<br />

council and MEC: DLGH<br />

• Submission of 2009/10<br />

Departmental Annual Performance<br />

Reports.<br />

• Place 2010/11 annual performance<br />

agreements on the municipal<br />

website.<br />

33<br />

Ba-Phalaborwa Mopani<br />

• 31/08/2010<br />

• 04/08/2010<br />

• 11/08/2010<br />

• 11/08/2010<br />

• 12/08/2010<br />

• 16/08/2010<br />

September 2010 <strong>IDP</strong> 30 September 2010


Month Activity Time-Frame<br />

Analysis Phase:<br />

• 2009/10 <strong>IDP</strong> implementation<br />

feedback: First Quarter Mayoral<br />

Imbizo<br />

• Data collection (ward-based<br />

planning)<br />

• Data analysis and interpretation<br />

Budget<br />

• Determine the funding revenue<br />

envelope potential (tariff review by<br />

departments)<br />

• Prepare initial allocation based on<br />

financial capacity & future outlook<br />

• Table indicative allocations to<br />

financial committee<br />

• Conclude initial consultation review<br />

and establish direction and policy,<br />

confirm priorities, identify other<br />

financial and non-financial budget<br />

parameters. Submission of priorities<br />

by departmental budget committees.<br />

PMS<br />

34<br />

Ba-Phalaborwa Mopani<br />

• 01/09/2010 – 10/09/2010<br />

• 01/09/2010 – 30/09/2010<br />

• 01/09/2010 – 08/10/2010<br />

• 03/09/2010 – 26/09/2010<br />

• 08/09/2010–26/09/2010<br />

• 17/09/2010<br />

• 29/10/2010


Month Activity Time-Frame<br />

• Submission of draft 2009/10<br />

departmental annual reports<br />

35<br />

• 25/09/2010<br />

Ba-Phalaborwa Mopani<br />

September 2010 Budget 30 September 2010<br />

• Circulate budget schedules to all<br />

departments<br />

• Consolidate draft core departments<br />

business plans & budgets<br />

• Review resources frames and<br />

financial strategies<br />

October 2010 <strong>IDP</strong><br />

ANALYSIS & STRATEGIES PHASES<br />

• <strong>IDP</strong>/Budget Operational Teams<br />

(Analysis Phase)<br />

• <strong>IDP</strong>/Budget Technical Committee<br />

(Analysis Phase)<br />

• Portfolio Committee meeting<br />

(Analysis Phase)<br />

• Advisory Board meeting with<br />

Municipal Manager<br />

• 30/09/2010 – 05/11/2010<br />

• 30/09/2010 – 05/11/2010<br />

• 30/09/2010 – 05/11/2010<br />

• 08/10/2010<br />

• 12/10/2010<br />

• 14/10/2010<br />

• 11/10/2010 - 14/10/2010


Month Activity Time-Frame<br />

• <strong>IDP</strong>/Budget Steering Committee<br />

(Analysis Phase)<br />

• Rep. Forum (Data presentation &<br />

prioritization of needs)<br />

• Strategic session<br />

Budget<br />

• Commence preparation for the<br />

2010/14 departmental operational<br />

plans and service delivery and budget<br />

implementation plan aligned to<br />

strategic priorities in <strong>IDP</strong> and inputs<br />

from other stakeholders including<br />

government and bulk service<br />

providers (and NERSA)<br />

• Submission of departmental<br />

adjustment budgets<br />

• Departmental budgets inputs for<br />

<strong>2011</strong>/14<br />

36<br />

• 19/10/2010<br />

• 21/10/2010<br />

Ba-Phalaborwa Mopani<br />

• 28/10/2010 – 29/10/2010<br />

• 15/12/2010<br />

• 15/12/2010<br />

• 15/12/2010<br />

31 October 2010


November 2010<br />

Month Activity Time-Frame<br />

PMS<br />

• Individual Performance assessments<br />

(First Quarter)<br />

• Continuation of preparations for the<br />

2009/10 annual report utilizing<br />

financial and non-financial<br />

information first reviewed as part of<br />

the budget and <strong>IDP</strong> analysis.<br />

• Compilation of first quarter<br />

performance report.<br />

• Mayoral Imbizo on first quarter<br />

performance<br />

STRATEGIES PHASE<br />

• <strong>IDP</strong>/Budget Operational Teams<br />

(Strategies)<br />

• Develop list of projects (Strategies)<br />

• <strong>IDP</strong>/Budget Technical Committee<br />

(Strategies)<br />

• Advisory Board meeting with<br />

37<br />

Ba-Phalaborwa Mopani<br />

• 01/10/2010 – 30/10/2010<br />

• 01/10/2010 – 30/10/2010<br />

• 01/10/2010 – 30/10/2010<br />

• 14/11/2010<br />

<strong>IDP</strong> November 2010<br />

• 02/11/2010<br />

• 02/11/2010 – 16/11/2010<br />

• 04/11/2010


Month Activity Time-Frame<br />

Municipal Manager<br />

• <strong>IDP</strong>/Budget Steering Committee<br />

(Strategies)<br />

• <strong>IDP</strong>/Budget Rep Forum (Strategies)<br />

Budget<br />

• Community and stakeholder<br />

consultation process, review inputs,<br />

financial models, assess impacts on<br />

tariffs and charges and consider<br />

funding decisions including<br />

borrowing. Adjust estimates based<br />

on plans and resources. Commence<br />

consultation on the proposed tariffs.<br />

Check the tariff submission date and<br />

align<br />

December 2010 <strong>IDP</strong><br />

PROJECTS PHASE<br />

• Review project design sheets<br />

38<br />

• 11/10/2010<br />

• 18/11/2010<br />

Ba-Phalaborwa Mopani<br />

• 02/11/2010 – 27/11/2010<br />

• 01/12/2010 – 23/12/2010


January <strong>2011</strong><br />

Month Activity Time-Frame<br />

Budget<br />

• Finalise the <strong>2011</strong>/14 inputs from bulk<br />

resource providers (and NERSA) and<br />

agree on proposed price increase.<br />

(Align after submission of proposed<br />

tariffs)<br />

PMS<br />

• Oversight Training of all councillors<br />

for probing the 2009/10<br />

• Finalise the draft 2009/10 annual<br />

report incorporating financial and<br />

non-financial information on<br />

performance, audit reports and<br />

annual financial statements.<br />

• Present Draft Annual Report to EXCO<br />

39<br />

• 01/12/2010<br />

Ba-Phalaborwa Mopani<br />

• 01/12/2010 – 14/12/2010<br />

• 14/12/2010<br />

• 17/12/2010<br />

<strong>IDP</strong> 31 January <strong>2011</strong><br />

PROJECTS<br />

PHASE<br />

PHASE & INTEGRATION<br />

• Projects prioritization task • 11/01/<strong>2011</strong> – 13/01/<strong>2011</strong><br />

team(Projects prioritization)<br />

• <strong>IDP</strong>/Budget Technical Committee • 18/01/<strong>2011</strong><br />

(Projects prioritization)


Month Activity Time-Frame<br />

• Advisory Board meeting with<br />

Municipal Manager<br />

• <strong>IDP</strong>/Budget Steering Committee<br />

(Projects Prioritization)<br />

• Joint Portfolio Committees seating<br />

(Priority list)<br />

• <strong>IDP</strong> Representative Forum (priority<br />

list)<br />

40<br />

• 20/01/<strong>2011</strong><br />

• 25/01/<strong>2011</strong><br />

• 27/01/<strong>2011</strong><br />

Budget<br />

• Mid-Year Performance Assessment<br />

and recommend and adjustment<br />

budget, if necessary.<br />

• 25/01/<strong>2011</strong><br />

• Incorporate priorities from the<br />

President’s State of the Nation • 21/01/<strong>2011</strong> – 25/02/<strong>2011</strong><br />

Address, National Treasury and<br />

SALGA for further budget<br />

•<br />

consideration.<br />

Review all aspects of the <strong>2011</strong>/14<br />

budget including any unforeseen and<br />

unavoidable expenditure in light of<br />

need for an adjustment budget.<br />

• 11/01/<strong>2011</strong> – 25/01/<strong>2011</strong><br />

• Tabling and approval of an<br />

adjustments budget (if necessary) • 25/01/<strong>2011</strong><br />

• Submit the <strong>2011</strong>/14 approved<br />

adjustments budget to the Provincial • 11/03/<strong>2011</strong><br />

Ba-Phalaborwa Mopani


Month Activity Time-Frame<br />

& National Treasury & any other<br />

affected organ of state (10 days after<br />

approval.)<br />

PMS<br />

• Compilation of 2010/11 Mid-year<br />

report<br />

• Mayor tables 2009/10 annual report<br />

to council.<br />

• Make public the 2009/10 annual<br />

report and invite comments from<br />

local community, submit report to<br />

the Auditor-General, Provincial<br />

Treasury & DLGH<br />

• Consider monthly & mid-year reports<br />

for the period ended 31 December,<br />

review implementation of budget<br />

and service delivery and budget<br />

implementation plan, identify<br />

problems and amend or recommend<br />

appropriate amendments. Submit<br />

report to council and make public<br />

any amendment to the SDBIP – due<br />

end of month.<br />

• Mayor reports to Council the status<br />

of next three year budget, 2009/10<br />

annual report (including AFS & audit<br />

41<br />

Ba-Phalaborwa Mopani<br />

• 03/01/<strong>2011</strong> – 21/01/<strong>2011</strong><br />

• 31/01/<strong>2011</strong><br />

• 31/01/<strong>2011</strong><br />

• 31/01/<strong>2011</strong><br />

• 31/01/<strong>2011</strong>


February <strong>2011</strong><br />

Month Activity Time-Frame<br />

report) and summarizes overall<br />

findings of 2009/10 annual<br />

performance report.<br />

• Individual Performance Assessments<br />

(Second Quarter)<br />

APPROVAL PHASE(DRAFT <strong>IDP</strong>, BUDGET<br />

& PMS)<br />

• <strong>IDP</strong>/Budget Operational Teams (Draft<br />

<strong>IDP</strong>, Budget & PMS)<br />

• <strong>IDP</strong>/Budget Technical Committee<br />

(Draft <strong>IDP</strong>/Budget)<br />

• Advisory Board meeting with<br />

Municipal Manager<br />

• <strong>IDP</strong>/Budget Steering Committee<br />

Meeting (Draft <strong>IDP</strong> document)<br />

• <strong>IDP</strong>/Budget Representative Forum<br />

• Establishment of Public Participation<br />

Project Team<br />

• Mayor table the Draft <strong>IDP</strong>, Budget &<br />

PMS in Council for adoption<br />

42<br />

Ba-Phalaborwa Mopani<br />

• 13/01/<strong>2011</strong> – 31/01/<strong>2011</strong><br />

<strong>IDP</strong> 28 February <strong>2011</strong><br />

PMS<br />

• 08/02/<strong>2011</strong><br />

• 10/02/<strong>2011</strong><br />

• 15/02/<strong>2011</strong><br />

• 22/02/<strong>2011</strong><br />

• 28/02/<strong>2011</strong><br />

• 28/02/<strong>2011</strong>


Month Activity Time-Frame<br />

• Place the 2009/10 annual report on<br />

the municipal website.<br />

43<br />

• 05/02/<strong>2011</strong><br />

Ba-Phalaborwa Mopani<br />

March <strong>2011</strong> <strong>IDP</strong><br />

APPROVAL PHASE( DRAFT <strong>IDP</strong>, BUDGET<br />

& PMS)<br />

31 March <strong>2011</strong><br />

• Publicizing<br />

schedule.<br />

public participation • 28/02/<strong>2011</strong><br />

March <strong>2011</strong><br />

Budget 31 March <strong>2011</strong><br />

• Consultation on tabled <strong>IDP</strong>, Budget &<br />

PMS, publicise and conduct public<br />

hearings and meetings within wards.<br />

• 19/03/<strong>2011</strong> – 25/03/<strong>2011</strong><br />

• Consider the views of the community • 19/03/<strong>2011</strong> – 25/03/<strong>2011</strong><br />

and other stakeholders on the<br />

•<br />

<strong>2011</strong>/14 budget.<br />

Respond to submissions received & if<br />

necessary revise the budget and<br />

• 28/03/<strong>2011</strong><br />

table amendments for council<br />

•<br />

consideration.<br />

<strong>IDP</strong>/Budget Operational Teams • 28/03/<strong>2011</strong><br />

(Analysis & integration of public<br />

comments)<br />

• <strong>IDP</strong>/Budget Technical Committee • 29/03/<strong>2011</strong><br />

(Analysis & integration of public<br />

comments)


April <strong>2011</strong><br />

June <strong>2011</strong><br />

Month Activity Time-Frame<br />

• <strong>IDP</strong>/Budget Steering Committee<br />

(Analysis and integration of public<br />

comments)<br />

44<br />

• 31/03/<strong>2011</strong><br />

Ba-Phalaborwa Mopani<br />

<strong>IDP</strong>, BUDGET & PMS Adoption of Final <strong>IDP</strong>, Budget &<br />

APPROVAL PHASE (Final <strong>IDP</strong>, Budget<br />

& PMS<br />

PMS 18 April <strong>2011</strong><br />

• <strong>IDP</strong>/Budget & PMS Rep Forum<br />

(Analysis & Integration of public<br />

comments<br />

• 06/04/<strong>2011</strong><br />

• Adjustment of <strong>IDP</strong>/Budget in • 06/04/<strong>2011</strong><br />

•<br />

accordance with public comments<br />

and Budget<br />

EXCO considers Draft <strong>IDP</strong>/Budget and<br />

PMS<br />

• 11/04/<strong>2011</strong><br />

• Mayor tables Final <strong>IDP</strong>/Budget and • 18/04/<strong>2011</strong><br />

PMS in Council for final<br />

approval/adoption.<br />

<strong>IDP</strong><br />

• Summary of <strong>IDP</strong><br />

• Public notice on adoption of<br />

<strong>IDP</strong>/Budget<br />

Budget<br />

• Submit approved <strong>IDP</strong>/Budget to<br />

National & Provincial Treasury, DLGH<br />

• 01/06/<strong>2011</strong> – 15/06/<strong>2011</strong><br />

• 15/06/<strong>2011</strong><br />

• 30/06/<strong>2011</strong>


Month Activity Time-Frame<br />

and District<br />

PMS<br />

• Submit draft SDBIP to the Mayor<br />

• Submit draft annual performance<br />

agreements to the Mayor<br />

• Approve the <strong>2011</strong>/12 SDBIP - final<br />

date under legislation 28 July<br />

45<br />

• 16/06/<strong>2011</strong><br />

• 28/06/<strong>2011</strong><br />

• 30/06/<strong>2011</strong><br />

Ba-Phalaborwa Mopani


B1. THE INTERNAL ENVIRONMENT<br />

SECTION B<br />

SITUATIONAL ANALYSIS<br />

The internal environment presents the strengths and weaknesses of the Municipality’s corporate<br />

structure, corporate culture and corporate resources:<br />

B1.1 Corporate Structure<br />

The overview of the organisational structure (organogram) of the Municipality indicates a<br />

hierarchical arrangement (See Figure B1.1 below). The structure has two divisions, namely the<br />

political division and the administrative division. The political division is led by the Mayor, whilst the<br />

administrative one is led by the Municipal Manager. The Executive Committee serves as a link<br />

between the two divisions.<br />

Although the Municipal Manager is the accounting officer, decision making authority is to a certain<br />

extent decentralized to the various departments or directorates. The directorates are organised on<br />

the basis of powers and functions allocated to each department (e.g. Corporate Services is<br />

responsible for, amongst other functions, administrative, human resources and legal matters).<br />

The structure is expected to be constantly aligned to current corporate objectives, strategies,<br />

policies, programmes and projects. The alignment and re-alignment processes are however costly to<br />

the Municipality since they require regular restructuring and job analysis. Resultantly, the present<br />

structure is not fully consistent with current corporate objectives, strategies, policies, programmes<br />

and projects. The Municipality is however going to address the challenge through a comprehensive<br />

institutional plan.<br />

46


The structure of the Municipality is basically similar to those of other municipalities.<br />

Figure B1.1: Basic Layout of the Municipality’s organisational structure<br />

B1.2 Corporate Culture<br />

The emerging and shared culture within the organisation is founded on cleanliness. The Municipality<br />

won the 2005 National Cleanest Town Competition. Table B1 presents the Municipality’s<br />

performance in the awards since the inception of the Cleanest Town Competition in 2005. The<br />

competition has been renamed the Greenest Municipality Competition in 2009. The Municipality has<br />

performed consistently in the new competition as indicated in the table below.<br />

Table B.1: The Municipality’s performance in the Cleanest 1 Town (Greenest Municipality)<br />

Competition between 2005 and 2010<br />

YEAR POSITION HELD<br />

2005 1, National<br />

2006 2, Provincial<br />

1 Cleanest Town competition’s name have changed to Greenest Town competition. The<br />

competition also focuses on all aspects of service delivery and not only on waste management<br />

47<br />

Political<br />

Division<br />

Admin<br />

Division


YEAR POSITION HELD<br />

2007 2, Provincial<br />

2008 1, Provincial<br />

2009 2, Provincial<br />

2010 1, District & Provincial<br />

This emerging culture still has to be communicated to and shared by all internal stakeholders. The<br />

culture of cleanliness supports the Municipality’s strategic intent of being the best tourism<br />

destination in Limpopo by 2020. Organisational values will have to be developed around the<br />

emerging corporate culture.<br />

The Municipality has to embrace the greenest culture such that it gets inculcated into day-to-day<br />

municipal productivity and service delivery matters.<br />

B1.3 Organisational Resources<br />

The Municipality has invested in human resources, municipal buildings and other organisational<br />

assets as per the municipal asset register. There is a need for in-service training workshops and<br />

programmes to improve personnel capacity in line with the demands of the local government<br />

environment. There is also a need for a comprehensive strategy on the maintenance of physical<br />

infrastructure.<br />

B1.4 Marketing<br />

The marketing objectives, strategies, policies and programmes of the Municipality are not clearly<br />

stated but implied from performance and through municipal budgets (e.g. through Public<br />

participation and municipal imbizos).<br />

There is a need to ensure that marketing objectives, strategies, policies, programmes and projects<br />

are clearly articulated and consistent with the Municipality’s vision, mission and strategic objectives.<br />

The Municipality is not doing well in terms of analyzing the market position and the market mix<br />

(services, prices, place, and promotion).<br />

The Municipality’s strategic position to the Kruger National Park offers a marketing competitive<br />

advantage over other municipalities focusing on tourism. The municipality is still to develop the<br />

48


marketing strategy that will guide the marketing of the municipality in line with the vision and<br />

mission.<br />

B1.5 Finance<br />

The Municipality’s current financial objectives, strategies, policies, and programmes are clearly<br />

stated under municipal strategies. There is however a need to ensure that they are consistent with<br />

the organisation’s vision, mission, and strategic objectives. They also have to respond to both<br />

internal and external challenges.<br />

B1.6 Municipal Operations<br />

The Municipality’s current service objectives, strategies, policies, and programs are clearly stated<br />

and expressed through the following Key performance areas of local government:<br />

Spatial Rationale;<br />

Basic Service Delivery;<br />

Local Economic Development;<br />

Municipal Transformation and Organisational Development;<br />

Municipal Financial Viability and Management; and<br />

Good Governance and Public Participation.<br />

Municipal operations are consistent with the organisation’s vision, mission, objectives, strategies,<br />

and policies and respond to the needs of both the internal and external environments. The efficiency<br />

of services rendered needs to be improved and clients’ waiting period for municipal services<br />

reduced. There is also a need to regularly analyse the efficiency municipal services with the view to<br />

informing decision making at strategic management level.<br />

B1.7 Human Resources Management (HRM)<br />

Human resources management objectives, strategies, policies, and programmes are clearly stated,<br />

but there is still a need for an institutional plan in order to address both current and future<br />

personnel demands. The Municipality is gradually adopting strategic human resources planning to<br />

ensure that HR objectives are consistent with the organisation’s vision, mission, objectives,<br />

strategies, policies and programmes.<br />

49


B1.8 Information Systems (IS)<br />

The Municipality’s current IS objectives, strategies, policies, and programmes are not clearly stated<br />

and not consistent with the vision, mission, objectives, strategies, and policies of the organisation.<br />

The information system is not able to:<br />

Provide a useful database;<br />

Automate routine clerical operations;<br />

Assist managers in decision making;<br />

The Municipality’s IS performance and stage of IS development do not compare well with those of<br />

similar institutions.<br />

50


B2. THE EXTERNAL ENVIRONMENT<br />

The Municipality has scanned both the task and societal environments with the view to identifying<br />

threats and opportunities in the external environment. This subsection presents an in-depth analysis<br />

of the external environment.<br />

B2.1. Spatial Analysis<br />

B2.1.1 Geographic Location<br />

Ba-Phalaborwa Municipality is in the African continent and therefore affected by the political, social<br />

and economic realities of the continent. One of the fundamental ills inherited from the continent is<br />

underdevelopment, hence the local municipality’s mandate to be a developmental sphere of<br />

government.<br />

Map B1: The African Continent<br />

Ba-Phalaborwa Municipality is situated in the North-Eastern part of South Africa in the Limpopo<br />

Province (See Maps B1 and B2). South Africa is a democratic country and therefore adheres to<br />

democratic principles, such public participation in government. Local government processes,<br />

51<br />

Ba-


including the <strong>IDP</strong> process are therefore characterised by public participation. South Africa, as the<br />

economic hub in Southern Africa, has the responsibility to trade with and support neighbouring<br />

countries with the view to overcoming underdevelopment in the region. Ba-Phalaborwa’ close<br />

proximity to Mozambique implies that the Municipalities has to forge socio-economic relationships<br />

with its sister municipality (Xai-Xai) across the border.<br />

Map B2: The Republic of South Africa<br />

Ba-Phalaborwa Municipality is situated in Mopani District of Limpopo Province, where<br />

unemployment and poverty are rife. In executing its developmental mandate, the Municipality is<br />

mindful of the developmental challenges facing the African continent and has to adopt<br />

democratically acceptable local economic development strategies and measures in addressing<br />

(amongst other challenges) unemployment and poverty. The National Spatial Development<br />

Perspective (NSDP) endorsed by National Cabinet in March 2003 purports the following<br />

development principles:<br />

PRINCIPLE 1: Rapid economic growth that is sustained and inclusive is a pre-requisite for the<br />

achievement of other policy objectives, amongst which poverty is key<br />

PRINCIPLE 2: Government has a constitutional obligation to provide basic services to all citizens (e.g.<br />

water, energy, health and educational facilities, wherever they reside<br />

52<br />

Ba-<br />

Phalaborwa


PRINCIPLE 3: Government spending on fixed investment should be focused on localities of economic<br />

growth and/or economic potential<br />

PRINCIPLE 4: Efforts to address past and current social inequalities should focus on people not<br />

places<br />

PRINCIPLE 5: Future settlement and economic development opportunities should be channeled into<br />

activity corridors and nodes that are adjacent to or link the main growth centres<br />

Map B3 below shows the geographic location of Ba-Phalaborwa Municipality in both the Province<br />

and Mopani District. Without losing sight of National Spatial Development Perspective guidelines,<br />

development at municipal level has to be informed by the Limpopo Province’s Provincial Growth<br />

and Development Strategy (PGDS). Principles of the PGDS:<br />

PRINCIPLE 1: An integrated and developmental approach that brings together strategies and<br />

programmes of different spheres of government together towards achieving<br />

sustainable economic growth, poverty reduction, and unemployment;<br />

PRINCIPLE 2: Contributing to national and international commitments e.g. Reconstruction and<br />

Development Programme’s objectives, the outcomes of the World Summit on<br />

Sustainable Development, United Millennium Development Goals, etc;<br />

PRINCIPLE 3: Building of relationships, sharing of information and a shared vision between spheres<br />

of government, between municipalities and between departments;<br />

PRINCIPLE 4: Participatory development and good governance to ensure transparency and<br />

accountability in shaping the future of the Province.<br />

53


Map B3: Limpopo Province<br />

Thabazimbi<br />

&V<br />

Thabazimbi<br />

Ba-Phalaborwa<br />

Lephalale<br />

&V<br />

Lephalale<br />

Waterberg<br />

Mogalakwena<br />

Blouberg<br />

Dendron<br />

&V<br />

Aganang<br />

Vhembe<br />

Messina<br />

Makhado<br />

Makhado<br />

&V<br />

54<br />

&V<br />

Musina<br />

Thohoyandou<br />

&V<br />

Thulamela<br />

&V<br />

Giyani<br />

&V Greater Letaba<br />

Soekmekaar<br />

Molemole<br />

&V Modjadjikloof<br />

Greater<br />

Giyani<br />

Polokwane<br />

&V Tzaneen<br />

Ba-Phalaborwa<br />

&V Polokwane Greater Tzaneen<br />

&V Phalaborwa<br />

Capricorn<br />

&V<br />

Vaalwater<br />

Modimolle<br />

Modimolle<br />

&V<br />

Bela-Bela<br />

&V<br />

Mokopane<br />

&V<br />

Lepelle-Nkumpi<br />

Maruleng<br />

&V<br />

Fetakgomo Hoedspruit &V<br />

Lebowakgomo Tubatse<br />

&V<br />

Mookgopong Sekhukhune<br />

&V Burgersfort Bushbuckridge<br />

Mookgopong Makhudutamaga &V &V<br />

Steelpoort Ohrigstad<br />

Marble Hall<br />

Bela-Bela<br />

&V<br />

Marble Hall<br />

&V<br />

Mkhuhlu 'A'<br />

&V Groblersdal<br />

Groblersdal<br />

Mutale<br />

Mopani<br />

Bohlabela<br />

It is one of the five local municipalities in the Mopani District. The Municipality has a geographical<br />

area of 3 004.88 km 2 and that constitutes 27% of the total Mopani District area. The Municipality<br />

serves as a convenient gateway to the Kruger National Park and the Transfrontier Park through to<br />

the Mozambique Coast.<br />

Map B4 shows the boundaries of the municipal area together with the natural environment -<br />

minerals and mining in the municipal area.<br />

Kruger<br />

National<br />

Park


Map B4: Ba-Phalaborwa Municipal Boundaries<br />

B2.1.2 Mopani District SDF – An Overview<br />

Ba-Phalaborwa Municipality is a predominantly rural medium capacity local Municipality. It consists<br />

of 23 villages and four towns (namely Gravelotte, Namakgale Lulekani and Phalaborwa). The<br />

Municipality adopts the Mopani District SDF as well as district guidelines for land use management<br />

to inform the local Land Use Management Scheme.<br />

B2.1.3 Guidelines for Land Use Management<br />

The Municipality has adopted a Land Use Management Scheme (LUMS). All land use issues in the<br />

municipal area are dealt with according to the adopted LUMS.<br />

B2.1.4 Spatial Planning and Land Use<br />

The purpose of conducting a spatial analysis is to ensure that the Municipality’s spatial strategies<br />

and land use management decisions are based on a general awareness of:<br />

Spatial constraints, problems, opportunities, trends and patterns;<br />

55


The necessity for spatial restructuring;<br />

The need for land reform; and<br />

The spatial dimension of development issues.<br />

Ba-Phalaborwa Municipality covers an area of 3 004,88km² with farms covering an enormous area of<br />

land belonging to private farmers followed by the tribal land that is under the control of Traditional<br />

Leaders (namely, Majeje Traditional Authority, Ba-Phalaborwa Traditional Authority, Maseke<br />

Traditional Authority and Selwane Traditional Authority). The other areas are proclaimed towns<br />

(Phalaborwa, Lulekani, Namakgale, and Gravelotte) and farms. Most of the farms belong to private<br />

owners and are used for game and citrus farming. Table below indicates the number of towns,<br />

villages and farms in Ba-Phalaborwa area.<br />

Table B.2: Settlements in Ba-Phalaborwa<br />

Towns Villages Farms<br />

4 23 109<br />

Mapping<br />

All towns within the Ba-Phalaborwa Municipality area are having lay-out plans and general plans<br />

approved by the Surveyor General. All new demarcations for stands are now done to the same<br />

standard and lay-out plans and general plans are prepared and the establishment of a township is<br />

also done.<br />

During the last 5 years several towns were completed in the rural areas namely:<br />

Area Section Number of Stands Vacant Sites Occupation Status<br />

Maseke Ext 1 500 500 Not occupied yet (new)<br />

Majeje Lulekani South 403 403 Not occupied (private<br />

developer)<br />

Mashishimale R3 East 209 - Occupied<br />

Makhushane Malungane<br />

Village<br />

630 300 70% occupied<br />

Mashishimale Tlapeng 508 250 50% occupied<br />

Mashishimale R3 Resevoir 312 230 Busy with allocation 20%<br />

Maseke South of tar<br />

road<br />

225 200 Less than 10% (no water)<br />

Boyelang Makhushane 516 400 20% allocated<br />

56


Area Section Number of Stands Vacant Sites Occupation Status<br />

Majeje Benfarm<br />

Lulekani road<br />

Mashishimale<br />

R3<br />

522 - Occupied<br />

West of R3 200 150 20% occupied<br />

Majeje Matikoxikaya 630 - Occupied<br />

Selwane New<br />

Development<br />

- n/a New<br />

Benfarm C - n/a new<br />

Formalisation of Villages<br />

Several villages need formalization in order to provide stands with numbers and allocate sites. This is<br />

also required in order to provide plans for installation of services (Eskom, etc).<br />

The following settlements listed below were identified to be formalized and provided to the<br />

Department of Human Settlements and Mopani District Municipality to assist the Municipality.<br />

Tribal Authority<br />

Name of Area No of Sites Priority<br />

Majeje Humulani (balance) +-500 5<br />

Majeje Matikoxikaya +-500 6<br />

Ba-Phalaborwa<br />

Municipality<br />

Majeje Benfarm (North West<br />

Kurhula +-700 1<br />

of Tribal Authority<br />

Offices)<br />

57<br />

+-300 2<br />

Majeje Benfarm next to R71 +-400 7<br />

Makhushane North East of<br />

Namakgale Hospital<br />

+-300 10<br />

Makhushane Dairy, next to Dairy +-400 3<br />

Makhushane Nyakelang not settled<br />

according to plan<br />

Makhushane Mbambamencisi next<br />

to access road<br />

+-600 4<br />

+-500 8


Tribal Authority<br />

Name of Area No of Sites Priority<br />

Selwane Selwane East +-500 8<br />

Selwane Selwane North of Road +-200 11<br />

Development Control<br />

As previously mentioned a Land Use Management Scheme (LUMS) was adopted by Council. There is<br />

a definite lack of understanding/communication by Traditional Authorities on how the new LUMS<br />

will affect any land use change in their areas.<br />

In order to implement the LUMS, a prescribed procedure must be followed and professional people<br />

(Town Planners and Land Surveyors) are involved. This is a lengthy and costly process. The result of<br />

this is that most of the applicants (businesses) in rural areas are not able to afford to follow the<br />

procedure for land use changes.<br />

Land Claims<br />

Spatial planning in Ba-Phalaborwa is seriously affected by land claims. Development initiatives are<br />

also hampered by lack of land. There are 109 farms in the municipal area. 77 of the farms (i.e. about<br />

72% of them) are under land claim. There are seven claimants on the farms. Two community claims<br />

have so far been partially restored on 14 farms. The remainder of the claims is likely to be protracted<br />

as a result of counter and multiple claims.<br />

The following seven claims have been lodged in the Ba-Phalaborwa municipal area:<br />

Mashishimale community is claiming 16 adjoining farms;<br />

Selwane community is claiming 15 adjoining farms;<br />

Makhushane community is claiming 22 adjoining farms;<br />

Maseke community is claiming 7 adjoining farms;<br />

The above four communities are also claiming the five farms on which Phalaborwa town and<br />

its mines are situated;<br />

Again, the above four communities and the Makhuva-Mathevula Royal Council, are claiming<br />

three adjoining farms and a portion of the Kruger National Park;<br />

58


Maenetja and Balapye-Kgoatla communities are claiming 22 adjoining farms in the western<br />

part of the Municipal area.<br />

The abovementioned claims are reflected on the Ba-Phalaborwa Land Claims Map (see next page).<br />

The claims are on 77 farms out of the total 101 farms in the municipal area. In some cases different<br />

communities are claiming the same farm(s). The land restoration process to community property<br />

associations (CPAs) has been completed on fourteen farms (11 farms for the Mashishimale<br />

community during 2005 and 3 farms for Selwane during 2006). The willingness of the owners to sell<br />

expedited the process.<br />

The Settlement Support and Development Unit within the Regional Land Claims Commission is<br />

providing limited assistance to the CPAs. The provision of support was never intended to be a<br />

function of the Land Claims Commissioner’s Office, but has become a practical necessity. The<br />

Mashishimale community has been identified as a pilot project for the sustainable Restitution<br />

Support Programme that will be managed by the University of Pretoria from August 2007 to<br />

December 2008.<br />

The tables below provide some information on the Mashishimale Selwane land claims. All the other<br />

claims are still under investigation. The view of the Regional Land Claims Commissioner is that Ba-<br />

Phalaborwa Municipality should play a more active role in resolving conflicts among claimants and<br />

facilitating agreements among them within the context of a development strategy that is beneficial<br />

for all stakeholders.<br />

59


Map B.5<br />

SENOBELA 362<br />

RUNNYMEDE 426<br />

MEADOW BANK 429<br />

MAMITWAS LOCATION 461<br />

D3247<br />

TAGANASHOEK 465<br />

DELHI 520<br />

THE NECK 565<br />

LANGUE<strong>DOC</strong> 563<br />

Greater Tzaneen<br />

NOVENGILLA 562<br />

BERLYN 670<br />

D3768<br />

D3247<br />

D3767<br />

BONN 671<br />

P43/ 3<br />

DUSSELDORP 22<br />

D21<br />

D3246<br />

SEDAN 672<br />

RIVERSIDE 514<br />

LA GRATITUDE 513<br />

JANETSI 463<br />

ROOIWATER 673<br />

Farms<br />

Land Claims Status<br />

LUXEM BURG 24<br />

No Claims<br />

Maenetja & Balapye-Kgoatla Claims Pending<br />

HARMONY 140<br />

Makhushane Claims Gazetted<br />

Mashishimale Claims Pending<br />

NAT IONAAL 29<br />

Selwane Claims Finalised, 2006<br />

LOFDAL 42<br />

Selwane Claims Pending<br />

Roads<br />

Type<br />

Maruleng<br />

LORRAINE 73<br />

D3252<br />

EUREKA 564<br />

LA MO TTE 464<br />

MAKUBE 425<br />

SIRULURUL 427<br />

MAM ITWAS KOP 462<br />

THE PLAIN S 519<br />

ALSACE 74<br />

WOMGOLOLO 428<br />

NAGUDE 517<br />

BELLE OMBRE 518<br />

THE PLAIN S 828<br />

BELLE OMBRE 827<br />

P1 81/1<br />

D3215<br />

CARPEDIEM Paved 76<br />

D3186<br />

D1292<br />

P142/1<br />

P112/2<br />

MOLATLE<br />

D263<br />

D3249<br />

Legend<br />

MARANDA 675<br />

D3253<br />

LABORIE 515<br />

COTTONDALE 674<br />

GAMELA 679<br />

RADOO 682<br />

JASI 731<br />

DEESIDE 733<br />

BEESPLAAS 676<br />

Joint Ba-Phalaborwa & Makhuva Claims Gazetted<br />

D3235<br />

Joint Ba-Phalaborwa Claims Gazetted<br />

Maseke Claims Gazetted<br />

Mashishimale Claims Finalised, 2005<br />

Unpaved<br />

Leydsdorp<br />

HOSPITAL SITE 778<br />

D202<br />

BISMARCK 174<br />

D1826<br />

OOCHOCK 683<br />

THIERGARTEN 531<br />

RUBBERVALE 784<br />

D202<br />

MAWA 680<br />

GUNYULA 730<br />

LAURAI NE 742<br />

QUAGGA 759<br />

KAPIRI RANCH 760<br />

LA PARISA 729<br />

HENLEY 734<br />

EDEN 757<br />

GRAVELOTTE 783<br />

VALLAMBROSA 681<br />

MATUMA 735<br />

LEYDSDORP DORPSGRONDE 779<br />

MIRAGOMA 684<br />

LETABA DRIFT 727<br />

LA COTTE 736<br />

LANGALANGA 141<br />

Greater Letaba<br />

CHESTER 756<br />

THE BEACON 769<br />

MON DESI R 782<br />

MI AM I 732<br />

GRAVELOTTE SIDING 785<br />

GRAVELOTTE SIDING 785<br />

BLACK HILLS 740<br />

SOLO MONS MINE 762<br />

CONSTANTIA 685<br />

FARRELL 781<br />

MABETE 726<br />

RIVERHEAD 755<br />

MAZUNGA 142<br />

BLACK HILLS 737<br />

FREE STATE 763<br />

CLAIMLAND 780<br />

Table B.3: Mashishimale Claim<br />

D3200<br />

D202<br />

D3198<br />

D1827<br />

D3229<br />

D1828<br />

D3187<br />

GROO T-LETABA<br />

D3202<br />

MOUNGWANE<br />

D1597<br />

Eiland<br />

EILAND 725<br />

MASHET 4<br />

Ba - Phalaborwa Land Claims<br />

Greater Giyani<br />

M'BAULA RANCH 6 -<br />

GROOTFONTEIN 738<br />

WI LLIE 787<br />

MALATI 764<br />

Murchison<br />

P17/3<br />

D1267<br />

SELATI RANCH 143<br />

JOSEPHINE 777<br />

D3844<br />

VYGEBOOM 739<br />

VO LSTRUIS 753<br />

MAKALALI 601<br />

ARUNDEL 788<br />

PRIESKA 723<br />

LESH OGOLE<br />

DANIE 789<br />

BEGIN 765<br />

MANANTJI 166<br />

Prieska<br />

MASALAL 722<br />

PLATVELD 752<br />

KOEDOES RAND 790<br />

MPANDE 165<br />

D1100<br />

THANKERTON 144<br />

LAMULA 162<br />

B.V.B. RANCH 776<br />

CORUNDUM 147<br />

LUTOPI 164<br />

VLAKLAAGTE 751<br />

D1655<br />

KONDOWE 741<br />

HUJA 791<br />

TRANSPO RT 145<br />

SHOBI 161<br />

D3849<br />

D2512<br />

D3847<br />

WATERBO K 721<br />

KASTEEL 766<br />

LEKKERGOED 160<br />

MAGW ENA 750<br />

VORSTER 775<br />

LEKKERGOED 158<br />

LEKKERSMAAK 792<br />

HOED 146<br />

HOOF PYN 269<br />

INYOKU 159<br />

D1656<br />

OXFORD 183<br />

60<br />

NONDWENE 720<br />

MASHAWA 748<br />

D1191<br />

HARTBEEST 743<br />

Ba-Phalaborwa<br />

LANDRAAD 774<br />

BOSBOK 793<br />

LILLIE 148<br />

ELLENBO OG 794<br />

ARCHIE 169<br />

CAMBRIDGE 184<br />

Nondweni<br />

GRANVILLE 767<br />

EXCELLENCE 157<br />

D3848<br />

HAMMAN 747<br />

BREAKFAST 773<br />

GLIP 797<br />

HOPE 149<br />

ARCHIE 156<br />

HARDEKOOL 190<br />

Maruleng<br />

Gaselwana<br />

SILWANA' S LOCATION 719<br />

LOSKOP 744<br />

BROOK 772<br />

BRAND 798<br />

PARSONS 155<br />

ROME 185<br />

MAKUBA'S LOCATI ON 700<br />

Mukhwanana<br />

SQUARE 150<br />

Nyakalane Mahale<br />

ALONBRIDG E 768<br />

WI LDEBEEST 745<br />

SCHEIDING 746<br />

ZIEK 771<br />

RAM 799<br />

PUNT 151<br />

MAGDALENA 154<br />

MAHALE 718<br />

D3260<br />

TRY 153<br />

D3980<br />

D3187<br />

D3981<br />

MADRID 39<br />

BELASTI NG 7<br />

LEEUW KOP 10<br />

ZEBRA 19<br />

CELHARD 20<br />

D3781<br />

Mashishimale R 3<br />

MASHISI MALI LOCAT ION 800<br />

Mashishimale R 2<br />

LEEUWSPRUIT 18<br />

GRIETJE 6<br />

D3794<br />

MORELAG 5<br />

DROEBULT 27<br />

Namakgale<br />

Maseke<br />

Mashishim ale R1<br />

MASEKI LOCATION 2<br />

D2263<br />

GROOTDRAAI 38<br />

D3966<br />

BADEROUKWE 11<br />

BEN 26<br />

PAUL 7<br />

LISBON 37<br />

LETABA RANCH 17<br />

Matiko-Xikaya Lulekani A&B<br />

QUAGGA 21<br />

Farm Name Land USe Value in R’ RLCC Action<br />

Landraad 774 LT<br />

Portion 1 2<br />

MOLOMAHLAPI<br />

MAKH UTSWI<br />

MOLOTOTSI<br />

GA-SELATI<br />

D3187<br />

OLIFANT SRIVIER<br />

MOHLABETSI<br />

GROOT-LETABA<br />

MBH AWU LA<br />

Ben AB C<br />

D3782<br />

MAKUSHANE LOCATION 28<br />

Makhusane R2<br />

Makhusane R1<br />

D3786<br />

D4424<br />

Humulani<br />

P112/1<br />

SCHALK 3<br />

KLIPHEUVEL 36<br />

D3790<br />

DOREEN 8<br />

POMPEY 16<br />

N'DOLE 12<br />

Kharula<br />

D726<br />

D86<br />

WEGSTEEK 30<br />

IRON<br />

MOSCOW 41<br />

D2105<br />

SABLE 13<br />

SCHIETTOCHT 25<br />

RHODA 9<br />

DOVER 29<br />

GENOEG 15<br />

SILONQUE 23<br />

D3264<br />

Phalab orwa<br />

LAASTE 24<br />

LOOLE 31<br />

SHEILA 10<br />

LAASTE 24<br />

KLEIN-LETABA<br />

OLIFANT SRIVIER<br />

OLIFANT SRIVIER<br />

DUNDEE 32<br />

PITLO CHRY 14<br />

MERENSKY 32<br />

ZEEKOEGAT 12<br />

VEREENIGING 11<br />

Scale 1 : 35 00 0<br />

LETABA<br />

SHIPIKANI<br />

OLIFANTSRIVIER<br />

KLASERIE MO ND 15<br />

POLOKWANE<br />

No 1 DIEPKLOOF Propark 406<br />

Baobab Place, Hampton Court<br />

Bendor Drive<br />

Polokwan e<br />

Suite 77<br />

0699<br />

Private Bag 9676<br />

Polokwane<br />

P O Box 3519<br />

0700<br />

Polokwan e<br />

South Africa<br />

Tel: +27 15 29 6 0361<br />

RIETVLEY 28<br />

Fax: +27 15 296 0363<br />

NORTHUM BERLAND 31<br />

Tel: +27 15 297 2418<br />

Fax: +27 15 297 242 8<br />

DURHAM 30<br />

NDLOPHU 102<br />

0 5 10 15<br />

km<br />

Game Lodge 9,000,000 Restored to CPA in<br />

Jul. 2005<br />

Ellenboog 794 LT Game Farming 7,500,000 Restored to CPA in<br />

Jul. 2005<br />

Bosbok 793 LT Game Farming 21,000,000 Restored to CPA in<br />

Oct. 2006<br />

Hope 149 KT Game Farming 23,620,000 Restored to CPA in<br />

Oct. 2006<br />

2 A settlement planning grant of R2, 714million and a restitution discretionary grant of R5, 655million<br />

were awarded for the farms Landraad and Ellenboog.


Game Vest Croc<br />

Ranch 3<br />

Game Lodge 104,000,000 Restored to CPA in<br />

Oct. 2006<br />

Hoed 146 KT Unwilling seller<br />

Lekkersmaak 792 LT Unwilling seller<br />

Kasteel 830 LT Unwilling seller<br />

Vorster 775 LT Unwilling seller<br />

Table B.4: Selwane Claim<br />

Farm Name Land Use Value in R’ RLCC Action<br />

Waterbok 4 721 LT<br />

Ptns 4,5 & 6<br />

Nondwene 720 LT Ptn<br />

6<br />

Game, citrus & cash<br />

crops<br />

Game, citrus<br />

Kondwe 741 LT Game, citrus<br />

Belasting 7 LU<br />

Mahale 718 LT<br />

Wildebeest 745 LT<br />

Magwena 750 LT<br />

Hartebeest 743 LT<br />

State farms; Gazankulu<br />

3,850,00 Restored to CPA in<br />

2006<br />

12,550,000<br />

61<br />

Restored to CPA in<br />

2006<br />

3 The property includes the farms Ram 799 LT, Glip 797 LT, Punt 151 KT and remaining portions of<br />

Ziek 771 LT, Brook 772 LT, Breakfast 773 LT<br />

4 A settlement planning grant of R1, 172million and a restitution discretionary grant of R2, 442<br />

million were also awarded for the farms waterbok, Nondwene and Kondowe


Farm Name Land Use Value in R’ RLCC Action<br />

Loskop 744LT<br />

Granville 767 KU<br />

Leeukop 10 LU<br />

Letaba 8 LU<br />

Hamman 747 LT<br />

Stands demand and supply<br />

Table B.5: Types and number of consumer units<br />

Consumer Units %<br />

Households/stands 32 253<br />

Household density/ha 0.11<br />

Residential units 12 283<br />

Formal residential stands 15 233<br />

Non-residential stands 2 170<br />

Non-residential stands (vacant) 190<br />

Formal consumer units 32 123<br />

Backyard units 262<br />

Total consumer units 32 384<br />

The current supply of low cost residential stands is represented in below:<br />

Table B.6: Supply of low cost residential stands<br />

Projects No. of Stands Approximate Land Required<br />

2787 239<br />

62


Potential infill projects<br />

(Namakgale)<br />

Housing projects (Provincial<br />

database)<br />

1055 79<br />

2457 123<br />

TOTAL 6299 441<br />

Other: Phalaborwa Ext. 7, 9,<br />

10, etc.<br />

1420<br />

The demand for residential sites is always escalating. The table below presents the demand for low<br />

cost residential sites:<br />

Table B.7 Demand for low cost residential stands (Projected: 2012)<br />

Scenario Traditional Informal Backyard Total<br />

demand<br />

per<br />

traditional;<br />

informal;<br />

backyard<br />

63<br />

No. of units<br />

in provincial,<br />

projects, site<br />

demarcation,<br />

potential<br />

infill<br />

2012<br />

Estimated<br />

need<br />

Minimum 3036 1491 435 4962 6299 -1337 0<br />

Additional<br />

land<br />

required<br />

Maximum 6072 1491 435 7998 6299 1699 169.0<br />

Other (Planned and potential) 1420<br />

Allocations for business sites in rural areas<br />

In rural areas the allocation of land for business is done by Traditional Authorities. Applications are<br />

forwarded to the Municipality, which in turn forwards same to the Department of Local Government<br />

and Housing (DLGH) for processing. Actual site demarcation is only made after the approval of the<br />

application by the department. However, reality indicates that there are many informal businesses<br />

that are mushrooming in the rural areas. The tendency defeats attempts to have an integrated<br />

approach to spatial planning and land use management<br />

Key issues with regard to spatial planning:<br />

There is a need to regulate mushrooming informal businesses;<br />

Land allocation needs to be done in a planned and coordinated manner between the<br />

Municipality and the traditional authorities;<br />

(ha)


The red tape involved in the land application process frustrates potential land owners/users;<br />

Local area planning is needed in the rural areas to ensure pro-active land use;<br />

There is a high demand for residential sites;<br />

Lack of a common town planning scheme causes delays in processing applications, and<br />

confusion and dissatisfaction amongst members of the community.<br />

B2.2. DEMOGRAPHICS<br />

2.2.1. Population<br />

The table below compares municipal demographics as presented by Statistics South Africa (STATS<br />

SA) in the 2001 Census and the 2007 Community Survey.<br />

Table B.8: Municipal Demographics based on 2001 Census and 2007 Community Survey<br />

ISSUE 2001 CENSUS 2007 CS Difference<br />

Population 131 098 127 304 -3 794<br />

Households 33 529 33 792 263<br />

Average per Household 3.9 3.8 -0.1<br />

Blacks 91.50% 94.27% 2.77%<br />

Whites 8.17% 5.33% -2.84%<br />

Coloureds 0.26% 0.40% 0.33%<br />

Indians/Isians 0.07% 0% -0.07%<br />

Male 48.91% 50.94% 2.03%<br />

Female 51.09% 49.06% -2.03%<br />

Source: STATS SA (2001 Census & 2007 CS)<br />

The table below presents the population size, household size and gender.<br />

Table B.9: Population size and number of households<br />

Description Number %<br />

Population 131 522<br />

Household size 4.06<br />

64


Male 61 807 47%<br />

Female 69 717 53%<br />

Total 131 524 100%<br />

Source: The Development Partnership, 2008<br />

The table below presents the nature and number of consumer units in the municipal<br />

Table B.10: The nature and number of consumer units<br />

Types of consumer Units Number of Units<br />

Households/stands 32 253<br />

Household density/ha 0.11<br />

Residential units 12 283<br />

Formal residential stands 15 233<br />

Non-residential stands 2 170<br />

Non-residential stands (vacant) 190<br />

Formal consumer units 32 123<br />

Backyard units 262<br />

Total consumer units 32 384<br />

Source: The Development Partnership, 2008<br />

Interpretation and Implications to the developmental mandate of the Municipality<br />

Figures from the 2007 CS indicate a population decrease from the situation in 2001. The population<br />

has decreased by 2.89% (about 3 794 people). This implies a household decrease of 2.9% (i.e. 973<br />

households) based on the 3.9 average per household. However, the 2007 CS presents a 0.78%<br />

increase in the number of households (about 263 new households). Reality on the ground indicates a<br />

significant increase in the number of households. The Municipality renders services to households<br />

and therefore adopts the layman’s view that the number of households has increased significantly<br />

between 2001 and 2007.<br />

65


The increase in the number of households, particularly in the rural areas where there are minimal<br />

services has increased backlogs in electricity provision, housing needs, roads, access to water,<br />

sanitation needs, etc.<br />

There are arbitrary differences in figures with regard to racial groups’ representations for the two<br />

accounting years in question. Although racial integration is gradually being achieved through a few<br />

blacks moving from the traditional black towns and rural areas to settle in Phalaborwa, there is a<br />

widening gap between the rich and the poor. Racial segregation is replaced by socio-economic<br />

segregation. There is therefore a need to speed up integrated human settlement in order to<br />

proactively address resultant social ills (such as crime, and skewed unsustainable development).<br />

The following table presents the number of households and estimated population in the population<br />

concentration points of the municipality.<br />

Table B.11: Number of consumer units (or service delivery points) and population size per<br />

municipal population concentration point.<br />

Population Concentration<br />

Point<br />

Number of<br />

consumer units<br />

66<br />

Average per<br />

Consumer<br />

Unit<br />

Population % of<br />

Municipal<br />

Population<br />

Phalaborwa Town 4 152 3.9 16 192 12.7%<br />

Namakgale Town 9 348 4 37 392 29.4%<br />

Lulekani Town 3 909 4 15 636 12.3%<br />

Gravelotte Town 690 3.8 2 622 2.1%<br />

Selwane Village 2 700 5.5 14 850 11.7%<br />

Total 20 799 4.2 86 692 68.1%<br />

Source: Ba-Phalaborwa Municipality – Strategic Planning and Information Management<br />

The following table presents population concentration points in the municipal area.<br />

Table B.12: Population concentration points in the municipal area<br />

Concentration/Growth Point Surrounding areas % of Municipal Population<br />

Lulekani Matiko-Xikaya


Concentration/Growth Point Surrounding areas % of Municipal Population<br />

Humulani<br />

Kurhula<br />

Biko<br />

Namakgale Makhushane<br />

Mashishimale<br />

Maseke<br />

Boelang<br />

Phalaborwa Schittoch<br />

Silonque<br />

Selwane Mahale<br />

Prieska<br />

Nondweni<br />

Gravelotte Gravelotte Ext.1<br />

Manerva Mine<br />

Murchison Mine<br />

Rubberville<br />

Farms:<br />

Leon Thom<br />

Pringa<br />

Selati<br />

Makhoma<br />

Source: Ba-Phalaborwa Municipality – Strategic Planning and Information Management<br />

In general, Ba-Phalaborwa Municipality presents a good model of population densification, with 94%<br />

of the municipal population staying in or around the Phalaborwa urban complex. The remaining 6%<br />

67


comprises the populations of the Gravelotte and Selwane areas. The 94% leaves within a distance of<br />

15km from Phalaborwa town. The map below illustrates how the 94% population is distributed<br />

within the Phalaborwa urban complex. Namakgale and Lulekani, together, account for 49% of the<br />

population within the Complex; whereas Phalaborwa town accounts for 20% and the remainder<br />

(31%) is made up of rural population.<br />

Map B6: Population distribution within the Phalaborwa urban complex<br />

The following table presents population distribution according to home language. Xitsonga (at<br />

45.4%) and Sepedi (40.3%) are the most spoken languages in the municipal area. These (together<br />

with English) are the main languages the Municipality uses for public participation purposes<br />

Table B.13: Population by home language<br />

Persons %<br />

Afrikaans 6.8<br />

English 2.0<br />

IsiNdebele 0.1<br />

IsiXhosa 0.2<br />

IsiZulu 0.9<br />

68


Persons %<br />

Sepedi 40.3<br />

Sesotho 2.2<br />

Setswana 0.3<br />

SiSwati 1.0<br />

Tshivenda 0.7<br />

Xitsonga 45.4<br />

Other 0.3<br />

Total 100.0<br />

Source: Demarcation Board, 2003<br />

The following table shows population distribution according to age:<br />

Table B.14: Population distribution according to age<br />

AGE GROUP NUMBER % OF POPULATION<br />

0 – 4 13 693 10.8%<br />

5 - 14 27 934 21.9%<br />

15 – 34 46 191 36.3%<br />

35 – 64 35 264 27.7%<br />

OVER 65 4 227 3.3%<br />

TOTAL 127 304 100%<br />

Source: STATS SA (2007 CS)<br />

The majority (36.3%) of the population is aged between 15 and 34, which suggests that the<br />

municipality is dominated by people who are both socially and economically active. The Municipality<br />

has to prioritize social programmes and projects which will be able to address the socio-economic<br />

needs of the people. For example, there is a need to increase the number and improve the quality of<br />

social amenities in the municipal area, preferably within the municipal growth points (See table B<br />

above on Municipal growth points). There is also a high probability of the spread of sexually<br />

transmitted diseases, such as HIV/AIDS. The Municipality should therefore encourage and support<br />

69


HIV/AIDS programmes in at least all the nodal points. Attention should also be paid to local<br />

economic development initiatives in these population concentration points.<br />

Key Issues with regard to the population:<br />

• Very young population (almost 70% of the population is aged below 35 years)<br />

• Employment creation has to be a priority in order to address the economic needs of the<br />

population<br />

• The Municipality should focus on improving both the quantity and quality of social amenities<br />

to meet the social needs of the young population.<br />

• The municipal area is a high risk area for sexually transmitted diseases and HIV/AIDS<br />

B2.3. Local Economic Development and Tourism<br />

Global economic trends indicate fluctuations in interest rates, fuel prices, inflation, and cost of<br />

energy. These factors are expected to negatively affect underdeveloped and developing countries<br />

the most. Resultantly, layoffs and high unemployment rates may soon hit the local economy. The<br />

unstable value of the rand against foreign currencies will affect, amongst other sectors the mining<br />

industry and tourism. The economy of Ba-Phalaborwa Municipality is highly dependent on mining<br />

and there are moves to grow the tourism sector as an alternative to mining.<br />

Local economic development in Ba-Phalaborwa Municipality has to be founded on and guided by the<br />

principles and objectives of the National Spatial Development Perspective (NSDP), the Provincial<br />

Spatial Development Strategy (PGDS), the District Local Economic Development (LED) Strategy,<br />

recommendations of the District Growth and Development Summit, and the local Spatial<br />

Development Framework (SDF) (See Spatial Analysis above for NSDP and LEGDP).<br />

In order for economic development to be coordinated it is suggested that development be primarily<br />

focused on areas of high population concentration. The table below indicates population<br />

concentration points or growth points as identified in the Limpopo Province Spatial Rationale (2002):<br />

Table B2.15: Growth points identified in the Limpopo Province Spatial Rationale<br />

LOCATION CLASSIFICATION OF GROWTH POINT<br />

Phalaborwa Provincial growth point<br />

Namakgale District growth point<br />

70


Gravelotte District growth point<br />

Lulekani Municipal growth point<br />

A growth point is a high population concentration point and an economic hub in the area. The<br />

implication to the Municipality is that infrastructure in the growth points be strengthened in order to<br />

support economic development.<br />

2.3.1 District Growth and Development Summit Recommendations<br />

Mopani District Municipality convened a district growth and development summit from the 26 to<br />

27 th of February 2007 at the Hans Merensky in Ba-Phalaborwa Municipality. The aim of the summit<br />

was to determine and agree on:<br />

“A development path and programme for the district and what each social partner (government,<br />

business, labour and community sector) should contribute to the implementation of the<br />

programme”<br />

The following limitations to local economic growth were identified:<br />

Scattered human settlement patterns<br />

A limited manufacturing base<br />

Widespread poverty and high levels of unemployment<br />

Limited human resource base<br />

Outstanding land claims.<br />

High prevalence of HIV/AIDS.<br />

The summit acknowledged a district comparative advantage in the following sectors of the economy:<br />

Tourism;<br />

Agriculture;<br />

Forestry; and<br />

Mining.<br />

Ba-Phalaborwa Municipality has a fully developed mining industry and a high potential of growing<br />

the tourism industry into a competitive sector. The Selwane area, along the Groot Letaba River, has<br />

71


a potential of becoming a formidable agricultural cluster with a tourism element in the Eland and<br />

Letaba Ranch.<br />

The following anchor programmes and projects were identified by the district summit to accelerate<br />

economic development and job creation:<br />

District Fresh Produce Market<br />

Greater Giyani Natural Resource Programme<br />

Tunnel dried Tomato Project<br />

Small-scale mining projects across the District.<br />

Tiles from Clay,<br />

Moshupatsela Programme<br />

Sapekoe Tea Estates<br />

Modjadji Nature Reserve Initiative<br />

Shangoni gate Transfrontier park development<br />

Successful implementation of these programmes and projects is dependent on the availability and<br />

quality of basic services such as electricity, sanitation, water, and roads. In order for the district<br />

summit recommendations to be realised, the summit:<br />

Re-affirmed the implementation of the District LED Strategy.<br />

Resolved that a systemic partnership between the District Municipality and the Private<br />

Sector should be strengthened. This partnership is critical to ensure economic growth, job<br />

creation and poverty eradication.<br />

Resolved to develop a district-wide Human Resource Development Strategy to enhance<br />

emerging competitive sectors of the economy; and<br />

Finally, resolved to implement a comprehensive land reform that ensures a symbiotic<br />

balance between addressing a historic injustice and the imperatives of food security, and<br />

economic development.<br />

Comparative Contribution of Ba-Phalaborwa Municipality to the District Economy<br />

The table below presents a comparative GDP contribution of the Municipality to the Mopani District<br />

economy:<br />

72


Table B.16: Comparative contribution of local municipalities to the district economy<br />

MUNICIPALITY % GDP CONTRIBUTION TO THE DISTRICT<br />

Ba-Phalaborwa 47.4%<br />

Tzaneen 20.3%<br />

Giyani 16.7%<br />

Letaba 8.9%<br />

Maruleng 6.7%<br />

Source: Global Insight<br />

2.3.2 Economic Sectors<br />

The District LED Strategy identifies the following key economic Sectors for Ba-Phalaborwa<br />

Municipality:<br />

Agriculture;<br />

Mining;<br />

Manufacturing; and<br />

Tourism<br />

a. Mining Sector<br />

Ba-Phalaborwa has the highest concentration of minerals in the Mopani District hence mining is the<br />

largest economic sector in the Municipality and is also the largest employer. The table below shows<br />

mining’s percentage contribution to the municipal GDP and to employment.<br />

Table B.17: Ba-Phalaborwa mining sector’s contribution to municipal GDP and employment<br />

DESCRIPTION % CONTRIBUTION BY MINING SECTOR<br />

District GDP 59.6%<br />

District Employment 45.8%<br />

District Mining Sector Employment 91.2%<br />

Source: Mopani District Economic Data Baseline Study - 2008<br />

73


The Municipality’s mining sector contributes 92.5% to the District’s mining sector GDP. This<br />

contribution translates to 59.6% of the total district GDP. Mining gives Ba-Phalaborwa a competitive<br />

edge over other municipalities in the District. Unfortunately, copper mining (which constitutes the<br />

backbone of the mining sector in the municipal area) is destined to stop before 2020.<br />

The most mined resources in the Municipal area are copper and phosphate in the Phalaborwa area,<br />

with gold and antimony in the Murchison Greenstone Belt.<br />

The table below presents the range of minerals available in the municipal area<br />

Table B.18: Minerals available in the Phalaborwa Area and the Murchison Range<br />

<strong>PHALABORWA</strong> AREA MURCHISON RANGE<br />

Magnetite Mineral sand<br />

Copper Antimony<br />

Vermiculite Gold<br />

Nickel Zinc<br />

Apatite Mercury<br />

Zirconium Paving and clad stones<br />

Titanium Emeralds<br />

Uranium Ilmenite<br />

Mica<br />

Clay<br />

Key Mining operations in Ba-Phalaborwa<br />

Palabora Mining company: Palabora Mining Company, situated in the Ba-Phalaborwa area of<br />

Mopani, operates South Africa's largest copper mine. Daily production from the underground<br />

mine averaged 30,780 tons per day and the total mine production was 11,020,496 tons in 2006.<br />

Most of the finished copper product is for local consumption, while most of the vermiculite is<br />

exported. Palabora is the only producer of refined copper in South Africa and supplies the<br />

country with the majority of its copper needs. The mine has been operational for over forty<br />

years. The primary product of the company is copper, together with by-products, which include<br />

74


magnetite, nickel sulphate, anode slimes, sulphuric acid and vermiculite. A major exporting<br />

country of the Pabalabora mining company is Switzerland.<br />

Foskor: Foskor is the world’s largest producer of phosphate and phosphoric acid. Foskor<br />

produces phosphate rock, copper concentrate, magnetite and fused zirconia’s through a<br />

smelting furnace process. The Foskor group has two mining operations, namely a phosphate<br />

rock mine and beneficiation plant situated in Phalaborwa; and a phosphoric acid plant situated<br />

in Richards Bay. The major exporting countries of Foskor are India, Japan and Brazil.<br />

Consolidated Murchison Mine (Metorex Group): Situated at Gravelotte close to Phalaborwa in<br />

the Limpopo province, Consolidated Murchison is the single largest antimony orebody known in<br />

the world, having produced in excess of nine million tons of high-grade stibnite ore. Gold is<br />

produced at Consolidated Murchison as a co-product of antimony. The top exporting countries<br />

of Consolidated Murchison Mine are Mexico, India and China.<br />

Copper is mined and processed by Phalaborwa Mining Company (PMC) into copper rods. The by-<br />

products of the mining of copper are phosphate and sulphate, which are further processed by<br />

Foskor. There are opportunities for small scale mining in the municipal area. Possible mining projects<br />

in the Ba-Phalaborwa area include:<br />

Expansion of rock phosphate by Foskor;<br />

Phlogopite processing facility<br />

Koalin clay project<br />

Surface strip mining of mineral sand in Gravelotte<br />

Steel production plant (Magnetite processing)<br />

Red River Mining (Mining of Ilmenite)<br />

Iscor/Kumba (Mining of Ilmenite)<br />

The following table portrays the development potential as identified within the mining sector of Ba-<br />

Phalaborwa.<br />

Table B.19: Development potential within the mining sector in Ba-Phalaborwa<br />

DEVELOPMENT POTENTIAL POTENTIAL PROJECTS<br />

Large variety of mineral deposits<br />

• Local mineral processing<br />

beneficiation activities<br />

and<br />

• Small scale mining operations<br />

75


DEVELOPMENT POTENTIAL POTENTIAL PROJECTS<br />

Production of copper<br />

• Increase in SMME development projects<br />

relating to the metal<br />

Production of clay<br />

•<br />

•<br />

Clay processing plant<br />

Brick manufacturing<br />

• Roof & floor tile manufacturing<br />

• Tile and cement products<br />

• Ceramic and sanitary ware<br />

Magnetite processing<br />

• Steel production plant<br />

Paving and cladding stones<br />

•<br />

•<br />

Processing of stones<br />

Increase in SMME development projects<br />

relating to paving and cladding stones<br />

Mining’s GDP contribution to the South African economy is less than 10%, while in the Limpopo<br />

Province it is estimated at 20%. In Ba-Phalaborwa Municipality, mining contributes 80% to the GDP<br />

and employs about 30% of the total labour force.<br />

The conclusions for the titano-magnetites are that both the Gravelotte and Red River deposits are<br />

major prospects for the production of ilmenite and possibly also iron and vanadium. Available<br />

information indicates that most of the parameters are in the range that would define a recoverable<br />

deposit. Little information has been found to indicate unsurmountable technical problems, though<br />

some possible problems in physical separation and smelting have been met during Mintek work on<br />

similar applications. One would expect the Iscor deposit to be the most likely to be developed but<br />

only a small amount of information is available to support this conclusion. An additional problem is<br />

the intellectual property situation covering relevant smelting technology. For antimony and gold,<br />

Metorex considers that the Murchison belt has potential and is trying to structure a joint venture to<br />

fund exploration. The possibility of a centralized gold processing plant in the area should be<br />

examined.<br />

Known reserves of zinc and copper in the Phalaborwa SDI are limited and do not justify a zinc or<br />

copper smelter, or even expansion of the mine, but there are reasonably high expectations of new<br />

finds which could be used to extend Maranda's life. No other significant deposits of zinc or copper<br />

have been identified. There may be a potential for small-scale mining of zinc or copper in the SDI,<br />

but this would not include artisanal operations. Should spare capacity arise at Phalaborwa Mining<br />

Company's smelter there may be an opportunity for Maranda to sell its copper concentrate to PMC<br />

at a considerable saving in transportation cost.<br />

76


The Mohale quartz deposit appears on the basis of initial information to be viable as a mine to<br />

supply the Pietersburg smelter of Silicon Smelters and/or exports. It would not be used for a silicon<br />

metal smelter in the SDI but it could be linked with other enterprises such as glass manufacture,<br />

SMME pegmatite producers or forestry operations. More exploration is needed on the Mohale<br />

deposit, the Marais deposit and for high quality quartz elsewhere in the SDI and the country<br />

generally.<br />

It is recommended that the factors impeding the development of the projects discussed be<br />

investigated in detail to see if any of them can be facilitated by government. This includes the<br />

administrative factors mentioned by Iscor as hindering the Gravelotte project. The Council for<br />

Geoscience should be asked to investigate the Marais deposit.<br />

The principle finding of a related study on small scale mining was that although there are 560<br />

identified mineral deposits in the Phalaborwa SDI, only two, slate and quartz offer a reasonable<br />

opportunity for small scale exploitation. While there are many reasons for this brief list including<br />

high capital cost, poor mineral markets, low grades, etc. it is evident that economically workable<br />

deposits are scarce. This is due, at least in part, to the fact that mining has been conducted in the<br />

area for over 100 years and many deposits are mined out. Secondly, although many suitable<br />

deposits may remain in regions such as the Murchison belt, insufficient geological information is<br />

available in the public domain to make a reasonable judgment. Nor has the study been able to<br />

identify sufficient deposits of one type and of good quality, to justify a central processing plant.<br />

The mineral rights holders have been identified for the five selected prospects. Further to this, a<br />

preliminary investigation on the mineral rights status of other deposits in the Limpopo revealed that<br />

many mineral rights belonged to the State. Yet, mining authorisations were granted in cases of up to<br />

55 subdivisions on each farm. Because the mining authorisations are granted in perpetuity the<br />

license holders are deemed to be “claim” holders. In such circumstances, the NSC will identify the<br />

specific holders concerned should this become necessary in terms of project development.<br />

An observation from a brief study of certain operating mines in the region is that although mines<br />

create permanent employment opportunities, relatively few jobs are created when compared with<br />

the considerable capital investment.<br />

77


. Agricultural Sector<br />

A broad scoping exercise was undertaken by the CSIR Food and Technology Division during 1999 to<br />

establish the current agricultural production and processing operations within the Phalaborwa<br />

Spatial Development Initiative (SDI). The aim of the scope was to identify current and possible<br />

future production and processing opportunities of agricultural produce in the area.<br />

The scope focused on subtropical fruit, vegetables, nuts and ornamentals. A wide variety of<br />

agricultural products are currently grown in the area. Fruit and vegetables are mostly destined for<br />

fresh consumption by the local and export markets. Farmers and private companies are responsible<br />

for some value addition. Value addition includes: manufacture of fruit juices, drying of fruit and<br />

vegetables, manufacture of atchaar.<br />

The table below presents the percentage contribution of the agricultural sector to the GDP and<br />

employment of both the Municipality and the District.<br />

Table B.20: Ba-Phalaborwa agricultural sector’s contribution to municipal GDP and employment<br />

DESCRIPTION % CONTRIBUTION BY AGRICULTURAL SECTOR<br />

District GDP<br />

District Employment<br />

District Tourism Sector Employment<br />

Source: Global Insight<br />

78<br />

1.1%<br />

15.6%<br />

15.9%<br />

The District LED Strategy identifies the following development opportunities and potential projects<br />

that can be undertaken in Ba-Phalaborwa:<br />

Table B.21: Development opportunities and potential projects in the agricultural sector<br />

DEVELOPMENT OPPORTUNITIES POTENTIAL PROJECTS<br />

Existing production of citrus and vegetables Juice making<br />

Existing livestock farming (Cattle, poultry, pigs,<br />

etc.<br />

Vegetable processing<br />

Meat processing plants<br />

Establishment of abattoirs<br />

Dairy products (Cheese, yoghurt,<br />

mass, etc.)<br />

Poultry processing and packaging<br />

Egg production and packaging


Game farming Game farming for selling and hunting<br />

c. Manufacturing Sector<br />

Manufacturing focuses on beneficiation of and value addition to products from the primary sector of<br />

the economy, namely mining and agriculture. It is, therefore, classified as the secondary sector of<br />

the economy. The manufacturing activities in the Municipality are mainly focused on the mining<br />

sector. There is, however, a potential for the processing and packaging of agricultural related<br />

products such as Cattle, poultry, vegetables, eggs, etc.<br />

The table below presents the percentage contribution of the manufacturing sector to the GDP and<br />

employment of both the Municipality and the District.<br />

Table B.22: Ba-Phalaborwa manufacturing sector’s contribution to municipal GDP and<br />

employment<br />

% CONTRIBUTION BY MANUFACTURING<br />

SECTOR<br />

District GDP<br />

District Employment<br />

District Manufacturing Sector Employment<br />

Source: Global Insight<br />

79<br />

0.5%<br />

1.9%<br />

14.4%<br />

The Municipality employs 14.4% of the total district labour force that is in the manufacturing<br />

industry and hence contributes only 0.5% to the overall District GDP. Manufacturing does not give<br />

the Municipality a competitive advantage over the other sister municipalities in the District. It then<br />

implies that the production of mining raw materials is not equally complemented with local<br />

beneficiation and value chain addition. In order to grow the manufacturing industry, the<br />

Municipality needs to strengthen support services, such as transport network, electricity and<br />

technology. It is also important to unblock land claims disputes to free land for development.<br />

Products currently manufactured in Ba-Phalaborwa include:<br />

Bricks for building and paving;<br />

Industrial chemical products;


Rubber products (lining);<br />

Printing;<br />

Pipe and tube manufacturing,<br />

Extracting oil from marula pips;<br />

Processing of Marula pulp;<br />

Food canning; and<br />

Protective clothing.<br />

The table below presents potential projects in the manufacturing sector:<br />

Table B.23: Potential projects in the manufacturing sector<br />

DEVELOPMENT POTENTIAL POTENTIAL PROJECTS<br />

Available local agricultural produce • Fruit and vegetable processing plant<br />

80<br />

• Meat processing<br />

• Packaging of eggs and other products<br />

• Dairy products like cheese<br />

• Poultry factory processing<br />

• Canned fruit and vegetables<br />

Available mining products • Clay processing plant<br />

• Brick manufacturing<br />

• Roof and floor tile manufacturing<br />

• Tile and cement manufacturing<br />

• Ceramic and sanitary ware<br />

manufacturing<br />

• Manufacturing of steel products<br />

Other natural products • Processing of extracted oil from Marula<br />

pips<br />

d. Tourism Sector<br />

• Processing of extracted marula pulp<br />

The decline of the mining industry forces the Municipality to venture into other economic sectors.<br />

The geographic position of Ba-Phalaborwa and the abundance of wildlife in the Kruger National Park


present an opportunity for diversification into tourism. Tourism is the economic sector with the<br />

most potential for development in the Municipality as a result of the Municipality’s ideal location<br />

and climate.<br />

The Mopani Local Economic Development Strategy indicates the following with regard to<br />

Tourism in Ba-Phalaborwa:<br />

The Municipality has high business tourism flows – especially linked to commerce, industry<br />

and the mines.<br />

Leisure traffic stops briefly in and around the town usually en route to and from the Kruger<br />

National Park (KNP).<br />

There is a limited amount of traffic that stays outside the Park to make day visits into the<br />

Park.<br />

Similarly, very few KNP visitors spend a night in Phalaborwa before or after their visits to the<br />

Park.<br />

Stay-over leisure traffic is growing as far as the golf estate is concerned.<br />

Tourism operators believe that the opportunity to travel to the Mozambican coast via Ba-<br />

Phalaborwa represents a significant tourism advantage. Archeological sites and the history of the<br />

arrival of the Malatji clan are also believed to hold tourism potential. The area has a particularly<br />

pleasant winter climate. The concept of converting former mine hostels into educational facilities or<br />

youth academies is another possibility. The fact that the local labour force comprises a high<br />

proportion of single persons reflects a need for leisure facilities that are not sufficiently available.<br />

The Ba-Phalaborwa Tourism Development Strategy as compiled by Grant Thornton in February 2006<br />

recommends, in order of priority, the following market:<br />

Domestic general leisure tourists<br />

Foreign general leisure tourists<br />

Domestic transit tourists<br />

Foreign transit tourists<br />

The Grant Thornton strategy recommends that the following tourism products be explored,<br />

developed and marketed:<br />

Phalaborwa as a base for exploring KNP;<br />

Phalaborwa as a base to explore Greater Limpopo Trans-frontier Park (GLTP);<br />

81


Phalaborwa as a transit to KNP and GLTP;<br />

A destination for general leisure experience;<br />

An interesting transit stop; and<br />

A convenient conferencing venue<br />

According to the Grant Thornton study, there is a need for tourism support infrastructure. The<br />

strategy recommends that upgrading of roads, electricity, water supply and sanitation be done.<br />

Grant Thornton further recommends that the Municipality:<br />

Maintains public amenities;<br />

Ensures the safety of tourists at visiting points;<br />

Provides infrastructure in support of tourism; and<br />

Standardises tourism related signage.<br />

Ba-Phalaborwa is a popular tourist destination and many opportunities exist to expand the income<br />

generated from the tourism economic sector. A scoping report on tourism opportunities in the<br />

Phalaborwa Corridor by KPMG concluded that priority should be given to:<br />

Development of the Hans Merensky Club into an international resort,<br />

Construction of an international mid-range hotel at the gate to the Kruger Park,<br />

Promotion of the Marula industry.<br />

The following are existing tourist attraction points in Ba-Phalaborwa:<br />

Hans Merensky Golf Course and Estate;<br />

46 accommodation facilities;<br />

Bonlati Game Ranch;<br />

Water based activities in the lower Olifants River;<br />

Tours to the ‘Big Hole’ at the copper mine in Phalaborwa;<br />

Big baobab tree of Gravelotte;<br />

Eiland Resort;<br />

Tsonga Kraal;<br />

Letaba Game Ranch<br />

Mashishimale Croch Ranch<br />

The table below portrays the identified development potential and potential projects for stimulating<br />

development within the tourism sector of the Municipality.<br />

82


Table B.24: Development potentials and potential projects<br />

DEVELOPMENT POTENTIAL POTENTIAL PROJECTS<br />

Various local tourist products, services and<br />

activities<br />

Existing attractions to be upgraded<br />

Development of cultural activities<br />

83<br />

Tourist services, product and activity<br />

packaging and marketing<br />

Development of a tourism development<br />

strategy<br />

Linking the existing tourist products and<br />

services to surrounding products and<br />

services<br />

Development of an anchor tourism<br />

site/facility<br />

The Big Boabab Tree in Gravelotte,<br />

interpretation of site and marketing<br />

development<br />

Road to Tsonga Kraal upgraded for better<br />

access<br />

Development of facilities at the Letaba<br />

Ranch<br />

Village tours and cultural activities south<br />

of Letaba Ranch<br />

Arts and crafts market<br />

Tourism infrastructure in the municipal area is presented in the table below and followed by a SWOT<br />

analysis of the tourism sector.<br />

Table B.25: SWOT analysis of the tourism sector<br />

Strengths Weaknesses<br />

Proximity to the Kruger National Park<br />

Abundant tourist accommodation<br />

Game Farms<br />

Open areas/parks and green belts<br />

Opportunities Threats<br />

Mopani worms<br />

Marula nuts<br />

Road to Mozambique via Phalaborwa gate<br />

Greater Ba-Phalaborwa trade and tourism<br />

forum<br />

Mopani District LED and tourism forum<br />

Eco-tourism<br />

Hunting<br />

Malaria area<br />

High temperatures in summer<br />

Deteriorating road infrastructure<br />

Increasing petty crime due to<br />

increased unemployment<br />

Pollution from mining activities<br />

Deforestation<br />

Over - development of parks and<br />

open spaces<br />

Land claims


Mining<br />

Birdlife South Africa initiative<br />

There is a rich potential of historical-cultural tourism with the existing archaeology and culture of<br />

ancient mining dating back from 800 AD to about 1350 AD.<br />

Bollanoto<br />

Bollanoto is a municipal property, a few metres from the Phalaborwa Gate. It was established with<br />

the view to making tourists destined for KNP to stop, spend and possibly stay in Phalaborwa town. It<br />

was meant to afford the previously disadvantaged (called beneficiaries) an opportunity to<br />

participate in the tourism industry. The existing structure is not functioning at its utmost potential.<br />

Assessment revealed that Bollanoto did not achieve its objectives as a result of, amongst other<br />

factors, the following:<br />

Beneficiaries felt it was too far from home and too costly to travel every day;<br />

No “champion”;<br />

Not enough feet passing through the Centre;<br />

Craft on sale along roadside and at KNP Gate (Hlanganani);<br />

Provincial support not sustained;<br />

Municipality was not interested in subsidizing the Centre, and the private sector did not see it as<br />

a viable project.<br />

Environmental and tourism education facilities – small lecture rooms and displays;<br />

Indigenous Tree Garden;<br />

“Touch and Feel” wildlife centre.<br />

A new approach has been suggested towards the physical upgrading and expansion of the Centre.<br />

The approach aims at ensuring that Bollanoto becomes the ‘heart and soul’ of tourism in Ba-<br />

Phalaborwa Municipality. The concept is to enclose the present buildings within a decorated wall<br />

and to construct all new facilities, such as gift shops, restaurants etc. facing outwards from this wall.<br />

This would create a flow of feet within the central circle and would ensure that a visitor heading for<br />

the restaurant, for example, would also see and pass the other facilities on offer.<br />

84


There is a possibility of creating a traffic roundabout (traffic circle) where there are traffic lights at<br />

present, and this would not only ease vehicle flow but would also assure higher visibility of the<br />

Centre.<br />

There is unused land (part of the Bollanoto property) extending to the north and northeast and this<br />

would be used for the Living Tree Museum, walks and trails, and some of the “touch and feel”<br />

animal experiences. Additional land may be available - at a price.<br />

The Municipality is currently considering the establishment of a legal municipal entity, which will be<br />

charged with the day to day management of Bollanoto tourism centre. The consideration takes into<br />

account the importance of public private partnership to ensure efficiency and sustainability.<br />

Annual Marula Festival<br />

The Marula Festival has become an annual event with Ba-Phalaborwa Municipality declared a<br />

permanent host. The festivities for <strong>2011</strong> were held over a period of three days in the picturesque<br />

town of Phalaborwa. The build-up activities of the festival will start on the 19 February <strong>2011</strong> in all<br />

the five (5) traditional authorities. The main venues for the <strong>2011</strong> activities will be Impala Park<br />

Stadium, Hans Merensky Golf Club and Spekboom Farm.<br />

Key issues with regard to tourism in Ba-Phalaborwa:<br />

Immigration bottlenecks in the Giryondo boarder;<br />

Crime and potential cross-border criminal activities may scare tourists;<br />

Lack of cross referrals between the KNP and accommodation facilities in the Ba-Phalaborwa<br />

area;<br />

Commercial banks meeting the needs of international tourists;<br />

Ensuring that the previously disadvantaged groups join the tourism industry as role players;<br />

Development of suitable infrastructure to meet the different tastes of tourists;<br />

Branding Ba-Phalaborwa as a tourist destination of choice;<br />

Lack of ownership of the tourism products by the stakeholders; and<br />

Cluttered signage<br />

e. Trade<br />

Currently, the trade situation in the Ba-Phalaborwa municipal area is segmented between the formal<br />

and the Informal sectors. There are currently 189 registered formal businesses in Phalaborwa town;<br />

85


whereas data on businesses in the two townships and the rural areas is still to be collated. The<br />

existent gap between the first and the second economies is evident from the operations of the<br />

businesses in both the formal and the informal sectors.<br />

Formal businesses in rural nodes, such as Makhushane, Maseke, Mashishimale, Majeje and Selwane<br />

are not well established. The businesses mainly serve as bread distributors with basic products not<br />

well stocked to the benefit of their customers.<br />

The Municipality’s concern is to close the gap between the first and the second economies by<br />

improving the informal economic sector without devaluing the formal sector. Glen Steyn &<br />

Associates’ analysis of the informal sector will assist the Municipality to understand the<br />

fundamentals of the informal sector and craft a relevant intervention strategy.<br />

f. Informal Economic Sector<br />

A survey was conducted, by Glen Steyn & Associates, to create a database on the state of informal<br />

trading in Ba-Phalaborwa. The above table represents the findings:<br />

Table B.26: Summary of the Traders and Trading Areas<br />

TRADING PLACE NUMBER OF TRADERS TRADERS INTERVIEWED<br />

Checkers Car Park 27 26<br />

Phalaborwa Taxi Rank 60 60<br />

Namakgale 143 12<br />

Majeje/Lulekani 68 5<br />

Mashishimale 37 24<br />

Makhushane 28 -<br />

Maseke 20 13<br />

Seloane 24 8<br />

Gravelotte 7 5<br />

Boelang 3 3<br />

TOTAL 417 156<br />

Source: Glen Steyn & Associates, 2007 Survey<br />

86


Needs identified by informal economy businesses.<br />

• The greatest need identified is the issue of decent trading structures and storage facilities at<br />

the places where they are currently trading.<br />

• Most traders in the Checkers Car Park indicated that they need access to micro-finance in<br />

order to increase their stock levels and variety.<br />

• Some Spaza owners mentioned the need for advertising materials (boards), to attract/ alert<br />

potential buyers<br />

• Electricity connections were requested by some traders.<br />

Employment<br />

The labour force in Phalaborwa was 51,510 persons in 2001 according to the strict definition. This<br />

indicates a participation rate of more than 39% (on a total population of 131,091), which is very high<br />

by South African standards. The average labour force participation rate in Limpopo was 24.6% in<br />

2001. This is an indication that Ba-Phalaborwa is a destination for labour migration.<br />

There was a modest increase in the number of employed persons between 1996 and 2001, but a<br />

considerable increase in the number of unemployed persons. The strict unemployment rate<br />

therefore increased from 29.2% in 1996 to 40.4% in 2001. The labour force participation rate in<br />

Phalaborwa was 34.6% in 1996, but increased to 39% as indicated above. More than half of the<br />

increase in the number of unemployed persons therefore originates as labour seekers from outside<br />

the municipal area.<br />

The following table presents employment of individuals per economic sector. Employment per<br />

sector:<br />

Table B2.27: Employment for individuals per employment sector<br />

Economic Sector Population %<br />

Primary 6 685 5.1%<br />

Secondary 12 424 9.4%<br />

87


Tertiary 14 507 11.0%<br />

Not applicable 97 868 74.4%<br />

Total 131 485 100%<br />

Source: Development Partnership, 2008<br />

The above table indicates a shift towards the services (Tertiary) sector. This may augur well for<br />

tourism development. At the same time, a sharp decline in the primary sector may greatly affect<br />

both the secondary and tertiary sectors, since their sustainability is dependent on the primary<br />

sector.<br />

The table below presents household heads’ occupations per sector<br />

Table B2:28 Household heads’ occupations per sector<br />

Occupations Number % of Household Head<br />

Population<br />

Legislators, Senior Officials and<br />

Managers<br />

1 541 4.6%<br />

Professionals 1 638 4.8%<br />

Technicians 1 217 3.6%<br />

Clerks 753 2.2%<br />

Service Workers, Shop &<br />

market Sales Workers<br />

Skilled Agricultural & Fishery<br />

Workers<br />

Crafts & related Trades<br />

Workers<br />

Plant & Machine Operators &<br />

assembly<br />

2 034 6.0%<br />

753 2.2%<br />

3 823 11.3%<br />

2 842 8.4%<br />

Elementary Occupations 3 946 11,7%<br />

Occupations unspecified 1 828 5.4%<br />

Not applicable 13 417 39.7%<br />

Total 33 792 100%<br />

Source: STATSA SA (2007 CS)<br />

88


The majority of household heads are employed in elementary occupations, do craft and related<br />

trade work or as plant and machine operators. It should therefore be noted that the forced shift of<br />

focus from mining to tourism will have to be complimented by the necessary workforce. Strategies<br />

need to be developed to train and/or retrain people in the different fields of the hospitality sector<br />

and support sectors.<br />

2.3.3 Employment Status and Income<br />

a. Employment Status<br />

The rate of unemployment in South Africa is currently at 43%. This analysis focuses on the<br />

employment status per household head in the municipal area (see the tables below).<br />

Table B.28: Employment status per household head in the municipal area<br />

2001<br />

EMPLOYMENT STATUS NUMBER %<br />

Employed 30704 54%<br />

Unemployed 20806 36%<br />

Could not find work 5830 10%<br />

100%<br />

Total 57340<br />

Source: STATS SA 2001 census Source: STATS SA 2007 CS<br />

According to the 2007 CS results, unemployment is at 11% per household head as compared to the<br />

36% in 2001. The difference may be attributed to the definitions of a household adopted in each of<br />

the studies and that the 2007 CS focused on household heads.<br />

b. Income Distribution and Categories<br />

Table B.29: Monthly income distribution per person in the municipal area in 2007<br />

CATEGORY NUMBER % OF POPULATION<br />

No Income 54 960 43.2%<br />

R1 – R400 30 753 24.2%<br />

R401 – R800 6 815 5.3%<br />

2007<br />

EMPLOYMENT STATUS NUMBER %<br />

Employed 19 913 59%<br />

Unemployed 3 842 11%<br />

Not economically active 7 282 22%<br />

Not applicable 2 755 8%<br />

Total 33 792 100<br />

89


R801 – R1 600 13 467 10.6%<br />

R1 601 – R3 200 5 893 4.6%<br />

R3 201 – R6 400 3 678 2.9%<br />

R6 401 – R12 800 3 123 2.5%<br />

R12 801 – R25 600 2 090 1.6%<br />

R25 601 – R51 200 587 0.5%<br />

R51 201 – R102 400 18 0.01%<br />

R102 401 – R204 800 - -<br />

R204 801 or more - -<br />

Response not given 3 845 3.0%<br />

Institution 2 079 1.6%<br />

Total 127 309 100%<br />

The per person income distribution in the municipal area indicates that about 83.3% of the<br />

municipal population earn a monthly income of R1 600 or less. If these figures are to translate to<br />

monthly household income, it can be surmised that the majority of household heads are either<br />

unemployed or under-employed and qualify to be declared indigents.<br />

The proportion of people without any income increased from 63.8% in 1996 to 69.6% in 2001.<br />

Factors that contributed to this picture were principally, the downscaling of mines and the fact that<br />

many people join the informal economy and are classified as not having income. The 2007 CS<br />

indicates a decrease in the percentage of people without an income from 69.6% in 2001 to 43.2%.<br />

Although the decrease is welcome, the figures are still unacceptably high and the situation warrants<br />

intervention.<br />

c. Dependence on social grants<br />

The following table shows distribution of food parcels by the Department of Social Development<br />

(Community Development section)<br />

90


Table B.30: Distribution of food parcels to needy families between 2006 and 2008<br />

YEAR NUMBER OF BENEFICIARIES<br />

(HOUSEHOLDS) IDENTIFIED PER<br />

WARD<br />

91<br />

NUMBER OF FOOD PARCELS DISTRIBUTED<br />

LULEKANI<br />

AREA<br />

NAMAKGALE AREA TOTAL<br />

2006/07 32 160 256 416<br />

2007/08 20 107 207 314<br />

B2.4 Safety and Security<br />

Greater Phalaborwa Cluster consists of 5 police stations, namely Phalaborwa Police Station,<br />

Namakgale Police Station, Lulekani Police Stations, Hoedspruit Police Station and Gravelotte Police<br />

Station. The Cluster is serving two municipalities, Ba-Phalaborwa Municipality and Maruleng Local<br />

Municipality. There are four police stations under Ba-Phalaborwa Municipality, namely, Phalaborwa<br />

Police Station, Namakgale Police Station, Lulekani Police Station and Gravelotte Police Station.<br />

Hoedspruit Police falls under Maruleng Local Municipality.<br />

B2.4.1 Analysis of Crime Trends<br />

An analysis of the Greater Phalaborwa Cluster crime situation is facilitated by grouping the crime<br />

tendencies into the following:<br />

• Contact crime<br />

• Contact related crime<br />

• Property crimes<br />

• Other serious crimes and<br />

• Crimes heavily dependent on police action for detection<br />

During the period 1 January 2008 until 1 January 2009 a total of 7366 crimes were registered in the<br />

Greater Phalaborwa cluster. 671 crimes were reported during 1 st January 2009 until 1 st January 2010.<br />

There is a decrease of 395 reported crimes.


B2.5 Environmental Considerations<br />

In terms of the National Environmental Management Act (Act 107 of 1998), Ba-Phalaborwa<br />

Municipality has to provide for co-operative environmental governance by establishing principles for<br />

decision-making on matters affecting the environment and to provide for matters connected<br />

therewith. This act works hand in hand with Environmental Conservation Act, 1989. Both Acts<br />

stipulate the provision of environmental impact assessments and exemption, noise control areas etc.<br />

and for the effective protection and controlled utilization of the environment and for matters<br />

incidental thereto.<br />

The purpose of environmental analysis is to ensure that municipal development strategies and<br />

projects take existing environmental problems and threats into consideration. It also aims at creating<br />

awareness about environmental assets that require protection or management. The Municipality,<br />

through the <strong>IDP</strong>, has to ensure sustainable development – development that meets the needs of the<br />

present generation without compromising the ability of future generations to meet their own needs<br />

(definition by the World Commission on the Environment and Development). According to the<br />

National Environmental Management Act (Act 107 of 1998), sustainable development should be<br />

perceived as the integration of social, economic and environmental factors into planning,<br />

implementation and decision making so as to ensure that development serves present and future<br />

generations.<br />

A number of wild animals roam freely within the area. Given the position of the area next to the<br />

National Park and private reserves, this is not an unnatural phenomenon and adds to the ambiance<br />

and attractiveness of the town. The provincial department responsible handles problem animals in<br />

conjunction with council and other role players. However, the area in general is under severe<br />

pressure from alien and invader plant species. The removal and control of such plants is the<br />

responsibility of government structure, the council and private landowners. Current legislation<br />

dictates us to control such plants according to their grading in the schedule to the act. Ba-<br />

Phalaborwa is regarded as an ecologically sensitive zone given its water sources and proximity to the<br />

Kruger National Park.<br />

Air pollution:<br />

The municipality does not have reliable information on the severity of air pollution in the area,<br />

taking into consideration the mining activities. At present, the Municipality does not have the<br />

capacity to perform air quality management.<br />

92


Water pollution:<br />

Mainly the mines, pit latrines and other sewage spillage cause the pollution of surface as well as<br />

underground water sources. Water pollution is also worsened by acid rain caused by air pollution.<br />

Water pollution poses a health risk to households that are dependant on water from rivers and/or<br />

boreholes.<br />

Deforestation:<br />

Deforestation is identified as major environmental problem in areas surrounding townships and<br />

villages. Deforestation is caused mainly by the creation of small farming plots, the use of firewood<br />

as main source of energy, uncontrolled veldfires and overgrazing.<br />

Veldfires:<br />

Veldfire is an environmental problem in the area, due to the fact that the majority of the area<br />

consists of game farms and borders on the Kruger National Park. Veldfires have a negative impact<br />

on biodiversity and contribute to soil erosion.<br />

Soil erosion:<br />

Soil erosion, although not so vast and confined mainly to areas around the villages, is due to<br />

deforestation and over-grazing.<br />

Chemical spills and hazardous accidents:<br />

A large area bordering the Kruger Park is utilized by the mining industry to dump their sludge and<br />

other waste products produced by mines. This, however, is well managed and does not pose an<br />

immediate threat to the environment.<br />

B2.7 Disaster Management<br />

The following hazards found to pose the greatest risks in the Municipal area on the economy,<br />

cultural, welfare, sustained development and sustained livelihoods.<br />

93


Natural Hazards<br />

B2.7.1 Hydro Meteorological Hazards<br />

• Drought<br />

• Cyclone<br />

• Floods<br />

• Fire<br />

• Hailstorm<br />

• Lightning<br />

• Severe storms<br />

• Wind storms<br />

• Tornado<br />

B2.7.2 Geological Hazards<br />

• Earthquake<br />

• Landslide/mudflow<br />

B2.7.3 Biological Hazards<br />

• Food poisoning<br />

• Foot and mouth disease<br />

• Malaria<br />

• Rabies (animals)<br />

• Communicable diseases<br />

B2.7.4 Technological Hazards<br />

• Dam failure<br />

• Hazardous installations<br />

• Hazardous material by rail<br />

• Hazardous material by road<br />

• Aircraft accidents<br />

B2.7.5 Environmental degradation<br />

• Air pollution<br />

• Deforestation<br />

• Soil pollution<br />

• Siltation<br />

• Land degradation<br />

94


B3. Institutional Arrangements<br />

The institutional arrangements of the Municipality are best presented through the organisational<br />

chart (organogram). See Annexure A for the Organogram of the Municipality.<br />

B4. Governance and Financial Viability<br />

B4.1 Financial Viability<br />

Budget and Management<br />

The Municipality has volunteered to table its budget in new reporting formats and fully complied.<br />

The municipality has fully complied with the provisions of the MFMA in preparing its 2009/10<br />

budget, compliance to the <strong>IDP</strong>/Budget Process Plan, submissions of MFMA and compliance to DoRA.<br />

Supply Chain<br />

The Municipality is at 93% in compliance the Supply Chain Management priorities as set out by the<br />

National Treasury. Supply Chain reports are tabled in council and submitted to National and<br />

Provincial Treasury. Through the Supply Chain Management, the Municipality has supported SMMEs.<br />

The Municipality has improved its fleet management; all Municipal vehicles are fitted with tracking<br />

devices that assist in tracking irregular issues. The tracking devices reports are printed on monthly<br />

basis and analysed. The Municipality has completed the GRAP compliant asset register.<br />

Revenue and Debt Management<br />

The Municipality has implemented a uniform tariff in the 2009/10 financial year. The Municipality<br />

has supported 3754 indigent households who qualified. The Municipality was able to collect R208<br />

million (R201 million budget) from own revenue sources. There is an improved average payment<br />

rate of services from 67% to 87%, an improved payment rate in town from 63% to 83%. An<br />

improvement was also noticed in the billing and customer care.<br />

Financial related Policies<br />

The Municipality has improved its business processes and developed and implemented 14 financial<br />

related policies:<br />

95


Debt Policy<br />

All the policies were public participated in all the wards in the Municipality.<br />

Revenue Enhancement Strategy<br />

Description Adjusted Budget Receipts to Date Variance Amount Percentage<br />

Collection<br />

Property rates 30 470 000 47 187 505 16 717 505 155%<br />

Electricity<br />

revenue<br />

62 508 000 40 458 677 -22 049 323 65%<br />

Water revenue 65 920 240 72 185 458 6 265 218 110%<br />

Sanitation<br />

revenue<br />

7 091 232 10 761 516 3 670 284 152%<br />

Refuse removal 4 530 924 6 126 709 1 595 785 135%<br />

Interest on<br />

outstanding debts<br />

4 908 742 26 222 137 21 313 395 534%<br />

Fines 780 000 524 404 -255 596 67%<br />

Licences and<br />

permits<br />

Service charges<br />

other<br />

5 468 813 4 396 182 -1 072 631 80%<br />

18 837 373 0 -18 837 373 0%<br />

Total 200 515 324 207 862 588 7 347 264 104%<br />

Grants and Subsidies received<br />

Grant Allocation Adjusted Budget Receipts to Date Percentage Allocation<br />

FMG 750 000 750 000 100%<br />

MSIG 500 000 500 000 100%<br />

MIG 12 812 000 12 335 000 96%<br />

NDPG 10 000 000 10 000 000 100%<br />

NDPG – Technical 2 500 000 - 0%<br />

96


Grant Allocation Adjusted Budget Receipts to Date Percentage Allocation<br />

Equitable Shares 39 033 100 39 033 100 100%<br />

FBS-MDM 4 849 085 4 849 085 100%<br />

Provincial Grant –<br />

Excess Employees<br />

2 440 000 2 440 000 100%<br />

DBSA Grant Funding 2 000 000 1 313 9191 66%<br />

MDM-GRAP<br />

Conversion<br />

0 1 000 000 100%<br />

Total 74 884 185 72 221 104 96%<br />

Budget Spending<br />

Standard Item Adjusted Budget Actual Year to<br />

date<br />

Employee related<br />

cost<br />

97<br />

Variance Amount Percentage Spent<br />

R R R<br />

Remuneration 62 183 975 63 664 435 -1 480 460 102%<br />

Employee related<br />

cost: social<br />

contributions<br />

Remuneration of<br />

councillors<br />

11 219 330 11 409 170 -189 840 102%<br />

11 617 000 8 345 349 3 271 651 72%<br />

Finance charges 795 780 1 708 796 -913 016 215%<br />

Bulk purchases 86 666 959 73 964 714 12 702 245 85%<br />

Repairs and<br />

Maintenance<br />

Contracted<br />

services<br />

Goods and<br />

services<br />

12 691 924 4 292 075 8 399 849 34%<br />

10 964 063 14 374 846 -3 410 783 131%<br />

25 797 780 30 712 160 -4 914 380 119%<br />

Vehicle expenses 5 300 512 5 045 048 255 464 95%<br />

Capital 16 000 000 350 000 15 650 000 2%


Standard Item<br />

expenditure from<br />

own revenue<br />

Adjusted Budget Actual<br />

date<br />

Year to<br />

Capital<br />

expenditure from<br />

grants funding<br />

98<br />

Variance Amount Percentage Spent<br />

25 312 000 30 679 245 -5 367 245 121%<br />

Other Express 2 849 085 5 888 513 -1 039 428 121%<br />

Total 273 398 408 250 434 351 22 964 057 92%<br />

Audit Opinion<br />

The Municipality has a history of receiving disclaimers from the Auditor General’s report. Even for<br />

the 2009/10 financial year the municipality has received a disclaimer opinion. The opinion has a<br />

serious bearing on the performance of the municipality. The municipality must come up with plans<br />

to address the audit challenges raised in the Auditor General’s report. The municipality has a target<br />

to get the clean audit be 2014 in line with the mandate of the current government.<br />

B4.2 Audit Committee<br />

The Municipality has appointed the Internal Auditor and Manager responsible for Risk. The<br />

Municipality does not have its own Audit Committee; Mopani District Municipality has appointed a<br />

shared Audit Committee that audits all local municipalities in the District. The District Audit<br />

Committee has been appointed for a three (3) year term. The District Audit Committee is part of the<br />

performance assessment of senior managers in the municipality.<br />

B4.3 Free Basic Services:<br />

Community Survey, 2007 5 indicates a total number of households as 33,791 of which 15,353 is<br />

indigent. No indication of number of households with access to free basic water is indicated. A total<br />

number of 2,638 indigent households are served with free basic electricity. Eskom is responsible for<br />

providing free basic electricity in townships. The Municipality has an Indigent Policy, which deals<br />

5 Basic Services Publication, 2009, Comparative information on basic services: Department of<br />

Cooperative Governance and Traditional Affairs


with the households that qualifies to be registered in the Indigent Register. Households that qualify<br />

to be registered in the Indigent Register qualify for free basic water, free basic electricity, free refuse<br />

removal, free sewerage and assessment rates.<br />

B4.4 Good Governance<br />

B4.4.1 Public Participation<br />

The Municipality has 16 ward committees, which is in line with the number of wards, a Public<br />

Participation Officer located in the Office of the Speaker and 13 appointed CDWs. All the 16 Ward<br />

Committees are functional. After the <strong>2011</strong> local government elections, the municipality will be<br />

having two additional wards and the total number of wards will be 18. Ward Committee reports are<br />

submitted on monthly basis to the Public Participation Officer in the office of the Speaker. The<br />

reports are processed through the Planning and Development Directorate Portfolio Committee.<br />

Ward Committee Reports forms part of agenda items in the Senior Management, Portfolio<br />

Committees, Exco and Council.<br />

B4.4.2 IGR Structures<br />

The Municipality is part of the established IGR structures in the Mopani District and the Limpopo.<br />

The established IGR structures include the following:<br />

District Ward Committee’s Forum<br />

District Municipal Manager’s Forum<br />

Speakers Forum<br />

Mayor’s Forum<br />

Premier’s Inter-Governmental Forum<br />

The forums provide a platform for the municipality to interactive with other governmental<br />

structures that has a bearing on its functionality.<br />

99


B5. Municipal Backlogs<br />

B5.1 Water<br />

The Selwane/Nondweni Water Scheme currently supplies 0,237MI/d to the Middle Letaba area and<br />

0,064Ml/d to Nondweni (See table below).<br />

Table B.31: Water Supply by the Selwane/Nondweni Water Scheme<br />

AREA CAPACITY (In<br />

Ml/d)<br />

SOURCE: Africon, 2007<br />

CALCULATED<br />

DEMAND<br />

100<br />

CURRENT SUPPLY (In Ml/d)<br />

MIDDLE<br />

LETABA<br />

AREA<br />

NONDWENI TOTAL<br />

1 0.340 0.237 0.064 0.301<br />

The total actual supply is 0,301MI/d compared to the calculated demand of 0,340Ml/d. There is a<br />

variance of 0,039MI/d. The implication is that there is an under supply of about 11.5%. In real terms,<br />

it implies that there are households in the areas which do not have access to RDP standard water.<br />

Water supply from the Namakgale/Lulekani Water Scheme is presented in the following table:<br />

Table B.32: Water supply from the Namakgale/Lulekani Water Scheme<br />

Capacity (MI/d) Actual (MI/d) Unutilized capacity (MI/d)<br />

Raw 72 66 6<br />

Potable 76 62 14<br />

Total 148 128 20<br />

Source: Africon, 2007<br />

Most of the water supply infrastructure is owned by Lepelle Northern Water Board. However, the<br />

Municipality owns some reservoirs, 78km of distribution lines and 512km of reticulation lines.


The following tables show access by households to water services:<br />

Table B.33: Households access to water<br />

SERVICE LEVEL DESCRIPTION NUMBER OF HOUSEHOLDS %<br />

Piped water in dwelling 12 251 36.3<br />

Piped water inside yard 17 082 50.6<br />

Piped water from access point<br />

outside yard<br />

3 812 11.3<br />

Borehole water 413 1.2<br />

Spring water - -<br />

Bam/Pool - -<br />

River/Stream - -<br />

Water vendor - -<br />

Rain water tank - -<br />

Other 234 0.7<br />

Total 33 792 100<br />

Source: STATS SA (2007 CS)<br />

Table B.34: Water services<br />

Service Level Description Number of Households %<br />

In-house 10 057 31.3%<br />

Yard tap 12 535 39.0%<br />

Communal stand pipe 200m 4 379 13.6%<br />

No water 178 0.6%<br />

Total 32 123 100%<br />

Source: The Development Partnership, 2008<br />

101


Access to water through communal stand pipes outside the yard is estimated at 11% to 29% of the<br />

households in the area. The above tables are not able distinguish between availability of water<br />

infrastructure and access to water.<br />

The Municipality conducted a Quality of Life Survey in 2008 that indicated a shortage of water in<br />

most of the wards. The Local Area Planning (LAP) process conducted by the Independent<br />

Development Trust (IDT, 2007) also confirms shortage of water as the number one complaint in the<br />

wards. The implication of these findings is that although infrastructure reticulation in the municipal<br />

area is at 98%, but water supply remains a challenge.<br />

B5.2 Sanitation<br />

The Municipality currently supplies water borne sanitation to Phalaborwa Town, Namakgale and<br />

Lulekani. The table below shows the sanitation infrastructure capacity in the three areas:<br />

Table B.35: Sanitation infrastructure capacity<br />

Area Capacity Current Inflow Spare Capacity<br />

Phalaborwa Town 4.8 7.0 -2.2<br />

Lulekani 4.0 1.2 2.8<br />

Namakgale 8.0 6.0 2.0<br />

Source: Africon, 2007<br />

Sanitation infrastructure capacity in Phalaborwa Town needs attention in order to accommodate<br />

current inflow as well as future demands. The development of Extension 7 is one example that<br />

requires upgrading of sanitation infrastructure or an alternative sustainable system.<br />

Table B.35a: Access to sanitation facilities by households<br />

TYPE OF FACILITY NUMBER OF HOUSEHOLDS %<br />

Flush toilet (connected to<br />

sewerage system)<br />

14 056 41.6%<br />

Flush toilet (with septic tank) 1 090 3.2%<br />

Dry toilet facility 208 0.6%<br />

102


TYPE OF FACILITY NUMBER OF HOUSEHOLDS %<br />

Pit toilet with ventilation (VIP) 2 868 8.5%<br />

Pit toilet without ventilation 8 958 26.5%<br />

Chemical toilet 0 0%<br />

Bucket toilet 0 0%<br />

None 6 612 19.6%<br />

Total 33 792 100%<br />

Source: STATS SA (2007 CS)<br />

STATS SA estimates that about 20% of the households do not have sanitation facilities, whereas The<br />

Development Partnership study puts the backlog at 40% (12 987 households out of an estimated 32<br />

123) It is evident from the above table that about 20% of the households in the municipal area does<br />

not have access to any type of toilet facility. The following table classifies households’ access to<br />

toilet facilities according to population group. The 20% population with no access to a toilet facility<br />

comprises of black people only. This confirms that access to some basic services, such as sanitation,<br />

is still skewed according to racial groups.<br />

Table B.36: Toilet facilities per household by population group:<br />

TYPE OF FACILITY %<br />

Flush toilet<br />

(connected to<br />

sewerage system)<br />

Flush toilet (with<br />

septic tank)<br />

BLACKS COLOUREDS INDIANS/ASIANS WHITES TOTAL<br />

32.4% 0.3% - 8.9% 41.6%<br />

3.0% - - 0.3% 3.3%<br />

Dry toilet facility 0.6% - - - 0.6%<br />

Pit toilet with<br />

ventilation (VIP)<br />

Pit toilet without<br />

ventilation<br />

8.0% - - 0.5% 8.5%<br />

26.5% - - - 26.5%<br />

Chemical toilet 0% - - - 0%<br />

Bucket toilet 0% - - - 0%<br />

103


TYPE OF FACILITY %<br />

BLACKS COLOUREDS INDIANS/ASIANS WHITES TOTAL<br />

None 19.6% - - - 19.6%<br />

Total 90% 0.3% - 9.7 100%<br />

104


The following table presents water and sanitation challenges faced by the communities in the various wards:<br />

Table B.37: Sanitation challenges faced in the wards<br />

WARD AFFECTED AREA<br />

(Village/Section)<br />

NATURE OF CHALLENGE INTERVENTION<br />

REQUIRED<br />

1 Haniville Partially reticulated with water<br />

network at RDP standard<br />

Water reticulation at<br />

high level of service with<br />

water meters<br />

Nyakelang 1 & 2 No water network Water reticulation at RDP<br />

standard<br />

2 Mahale Partially reticulated with water<br />

network at RDP standard<br />

Nondweni Partially reticulated with water<br />

network at RDP standard<br />

Prieska Partially reticulated at RDP<br />

standard with Borehole water<br />

Water reticulation at<br />

high level of service with<br />

water meters<br />

Water reticulation at<br />

high level of service with<br />

water meters<br />

Water reticulated at high<br />

level of service with cost<br />

recovery<br />

105<br />

NO. OF HOUSEHOLDS<br />

AFFECTED<br />

ESTIMATED<br />

COST<br />

RESPONSIBLE<br />

ENTITY<br />

1 109 R6.7m Mopani<br />

1 163 R7.0m Mopani<br />

650 R4.0m Mopani<br />

500 R3.0m Mopani<br />

200 R1.2m Mopani<br />

3 - - - - - -<br />

4 Matiko-Xikaya<br />

Ext. A,B,C & D<br />

No water network Water reticulation to RDP<br />

standard<br />

Humulani No water network Reticulation with water<br />

network at RDP standard<br />

800 R4.8m Mopani<br />

500 R3.0m Mopani


WARD AFFECTED AREA<br />

(Village/Section)<br />

NATURE OF CHALLENGE INTERVENTION<br />

REQUIRED<br />

106<br />

NO. OF HOUSEHOLDS<br />

AFFECTED<br />

ESTIMATED<br />

COST<br />

5 - - - - - -<br />

6 - - - - - -<br />

7 Namakgale E<br />

(Topville)<br />

8 Benfarm A, B &<br />

C<br />

9 Mashishimale R3<br />

new Ext.<br />

10 Maseke<br />

Extensions<br />

Mashishimale R1<br />

Extensions<br />

Uncompleted sewer projects Outstanding works to be<br />

completed<br />

No sewer. Waste water is all over<br />

the areas, polluting the<br />

environment and promoting<br />

mosquitoes breeding<br />

Sewer reticulation to all<br />

planned areas<br />

No water network Water reticulation at RDP<br />

standard<br />

No water network Water reticulation at RDP<br />

standard<br />

No water network Water reticulation at RDP<br />

standard<br />

Boelang Partial reticulation at RDP<br />

standard<br />

Gravelotte (New<br />

development<br />

sites)<br />

Water reticulation at<br />

higher level of service<br />

with water meters<br />

No water network Water reticulation at<br />

high level of service with<br />

water meters<br />

RESPONSIBLE<br />

ENTITY<br />

R3.0m Mopani<br />

1 840 R15.6m Mopani<br />

1 000 R6.0m Mopani<br />

300 R1.8m Mopani<br />

350 R2.1m Mopani<br />

550 R3.3m Mopani<br />

224 R1.4m Mopani


WARD AFFECTED AREA<br />

(Village/Section)<br />

11 Makhushane<br />

Ntswelemotse<br />

Makhushane<br />

Gardenview<br />

Makhushane<br />

kanana<br />

NATURE OF CHALLENGE INTERVENTION<br />

REQUIRED<br />

No water network Water reticulation at<br />

high level of service with<br />

water meters<br />

No water network Water reticulation at RDP<br />

standard<br />

No formal water network (Partial<br />

self reticulation and connections)<br />

Water reticulation at RDP<br />

standard<br />

107<br />

NO. OF HOUSEHOLDS<br />

AFFECTED<br />

ESTIMATED<br />

COST<br />

RESPONSIBLE<br />

ENTITY<br />

80 R0.5m Mopani<br />

250 R1.5 Mopani<br />

500 R3.0m Mopani<br />

12 - - - - - -<br />

13 - - - - - -<br />

14 Benfarm -<br />

Nobody<br />

Benfarm -<br />

Extensions<br />

Namakgale –<br />

Developed 323<br />

sites<br />

15 Makhushane-<br />

Maune<br />

No water network Water reticulation to RDP<br />

standard<br />

No water network Water reticulation to<br />

RDP standard<br />

Unmetered water connections Provision of water<br />

meters<br />

Unmetered and unauthorized<br />

water connection at RDP standard<br />

Water reticulation at<br />

high level of service with<br />

water meters<br />

200 R1.2m Mopani<br />

200 R1.2m Mopani<br />

323 R0.2m Ba-<br />

Phalaborwa<br />

Municipality<br />

900 R6.0m Mopani<br />

Makhushane - Unmetered and unauthorized Water reticulation at 700 R5.0m Mopani


WARD AFFECTED AREA NATURE OF CHALLENGE INTERVENTION<br />

(Village/Section)<br />

REQUIRED<br />

Mabikiri water connection at RDP standard high level of service with<br />

water meters<br />

Makhushane -<br />

Sebera<br />

Mashishimale R1<br />

- Nguvo<br />

16 Kurhula (New<br />

Extensions)<br />

No water network Water reticulation at RDP<br />

level of service<br />

No water network Water reticulation at RDP<br />

level of service<br />

No water network Water reticulation to RDP<br />

level of service<br />

Lulekani A No sewer, waste water is all over<br />

the area, encouraging mosquitoes’<br />

breeding<br />

Lulekani –<br />

Stadium Ext.<br />

(New planned<br />

sites)<br />

Sewer reticulation should<br />

be provided to well<br />

planned stands<br />

No water network. No sewer. Water and sewer<br />

reticulation to a higher<br />

level of service with<br />

water meters<br />

108<br />

NO. OF HOUSEHOLDS<br />

AFFECTED<br />

ESTIMATED<br />

COST<br />

RESPONSIBLE<br />

ENTITY<br />

400 R2.4m Mopani<br />

100 R0.6 Mopani<br />

528 R3.2m Mopani<br />

2 000 R17.m Mopani<br />

400 R6.0m Mopani


Key Issues with regard to water and sanitation:<br />

Ba-Phalaborwa Municipality is not a water services authority;<br />

The current water backlog requires about R34 million to correct, up to RDP level;<br />

R80 million is required to correct the backlog to yard connection status;<br />

Management of Nondweni Augmentation Scheme is a challenge;<br />

The distribution infrastructure is more than 35 years old;<br />

Supply to Phalaborwa town is operating at full capacity (25,6Ml/d);<br />

There is unbalanced water distribution caused by over utilization in unmetred areas as well as<br />

system capacity;<br />

There is over consumption (About 10MI/d due to non-metering, loss of income is estimated at<br />

R30 000 per day);<br />

Loss of income due to non-payment is about 5Ml/d or R15 000 per day;<br />

Service below RDP standard is at 23%;<br />

Communities that rely on boreholes complain about boreholes that are not working;<br />

Daily water supply interruptions are common in more that 75% of the wards;<br />

Some households in Wards 2, 11, and 16 still have to travel more than 200m to access water;<br />

Two Clinics, one in Ward 9 and the other in Ward 11 do not have piped water;<br />

Two schools in Ward 8 and one in Ward 12 do not have toilets;<br />

Delays in the approval of technical reports by DWA; and<br />

Cost recovery and the non-payment of services.<br />

Management supply problems affect water in the Selwane/Nondweni Water Scheme.<br />

Sanitation infrastructure in Phalaborwa Town needs to be upgraded in order to accommodate<br />

new developments<br />

B5.3 Electricity/Energy<br />

The National Electricity Regulator has licensed the Municipality to supply electricity within the<br />

boundaries of the old Phalaborwa area. ESKOM is the license holder within the Municipality for all<br />

the out-laying areas, which includes Namakgale, Lulekani, and all the villages such as Makhushane,<br />

Selwane, Nondweni, etc.<br />

109


The table below gives an indication of the backlog with regard to electrification within the<br />

Municipality’s area of jurisdiction.<br />

Table B.38: Electricity backlog<br />

Priority<br />

Village<br />

1 Selwane, Mahale<br />

Nondweni, Prieska<br />

Type of connection<br />

Grid Non-grid Post conn Total no of units<br />

3 Gravelotte 276 276<br />

110<br />

1050<br />

6 Makhushane 1650 1650<br />

7 Kurhula<br />

Lulekani<br />

500 500<br />

10 Maseke 100 100<br />

11 Matiko-Xikaya 700 250<br />

Total 3956 3826<br />

Source: Ba-Phalaborwa Energy Forum, <strong>2011</strong><br />

According to STATS SA figures, the municipality has 2 780 households (i.e. 8.2% of municipal<br />

households) that do not have electricity.<br />

The following table shows energy usage per energy source by households.<br />

Table B.39: Energy usage per energy source by households<br />

ENERGY SOURCE ENERGY USAGE<br />

COOKING HEATING LIGHTING<br />

Electricity 20 315 (60.1%) 20 353 (60.1%) 31 012 (91.8%)<br />

Gas 320 (0.9%) 149 (0.4%) -


Paraffin 2 684 (7.9%) 1 741 (5.2%) 182 ((0.5%)<br />

Candles - - 2 541 (7.5%)<br />

Wood 10 413 (30.8%) 11 285 (33.4%) -<br />

Coal 60 (0.2%) 60 (0.2%) -<br />

Animal Dung - - -<br />

Solar - - -<br />

Other - 203 (0.6%) 58 (0.2%)<br />

Total 33 792 33 792 33 792<br />

Source: STATS SA (2007 CS)<br />

Although 91.8% of the municipal population (in households) has access to electricity (and do use<br />

electricity for lighting), only 60% use electricity for cooking and heating. Wood is used as an<br />

alternative source of energy for cooking and heating (used by about 33% of the population). The<br />

wide spread use of wood constitutes a grave danger to the environment as the aggressive denuding<br />

of the natural bush is evident over large areas. One of the main thrusts of the electrification<br />

campaign was to drastically reduce the dependence of the poorer sections of the population on the<br />

use of firewood as a source of cooking energy. From observation this has had very little impact on<br />

the use of wood and it would seem that a lot more intense use of electricity will have to be made<br />

before any significant reduction in the present rate of deforestation will be evident. The anticipated<br />

increases in electricity tariffs will increase the percentage dependant on firewood for heating and<br />

cooking. The Municipality may have to investigate the use of another energy source, such as solar, as<br />

an alternative to both electricity and firewood.<br />

Electricity Supply in Phalaborwa Town<br />

The Phalaborwa network supplies the town business, commercial, industrial and residential areas<br />

and has approximately four thousand connections varying from normal residential connections to<br />

three phase LV business connections to 11kv bulk supplies to large consumers. The Phalaborwa<br />

electricity distribution network is in dire need of reinforcement and refurbishment. A large<br />

percentage of the 11kv switchgear and transformer equipment has been in constant service for<br />

over 40 years. Some 11kV circuit breakers no longer meet modern safety requirements and in fact<br />

111


are positively dangerous to operate under certain fault conditions. Some of the mechanisms are<br />

inconsistent and erratic in their speed of operation, probably due to mechanical wear, with the<br />

result that the performance of the protection systems is not reliable. The redundant capacity of a<br />

number of 11 kV cable ring supplies are no longer capable of meeting the increased loads placed<br />

upon them during fault conditions. There are a number of faults scenarios which, should they<br />

occur, will result in a severe and prolonged curtailment of electricity supply to large areas of the<br />

town, including the central business district and industrial area. Furthermore, the capacity to<br />

transfer sufficient power from the Selati main in-take substation is not adequate during periods of<br />

heavy loading should one of the present lines be lost. The line feeding the whole northern area is<br />

critical and needs to be augmented by means of an additional line.<br />

The increased demand for electricity over the past number of years is set to continue and the point<br />

has been reached where significant parts of the network are no longer able to ensure a reliable<br />

supply. There is therefore a definite and urgent requirement for selective up grading of the network<br />

as well as ongoing refurbishment and replacement of ageing and obsolete equipment.<br />

Street Lighting<br />

The present situation regarding public lighting within the area of jurisdiction of the Ba-Phalaborwa<br />

Municipality for the main towns is as follows:<br />

Phalaborwa Town<br />

All streets in both the business and residential areas are well lit using roadside luminaries ranging<br />

from 125-watt mercury vapour lamps to 250-watt high-pressure sodium lighting. The sport stadium<br />

is also fully equipped with flood lighting. There is however a major part of the main thoroughfare to<br />

the Kruger Park Gate, namely Hendrik Van Eck road which does not have street lighting.<br />

Namakgale<br />

A total 7.7km of roads within the township is equipped with roadside lighting of good quality. In<br />

addition there are a total of 41 highmast lights spread throughout the township, which gives<br />

acceptable area coverage. The sport stadium is equipped with flood lighting. However, there are<br />

still a number of roads that need to have roadside street lighting installed.<br />

112


Lulekani<br />

A total of 9.75 km of roads within the township has roadside street lighting installed together with<br />

7 high mast lights providing area lighting. The sports stadium is also equipped with flood lighting.<br />

At a number of identified dangerous intersections street lighting has been installed on an ad-Hoc<br />

basis. There are however many areas, which need to have lighting, installed.<br />

Out Laying Villages<br />

With regard to the out laying villages of the municipal area, street lighting is non-existent. Some of<br />

these villages have not as yet been electrified and therefore no street lighting can be installed.<br />

Solar-based highmast lighting may be a solution.<br />

Table B.40: Number of households without electricity per Ward<br />

1<br />

Ward Area/Location No. of Households Estimated cost 6<br />

Nyakelang 4 225 2250<br />

2 Selwane 89 890<br />

10 Boelang 100 1.000<br />

Maseke/Mashishimale<br />

R1 492 4.920<br />

Gravelotte 392 3.920<br />

11 Maune 11 110<br />

6 Estimations at R10 000, 00 per Household<br />

Ntswelemotse 41 410<br />

Kananana 509 5.090<br />

Garden View 580 5.800<br />

113<br />

R’000


Ward Area/Location No. of Households Estimated cost 6<br />

Tipeng 69 690<br />

Boelang & Tselang<br />

Gape 500 500<br />

14 Namakgale Zone 2 1 100 111.000<br />

15 Makhushane 280 2.800<br />

16<br />

Source: Electricity Department 2009<br />

Key issues with regard to electricity supply:<br />

Maseke 81 810<br />

Kurhula / Pondo /<br />

Mlambo 84 840<br />

Total 7355 73.550.000<br />

Lack of street/area lighting in the rural areas promotes crime;<br />

Highmast lights are not properly maintained;<br />

Rates income not enough to cover both capital and operational costs;<br />

114<br />

R’000<br />

LAP information reveal that there are three schools, two in Ward 4 and 1 in Ward 11 that do not<br />

have electricity;<br />

Wards 2, 8, 12, and 13 complain about power cuts by the supplier without prior warnings;<br />

Electricity easily cuts-off during windy and rainy days;<br />

Cable theft, particularly in Wards 9 an 16, is a serious concern to electricity users;<br />

There is an urgent need for refurbishment of old network in Phalaborwa in order to attract<br />

investment.


B5.4 Waste Management<br />

The Municipality is providing waste management services to 22 553 households of its total<br />

households of 33 793. The number represents 67% of the total households in the Municipality that<br />

receives the services. The following areas are serviced on weekly basis:<br />

• Phalaborwa<br />

• Namakgale<br />

• Lulekani<br />

• Gravelotte<br />

• Mahishimale R1, R2, R3<br />

• Mandela Village (Namakgal<br />

Waste Management Backlog in the Municipality<br />

The solid waste management backlog is standing at 11 240 which represents 33% of the total<br />

households without the service. The Municipality has a five (5) year plan to extend the service to all<br />

the rural areas in the Municipal area. The following table represents the waste management backlog<br />

in the Municipal area:<br />

Table B.41<br />

Five Year Plan Area Number of Households Percentage<br />

2009/10 Matiko Xikaya & Humulani 2 673 8%<br />

2010/11 Selwane, Prieska, Nondweni,<br />

Silonque, Grietjie<br />

115<br />

2 873 9%<br />

<strong>2011</strong>/12 Makhushane 2 383 7.5%<br />

2012/2013 Kurhula, Maseke & Boyelang 3 311 8.5%<br />

Total 11 240 33%


Key Issues with regard to Waste Management<br />

• Ageing infrastructure.<br />

• Inadequate staffing.<br />

• Land claims in the Phalaborwa dumping site.<br />

• Licensing of new landfill site.<br />

• Rehabilitation and closing of Namakgale, Lulekani and Phalaborwa landfill sites.<br />

Waste Management Recycling<br />

The Municipality is able to recycle 20% of its waste in the Phalaborwa dumping site. The percentage as it is<br />

currently is very low. The challenge with recycle is the distance from Phalaborwa to Gauteng where waste<br />

recycle materials are sold and the lack of transport thereof.<br />

Other recycling in the Municipality is done by private companies in the Phalaborwa Industrial area. They<br />

receive most of their recyclables from the local mines and industrial factories. Sorting of recyclables is done<br />

in the yard as well as outside the yard.<br />

B5.5 Housing<br />

Ba-Phalaborwa Municipality is not a housing authority. The table below presents an overview of the<br />

housing situation in the municipal area over the years.<br />

Table B.42: Housing delivery, 2002/03 to 2007/08<br />

Year Allocation Delivery % Delivered<br />

2002/03 800 486 60.75<br />

2003/04 720 682 94.72<br />

2004/05 561 161 28.7<br />

2005/06 385 385 100


Year Allocation Delivery % Delivered<br />

2006/07 300 300 100<br />

2007/08 No new allocation<br />

(Except for 223<br />

Blocked housing<br />

units)<br />

2008/09 623 (300 rural and<br />

323 urban –<br />

Namakgale)<br />

Source: Department of Local Government and Housing<br />

Table B.43: Types of dwellings for households<br />

179 80.27<br />

TYPE OF DWELLING NUMBER OF HOUSEHOLDS % OF HOUSEHOLDS<br />

House or brick structure on a<br />

separate stand or yard<br />

Traditional<br />

dwelling/hut/structure made of<br />

traditional materials<br />

29 780 88.1%<br />

1 183 3.5%<br />

Flat in block of flats - -<br />

Town/cluster/semi-detached<br />

house<br />

217 0.6%<br />

House/flat/room in backyard 116 0.3%<br />

Informal dwelling/shack in<br />

backyard<br />

Informal dwelling/shack NOT in<br />

backyard (e.g. in an<br />

informal/squatter settlement)<br />

Room/flatlet not in backyard<br />

but on a shared property<br />

302 0.9%<br />

58 0.2%<br />

566 1.7%<br />

117


TYPE OF DWELLING NUMBER OF HOUSEHOLDS % OF HOUSEHOLDS<br />

Caravan or tent - -<br />

Private ship/boat - -<br />

Workers hostel (bed/room) 1 570 5.0%<br />

Other - -<br />

Total 33 792 100%<br />

Source: STATS SA (2007 CS)<br />

Based on the above information, the housing backlog in the municipal area is estimated at 4 012, which is<br />

about 11.9% of the household population. This figure is arrived at by regarding any other type of<br />

dwelling which is not a house or brick structure on a separate stand or yard as a substandard dwelling<br />

type for a formal household. Some of the households with access to a house or structure on a separate<br />

stand may be exceeding the average household size of the municipality (which is at 3.8 people per<br />

household). It is evident from the table below that more than 50% of the households with access to a<br />

house or brick structure on a separate stand or yard have an above average household size. That may<br />

imply more housing needs in the near future.<br />

Table B.44: Household size per type of dwelling:<br />

TYPE OF<br />

DWELLING<br />

House or brick<br />

structure on a<br />

separate stand<br />

or yard<br />

Traditional<br />

dwelling/hut/str<br />

ucture made of<br />

traditional<br />

materials<br />

Flat in block of<br />

flats<br />

01 02 03 04 05 06 07 08 09 10+ Total<br />

5 134 5 352 3 858 5 026 4 026 2 797 1 266 851 754 716 29 780<br />

333 173 238 155 116 54 - 57 57 - 1 183<br />

- - - - - - - - - - -<br />

118


TYPE OF<br />

DWELLING<br />

Town/cluster/se<br />

mi-detached<br />

house<br />

House/flat/roo<br />

m in backyard<br />

Informal<br />

dwelling/shack<br />

in backyard<br />

Informal<br />

dwelling/shack<br />

NOT in backyard<br />

(e.g. in an<br />

informal/squatt<br />

er settlement)<br />

Room/flatlet not<br />

in backyard but<br />

on a shared<br />

property<br />

01 02 03 04 05 06 07 08 09 10+ Total<br />

62 64 92 - - - - - - - 217<br />

- - - - - 59 - - 57 - 116<br />

121 61 - - 120 - - - - - 302<br />

58 - - - - - - - - - 58<br />

504 62 - - - - - - - - 566<br />

Caravan or tent - - - - - - - - - - -<br />

Private<br />

ship/boat<br />

Workers hostel<br />

(bed/room)<br />

- - - - - - - - - - -<br />

1 436 74 60 - - - - - - - 1 570<br />

Other - - - - - - - - - - -<br />

Total 7 648 5 786 4 248 5 181 4 262 2 910 1 266 908 867 716 33 792<br />

119


Key issues with regard to RDP houses:<br />

• Wards 3, 4, 9, 10, and 11 complain about poor quality houses (problem areas include cracking<br />

walls, leaking roofs, peeling plastering, and poor foundations;<br />

• The housing backlog in the municipal area indicates 4500 households in the waiting list based on<br />

latest database registration done in 2009;<br />

• The Housing Audit indicated unoccupied houses in Namakgale (3), Lulekani (3), Selwane (1) and<br />

Gravelotte (15).<br />

B5.6 Roads and Transport<br />

The Municipality is responsible for the rehabilitation and maintenance of 310Km of municipal road. In the<br />

past two financial years, 9km of new roads was build. In the 2005/06 and 2006/07 financial years; R800<br />

000, 00 and R1 360 000, 00; respectively was allocated from operational budget to maintain the roads. In<br />

the same period, a total of R12 000 000, 00 from capital budget was spent to build municipal roads. Most<br />

of the municipal roads are still dirt roads and in bad condition. The municipality is struggling with road<br />

maintenance, given that there is no enough earthwork equipment.<br />

The table below shows the main roads in the municipal area. All the roads are provincial roads and<br />

therefore maintained by the Department of Roads and Transport.<br />

Table B.45: Main roads in the municipal area<br />

NAME OF ROAD DESCRIPTION CLASSIFICATION CONDITION<br />

R71 Phalaborwa to<br />

Polokwane via<br />

Gravelotte and<br />

Tzaneen<br />

Provincial Satisfactory<br />

R526 Gravelotte to Mica Provincial Satisfactory<br />

R40 Phalaborwa to<br />

Nelspruit via Mica<br />

R529 Western boarder.<br />

Links Greater<br />

Provincial Satisfactory<br />

Provincial Satisfactory<br />

120


Giyani to Greater<br />

Tzaneen<br />

Giyani to<br />

Phalaborwa via<br />

Letaba Ranch<br />

Figure B5.1 Major Roads in the municipal area<br />

Provincial Under construction<br />

(Upgrading from gravel<br />

to tar)<br />

121


Source: Draft Ba-Phalaborwa SDF<br />

The following are the most common needs associated with municipal roads:<br />

• Stormwater control and culverts<br />

• Regravelling<br />

• Street paving<br />

• Potholes repairs<br />

Each of the highlighted needs is presented separately according to location and estimated cost<br />

Table B.46: Backlog on Stormwater Control and Culverts<br />

WARD LOCATION QTY COST ESTIMATE<br />

1 Makhushane - Nyakelang 1 Struct. R180,000.00<br />

Makhushane - Haniville 2 Struct. R260,000.00<br />

Sub - total R440,000.00<br />

2 Selwane 1 Struct. R70,000.00<br />

Selwane - Mohale 2 Struct. R260,000.00<br />

Sub –total R330,000.00<br />

3 Namakgale Zone D 1 Struct. R50,000.00<br />

Sub – total R50,000.00<br />

4 Matiko-Xikaya 1 Struct. R130,000.00<br />

Sub - total R130,000.00<br />

5 - - -<br />

6 Lulekani 2 Structures R300,000.00<br />

Sub – total R300,000.00<br />

7 Namakgale - T/Mshong 1 Struct. R160,000.00<br />

Namakgale – Top Ville 1 Struct. R130,000.00<br />

122


WARD LOCATION QTY COST ESTIMATE<br />

Sub- total 290,000.00<br />

8 Majeje - Nanana 1 Struct. R160,000.00<br />

Sub – total R160,000.00<br />

9 Mashishimale R3 – Nkweshe 1 1 Struct. R180,000.00<br />

Mashishimale R3 – Nkweshe 2<br />

1 Struct. R130,000.00<br />

Mashishimale R3 - Tlapeng 1 Struct. R100,000.00<br />

Sub – total R410,000.00<br />

10 Gravelotte 1 Struct. R160,000.00<br />

Maseke 1 Struct. R160,000.00<br />

Mashishimale R1 1 Struct. R160,000.00<br />

Sub – total R480,000.00<br />

11 Makhushane - Changaan 1 Struct. R160,000.00<br />

Makhushane - Thlakisi 1 Struct. R160,000.00<br />

Sub – total R320,000.00<br />

12 Namakgale Zone D 1 Struct. R160,000.00<br />

Sub – total R160,000.00<br />

13 - - -<br />

14 Majeje 1 Struct. R160,000.00<br />

Sub – total R160,000.00<br />

15 Mashishimale R1 1 Struct. R140,000.00<br />

Mashishimale R2 - MPCC 1 Struct. R80,000.00<br />

Makhushane - Sebera 1 Struct. R160,000.00<br />

Sub – total R380,000.00<br />

123


WARD LOCATION QTY COST ESTIMATE<br />

16 Kurhula 2 Struct. R320,000.00<br />

Sub – total R320,000.00<br />

GRAND TOTAL R3,930,000.00<br />

The Municipality requires about four million rand (R3, 930,000.00) to address identified stormwater control<br />

and culverts challenges identified. Lack of proper stormwater control and culverts affect the socio-<br />

economic life of the municipality during rainy seasons. Amongst the services sacrificed during rainy seasons<br />

is schooling and hence the education of the municipal area.<br />

The follow table presents municipal roads, per location that need to be re-graveled<br />

Table B.47: Municipal roads per location that need upgrading<br />

WARD LOCATION QTY COST ESTIMATE<br />

1 Makhushane - Haniville 2km R4,000,000.00<br />

Sub - total R4,000,000.00<br />

2 Selwane 3km R6,000,000.00<br />

Sub –total R6,000,000.00<br />

3 Namakgale Zone A & D 4km R8, 000,000.00<br />

Sub – total R8, 000,000.00<br />

4 Matiko-Xikaya 2km R4,000,000.00<br />

5 -<br />

Humulani 2km R4,000,000.00<br />

Sub - total R8,000,000.00<br />

6 Lulekani – Far East 2km R4,000,000.00<br />

Sub – total R4, 000,000.00<br />

124


WARD LOCATION QTY COST ESTIMATE<br />

7 Namakgale - Aaron Dim 0.6km R1,200,000.00<br />

Namakgale – Zone E 1km R2,000,000.00<br />

Sub- total R3,000,000.00<br />

8 Majeje – Block C 2km R4,000,000.00<br />

Sub – total R4,000,000.00<br />

9 Mashishimale R3 - Tlapeng 1km R2,000,000.00<br />

Sub – total R2,000,000.00<br />

10 Gravelotte 2km R4,000,000.00<br />

Maseke 1km R2,000,000.00<br />

Mashishimale R1 1km R2,000,000.00<br />

Sub – total R8,000,000.00<br />

11 Makhushane - Maune 1km R2,000,000.00<br />

Makhushane - Thlakisi 1km R2,000,000.00<br />

Sub - total R4,000,000.00<br />

12 Namakgale Zone D 2.5km R5,000,000.00<br />

Sub – total R5,000,000.00<br />

13 Namakgale Zone C 2.5km R5,000,000.00<br />

Sub – total R5,000,000.00<br />

14 Namakgale Zone B 3km R6,000,000.00<br />

Majeje 2km R4,000,000.00<br />

Sub – total R8,000,000.00<br />

15 Mashishimale R1 - Phatamas 3km R6,000,000.00<br />

Mashishimale R2 - Mchongol 2km R4,000,000.00<br />

125


WARD LOCATION QTY COST ESTIMATE<br />

Makhushane - Patamedi 1.5km R3,000,000.00<br />

Sub – total R13,000,000.00<br />

16 Kurhula 2km R4,000,000.00<br />

Pondo 2km R4,000,000.00<br />

Sub - total R8,000,000.00<br />

GRAND TOTAL R291,000,000.00<br />

The Municipality has over 46.1km or dirt road to regravel at an estimated cost of R38, 675,000.00.<br />

regravelled roads are expected to improve mobility and access to various places and enhance socio-<br />

economic activities.<br />

There are certain priority roads, especially in high population concentration points (municipal growth<br />

points) that need to be upgraded from gravel to paved roads. The table below presents streets that are<br />

earmarked for paving.<br />

Table B.48: Streets earmarked for paving per location<br />

WARD LOCATION QTY COAST ESTIMATE<br />

1 Phalaborwa Extension 5 3km R3, 450,000.00<br />

Sub - total R3, 450,000.00<br />

2 - - -<br />

3 Namakgale Zone A & D 3km R3, 450,000.00<br />

Sub – total R3, 450,000.00<br />

4 Matiko-Xikaya 1.8km R2, 070,000.00<br />

Humulani 0.8km R920,000.00<br />

Sub - total R2, 990,000.00<br />

126


WARD LOCATION QTY COAST ESTIMATE<br />

5 Phalaborwa - Bataleur 0.5km R425,000.00<br />

Sub-total R425,000.00<br />

6 Lulekani – CBD 1km R1, 150,000.00<br />

Sub – total R1, 150,000.00<br />

7 Namakgale – Zone C 1km R1, 150,000.00<br />

Sub- total R1, 150,000.00<br />

8 Majeje – Block C 1.7km R1, 955,000.00<br />

Sub – total R1, 955,000.00<br />

9 - - -<br />

10 Gravelotte 2km R2, 300,000.00<br />

Sub – total R2, 300,000.00<br />

11 - - -<br />

12 Namakgale Zone A&D 3km R3, 500,000.00<br />

Sub – total R3, 500,000.00<br />

13 Namakgale Zone A&D 1km R1, 150,000.00<br />

Sub – total R1, 150,000.00<br />

14 Namakgale Zone A&D 2km R2, 300,000.00<br />

Sub – total R2, 300,000.00<br />

15 - - -<br />

16 - - -<br />

GRAND TOTAL 20.8km R23, 820,000.00<br />

127


The streets prioritized for paving in the population concentration points, as per the table above, are<br />

expected to improve access to government and other services. To achieve this objective, the Municipality<br />

has to pave about 21km of streets at an estimated cost of R24, 000,000.00.<br />

The table below shows Municipal roads that need maintenance (potholes repairs)<br />

Table B.48: Streets per location that need maintenance (Potholes Repairs)<br />

WARD LOCATION QTY COAST ESTIMATE<br />

1 Phalaborwa - CBD<br />

R112,000.00<br />

Sub - total R112,000.00<br />

2 - - -<br />

3 Namakgale Zone A & D<br />

R63,000.00<br />

Sub – total R63,000.00<br />

4 Matiko-Xikaya<br />

R8,400.00<br />

Sub - total R8,400.00<br />

5 Phalaborwa - Bataleur<br />

6 Lulekani<br />

R112,000.00<br />

Sub-total R112,000.00<br />

R63,000.00<br />

Sub – total R63,000.00<br />

7 Namakgale – Zone C<br />

8 Majeje<br />

R14,000.00<br />

Sub- total R14,000.00<br />

R7,000.00<br />

Sub – total R7,000.00<br />

9 - - -<br />

10 Gravelotte<br />

R8,400.00<br />

128


WARD LOCATION QTY COAST ESTIMATE<br />

Maseke - Boelang 60m 2<br />

R8,400.00<br />

Sub – total R16,800.00<br />

11 Makhushane – Main Road 120m 2<br />

R16,800.00<br />

Sub-total R16,800.00<br />

12 Namakgale Zone A&D 150m 2<br />

R21,000.00<br />

Sub – total R21,000.00<br />

13 Namakgale Zone B&C 150m 2<br />

R21,000.00<br />

Sub – total R21,000.00<br />

14 Namakgale Zone B 180m 2<br />

Majeje 20m 2<br />

R25,200.00<br />

R2,800.00<br />

Sub – total R28,000.00<br />

15 Mashishimale - Maune 40m 2<br />

R5,600.00<br />

Sub – total R5,600.00<br />

16 - - -<br />

GRAND TOTAL 3,490m 2 R488,600.00<br />

Public Transport<br />

The table below presents modes of transport in the municipal area.<br />

Table B.49: Percentage population utilizing different modes of transport<br />

Mode of Transport Number utilizing transport mode % Utilizing the<br />

Transport Mode<br />

Foot/bicycle 45 577 34.7%<br />

Private 12 527 9.5%<br />

Bus 6 144 4.7%<br />

129


Taxi 7 405 5.6%<br />

Not applicable 59 832 45.5%<br />

Total 131 485 100%<br />

The Development Partnership, 2008<br />

The majority of people in the Municipal area do not own and use private transport. They rely on public<br />

transport to commute in and out of town on a daily basis. However there is no link between taxi and bus<br />

services as the two measure forms of public transport. There is a need for an inter-modal public transport<br />

system. This will require integrated bus and taxi ranks at strategic points in the municipal area. The other<br />

concern raised in the 2006/07 <strong>IDP</strong> review was the roadworthiness of the buses used to transport<br />

commuters. The buses have since been replaced by 22 brand new ones. This is a major contribution<br />

towards bettering the lives of people.<br />

Rail Transport<br />

Rail infrastructure in Ba-Phalaborwa is under utilised. The table below captures rail utilisation and cargo<br />

distribution from Ba-Phalaborwa:<br />

Table B.50: Rail utilisation and cargo distribution<br />

Rail Utilisation Cargo Source Cargo<br />

Distribution<br />

Areas<br />

Capacity 12 Megatons per<br />

annum (Mton/a)<br />

Mostly<br />

Phalaborwa<br />

Town<br />

Richardsbaai<br />

Sasolburg<br />

Broodsnyers<br />

Plaas<br />

Accessible Ports<br />

Maputo<br />

Richardsbaai<br />

Durban<br />

(International<br />

Capacity)<br />

Utilisation 8 Mton/a Bottle neck<br />

between<br />

Hoedspruit &<br />

Maputo<br />

130


Spare Capacity 4 Mton/a<br />

90% of wagons to Phalaborwa are<br />

empty<br />

Air Transport<br />

There is one airport in the Municipality. The airport only accommodates small air crafts, but proves to be<br />

useful to the local mines and other businesses. There is a need to improve the airport and number of flights<br />

in order to add value to the tourism sector in the area.<br />

Key issues, with regard to roads and transport:<br />

There is a need to upgrade existing roads;<br />

The Giyani - Phalaborwa and Eiland - Letaba Ranch roads have the potential to boost tourism in the<br />

area.<br />

Road maintenance is not satisfactory because of lack of enough equipment.<br />

The capacity by the Municipality to upgrade and maintain roads.<br />

The current rail link and service out of Phalaborwa is also inadequate to support the potential for<br />

magnetite beneficiation<br />

The air flights schedule for Phalaborwa Airport is not that responsive to the needs of the people who<br />

use the service. The Airport only offers afternoon flights; there are no morning flights from Phalaborwa<br />

and to Phalaborwa.<br />

B5.7 Thusong Service Centres<br />

The Municipality does not have a functional Thusong Service Centre (TSC). Mashishimale and Ben-Farm<br />

MPCCs / TSCs are not functional - given that there are no services rendered at the centres. The South<br />

African Social Security Agency (SASSA) and the South African Police Service (SAPS) are the only sectors that<br />

actively provide periodic services in the two centres.<br />

People living in and around the operational areas of Mashishimale and Ben-Farm TSCs do receive various<br />

forms of government services. The services include primary health care, traditional authority services, etc.<br />

131


in addition to security services and social grants. The challenge is that service delivery happens in a<br />

disintegrated manner and may not be sustainable. The Municipality is a process to revitalize both centres<br />

and officially launch them as second generation MPCCs or TSCs.<br />

The Municipality has built a TSC at Selwane. The TSC is complete and is expected to be officially launched<br />

by the Office of the Premier in April <strong>2011</strong>. The TSC will house the following government departments,<br />

Home Affairs, Sassa, Agriculture, and Social Development, SAPS, SA Post Office and the Selwane Traditional<br />

Authority offices. There are still office spaces to accommodate more government departments.<br />

Key issues with regard to TSCs:<br />

The Mashishimale TSC needs to be revitalized;<br />

The Ben-Farm TSCs also needs to be revitalized;<br />

SelwaneTSC still to be officially launched by Office of the Premier.<br />

B5.8 Libraries<br />

The Municipality manages four fully established community libraries based in Phalaborwa, Gravelotte,<br />

Namakgale and Lulekani. The Municipality provides mobile library service (school/community library) to<br />

Mashishimale. The services are rendered at Lebeko and Makikele High Schools, respectively. Selwane<br />

library is complete and operations are at the pilot stage.<br />

Backlogs<br />

The following areas need library infrastructure in order for the Municipality to achieve the objective of<br />

increased access to library services:<br />

Mashishimale,<br />

Majeje,<br />

Makhushane,<br />

Maseke and<br />

Humulani/Matiko-Xikaya.<br />

132


Phalaborwa Library needs to be extended to include children’s section, a study hall, three offices,<br />

storeroom, and activity room. The extension will help the main library to support branch libraries.<br />

Table B.51. A synopsis of library services rendered in the municipal area<br />

Name of Library Ward Location Services Rendered<br />

Phalaborwa Town<br />

Library<br />

Leboneng Library 14 Namakgale<br />

Rixile Library 6 Lulekani<br />

Lebeko High School<br />

Library<br />

Makikela High School<br />

Library<br />

1 Phalaborwa Town Internet service (Phalaborwa only);<br />

9 Mashishimale<br />

2 Selwane<br />

Gravelotte Library 10 Gravelotte<br />

Tourist information (Phalaborwa only);<br />

Online public access library<br />

catalogue(Phalaborwa, Namakgale and<br />

Lulekani); User education<br />

Study space<br />

Advisory service to school libraries (at<br />

request)<br />

Community outreach programmes (all<br />

libraries)<br />

There is a need to enhance current municipal IT infrastructure to ensure that library services are able to<br />

achieve the objective of bridging the digital divide through library IT services. Gravelotte library and<br />

Mashishimale mobile library need IT network infrastructure to facilitate access to planned electronic<br />

information resources and for general library services administration. The five seconded library officials<br />

from the Limpopo Department of Sport, Arts and Culture have enhanced library service delivery.<br />

The table below presents statistics on the distribution and use of community libraries within the municipal<br />

area for the 2008/09 financial year.<br />

Table B.52: Library statistics: July 2008 – June 2009<br />

Activity Phalaborwa Leboneng Rixile Gravelotte Mashishimal<br />

e<br />

Selwane Total<br />

Membership 10537 1679 1127 15 450 87 13895<br />

133


Activity Phalaborwa Leboneng Rixile Gravelotte Mashishimal<br />

e<br />

Circulated<br />

items<br />

Tourist<br />

community<br />

information<br />

Reference /<br />

reader<br />

guidance<br />

Internal<br />

users<br />

New<br />

information<br />

resources<br />

Service<br />

income<br />

Selwane Total<br />

101068 20978 5453 1250 4312 2461 135522<br />

15768 16725 3934 135 216 189 36967<br />

30832 20323 5745 221 6894 546 64561<br />

46320 63597 41491 841 1941 11041 165231<br />

4259 2055 1912 1081 1761 1934 13002<br />

R54 968 R15<br />

889.50<br />

Key issues with regard to libraries:<br />

R11<br />

385,50<br />

R345,00 R250,00 R18,00 R82<br />

856,00<br />

Libraries need to be within walking distance to ensure that increased access to library services;<br />

Improved library services through IT infrastructure to enhance the objective of bridging the digital<br />

divide;<br />

Lack of resources makes it a challenge to maintain and upgrade current service levels and<br />

infrastructure;<br />

There is a need to ensure public participation in community library service delivery through<br />

sustainable library and information service committee;<br />

Lack of libraries and/or information centres makes it difficult for people to access government services<br />

and information that they are entitled to;<br />

134


There is a need for public participation in community library service delivery through establishing a<br />

library and information service committee;<br />

Improved collection development management to ensure library information resources continuously<br />

responds to the changing information needs for socio-economic development in the Municipality;<br />

Training and development of personnel to improve service standard levels as well as increased<br />

utilisation of all libraries;<br />

Finalisation of the library personnel structure to increase its capacity to deliver services;<br />

Improved relations with the Provincial Library Services and Palabora Foundation as key stakeholders in<br />

the development of library services.<br />

B5.9 Recreational Facilities<br />

Current sporting codes include golf, tennis, long distance running, squash, netball, cricket, soccer, long<br />

distance swimming, basketball, shooting, snooker, darts and rugby. The table below presents formalised<br />

sports infrastructure in the Municipal area in the municipal growth points.<br />

Table B.53: Formalised Sports infrastructure per municipal growth point<br />

Town Tennis<br />

court<br />

Soccer/Rugby field Swimming pool Athletics track<br />

Gravelotte - - - -<br />

Selwane - - - -<br />

Lulekani 2 1 - 1<br />

Namakgale - 1 - 1<br />

Phalaborwa - 3 - -<br />

Total 2 5 0 2<br />

Source: Municipality, 2004<br />

135


Sports infrastructure is concentrated within the Phalaborwa Urban Complex, namely, Phalaborwa,<br />

Namakgale and Lulekani. There are no recreational facilities in outlying areas, such as Selwane and<br />

Gravelotte.<br />

The condition of existing sports facilities is not satisfactory and therefore there is no value addition to<br />

tourism in the area. The Municipality has to increase both the quantity and quality of sports infrastructure<br />

in order to attract national and international events to the area and benefit local tourism.<br />

Phalaborwa<br />

The Impala Park, along with privately owned initiatives such as Hans Merensky club, provides sufficient<br />

sporting facilities to cater for the current population of the town and the various activities currently<br />

prevalent. The park is well maintained.<br />

Lulekani<br />

Lulekani stadium provides a well-developed infrastructure relatively suitable for large sports events, social<br />

gatherings and meetings. The soccer field and the athletics track are well maintained, although not up to<br />

international standards (in terms of size and pitch layout). The tennis and netball courts are currently being<br />

upgraded by Foskor. As soccer is the prevalent sport of choice, a number of areas have been graded to<br />

serve as practice areas. These areas, however, need to be formalised.<br />

Namakgale<br />

The Namakgale stadium has areas for soccer and athletics that are not convenient. Infrastructure for other<br />

sporting codes, that was previously provided, has fallen into disrepair as a result of non-use and insufficient<br />

funding for maintenance. The municipality planned to do renovations and built an indoor sports centre at<br />

the stadium through the NDPG grant. A contractor was appointed to commence with the renovations and<br />

the construction of the indoor sports centre, however the project was not approved by the National<br />

Treasury (NDPG). The municipality will in the meantime regularly do maintenance on the stadium until<br />

funding is secured to do the renovations and construction of the indoor sports centre.<br />

136


Gravelotte and Selwane<br />

There are no formalised sporting facilities in the Selwane and Gravelotte areas except for poorly<br />

maintained and under-utilised soccer pitches. There is a need to provide these population concentration<br />

points with recreational facilities.<br />

Rural Areas:<br />

The provision of sporting facilities is virtually non-existent in the rural areas. Basic soccer fields provided<br />

by the communities are insufficient in both quantity and quality, and do not meet the needs of the<br />

communities. Schools do not have sport fields and hence learners are denied their right to participate in<br />

sporting activities.<br />

Key issues with regard to sports infrastructure and activities:<br />

Sports is not properly marketed;<br />

Obtaining land and developing facilities across the area on an equitable basis, and prioritized according<br />

to needs;<br />

Sports council is not fully representative of all the sporting codes;<br />

There are no long term plans for sports development;<br />

Limited budget set aside for sports activities.<br />

B5.10 Health Facilities<br />

There are two hospitals in the municipal area, one in Phalaborwa town and another in Namakgale<br />

(Maphutha L Malatji Hospital). The Phalaborwa Hospital has been reduced to the status of a health centre.<br />

The current arrangement has put more strain on the Maphuta Hospital. There is a need to improve the<br />

quality of health facilities in order to accommodate the needs of tourists within the area. The nearest<br />

health facility that offers specialists’ services is Letaba Hospital and the Medi-Clinic in Greater Tzaneen<br />

Municipality.<br />

The table below presents the number of beds, occupancy rate and staff availability in the local health<br />

facilities.<br />

137


Table B.54: Number of beds, occupancy rate and staff availability in the local health facilities<br />

INDICATOR NO% REMARKS<br />

Number of beds 117<br />

UBUR 57.6% Occupacy is kept low due to limited<br />

capacity in Phalaborwa Health<br />

Centre, which is temporarily used for<br />

Maternity patients. Maphuta Malatji<br />

Maternity ward is under<br />

construction.<br />

Doctors: Permanent 9 1 terminating end of February 2010<br />

Doctors: Part time 5<br />

Doctors: Community Service 1<br />

Professional Nurses 62 Inclusive of Nursing Manager<br />

Staff Nurses 21<br />

Nursing Assistants 50<br />

Source: Dept. Health, 2010<br />

The Clinix group has acquired Phalaborwa Hospital and converted it into a private clinic. The clinic has not<br />

yet been officially opened to service the community. It is hoped that the private clinic will assist in<br />

improving health services in the municipal area. The improved health services will assist the Municipality’s<br />

intention to attract investors and professionals into the area.<br />

The table below shows the number of clinics per Ward, the level of service rendered and the estimated<br />

population served by each clinic.<br />

Table B.55: Number of clinics, level of service rendered and estmated population served<br />

WARD LOCATION NUMBER OF<br />

CLINICS<br />

1 Phalaborwa 1(Phalaborwa Bus<br />

stop)<br />

LEVEL OF SERVICE<br />

RENDERED<br />

ESTIMATED<br />

POPULATION<br />

SERVED<br />

PHC 14 243<br />

138


WARD LOCATION NUMBER OF<br />

CLINICS<br />

2 Selwane 2<br />

Selwane<br />

Mahale<br />

LEVEL OF SERVICE<br />

RENDERED<br />

PHC<br />

PHC<br />

ESTIMATED<br />

POPULATION<br />

SERVED<br />

1 867<br />

5 356<br />

3 Namakgale 1 (Namakgale A) PHC 7 479<br />

4 - - - -<br />

5 - - - -<br />

6 - - - -<br />

7 Namakgale 1 (Namakgale B) PHC 22 140<br />

8 Humulani 1 (Humulani) PHC 19 554<br />

9 - - - -<br />

10 Murchison Mine 1 (Murchison<br />

Mine)<br />

Step-Down health<br />

facility<br />

1 429<br />

11 Makhushane 1 (Makhushane) PHC 12 408<br />

12 - - - -<br />

13 - - - -<br />

14 Ben-Farm 1 (Ben-Farm) PHC 8 501<br />

15 - - - -<br />

16 Lulekani 1 (Lulekani CHC) PHC 25 376<br />

total 10 clinics 119 714<br />

Source: Department of Health<br />

The above table shows that 119 714 people out of a total population of 127 304 have access to health<br />

services through clinics in their wards. Although the picture painted here is that 94% of the municipal<br />

population has access, there are still challenges with regard to distances that residents have to walk to the<br />

nearest health facility as well as the standard of services rendered in the facilities.<br />

139


There are three mobile teams serving the mobile points in the Municipality. The Mobile service points<br />

have structures and are situated at Mashishimale Nkoana, Mashishimale Moshate and Maseke Moshate ,<br />

with populations of 7 419; 4 102; and 6 988, respectively. Serious illnesses that are prevalent in Ba-<br />

Phalaborwa are HIV/AIDS, tuberculosis (TB) and Malaria. Out of the 2 019 people tested for HIV/AIDS in<br />

2000, almost 35 % were HIV positive.<br />

Malaria<br />

The prevalence of malaria in the area is a threat to tourism. The table below presents recorded malaria<br />

cases for Limpopo per district between January 2005 and January 2009:<br />

Table B.56: Malaria cases for Limpopo per district between January 2005 and January 2009<br />

District 2005 2006 2007 2008 Jan. 2009<br />

Mopani 652 2 121 699 1 036 16<br />

Capricorn 54 54 71 47 1<br />

Sekhukhune 13 60 54 46 -<br />

Vhembe 2 545 4 283 2 399 3 739 73<br />

Waterberg 197 234 92 112 3<br />

Source: Department of Health and Social Development Malaria Control<br />

Mopani District Municipality comes second in the Province with regard to reported malaria cases. The table<br />

below presents monthly statistics for Ba-Phalaborwa Municipality.<br />

Table B.57: Monthly malaria cases in Ba-Phalaborwa Municipality between January 2005 and January<br />

2009<br />

Month 2005 2006 2007 2008 2009<br />

January 28 99 22 36 7<br />

February 13 93 11 61<br />

March 16 47 9 25<br />

April 27 32 33 8<br />

May 11 17 11 18<br />

140


June 7 7 0 14<br />

July 1 5 2 1<br />

August 1 13 6 2<br />

September 23 14 33 27<br />

October 15 15 39 25<br />

November 13 32 7 7<br />

December 34 44 24 5<br />

Total 189 418 197 229 7<br />

Source: Department of Health and Social Development Malaria Control<br />

Social Grants<br />

With respect to welfare, Ba-Phalaborwa Municipality has the Christelike Maatskaplike Raad (CMR) based at<br />

the Dutch Reformed Church in Phalaborwa town, the Maroela house which serves as a house of safety for<br />

abused women and children. The number of people receiving social grants, as provided by the Lulekani<br />

office, is presented in Table below. The figures for the Disability Grant and the Child Support still needs to<br />

be confirmed since these figures do not seem realistic taking into consideration the monthly amounts paid<br />

for these grants<br />

Table B.58: Number of people receiving social grants, 2004<br />

Type of Grant Number of people Amount Rand value<br />

Old Age 4292 780 3 347 760<br />

Disability 2040 780 1 591 200<br />

Veteran (war) 4 780 3 120<br />

Granting Aid 48 180 8 640<br />

Foster Care 604 500 302 000<br />

141


Type of Grant Number of people Amount Rand value<br />

Child Support 21 749 180 34 943 220<br />

Dependency Grant<br />

(disabled under 18)<br />

Source: Department of Social Development<br />

Key Issues with regard to health and welfare:<br />

221 780 172 380<br />

Increasing number of people dependent on social grants, in particular the child support grant;<br />

Need for reducing incidences of malaria, diarrhea and other diseases;<br />

Need for developing and maintaining up-to-date databases at all health centres and linking this with<br />

the <strong>IDP</strong> office in the Municipality;<br />

Shortage of health facilities, coupled with low staff retention and high staff overload.<br />

B5.11 HIV/Aids<br />

It is recorded that serious illnesses that are prevalent in the Ba-Phalaborwa Municipality are HIV & AIDS, TB<br />

and Malaria. The connection between TB and HIV & AIDS cannot be overemphasized.<br />

The current District prevalence rate is at 25.2% which represents an increase from the previous rate of<br />

23.8%. However, the local prevalence rate is not yet known. These points to the fact that as a<br />

municipality, we have to do more to contribute towards the reduction of the prevalence rate by 5%, and<br />

also develop programmes to reduce the infection rate. In keeping with the NSP 2007-<strong>2011</strong>, all efforts are<br />

being made to reduce the HIV incidence rate by 50% by <strong>2011</strong>.<br />

To this end, we have prevention programmes run by different stakeholders providing HIV & AIDS related<br />

services. The Ba-Phalaborwa Comprehensive Care, Management, Treatment and Support Programme,<br />

managed by Phelang, covers areas which include Mashishimale, Majeje, Namakgale, Humulani, Gravelotte,<br />

Selwane, Mahale, Prieska, Buyela, Nondweni, and Phalaborwa workplaces.<br />

142


Community Radio Station Educational discussions are also conducted, which include topics like positive use<br />

of male condoms and femidoms (female condoms), importance of VCT, abstinence, etc. Other<br />

stakeholders in the Local AIDS Council, which include sector departments, are doing more in their<br />

respective fields to respond to the pandemic. Programmes include:<br />

Awareness Campaigns like World AIDS Day,<br />

Candlelight Memorial,<br />

TB Awareness,<br />

Awareness in High Transmission Areas (HTA’s), E<br />

ducation and Training,<br />

School visits.<br />

ARV sites that provide treatment, care and support.<br />

Khanyisa Clinic – MPL Malatji;<br />

Lulekani Health Centre and<br />

Phelang Community Centre.<br />

Challenges on HIV/Aids treatment<br />

Self referred clients without relevant documents,<br />

Accessing the services very late,<br />

Self de-registration after commencement of the treatment,<br />

Individual ill-discipline,<br />

Substance abuse by clients on ARV’s.<br />

The Municipality is in partnership with other organizations and individuals, including other Municipalities.<br />

Through the Centre for Municipal Research and Advise (CMRA) and SALGA, the Municipality is<br />

mainstreaming HIV & AIDS in service provision. This is based on the understanding that HIV & AIDS is not a<br />

health issue but a developmental challenge facing Local Government, hence the involvement of SALGA.<br />

The SALGA Country Guide and the DPLG Framework assist municipalities to mainstream HIV & AIDS into all<br />

municipal services. The Municipality is also in the process of partnering with other municipalities like<br />

Greater Tubatse Municipality, Greater Tzaneen Municipality and Intsika Yethu (Eastern Cape) in developing<br />

143


the HIV & AIDS Municipal Strategy, HIV & AIDS Workplace Programme and Ward AIDS Councils<br />

respectively.<br />

Through the Local AIDS Council, the municipality will be able to respond appropriately to the scourge of HIV<br />

& AIDS and consequently reduce the HIV incidence rate through focusing on the priority areas identified in<br />

the NSP 2007 – <strong>2011</strong>.<br />

The strength of the current response for our Municipality is that all interventions are beginning to have the<br />

requisite political and management support.<br />

Community Drop-In Centres<br />

Drop in centres have been established in communities with the aim of caring for orphans and vulnerable<br />

children, particularly as a result of HIV/AIDS. The orphans in the centres are between 3 and 18 years of age.<br />

The table below shows the caregiver-orphan ration per centre<br />

Table B.59: Caregiver – orphan ratio per centre<br />

NAME OF CENTRE NUMBER OF<br />

ORPHANS<br />

Tswelopele<br />

(Makhushane – Maune)<br />

NUMBER OF CARE<br />

GIVERS<br />

252 12 1:21<br />

Mashishimale (Tshubje) 155 11 1:14<br />

Lesedi 107 10 1:11<br />

Makhushane 182 10 1:18<br />

Majeje 97 7 1:14<br />

Maseke 125 12 1:10<br />

Total 918 62 1:15<br />

CARE-GIVER –<br />

ORPHAN RATIO<br />

144


The Drop-In centres are funded by the Department of Health and Social Development as well as<br />

Phalaborwa Rotary Club. Sediba Gymnasium also offers free subscriptions to clients. Some of the centres<br />

do not have proper buildings from which to practice their care-giving chores. The established centres are<br />

not sustainable given that the care-givers work on voluntary basis.<br />

Other strategies employed to fight HIV/AIDS<br />

A team of 30 young females conduct home visits on a regular basis to educate families and the youth on:<br />

• Sexually Transmitted Infections (STIs);<br />

• The importance of knowing one’s health status; and<br />

• The use of condoms<br />

Taverns in Namakgale, Majeje, Humulani, Matiko-Xikaya, Lulekani, Mashishimale, Maseke, and<br />

Makhushane have been identified as high transmission areas for HIV.<br />

Ba-Phalaborwa Municipality Drop-In-Centres<br />

The following table presents the Drop-In-Centres in the municipal area according to their numbers of<br />

orphans-and-vulnerable children and caregivers.<br />

Table B.60: Drop in centers in the municipal area<br />

DROP-IN-CENTRE No. OF<br />

ORPHANS<br />

Mashishimale<br />

(Tshube)<br />

AGE RANGE No. OF CARE-<br />

GIVERS<br />

216 6 - 18 11 20:1<br />

Lesedi 97 7 - 16 10 10:1<br />

Makhushane<br />

(Tshangana)<br />

253 5 - 18 10 25:1<br />

Majeje (Ben- 97 2 - 16 7 14:1<br />

ORPHAN:CARE-GIVER<br />

RATIO<br />

145


DROP-IN-CENTRE No. OF<br />

ORPHANS<br />

Farm)<br />

AGE RANGE No. OF CARE-<br />

GIVERS<br />

Maseke 144 3 - 16 12 12:1<br />

Tswelopele<br />

(Makhushane-<br />

Maune)<br />

278 6 - 12 15 18:1<br />

The centers perform at least the following services:<br />

• Provide daily nutritious meals;<br />

• Teach life skills to children;<br />

• Assist with children’s school and cultural activities.<br />

The following general challenges are experienced in the different centres:<br />

• The challenge faced is lack of funding to sustain the centre;<br />

• Lack of proper accommodation;<br />

• Lack of storage facilities;<br />

Key issues on HIV/AIDS:<br />

• 2 125 orphans and vulnerable children benefited from the HIV/AIDS programme;<br />

ORPHAN:CARE-GIVER<br />

RATIO<br />

• Funding is needed to support the individuals (Care-givers) who risk their own lives caring for both the<br />

infected and affected;<br />

• More stakeholders need to be brought on board in the fight against HIV/AIDS.<br />

146


B5.12 Educational Facilities<br />

Table B.61: Number and type of schools per circuit office in the municipal area<br />

Circuit Office Public Primary<br />

Schools<br />

Public<br />

Secondary<br />

Schools<br />

Combined<br />

Private<br />

schools<br />

Combined<br />

Public Schools<br />

Lulekani 19 7 5 1 32<br />

Namakgale 18 7 0 0 25<br />

Total 37 14 5 1 57<br />

Source: Department of Education<br />

B5.13 Special Groups<br />

The special groups in the municipality consist of the youth, women, child, the disable and the elderly<br />

people. The municipality has a desk that caters for the needs of the special groups. The desk is located in<br />

the Office of the Mayor. The municipality has appointed a full time coordinator to head the special groups’<br />

desk. The desk is responsible for the coordination of all the activities of the special groups in the<br />

municipality. Special groups’ needs are projects are well captured in the <strong>IDP</strong> document and they are part of<br />

the <strong>IDP</strong> process.<br />

Key issues with regard to the special groups:<br />

• Unemployment<br />

• Access of government and municipal buildings<br />

• Lack skills<br />

• Limited economic opportunities<br />

• Inadequate Learnership and Internship opportunities<br />

The Municipality participates in the intergovernmental structures coordinated by the Mopani District<br />

Municipality and the Limpopo Provincial Government. The Municipality is able to raise issues with sector<br />

departments through the IGR structures.<br />

Total<br />

147


B6. Problem Statement<br />

The problem faced by the Ba-Phalaborwa Municipality is on the downscaling of mining activities as a result<br />

of the depleted copper body, ageing infrastructure and demand for more services . This has serious<br />

ramifications on the local labour force and the general economy of the area. The Municipality has to grow<br />

the local economy and promote job creation, whilst addressing backlogs in basic service delivery.<br />

B7. Recommendations<br />

In line with the NSDP, the LEGDS, the District Local Economic Development Plan and the Spatial<br />

Development Framework; it is recommended that the Municipality investigates the possibility of growing<br />

the tourism industry to boost the local economy. In order to achieve this strategic intent, the Municipality<br />

has to establish partnerships with both the public and private sectors.<br />

B8. Community Needs<br />

The Municipality held ward meetings in all the wards to identify community needs and their priorities<br />

for the <strong>2011</strong>/12 financial year.<br />

Ward challenges identified through the above processes were confirmed during public participation<br />

processes in the wards. Public participation processes included, Imbizos, ward report back sessions on<br />

service delivery and ward reports submitted monthly in the Municipality.<br />

The table below presents prioritized community needs. Ward councilors played a crucial role in confirming<br />

ward priority needs:<br />

Table B.62 Community Needs as per Ward submissions<br />

Ward Community Needs/Challenges Location/Area Responsible Institution<br />

1 Water supply Makhushane – Nyakelany 1-4 Mopani/ Dwaf<br />

Electrification Makhushane – Nyakelang 4 ESKOM<br />

Formalization of settlement Makhushane – Nyakelang BPM<br />

Site demarcation – Makhushane<br />

Nyakelang<br />

Makhushane – Nyakelang 4 Makhushane Tribal<br />

148


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

Street maintenance -Phalaborwa<br />

Demarcation and fencing of<br />

cemetery<br />

Sewerage flowing through the<br />

community<br />

-Makhushane<br />

-Nyakelang<br />

BPM<br />

Makhushane Traditional<br />

Authority/BPM<br />

Makhushane Nyakelang BPM<br />

Upgrading of Haniville road Makhushane Nyakelang BPM<br />

Culverts Between graveyard and<br />

Haniville 3<br />

From Nyakelang 1 to<br />

Graveyard<br />

BPM<br />

Extension of graveyard Tipeng Makhushane<br />

Overhead walkway Phalaborwa Taxi Rank BPM<br />

Rehabilitation of Taxi rank Phalaborwa Taxi Rank BPM<br />

Opening of streets -Kanana<br />

-Tshelang Gape to Gardenview<br />

BPM<br />

Apollo lights Ward BPM<br />

Primary School Kanana Dept of Education<br />

Speed humps Ward BPM<br />

Community Hall Showground BPM<br />

Mobile Clinic Kanana Dept of Health<br />

Repair of toilets in graveyard Graveyard Tshangaan BPM<br />

Bridge Makhushane Dairy BPM<br />

2 Water supply Ward BPM/Mopani<br />

149


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

Water infrastructure Prieska Mopani<br />

Tar road Eiland to Letaba Ranch RAL<br />

Prieska Clinic Preiska Health<br />

Upgrading of cemeteries Mahale, Nondweni & Prieska BPM<br />

Paving and culverts Ward BPM<br />

Electricity Selwana Eskom<br />

RDP houses Ward DLGH<br />

High school Nondweni Education<br />

Renovation of Selwane stadium Nondweni BPM<br />

Upgrading of Selwana clinic to<br />

become health<br />

Selwane Clinic Dept of Health<br />

Bus stop shades Ward BPM<br />

Refuse removal Ward BPM<br />

Community Hall renovation Selwane BPM<br />

3 Street paving and tarring Ward BPM<br />

RDP Houses Ward DLGH<br />

Sports facilities and play ground Ward BPM<br />

Speed humps Magogo street<br />

Dikhafing road<br />

Mega bus/ Makhushane road<br />

Sono/clinic road<br />

Mavuso/Foskor street<br />

150


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

Site demarcation Ward BPM/DLGH<br />

Street maintenance Namakgale BPM<br />

High mast street lights Namakgale BPM<br />

Waste removal (Littering) Namakgale BPM<br />

Storm water drainage system Namakgale BPM<br />

High crime rate Namakgale BPM<br />

Upgrading of street Maphuta – Tshelang Gape BPM<br />

New residential sites Ward BPM<br />

Land for agriculture ward BPM<br />

Illegal Taxi Rank at Mega bus to<br />

be removed<br />

Mega bus BPM<br />

Graveyard Ward BPM<br />

Land for staff accommodation<br />

at clinic A<br />

Unhealthy Environment at<br />

Dekefing<br />

Namakgale Clinic A BPM/Dept of Health<br />

Namakgale Dikhefing BPM<br />

4 Water supply Ward BPM<br />

Stand pipes Matiko-Xikaya A-D<br />

Humulani A-C<br />

BPM<br />

Community library Matiko-Xikaya BPM<br />

Formalisation of Informal<br />

settlements<br />

Matiko-Xikaya Block C &D DLGH/BPM<br />

Illegal Dumping Ward BPM<br />

De-bushing crime hot spots Ward BPM<br />

Maintenance of streets Ward BPM<br />

151


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

Clinic Matiko-Xikaya Dept of Health<br />

Demarcation of new sites Humulani DLGH/BPM/Majeje<br />

Tribal<br />

Cattle grazing land Matiko-Xikaya Majeje Tribal Office<br />

Public Transport Humulani BPM/Taxi Association<br />

Water Infrastructure Matiko-Xikaya D Ext & B Ext BPM/MDM<br />

Opening of streets Matiko-Xikaya Block A Ext & D<br />

Ext<br />

BPM<br />

High School Humulani Dept of Education<br />

Culverts to cemetery Humalani Cemetery BPM<br />

Grading of streets Ward BPM<br />

Water shortages Humulani Clinic BPM<br />

Fence, Toilets & Water Matiko-Xikaya new graveyard BPM<br />

Apollo lights Ward BPM<br />

Satellite Police Station Ward SAPS<br />

Land Development (donated<br />

land for the clinic visiting point)<br />

Matiko-Xikaya BPM<br />

Primary School Matiko-Xikaya Block D Ext Dept of Education<br />

RDP Houses Ward DLGH<br />

Maintenance of Lulekani to<br />

Matiko-Xikaya Road (road<br />

becoming narrow)<br />

Ward BPM<br />

VIP Toilets Ward MDM<br />

Boreholes for farmers Ward<br />

Culverts (Lulekani Old<br />

Graveyard)<br />

Boundary of Ward 6 & 4 BPM<br />

152


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

Unfinished RDP Houses (3<br />

houses)<br />

Matiko-Xikaya Block A, B, C &<br />

D<br />

Matiko-Xikaya DLGH<br />

Tarring or paving of road Humulani to Lulekani CBD<br />

road<br />

BPM<br />

Road sign (pedestrian crossing) Ward (next to all schools) BPM<br />

Speed humps Ward (next to all schools) BPM<br />

5 Water supply (pressure) High lying areas Mopani<br />

Electricity Network (Old<br />

infrastructure)<br />

Ward BPM<br />

Roads & Maintenance Ward BPM<br />

Sewerage Services (leakages) Ward BPM<br />

Refuse Removal (Dumping site) Ward BPM<br />

Public parks and sidewalks<br />

(Maintenance)<br />

Ward BPM<br />

Moving of Skukuza Ward Mopani<br />

Hospital Ward BPM<br />

Tourism Ward BPM, LEDET<br />

Crime Ward SAPS<br />

6 Poor water pressure Biko BPM<br />

Speed humps and pedestrian<br />

crossing<br />

Lulekani P School<br />

B1 Ext<br />

Chris Hani street<br />

BPM<br />

Culverts Lulekani Graveyard BPM<br />

153


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

Police Station street<br />

Lulekani Health Centre<br />

Paving B1 Ext BPM<br />

Fencing of graveyard new and<br />

old<br />

De-bushing of empty spaces and<br />

parks<br />

Lulekani graveyard BPM<br />

Ward BPM<br />

Crèche Biko East & West Department of<br />

Education<br />

Funding for Lulekani Homebased<br />

Care<br />

Thambo Section Social Development<br />

7 High mast street lighting Mandela village & Topville BPM<br />

Recreational facilities Ward BPM<br />

Repair and maintenance of<br />

Apollo light no 34,35 &40<br />

Ward BMP<br />

Grading of Sports fields Refentse and other in the<br />

ward<br />

BPM<br />

De-bushing Crime hot spot BPM<br />

Potholes Namakgale BPM<br />

Cleaning of streets Namakgale BPM<br />

High school Ward Dept of Education<br />

Upgrading of streets Ward BPM<br />

Repair of bridges/culverts Mxongo/Topville<br />

Namakgale E & D<br />

BPM<br />

Recreational facilities Ward BPM<br />

600 Houses & sites Ward Department of Housing<br />

154


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

Culverts Ward BPM<br />

Checking of water meters Ward BPM<br />

Storm water drainage Section C (From Mpholo to<br />

former Mayor )<br />

4 Houses without sewerage<br />

system<br />

BPM<br />

Mshenguville BPM<br />

One block without water system Bosveld BPM<br />

Street cleaning (Illegal dumping) Ward BPM<br />

High School Ward Department of<br />

Education<br />

Tar road -Tambo street to Mashikinya<br />

to Score to Long Till/ Chicken<br />

farm<br />

-Chicken farm to Topville to<br />

ward 12 RDP<br />

-Archie’s Tavern to Mashikinya<br />

-Zama zama via unit E RDP<br />

houses<br />

BPM<br />

Sewer maintenance Zama zama Topville bridge BPM<br />

8 Cleaning Sports grounds Ward BPM<br />

Water shortage Ext C1 F BPM<br />

Community Library Majeje MPCC BPM<br />

Gravelling of road Ward BPM<br />

Tar road Mokoena road BPM<br />

Access streets Majeje section F BPM<br />

VIP Toilets Ward Mopani<br />

155


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

RDP Houses Ward Local Government<br />

Graveyard digging services and<br />

toilets<br />

Site demarcation for sports<br />

centre<br />

Majeje MPCC SAPS<br />

Ward Majeje Tribal<br />

Culverts Nana/ward Eskom / BPM<br />

9 Water New Ext and old BPM<br />

Tar road Mashishimale Road R2 & R3 Mopani<br />

Speed hump Ward Mopani<br />

Fencing , water & toilets for<br />

cemetery<br />

Ward BPM<br />

Community Library Ward BPM<br />

Indoor sports centre Ward BPM<br />

Primary school Dept of Education<br />

Satellite Police Station Mashishimale SAPS<br />

Bridge Mohlabeng to cemetery BPM<br />

Tar road Makhushane Mashishimale Mopani<br />

Upgrading of streets ward BPM<br />

Infrastructure for Home based<br />

care<br />

Electricity Eskom<br />

RDP Houses Ward DLGH<br />

Sanitation Ward Mopani<br />

10 Water supply Gravelotte (Water<br />

reticulation)<br />

Department of Social<br />

Mopani<br />

156


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

Electrification Boyelang<br />

Mashishimale R1 (Booster<br />

pump )<br />

Maseke<br />

Eskom<br />

Paving Phase 3 Gravelotte BPM<br />

RDP Houses Ward Department of Local<br />

government<br />

Culverts / speed humps Maseke<br />

Mashshimale<br />

Gravelotte<br />

BPM<br />

Secondary School Gravelotte Dept of Education<br />

Transfer of Primary School from<br />

JCI mine<br />

Gravelotte Dept of Education<br />

Maintenance of street Ward BPM<br />

Transfer of clinic from JCI mine<br />

premises<br />

Gravelotte Dept of Health<br />

Residential sites Gravelotte BPM<br />

Recreational facilities Gravelotte BPM<br />

Fencing of Cemeteries Mashishimale R1<br />

Maseke<br />

Boelang<br />

BPM<br />

Food parcels Ward Department of Social<br />

Apollo lights Ward BPM<br />

Opening of roads Boyelang BPM<br />

157


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

Demarcation of new sites Gravelotte BPM<br />

Shopping complex Gravelotte BPM<br />

Water reticulation & Electricity<br />

connections<br />

New stand & Maseke BPM & ESKOM<br />

Fruit Market Gravelotte BPM<br />

Site demarcation for churches Gravelotte BPM<br />

Community hall Gravelotte BPM<br />

Drop-in centre Gravelotte BPM<br />

Paving phase 3&4 Gravelotte BPM<br />

Agricultural projects Gravelotte BPM<br />

Culverts and speed humps Maseke<br />

Mashishimale R1<br />

Gravelotte<br />

BPM<br />

Public Transport Gravelottee BPM<br />

RDP Houses Maseke<br />

Gravelotte<br />

Boyelang<br />

Mashishimale R1<br />

DLGH<br />

Creche Gravelotte Dept of Education<br />

11 High School Between Kanana and<br />

Gardenview<br />

Dept of Education<br />

Poverty alleviation Projects Ward BPM (LED Unit)<br />

Water reticulation and<br />

Metering<br />

Gardenview<br />

Ntswelemotse<br />

MDM<br />

158


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

Electricity Gardenview<br />

Ntswelemotse<br />

Culverts Ward BPM<br />

Speedhumps/rumbles Ward BPM<br />

Eskom/DMER<br />

Community Library Ward BPM/DSAC<br />

Community Hall Ward BPM<br />

Flowing Sewerage streams Ward BPM<br />

Repair of Sekwete Bridge Ward BPM<br />

Erection of Stop Sign or (one<br />

vehicle width) at Sekwete<br />

bridge<br />

Ward BPM<br />

12 Street maintanamce Ward BPM<br />

Storm water drainage Ward BPM<br />

High crime rate Namakgale SAPS<br />

Poverty alleviation projects Ward Social Development<br />

Streets lights Ward BPM<br />

Street paving -Nazareth<br />

-Vuxeni<br />

-Dr Aphane’s street<br />

BPM<br />

De-bushing Sir Val Ducan FET College BPM<br />

High mast light Ward BPM<br />

Residential site Kholofelo BPM<br />

13 Street maintenance Namakgale BPM<br />

Storm water drainage Namakgale (Calvin Ngobeni) BPM<br />

159


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

De-bushing crime hot spots Namakgale BPM<br />

High crime rate Namakgale SAPS<br />

High poverty rate Ward Social Development<br />

Establishment of parks Ward BPM<br />

Paving of streets Ward BPM<br />

High mast light Zone B BPM<br />

Residential land Zone C BPM<br />

Sports Facilities Zone C (Lepato) BPM<br />

14 Unplanned settlements Nobody BPM<br />

Water supply Ward Mopani<br />

Sanitation Ward Mopani<br />

School renovation Zamani Primary School<br />

(Namakgale)<br />

Sewerage system Ben-farm<br />

Electrification -Nobody<br />

RDP Houses (Connection)<br />

-Makhushane construction<br />

camp<br />

-Polar park RDP<br />

-Ben-farm Ext A<br />

High mast street lights -Nobody<br />

Upgrading Maphutha-Malatji –<br />

Tshelang Gape road<br />

-Ben-farm B Ext<br />

-Namakgale B<br />

Department of<br />

Education<br />

BPM<br />

ESKOM<br />

BPM<br />

Namakgale B BPM<br />

160


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

Tarring of streets -Ben-Farm A Clinic – Business<br />

area<br />

-Streets to school : Namakgale<br />

& Ben-Farm A<br />

Construction of new roads Nobody Makhushane<br />

unplanned settlements<br />

BPM<br />

BPM<br />

Street maintenance Ward BPM<br />

Storm water drainage Namakgale B BPM<br />

Pedestrian Crossing R71 – Majeje (Mondweni) BMP<br />

Culverts -Ackson Malatji & Zakes<br />

Ngweshen street: Namakgale<br />

B<br />

-Sekwe River: Between Benfarm<br />

A & Ben-farm B Ext<br />

BPM<br />

De-bushing open spaces Ward BPM<br />

Vegetable Garden Park 3516B : Namakgale BPM<br />

15 Water supply -Maseke<br />

-Mashishimale R1<br />

-Makhushane Maune<br />

-Makhushane Mapikiri<br />

Mopani<br />

Wobbly water tank (Reservoir) Makhushane Nyakelang BPM<br />

Electrification -Maseke Ext<br />

-Mashishimale R1, R2 & Ext<br />

-Boelang<br />

-Phatamashako<br />

ESKOM<br />

161


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

-Sebereka Ext<br />

Sanitation (VIP toilets) -Mashishimale R1 & R2<br />

Upgrading of Makhushane -<br />

Mashishimale road<br />

- Makhushane Maune<br />

-Makhushane Mapikiri<br />

-Sebera<br />

-Makhushane<br />

-Maseke<br />

-Mashishimale<br />

Construction of new road Makhushane Mapikiri –<br />

Mashishimale R2<br />

Mopani<br />

BPM<br />

BPM<br />

Street road grading Ward BPM<br />

Maintenance of sports grounds Ward BPM<br />

24 Hours clinic services Maseke Department of Health<br />

Demarcation of sites Maseke BPM<br />

Community Hall -Maseke<br />

-Mashishimale<br />

BPM<br />

Fencing -Ward BPM<br />

16 Electrification Kurhula ESKOM<br />

Free Basic Electricity Ward BPM/Eskom<br />

Houses Ward DLGH<br />

Sanitation Ward Mopani<br />

Water supply Kurhula Mopani<br />

High HIV/AIDS prevalence Ward Health/BPM<br />

Primary school Kurhula Education<br />

162


Ward Community Needs/Challenges Location/Area Responsible Institution<br />

RDP Houses Ward Department of Housing<br />

Bridges/Culverts Pondo, Mlambo & Kurhula BPM<br />

Access street Kurhula BPM<br />

Apollo lights Ward Eskom/BPM<br />

Clinic Kurhula Departmental<br />

VIP Toilets -Pondo<br />

-Mlambo<br />

-Kurhula<br />

Mopani<br />

Grading of Roads Ward BPM<br />

Sports facilities Ward BPM<br />

Table B.63 Community Priorities as per Ward submissions<br />

Ward No. Ward Priority Location Responsible Institution<br />

1 Electrification Kanana Eskom<br />

Water reticulation Nyakelang 1 to 4 BPM<br />

Culverts -From Nyakelang 1 to<br />

Graveyard<br />

- Dairing<br />

Opening of street From Tshelang Gape<br />

via Kanana<br />

Streets lights Hendricks Van Eck road<br />

(Phalaborwa)<br />

BPM<br />

BPM<br />

2 Water supply Ward BPM<br />

163


Ward No. Ward Priority Location Responsible Institution<br />

Paving and culverts Ward BPM<br />

Tar road Eiland to Letaba Ranch RAL<br />

Prieska Clinic Preiska Health<br />

Upgrading of cemeteries Mahale, Nondweni &<br />

Prieska<br />

BPM<br />

3 Paving of roads and street Ward BPM<br />

Speed humps Magogo street<br />

Demarcation of new sites (Zone D<br />

Foskor)<br />

Dikhafing road<br />

Mega bus/<br />

Makhushane road<br />

Sono/clinic road<br />

Mavuso/Foskor street<br />

Ward BPM/DLGH<br />

Sport facilities and play grounds Ward BPM<br />

Stormwater drainage Ward BPM<br />

4 Water supply/stand pipes Ward BPM<br />

Culverts Humulani Cemetery BPM<br />

Formalisation of Informal<br />

settlements<br />

Matiko-Xikaya DLGH/BPM<br />

RDP Houses Ward DLGH<br />

VIP Toilets Ward MDM<br />

5 Sewerage Phalaborwa BPM<br />

Water Phalaborwa BPM<br />

164


Ward No. Ward Priority Location Responsible Institution<br />

Electricity Phalaborwa BPM<br />

Refuse removal Phalaborwa BPM<br />

Roads and Maintenance Phalaborwa BPM<br />

6 Grading and paving of roads Ward BPM<br />

Fencing of graveyard (old & new) Lulekani Graveyard BPM<br />

Speed humps and pedestrian<br />

crossing<br />

Lulekani School<br />

B1 Ext<br />

Chris Hani street<br />

Culverts Lulekani graveyard<br />

Police station street<br />

Lulekani Heal care<br />

centre<br />

BPM<br />

Demarcation of new residential sites Ward BPM/DLGH<br />

7 Storm water drainage Section C (Mpholo to<br />

former Mayor street)<br />

BPM<br />

Apollo lights Ward BPM<br />

Tar road Tambo street to<br />

Mashiskinya to Score<br />

to Long till/Chicken<br />

farm<br />

Tar road Chicken farm to<br />

Topville to ward 12<br />

RDP<br />

BPM<br />

BPM<br />

Tar road Zama zama via unit E BPM<br />

165


Ward No. Ward Priority Location Responsible Institution<br />

8 Water shortage (vandalism of water<br />

meters)<br />

RDP Houses<br />

Section C Ext Mopani<br />

Access streets Section F BPM<br />

Paving / Tar road Mokoena Road BPM<br />

R71 to Tribal office (New Road) BPM<br />

Digging services Majeje Graveyard BPM<br />

9 Water New Ext and Old BPM<br />

Tar Road Mashishimale road R2<br />

& R3<br />

Mopani<br />

Fencing, water & toilet Cemetery Ward BPM<br />

Speed hump Ward Mopani<br />

Community Library Ward BPM<br />

10 Water shortage Gravelotte (Water<br />

reticulation)<br />

Mashishimale R1<br />

(Booster pump )<br />

Electrification Boyelang<br />

Maseke<br />

Eskom<br />

Paving phase 3 Gravelotte BPM<br />

RDP Houses Ward Department of Local<br />

government<br />

Culverts / speed humps Maseke<br />

Mashshimale<br />

166


Ward No. Ward Priority Location Responsible Institution<br />

Gravelotte<br />

11 Water reticulation(Meters ) -Garden view<br />

-Ntswelemotse<br />

BPM<br />

Culverts Ward BPM<br />

Speed humps/rumbles Ward BPM<br />

Electricity Garden view<br />

-Ntswelemotse<br />

Eskom<br />

High mast light Ward BPM<br />

12 Residential site Kholofelo BPM<br />

Paving of streets Ward BPM<br />

High mast lights RDP site BPM<br />

Storm water drainage Ward BPM<br />

De-bushing -Sir Val Duncan<br />

-Behind Lemi’s tavern<br />

BPM<br />

13 Street tarring & paving Ward BPM<br />

Storm water drainage Calvin Ngobeni Road<br />

Phumulong Street<br />

BPM<br />

Apollo lights Namakgale Zone B BPM<br />

Establishment recreational park Zone C 7 B BPM<br />

Sport facilities Ward BPM<br />

14 Water supply Nobody BPM<br />

167


Ward No. Ward Priority Location Responsible Institution<br />

Electrification -Nobody<br />

-RDP<br />

ESKOM<br />

Paving and Grading of internal roads Ward BPM<br />

Storm water drainage Ward BPM<br />

Apollo light -Nobody next zama<br />

bottle store<br />

-Maphutha and two<br />

mountain<br />

-Ben-farm A<br />

15 Water supply (new reservoir) -Mapikiri<br />

-Mashishimale R1<br />

BPM<br />

Mopani<br />

Tar roads Ward BPM<br />

Culverts -Maseke<br />

-Makhushane – Maune<br />

-Makhushane –<br />

Mapikiri<br />

RDP Houses -Maseke<br />

-Mashishimale R1 & R2<br />

-Makhushane – Maune<br />

-Makhushane –<br />

Mapikiri<br />

-Mashishimale R1&R2<br />

-Sebera<br />

BPM<br />

168


Ward No. Ward Priority Location Responsible Institution<br />

VIP Toilets Ward Mopani<br />

16 Water Infrastructure Kurhula Mopani<br />

Electrification Kurhula Eskom<br />

RDP Houses Ward DLGH<br />

Opening of streets & gravelling of<br />

roads<br />

Kurhula & ward BPM<br />

Tar roads Nyota road to Kurhula BPM<br />

169


C1. Introduction<br />

SECTION C<br />

Strategic Intent<br />

This document is the strategic plan for Ba-Phalaborwa Municipality that was developed on 27 – 29 October<br />

2010 at the strategic planning session that was held in Mopani Rest Camp, Kruger National Park. The<br />

strategic planning session was attended by the Acting Municipal Manager, S57 managers, Assistant<br />

Directors, Internal Auditor, Risk Manager, <strong>IDP</strong> Manager, Manager Tourism, the Performance Management<br />

Officer, Speaker, the Executive Committee and union representatives.<br />

The content of this strategic plan draws meaning from the Analysis Phase of the integrated development<br />

planning process of the Municipality; and is meant to inform and give meaning to the Projects Phase. The<br />

strategic planning session was held to ensure that the Municipality remains relevant and responsive to the<br />

needs of the community and form a base for monitoring progress and assessing results and impact.<br />

The strategic planning team focused on assessing the Municipality’s current business environment, defining<br />

the organisation’s purpose, and deciding on what the organisation should look like in the next decade or so.<br />

The Municipality further recognised its strengths, weaknesses, opportunities and threats. It resultantly<br />

mapped out a course of action to be undertaken in order to move from the current situation to the desired<br />

position.<br />

A picture of the current situation in the Municipality was painted with the view to presenting the status<br />

quo and laying a sound foundation for future plans. The following presentations were made in an attempt<br />

to present the current state of development amid interventions undertaken in the previous financial years:<br />

• Progress made in the implementation of the 2009/10 <strong>IDP</strong>;<br />

• Situational analysis focusing on both the internal and external environments of the Municipality;<br />

and<br />

• Line function performance reports, goals and strategies by heads of departments.<br />

170


Based on the environmental scan, the strengths, weaknesses, threats and opportunities that prevail were<br />

identified through a SWOT Analysis exercise. The strategic intent of the Municipality was confirmed,<br />

without changes, by reviewing the vision and mission statements as well as the guiding principles (values).<br />

A set of strategic goals (broad goals) was developed and strategies formulated over the short to long term<br />

period. It was agreed that the strategic goals be refined and aligned to at least the following strategic<br />

documents:<br />

• The Provincial Development Growth Strategy (PGDS);<br />

• The Medium Term Strategic Framework (MTSF);<br />

• The Municipal Turn Around Strategy (MTAS); and<br />

• The Outputs of Outcome 9 in the Minister of COGTA’s Delivery Agreement.<br />

C2. 2009/2010 <strong>IDP</strong> Implementation Report<br />

A shift in strategic focus can be seen from 2008/2009 and 2009/2010 through the following:<br />

The 2008/09 vision statement was amended during the previous (2009) strategic session from “Growing<br />

the economy and creating employment through tourism” to read “Best tourist destination in Limpopo by<br />

2020”. The mission was expanded to include focus on the mining industry and Ba-Phalaborwa as a<br />

destination of choice and an additional value (continuous learning) was identified and included in the<br />

strategic values.<br />

Annual Performance<br />

Performance in the implementation of the strategic objectives as contained in the strategy map was as<br />

follows:<br />

Under the community perspective, Community well-being reached target and the perspective and<br />

objective scored 3. Under the financial perspective, two objectives, Facilitate the growth of the local<br />

economy and to provide for mobility and access, did not reach targets and scored, respectively, 2.46 and<br />

2.78. Become financially viable exceeded target and scored 3.14 and the financial perspective in total<br />

scored 2.77 and therefore did not reach target. All four strategic objectives in the institutional processes<br />

171


perspective reached target. Ensure environmental sustainability scored 3.85, to maintain and upgrade<br />

municipal assets and services scored 3.43, Develop effective and sustainable stakeholder relationships and<br />

partnerships scored 3 and to develop and implement integrated management and governance systems<br />

scored 3.29 which resulted in an overall score in this perspective of 3.39. In the learning and growth<br />

perspective the strategic objective to attract, develop and retain human capital scored 3.51 which resulted<br />

in the same score for this perspective<br />

With regard to the overall performance of the strategic scorecard and the SDBIP and LSDBIP, the overall<br />

performance per quarter can be broken down as follows:<br />

September 09 December 09 March 2010 June 2010<br />

Overall Performance 3.20 3.01 2.83 3.04<br />

Strategic 3.18 3.45 3.04 3.11<br />

SDBIP & LSDBIP 3.22 2.57 2.61 2.97<br />

Table C. 1: Annual Performance<br />

Strategic scorecard performance exceeded target in all four quarters, but SDBIP and LSDBIP exceeded<br />

target in the first quarter but did not reach target for the rest of the quarters<br />

Performance with regard to the National Key Performance Indicators is as follows:<br />

% municipal budget used for WSP the target of 1% was reached, % households with access to solid waste<br />

removal, the target was exceeded from 54.57% to 66.74%, % households with access to electricity in town<br />

the target of 100% was reached, % households with access to free basic water the target of 51% was<br />

exceeded to 85% and the number of households with access to free basic electricity, the target of 6000<br />

households was reached. % Capital spending on projects in <strong>IDP</strong> also reached the target of 100%. Annual<br />

revenue received for services exceeded the target of R270, 000,000 to R285,000,000. Two national<br />

indicators did not reach target, number of jobs created through LED and EPWP, only 13 permanent and 361<br />

172


temporary jobs were created against the target of 200 permanent and 750 temporary. % outstanding<br />

service debtors did not reach the target of 50%.<br />

With regard to SDBIP and LSDBIP performance, Corporate Services Directorate and the Office of the<br />

municipal manager exceeded targets in all the four quarters, whereas the rest of the directorates only<br />

managed to reach their performance targets.<br />

Interventions on priority needs per ward:<br />

An analysis of the extent of municipal interventions on ward priorities revealed the following:<br />

Ward Priority Need % Intervention<br />

1 Water, sanitation, electricity 60%<br />

2 Water, bridge and culverts, job creation, clinics 40%<br />

3 Streets, cemetery, residential sites, job creation 40%<br />

4 Electrification, water, transport/roads,<br />

formalization of settlements<br />

5 Sewerage, water, electricity, refuse removal, road<br />

maintenance<br />

6 Cemetery, electrification, culverts, speeds humps,<br />

new sites<br />

7 Street lights, roads, new sites, recreational<br />

facilities, storm water<br />

60%<br />

100%<br />

40%<br />

8 Water, roads, cemetery, library 40%<br />

9 Roads, water, bridge, cemetery 20%<br />

10 Water, electrification, roads, houses, culverts 80%<br />

0%<br />

173


Ward Priority Need % Intervention<br />

11 Culverts, library, hall, sports r, roads 0%<br />

12 Storm water, sites, debushing, roads, street lights 40%<br />

13 Roads, storm water, street lights, parks, sports<br />

facilities<br />

20%<br />

14 Roads, electrification, street lights, library 40%<br />

15 Water, roads, culverts, houses, toilets 0%<br />

16 Water, electrification, houses, roads 20%<br />

Table C. 2: Ward Priority Needs<br />

Average intervention 33%<br />

Rating on achievement of strategic values:<br />

A community satisfaction survey conducted by the Municipality revealed that the Ba-Phalaborwa<br />

Community is dissatisfied with the performance of the Council on all strategic values (with the exception of<br />

fairness) as per the <strong>IDP</strong>.<br />

Assessment of quality of service:<br />

The survey allowed the community to present its perceptions on the performance of the Municipality in the<br />

provision of different municipal services. The table below presents the ratings by those who participated in<br />

the survey:<br />

Type of Service Rating<br />

Water Inadequate<br />

Sanitation Inadequate<br />

174


Type of Service Rating<br />

Refuse Removal Adequate<br />

Traffic Control Adequate<br />

Licensing Inadequate<br />

Electricity Supply Adequate<br />

Approval of Building Plans Inadequate<br />

Land Use Applications Inadequate<br />

Libraries Adequate<br />

Community Halls Adequate<br />

Storm-Water Drainage Inadequate<br />

Sports Fields & Stadia Inadequate<br />

Streets, Roads & Pavements Inadequate<br />

Economic Development Bad Service<br />

Parks and Open Spaces Inadequate<br />

Promotion of Tourism Adequate<br />

Public Participation Inadequate<br />

Monthly Billing System Inadequate<br />

Table C. 3: Survey on quality of services<br />

The outcomes of the 2009/2010 <strong>IDP</strong> implementation report and community perceptions, expressed<br />

through the ratings, on the strategic values and quality of services rendered were taken into account when<br />

175


conducting the SWOT Analysis and crafting the strategic goals and strategies for implementation in the<br />

future.<br />

C3. Analysis<br />

C3.1 Situational Analysis<br />

7 S152 of the Constitution sets out the objects of local government:<br />

a) to provide democratic and accountable government for local communities;<br />

b) to ensure the provision of services to communities in a sustainable manner;<br />

c) to promote social and economic development;<br />

d) to promote a safe and healthy environment; and<br />

e) to encourage the involvement of communities and community organisations in the matters of local<br />

government.<br />

The provision of sustainable services includes i.e. access to water and sanitation, electricity, refuse removal,<br />

transport facilities, housing, education and primary health services.<br />

To deliver on the objects of local government and to achieve the ultimate goal of improving the lives of the<br />

community a developmental approach is necessary. Due regard should be given to spatial planning and<br />

development as all development in South Africa finds expression in space economy. Development and<br />

service provision should be concentrated on growth points to ensure that the poorest of the poor have<br />

access to services and job opportunities. The following assumptions are contained in the National Spatial<br />

Development Perspective:<br />

1. Location is critical for the poor to exploit opportunities for growth<br />

2. The poor, concentrated around economic centers have greater opportunity to gain from economic<br />

growth<br />

3. Areas with demonstrated economic potential provide greater protection due to greater diversity of<br />

income sources<br />

7 Constitution of the Republic of South Africa, 108 of 1996<br />

176


4. Areas with demonstrated economic potential are most favourable for overcoming poverty<br />

5. The poor are making rational choices about relocating to areas of opportunity<br />

With regard to Ba-Phalaborwa municipal area the population is concentrated around the following areas:<br />

• Phalaborwa with Schittoch and farm Silonque<br />

• Namakgale with Makhushane, Mashishimale, Maseke and Boelang<br />

• Gravelotte<br />

• Lulekani with Matiko-Xikaya, Humulani, Kurhula and Biko section<br />

• Seloane with Mahale, Prieska and Nondweni, and<br />

In terms of the Limpopo Spatial Rationale, Phalaborwa town is a provincial growth point, Namakgale and<br />

Gravelotte district growth points and Lulekani a municipal growth point<br />

Ba-Phalaborwa municipal area consists of 2 town centers, 3 townships, 11 villages and 101 farms<br />

The following issues needs to be taken into consideration in developmental planning:<br />

Established areas:<br />

Urban management areas:<br />

• Maintenance of infrastructure<br />

• Zoning/Land use management<br />

• Clean, green and safe areas<br />

• Infill development<br />

Consolidation residential areas:<br />

• Infrastructure backlogs<br />

• New housing development<br />

• Economic infrastructure<br />

• Accessibility<br />

• Infill development<br />

177


Rural Village areas:<br />

Provision of basic services:<br />

• Water<br />

• Electricity<br />

• Sanitation<br />

• Roads accessibility<br />

• Facilitate subsistence/commercial farming<br />

Conservation area:<br />

Mining areas:<br />

• Protect from urban development<br />

• Air pollution<br />

• Beneficiation<br />

Economic nodes and industrial areas:<br />

• Demarcate industrial areas with potential<br />

• Small business development in all economic sectors<br />

• Provide appropriate infrastructure and maintain<br />

• Provide an environment for the growth and development of various economic sectors<br />

In applying the spatial rationale in the development of Ba-Phalaborwa areas means the following:<br />

1. Undertaking rigorous analysis of the space economy to identify areas of economic significance<br />

and concentrations of poverty and relative and dynamic comparative advantage of localities<br />

2. Providing a common platform for structured dialogue<br />

In applying the above the municipality will be able to:<br />

1. Focus investment and development interventions to ensure maximum and sustainable impact<br />

2. Capitalise on complementarities and facilitate consistent and focused decision-making<br />

178


3. Move beyond mere focusing on integration and coordination procedures towards strategic<br />

coordination, interaction and alignment<br />

All the above factors were taken into account during the strategic planning session in identifying priorities<br />

and planning developmental and institutional programmes. The Ba-Phalaborwa Sustainable Development<br />

Initiative, will go a long way in ensuring sustainable development and economic growth within the<br />

municipal area.<br />

C3.1 Ba-Phalaborwa Sustainable Development Initiative<br />

Ba-Phalaborwa Municipality, together with its strategic partners has embarked on an initiative, The Ba-<br />

Phalaborwa Sustainable Development Initiative, to expedite inclusive economic growth of all communities<br />

within the municipal area to ensure a better life for all.<br />

C3.2 SWOT Analysis<br />

SWOT analysis is a strategic planning tool used to discuss and evaluate the Strengths, Weaknesses,<br />

Opportunities and Threats in the municipality. It identifies the internal and external factors that influence<br />

the strategic intent which assist the municipality to better align itself with existing conditions so as to<br />

maximise its ability to function optimally.<br />

The SWOT Analysis provides a better understanding of environmental influences on the municipality,<br />

enabling it to effectively plan for the future and make strategic decisions based on this analysis. The<br />

information which is developed through the analysis will help to bring opportunities to the fore. Resources<br />

can be more effectively allocated when a thorough understanding of the factors affecting the municipality<br />

are taken into account as well as factors that are hindering the municipality are discovered and addressed.<br />

Taking into account the 2009/2010 <strong>IDP</strong> Implementation Report, community needs, situational analysis and<br />

2009 SWOT, the following SWOT Analysis was determined:<br />

179


SWOT ANALYSIS<br />

Strengths Weaknesses Opportunities Threats<br />

Billing Maintenance of infrastructure, infrastructure<br />

backlogs, ageing infrastructure<br />

Healthy and green<br />

Service backlog and new basic services, non<br />

environment<br />

provision of services<br />

Peaceful and stable<br />

community<br />

Beneficiation of byproducts<br />

and value chain<br />

Land Claims<br />

Marula Industry Poverty<br />

Water and electricity losses Agriculture Negative economic growth<br />

Institutional knowledge Water provision and service level agreement Tourism potential Economic infrastructure<br />

Quality of <strong>IDP</strong> document ICT infrastructure Land availability Social infrastructure<br />

Implementation and<br />

compliance to policies and<br />

strategies<br />

Project Management Infill development Accessibility (ITP)<br />

Implementation of plans Housing accreditation Pollution (air and water)<br />

Table C. 4: SWOT Analysis<br />

Non-functionality of the GIS Water Service Authority<br />

Status<br />

Landfill site<br />

Financial viability, financial management, Audit<br />

history, Personnel budget, revenue collection and<br />

locked finances, maintenance budget, failure to<br />

maximise revenue collection<br />

Availability of grants Non payment for services<br />

Contract management Budget for water maintenance<br />

Risk management and internal controls Alignment of plans with sector<br />

departments and traditional authorities<br />

Monitoring and evaluation Co-operation with Traditional<br />

Transparency and openness


Strengths<br />

The billing system has become strength within the municipality as all services are billed for and that was<br />

not possible previously. Data cleaning also ensures that billing information is correct and up to date. The<br />

municipality has a vast institutional knowledge of people in strategic position being employed for a long<br />

time. Through this capacity building and skills transfer is excelled. The <strong>IDP</strong> of the municipality was rated as<br />

one of the best within the Limpopo Province. This is a great improvement since the <strong>IDP</strong> document was<br />

identified as a weakness during 2009 strategic planning session. Another weakness that has become<br />

strength is implementation and compliance of policies and strategies. This also indicates of how the<br />

municipality has improved within the 2009/2010 financial year. The municipality won the 2010 Greenest<br />

Municipality Award in the Province, the strength also lay in the fact that for the past few years the<br />

municipality was one of the best performing municipalities competing for this reward. One of the greatest<br />

strengths of the municipality is the peaceful and stable community which is indicative of a stable and well<br />

performing municipality.<br />

Weaknesses<br />

The municipality’s mandate is to provide services to the community, and if there are challenges of<br />

infrastructure maintenance, infrastructure backlogs, ageing infrastructure and service provision backlogs<br />

and non provision of services, it poses huge challenges for the municipality as it will not be able to deliver<br />

on its mandate. It is therefore crucial that these challenges and weaknesses are addressed to ensure<br />

sustainable quality services to the community. Information and Communication Technology is the way in<br />

which information is stored, how the municipality conducts its business and how it communicates<br />

internally within the organization and externally with its customers and the community. It is therefore<br />

crucial that sound information and communication technologies are practiced to ensure sound governance<br />

and the provision of services. Project management and implementation of plans are important to ensure<br />

that services are provided as planned. Projects and plans not implemented not only cause delays in service<br />

provision but also wastage of money and revenue within the municipality which directly impacts on<br />

planning within the municipality. A lot of time and money is wasted due to a non-functional GIS. GIS is the<br />

most important planning tool for the municipality. If the GIS is functional, all assets, project planning,<br />

maintenance, replacement of infrastructure, budget planning can be aligned. The fact is, if you don’t know<br />

where you are at the moment, how can you plan for the future? One of the biggest challenges in most<br />

municipalities is financial viability. Identified weaknesses under financial viability include financial<br />

management, audit history, personnel budget, revenue collection and locked finances, maintenance<br />

181


udget and failure to maximise revenue collection. There is a great need to put strategies in place to<br />

overcome this weakness because if a municipality is not financially viable, it cannot exist. The municipality<br />

has improved, i.e. the billing system, but revenue collection and all relevant identified weaknesses needs to<br />

be addressed to ensure a sustainable future for the municipality and the community. Contract<br />

management and risk management and internal controls are other identified weaknesses. Contract needs<br />

to be managed to ensure that monies are not paid for expired contracts, it needs to be monitored to<br />

ensure that the service providers deliver as expected. Risk management and internal controls entails that<br />

with every decision that is made within the municipality a risk assessment be done to ensure that all risks<br />

are managed and mitigated. Regarding the communication as identified weakness, although the<br />

municipality has improved greatly in internal and external communication, there is still room for<br />

improvement as not all decisions are communicated bottom up and top down within the municipality.<br />

Monitoring and evaluation and transparency and openness go hand in hand. The weakness openness and<br />

transparency was identified in a survey conducted on the performance of the strategic values of the<br />

municipality. This also links to communication. Strategies should be put in place to ensure that<br />

transparency and openness and therefore monitoring and evaluation be addressed.<br />

Opportunities<br />

Opportunities within Ba-Phalaborwa municipality are directly linked with economic development, i.e.<br />

beneficiation of by-products and value chain, the marula industry, agriculture and tourism potential. Land<br />

availability could be exploited through negotiations with traditional leaders. There is no urban sprawl in<br />

the municipal area and the municipality should infill development along the routes between the major<br />

economic nodes within the municipal area. The municipality should endeavour to obtain housing<br />

accreditation and water services authority. Through this the municipality could by itself provide very<br />

necessary needs in the community without being reliant on other sector departments. If obtained, the<br />

revenue stream will also be increased. Grants are available to municipalities and the municipality should<br />

ensure that it adheres to the terms and conditions of grants to ensure that all avenues to provide the<br />

necessary services to the community are exploited.<br />

Threats<br />

As per the previous year’s SWOT analysis, land claims are a huge risk for the municipality. It is therefore<br />

crucial that a sound relationship exist between the municipality, the community and traditional leaders to<br />

ensure that land, when restituted is utilized in the best way possible. Co-operation with traditional leaders<br />

182


in this regard is very important and also to ensure that land is not utilized for purposes that it is not<br />

intended to. Negative economic growth and poverty go hand in hand and strategies and plans should be<br />

put in place to ensure that economic growth is speeded up to alleviate poverty. It is also important to<br />

ensure that planning is done according to the SDF to ensure that aspects of nodes are addressed. The<br />

municipality must ensure that economic and social infrastructure be provided for sustainable development<br />

within the municipal area. Accessibility is an identified weakness in that the area is not accessible to all and<br />

the development of the Integrated Transport Plan should receive preference. Due to mining activity,<br />

pollution (air and water) is a challenge and should be monitored and managed. Ba-Phalaborwa has a lack<br />

of water resources and cannot afford to have the little resource to be polluted. The landfill site needs to be<br />

rehabilitated and new landfill site established. In this regard the municipality has to negotiate with one of<br />

its strategic partners, Foskor, regarding the closure and rehabilitation of the site. A weakness that impacts<br />

greatly on the revenue stream of the municipality is the non payment for services. It is important that all<br />

services rendered be paid for by the community. Here the municipality has the responsibility to ensure<br />

that the services provided are of a standard that can enforce payment from the community. A great<br />

challenge for Ba-Phalaborwa is the fact that the budget for water lies with the district municipality. It is<br />

crucial for the municipality to, as identified as an opportunity, to become the water services authority to<br />

ensure independence from other entities for the provision and revenue stream of water. Strategies need<br />

to be put in place to improve the participation and co-operation of sector departments and traditional<br />

leaders in planning and therefore alignment of plans in the <strong>IDP</strong>.<br />

C3.3 Developmental Priorities<br />

In analysing the SWOT some areas were grouped together into definite “constraints and enablers”.<br />

Constraints are those areas which impede, and enablers are those areas which facilitate the municipality’s<br />

successful operation. It is also called Key Priority Focus areas. The process of identification of the pains<br />

and enablers forms an integral part of the development of the municipality’s priorities and objectives. It<br />

also contributes materially to the ongoing effective and efficient management of people and processes that<br />

have a direct impact on the quality of services delivered.<br />

The following constraints were identified in analysing the SWOT:<br />

Constraints Enablers<br />

Non-sustainable service delivery Integrated sustainable infrastructure<br />

183


Constraints Enablers<br />

Revenue generation Financial viability<br />

Lack of integrated planning Integrated planning<br />

Poor governance Good corporate governance<br />

Lack of community involvement Empowered communities<br />

Non sustainable development Integrated sustainable infrastructure and planning<br />

Environmental management Environmental sustainability<br />

Table C. 5: Constraints and Enablers<br />

In the review of its Strategic Intent, Ba-Phalaborwa Local Municipality considered the realities of its Status<br />

Quo Analysis and the developmental needs of the community, its internal SWOT Analysis, the constraints it<br />

faces as well as the identified priority focus areas above, while also aligning itself to the National and<br />

Provincial Development Priorities. Six strategic goals were identified for which short, medium and long<br />

term strategies were developed and will be discussed under strategic intent.<br />

C4. Strategic Intent<br />

C4.1 Background<br />

Section 152 (1) of the Constitution of the Republic of South Africa (1996) states that the objects of local<br />

government are:<br />

(a) to provide democratic and accountable government for local communities;<br />

(b) to ensure the provision of services to communities in a sustainable manner;<br />

(c) to promote social and economic development;<br />

(d) to promote a safe and healthy environment; and<br />

184


(e) to encourage the involvement of communities and community organisations in the matters of local<br />

government.<br />

Section 152(2) prescribes that a municipality must strive, within its financial and administrative capacity, to<br />

achieve the objects set out in subsection (1).<br />

Section 153 determines that to fulfill its developmental duties a municipality must-<br />

(a) structure and manage its administration and budgeting and planning processes to give priority to<br />

the basic needs of the community, and to promote the social and economic development of the<br />

community; and<br />

(b) participate in national and provincial development programmes.<br />

This implies that the local sphere of government should align its strategies and priorities to that of national<br />

and provincial government. A number of key documents and role players influence the setting of strategies<br />

and priorities within municipalities. These will be described in more detail below.<br />

The new Medium Term Strategic Framework (MTSF) which outlines the priorities, strategic objectives and<br />

targets of government for the period 2009 – 2014, indicates National Government’s Strategic intent is to<br />

improve the quality of life of South African communities. An extraction of these priorities as provided in a<br />

document issued by the Office of the Presidency: Together Doing more and Better Medium Term Strategic<br />

Framework: A framework to guide government’s programmes in the electoral mandate period (2009-<br />

2014) 8 , can be summarised as follows:<br />

Strategic Priority 1: Speeding up growth and transforming the economy to create decent work and<br />

sustainable livelihoods.<br />

Strategic Priority 2: Massive programme to build economic and social infrastructure.<br />

Strategic priority 3: Comprehensive rural development strategy linked to land and agrarian reform and<br />

food security.<br />

Strategic Priority 4: Strengthen the skills and human resource base.<br />

8 The Presidency Republic of South Africa. 2009. Together doing more and better. Medium term strategic<br />

framework. Available at: http://www.thepresidency.gov.za/docs/pcsa/planning/mtsf_july09.<strong>pdf</strong><br />

185


Strategic Priority 5: Improve the health profile of all South Africans<br />

Strategic Priority 6: Intensify the fight against crime and corruption.<br />

Strategic Priority 7: Build cohesive, caring and sustainable communities.<br />

Strategic Priority 8: Pursuing African advancement and enhanced international cooperation.<br />

Strategic Priority 9: Sustainable Resource Management and use.<br />

Strategic Priority 10: Building a developmental state including improvement of public services and<br />

strengthening democratic institutions.<br />

In addition to the above, the Office of the Presidency published the Green Paper on National Strategic<br />

Planning (2009) 9 which provides ideas on planning and co-ordination with the aim of achieving the<br />

identified national priorities. In relation to the above, the South African government is taking drastic steps<br />

toward improving strategic planning, performance and monitoring within all spheres of government.<br />

This was symbolised by its decision to establish the following two crucial institutions:<br />

• National Planning Commission – to do the overall planning and give direction to all spheres of<br />

government<br />

• Performance Monitoring, Evaluation and Administration in the Office of the Presidency – to<br />

monitor and evaluate the performance of government in all three spheres.<br />

At the onset of the fourth democratic government, The Department of Provincial and Local Government<br />

was re-structured as the Department of Co-operative Governance and Traditional Affairs (COGTA). In terms<br />

of the Green Paper COGTA is placed at the centre of Government as a key partner to the National Planning<br />

Commission and the Monitoring and Evaluation Unit in the Presidency. COGTA is further responsible for<br />

aligning its priorities to that of National Government. Its key priority areas as set out in the MTSF and<br />

Strategic Plan 2009-2014 10 include:<br />

9 The Presidency. Republic of South Africa. 2009. Green Paper: National Strategic Planning. Available at:<br />

http://www.thepresidency.gov.za.<br />

10<br />

Department Cooperative Governance and Traditional Affairs. 2009. Strategic Plan FY 2009-2014. Available at:<br />

http://www.thedplg.gov.za/index.php?option=com_docman&task=cat_view&gid=118&Itemid=27<br />

186


• Building the Developmental State in Provincial and Local Government that is efficient, effective and<br />

responsive.<br />

• Strengthen Accountability and Clean Government.<br />

• Accelerating Service Delivery and supporting the vulnerable.<br />

• Improving the Developmental Capability of the Institution of Traditional Leadership.<br />

• Fostering Development Partnerships, Social Cohesion and community mobilisation.<br />

Cabinet approved a comprehensive Local Government Turnaround Strategy (LGTAS) on the 2 nd of<br />

December 2009 11 .<br />

The five strategic objectives of the LGTAS are to:<br />

1. Ensure that municipalities meet basic needs of communities. This implies that an environment is<br />

created, support provided and systems built to accelerate quality service delivery within the<br />

context of each municipality’s conditions and needs;<br />

2. Build clean, responsive and accountable local government. Make sure that systems and structures<br />

and procedures are developed and enforced to deal with corruption, maladministration and ensure<br />

that municipalities communicate and account more to communities;<br />

3. Improve functionality, performance and professionalism in municipalities. Ensure that the core<br />

administrative and institutional systems are in place and are operational to improve performance;<br />

4. Improve national and provincial policy, support and oversight to local government.; and<br />

5. Strengthen partnerships between local government, communities and civil society. Ensure that<br />

communities and other development partners are mobilized to partner with municipalities in<br />

service delivery and development.<br />

11 Department Cooperative Governance and Traditional Affairs’ Local Government Turnaround Strategy, November<br />

2009. Available at: http://www.dplg.gov.za/index.php?option=com_docman&task=doc_download&gid=476<br />

187


In response to the national priorities, the Limpopo Department of Local Government and Housing has also<br />

aligned their priorities and objectives to that of National Government as contained in the Provincial<br />

Employment Development and Growth Plan. These priorities include:<br />

Creating decent work and sustainable livelihoods by way of competitive industrial cluster<br />

promotion, infrastructure construction, and various national development programmes.<br />

Improving the quality of life of citizens through effective education (including skills development),<br />

reliable health care, alert policing, comfortable housing, social grants and sport, with specific<br />

emphasis on their own participation in these processes.<br />

Promoting rural development, food security and land reform in order to spread the benefits of<br />

economic growth beyond the urban areas.<br />

Raising the effectiveness and efficiency of the developmental state by way of effective organisation<br />

structuring and recruiting, targeted training and the building of a culture of service and<br />

responsibility, integrated development management; and co-operation between all organisations<br />

in the development process.<br />

Giving specific attention and allocate sufficient resources to the high-priority challenges of:<br />

Regional Co-operation<br />

Sustainable Development and Climate Change<br />

Black Economic Empowerment<br />

The Informal Economy<br />

12 Cabinet approved government performance monitoring and evaluation system and the management for<br />

outcomes. This includes 12 outcomes that collectively address the main strategic priorities of government.<br />

Outcome 9, “A responsive, accountable, effective and efficient local government system,” specifically deals<br />

with local government and also needs to be aligned and integrated in other national, provincial, district<br />

priorities and strategies.<br />

12 Guide to the outcomes approach, Version: 1 June 2010<br />

188


13 The Delivery Agreement for Outcome 9, identifies the following 7 outputs with sub outputs that are linked<br />

to Outcome 9 and are as follows:<br />

Output 1: Implement a differentiated approach to municipal financing, planning and support<br />

• Policy framework for differentiation<br />

• More autonomy to six metro's and top 21 municipalities in respect of infrastructure and housing<br />

delivery<br />

• A focused intervention for clearly defined smaller municipalities<br />

Output 2: Improved access to basic services<br />

• Increased access to basic services<br />

• Bulk infrastructure fund established<br />

• Established special purpose vehicle<br />

Output 3: Implement the community work programme and cooperatives supported<br />

• Job creation supported through the community work programme<br />

• Job creation supported through the establishment of cooperatives where feasible<br />

Output 4: Actions supported by the human settlement outcomes<br />

• Increased densities in Metro's and large town supported<br />

• Land acquisition for low income and affordable housing supported<br />

• Informal settlements in 45 priority municipalities upgraded<br />

Output 5: Deepened democracy through a refined ward committee model<br />

• Review and strengthen the legislative framework for Ward Committees and community<br />

participation<br />

• Support measures to ensure that 90% of ward are fully functional by 2014<br />

Output 6: Improved municipal financial and administrative capacity<br />

13 Delivery Agreement for Outcome 9, 30 September 2010<br />

189


• Improved audit outcomes of municipalities<br />

• Reduced municipal debt<br />

• Municipal overspending on opex reduced<br />

• Municipal under spending on capex reduced<br />

• Municipalities spending less than 5% of opex on repairs and maintenance reduced<br />

• Improved administrative and human resource management practices<br />

Output 7: Single window of coordination<br />

• Review local government legislation<br />

• Coordinated support, monitoring and intervention in provinces and municipalities<br />

The alignment of the above-mentioned priorities with that of the Ba-Phalaborwa Local Municipality is<br />

outlined later in this Strategic Plan in the form of a matrix.<br />

C4.1 Vision<br />

A vision statement is the picture of an organisation in the future; it is the organisation’s inspiration and the<br />

framework for all strategic planning. The vision statement answers the question “Where do we want to<br />

go?” When creating a vision statement, dreams and hopes for the organisation is articulated, it reminds<br />

the organisation of what it is trying to build. It focuses on the organisation’s future. A vision statement<br />

does not tell you how you are going to get there, but it set the direction for the organisation’s strategic and<br />

business planning. Unlike a mission statement, the vision statement is for the organisation and its<br />

employees, not for customers and clients.<br />

The vision was confirmed as relevant and no amendments were made:<br />

190


C4.2 Mission<br />

“Best tourist destination in Limpopo by 2020”<br />

SLOGAN<br />

The Home of Marula and Wildlife Tourism<br />

A mission statement is a brief description of an organisation’s fundamental purpose. It answers the<br />

question: “Why do we exist?” It articulates the organisation’s purpose for both those in the organisation<br />

and for the public. Ba-Phalaborwa’s mission addresses the objects of local government as stipulated in<br />

Section 152 of the Constitution: Democratic and accountable governance; sustainable services; social and<br />

economic development; safe and healthy environment; and community involvement. It also supports the<br />

key provisions of the Systems Act that are to: “provide for the core principles, mechanisms and processes<br />

that are necessary to enable municipalities to move progressively towards the social and economic<br />

upliftment of local communities and ensure universal access to essential services that is affordable to all.”<br />

The mission was confirmed with replacement of the fourth bullet to change from “To build the mining<br />

industry for economic growth”<br />

• To ensure financial viability, sound administration and accountable governance for investor<br />

attractiveness<br />

• To render all stakeholders with quality and affordable infrastructure and services for enhancing a<br />

safe and better life for all<br />

• To manage the environment for future sustainable economic growth<br />

• To promote and support mining and agricultural industries for economic growth<br />

• To position Ba-Phalaborwa as a tourism destination of choice<br />

191


C4.3 Values<br />

Values are qualities that are considered worthwhile, they represent the municipality’s highest priorities and<br />

deeply held driving forces. It represents how the municipality will value its customers, suppliers and<br />

internal community and guide the people in the municipality towards the achievement of the mission and<br />

ultimately the vision.<br />

The values were confirmed with one addition, “Effectiveness”:<br />

• Efficiency and effectiveness<br />

• Accountability<br />

• Innovation and creativity<br />

• Professionalism and hospitality<br />

• Transparency and fairness<br />

• Continuous learning<br />

• Conservation conscious<br />

C4.4 Strategy Map<br />

A strategy map is a picture of the strategy of the municipality. It depicts the objectives in support of the<br />

strategy in terms of different perspectives, namely the learning and growth, institutional, the financial and<br />

the customer perspectives. This step in strategy formulation acts as the integration of strategy and<br />

operational planning. The following are the most important benefits of developing a strategy map:<br />

• It offers a differentiated customer value proposition;<br />

• It focuses on the most important institutional processes that need to be addressed;<br />

• It combines a growth strategy as well as a productivity strategy to be sustainable;<br />

• It creates a foundation to be innovative;<br />

• It focuses on both the tangible as well as intangible aspects; and<br />

• It forces change- to do things differently.<br />

The strategy map leads to the development of scorecards at different levels that will be used as the<br />

measurement and management tool to ensure achievement of the vision, mission and objectives of the<br />

192


strategy. In this way the district municipality can ascertain whether it has made any progress towards<br />

attainment of its strategies and the objectives.<br />

The following is a diagrammatical presentation of the strategy map:<br />

STRATEGIC PERSPECTIVES<br />

Institutional Finances Community<br />

Processes<br />

Satisfaction<br />

Learning<br />

and Growth<br />

Figure 1: Strategy Map<br />

Best Tourist destination in Limpopo by 2020<br />

The Home of Marula and Wildlife Tourism<br />

Economic and<br />

Tourism<br />

Development and<br />

Growth<br />

Integrated<br />

sustainable<br />

infrastructure and<br />

services<br />

Environmental<br />

sustainability<br />

Enhance<br />

stakeholder<br />

involvement<br />

Developmental and<br />

performance<br />

orientated planning<br />

Attract, retain<br />

and build human<br />

capital<br />

Financial Viability<br />

Advance Good<br />

Corporate<br />

Governance<br />

The strategy map as shown above identifies the objectives that the Ba-Phalaborwa Local Municipality will<br />

aim to achieve. The strategy map clearly indicates the two different strategies - growth and excellence –<br />

through the colours used for the different strategic objectives (yellow indicates the Growth Strategy and<br />

green indicates the Excellence Strategy). A combination of these colours means that those objectives are<br />

focussing upon both growth and development.<br />

193


1.1. Strategic Objectives<br />

The strategic objectives were reviewed in line with the <strong>IDP</strong> implementation report, SWOT, constraints and<br />

enablers and also measured against the NSDP, PGDS, Green Paper on National Planning, Local Government<br />

Turn Around Strategy and Outcome 9, to ensure alignment and integration of priorities of all three spheres<br />

of government.<br />

Each of the strategic objectives in the strategy map are described in more detail below:<br />

Specific focus on the Learning and Growth Perspective as point of departure is provided.<br />

To attract, retain<br />

and build human<br />

capital.<br />

This is a basic need that requires the municipality to focus effort and resources on<br />

programmes and projects to attract talent, develop employees and ensure that<br />

the best human capital is retained. Included in the retention of the best human<br />

capital, it is important that due regard be given to the strength “Institutional<br />

knowledge” on how the municipality is ensuring that institutional knowledge be<br />

kept within the municipality and transferred to other employees. This objective<br />

will also assist the municipality to more effectively focus on the ‘bigger picture’<br />

and to achieve its ambitions.<br />

Focusing on attracting, developing and retaining the best human capital will enable the municipality to be<br />

better equipped and capacitated and thereby improve the institutional processes.<br />

Advance good<br />

corporate<br />

governance<br />

To enhance unqualified institutional management, institutional processes<br />

should be improved. Cooperative governance deals with policy<br />

implementation, audit, information and communication technology,<br />

intergovernmental relations which should be improved upon and<br />

strengthen. This will lead to open and transparent decision-making and<br />

sound governance practices throughout the municipality<br />

194


Developmental<br />

and performance<br />

orientated<br />

planning<br />

Integrated<br />

sustainable<br />

infrastructure and<br />

services<br />

Environmental<br />

sustainability<br />

All development should be aligned to the SDF to ensure that growth points<br />

are developed. All programmes and projects should be continuously<br />

monitored and evaluated to ensure that they contribute to the future<br />

growth and achievement of the “bigger picture” envisaged for the<br />

municipal area.<br />

Urgent attention needs to be paid to the provision of infrastructure and<br />

services (as per the constitutional requirements) to improve the<br />

accessibility of services to all communities within the municipal area. This<br />

will include, basic services, roads, sports fields, community halls, libraries<br />

and rending of services such as traffic and licensing, safety and security and<br />

the provision of cemeteries<br />

Environmental sustainability must receive due consideration. Ba-<br />

Phalaborwa has scarce water resources, therefore special attention should<br />

be given to the conservation and management of water resources. Due to<br />

the mining activities, water and air pollution should be monitored and<br />

assessed continuously and mitigating actions taken to ensure management<br />

of pollution. Together with this, a great challenge for Phalaborwa is the<br />

establishment of a new landfill site and the closure and rehabilitation of the<br />

current landfill site. The development of parks should also be addressed<br />

under this objective<br />

Corporate governance, sustainable developmental and performance oriented planning, integrated<br />

sustainable infrastructure and services and environmental sustainability will advance the utilisation and<br />

allocation of financial resources.<br />

Economic and<br />

tourism<br />

development and<br />

growth<br />

The best way to alleviate poverty, curb unemployment and address social<br />

problems is to ensure that there are enough jobs so that everybody in the<br />

community can earn a living. Ba-Phalaborwa has various projects and initiatives<br />

to alleviate poverty and stimulate economic growth. Ba-Phalaborwa’s location<br />

has established it as developmental and economic node in tourism, mining,<br />

195


agriculture and a service. The aim with this objective is to ensure that all<br />

community members can participate and share in the growing economy. The<br />

Ba-Phalaborwa Sustainable Development Initiative will go a long way in ensuring<br />

that the poorest communities are included and benefitting through economic<br />

growth within the municipal area.<br />

Financial Viability Weaknesses identified under this objective are financial viability, financial<br />

Enhance<br />

stakeholder<br />

involvement<br />

1.2. Strategic Alignment<br />

management, audit history, personnel budget, revenue collection and locked<br />

finances, maintenance budget, failure to maximise revenue collection.<br />

Strategies have been developed to ensure that challenges regarding financial<br />

viability are addressed<br />

One of the greatest challenges in municipalities is to involve the community in<br />

activities of the municipality and to let the voice of the community be heard.<br />

Two programmes where this can be achieved are through public participation<br />

and ward committees. It is therefore crucial for the municipality to ensure that<br />

ward committees are 100% functional and that the community’s voice be heard<br />

through public participation. Customer relations management needs to be<br />

improved i.e. communication to communities and the customer care desk.<br />

Complaints by the community need to be tracked and reported back to the<br />

community. Programmes to strengthen community empowerment are<br />

HIV/Aids, Youth, Gender, Disability, Arts and Culture, Sports and Recreation,<br />

Libraries and Indigent Support<br />

Ten strategic priority areas which are aligned to the Vision 2014 have been identified by national<br />

government within the MTSF to create a platform for the future development of South Africa as a whole.<br />

Based on these priority areas, the COGTA has identified their own priority areas that will guide national,<br />

local and provincial governance. COGTA has also developed the Local Government Turnaround Strategy<br />

(LGTAS) and identified five Strategic Objectives in addressing the cause and effect of challenges within local<br />

196


government. The Limpopo Province has identified strategic objectives aligned to these priorities. Ba-<br />

Phalaborwa Local Municipality has identified their strategic objectives in response to the strategies<br />

identified by the Limpopo Province. Municipal programmes are translated to these objectives and<br />

subsequently to national and provincial strategic priorities and objectives.<br />

The matrix below indicates the relation between the strategic objectives of Ba-Phalaborwa Local<br />

Municipality and the national and provincial priority areas:<br />

197


Strategic Alignment:<br />

PERSPECTIVE MTSF COGTA MTAS LEGDP (PGDS) Outcome 9 BA-<strong>PHALABORWA</strong><br />

Community<br />

Satisfaction<br />

Financial<br />

Institutional<br />

Improve the health<br />

profile of society<br />

Building of<br />

cohesive, caring<br />

and sustainable<br />

communities<br />

Speed up<br />

economic growth<br />

and transform the<br />

economy to create<br />

decent work and<br />

sustainable<br />

livelihoods.<br />

Fostering<br />

Development<br />

Partnerships,<br />

Social Cohesion<br />

and community<br />

mobilisation<br />

Strengthen<br />

partnerships<br />

between local<br />

government,<br />

communities and<br />

civil society<br />

Access to quality<br />

education<br />

Improved health<br />

care<br />

Ensuring more<br />

inclusive economic<br />

growth, decent<br />

work and<br />

sustainable<br />

livelihoods<br />

Deepened democracy<br />

through a refined<br />

ward committee<br />

model<br />

Implement the<br />

community work<br />

programme and<br />

cooperatives<br />

supported<br />

Improved municipal<br />

financial capacity<br />

Implement a<br />

differentiated<br />

approach to municipal<br />

financing, planning<br />

and support<br />

Improved access to<br />

basic services<br />

Enhance<br />

stakeholder<br />

involvement<br />

Economic and<br />

tourism<br />

development and<br />

growth<br />

Financial viability<br />

Developmental and<br />

performance<br />

orientated planning


PERSPECTIVE MTSF COGTA MTAS LEGDP (PGDS) Outcome 9 BA-<strong>PHALABORWA</strong><br />

Institutional<br />

Programmes to<br />

build economic<br />

and social<br />

infrastructure<br />

Comprehensive<br />

rural development<br />

strategy linked to<br />

land and agrarian<br />

reform and food<br />

security<br />

Sustainable<br />

resource<br />

management and<br />

use<br />

Building of a<br />

developmental<br />

state including<br />

improving of public<br />

services and<br />

strengthening<br />

democratic<br />

Accelerating<br />

service delivery<br />

and supporting the<br />

vulnerable<br />

Building the<br />

Developmental<br />

State in Provincial<br />

and Local<br />

Government that is<br />

efficient, effective<br />

and responsive<br />

Ensure that<br />

municipalities<br />

meet the basic<br />

needs of<br />

communities<br />

Build clean,<br />

responsive and<br />

accountable local<br />

government<br />

Provision of<br />

economic and<br />

social<br />

infrastructure<br />

Cohesive and<br />

sustained<br />

communities<br />

Rural<br />

development, food<br />

security and land<br />

reform<br />

Sustainable<br />

resource<br />

management and<br />

use<br />

A developmental<br />

state including<br />

improvement of<br />

public services<br />

Improved access to<br />

basic services<br />

Actions supportive of<br />

human settlement<br />

outcomes<br />

Single Window of<br />

coordination<br />

Integrated<br />

sustainable<br />

infrastructure and<br />

services<br />

Developmental and<br />

performance<br />

orientated planning<br />

Environmental<br />

sustainability<br />

Good corporate<br />

governance<br />

199


PERSPECTIVE MTSF COGTA MTAS LEGDP (PGDS) Outcome 9 BA-<strong>PHALABORWA</strong><br />

Institutional<br />

institutions<br />

Intensify the fight<br />

against crime and<br />

corruption<br />

Pursuing African<br />

advancement and<br />

enhanced<br />

international<br />

cooperation<br />

Strengthen<br />

Accountability and<br />

Clean Government<br />

Improving the<br />

Developmental<br />

Capability of the<br />

Institution of<br />

Traditional<br />

Leadership.<br />

Improve<br />

functionality,<br />

performance and<br />

professionalism in<br />

municipalities<br />

Improve national<br />

and provincial<br />

policy, support and<br />

oversight to local<br />

government<br />

Fighting crime and<br />

corruption<br />

Creation of a<br />

better Africa and a<br />

better world<br />

Good Corporate<br />

Governance<br />

200


PERSPECTIVE MTSF COGTA MTAS LEGDP (PGDS) Outcome 9 BA-<strong>PHALABORWA</strong><br />

Learning and<br />

Growth<br />

Strengthening of<br />

skills and human<br />

resource base<br />

Table C. 6: Strategic Alignment Matrix<br />

Improved<br />

administrative<br />

capacity<br />

Attract, retain and<br />

build human<br />

capital<br />

201


Local Government: Municipal Performance Regulations R805(2006) prescribes five Key Performance Areas<br />

that relates to the Five Year Local Government Strategic Agenda. The aim of these Performance Areas is to<br />

facilitate ease of all Government planning and performance management . The table below indicates how<br />

the Ba-Phalaborwa Local Municipality’s Strategic Objectives was aligned to the five Key Performance Areas.<br />

Strategic Agenda KPA Strategic Objectives<br />

Municipal Transformation and<br />

Organisational Development<br />

Attract, retain and build human capital<br />

Developmental and performance orientated planning<br />

Basic Service Delivery Integrated sustainable infrastructure and services<br />

Environmental sustainability<br />

Local Economic Development Economic and tourism development and growth<br />

Municipal Financial Viability and<br />

Management<br />

Financial viability<br />

Good Governance and Public Participation Advance good corporate governance<br />

Enhance stakeholder involvement<br />

Table C. 7: STRATEGIC OBJECTIVES AND STRATEGIC AGENDA KPA’S<br />

The following strategies were developed per strategic goal/outcome:


Strategic<br />

Goal<br />

Financial Viability<br />

Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />

Revenue Management<br />

Integrated Financial<br />

management solution<br />

Asset management<br />

Review and implement revenue<br />

enhancement strategy<br />

Develop and implement service<br />

demand management strategy<br />

Implement financial management<br />

system<br />

Develop and implement asset<br />

management plan<br />

Unbundle infrastructure asset<br />

(water, sanitation and electricity)<br />

Five year financial plan Develop and implement a five year<br />

financial plan<br />

Financial risk management<br />

and internal controls<br />

Develop and implement financial risk<br />

management strategy<br />

Develop and implement internal<br />

control procedures<br />

Unqualified audit opinion Develop and implement an audit<br />

action plan to address issues raised<br />

in the audit report<br />

MFMA implementation Develop and implement financial<br />

delegations<br />

Supply chain management<br />

Review and implement revenue<br />

enhancement strategy<br />

Review and implement service demand<br />

management strategy<br />

Review and implement revenue<br />

enhancement strategy<br />

Review and implement service demand<br />

management strategy<br />

Maximise integrated system utilisation Improve system utilisation<br />

Review and implement asset<br />

management plan<br />

Review and implement a five year<br />

financial plan<br />

Review and implement financial risk<br />

management strategy<br />

Review and implement internal control<br />

procedures<br />

Develop and implement an audit action<br />

plan to address issues raised in the<br />

audit report<br />

Review and implement financial<br />

delegations<br />

Integrate asset management plan with<br />

GIS<br />

Review and implement a five year<br />

financial plan<br />

Review and implement financial risk<br />

management strategy<br />

Review and implement internal control<br />

procedures<br />

Develop and implement an audit action<br />

plan to address issues raised in the audit<br />

report<br />

Review and implement financial<br />

delegations<br />

Improve MFMA compliance Full MFMA compliance Full MFMA compliance<br />

Inventory management plan<br />

Develop and implement fleet<br />

management plan<br />

Financial accounting Develop and implement cash flow<br />

management plan<br />

Review and implement fleet<br />

management plan<br />

Review and implement cash flow<br />

management plan<br />

Review and implement fleet<br />

management plan<br />

Review and implement cash flow<br />

management plan<br />

Financial accounting Use financial ratios to management Use financial ratios to management Use financial ratios to management


Strategic<br />

Goal<br />

Good Corporate Governance<br />

Go<br />

od<br />

Cor<br />

por<br />

Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />

Electronic records<br />

management<br />

Complaint management<br />

system<br />

financial performance financial performance financial performance<br />

Training of employees on Munadmin<br />

Development and implementation of<br />

the complaint management system<br />

strategy.<br />

Internal Communication Development and implementation of<br />

the internal communication strategy.<br />

Marketing & branding Development and implementation of<br />

marketing and branding plan<br />

Implementation of electronic records<br />

keeping<br />

Review and implementation of the<br />

complaint management system<br />

strategy.<br />

Review and implementation of the<br />

internal communication strategy<br />

Review and implementation of<br />

marketing and branding plan<br />

Implementation of electronic records<br />

keeping<br />

Review and implementation of the<br />

complaint management system strategy.<br />

Review and implementation of the<br />

internal communication strategy<br />

Internal Auditing Governance audit Governance audit Governance audit<br />

Strategic Planning<br />

Human resource<br />

management<br />

Review and implementation of marketing<br />

and branding plan<br />

Auditing strategic risks Auditing strategic risks Auditing strategic risks<br />

<strong>IDP</strong> review process <strong>IDP</strong> review process <strong>IDP</strong> review process<br />

Develop, review and adopt<br />

outstanding sector plans<br />

Integration of all sector plans Integrated development planning &<br />

management<br />

PMS process PMS process PMS process<br />

PMS policy review and<br />

implementation.<br />

Development & implementation<br />

public participation strategy.<br />

PMS policy review and implementation. PMS policy review and implementation.<br />

Review & implementation public<br />

participation strategy.<br />

Review & implementation public<br />

participation strategy.<br />

Auditing and review of the structure. Review and implement the structure Auditing, review and implement of the<br />

structure.<br />

204


Strategic<br />

Goal<br />

Economic and Tourism<br />

Development and<br />

Growth<br />

Econo<br />

mic<br />

and<br />

Touris<br />

Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />

Review and implementation of<br />

policies and procedures<br />

Implement, assess and review the<br />

improvement in the rating tool<br />

(employee satisfaction survey)<br />

Align & implement WSP to<br />

competency gaps<br />

Contract management Update and manage the contract<br />

register<br />

Training on code of conduct for<br />

employees and terms and conditions<br />

of employment<br />

Risk Management Conduct and implement strategic<br />

risk assessment<br />

Local Economic<br />

Development<br />

Review and implementation of policies<br />

and procedures<br />

Implement, assess and review the<br />

improvement in the rating tool<br />

(employee satisfaction survey)<br />

Competency gap re-assessment and realignment<br />

and implementation<br />

Update and manage the contract<br />

register<br />

Training on code of conduct for<br />

employees and terms and conditions of<br />

employment<br />

Conduct and implement strategic risk<br />

assessment<br />

Review and implementation of policies<br />

and procedures<br />

Improve the level/quality of service to<br />

the communities<br />

Raising productivity<br />

Update and manage the contract register<br />

Training on code of conduct for<br />

employees and terms and conditions of<br />

employment<br />

Conduct and implement strategic risk<br />

assessment<br />

Review the LED Strategy Implementation of the LED Strategy Implementation of the LED Strategy<br />

Revival of the LED Forum Monitor and report on the functionality<br />

of the LED Forum<br />

Develop an Investment Attraction<br />

Plan<br />

Implementation of the Marula<br />

strategy<br />

Tourism Development Review the tourism development<br />

strategy<br />

Implementation of the Investment<br />

Attraction Plan<br />

Monitor and report on the functionality<br />

of the LED Forum<br />

Implementation of the Investment<br />

Attraction Plan<br />

Implementation of the Marula strategy Review of the Marula strategy<br />

Implementation of the tourism<br />

development strategy<br />

Implementation of the tourism<br />

development strategy<br />

205


Strategic<br />

Goal<br />

Integrated sustainable infrastructure and Services<br />

Integr<br />

ated<br />

sustai<br />

nable<br />

Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />

Demand Management<br />

- Water<br />

- Roads<br />

- Electricity<br />

- Cemetery<br />

- Infrastructure<br />

- Housing<br />

Develop the tourism marketing plan Implementation of the tourism<br />

marketing plan<br />

Develop services delivery demand<br />

management plan<br />

Water Service Authority Signing of SLA- MOU with MDM<br />

Application to DWAF<br />

Infrastructure Master Plan Development of infrastructure<br />

master plan<br />

- Electricity<br />

- Roads and storm -<br />

water<br />

- IT<br />

- Parks<br />

- Cemeteries<br />

Review and adopt draft<br />

Infrastructure master Plan<br />

Review the tourism marketing plan<br />

Implementation of plan Review Demand Service Management<br />

Plan<br />

Develop water services master plan Review and expand services<br />

Implementation and Improved water<br />

services provision<br />

Implementation Review of plan<br />

Waste Removal Services Household collection service to all Increased collection frequency Increased waste minimization<br />

206


Strategic<br />

Goal<br />

Developmental and<br />

Performance Orientated<br />

Planning<br />

Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />

Vandalism of<br />

Infrastructure<br />

(Illegal connection)<br />

Awareness<br />

Monitoring<br />

Enforcement of By-laws<br />

Quality Assurance Development of SLA with standards<br />

and specifications<br />

IGR-<br />

Sector departments<br />

Engage and Participate in the sector<br />

Dept (one on one) on <strong>IDP</strong> and sector<br />

departments plans. Include sector<br />

Dept in the <strong>IDP</strong> process plan<br />

EPWP Policy Development and implementation of<br />

a EPWP policy<br />

Housing provision Identification of housing<br />

beneficiaries and application for the<br />

housing accreditation<br />

Tribal Authorities - Enforcement of bylaws?<br />

-Include the tribal authority’s plans<br />

in <strong>IDP</strong><br />

Continuous enforcement and<br />

monitoring<br />

Enforcement and monitoring<br />

(Standards and specifications)<br />

Continuous enforcement and monitoring<br />

Continuous enforcement and monitoring<br />

(Standards and specifications)<br />

Continuous engagements Continuous engagements<br />

Review housing strategy Implementation of the housing strategy<br />

Land Use Management Verify land uses and ownership Managing land use and ownership Managing land use and ownership<br />

SDF<br />

Infill development in municipal<br />

vacant land<br />

Implementation of the SDF Reviewal of the SDF<br />

207


Strategic<br />

Goal<br />

Environmental<br />

Sustainability<br />

Environmental sustainability<br />

Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />

Demarcation of sites Demarcation of sites Demarcation of sites<br />

Formalisation of informal<br />

settlements<br />

GIS Capturing of data and obtaining of<br />

software<br />

Waste Management<br />

Environmental<br />

Management<br />

Environmental<br />

Management<br />

Formalisation of informal settlements<br />

Capturing and linkage with other<br />

departments<br />

Landfill/recycling site Establish drop off centres<br />

Continuous update<br />

Rehabilitation of old sites Hand over to beneficiaries<br />

Establishment of a land fill site<br />

Obtain Environmental Management<br />

Plan and Framework<br />

Monitoring and reporting pollution Adapt the Environmental Management<br />

Plan and Framework<br />

Expansion of Phalaborwa<br />

environmental committee<br />

Green economy programme<br />

Greening and beautification (global<br />

warming)<br />

Alien plant and pest control<br />

Strategic partnerships<br />

Parks, gardens and open space<br />

maintenance<br />

Review State of Environment report Establish Environmental Management<br />

unit<br />

Sustainable use, assistance and<br />

preservation of game farms (land claims)<br />

Implement EMP recommendations Guidance on alternative use of land<br />

claimed<br />

208


Strategic<br />

Goal<br />

Enhanced stakeholder<br />

involvement<br />

Priority Focus Area Short Term Strategy Medium Term Strategy Long Term Strategy<br />

Municipal Development<br />

Charter<br />

Advisory Board and<br />

Development Clusters<br />

A Comprehensive<br />

Stakeholder Involvement<br />

Strategy<br />

Community involvement and<br />

education<br />

Development, adoption and<br />

execution of implementation plan<br />

Establishment of key development<br />

clusters under the auspices of the<br />

Advisory Board<br />

Development of a Comprehensive<br />

Stakeholder Involvement Strategy<br />

and implementation plan<br />

Table C. 8: Short, Medium, Long Term Strategies per strategic goal<br />

Execution and review of<br />

implementation plan<br />

Consolidation and reinforcement of the<br />

Advisory Board and development<br />

clusters<br />

Review of the Development Charter,<br />

implementation plan<br />

Review of the Advisory Board and<br />

development clusters<br />

Implementation of the strategy Review and implementation of the<br />

Strategy<br />

209


1.3. Strategic Scorecard<br />

In the development of the strategic scorecard, the next step is to establish the end result, what the<br />

municipality wants to achieve with the objective. It is important to always have the end in mind when<br />

setting measurements and targets for objectives. After the results were established, measures and targets<br />

were set and projects identified.<br />

• Results are the ultimate impact that we would like to see with regards to the objective<br />

• Key Performance indicators are measurable results of the objectives, projects and programmes.<br />

• Strategies are unique and sustainable ways though which the municipality creates value<br />

• Projects are the specific initiatives undertaken by the municipality to support the objective.<br />

The purpose of the Strategic Scorecard is for Council and the Municipal Manager to focus on the real<br />

strategic measurements and projects that must be attained and implemented during the course of the next<br />

financial year. Strategic Key Performance Indicators are the measurements identified that will enable<br />

Council to ascertain whether the Municipality is moving towards the attainment of the strategic objectives<br />

as contained in the strategy map. Strategic projects are identified as those critical projects that the<br />

Municipality must implement to address the constraints as indicated in the table reflecting constraints and<br />

priority focus areas. Strategic projects are also projects that were identified as a “quick win” option to pave<br />

the way for implementation of other initiatives or projects.<br />

The strategic scorecard is indicated on the following page. Strategies as developed will be cascaded to<br />

operational plans and projects to facilitate implementation of strategic direction of the municipality.<br />

210


Objective Outcome Strategic Key<br />

Performance<br />

Indicator<br />

Enhance<br />

stakeholder<br />

involvemen<br />

t<br />

Economic<br />

and<br />

tourism<br />

developme<br />

Participatory<br />

communities<br />

An inclusive<br />

growing<br />

economy<br />

% issues<br />

raised at<br />

ward<br />

committees<br />

processed<br />

through<br />

Portfolio<br />

Committees<br />

%<br />

development<br />

clusters<br />

established (<br />

8 clusters)<br />

% queries<br />

from<br />

customers<br />

tracked<br />

three weeks<br />

after receipt<br />

%<br />

procurement<br />

from local<br />

enterprises<br />

Five Year<br />

Strategic<br />

Intent<br />

(2006-<br />

<strong>2011</strong>)<br />

All ward<br />

committee<br />

s are<br />

functioning<br />

effectively<br />

As per Ba-<br />

Phalaborw<br />

a<br />

objectives<br />

As per Ba-<br />

Phalaborw<br />

a<br />

objectives<br />

As per Ba-<br />

Phalaborw<br />

a<br />

objectives<br />

Statu<br />

s<br />

2010<br />

/<br />

<strong>2011</strong><br />

Target<br />

<strong>2011</strong>/<br />

2012<br />

Target<br />

Sept<br />

2010<br />

Target<br />

Dec<br />

2010<br />

Target<br />

Mar<br />

<strong>2011</strong><br />

Target<br />

June<br />

<strong>2011</strong><br />

Target<br />

2012<br />

Target<br />

2013<br />

Target<br />

2014<br />

Target<br />

2015<br />

100% 100% 100% 100% 100% 100% 100% 100% 100%<br />

211<br />

Strategic<br />

Projects /<br />

Initiatives<br />

YR 1<br />

100% 25% 50% 75% 100% 100% 100% 100% 100% Ba-<br />

Phalabor<br />

wa<br />

Developm<br />

ent<br />

Charter<br />

100% 100% 100% 100% 100% 100% 100% 100% 100% Complain<br />

ts<br />

Managem<br />

ent<br />

System<br />

40% 40% 40% 40% 40% 40% 40% 40% 40% Review of<br />

LED<br />

Strategy<br />

Budge<br />

t<br />

<strong>2011</strong>/<br />

2012


Objective Outcome Strategic Key<br />

Performance<br />

Indicator<br />

nt and<br />

growth<br />

Economic<br />

and<br />

tourism<br />

developme<br />

nt and<br />

growth<br />

Financial<br />

viability<br />

An inclusive<br />

growing<br />

economy<br />

Financially<br />

sustained<br />

institution<br />

%<br />

infrastructur<br />

e projects<br />

that are<br />

EPWP<br />

# jobs<br />

created<br />

through<br />

municipal<br />

initiatives<br />

% revenue<br />

received /<br />

billed<br />

revenue<br />

% debt<br />

coverage<br />

% cost<br />

coverage<br />

% service<br />

debtors<br />

Five Year<br />

Strategic<br />

Intent<br />

(2006-<br />

<strong>2011</strong>)<br />

As per Ba-<br />

Phalaborw<br />

a<br />

objectives<br />

Halve<br />

unemploy<br />

ment b<br />

2014<br />

Implement<br />

ation of<br />

revenue<br />

enhanceme<br />

nt plan<br />

Financial<br />

sustainabili<br />

ty<br />

Financial<br />

sustainabili<br />

ty<br />

Financial<br />

sustainabili<br />

Statu<br />

s<br />

2010<br />

/<br />

<strong>2011</strong><br />

Target<br />

<strong>2011</strong>/<br />

2012<br />

Target<br />

Sept<br />

2010<br />

Target<br />

Dec<br />

2010<br />

Target<br />

Mar<br />

<strong>2011</strong><br />

Target<br />

June<br />

<strong>2011</strong><br />

308 250 63 126 189 250<br />

Target<br />

2012<br />

Target<br />

2013<br />

Target<br />

2014<br />

Target<br />

2015<br />

212<br />

Strategic<br />

Projects /<br />

Initiatives<br />

YR 1<br />

Review of<br />

Tourism<br />

Developm<br />

ent<br />

Strategy<br />

95% 75% 80% 85% 95% 95% 95% 95% 95% Review of<br />

Revenue<br />

Enhance<br />

ment<br />

Strategy<br />

133% 133% 133% 133% 133% 130% 125% 120% 115% Five Year<br />

Financial<br />

Plan<br />

100% 100% 100% 100% 100% 100% 100% 100% 100%<br />

153% 153% 153% 153% 153% 150% 145% 140% 135%<br />

Budge<br />

t<br />

<strong>2011</strong>/<br />

2012


Objective Outcome Strategic Key<br />

Performance<br />

Indicator<br />

Integrated<br />

sustainable<br />

infrastructu<br />

re and<br />

services<br />

All<br />

households<br />

have access<br />

to basic and<br />

other<br />

services<br />

GRAP<br />

compliant<br />

AFS<br />

% internal<br />

audit<br />

recommenda<br />

tions on SCM<br />

implemented<br />

%<br />

households<br />

connected to<br />

national grid<br />

- Phalaborwa<br />

Town<br />

%<br />

households<br />

to have<br />

access to at<br />

least once-aweek<br />

refuse<br />

removal<br />

services<br />

Five Year<br />

Strategic<br />

Intent<br />

(2006-<br />

<strong>2011</strong>)<br />

ty<br />

Unqualified<br />

audit by<br />

<strong>2011</strong><br />

As per Ba-<br />

Phalaborw<br />

a<br />

objectives<br />

Eradicate<br />

basic<br />

service<br />

backlogs by<br />

2014<br />

Eradicate<br />

basic<br />

service<br />

backlogs by<br />

2014<br />

Statu<br />

s<br />

2010<br />

/<br />

<strong>2011</strong><br />

67.0<br />

0%<br />

Target<br />

<strong>2011</strong>/<br />

2012<br />

Target<br />

Sept<br />

2010<br />

Target<br />

Dec<br />

2010<br />

Target<br />

Mar<br />

<strong>2011</strong><br />

Target<br />

June<br />

<strong>2011</strong><br />

Target<br />

2012<br />

Target<br />

2013<br />

Target<br />

2014<br />

Target<br />

2015<br />

100% 100% 100% 100% 100% 100% 100% 100% 100%<br />

100% 100% 100% 100% 100% 100% 100% 100% 100%<br />

213<br />

Strategic<br />

Projects /<br />

Initiatives<br />

YR 1<br />

100% 100% 100% 100% 100% 100% 100% 100% 100% Water<br />

Services<br />

Authority<br />

75% 75% 84% 91.5% 100% 100% Service<br />

Delivery<br />

Demand<br />

Managem<br />

ent Plan<br />

Budge<br />

t<br />

<strong>2011</strong>/<br />

2012


Objective Outcome Strategic Key<br />

Performance<br />

Indicator<br />

Environme<br />

ntal<br />

sustainabili<br />

ty<br />

Environme<br />

ntal<br />

sustainabili<br />

ty<br />

Clean and<br />

healthy<br />

communities<br />

Clean and<br />

healthy<br />

communities<br />

%<br />

households<br />

registered in<br />

Indigent<br />

Register with<br />

access to<br />

free basic<br />

water<br />

%<br />

households<br />

registered on<br />

Indigent<br />

Register with<br />

access to<br />

free basic<br />

electricity<br />

Rehabilitatio<br />

n of landfill<br />

site<br />

New landfill<br />

site<br />

established<br />

Five Year<br />

Strategic<br />

Intent<br />

(2006-<br />

<strong>2011</strong>)<br />

Ensure that<br />

all indigent<br />

households<br />

are<br />

supported<br />

Ensure that<br />

all indigent<br />

households<br />

are<br />

supported<br />

As per Ba-<br />

Phalaborw<br />

a<br />

objectives<br />

As per Ba-<br />

Phalaborw<br />

a<br />

objectives<br />

Statu<br />

s<br />

2010<br />

/<br />

<strong>2011</strong><br />

Target<br />

<strong>2011</strong>/<br />

2012<br />

Target<br />

Sept<br />

2010<br />

Target<br />

Dec<br />

2010<br />

Target<br />

Mar<br />

<strong>2011</strong><br />

Target<br />

June<br />

<strong>2011</strong><br />

Target<br />

2012<br />

Target<br />

2013<br />

Target<br />

2014<br />

Target<br />

2015<br />

100% 100% 100% 100% 100% 100% 100% 100% 100%<br />

100% 100% 100% 100% 100% 100% 100% 100% 100%<br />

100% 100% 100% 100% 100% 100%<br />

100% 100% 100% 100% 100% 100%<br />

214<br />

Strategic<br />

Projects /<br />

Initiatives<br />

YR 1<br />

Budge<br />

t<br />

<strong>2011</strong>/<br />

2012


Objective Outcome Strategic Key<br />

Performance<br />

Indicator<br />

Developme<br />

ntal and<br />

performanc<br />

e<br />

orientated<br />

planning<br />

Advance<br />

good<br />

corporate<br />

governance<br />

Attract,<br />

retain and<br />

build<br />

human<br />

capital<br />

Liveable<br />

neighbourho<br />

ods<br />

Corporate<br />

Governance<br />

Skilled and<br />

capacitated<br />

workforce<br />

Prevention<br />

of<br />

mushroomin<br />

g of informal<br />

settlements<br />

%<br />

compliance<br />

to<br />

<strong>IDP</strong>/PMS/Bu<br />

dget Process<br />

Plan<br />

Unqualified<br />

audit Report<br />

% of<br />

employees<br />

from<br />

previously<br />

disadvantage<br />

d groups<br />

Five Year<br />

Strategic<br />

Intent<br />

(2006-<br />

<strong>2011</strong>)<br />

As per Ba-<br />

Phalaborw<br />

a<br />

objectives<br />

As per Ba-<br />

Phalaborw<br />

a<br />

objectives<br />

Unqualified<br />

audit by<br />

<strong>2011</strong><br />

Annually<br />

achieve the<br />

targets set<br />

out in the<br />

municipalit<br />

y's EE plan<br />

Statu<br />

s<br />

2010<br />

/<br />

<strong>2011</strong><br />

Target<br />

<strong>2011</strong>/<br />

2012<br />

Target<br />

Sept<br />

2010<br />

Target<br />

Dec<br />

2010<br />

Target<br />

Mar<br />

<strong>2011</strong><br />

Target<br />

June<br />

<strong>2011</strong><br />

Target<br />

2012<br />

Target<br />

2013<br />

Target<br />

2014<br />

Target<br />

2015<br />

215<br />

Strategic<br />

Projects /<br />

Initiatives<br />

YR 1<br />

100% 100% 100% 100% 100% 100% 100% 100% 100% Housing<br />

Accredita<br />

tion<br />

100% 100% 100% 100% 100% 100% 100% 100% 100%<br />

100% n/a 100% n/a n/a 100% 100% 100% 100%<br />

Budge<br />

t<br />

<strong>2011</strong>/<br />

2012


Objective Outcome Strategic Key<br />

Performance<br />

Indicator<br />

Attract,<br />

retain and<br />

build<br />

human<br />

capital<br />

appointed in<br />

the three<br />

highest<br />

levels of<br />

management<br />

as per the<br />

approved EE<br />

plan (NKPI)<br />

% personnel<br />

budget<br />

allocated to<br />

skills<br />

development<br />

spent<br />

Five Year<br />

Strategic<br />

Intent<br />

(2006-<br />

<strong>2011</strong>)<br />

Achieve<br />

national<br />

norms and<br />

standards<br />

by 2014 in<br />

terms of<br />

the %<br />

budget to<br />

be spent on<br />

implementi<br />

ng the<br />

workplace<br />

skills plan<br />

Statu<br />

s<br />

2010<br />

/<br />

<strong>2011</strong><br />

Target<br />

<strong>2011</strong>/<br />

2012<br />

Target<br />

Sept<br />

2010<br />

Target<br />

Dec<br />

2010<br />

Target<br />

Mar<br />

<strong>2011</strong><br />

Target<br />

June<br />

<strong>2011</strong><br />

Target<br />

2012<br />

Target<br />

2013<br />

Target<br />

2014<br />

Target<br />

2015<br />

216<br />

Strategic<br />

Projects /<br />

Initiatives<br />

YR 1<br />

Budge<br />

t<br />

<strong>2011</strong>/<br />

2012


C5. Ba-Phalaborwa Turnaround Strategy<br />

The Department of Cooperative Governance and Traditional Affairs (CoGTA) compiled a State of the<br />

Local Government Report on Service Delivery. The report highlighted governance and service delivery<br />

challenges within municipality. It further identified five strategic objectives to guide municipalities in<br />

the development of their Turnaround Strategies, which are 14 :<br />

1. Ensure that municipalities meet the basic service needs of communities<br />

2. Build clean, effective, efficient, responsive and accountable local government<br />

3. Improve performance and professionalism in municipalities<br />

4. Improve national and provincial policy, oversight and support<br />

5. Strengthen partnerships between local government, communities and civil society<br />

The municipal Turnaround Strategy should be incorporated within the <strong>IDP</strong> process and adopted by<br />

Council with the <strong>IDP</strong>.<br />

Ba-Phalaborwa Municipality has developed its Turnaround Strategy which comprises the following table:<br />

14 Local Government Turnaround Strategy, November 2009<br />

217


C6: Ba-Phalaborwa Local Municipality Turnaround Strategy<br />

No.<br />

Priority Turn Around<br />

Focal Area<br />

1. Basic Service Delivery<br />

1.1 Access to water<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

1. Infrequent supply of<br />

water at: Gravelotte<br />

& all villages (11)<br />

2. Aged infrastructure<br />

(asbestos pipes) and<br />

no refurbishment<br />

plan for PHB,<br />

Lulekani &<br />

Namakgale<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

1. Functional<br />

Boreholes at<br />

Selwane,<br />

Mashishimale,<br />

Gravelotte<br />

2. Section of<br />

pipeline<br />

replaced on<br />

every financial<br />

Municipal<br />

Action<br />

1. Monitor the<br />

functionalit<br />

y of the<br />

boreholes<br />

2. PHB<br />

refurbished<br />

reticulation<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

1. MDM (WSA)to<br />

equip the<br />

boreholes<br />

2. MDM (WSA)<br />

must provide<br />

budget for<br />

rehabilitation<br />

45<br />

Human<br />

Resource<br />

allocated<br />

(-24 DWAE)<br />

218<br />

Budget<br />

Allocated Projected<br />

1. MDM<br />

2. MDM<br />

&<br />

BPM


No.<br />

Priority Turn Around<br />

Focal Area<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

1.2 Access to sanitation Existing sewer<br />

reticulation aged<br />

(asbestos) in PHB,<br />

Namakgale and Lulekani<br />

1.3 Access to electricity<br />

1. Electrification<br />

backlog of 3826<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

year<br />

Planning of N’kgale<br />

sewer treatment<br />

works upgrade &<br />

PHB pump station<br />

1. Electrify Kanana,<br />

Namakgale RDP,<br />

Ntswelemotse,<br />

Gardenview &<br />

Sebera<br />

Municipal<br />

Action<br />

line<br />

Replacement of<br />

sewer<br />

reticulation in<br />

PHB<br />

1. Apply for<br />

additional<br />

funds to<br />

implement<br />

electricity<br />

projects<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

of water<br />

infrastructure<br />

MDM (WSA) to<br />

fast-track the<br />

planning &<br />

upgrade of the<br />

N’kgale sewer<br />

treatment works &<br />

PHB pump station<br />

1. Dept of Energy<br />

must grant<br />

sufficient<br />

allocations to<br />

meet the<br />

electricity MDG<br />

by 2014<br />

Human<br />

Resource<br />

allocated<br />

35 (-30<br />

DWAE)<br />

40 (-3 from<br />

Eskom, 2<br />

from INEG)<br />

219<br />

Budget<br />

Allocated Projected<br />

MDM<br />

<strong>2011</strong>/<br />

12<br />

MTEF<br />

1. R4 m<br />

(Esko<br />

m &<br />

BPM/<br />

INEG)


No.<br />

Priority Turn Around<br />

Focal Area<br />

1.4 Refuse removal and solid<br />

waste disposal<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

2. PHB aged<br />

infrastructure<br />

Removal of solid waste<br />

in PHB, N’kgale,<br />

Lukekani, Gravelotte,<br />

Mashishimale R1, 2 &<br />

3, Mandela villages<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

2. Complete 2<br />

refurbishment/<br />

upgrading<br />

projects<br />

Extension of waste<br />

removal services to<br />

Matiko-Xikaya &<br />

Lulekani A<br />

Municipal<br />

Action<br />

2. Improve<br />

collection of<br />

electricity<br />

service<br />

charges<br />

Hire more<br />

labourers for<br />

the extension of<br />

services<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

Human<br />

Resource<br />

allocated<br />

220<br />

Budget<br />

Allocated Projected<br />

2. BPM<br />

<strong>2011</strong>/<br />

12<br />

MTEF<br />

None 60 BPM<br />

<strong>2011</strong>/ 12<br />

MTEF


No.<br />

Priority Turn Around<br />

Focal Area<br />

1.5 Access to municipal roads<br />

1.6 Formalisation of informal<br />

settlements<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

1. No maintenance<br />

budget & plan for<br />

provincial and<br />

district roads<br />

2. Insufficient<br />

allocation to<br />

eradicate the<br />

backlog by 2014<br />

informal settlements in<br />

Matikoxikaya, Benfarm,<br />

Namakgale, Lulekani &<br />

Makhushane<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

1. Complete the<br />

Integrated Roads<br />

Master Plan<br />

2. Implement all<br />

MIG-funded<br />

projects & finish<br />

in time<br />

Application for the<br />

formalization of all<br />

informal settlements<br />

Municipal<br />

Action<br />

1. Integrated<br />

planning &<br />

maintenanc<br />

e with<br />

sector<br />

department<br />

s<br />

2. Fast-track<br />

the<br />

implementa<br />

tion of the<br />

MIG<br />

projects<br />

Prevent the<br />

mushrooming of<br />

informal<br />

settlements<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

1. Province &<br />

District roads<br />

maintenance<br />

budgets be<br />

transferred to<br />

LMs<br />

2. COGTA to<br />

increase MIG<br />

allocation for<br />

infrastructure<br />

development<br />

DLGH to refrain<br />

from requests for<br />

demarcation of<br />

sites from<br />

traditional<br />

authorities without<br />

23<br />

Human<br />

Resource<br />

allocated<br />

221<br />

Budget<br />

Allocated Projected<br />

1. DoRT<br />

&<br />

MDM<br />

2. R17<br />

m<br />

4 DLGH


No.<br />

Priority Turn Around<br />

Focal Area<br />

2. Public Participation<br />

2.1 Functionality of Ward<br />

Committees<br />

2.2 Broader public<br />

participation policies and<br />

plans<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

All ward committees<br />

functional<br />

Public participation<br />

done in line with <strong>IDP</strong>/<br />

Budget process plan<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

All ward committees<br />

functional<br />

Finalise the<br />

Stakeholder Forum<br />

and sign social<br />

compact with all<br />

stakeholders.<br />

Municipal<br />

Action<br />

Process issues<br />

raised at ward<br />

committee<br />

meetings<br />

through<br />

Portfolio<br />

Committees<br />

Finalise<br />

Stakeholder<br />

Forum<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

the consent of LMs<br />

The municipality is<br />

paying all ward<br />

committee<br />

members a<br />

stipends<br />

Meaningful<br />

participation of<br />

Sector<br />

Departments in the<br />

<strong>IDP</strong>/ Budget<br />

Human<br />

Resource<br />

allocated<br />

3 BPM<br />

<strong>2011</strong>/ 12<br />

MTEF<br />

4 BPM<br />

2010/ 11<br />

MTEF<br />

222<br />

Budget<br />

Allocated Projected


No.<br />

Priority Turn Around<br />

Focal Area<br />

2.3 Public Communication<br />

systems<br />

2.4 Complaints management<br />

systems<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

Adoption of Public<br />

Participation Policy<br />

Not effective Improve the<br />

effectiveness of the<br />

public<br />

communication<br />

system<br />

Functional but not<br />

effective – lacks<br />

timeous tracking of all<br />

queries<br />

2.5 Front Desk Interface Front Desk serve as<br />

switchboard<br />

Functional &<br />

effective complaint<br />

management system<br />

Integrated front desk<br />

function<br />

Municipal<br />

Action<br />

Strengthen the<br />

Communication<br />

unit with skilled<br />

personnel<br />

Timeous<br />

tracking of all<br />

received queries<br />

Integrate the<br />

front desk<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

Process Plan<br />

Government<br />

Communicators<br />

Forum to be<br />

relevant to<br />

supporting<br />

municipal needs<br />

District-wide<br />

complaint<br />

management<br />

system to be<br />

established as per<br />

D-IGF resolution<br />

Human<br />

Resource<br />

allocated<br />

1 BPM<br />

<strong>2011</strong>/ 12<br />

MTEF<br />

0 BPM<br />

<strong>2011</strong>/ 12<br />

MTEF<br />

None 1 BPM<br />

<strong>2011</strong>/ 12<br />

223<br />

Budget<br />

Allocated Projected


No.<br />

3.Governance<br />

Priority Turn Around<br />

Focal Area<br />

3.1 Political Management and Oversight<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

Municipal<br />

Action<br />

3.1.1 Stability of Councils Functional Council Functional Council Functional<br />

Council<br />

3.1.2 Delegation of functions<br />

between political and<br />

administration<br />

Delegation system in<br />

place<br />

3.1.3 Training of Councillors Councillors trained as<br />

per WSP<br />

Review the<br />

delegation system<br />

Councillors trained<br />

as per WSP<br />

Review the<br />

delegation<br />

system<br />

Councillors<br />

trained as per<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

Human<br />

Resource<br />

allocated<br />

224<br />

Budget<br />

Allocated Projected<br />

MTEF<br />

None 5 BPM<br />

<strong>2011</strong>/ 12<br />

MTEF<br />

None All staff None<br />

LG-SETA must<br />

develop better<br />

3 BPM<br />

<strong>2011</strong>/ 12


No.<br />

Priority Turn Around<br />

Focal Area<br />

3.2 Administration<br />

3.2.1 Recruitment, Selection<br />

and Suspension of<br />

employees<br />

3.2.2 Vacancies (Top 4- MM,<br />

CFO, Planner, Engineer)<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

Municipal<br />

Action<br />

All critical posts filled All vacant posts filled No employees<br />

on suspension<br />

1 vacancy of MM No vacancies Retention<br />

Strategy in place<br />

3.2.3 Vacancies in other levels 196 Half the vacancy rate Half the vacancy<br />

rate<br />

3.2.4 Top 4 appointed with<br />

signed Performance<br />

Top 6 appointed with<br />

performance<br />

Top 6 sign annual<br />

performance<br />

agreements by due<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

WSP training courses for<br />

Councillors<br />

Annual<br />

Performance<br />

Plans completed<br />

Human<br />

Resource<br />

allocated<br />

225<br />

Budget<br />

Allocated Projected<br />

MTEF<br />

n/a 5 BPM<br />

<strong>2011</strong>/ 12<br />

MTEF<br />

n/a n/a BPM<br />

<strong>2011</strong>/ 12<br />

MTEF<br />

5 None<br />

n/a 1 BPM<br />

<strong>2011</strong>/ 12


No.<br />

Priority Turn Around<br />

Focal Area<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

Municipal<br />

Action<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

Human<br />

Resource<br />

allocated<br />

Agreements agreements date by 30 June <strong>2011</strong> MTEF<br />

3.2.5 Organisational<br />

Performance<br />

Management System<br />

3.2.6 Skills development for<br />

employees<br />

3.3 Labour Relations<br />

3.3.1 Functionality of Local<br />

Labour Relations<br />

Organisational<br />

Performance<br />

Management System<br />

cascaded to Assistant<br />

Directors<br />

Workplace Skills Plan<br />

(WSP) in place and<br />

implemented<br />

Local Labour Forum in<br />

place, functional and<br />

constructive<br />

engagements<br />

Cascade<br />

organisational<br />

performance<br />

management system<br />

to post level 6<br />

Enhance training<br />

programmes for<br />

semi-professional<br />

staff (artisans)<br />

Maintain<br />

functionality and<br />

constructiveness of<br />

LLF<br />

Quarterly<br />

performance<br />

assessments<br />

<strong>2011</strong>/12 WSP<br />

more focused<br />

on artisan<br />

training<br />

Meaningful<br />

consultation at<br />

LLF on all labour<br />

related matters<br />

n/a 1 BPM<br />

<strong>2011</strong>/ 12<br />

MTEF<br />

None 03 BPM<br />

<strong>2011</strong>/ 12<br />

MTEF<br />

Elimination of<br />

conclusion of<br />

onerous collective<br />

agreement at<br />

07 n/a<br />

226<br />

Budget<br />

Allocated Projected


No.<br />

Priority Turn Around<br />

Focal Area<br />

4. Financial Management<br />

4.1 Revenue enhancement<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

1. Revenue<br />

Enhancement<br />

Strategy in place<br />

2. No cost recovery in<br />

rural, townships and<br />

sector departments.<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

1. Improve<br />

implementation<br />

of Revenue<br />

Enhancement<br />

Strategy<br />

2. Institute cost<br />

recovery in rural<br />

areas and<br />

enforce credit<br />

control<br />

measures in<br />

Municipal<br />

Action<br />

1. Complete<br />

data<br />

cleansing<br />

project of<br />

municipal<br />

accounts<br />

2. Improve<br />

enforcemen<br />

t of credit<br />

control<br />

measures<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

SALGBC<br />

Treasury must<br />

enforce provisions<br />

of the PFMA &<br />

MFMA on nonpaying<br />

sector<br />

departments<br />

Human<br />

Resource<br />

allocated<br />

40 BPM <strong>2011</strong>/<br />

12 MTEF<br />

227<br />

Budget<br />

Allocated Projected


No.<br />

Priority Turn Around<br />

Focal Area<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

4.2 Debt management Unfunded mandates in<br />

relation to operations<br />

and maintenance for<br />

water and sanitation<br />

affecting cash flow<br />

4.3 Cash flow management working capital<br />

4.4 Repairs and maintenance<br />

provision<br />

15% of operational<br />

budget allocated to<br />

repairs & maintenance<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

townships and<br />

on sector<br />

departments<br />

Eliminate unfunded<br />

mandates<br />

Improve working<br />

capital<br />

Improve revenue<br />

collection<br />

15% of operational<br />

budget allocated to<br />

repairs &<br />

Municipal<br />

Action<br />

Improve<br />

revenue<br />

collection for<br />

working capital<br />

Have working<br />

capital<br />

Expend on<br />

repairs and<br />

maintenance<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

MDM must gazette<br />

operations &<br />

maintenance<br />

allocations for LMs<br />

Human<br />

Resource<br />

allocated<br />

228<br />

Budget<br />

Allocated Projected<br />

2 MDM &<br />

BPM <strong>2011</strong>/<br />

12 MTEF<br />

None 2 n/a<br />

MDM & DoRT to<br />

allocate funds for<br />

maintenance of<br />

district & provincial<br />

02 BPM <strong>2011</strong>/<br />

12 MTEF<br />

MDM &


No.<br />

Priority Turn Around<br />

Focal Area<br />

4.5 Capital expenditure MIG @ 42%<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

Own funds@ 72%<br />

4.6 Clean Audit Disclaimed opinion<br />

Audit Issues Action Plan<br />

in place<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

Municipal<br />

Action<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

maintenance roads (gazette the<br />

allocation)<br />

2009/10 MIG@<br />

100% by March 2010<br />

2010/11 MIG@ 70%<br />

Implement the<br />

Action Plan on issues<br />

raised by the AG<br />

Eliminate recurring<br />

issues<br />

Improve MIG<br />

expenditure<br />

Full<br />

implementation<br />

of action plan &<br />

eliminate<br />

recurrence of<br />

issues<br />

Interim audit by<br />

the AG<br />

Human<br />

Resource<br />

allocated<br />

229<br />

Budget<br />

Allocated Projected<br />

DoRT<br />

2 PMU R12 m<br />

(09/10)<br />

R14 m<br />

(10/11)<br />

R17m<br />

(11/12)<br />

All staff BPM <strong>2011</strong>/<br />

12 MTEF<br />

4.7 Submission of Annual Submitted by 31 August Submit by 31 August Compile GRAP- Interim audit by 1 BPM <strong>2011</strong>/


No.<br />

Priority Turn Around<br />

Focal Area<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

Municipal<br />

Action<br />

Financial Statements <strong>2011</strong> <strong>2011</strong> compliant AFS<br />

4.8 Asset management Asset Register not<br />

compliant to GRAP<br />

4.9 Credibility and<br />

transparency of Supply<br />

Chain Management<br />

SCM Policy and<br />

Procedures in place<br />

GRAP-compliant<br />

Asset Register<br />

SCM audit<br />

completed<br />

SCM Risk Register in<br />

place<br />

Resourcing the<br />

Financial<br />

Controls unit<br />

Unbundling of<br />

infrastructure<br />

assets (roads)<br />

underway<br />

Implement<br />

Internal Audit<br />

recommendatio<br />

ns on SCM<br />

Manage the<br />

SCM<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

Human<br />

Resource<br />

allocated<br />

the AG 12 MTEF<br />

MDM to assist with<br />

Asset Register as<br />

per D-IGF<br />

Resolution<br />

230<br />

Budget<br />

Allocated Projected<br />

3 R1 mil<br />

(unbundling<br />

of assets)<br />

MDM<br />

(Asset<br />

register)<br />

none 5 BPM <strong>2011</strong>/<br />

12 MTEF


No.<br />

Priority Turn Around<br />

Focal Area<br />

5. Local Economic Development<br />

5.1 Municipal contribution to<br />

LED<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

Plans to formalise the<br />

Marula industry in place<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

Complete &<br />

operationalize the<br />

Marula Extraction<br />

Hub & consolidation<br />

of Marula Women<br />

cooperatives<br />

(MWCs)<br />

Municipal<br />

Action<br />

operational risks<br />

1. Fast-track the<br />

construction<br />

of the Marula<br />

Oil Extraction<br />

Hub<br />

2. Outline the<br />

business<br />

process and<br />

plant design<br />

to<br />

manufacture<br />

other<br />

products on<br />

the Marula<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

4. Completion of<br />

Marula Product<br />

Strategy<br />

including<br />

consolidation<br />

of the Marula<br />

Value Chain<br />

studies by<br />

LEDET<br />

5. Training of<br />

MWCs into<br />

Marula byproduct<br />

manufacturing<br />

Human<br />

Resource<br />

allocated<br />

4 R8 m<br />

231<br />

Budget<br />

Allocated Projected


No.<br />

Priority Turn Around<br />

Focal Area<br />

5.2 LED Plan aligned to the<br />

LEGDP and adopted by<br />

Council<br />

April <strong>2011</strong> (Current<br />

Situation/ Baseline)<br />

Approved LED Strategy<br />

Target for December<br />

<strong>2011</strong> (Changed<br />

Situation)<br />

LED Strategy aligned<br />

to SDF, LEDGDP<br />

Municipal<br />

Action<br />

value chain<br />

3. SABS &<br />

FMASA<br />

accreditation<br />

&<br />

certification<br />

Implementation<br />

of the LED<br />

Strategy<br />

Unblocking Action<br />

Needed from other<br />

Spheres and<br />

Agencies (e.g.<br />

intervention or<br />

technical support)<br />

by Agriculture,<br />

Mopani FET &<br />

LIBSA<br />

6. Source market<br />

for Marula<br />

Extraction Hub<br />

products by TIL<br />

Human<br />

Resource<br />

allocated<br />

232<br />

Budget<br />

Allocated Projected<br />

None 4 BPM <strong>2011</strong>/<br />

12 MTEF


C7.CONCLUSION:<br />

The afore-mentioned consists of the strategic intent of the municipality that was developed by taking<br />

National and Provincial priorities and strategies into consideration. The vision, mission and values were<br />

reviewed and amended. Strategic objectives and objective strategies were reviewed and amended and<br />

programme strategies developed through which the strategic objectives are operationalised. Projects<br />

have been identified and prioritized and will be dealt with in the next chapter. The strategic intent will<br />

be implemented through development of scorecards on different levels which will be monitored,<br />

evaluated, assessed and review on annual basis. The implementation will be dealt with under the<br />

section Organisational Performance Management.<br />

233


D1. Introduction<br />

Projects are identified through the following:<br />

SECTION D<br />

PROJECTS<br />

Needs experienced by the community and councilors in their areas or villages<br />

Municipal Departments and officials from departmental plans, sector plans, specialist studies and<br />

maintenance programmes<br />

Strategic planning exercises might identify projects of strategic importance<br />

The municipality must ensure that projects are in line with principles, objectives and strategies of the<br />

municipality. Also due to limited financial and human resources it is necessary that project proposals be<br />

prepared in order to assist the municipality to ensure transparent and realistic distribution of resources<br />

between priority issues and routine expenditure. It is also necessary that the community is involved in the<br />

planning of projects to ensure that planned projects are in line with community needs as well as that the<br />

community accepts ownership of projects. Public participation is also necessary to avoid bias to certain<br />

community groups. Public participation could be achieved through the <strong>IDP</strong> Representative Forum.<br />

234


D2. Operational and Maintenance Projects<br />

Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Corporate Services IT Equipments, Furniture & Office Equipments<br />

Corp/01 Interactive web BPM BPM 300<br />

Corp/02 Computer Notebook (30) BPM BPM 350<br />

Corp/03 Business Plan (IT & FMS) BPM BPM 300<br />

Corp/04 GPS (1) BPM BPM 75<br />

Corp/05 ICT Infrastructure BPM BPM 4.000<br />

Corp/06 Data Projector (4) BPM BPM 150<br />

Corp/07 Project Screen- fixed (2) BPM BPM 10<br />

Corp/08 Projection Screen portable BPM BPM 2500<br />

Corp/09 Digital Voice Recorder +<br />

Transcription<br />

Software(mobile)<br />

Corp/10 Internet Solution ASDL<br />

Accounts (12)<br />

BPM BPM 42<br />

BPM BPM 30<br />

235


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Corp/11 Disaster Recovery Plan BPM BPM 200<br />

Corp/12 Team mate Software(audit) BPM BPM 200<br />

Corp/13 Notebook Computer spares<br />

(1)<br />

Corp/14 Desktop Computer spares<br />

(1)<br />

Corp/15 Network Infrastructure<br />

maintenance<br />

BPM BPM 30<br />

BPM BPM 30<br />

BPM BPM 20<br />

Corp/16 Bulk Shredder Ba-Phalaborwa BPM 10<br />

Corp/17 Steel Cabinets (4) (Legal) Ba-Phalaborwa BPM 20<br />

Corp/18 Desk & Credenza (legal) (1) Phalaborwa BPM 30<br />

Corp/19 Desks (3) Ba-Phalaborwa BPM 50<br />

Corp/20 High back Chairs (3) Ba-Phalaborwa BPM 10<br />

Corp/21 Visitors Chairs (6) Ba-Phalaborwa BPM 30<br />

Corp/22 Filling Cabinets (3) (Safety) Ba-Phalaborwa BPM 30<br />

236


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Corp/23 Desks, Chairs, & Filling<br />

Cabinets (Records)<br />

Corp/24 Mobile Filling System 3x3<br />

(Human Resources) Zippel<br />

Lulekani BPM 50<br />

Ba-Phalaborwa BPM 150<br />

Corp/25 Vacuum Cleaners x 2 Ba-Phalaborwa BPM 20<br />

Corp/26 Toilet Roll Holder Steel Ba-Phalaborwa BPM 10<br />

Corp/27 Soap Holders Ba-Phalaborwa BPM 10<br />

Corp/28 Shelves Steel Lulekani BPM 100<br />

Technical Services Furniture & Office Equipments<br />

Tech/01 Desks (new staff) 7 BPM BPM 150<br />

Tech/02 High back Chairs 7 Ba-Phalaborwa BPM 30<br />

Tech/03 6 Single base sets (Standby<br />

Electrical)<br />

Tech/04 Steel Filling Cabinet<br />

(Zippel)<br />

Phalaborwa BPM 15<br />

Ba-Phalaborwa BPM 150<br />

237


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Planning<br />

Development<br />

&<br />

Furniture & Office Equipments<br />

Plan/01 Desks (new staff) 1 Phalaborwa BPM 5<br />

Plan/02 High back Chair (1) Phalaborwa BPM 3<br />

Municipal<br />

Manager<br />

Furniture & Office Equipments<br />

Mun/01 Desks (3) Phalaborwa BPM 50<br />

Mun/02 High back Chairs (3) Phalaborwa BPM 10<br />

Mun/03 Visitors Chairs (4) Phalaborwa BPM 12<br />

Mun/04 Desks (new staff) 2 Phalaborwa BPM 30<br />

Mun/05 Chairs (new staff) 2 Phalaborwa BPM 10<br />

Mun/06 Filling Cabinet Steel Phalaborwa BPM 30<br />

Mun/07 Office Furniture (Audit) 2<br />

Workstations<br />

Mun/08 Wall Unit- Shelves<br />

(Communication) (1)<br />

Phalaborwa BPM 30<br />

Phalaborwa BPM 10<br />

238


Implementing<br />

Dept<br />

Mun/09 Furniture (Disaster<br />

Management)<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Ba-Phalaborwa BPM 30<br />

Mun/10 Filling Cabinets Wood (3) Ba-Phalaborwa BPM 20<br />

Community<br />

Services<br />

Com/01 High back Swivel Chairs (7)<br />

Cashiers<br />

Furniture & Office Equipments<br />

Phalaborwa BPM 30<br />

Com/02 Cabinet Wood (1) Ba-Phalaborwa BPM 10<br />

Com/03 Steel Cabinets 4 Drawer (3) Ba-Phalaborwa BPM 12<br />

Com/04 Shelves (Licensing &<br />

Library)<br />

Ba-Phalaborwa BPM 30<br />

Com/05 Replacement of 2<br />

Computers (Prosecution)<br />

Ba-Phalaborwa BPM 20<br />

Com/06 Mobile Filling (Traffic &<br />

Licensing)<br />

Ba-Phalaborwa BPM 30<br />

Mayor & Council Venues upgrade & Equipment<br />

May/01 Chairs (50) Council Chamber BPM 200<br />

May/02 Mayor’s Office Furniture Office of the Mayor BPM 60 - - - -<br />

239


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

May/03 Curtains Council Chamber BPM 70<br />

May/04 Curtains Lulekani Town Hall BPM 100<br />

May/05 Curtains Mayoral Parlour BPM 120<br />

May/06 Carpets Council Chamber Council Chamber BPM 50<br />

May/07 Carpets Activity Hall Activity hall BPM 50<br />

May/08 Blinds (steel) Namakgale BPM 50<br />

May/09 Steel tables New Venues BPM 200<br />

May/10 Table clothes BPM BPM 50<br />

May/11 Chairs (100) Activity Hall BPM 200<br />

May/12 Air Conditioners Lulekani Town Hall BPM 100<br />

May/13 Air Conditioners Namakgale Council<br />

Chamber<br />

BPM 15<br />

May/14 Air Conditioners Namakgale Town Hall BPM 100<br />

May/15 Air Conditioners Lulekani Archives BPM 200<br />

240


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

May/16 Air Conditioners Licensing Revenue BPM 15<br />

May/17 Sprinkler system – fire<br />

prevention<br />

May/18 Air Conditioners Namakgale Town Hall<br />

Rates Offices<br />

Lulekani Archives BPM 80<br />

BPM 100<br />

May/19 Sound System (Chamber) Ba-Phalaborwa BPM 220<br />

May/20 Tables & Chairs Gravelotte BPM 30<br />

May/21<br />

Tables & Chairs Selwane Community<br />

Hall<br />

May/22 Water Cooler Fountain Impala Park Sports<br />

Hall<br />

BPM 30<br />

BPM 15<br />

May/23 Water Cooler Fountain Lulekani Stadium BPM 15<br />

May/24 Water Cooler Fountain Namakgale Stadium BPM 15<br />

May/25 Water Cooler Fountain Licensing Phalaborwa BPM 15<br />

May/26 Centralised Records Phalaborwa Records BPM 400<br />

241


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Section & Lulekani<br />

Archives<br />

May/27 Mobile PA Phalaborwa Main<br />

Office<br />

Community<br />

Services<br />

Com/07 Replacement of 3 patrol<br />

cars<br />

Com/08 Replacement of 2<br />

computers – Prosecution<br />

Com/09 Play detector – Vehicle<br />

Testing Centre (VTC)<br />

BPM 70<br />

Traffic Section<br />

Traffic BPM 900 3m<br />

Traffic BPM 20. 000<br />

Traffic & Licensing BPM 200. 000<br />

Com/10 Upgrade of computer VTC Traffic & Licensing BPM 20. 000<br />

Com/11 Replace Clifford brake<br />

tester VTC<br />

Traffic & Licensing BPM 200. 000<br />

Com/12 Road marking machine Traffic BPM 90. 000<br />

Com/13 Replacement of electronic Traffic & Licensing BPM 15. 000<br />

242


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

clipboard motor cycle tests<br />

Com/14 Speed measuring device Traffic BPM 100. 000<br />

Com/15 Replacement of 2 Road<br />

marking LDV’s<br />

Traffic BPM 400 000<br />

Com/16 Mass Meter (x2) Traffic & Licensing BPM 158 000<br />

Com/17 Replacement of 2 Road<br />

marking LDV’s<br />

Com/18 Replacement of speed<br />

measuring device<br />

Traffic BPM 600 000<br />

Traffic BPM 150 000<br />

Waste Management<br />

Com/19 Domestic Refuse Services Humulani, Matiko-<br />

Xikaya & Lulekani A<br />

BPM 550.000<br />

Com/20 Domestic Refuse Services Maseke and Boyelang BPM 570.000<br />

Com/21 Domestic Refuse Services Makhushane BPM 600.000<br />

Com/22 Domestic Refuse Services Prieska, Mahale,<br />

Nondweni, Silonque<br />

BPM 640.000<br />

243


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Com/23 Domestic Refuse Services All new Settlements BPM 680.000<br />

Com/24 Landfill Compactor Landfill Site MDM 3m<br />

Com/25 New Landfill Site Development and<br />

Infrastructure<br />

MDM 3m 5m 5m<br />

Com/26 DSN430N<br />

Replace Refuse Compactor<br />

Refuse removal BPM 1.7m<br />

Com/27 Mass Containers (Skips) Namakgale and Drop<br />

off Centres<br />

BPM 96.000 135.000 160.000<br />

Com/28 DKR237N<br />

Tractor and Trailer<br />

Replacement for<br />

refuse<br />

dumping<br />

and illegal<br />

Com/29 Wheely Bins Waste Management<br />

Street Cleansing<br />

Com/30 Fencing (Landfill Facility) Phalaborwa Dumping<br />

Site<br />

BPM 600.000 820.000<br />

BPM 24.000 30.000 36.000 42.000 50.000<br />

MDM 200.000 240.000<br />

Com/31 Dustbins (Pavement) Provide on sidewalks BPM 32.000 40.000 45.000 47.000 53.000<br />

Com/32 Pole bins 20L Install on pole BPM 40.000 50.000 62.000 68.000 74.000<br />

244


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Environmental Health<br />

Com/33 Spray pumps<br />

Vector control<br />

BPM BPM 6 000 8 000 11 000<br />

Com/34 Medical containers BPM BPM 30 000 35 000 40 000 46 000 50 000<br />

Com/35 Litter Pickers BPM BPM 24 000 30 000 34 000 38 000 42 000<br />

Com/36 Camera (Digital) BPM BPM 4 000<br />

Parks Section<br />

Com/37 Cemetery fencing &<br />

Stadium fencing<br />

Ba-Phalaborwa BPM 1.5 1.6 500 600 600<br />

Com/38 Computerized cemetery<br />

system<br />

Ba-Phalaborwa BPM 210 - - - -<br />

Com/39 Replacement of 2 tractors Ba-Phalaborwa BPM 950 - - 1.2 -<br />

Com/40 Water Tanker & Trailer Ba-Phalaborwa BPM 850 - 900 - -<br />

Com/41 Front-end loader/Back hoe Ba-Phalaborwa BPM 1.1 - - - -<br />

Com/42 1 New LDV (Cemeteries) Ba-Phalaborwa BPM 200 - - - -<br />

Com/43 Medium Tip Truck Ba-Phalaborwa BPM 600 - - - -<br />

245


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Com/44 Small Equipment (new and<br />

replacement)<br />

Com/45 Wheelbarrow Poison Spray<br />

Unit<br />

Ba-Phalaborwa BPM 300 300 350 350 400<br />

Ba-Phalaborwa BPM 75 - - - -<br />

Com/46 Tractor – Mounted Slashers Ba-Phalaborwa BPM 120 135 145 160 180<br />

Com/47 Ride-on mowers (2) Ba-Phalaborwa BPM 160 - 200 - 220<br />

Com/48 Parks and recreational<br />

area furniture<br />

Com/49 Nursery plant development<br />

and purchase<br />

Com/50 4 X Refridgerators Selwane, Rixile ,<br />

Leboneng And<br />

Gravellote Libraries<br />

Com/51 IT Network connectivity Selwane, Gravelotte,<br />

& Mashishimale<br />

Libraries<br />

Com/52 2 X Photocopier Machines Selwane &<br />

Mashishimale<br />

Libraries<br />

Parks and Cemeteries BPM 100 110 120 130 140<br />

Nursery BPM 60 70 80 90 100<br />

Library Services<br />

BPM 20 000<br />

BPM 150<br />

BPM lease<br />

246


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Com/53<br />

1000 X Bookholders<br />

All Libraries BPM 15 000<br />

Com/54<br />

6 X Water coolers<br />

All Libraries BPM 18 000<br />

Com/55<br />

Mashishimale BPM 6000<br />

5 X Microwave oven excluded<br />

Com/56<br />

6 X Flat screen TV<br />

All Libraries BPM 20 000 12000 14000 15000 16000<br />

Com/57<br />

6 X DVD Players<br />

All Libraries BPM 6 000 3500 3500 3500 4000<br />

Com/58 Window Blinds All Libraries BPM 15 000 15 000 15000<br />

Planning &<br />

Development<br />

Plan/03 Formalisation of Informal<br />

areas<br />

Makhushane<br />

(Opposite<br />

Maphuta Hospital<br />

Area before<br />

Namakgale<br />

cemetery<br />

Area between<br />

Benfarm and R71<br />

Matiko Xikaya C<br />

Selwane<br />

(Matshilapate)<br />

Planning & Land Use<br />

DLGH/MDM 500 500 500 500 500<br />

247


Implementing<br />

Dept<br />

Plan/04 Marula Oil Extraction<br />

depots<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Kurhula<br />

Ba-Phalaborwa<br />

Makhushane<br />

Maseke<br />

Majeje<br />

Seloane<br />

Mashishimale<br />

LED & Tourism<br />

Rio Tinto 1000<br />

Plan/05 Waterbok Crop Farm Seloane Rio Tinto 1000<br />

Plan/06 Street paving depot Makhushane FOSKOR 1000<br />

Plan/07 Upgrading of Bollanoto Phalaborwa FOSKOR 1000<br />

Plan/08 SMME Development Ba-Phalaborwa BPM/LIBSA 100<br />

Plan/09 Hawkers facility, curio shop<br />

& rest station<br />

Budget & Treasury<br />

Budg/01 Electricity vending<br />

machines<br />

Budg/02 Replacement of fleet<br />

vehicles (40)<br />

Gravelotte Murchison Mine 150 150<br />

Ba-Phalaborwa BPM - - - - -<br />

Ba-Phalaborwa BPM 3120 3307 3505 3715 -<br />

248


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Budg/03 Integrated Financial<br />

Management System<br />

Ba-Phalaborwa BPM 4000 - - - -<br />

Technical Services Buildings<br />

Tech/05 Extension of Supply Chain<br />

Offices<br />

Tech/06 Erection of (shades)<br />

parking area<br />

Phalaborwa BPM 950 - - - -<br />

Lulekani Municipal<br />

Offices<br />

Tech/07 Backup Generator (sewer Phalaborwa, Lulekani<br />

pump station)<br />

& Namakgale<br />

Tech/08 Backup Generator Phalaborwa<br />

(Municipal Main<br />

Offices)<br />

BPM 400 - - - -<br />

Electrical<br />

BPM 1.5<br />

BPM 300<br />

Roads & Storm Water<br />

Tech/09 Storm water drainage Namakgale BPM 500 1.000 - - -<br />

Tech/10 Storm water drainage Lulekani BPM 500 1.000 - - -<br />

Tech/11 Storm water drainage<br />

Repairs<br />

Phalaborwa BPM 1.000 - - - -<br />

249


Implementing<br />

Dept<br />

Operational & Maintenance Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Tech/12 Culverts Humulani Cemetery BPM 500 - - - -<br />

Buildings Sections<br />

Tech/13 Replacement of Handrails Phalaborwa Sewer<br />

Plant<br />

BPM 860<br />

Municipal<br />

Manager<br />

Communications Unit<br />

Mun/11 Calendars & Diaries Ba-Phalaborwa BPM 300 - - - -<br />

Disaster Management<br />

Mun/12 Disaster Relief Tents Ba-Phalaborwa BPM 60 - - - -<br />

Mun/13 Disaster Relief – Disaster<br />

Response Trailer (fully<br />

equipped)<br />

Mun/14 Potable drinking water<br />

trailer<br />

Ba-Phalaborwa BPM 180 - - - -<br />

Ba-Phalaborwa BPM 20 - - - -<br />

250


D3. Programmes, Strategies and Plans<br />

Implementing<br />

Dept.<br />

Technical Services<br />

Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />

Name Location<br />

Tech/14 Water Conservation/Water<br />

Demand Strategy<br />

MDM 600<br />

Tech/15 Road Master Plan Ba-Phalaborwa BPM 1.300<br />

Tech/16<br />

Corporate Services<br />

Electricity Master Plan Ba-Phalaborwa BPM 900<br />

Corp/28 Skills Training<br />

- WSP (5% of the<br />

workforce undergo inservice<br />

training)<br />

Ba-Phalaborwa<br />

BPMLGSETA 930<br />

Municipal HIV/Aids<br />

<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

251


Implementing<br />

Manager<br />

Dept.<br />

Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />

Name Location<br />

<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Mun/15 World Aids Day Ba-Phalaborwa BPM 80 100 110 120 130<br />

Mun/16 Candlelight Ba-Phalaborwa BPM 80 100 110 120 130<br />

Mun/17 HIV/Aids Workshop Ba-Phalaborwa BPM 40 45 50 55 60<br />

Mun/18 Workplace HIV/Aids Programme Ba-Phalaborwa BPM - - - - -<br />

Mun/19 Workplace HIV/Aids Programme Ba-Phalaborwa BPM 80<br />

Mun/20 Local Aids Council Activities Ba-Phalaborwa BPM 50 60 70 80 90<br />

252


Implementing<br />

Dept.<br />

Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />

Name Location<br />

Mun/21 HIV/Aids Workplace Policy<br />

Review<br />

<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Ba-Phalaborwa BPM - - - - -<br />

Sports, Arts & Culture<br />

Mun/22 Ba-Phalaborwa Sports Day Ba-Phalaborwa BPM 70<br />

Mun/23 Junior Dipapadi Local, District,<br />

Provincial &<br />

National<br />

Mun/24 Cultural Day Ba-Phalaborwa BPM 25<br />

Mun/25 Development of Local Sports<br />

Strategy<br />

BPM 40 55 60 70 90<br />

Ba-Phalaborwa BPM 10<br />

Mun/26 Senior Citizens Tournament Ba-Phalaborwa BPM 20<br />

253


Implementing<br />

Dept.<br />

Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />

Name Location<br />

<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Mun/27 OR Tambo Games Ba-Phalaborwa BPM 40 55 60 70 90<br />

Mun/28 Women in Sports Ba-Phalaborwa BPM 30 35 40 45 50<br />

Mun/29 Indigenous Games Ba-Phalaborwa BPM 40 55 60 70 90<br />

Mun/30 Sports Council Training Ba-Phalaborwa BPM 40 60 80 100 120<br />

Mun/31 Strategy Planning workshop Ba-Phalaborwa BPM 80<br />

Youth, Women, Children & Disability<br />

Mun/32 Women’s Month Ba-Phalaborwa BPM 100 90 90 - -<br />

254


Implementing<br />

Dept.<br />

Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />

Name Location<br />

<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Mun/33 Children’s Day Ba-Phalaborwa BPM 60 70 70 - -<br />

Mun/34 Disability Day Ba-Phalaborwa BPM 120 130 130 - -<br />

Mun/35 16 Days of Activism against<br />

Children and Women Abuse<br />

Ba-Phalaborwa BPM 70 80 80 - -<br />

Mun/36 Back to School Campaign Ba-Phalaborwa BPM 2.500 3 3 - -<br />

Mun/37 Elderly Day Ba-Phalaborwa BPM 60 70 70 - -<br />

Mun/38 SAYC Bi-Annual Assembly Ba-Phalaborwa BPM 100 130 130 - -<br />

Mun/39 Ba-Phalaborwa Disadvantages<br />

groups Economic Summit<br />

Ba-Phalaborwa BPM 90 100 100 - -<br />

255


Implementing<br />

Dept.<br />

Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />

Name Location<br />

<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Mun/40 Youth Month Activities Ba-Phalaborwa BPM 120 120 130 - -<br />

Mun/41 <strong>IDP</strong> Review Process and Public<br />

Participation/Imbizos<br />

Mun/42<br />

Mun/43<br />

Strategic Planning Unit<br />

Ba-Phalaborwa 950 950 950 950 950 950<br />

Community Satisfaction Survey Ba-Phalaborwa BPM/DLGH 300 150<br />

Greenest Municipality<br />

Programme<br />

Ba-Phalaborwa BPM 100 100 150 170 200<br />

Internal Audit Unit<br />

Mun/44 Specialised Audit Services Ba-Phalaborwa BPM 700<br />

Communications<br />

256


Implementing<br />

Dept.<br />

Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />

Name Location<br />

<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Mun/45 Local Communicators Forum Ba-Phalaborwa BPM 77 84 93 102 -<br />

Mun/46 Professional<br />

bodies/membership fees<br />

Ba-Phalaborwa BPM 2 2 2 2 -<br />

Mun/47 Branding and Marketing Ba-Phalaborwa BPM 220 242 266 292 -<br />

Mun/48 Risk/Hazard Analysis of fire<br />

hydrants<br />

Planning &<br />

Development<br />

Plan/10 Development of Municipal<br />

Informal Economy Support<br />

Strategy<br />

Disaster Management<br />

Ba-Phalaborwa BPM 30 - - - -<br />

LED & Tourism<br />

Ba-Phalaborwa BPM 250 250<br />

Plan/11 Annual Christmas Tree Ba-Phalaborwa Rio Tinto 100 110 120 130 140<br />

257


Implementing<br />

Dept.<br />

Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />

Name Location<br />

Plan/12 Investment Attraction Plan Ba-Phalaborwa BPM 100<br />

Plan/13 Ba-Phalaborwa Development<br />

Agency<br />

Plan/14 Economic Summit Ba-Phalaborwa BPM 90<br />

Plan/15 Annual Marula Festivities<br />

Plan/16 Annual September Tourism<br />

Month Activities<br />

Plan/17 Local and National Tourism<br />

Shows<br />

<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Ba-Phalaborwa BPM/Strategic Partners 600 400 3000 4000 6000<br />

• Makhushane<br />

• Mashishimale<br />

• Maseke<br />

• Majeje<br />

• Seloane<br />

• Phalaborwa<br />

BPM 650 650 650 700 700<br />

Ba-Phalaborwa BPM 200 220 240 250 260<br />

Durban, JHB,<br />

Hoedspruit,<br />

Tzaneen, Giyani,<br />

Cape Town<br />

BPM 180 190 200 210 220<br />

258


Implementing<br />

Dept.<br />

Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />

Name Location<br />

Plan/18 Promotion and Marketing<br />

materials of Tourism products<br />

and routes (Ba-Phalaborwa)<br />

Plan/19 Operationalisation of:<br />

• Flea Market<br />

• Cultural Village<br />

• Namakgale & Lulekani Taxi<br />

Ranks<br />

• Freedom & Memorial<br />

Precinct<br />

• Bollanoto Tourism &<br />

Information Centre<br />

• Seloane TSC (Curio Shop)<br />

Plan/20 Development of Ba-Phalaborwa<br />

Marula Village Hub<br />

<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Ba-Phalaborwa BPM 800 850 900 950 1000<br />

Namakgale<br />

Phalaborwa<br />

Lulekani<br />

Makhushane<br />

Mashishimale<br />

Seloane<br />

BPM 200<br />

Ba-Phalaborwa BPM 500<br />

Plan/21 Poverty Alleviation Projects Ba-Phalaborwa BPM/Sector Departments - - - - -<br />

259


Implementing<br />

Dept.<br />

Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />

Name Location<br />

Plan/22 Poverty Reduction, Improved<br />

Service Delivery & Integrated<br />

Development Programme<br />

Ba-Phalaborwa Embassy of the Kingdom<br />

of Belgium<br />

<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Plan/23 Community Development Plan Selwane Kondowe - - - - -<br />

Planning and Land Use<br />

Plan/23 GIS Strategy/Policy Ba-Phalaborwa BPM/OTP 300<br />

Plan/24 Landfill site (Professional Study) Ba-Phalaborwa BPM 300 200 200 200 200<br />

Com/59<br />

Environmental Management<br />

Plan<br />

Community Services<br />

480<br />

Ba-Phalaborwa BPM 1.000 500 600<br />

Com/60 Arbor Day Ba-Phalaborwa BPM 30 35 40 45 50<br />

260


Implementing<br />

Dept.<br />

Programmes, Strategies, Plans / Policies Source(s) of Funds Budget (R’000)<br />

Name Location<br />

<strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Com/61 De-bushing Ba-Phalaborwa BPM 250 250 300 300 400<br />

Com/62 Alien Plan Campaigns Ba-Phalaborwa BPM 120 130 145 160 175<br />

Com/63 Premiers Greening Project<br />

(Foskor)<br />

Com/64 Premiers Greening Project<br />

Budget & Treasury<br />

(PMC)<br />

Budg/04 Infrastructure Assets<br />

Unbundling – (water, sanitation<br />

& electricity)<br />

Ba-Phalaborwa<br />

Foskor 150. 150. 150.<br />

Ba-Phalaborwa PMC 75. 75. 75.<br />

Ba-Phalaborwa BPM 6.000 -<br />

261


D4. Capital Projects<br />

Implementing<br />

Dept<br />

Capital Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Technical Services Roads & Storm water<br />

Tech/18 PHB Street Rehabilitation Phalaborwa Town BPM 1.000 1.500 1.500 2.000 2.500<br />

Tech/19 New 4 Ton Drop Side<br />

Truck (Roads Section)<br />

Tech/20 Replacement of 3 Ton<br />

Truck (Roads Section)<br />

Tech/21 Low Bed Trailer<br />

Tech/22 Silongue Road<br />

Rehabilitation<br />

Ba-Phalaborwa BPM 400 - - - -<br />

Ba-Phalaborwa BPM 400 - - - -<br />

Ba-Phalaborwa BPM 350 - - - -<br />

Phalaborwa BPM 150 150 - - -<br />

Electrical Section<br />

262


Implementing<br />

Dept<br />

Tech/23 Maintenance &<br />

refurbishment of<br />

overhead lines<br />

Tech/24<br />

Capital Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Upgrading of electrical<br />

network at Ext 01 Phase 3<br />

From Selati Sub to<br />

Main Sub (3). From<br />

Selati Sub to Ext 7<br />

Sub (1)<br />

From main Sub to<br />

Ext 7 Sub (1). Main<br />

Sub to Cleveland Sub<br />

(1). From Ext 7 Sub<br />

to Ext 8A and B Sub<br />

(2). From M/Sub<br />

8B/D to Airport<br />

beacon. Selati to Ext<br />

5. Main to<br />

Schietocht. Main<br />

pump to KNP.<br />

BPM 1.500 1.500 1.000<br />

Phalaborwa Town BPM 4.500<br />

263


Implementing<br />

Dept<br />

Capital Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Tech/25 Erect second feeder to<br />

Ext 5 Substation<br />

Tech/26 Replacement of<br />

electricity three phase<br />

meters (KVA & KWH)<br />

Tech/27 Installation of High Mast<br />

lights<br />

Tech/28 Streetlights Maintenance<br />

Truck (Cherry Picker)<br />

Tech/29 Installation of ring main<br />

units and replace 3 phase<br />

mini-subs<br />

Extension 5 BPM 0.500<br />

Phalaborwa Town BPM 1.500<br />

Ba-Phalaborwa BPM 1.500<br />

Ba-Phalaborwa BPM 0.550<br />

Ext 1,2 ,3,4 & 6 BPM 1.000 1.200 1.400 1.500 1.700<br />

264


Implementing<br />

Dept<br />

Capital Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Tech/30 Maintenance of<br />

substations Transformers,<br />

switch gears and<br />

protection relays<br />

Tech/31 Installation of 300 street<br />

lights at Hendrik Van Eck<br />

Road<br />

Tech/32 Electrification<br />

Infrastructure<br />

reticulations 1100 units<br />

Tech/33 Electrical Infrastructure<br />

reticulation - 600 units<br />

Tech/34 Electrification of 350 RDP<br />

units at Namakgale<br />

Selati and Main<br />

Substations<br />

BPM 1.000 - 1.200<br />

Phalaborwa BPM 1.000 1.200 1.440 - -<br />

Kanana Eskom/DME 11.000 - - - -<br />

Selwane Eskom/DME 6.000 - - - -<br />

Namakgale New RDP<br />

Houses<br />

Eskom/DME 2.450 - - - -<br />

265


Implementing<br />

Dept<br />

Tech/35 Electrification of 500<br />

units at Matshilapata<br />

(unoccupied)<br />

Capital Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Tech/36 Electrification of 200<br />

units at Boyelang/Maseke<br />

Tech/37 Electrification of<br />

“Nobody”<br />

Tech/38 Electrification of 950<br />

units at Maseke Ext &<br />

Mashishimale R1, R2<br />

Tech/39 Electrical Infrastructure<br />

Reticulation – 600 units<br />

Matshilapata Ext Eskom/DME - 5.000<br />

Boyelang/Maseke Eskom (approved) 1.161 - - - -<br />

“Nobody”<br />

Namakgale<br />

Maseke Ext &<br />

Mashishimale R1, R2<br />

Eskom/DME 11.000 - - - -<br />

Eskom/DME 9.500 - - - -<br />

Kurhula BPM 6.000<br />

266


Implementing<br />

Dept<br />

Capital Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Tech/40 Electricity Switch gears Phalaborwa BPM 3.000<br />

Tech/41 Installation of ring main<br />

units<br />

Tech/42 Electrical Infrastructure<br />

Reticulation 276<br />

Tech/43 Upgrading rising sewer &<br />

pump station<br />

Phalaborwa Ext 2, 3<br />

& 4<br />

Mabikiri 88<br />

Sebera 130<br />

Maune 36<br />

Tshube 22<br />

Existing Pump<br />

Station Phalaborwa<br />

Plant<br />

BPM 2.800 3.360 4.032 - -<br />

Eskom/DME 2.760<br />

Water & Sanitation<br />

MDM 6.500 6.500 6.500<br />

Tech/44 Matiko Xikaya waterline Matiko Xikaya MDM 1.300<br />

Tech/45 Sewer Reticulation Lulekani A MDM 5.000 5.000 5.000 5.000 -<br />

267


Implementing<br />

Dept<br />

Tech/46<br />

Capital Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Sanitary House<br />

connections<br />

Tech/47 Lebeko Regional Resevoir<br />

& Related works<br />

Lulekani Ext 2 MDM 200 200 200 200 -<br />

Mashishimale R3 Ext<br />

1<br />

LNW & MDM 6.000 - - - -<br />

Tech/48 Benfarm Link Line Benfarm B & C MDM - 2.000 - - -<br />

Tech/49 Benfarm A, B & C Sewer<br />

Reticulation & Outfall line<br />

Benfarm A, B & C MDM - 5.000 5.000 - -<br />

Tech/50 Honey Sucker Tanker Phalaborwa BPM 250 - - - -<br />

Tech/51 Mobile Water Tanker<br />

(Technical)<br />

Community Parks Section<br />

Ba-Phalaborwa BPM 500 - - - -<br />

268


Implementing<br />

Dept<br />

Services<br />

Capital Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Com/64 Cemetery Establishment<br />

and construction (new)<br />

Lulekani BPM 2m 2m 2m 2m 2m<br />

Com/65 Cemetery upgrading Namakgale BPM 3m 2m 2m 2m 2m<br />

Com/66 Cemetery<br />

establishment/land<br />

identification and<br />

procurement (new)<br />

Com/67<br />

Gravelotte<br />

Cemetery Fencing Lulekani, Namakgale<br />

& Phalaborwa<br />

BPM 2m 2m 2m 2m 2m<br />

BPM 1.000<br />

Library Services<br />

Com/68 Mashishimale Library Mashishimale BPM 6m - - - -<br />

Com/69 Majeje Library Majeje Tribal BPM - - 6.5m - -<br />

269


Implementing<br />

Dept<br />

Capital Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Com/70 Makhushane Library Makhushane BPM - - - - 7m<br />

Planning &<br />

Development<br />

Planning & Land Use<br />

Plan/25 Development of Ext 7 Phalaborwa BPM 700 - - - -<br />

D5. MIG Projects<br />

Implementing Dept MIG Projects Source(s) of Funds O & M Budget (R’000)<br />

MIG/01 Phalaborwa<br />

Upgrading of Taxi<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Phalaborwa MIG 1.353 - - - -<br />

270


Implementing Dept MIG Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Rank Facilities<br />

MIG/02 Tshelang Kgape<br />

Maphuta Street<br />

paving Phase 4<br />

MIG/03 Nyakelang Street<br />

paving<br />

MIG/04 Matiko Xikaya –<br />

Humulani Street<br />

paving<br />

MIG/05 Kurhula Street<br />

paving Phase 1<br />

MIG/06 PHB Taxi Rank<br />

Overhead Walkway<br />

Namakgale MIG 2.736 1.987 2.000 - -<br />

Namakgale MIG 300 3.000 - - -<br />

Lulekani MIG 3.000 2.500 - - -<br />

Lulekani MIG 2.500 2.100 2.000 - -<br />

Phalaborwa MIG 1.800 - - - -<br />

271


Implementing Dept MIG Projects Source(s) of Funds O & M Budget (R’000)<br />

MIG/07 Gravelotte RDP<br />

Street paving Phase<br />

2<br />

MIG/08 Makhushane Street<br />

Paving<br />

MIG/09<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Selwane Street<br />

Paving<br />

MIG/10 Majeje Subsoil<br />

Drainage<br />

Gravelotte MIG - - 200 - -<br />

Makhushane MIG 2.674<br />

Selwane MIG 200 2.000 2.100 2.500 2.500<br />

Majeje MIG 2.740 1.500 1.500 1.500<br />

MIG/11 Thepe Trust Bridge Mashishimale R3 MIG 2.593 - - - -<br />

MIG/12 Majeje Street Paving Majeje MIG - 150 2.850 1.500 1.500<br />

272


Implementing Dept MIG Projects Source(s) of Funds O & M Budget (R’000)<br />

MIG/13 Mashishimale Street<br />

Paving R1,2,3<br />

MIG/14 Lulekani Street<br />

Paving (Biko & B1<br />

Ext)<br />

MIG/15 Namakgale Street<br />

Paving (Score & Zone<br />

D)<br />

MIG/16 Tipeng Stormwater<br />

Culverts Phase 3 & 4<br />

MIG/17 Lulekani upgrading<br />

of Hlekani Str to<br />

tar/side kerbs<br />

Amazon Str.<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Mashishimale MIG - 200 700 2.000 2.100<br />

Lulekani MIG - 150 3.450 2.400 2.100<br />

Namakgale MIG - 150 2.450 2.400 2.000<br />

Makhushane/<br />

Mashishimale<br />

MIG - 200 3.800 2.000 2.000<br />

Lulekani MIG 2.450 - - - -<br />

273


Implementing Dept MIG Projects Source(s) of Funds O & M Budget (R’000)<br />

MIG/18 Installation of High<br />

Mask Lights &<br />

Energy Serving<br />

Street Lights at Ba-<br />

Phalaborwa<br />

D6. NDPG Projects<br />

Implementing<br />

Dept<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

Ba-Phalaborwa MIG 3.00 5.000 7.000 3.000<br />

NDPG Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

NDPG/01 Speed humps Ba-Phalaborwa NDPG 370<br />

NDPG/02 Street Paving & Stormwater<br />

Drainage<br />

Namakgale, Lulekani &<br />

Gravelotte<br />

NDPG 4.000 4.200 - - -<br />

274


Implementing<br />

Dept<br />

NDPG Projects Source(s) of Funds O & M Budget (R’000)<br />

Project Name Project Location <strong>2011</strong>/12 2012/13 2013/14 2014/15 2015/16<br />

NDPG/03 Namakgale Sports Complex<br />

Phase 1<br />

NDPG/04 Lulekani Sport Precinct<br />

Phase 1<br />

D7. Mopani District Municipality Projects<br />

Namakgale NDPG (unregistered) 5000 12000 20000 30000 -<br />

Lulekani NDPG (unregistered) 5000 13000 25000 45000<br />

Project Name Project Location Description Implementing Budget<br />

Upgrading of water reticulation and<br />

extensions<br />

Phalaborwa Ext 5, Water supply Phase<br />

2<br />

Water<br />

Ba-Phalaborwa Upgrading of water<br />

reticulation and<br />

extensions<br />

MDM -<br />

Phalaborwa Extension 5 Water supply MDM -<br />

275


Project Name Project Location Description Implementing Budget<br />

Selwane water scheme Selwane Water supply MDM -<br />

Makhushane reservoir Makhushane Construction of<br />

reservoir<br />

Namakgale sewerage works<br />

rehabilitation<br />

Sanitation<br />

Namakgale Sewerage works<br />

rehabilitation<br />

MDM -<br />

MDM -<br />

Mopani rural households sanitation Ba-Phalaborwa Sanitation infrastructure DWA -<br />

Upgrading of Phalaborwa sewage<br />

plant<br />

Phalaborwa Upgrading of<br />

Phalaborwa sewage<br />

plant<br />

MDM -<br />

RDP Houses sewerage Matiko Xikaya Sanitation MDM -<br />

Harmony to Gravelotte road Harmony/Gravelotte 29.78km paving/tar MDM -<br />

Makhushane – Maune Road Makhushane/Maune Paving/tar MDM -<br />

Upgrading of Maseeke to<br />

Mashishimale road phase V<br />

Roads<br />

Maseke/Mashishimale 13km paving/tar MDM<br />

Apollo lights Ba-Phalaborwa Light in crime prone MDM<br />

276


Project Name Project Location Description Implementing Budget<br />

areas<br />

Educational Infrastructure<br />

Two crèche buildings Locations to be identified ECD Support to LMS MDM -<br />

D8. Sector Departments<br />

Project Name Project Location Project Description Implementing<br />

Agent<br />

Seloane (Pty) LTD Seloane Drip Irrigation for<br />

10ha<br />

Mponeng, Tipfuxeni<br />

eggs<br />

Miami plot no. &<br />

Itekeng Batub<br />

Overall<br />

Budget<br />

Land Reform Programme<br />

Phalaborwa Broiler LDA 97 032<br />

Planning &<br />

Design<br />

FY Budget <strong>2011</strong>-<br />

2012<br />

LDA 595000 - - 595000<br />

Implementing Period & Budget<br />

2012-<br />

2013<br />

2013-<br />

2014<br />

2014-<br />

2015<br />

277<br />

2015-<br />

2016


Project Name Project Location Project Description Implementing<br />

Agent<br />

Khomanani swi tiya,<br />

Regodisheng, Titirheleni<br />

Community Garden,<br />

Kurhula Community<br />

Garden, Mmone,<br />

Batswenyegi, Mantshe<br />

community garden,<br />

Tivekani farm,<br />

Raleputso farm,<br />

Mogoleng farm,<br />

Solester farm,<br />

Langutani, Tlharihani<br />

community gardeni &<br />

waterbok<br />

Overall<br />

Budget<br />

Phalaborwa Vegetables LDA 1 172<br />

460<br />

Cattle Handling Ba-Phalaborwa Construction of a<br />

basic cattle<br />

handling facility<br />

Animal Health Programme<br />

LDA 60000 10-<br />

11<br />

Planning &<br />

Design<br />

FY Budget <strong>2011</strong>-<br />

2012<br />

- 60 000<br />

Implementing Period & Budget<br />

2012-<br />

2013<br />

2013-<br />

2014<br />

2014-<br />

2015<br />

278<br />

2015-<br />

2016


Project Name Project Location Project Description Implementing<br />

Agent<br />

Oasis nursery for<br />

indeginous<br />

National School<br />

Nutrition<br />

Learner Support<br />

Materials<br />

Maphuta Malatji<br />

Hospital Revitalisation<br />

Benfarm Planting of<br />

indigenous tress<br />

Head Office Provision of<br />

Learners with<br />

Nutritional food<br />

All Schools Provision of<br />

Learner Support<br />

Materials to all<br />

schools<br />

Overall<br />

Budget<br />

Planning &<br />

Design<br />

FY Budget <strong>2011</strong>-<br />

2012<br />

DoA 950 000 950 000<br />

Limpopo Department of Education<br />

DoE - - - 659,233<br />

,000<br />

DoE 650,069<br />

,919<br />

Limpopo Department of Health and Social Development<br />

Namakgale Hospital District DPW 128,660 Multi<br />

ple<br />

Mashishimale Clinic Mashishimale Clinic Sakhiwo SH 6,777 2010<br />

/11<br />

Implementing Period & Budget<br />

2012-<br />

2013<br />

829,669,0<br />

00<br />

681,320,8<br />

20<br />

2013-<br />

2014<br />

892,96<br />

4,000<br />

745,72<br />

5,864<br />

25,732 40,878 35,500 10,000<br />

678 788<br />

2014-<br />

2015<br />

279<br />

2015-<br />

2016


Project Name Project Location Project Description Implementing<br />

Agent<br />

Phalaborwa Bus Stop<br />

Clinic<br />

Multi-Purpose Traffic<br />

Centre<br />

Routine Road<br />

Maintenance<br />

Tzaneen to Dan to<br />

Burgersdorp to<br />

Gravelotte<br />

Giyani – Phalaborwa<br />

road<br />

Overall<br />

Budget<br />

Phalaborwa Clinic Sakhiwo SH 12,600 2010<br />

/11<br />

Lulekani Multi-Purpose<br />

Traffic Centre<br />

All The whole road<br />

maintenance under<br />

the control of the<br />

Department<br />

Tzaneen/Ba-<br />

Phalaborwa<br />

Planning &<br />

Design<br />

FY Budget <strong>2011</strong>-<br />

2012<br />

Limpopo Department of Roads and Transport (Traffic Management)<br />

Road preventative<br />

maintenance and<br />

rehabilitation<br />

Ba-Phalaborwa Upgrading gravel to<br />

tar<br />

LDRT 16m 2010<br />

/11<br />

Implementing Period & Budget<br />

2012-<br />

2013<br />

1,260 2,000 10,000<br />

693,10<br />

0,80<br />

3 157<br />

459,20<br />

LDRT - - - 401<br />

324,000<br />

LDRT 25,200,<br />

000<br />

Road Agency Limpopo<br />

RAL 16,000,<br />

000<br />

2013-<br />

2014<br />

135 965 264<br />

787<br />

2014-<br />

2015<br />

280<br />

2015-<br />

2016


Project Name Project Location Project Description Implementing<br />

Agent<br />

Letsitele – Eiland –<br />

Letaba Ranch<br />

Shonalanga Water<br />

Resort<br />

Establishment of<br />

monitoring 2 air quality<br />

stations<br />

Limpopo Mukumbi<br />

Industries<br />

Ba-Phalaborwa LM<br />

water reticulation &<br />

extension<br />

Ba-Phalaborwa Upgrading gravel to<br />

tar<br />

Overall<br />

Budget<br />

Planning &<br />

Design<br />

FY Budget <strong>2011</strong>-<br />

2012<br />

Implementing Period & Budget<br />

2012-<br />

2013<br />

RAL 50,000,00<br />

0<br />

Limpopo Department of Economic Development, Environment & Tourism<br />

Phalaborwa Water resort LTP 40m<br />

Ba-Phalaborwa 2 Air Quality<br />

Stations<br />

Ba-Phalaborwa Mukumbi<br />

Industries<br />

Ba-Phalaborwa Ba-Phalaborwa<br />

water reticulation<br />

& extension<br />

2013-<br />

2014<br />

70,000<br />

,000<br />

2014-<br />

2015<br />

59,000,<br />

000<br />

LEDET - - - - - - - -<br />

LEDET 1,5m - - - - - -<br />

DWAF<br />

DWAF 15,000,<br />

000<br />

281<br />

2015-<br />

2016<br />

30,000<br />

,000


Project Name Project Location Project Description Implementing<br />

Agent<br />

Upgrading basic<br />

sanitation to<br />

waterborne system in<br />

dense settlements (e.g.<br />

Lulekani “A”)<br />

Benfarm A, B, C:<br />

reticulation (wards 8 &<br />

14)<br />

Benfarm A, B, C:<br />

reticulation (wards 8 &<br />

14)<br />

Lulekani RDP house<br />

sewer reticulation<br />

Lulekani Upgrading basic<br />

sanitation to<br />

waterborne system<br />

in dense<br />

settlements<br />

Benfarm A, B, C Benfarm A, B, C :<br />

reticulation<br />

Benfarm A, B, C Benfarm A, B, C :<br />

reticulation<br />

Lulekani D Lulekani D RDP<br />

house sewer<br />

reticulation<br />

Lulekani Stadium area Lulekani Lulekani Stadium<br />

area<br />

Overall<br />

Budget<br />

Planning &<br />

Design<br />

FY Budget <strong>2011</strong>-<br />

2012<br />

DWAF 17,000,<br />

000<br />

DWAF 3,000,0<br />

00<br />

DWAF 7,000,0<br />

00<br />

Implementing Period & Budget<br />

7,000,0<br />

00<br />

2012-<br />

2013<br />

DWAF - - - - - -<br />

DWAF 3,000,0<br />

00<br />

2013-<br />

2014<br />

2014-<br />

2015<br />

282<br />

2015-<br />

2016


Project Name Project Location Project Description Implementing<br />

Agent<br />

Kurhula water supply<br />

(ward 16)<br />

Makhushane (Maune,<br />

Mabikiri, Sebera)<br />

Mashishimale (Nguvo)<br />

Makhushane<br />

(ntswelemotse,<br />

Gardenview, Kanana)<br />

Mashishimale Bulk<br />

water operational plan<br />

Maseke<br />

Matiko Xikaya water<br />

supply operational<br />

Kurhula Kurhula water<br />

supply<br />

Makhushane/M<br />

ashishimale<br />

Makhushane<br />

(Maune, Mabikiri,<br />

Sebera)<br />

Mashishimale<br />

(Nguvo)<br />

Makhushane Makhushane<br />

(Ntswelemotse,<br />

Gardenview,<br />

Kanana)<br />

Mashishimale Mashishimale bulk<br />

operational plan<br />

Maseke<br />

Matiko Xikaya Matiko Xikaya<br />

water supply<br />

Overall<br />

Budget<br />

Planning &<br />

Design<br />

FY Budget <strong>2011</strong>-<br />

2012<br />

DWAF 3,500,0<br />

00<br />

DWAF 5,000,0<br />

00<br />

DWAF 3,000,0<br />

00<br />

DWAF 2,000,0<br />

00<br />

Implementing Period & Budget<br />

2012-<br />

2013<br />

6,000,000<br />

2013-<br />

2014<br />

2014-<br />

2015<br />

DWAF - - - - - - - -<br />

283<br />

2015-<br />

2016


Project Name Project Location Project Description Implementing<br />

Agent<br />

Namakgale E sanitation<br />

(Topville)<br />

Namakgale D sewer<br />

reticulation raising<br />

sewer, additional pump<br />

mains and secondary<br />

bulk<br />

Mahale, Nondweni,<br />

Prieska water<br />

reticulation<br />

Humulani/Matiko<br />

Xikaya water<br />

reticulation phase 2<br />

operational<br />

Namakgale E Namakgale E<br />

sanitation<br />

(Topville)<br />

Namakgale D Namakgale D<br />

sewer<br />

Mahale,<br />

Nondweni,<br />

Prieska<br />

Humulani/Matik<br />

o Xikaya<br />

Mahale, Nondweni,<br />

Prieska water<br />

reticulation<br />

Humulani/Matiko<br />

Xikaya water<br />

reticulation phase<br />

2<br />

Overall<br />

Budget<br />

Planning &<br />

Design<br />

FY Budget <strong>2011</strong>-<br />

2012<br />

Implementing Period & Budget<br />

2012-<br />

2013<br />

2013-<br />

2014<br />

2014-<br />

2015<br />

DWAF - - - - - - - -<br />

DWAF 4,000,0<br />

00<br />

DWAF 5,000,0<br />

00<br />

DWAF 3,000,0<br />

00<br />

4,000,000<br />

284<br />

2015-<br />

2016


Project Name Project Location Project Description Implementing<br />

Agent<br />

Nyakelang/Makhushane<br />

/Haniville water supply<br />

Mopani STW: Ba-<br />

Phalaborwa<br />

Maintenance of Muti<br />

wa Vatsonga<br />

Sports Development<br />

Nyakelang/Mak<br />

hushane/Hanivil<br />

le<br />

Nyakelang/Makhus<br />

hane/Haniville<br />

water supply<br />

Ba-Phalaborwa Mopani STW: Ba-<br />

Phalaborwa<br />

Eiland Maintenance of<br />

Muti wa Vatsonga<br />

Clubs Establishment All Locals Establish one rugby<br />

club per local<br />

Overall<br />

Budget<br />

Planning &<br />

Design<br />

FY Budget <strong>2011</strong>-<br />

2012<br />

DWAF 5,000,0<br />

00<br />

DWAF 5,700,0<br />

00<br />

Department of Sports, Arts & Culture<br />

Museum & Heritage<br />

DSAC 1,200,0<br />

00<br />

DSAC 12,000<br />

per local<br />

School Sports & Recreation<br />

Implementing Period & Budget<br />

2012-<br />

2013<br />

5,000,000<br />

2013-<br />

2014<br />

300.000 400,000 500,00<br />

0<br />

12,000<br />

2014-<br />

2015<br />

285<br />

2015-<br />

2016


Project Name Project Location Project Description Implementing<br />

Agent<br />

Ba-Phalaborwa Hubs Namakgale &<br />

Mashishimale<br />

Ba-Phalaborwa Hubs Namakgale &<br />

Mashishimale<br />

Ba-Phalaborwa Hubs Namakgale &<br />

Mashishimale<br />

School Sport Mass<br />

Participation<br />

Programme<br />

Training of 32<br />

Coordinators<br />

Training of educators as<br />

coaches & technical<br />

officials<br />

Overall<br />

Budget<br />

Planning &<br />

Design<br />

FY Budget <strong>2011</strong>-<br />

2012<br />

Hubs DSAC 10,000<br />

Hubs DSAC 20,000<br />

Hubs DSAC 33,760<br />

Ba-Phalaborwa Establishment &<br />

support to leagues<br />

Ba-Phalaborwa Training of 32<br />

Coordinators<br />

Ba-Phalaborwa Training of<br />

educators as<br />

coaches &<br />

technical officials<br />

Implementing Period & Budget<br />

2012-<br />

2013<br />

DSAC 360,000 378,000<br />

DSAC 26,800<br />

DSAC 37,000<br />

2013-<br />

2014<br />

2014-<br />

2015<br />

286<br />

2015-<br />

2016


D9. Libsa Projects<br />

Strategic Objectives Measurable<br />

Objectives<br />

Provision of strategic<br />

marketing and<br />

communication<br />

services to internal<br />

and stakeholders<br />

To facilitate 2<br />

business seminars<br />

across five districts<br />

To participate in 100<br />

workshop across five<br />

districts<br />

To participate in 12<br />

radio campaigns<br />

Distribution of 6 000<br />

LIBSA newsletters<br />

Key Performance<br />

Indicators<br />

2 Business<br />

seminars to be<br />

conducted<br />

100 workshops to<br />

participate in<br />

12 adverts and<br />

radio talk shows<br />

to be participated<br />

in<br />

6 000 newsletters<br />

to be distributed<br />

Baseline<br />

2009/10<br />

3 business<br />

seminars<br />

conducted<br />

Participate<br />

d in 191<br />

workshops<br />

Participate<br />

d in 8 radio<br />

campaigns<br />

2 700<br />

newsletters<br />

distributed<br />

Budget<br />

2010/11<br />

R50 000 1 business<br />

seminars<br />

conducted<br />

Quarter 1 Quarter 2 Quarter 3 Quarter 4<br />

30<br />

workshops<br />

3 radio<br />

adverts<br />

1 500<br />

newsletters<br />

No business<br />

seminars<br />

conducted<br />

30<br />

workshops<br />

3 radio<br />

adverts<br />

1 500<br />

newsletters<br />

1 business<br />

seminars<br />

conducted<br />

30<br />

workshops<br />

3 radio<br />

adverts<br />

1 500<br />

newsletters<br />

No seminars to<br />

be conducted in<br />

this quarter<br />

10 workshops<br />

3 radio adverts<br />

1 500<br />

newsletters<br />

287


Strategic Objectives Measurable<br />

Objectives<br />

TOTAL<br />

GRAND TOTAL<br />

D10. Foskor Projects<br />

Distribution of 3 000<br />

LIBSA brand booklets<br />

Key Performance<br />

Indicators<br />

3 000 brand<br />

booklets to be<br />

distributed<br />

Baseline<br />

2009/10<br />

1 813<br />

brand<br />

booklets<br />

distributed<br />

Budget<br />

2010/11<br />

Quarter 1 Quarter 2 Quarter 3 Quarter 4<br />

750<br />

booklets<br />

750 booklets 750 booklets 750 booklets<br />

R550 000 R137 500 R137 500 R137 500 R137 500<br />

Name of Project Purpose of the Project Brief Description of the Project Budget<br />

Charity Golf Donations Community Up liftment Foskor has hosted this event for 21 years and in 2010 R300, 000 will be distributed<br />

to charities from the funds raised. 270,000.00<br />

Protec Educational Support Protec is a leader at motivating youth towards technical careers. Foskor is a cosponsor<br />

with PMC and Sasol Agri in the local programme for an investment by 540,000.00<br />

288


Name of Project Purpose of the Project Brief Description of the Project Budget<br />

HIV & AIDS Health: HIV & AIDS Support<br />

Foskor of R350,000 a year.<br />

Foskor has a joint community HIV& Aids project with PMC and Department of Health<br />

, managed by the Phalaborwa Foundation. R258,940 was invested by Foskor during<br />

the period under review. 258,940.00<br />

Traditional Authorities Stakeholders Relations Local traditional leaders are important stakeholders for the company and each year<br />

a donation of up to R100,000 is made for projects they put forward. 100,000.00<br />

Bursaries (University<br />

and Technikon)<br />

Educational Support Foskor’s Tertiary Bursary programme is targeted at external candidates studying<br />

towards various engineering disciplines. Up to R600, 000 is spent annually on this<br />

bursary scheme. 450,000.00<br />

Sports Development Sports Development The company has always supported its people in their endeavours on the sports<br />

field. The Socce and Athletics Team is a proud part of Foskor’s history and each year<br />

receives about R80,000 each. 160,000.00<br />

Marula Festival<br />

Foskor sponsors the Marula Festival with an annual donation of R20,000. 30,000.00<br />

Foskor Open Pit Race Sports Development The open pit race starts at the open pit mine and is a 21 km race, the annual<br />

sponsorship for which is R100,000.<br />

100,000.00<br />

Foskor Community<br />

Centre<br />

Small Scale Community<br />

Project / Entrepreneural<br />

Development<br />

Foskor built a community centre in Namakgale 20 years ago. Foskor has undertaken<br />

the restoration of the centre in partnership with local government and business. 260,000.00<br />

Media Centre Educational Support This facility is a resource centre for local schools, operating in the Foskor Community<br />

Centre in Namakgale. It provides administrative back-up for 55 local schools. Foskor<br />

provides the venue, pays for the rental of the equipment and employs a temporary<br />

worker to manage the facility – a cost of about R240,000 a year. 240,000.00<br />

Museum This is located in the very first house that was built in Phalaborwa. It is a record of a<br />

town that grew up around its unique mineral wealth and presents a live history of a<br />

mining town. The intention is to continue expanding the appeal of the museum, by 220,000.00<br />

289


Name of Project Purpose of the Project Brief Description of the Project Budget<br />

Cleaning of Streets in<br />

getting it onto the South African tourism map and adding a coffee shop for visitors.<br />

This is one of the projects that we undertake to clean the streets in the local area of<br />

Ba-Phalaborwa area<br />

Ba-Phalaborwa 100,000.00<br />

Foskor 21 Marathon Sports Development Foskor invests R500,000 each year towards the half marathon, which attracts<br />

professional athletes. 500,000.00<br />

Nutri Suppl (Cel Food) Health Support Initiative Foskor provides nutritional supplements to all its workforce and their immediate<br />

family members to boost their immune systems 320,000.00<br />

Foskor Primary School Educational Support Foskor will be adopting the Stanbury Primary School with the hope of helping in<br />

improving the standard of teaching and learning at the school 292,000.00<br />

Dinaledi Schools Educational Support Foskor supports the development of maths and science which are a requirement for<br />

skills that are identified as critical for the future of our operations 200,000.00<br />

SPCA Community Community Support Foskor undertakes to support the local Municipality and the SPCA in assisting and Operational cost:<br />

Outreach Programme<br />

educating households that do not have direct access or the means to provide 1,169,700.00<br />

sufficient animal care<br />

Capital cost:<br />

150, 252.00<br />

Miscellaneous<br />

Donations<br />

190,236.00<br />

290


D11. Rio Tinto Palabora Foundation Projects<br />

Name of Project Forecast 2010 Budget <strong>2011</strong><br />

Community Health Services 3 263 815.00 3 443 752.00<br />

Skills Development 4 106 131.00 5 006 248.00<br />

Education – Student Support 8 820 886.00 9 806 537.00<br />

Business Development 1 580 912.00 1 676 943.00<br />

LED & Tourism 1 115 906.00 2 647 406.00<br />

ELC & Communities 1 882 802.00 1 601 173.00<br />

Management & Support 7 984 550.00 8 750 817.00<br />

Capital & Projects 5 644 154.00 4 360 949.00<br />

Total 34 399 156.00 37 293 949.00<br />

Marula Festival – 1 st Testing by Traditional Authorities<br />

Mashishimale Clinic<br />

Other Projects Supported Projects<br />

291


Name of Project Forecast 2010 Budget <strong>2011</strong><br />

Infrastructure for Lesedi Drop-In Centre<br />

Tourism Projects:<br />

• Bollanoto Tourism Centre<br />

• Annual Durban Tourism Indaba<br />

• Branding & Marketing of Ba-Phalaborwa<br />

D12. Rio Tinto Palabora Social Labour Plan (SLP) Projects<br />

Name of Project Project Location Project Value Budget<br />

Farm Waterbok Selwane 5.0m In progress<br />

Marula Beneficiation Ba-Phalaborwa 5.0m<br />

Electrical Upgrade Phalaborwa 3.50m Completed<br />

292


D13. South African Airlink Project (s)<br />

Name of Project Project Location Source of Funding Year Budget (R)<br />

Upgrading of Phalaborwa Airport Phalaborwa SAA Airlink <strong>2011</strong>/12 65.000 000.00<br />

293


SECTION E<br />

Summaries of Sector Plans<br />

For the <strong>IDP</strong> to be credible, the document should have sector plans aligned to the main document. The table<br />

below lists all the necessary sector plans and the status of each plan.<br />

Name of Sector Plan/Strategy Status RESPONSIBLE DEPARTMENT<br />

Anti-Corruption Strategy Yes Office of the Municipal Manager<br />

Disaster Management Plan Yes Office of Municipal Manager<br />

Environmental Management<br />

Plan<br />

No Community Services<br />

Five-Year Financial Plan No Budget & Treasury<br />

<strong>IDP</strong> Housing Chapter Yes Planning & Development<br />

LED Strategy Yes Planning & Development<br />

LUMS Yes Planning & Development<br />

Waste Management Plan Yes Community Services<br />

Risk Management Strategy Yes Office of the Municipal Manager<br />

SDF Yes Planning & Development<br />

Recruitment & Retention<br />

Strategy<br />

Yes Corporate Services<br />

Municipal Institutional Plan Yes Corporate Services<br />

Revenue Enhancement<br />

Stratery<br />

Yes Budget & Treasury<br />

Community Safety Plan No Community Services & SAPS<br />

HIV/AIDS Strategy No Municipal Manager<br />

294


E1. Ba-Phalaborwa Municipality <strong>IDP</strong> Housing Chapter<br />

Housing Strategy<br />

Table below reflects the proposed housing strategy for the Ba-Phalaborwa Municipality. From this it is<br />

evident that there is sufficient land available to deal with the entire housing demand in the Municipal area<br />

and there is even spare capacity of about 5126 in terms of land identified.<br />

295


PROJEC<br />

TS<br />

SETTLE<br />

MENT<br />

NAME<br />

1 Ben<br />

Farm<br />

2 Lulekani<br />

A<br />

3 Makhus<br />

hane<br />

PROJECTS<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

Lulekani 1A<br />

Mashishimale<br />

R3<br />

Tlapeng<br />

Maseke<br />

Boelang<br />

Makhushane<br />

Malungani<br />

village<br />

403 318 508 280 430 220 628 1154 110 - 1070 1000 - 6121<br />

150 135 15 150 0<br />

268 268 268 0<br />

197 197 197 0<br />

4 Mashishi 198 198 198 0<br />

Namakgale<br />

Phalaborqa x7<br />

Phalaborwa x10<br />

Phalaborwa x9<br />

Leydsorp<br />

Murchison<br />

Mining Town<br />

Total<br />

DEFICIT (-)<br />

296


male<br />

5 Maseke 197 197 197 0<br />

6 Matiko-<br />

Xikaya<br />

394 0 0<br />

7 Selwana 198 0 0<br />

TOTAL<br />

ALLOC<br />

ATED<br />

SURPLU<br />

S (+)<br />

1602 403 213 0 197 0 197 0 0 0 0 0 0 - 1010 0<br />

0 120 508 83 430 23 628 1154 110 - 1070 1000 - 5126 995<br />

297


Proposed Priority Projects<br />

Following from the above information, the proposed priority housing projects for Ba-Phalaborwa<br />

Municipality can be summarised as follows:<br />

• Matiko-Xikaya<br />

• Ben Farm<br />

• Lulekani A<br />

• Selwane<br />

• Maseke<br />

• Mashishimale<br />

• Makhushane<br />

• Phalaborwa<br />

The current housing backlog of 1925 can be easily addressed within the areas of town, Lulekani,<br />

Namakgale, Mashishimale and Makhusane area. This number is very minimal, and can be addressed in less<br />

than the stipulated five years.<br />

Remarks<br />

Apart from some prevalent institutional problems, the Ba-Phalaborwa Municipality has a clear and well-<br />

directed vision as to how it will meet the existing and projected future housing demand in its area of<br />

jurisdiction. The housing strategy caters for public and private housing, and projects are aimed at<br />

consolidating the urban structure, optimising the utilisation of existing infrastructure, and enhancing the<br />

sustainability of the livelihoods of all of its residents.<br />

298


E2. Land Use Management Scheme of Ba-Phalaborwa<br />

The Ba-Phalaborwa Local Municipality or its successor in title shall be the authority responsible for the<br />

enforcing and execution of the provisions of this land-use scheme.<br />

Authority of Land-Use Scheme<br />

This land-use scheme has been prepared in terms of the provisions of Section 18 of the Town Planning and<br />

Townships Ordinance, 1986 (Ordinance No. 15 of 1986), and will be the only land-use scheme for the<br />

municipal area.<br />

Title of Land-Use Scheme<br />

This scheme shall be known as the Ba-Phalaborwa Land-use Scheme, 2008.<br />

Area of the Land-Use Scheme<br />

The area to which the land-use scheme applies is the area of the municipality.<br />

Administration of Land-Use Scheme in Area<br />

The local municipality to determine the use of land and land-uses, which is deemed to be agricultural and<br />

shall be either formal rural settlement, an informal rural settlement or a semi formal rural settlement<br />

(where relevant), for which the land-uses to be permitted have not been depicted by notations for the use<br />

zones on the map.<br />

Substitution<br />

The Scheme substitutes any existing scheme in operation only regarding the relevant area of this Scheme<br />

and Regulations.<br />

Conflict between provisions of this land-use scheme, conditions of title and legislation<br />

A consent granted by the local municipality by virtue of provisions of this scheme does not entitle any<br />

person the right to use any land, or to erect or use buildings thereon in any manner or for any purpose<br />

which is prohibited by the provisions of any condition registered against the title deed under which such<br />

land is held, or imposed by legislation in respect of such land.<br />

299


Statutory related definitions<br />

• Communal Property Registration Act, No. 28 of 1996.<br />

• The Environment Conservation Act, (Act No. 73 of 1989), National Environmental Management Act,<br />

1998 (Act 107 of 1998), and later amendments.<br />

• Municipal Systems Act (Act 32 of 2000).<br />

• Town Planning and Townships Ordinance, 1986 (Ordinance No. 15 of 1986) and is a component of land-<br />

use management.<br />

• Limpopo Environmental Management Act, 2003.<br />

• National Environmental Management Act, 1998 (Act 107 of 1998).<br />

• National Environmental Management Biodiversity Act, 2004 (Act 10 of 2004).<br />

Protection of Land and Environment<br />

• No person may spoil or damage land in any Use Zone so as to impair its use or the purpose for which it<br />

was zoned.<br />

• No person may develop land without complying with the requirements of the Environment<br />

Conservation Act, (Act 73 of 1989) and National Environmental Management Act, 1998 (Act 107 of<br />

1998) as amended from time to time and without observing the requirements relating to listed<br />

activities.<br />

Placing and Development of Buildings<br />

• The siting of buildings, including outbuildings erected on the erf, as well as exits and entrances to a<br />

public street system shall be to the satisfaction of the local municipality.<br />

• No building of any nature shall be erected on that portion of the property which is likely to be<br />

inundated by the floodwater of a public stream on an average of 100 years, as determined by the<br />

relevant legislation from time to time and the local municipality.<br />

300


Erection and Use of Buildings or Use of Land<br />

The purposes for which buildings and land in each of the use zones:<br />

• may be erected and/or used;<br />

• may be erected and/or used only with the special consent of the local municipality, permanently or for<br />

a specified period;<br />

• may be erected and/or used only with the written consent of the local municipality; or<br />

• may not be erected and/or used.<br />

E3. Anti-Corruption Strategy (Adopted)<br />

Introduction<br />

The primary objective of this strategy is to prevent fraudulent conduct before it occurs by encouraging a<br />

culture within the Municipality where all employees, members of the public and other stakeholders<br />

continuously behave with and promote integrity in their dealings with, or on behalf of municipality.<br />

To encouraging all employees and other stakeholders to strive toward the promotion of integrity and the<br />

prevention and detection of unethical conduct, fraud and corruption impacting or having the potential to<br />

impact on the Municipality.<br />

To improving accountability, efficiency and effective administration within municipality, including decision-<br />

making and management conduct which promotes integrity.<br />

Principles of the strategy<br />

The main principles upon which the strategy is based are the following:<br />

• Creating a culture within municipality which is intolerant to unethical conduct, fraud and corruption;<br />

• Strengthening community participation in the fight against corruption in municipality;<br />

• Strengthening relationships with key stakeholders, e.g. SALGA, SAPS Employee representative unions<br />

and Communities, that are necessary to support the actions required to fight corruption in<br />

municipality;<br />

• Deterrence of unethical conduct, fraud and corruption;<br />

301


• Preventing unethical conduct, fraud and corruption which cannot be deterred;<br />

• Detection of unethical conduct, fraud and corruption;<br />

• Investigating detected unethical conduct, fraud and corruption;<br />

• Taking appropriate action in the event of such irregularities, e.g. disciplinary action, recovery of losses,<br />

prosecution, etc; and<br />

• Applying sanctions, which include redress in respect of financial losses.<br />

• improving the application of systems, policies, procedures and regulations;<br />

• Changing processes of the Municipality that facilitate corruption/fraud and allow it to go unnoticed<br />

or unreported.<br />

All aspects of the strategy will be:<br />

• Supported by comprehensive education, training and awareness campaigns;<br />

• Coordinated with other the spheres of government and community;<br />

• Subjected to continuous fraud risk assessments; and<br />

• Expressed in terms of measurable and time-bound implementation plans.<br />

Statement of attitude to fraud<br />

Fraud represents a significant potential risk to the Municipality’s assets, service delivery efficiency and<br />

reputation. The Institution will not tolerate corrupt or fraudulent activities, whether internal or external to<br />

the Institution, and will vigorously pursue and prosecute any parties, by all legal means available, which<br />

engage in such practices or attempt to do so.<br />

Regulatory legislation.<br />

The Public Service Anti-Corruption Strategy.<br />

During 1997, Government initiated a national anti-corruption campaign. This campaign progressed to a<br />

National Anti-corruption Summit held in April 1999 at which all sectors of society (public and private)<br />

committed themselves to establishing sectoral anti-corruption strategies. At the same time, they also<br />

committed to the co-responsibility for fighting corruption through the coordination of these sectoral<br />

strategies.<br />

302


The Local Government Anti-Corruption Strategy.<br />

Local Government developed the Local Government Anti-Corruption Strategy (LGACS), which is modelled<br />

around the Public Service Anti-Corruption Strategy.<br />

Prevention and Combating of Corrupt Activities Act, 12 of 2004 (PRECCA)<br />

Aimed at the strengthening of measurement to prevent and combat corrupt activities.<br />

Prevent of Organized Crime Act 121 of 1998 (POCA)<br />

As amended contained provisions that are aimed at combating of organized crime, money laundering and<br />

criminal gang activities .<br />

Protection Disclosure Act 20 of 2000 (PDA)<br />

The act was promulgated to facilitate reporting by employees (whistle blowers) of fraud, corrupt or other<br />

unlawful or irregular action by other employers(s) or co-employers without fear of any discrimination or<br />

reprisal by their employers or co-employees.<br />

Municipal Finance Management Act (MFMA)<br />

The act was promulgated to facilitate the formal management Municipal finances and associated activities.<br />

Certain aspects of the Act refer especially to activities which might be regarded as being corrupt or<br />

fraudulent in nature e.g. Unauthorized, irregular and fruitless and wasteful expenditure.<br />

Municipal System Act 32 of 2000 ( MSA)<br />

The MSA sets out procedure to be adopted by municipal management with regard to a number of aspects<br />

affecting the management of municipality. The Act also stipulates procedures to be adopted with regard to<br />

certain aspects related to misconduct and investigation thereof.<br />

Ba-Phalaborwa Municipality anti-fraud and corruption strategy.<br />

This Anti-Corruption Strategy has been developed as a result of the expressed commitment of Government<br />

to fight corruption. It is also an important contribution to the National Anti-Corruption Strategy of the<br />

303


country and supplements both the Public Service Anti-Corruption Strategy and the Local Government Anti-<br />

Corruption Strategy.<br />

Definition of fraud and corruption<br />

In South Africa, the Common Law offence of fraud is defined as “the unlawful and intentional making of a<br />

misrepresentation which causes actual and or potential prejudice to another”. The term “fraud” is also<br />

used in a wider sense by the general public.<br />

In this regard, the term is used in this document in its widest possible meaning and is intended to include<br />

all aspects of economic crime and acts of dishonesty. In other words, fraud can be described as any<br />

conduct or behaviour of which a dishonest representation and/or appropriation forms an element.<br />

The general offence of corruption is contained in Section 3 of The Prevention and Combating of Corrupt<br />

Activities Act. This section provides that any person who gives or accepts or agrees or offers to accept /<br />

receive any gratification from another person in order to influence such other person in a manner that<br />

amounts to:<br />

• The illegal or unauthorised performance of such other person’s powers, duties or functions;<br />

• An abuse of authority, a breach of trust, or the violation of a legal duty or a set of rules;<br />

• The achievement of an unjustified result; or<br />

• Any other unauthorised or improper inducement to do or not to do anything is guilty of the<br />

offence of Corruption.<br />

Forms of corruption<br />

Corruption takes various forms in the public service and elsewhere in society. The following are examples<br />

of different types of corruption:<br />

Bribery<br />

Bribery involves the promise, offering or giving of a benefit that improperly affects the actions or decisions<br />

of public servants.<br />

304


Embezzlement<br />

This involves theft of resources by persons who control such resources.<br />

Fraud<br />

Any conduct or behaviour of which a dishonest representation and/or appropriation forms an element.<br />

Extortion<br />

Coercion of a person or entity to provide a benefit to a public servant, another person or an entity, in<br />

exchange for acting (or failing to act) in a particular manner.<br />

Abuse of power<br />

The use by a public servant of his or her vested authority to improperly benefit another public servant,<br />

person or entity (or using vested authority to improperly discriminate against another public servant,<br />

person or entity).<br />

Conflict of interest<br />

The failure by a public servant to act or to consciously fail to act on a matter where the public servant has<br />

an interest or another person or entity that has some form of relationship with the public servant has an<br />

interest.<br />

Abuse of privileged information<br />

This involves the use, by a public servant of privileged information and knowledge that a public servant<br />

possesses as a result of his/ her office to provide unfair advantage to another person or entity to obtain a<br />

benefit.<br />

Favouritism<br />

The provision of services or resources according to personal affiliation (for example cultural or religious) of<br />

a public servant.<br />

305


Nepotism<br />

A public servant ensuring that family members are appointed to public service positions or that family<br />

members receive contracts from the state is regarded as nepotism.<br />

These manifestations are by no means exhaustive as corruption appears in many forms and it is virtually<br />

impossible to list all of these.<br />

E4. Local Economic Development Strategy (Approved)<br />

Purpose<br />

The purpose of this document is to recommend strategic interventions to create integrated and sustainable<br />

communities for Ba-Phalaborwa Local Municipality where social well-being, economic development and<br />

the environment are in harmony. This forms part of the DBSA sustainable community programme, which is<br />

currently being piloted at six places in South Africa, including Ba-Phalaborwa.<br />

Localised strategic guidelines for local economic development adopted to inform specific LED strategies<br />

and employment generation strategies which have to be designed to address unemployment and lack of<br />

income sources. The strategic guidelines will also inform strategies and the design of project proposals in<br />

other fields, which may have an impact on local economic development. These may include issues such as<br />

labour-intensive means of construction and procurement approaches.<br />

Motivation:<br />

The achievement of <strong>IDP</strong> objectives is largely dependant on the local economic development (LED) strategy<br />

that needs to incorporate elements of local economic promotion.<br />

Source documents for local economic guidelines:<br />

• The Constitution of the Republic of South Africa – mandate to promote social and economic<br />

development;<br />

• White paper on Local Government;<br />

• Growth, Employment and Redistribution Programme (GEAR), and<br />

306


• ASGISA (Accelerated and Shared Growth Initiative for South Africa).<br />

Relevant guidelines / principles:<br />

• Poverty alleviation through creation of employment opportunities by primarily utilizing local<br />

resources<br />

• Introduction of LED support programmes through strategies<br />

• Focal economic sectors for promotion;<br />

• Basic principles of promotion;<br />

• Major instruments of promotion;<br />

• Major target groups and intended beneficiaries;<br />

• Focal geographic areas.<br />

• LED should aim at creating employment opportunities and redistribution of economic resources and<br />

opportunities for the benefit of all residents (thereby contributing to alleviation of poverty) through<br />

economic growth and development based primarily on local resources. Local government is supposed<br />

to play a crucial role in promoting LED.<br />

• <strong>IDP</strong> is considered to be the tool to plan LED support programmes, assuming that some of the socio-<br />

economic needs (i.e. priority issues) will be best addressed through LED initiatives.<br />

• <strong>IDP</strong> has to ensure proper consideration of LED objectives in other strategies and initiatives (e.g.<br />

infrastructure development);<br />

• <strong>IDP</strong> should provide guidelines for the promotion of sector-specific or location-specific economic<br />

development initiatives (such as tourism development strategies) in the municipal area.<br />

Application of principles:<br />

The strategies for LED should incorporate the following elements:<br />

• The vigorous identification and sourcing of resources, public and private, for LED enhancement (i.e.<br />

attraction of investment, lobbying for government allocations etc.);<br />

• Consideration of employment creation possibilities for municipal projects; and<br />

• The advancement of facilitation of development of local economic potential.<br />

307


Key issues in the LED Strategy<br />

The strategy provides baseline information on the current:<br />

• Socio-economic situation<br />

• Spatial development situation<br />

• Infrastructure situation<br />

• State of the environment<br />

• Institutional capacity, and<br />

• Development policy in the Municipality<br />

It also projects future development scenarios and provides implementation plans for:<br />

• Mining<br />

• Tourism<br />

• Agriculture<br />

• Manufacturing<br />

• Housing<br />

• Entrepreneurship; and<br />

• Social investments.<br />

E5. Summary of Ba-Phalaborwa Municipality SDF (Approved)<br />

Purpose and Scope<br />

As a minimum legal requirement of the Municipal Systems Act (Act 32 of 2000), all Municipalities are<br />

required to prepare a Spatial Development Framework (SDF) as part of the Integrated Development<br />

Planning Process. The Spatial Development Framework for the Ba-Phalaborwa Local Municipality comprises<br />

of approximately 3001 km² that extends from Rubbervale in the West to Phalaborwa in the East and up to<br />

the Letaba River in the North and Grietjie in the South.<br />

308


Legislation<br />

Key legislation that guides, influences and impacts on the SDF.Name of Act/Policy/Guideline Short Name<br />

No of Act<br />

• Constitution of South Africa Constitution Act 108 of 1996<br />

• Municipal Systems Act Systems Act 32 of 2000<br />

• Municipal Structures Act Structures Act 117 of 1998<br />

• Municipal Demarcation Act Demarcation Act 27 of 1998<br />

• Development Facilitation Act DFA Act 67 of 1995<br />

• Transvaal Town Planning and Townships Ordinance O.15 of 1986 Ordinance 15 of 1986<br />

• Division of Land Ordinance O.20 of 1986 Ordinance 20 of 1986<br />

• Roads and Ribbon Development Act - Act 21 of 1940<br />

• Subdivision of Agricultural Land Act 70 of 1970<br />

• National Environmental Management Act NEMA Act 107 of 1998<br />

• Environmental Conservation Act (amended) ECA Act 50 of 2003<br />

• Extension of Security of Tenure Act ESTA Act 62 of 1997<br />

• Housing Act HA Act 107 of 1997<br />

• Interim Protection of Informal Land Rights Act IPILRA Act 31 of 1996<br />

• Less Formal Township Establishment Act LFTE Act 113 of 1991<br />

• Provision of Land and Assistance Act PLA Act 126 of 1993<br />

• National Spatial Development Perspective NSDP 2002<br />

• Limpopo Provincial Growth Development Strategy LGDS 2005<br />

• Limpopo Spatial Development Framework LSDF 2000<br />

• Mopani District Spatial Development Framework MSDF 2007<br />

• Mopani District Municipality <strong>IDP</strong> <strong>IDP</strong> 2007/8<br />

• Ba-phalaborwa <strong>IDP</strong> <strong>IDP</strong> 2007/8<br />

• Public Resort Ordinance Resort Ordinance Ord 18 of 1969<br />

• Ba-phalaborwa Town Planning Scheme TPS<br />

309


Land use management within the Municipality area is dealt with in terms of the existing Town Planning<br />

Ordinance, the Phalaborwa Town Planning Scheme, Proclamation R293 AND R 188,<br />

The objectives of the SDF are to:<br />

• Define desired patterns of land use within Ba-Phalaborwa municipal area.<br />

• Promote the spatial integration of the Municipal area in terms of defining:<br />

a) Integration of formerly disadvantaged areas.<br />

b) The identification of development nodes.<br />

c) Direction of growth.<br />

d) Major transport and movement routes.<br />

e) Conservation of the natural and built environment.<br />

f) Identification of specific development zones and densities.<br />

g) Proposed nature areas and location of future development in conjunction with the<br />

h) Integrated Environmental Programme of the Ba-Phalaborwa Municipality.<br />

i) Basic guidelines for a land use management system within the Municipal area.<br />

The Scope of work of the SDF includes:<br />

• Formulation of a policy of development to define desired patterns of land use and the spatial<br />

reconstruction of the municipal area.<br />

• Formulation of a Spatial Framework indicating the desired spatial form.<br />

• Development of Guidelines for a Land Use Management System.<br />

• Strategic Environmental Assessment of the impact of development proposals contained in the SDF.<br />

• Implementation plan of the SDF.<br />

• Institutional arrangement for effective implementation and management of the SDF.<br />

Key Deliverables of the SDF for Ba-Phalaborwa municipality are:<br />

• Spatial and updated spatial analysis<br />

• Reviewing of the Legal framework and land use plans which impacts on the Spatial<br />

• Development<br />

310


• Gathering of information to fill existing gaps.<br />

• Investigation of land use patterns, trends, tendencies and spatial imbalances.<br />

• Evaluation and assessment of vacant land.<br />

• Audit of land availability and ownership.<br />

• Visual presentation (GIS) of spatial issues and trends emanating from detailed investigation<br />

E6. Integrated Waste Management Plan<br />

Legislative and Policy Framework<br />

The Integrated Waste Management Plan is informed by the following legislative framework:<br />

• National legislation<br />

• National Policy<br />

• Intergovernmental Relations<br />

• Waste Related Legislation<br />

• National Initiatives<br />

• International Obligations<br />

Waste Management is a holistic approach to waste focusing on prevention and minimisation of both the<br />

generation of waste and any negative impact it may have on human health and the environment.<br />

Integrated Waste Management Plan is based on the concept of waste hierarchy, aims for universal service<br />

and requires separation at source to be effective.<br />

Cleaner production: Waste prevention and minimization<br />

Cleaner production focuses on production processes in order to ensure that the volume of waste over the<br />

life cycle of the product is reduced and minimised. Cleaner production also focuses on the efficient use of<br />

311


natural resources including water and energy, e.g a more energy efficient production process can reduce<br />

the need to burn coal for electricity and reduce the generation of ash from power plants.<br />

Collection<br />

• Ba-Phalaborwa removes waste from the following areas:<br />

• Phalaborwa town<br />

• Namakgale<br />

• Lulekani<br />

• Gravelotte<br />

Treatment<br />

Waste can treated after it is collacted and prior to final disposal. The goal of treatment is to reduce the<br />

volume of waste and to reduce its potential cause to harm to human health and the environment.<br />

Treatment for general includes incineration or biological processes. Other treatment options are available<br />

for specialised waste, e.g. the preferred treatment for infectious waste is steam sterilisation in an<br />

autoclave.<br />

Final Disposal of Waste<br />

The Phalaborwa waste disposal site is the one site that is currently used. The site is open from 07h00 in the<br />

morning to 18h00 in the evening. The dumping is site is not licensed landfill site.<br />

312


E7. Recruitment and Retention Strategy<br />

Preamble<br />

Staff recruitment and retention is currently regarded as one of the top priorities for strategic planning in an<br />

organization. This is focused on attracting employees to join the organization through focused recruitment<br />

and selection strategies and retaining those who are already employed especially those with crucial skills to<br />

the organization. The strategy will cover both the psychological aspects of employees, the operational<br />

aspects attached to the job or tasks where an employee is appointed and of utmost importance is about<br />

motivating staff.<br />

The strategy will address intentions to retain staff, classification of skills and the key aspects of staff<br />

recruitment and retention. The strategy will further highlight on what will make employees to stay in the<br />

municipality and what interventions measures to put in place to minimise staff turnover.<br />

Objectives<br />

• To become the employer of choice.<br />

• To ensure a conducive and harmonious working environment for employees.<br />

• To ensure employees health and wellness.<br />

• To attract and retain competent staff.<br />

• To retain key staff members whose services are regarded as critical or classified as scarce skills.<br />

• To ensure career development for staff.<br />

• To reduce annual staff turnover rate.<br />

Legislative framework<br />

• Basic conditions of employment Act<br />

• Employment Equity Act 55 of 1998<br />

• Skills Development Act 97 of 1998<br />

313


Principles that underpins the recruitment and Retention strategy<br />

• The policy is developmental rather than subjective.<br />

• Classification of posts into scarce skills, valued skills and high risk skills.<br />

• The culture of continually developing staff shall be maintained in line with the Skills Development Act<br />

and Performance Management System.<br />

• The culture of creating and sustaining a pleasant and humane working environment where employees<br />

are given a chance to thrive shall be a norm.<br />

• The potential and reasons for leaving the Ba-Phalaborwa municipality shall be determined by<br />

conducting exit interviews and staff morale assessment surveys.<br />

• The Recruitment and Retention policy should by no means be construed to be creating expectations for<br />

either promotion or monetary rewards.<br />

E8. Municipal Institutional Plan<br />

Ba-Phalaborwa Municipality is a Category B Municipality in terms of section 4 of the Municipal Structures<br />

Act of 1998 and was established in the year 2000. It is a municipality with a Mayoral Executive System<br />

contemplated in section 3(b) of the Northern Province Determination of Types of Municipality Act, 2000.<br />

The name of the Local municipality is Ba-Phalaborwa Local Municipality.<br />

The Municipal Institutional Plan is an internal plan that enables the municipality to organize and deploy its<br />

human resources and systems to achieve its strategic objectives.<br />

Purpose and benefits<br />

• The Municipal Institutional Plan ensures amongst others the following:<br />

• Ensure that there are resources properly arranged to implement the <strong>IDP</strong>.<br />

314


• Ensures that there is focus in the desired goals as stipulated in the <strong>IDP</strong> document are achieved without<br />

failure.<br />

• Better service delivery because you will be having the right people with skills.<br />

• Assists the municipality to drive its objectives.<br />

• Improves organizational effectiveness and efficiency.<br />

• It allows for integrated implementation of the <strong>IDP</strong>.<br />

• Optimal utilization of human capital.<br />

• It could contribute towards a clean audit.<br />

• Improves client relations.<br />

• Assists municipalities to do a realistic assessment of its capacity.<br />

• Assist municipalities to comply with legislative compliance.<br />

• It will assist the municipality to perform all its functions.<br />

• It contributes towards the alignment of the vision.<br />

• It should contribute towards the allocation of powers and functions<br />

Objectives<br />

• To become the employer of choice.<br />

• To ensure a conducive and harmonious working environment for employees.<br />

• To ensure employees health and wellness.<br />

• To attract and retain competent staff.<br />

• To retain key staff members whose services are regarded as critical or classified as scarce skills.<br />

• To ensure career development for staff.<br />

• To reduce annual staff turnover rate.<br />

Legislative framework<br />

• Basic conditions of employment Act<br />

• Employment Equity Act 55 of 1998<br />

• Skills Development Act 97 of 1998<br />

315


Principles that underpins the recruitment and Retention strategy<br />

• The policy is developmental rather than subjective.<br />

• Classification of posts into scarce skills, valued skills and high risk skills.<br />

• The culture of continually developing staff shall be maintained in line with the Skills Development Act<br />

and Performance Management System.<br />

• The culture of creating and sustaining a pleasant and humane working environment where employees<br />

are given a chance to thrive shall be a norm.<br />

• The potential and reasons for leaving the Ba-Phalaborwa municipality shall be determined by<br />

conducting exit interviews and staff morale assessment surveys.<br />

• The Recruitment and Retention policy should by no means be construed to be creating expectations for<br />

either promotion or monetary rewards.<br />

E9. Risk Management Policy<br />

The Accounting Officer has committed the Ba-Phalaborwa Municipality to a process of risk management<br />

that is aligned to the principles of good corporate governance, as supported by the Municipal Finance<br />

Management Act (MFMA), Act no 56 of 2003.<br />

Risk management is recognised as an integral part of responsible management and the Institution<br />

therefore adopts a comprehensive approach to the management of risk. The features of this process are<br />

outlined in the Institution’s Risk Management Strategy. It is expected that all departments / operations<br />

and processes will be subject to the risk management strategy. It is the intention that these departments<br />

will work together in a consistent and integrated manner, with the overall objective of reducing risk, as far<br />

as reasonably practicable.<br />

Effective risk management is imperative to the Institution to fulfill its mandate, the service delivery<br />

expectations of the public and the performance expectations within the Institution.<br />

316


The realization of our <strong>IDP</strong> depends on us being able to take calculated risks in a way that does not<br />

jeopardize the direct interests of stakeholders. Sound management of risk will enable us to anticipate and<br />

respond to changes in our service delivery environment, as well as take informed decisions under<br />

conditions of uncertainty.<br />

We subscribe to the fundamental principles that all resources will be applied economically to ensure:<br />

• The highest standards of service delivery;<br />

• A management system containing the appropriate elements aimed at minimizing risks and costs in the<br />

interest of all stakeholders;<br />

• Education and training of all our staff to ensure continuous improvement in knowledge, skills and<br />

capabilities which facilitate consistent conformance to the stakeholders expectations; and<br />

• Maintaining an environment, which promotes the right attitude and sensitivity towards internal and<br />

external stakeholder satisfaction?<br />

An entity-wide approach to risk management has been adopted by the municipality as out lined in the<br />

Municipal Risk Management Strategy, which means that every key risk in each part of the Municipality will<br />

be included in a structured and systematic process of risk management. Risk management processes have<br />

become embedded into the Institution’s systems and processes, ensuring that our responses to risk remain<br />

current and dynamic. All risk management efforts has been focused on supporting the Municipal’s<br />

objectives. Equally, they must ensure compliance with relevant legislation, and fulfill the expectations of<br />

employees, communities and other stakeholders in terms of corporate governance.<br />

E10. Disaster Management Plan<br />

This plan has been developed in order to provide key officials, role players and departments in the Ba-<br />

Phalaborwa Municipality as a general guideline for the expected initial response to an emergency and an<br />

overview of their responsibilities during an emergency or disaster.<br />

For this plan to be effective, it is important that all concerned parties be made aware of its provisions and<br />

that every official, role player, and department at personnel be prepared to carry out their assigned<br />

317


functions and responsibilities before, during and after emergency. The following paragraphs provide an<br />

overview of the background and some of the highlights of this plan.<br />

This plan serves to confirm the arrangements in the Phalaborwa Disaster Management approach to<br />

effectively prevent disasters from occurring and to lessen the impact of those hazards that cannot be<br />

avoided.<br />

Disaster Management is a continuous and integrated multi-sect oral and multi-disciplinary process of<br />

planning and implementation of measures aimed at disaster prevention, mitigation, preparedness,<br />

response, recovery, and rehabilitation (Disaster Management Act 57 of 2002)<br />

The preventative elements of this plan must be implemented and maintained on a continuous basis. The<br />

emergency or reactive elements of this plan will be implemented in the Ba-Phalaborwa Municipality<br />

whenever a major incident or disaster occurs or is threatening in its area of jurisdiction.<br />

The responsibility for the coordination of the overall implementation of the plan is that of the Head of the<br />

Disaster Management Centre.<br />

The Disaster Management Act requires the municipality to take the following actions:<br />

• Prepare a disaster management plan for its area according to the circumstances prevailing in the<br />

area.<br />

• Co-ordinate and align the implementation of its plan with those of other organs of state and<br />

institutional role players, and<br />

• Regularly review and update its plan.(section 48)<br />

The plan must:<br />

• Form an integral part of the municipal <strong>IDP</strong><br />

• Anticipate the likely types of disaster that might occur in the Municipal area and their possible<br />

effects.<br />

• Identify the communities at risk.<br />

• Provide for appropriate prevention and mitigation strategies.<br />

• Identify and address weaknesses in capacity to deal with possible disasters.<br />

• Facilitate maximum emergency preparedness/prevention/Mitigation<br />

• Establish the emergency management policy framework and organization that will be utilized to<br />

mitigate any significant emergency or disaster affecting the Phalaborwa Municipal area.<br />

• Establish the operational concepts & procedures associated with day to day operational response<br />

to emergencies by Municipal areas and municipal departments.<br />

• Contain contingency plans and emergency procedures in the event of a disaster, providing for-<br />

318


(i) The allocation and co-ordination of responsibilities allocated to the various role players.<br />

(ii) Prompt disaster response and relief,<br />

(iii) Disaster recovery and rehabilitation focused on risk elimination or mitigation.<br />

(iv) The procurement of essential goods and services,<br />

(v) The establishment of strategic communication links.<br />

(vi) The dissemination of information.<br />

Current Reality<br />

The Corporate Plan makes provision in a generic sense of hazards that will impact on the Municipal area<br />

economy, cultural, welfare, sustainable development and sustainable livelihoods.<br />

Hazard profiles, associated vulnerabilities and risk (probability or lost) will determine the priorities for<br />

Disaster Management programmes and projects. The possible cost benefit to be derived from a project in<br />

terms of lives protected, livelihoods secured and property or natural resources defended, will be the<br />

criteria that determines priorities.<br />

The following hazards found to pose the greatest risks in the Municipal area on the economy, cultural,<br />

welfare, sustained development and sustained livelihoods.<br />

Natural hazards<br />

Geological Hazards.<br />

Biological Hazards<br />

Technological Hazards and Environmental Degradation<br />

319


SECTION F<br />

Addedum: Municipal Organogram<br />

320


321

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!