Tata Steel Tubes, Corby Collection Plan
Tata Steel Tubes, Corby Collection Plan
Tata Steel Tubes, Corby Collection Plan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Loading:<br />
ColdForm<br />
CenFin<br />
6”<br />
SR<br />
Reporting/Arrival:<br />
Loading/Securing:<br />
Stand in green<br />
area during<br />
loading<br />
Site entrance<br />
Straps LC 2000 daN<br />
Mon- Fri<br />
24 hours<br />
Mon- Thu 0700-1500<br />
2100 -0700<br />
Fri 0700-1500<br />
<strong>Tata</strong> <strong>Steel</strong> <strong>Tubes</strong>, <strong>Corby</strong><br />
<strong>Collection</strong> <strong>Plan</strong><br />
PPE Requirements:<br />
Reception<br />
Reception<br />
Stop at weigh<br />
bridge<br />
DOORS MUST BE KEPT CLOSED WHEN<br />
DRIVING ON SITE<br />
NO CUTS NO KNOTS NOT WORN<br />
LOADS MUST BE SECURED IN THE LOADING BAY – PLEASE HAVE STRAPS READY BEFORE ENTERING THE BAY<br />
<br />
A Dubai World Company<br />
Additional Information:<br />
Follow directions to<br />
loading point
Loading:<br />
ColdForm<br />
CenFin<br />
6”<br />
SR<br />
Reporting/Arrival:<br />
Loading/Securing:<br />
Stand in green<br />
area during<br />
loading<br />
Site entrance<br />
Straps LC 2000 daN<br />
Mon- Fri<br />
24 hours<br />
Mon- Thu 0700-1500<br />
2100 -0700<br />
Fri 0700-1500<br />
<strong>Tata</strong> <strong>Steel</strong> <strong>Tubes</strong>, <strong>Corby</strong><br />
<strong>Collection</strong> <strong>Plan</strong><br />
PPE Requirements:<br />
Reception<br />
Reception<br />
Stop at weigh<br />
bridge<br />
DOORS MUST BE KEPT CLOSED WHEN<br />
DRIVING ON SITE<br />
NO CUTS NO KNOTS NOT WORN<br />
<br />
A Dubai World Company<br />
Additional Information:<br />
Follow directions to<br />
loading point<br />
LOADS MUST BE SECURED IN THE LOADING BAY – PLEASE HAVE STRAPS READY BEFORE ENTERING THE BAY