07.05.2013 Views

Tata Steel Tubes, Corby Collection Plan

Tata Steel Tubes, Corby Collection Plan

Tata Steel Tubes, Corby Collection Plan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Loading:<br />

ColdForm<br />

CenFin<br />

6”<br />

SR<br />

Reporting/Arrival:<br />

Loading/Securing:<br />

Stand in green<br />

area during<br />

loading<br />

Site entrance<br />

Straps LC 2000 daN<br />

Mon- Fri<br />

24 hours<br />

Mon- Thu 0700-1500<br />

2100 -0700<br />

Fri 0700-1500<br />

<strong>Tata</strong> <strong>Steel</strong> <strong>Tubes</strong>, <strong>Corby</strong><br />

<strong>Collection</strong> <strong>Plan</strong><br />

PPE Requirements:<br />

Reception<br />

Reception<br />

Stop at weigh<br />

bridge<br />

DOORS MUST BE KEPT CLOSED WHEN<br />

DRIVING ON SITE<br />

NO CUTS NO KNOTS NOT WORN<br />

<br />

A Dubai World Company<br />

Additional Information:<br />

Follow directions to<br />

loading point<br />

LOADS MUST BE SECURED IN THE LOADING BAY – PLEASE HAVE STRAPS READY BEFORE ENTERING THE BAY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!