28.05.2013 Views

Value management in construction

Value management in construction

Value management in construction

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Successful <strong>in</strong>itiatives<br />

The key to start<strong>in</strong>g a successful VM study<br />

(and a successful project) is to have a clear<br />

understand<strong>in</strong>g of what value means to the<br />

client and to establish the objectives.<br />

For Hextable Dance, this was all-important, as<br />

sav<strong>in</strong>g one-fifth of the <strong>construction</strong> cost with<strong>in</strong><br />

the constra<strong>in</strong>ts of an exist<strong>in</strong>g design was likely to<br />

be an unrealistic target. Therefore, it was<br />

advisable to take a step back from the exist<strong>in</strong>g<br />

design and to review the client brief, the<br />

required project benefits and important functions<br />

of the new build<strong>in</strong>g. With these pr<strong>in</strong>ciples<br />

established and agreed by the client, the project<br />

team could reach a common understand<strong>in</strong>g for<br />

the scheme.<br />

The discussions addressed and clarified many<br />

uncerta<strong>in</strong>ties, particularly <strong>in</strong> relation to client<br />

needs. This led to the identification of important<br />

functions – key value drivers – which ranged<br />

from delivery of the project to functions<br />

required of the completed build<strong>in</strong>g, <strong>in</strong>clud<strong>in</strong>g:<br />

■ keep<strong>in</strong>g with<strong>in</strong> fund<strong>in</strong>g requirements<br />

■ optimis<strong>in</strong>g the use of space<br />

■ comply<strong>in</strong>g with third-party constra<strong>in</strong>ts<br />

■ rais<strong>in</strong>g the profile of Hextable School<br />

■ deliver<strong>in</strong>g functionality to match the school’s<br />

curriculum requirements.<br />

Further discussion and analysis of these value<br />

drivers enabled the project team to fulfil the<br />

clients actual requirements.<br />

Be<strong>in</strong>g creative<br />

With a clear understand<strong>in</strong>g of the client’s needs,<br />

the team was able to view the project from<br />

a functional perspective and to identify<br />

opportunities for stretch<strong>in</strong>g the constra<strong>in</strong>ts of the<br />

exist<strong>in</strong>g design. This enabled the team to put<br />

forward <strong>in</strong>novative design solutions, without<br />

compromis<strong>in</strong>g the client’s requirements.<br />

Dur<strong>in</strong>g this stage of the study, all suggestions<br />

were captured without discussion or evaluation.<br />

This stimulated creativity and removed <strong>in</strong>hibitions.<br />

This document is <strong>in</strong> the public doma<strong>in</strong> and is shared here by RSS Construction Projects Ltd - www.rssprojects.com<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!