CPRI<br />

NEWS<br />

Tutorial Program <strong>on</strong> <str<strong>on</strong>g>Short</str<strong>on</strong>g>-<str<strong>on</strong>g>Circuit</str<strong>on</strong>g> & Switch<strong>in</strong>g <str<strong>on</strong>g>Test</str<strong>on</strong>g> Duty Requirements of MV and HV Switchgears<br />

A <strong>on</strong>e-day tutorial program <strong>on</strong> <str<strong>on</strong>g>Short</str<strong>on</strong>g>-<str<strong>on</strong>g>Circuit</str<strong>on</strong>g> and Switch<strong>in</strong>g <str<strong>on</strong>g>Test</str<strong>on</strong>g> Duty Requirements of MV and HV Switchgears was c<strong>on</strong>ducted <strong>on</strong> 24 August<br />

2012. There were about 42 participants from manufacturers, utilities and other organizati<strong>on</strong>s. After an <strong>in</strong>teractive sessi<strong>on</strong>, the participants<br />

were taken to the generator build<strong>in</strong>g, test c<strong>on</strong>trol room and test cell. The participants also saw a short-circuit test <strong>on</strong> a <strong>220</strong> kV/<strong>132</strong> kV <strong>100</strong><br />

<strong>MVA</strong> power transformer.<br />

C<strong>on</strong>formance <str<strong>on</strong>g>Test</str<strong>on</strong>g><strong>in</strong>g for IEC 61850<br />

We Tra<strong>in</strong> We Tra<strong>in</strong><br />

The Utility <strong>Auto</strong>mati<strong>on</strong> Research Centre has established a state-of-the-art protocol test<strong>in</strong>g laboratory, which is the first and <strong>on</strong>ly facility of its<br />

k<strong>in</strong>d available <strong>in</strong> the country. The laboratory is equipped with test tools authorized by <strong>in</strong>ternati<strong>on</strong>al agencies. The Substati<strong>on</strong> <strong>Auto</strong>mati<strong>on</strong><br />

Laboratory is accredited by Utility Communicati<strong>on</strong> Architecture Internati<strong>on</strong>al User Group (UCA IUG), USA as a Level A laboratory (Level A<br />

implies <strong>in</strong>dependent third party test laboratory). The c<strong>on</strong>formance certificate issued by CPRI carries UCA and CPRI logos, which are accepted<br />

worldwide. <str<strong>on</strong>g>Test</str<strong>on</strong>g>s are carried out as per the latest release of UCA test procedures.<br />

IEC 61850 is an open standard for substati<strong>on</strong> automati<strong>on</strong>. The standard def<strong>in</strong>es rules for realiz<strong>in</strong>g <strong>in</strong>teroperability between functi<strong>on</strong>s and<br />

devices used for protecti<strong>on</strong>, m<strong>on</strong>itor<strong>in</strong>g, supervisi<strong>on</strong> and c<strong>on</strong>trol <strong>in</strong> substati<strong>on</strong>s. C<strong>on</strong>formance test<strong>in</strong>g is a process to verify implementati<strong>on</strong> <strong>on</strong><br />

IEDs and communicati<strong>on</strong> with the external world accord<strong>in</strong>g to the standard. The laboratory is equipped with tools for c<strong>on</strong>formance test<strong>in</strong>g for<br />

IEC 61850 server devices. The laboratory has been functi<strong>on</strong><strong>in</strong>g s<strong>in</strong>ce 2008 and it is be<strong>in</strong>g utilized by various manufacturers and developers. IEDs<br />

of various types <strong>in</strong>clud<strong>in</strong>g RTU, Protecti<strong>on</strong> IEDs and Gateways are be<strong>in</strong>g tested <strong>in</strong> the laboratory. It is also used to provide development<br />

assistance to various developers and manufacturers for the development of IEDs as per IEC 61850.<br />

This facility of CPRI is an important c<strong>on</strong>tributi<strong>on</strong> to the power sector for promot<strong>in</strong>g substati<strong>on</strong> automati<strong>on</strong>, as it supports <strong>in</strong>teroperability. This<br />

standard is identified as a core standard for Smart Grid.<br />

Laboratory <str<strong>on</strong>g>Test</str<strong>on</strong>g> Setup Corporate Member<br />