06.05.2013 Views

2011 smart metering CEE PPC Mikronika - Power Plus ...

2011 smart metering CEE PPC Mikronika - Power Plus ...

2011 smart metering CEE PPC Mikronika - Power Plus ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Medium voltage BPL installations:<br />

case study from Poland<br />

Smart Metering Central & Eastern Europe <strong>2011</strong>


Smart Metering & Smart Grid for Kleszczow<br />

Basic informations<br />

Medium voltage BPL installations:case study from Poland<br />

Telecontrol and<br />

Supervision Systems<br />

2


Smart Metering & Smart Grid for Kleszczow<br />

The low voltage solution<br />

Gateway (LGW200)<br />

The LGW200 is the <strong>smart</strong> <strong>metering</strong> gateway of the Aranuka system, made by <strong>Power</strong> <strong>Plus</strong><br />

Communication. It enables the real-time readout of <strong>smart</strong> meters. The LGW200 connects the<br />

BPL network to meters via standard short range interfaces such as Wireless-M-Bus or RS485,<br />

RS232, M-Bus and Current Loop (wired) and also narrow band PLC. This system allows easy<br />

integration of meters from different manufacturers in order to build a multi-utility (electricity, gas,<br />

water, heat) <strong>metering</strong> solution.<br />

Repeater (LR200)<br />

The LR200 extends the coverage of the BPL network by regenerating the data signal<br />

dynamically. It serves as <strong>smart</strong> nodes in a meshed network structure.<br />

Headend (LH200)<br />

The LH200 connects the BPL network to the backbone via an Ethernet interface.<br />

Medium voltage BPL installations:case study from Poland<br />

3


Smart Metering & Smart Grid for Kleszczow<br />

The low voltage solution<br />

Medium voltage BPL installations:case study from Poland<br />

4


Smart Metering & Smart Grid for Kleszczow<br />

The medium voltage solution<br />

Coupler<br />

With the BPL medium-voltage coupler a medium-voltage grids can be turned into broadband<br />

data networks. It has been developed specifically for the transmission of broadband signals<br />

over ground-cables and overhead lines. Together with the MV200 BPL modem, this coupler<br />

enables data transmission rates up to 30 Mbps.<br />

MV200<br />

<strong>PPC</strong>'s medium-voltage modem MV200 is able to transmit data on cables with a data rate up to<br />

30 Mbps, in combination with the BPL coupler.<br />

Medium voltage BPL installations:case study from Poland<br />

5


Smart Metering & Smart Grid for Kleszczow<br />

The medium voltage solution<br />

Medium voltage BPL installations:case study from Poland<br />

Installation on underground cables<br />

6


Smart Metering & Smart Grid for Kleszczow<br />

The medium voltage solution<br />

Medium voltage BPL installations:case study from Poland<br />

Installation on overhead cables<br />

7


Smart Metering & Smart Grid for Kleszczow<br />

Basic informations<br />

Area: 12 square km<br />

Population: 5 000 people<br />

Number of electricity customers: over 1 500<br />

Number of stations MV / LV: 12 (two MV rings)<br />

MV cable length between stations: from 200m to 1800m<br />

Type of MV cable: Underground<br />

Aim of installation BPL communication over MV grid:<br />

• implementation of telecommunication connections between all electricity meters<br />

installed at the customers supplied from the LV and fiber-optic backbone network of<br />

energy supplier/distributor<br />

• implementation of telecommunication connections between RTU planned to be<br />

installed in substations MV / LV and supervising system of energy grid (for mapping of<br />

switch location, measurements of MV/LV grid parameters, access control)<br />

Medium voltage BPL installations:case study from Poland<br />

8


Smart Metering & Smart Grid for Kleszczow<br />

Geographic overview of the area of the survey<br />

Medium voltage BPL installations:case study from Poland<br />

9


Smart Metering & Smart Grid for Kleszczow<br />

Schema of MV BPL installation<br />

Medium voltage BPL installations:case study from Poland<br />

10


Smart Metering & Smart Grid for Kleszczow<br />

Schema of installation in 15kV switch gear of HV station<br />

Medium voltage BPL installations: case study from Poland<br />

11


Smart Metering & Smart Grid for Kleszczow<br />

Schema of installation in 15kV MV station ST-3<br />

Medium voltage BPL installations: case study from Poland<br />

12


Smart Metering & Smart Grid for Kleszczow<br />

Schema of installation in 15kV MV station ST-9<br />

Medium voltage BPL installations: case study from Poland<br />

Part of implementation<br />

for LV BPL<br />

13


Smart Metering & Smart Grid for Kleszczow<br />

Installation of BPL24CC on underground cables<br />

Cable to MV200 modem<br />

Medium voltage BPL installations:case study from Poland<br />

14


Smart Metering & Smart Grid for Kleszczow<br />

MV200 modem in HV/MV GPZ Kleszczow station<br />

Medium voltage BPL installations:case study from Poland<br />

TCP/IP Backbone Router<br />

15


Smart Metering & Smart Grid for Kleszczow<br />

MV200 modems in MV/LV ST-3 station<br />

MV200 direction GPZ<br />

Medium voltage BPL installations: case study from Poland<br />

MV200 direction ST-9<br />

16


Smart Metering & Smart Grid for Kleszczow<br />

Schema of MV BPL implementation for GPZ, ST-3, ST-9<br />

Medium voltage BPL installations:case study from Poland<br />

17


Smart Metering & Smart Grid for Kleszczow<br />

Measurements - Link for connection between ST9–GPZ (1.2km)<br />

The following Figure shows the link quality. One can see that only the first two bands can be<br />

used with QPSK-modulation for data transmission due to the attenuation of the 1.200 meter<br />

long cable.<br />

Medium voltage BPL installations:case study from Poland<br />

18


Smart Metering & Smart Grid for Kleszczow<br />

Measurements - Link for connection between ST9–GPZ (1.2km)<br />

Link ST9 – GPZ (1.200 meter)<br />

Two Bandwidth measurements have been made. For this test, the devices in ST-3 have been<br />

powered off.<br />

The first was made with the default configuration of the Aranuka modems, for meshed BPL<br />

infrastructure. The bandwidth was 1.45 Mbps.<br />

The second measurements where done with optimised configuration for Point-To-Point Links.<br />

With optimised configuration, on this communication link increased from 1.45 Mbps to 2.45<br />

Mbps in average.<br />

Medium voltage BPL installations:case study from Poland<br />

19


Smart Metering & Smart Grid for Kleszczow<br />

Measurements - Link for connection between ST3–GPZ (800m)<br />

The following Figure shows the link quality between GPZ and ST3. One can see that four of<br />

seven bands can be used, with all types of modulation for data transmission on the 800 meter<br />

long cable.<br />

The average bandwidth was 6 Mbps<br />

Medium voltage BPL installations: case study from Poland<br />

20


Smart Metering & Smart Grid for Kleszczow<br />

The MV BPL network extension to the area of LV grid (ST-9)<br />

RS485 to ETH converter<br />

Router<br />

Medium voltage BPL installations: case study from Poland<br />

MV200 direction ST-3<br />

LH200 connection to LV grid<br />

LH200 connection to router LH200<br />

21


Smart Metering & Smart Grid for Kleszczow<br />

The MV BPL network extension to the area of LV grid<br />

Meters cabinet in multifamily apartments<br />

Medium voltage BPL installations: case study from Poland<br />

LGW200<br />

Meter<br />

RS485 to ETH converter<br />

RS485 bus<br />

22


Smart Metering & Smart Grid for Kleszczow<br />

MV BPL network extension to LV grid - Measurements<br />

Medium voltage BPL installations: case study from Poland<br />

23


Smart Metering & Smart Grid for Kleszczow<br />

MV BPL - conclusions<br />

• Low implementation costs - comparable with narrowband PLC technology<br />

• Higher speed of transmission than narrowband PLC technology offering<br />

• Easy to install<br />

• A good way to extend the TCP / IP backbone network to the MV / LV station<br />

• Allows the coexistence of multiple systems, not only Smart Meterig or Smart Grid<br />

The surveillance system for energy networks<br />

Control of street lighting and traffic lights<br />

Access control system<br />

• MV BPL is an alternative to Fibre-Optic link<br />

Cheaper to implementation<br />

Faster to implementation<br />

Often the only way to use in an urban area<br />

• The possibility of extending the TCP/IP backbone to the LV grid area<br />

Medium voltage BPL installations: case study from Poland<br />

24


Medium voltage BPL installations:<br />

case study from Poland<br />

Smart Metering Central & Eastern Europe <strong>2011</strong><br />

Thank you for your attention<br />

Jacek Koźbiał – <strong>Mikronika</strong><br />

Thomas Wolski – <strong>Power</strong> <strong>Plus</strong> Communication AG