02.06.2013 Views

8-Storey Residential Block Bridport House - The Building Centre

8-Storey Residential Block Bridport House - The Building Centre

8-Storey Residential Block Bridport House - The Building Centre

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Bridport</strong> <strong>House</strong><br />

8-<strong>Storey</strong> <strong>Residential</strong> <strong>Block</strong><br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Contents<br />

• Eurban<br />

• Why CLT / Stora Enso ?<br />

• <strong>Bridport</strong> <strong>House</strong><br />

• Summary<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Eurban<br />

• Independent timber engineers/contractor<br />

• Specialists in CLT structures<br />

• UK based company – offices in London and Inverness<br />

• Projects for both public and private sectors<br />

• Over 60 projects delivered in the last 6 years<br />

• Providers of full structural package<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Eurban<br />

Integrated Supply Partner<br />

ENGINEERING MATERIALS<br />

INSTALLATION<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Eurban / Engineering<br />

ENGINEERING<br />

• In-house specialist timber engineers<br />

• State-of-the-art technology<br />

• Full timber design services<br />

• Working with leading European companies<br />

• Co-ordination with the design team<br />

• Close collaboration with the on-site team<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Eurban / Materials<br />

SUPPLY<br />

• Data interface with manufacturers<br />

• Sourcing the most appropriate<br />

product / supplier for each project<br />

• Project-specific solutions<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Eurban / Installation<br />

INSTALLATIO<br />

• Our own on-site installation teams<br />

• Buildability considered during design<br />

• Quality management<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Eurban / Multi-<strong>Storey</strong><br />

• Hackney, London<br />

• 2005<br />

• 5 storeys<br />

• 6 weeks Installation<br />

• 1,067m 2 GIFA<br />

• 7 office units<br />

• 11 residential units<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Eurban / Multi-<strong>Storey</strong><br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Why CLT?<br />

• Simple details => quality management<br />

• Solid building system => different to timber frame<br />

• Prefabricated system => short installation time<br />

• Better tolerance => quality on site / following trades<br />

• Sustainable material => green building system<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Why Stora Enso CLT?<br />

• Integrated sawmill & manufacturing plant<br />

=> less transport and CO 2 emissions<br />

• Edge glued panels<br />

=> closed surface, weather resistance<br />

• Formaldehyde-free adhesive<br />

=> indoor air quality<br />

• Interface with the factory<br />

=> efficient date transfer between Eurban and Stora Enso<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong><br />

• 7 weeks design period<br />

• 10 weeks fabrication prior<br />

to start on site<br />

• 12 weeks installation<br />

• CLT Panels 1576m 3<br />

• Steel Elements 1520kg<br />

• 30 CLT deliveries<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong><br />

© Karakusevic Carson Architects<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong><br />

D<br />

C<br />

B<br />

A<br />

01 02 03 04 05 06 07 08 09 10 11<br />

01 02 03 04 05 06 07 08 09 10 11<br />

01<br />

D D<br />

C C<br />

B B<br />

A A<br />

01<br />

02<br />

02<br />

03<br />

03<br />

04<br />

04<br />

05<br />

05<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011<br />

06<br />

06<br />

07<br />

07<br />

08<br />

08<br />

09<br />

09<br />

10<br />

10<br />

12<br />

12<br />

12<br />

11<br />

11<br />

12<br />

D<br />

C<br />

B<br />

A


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Challenge<br />

• Different layout of the loadbearing elements<br />

• Overall shrinkage<br />

• Overall stability<br />

• Logistics of a very tight site<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

D<br />

C<br />

B<br />

A<br />

Loadbearing Structure<br />

01 02 03 04 05 06 07 08 09 10 11<br />

01 02 03 04 05 06 07 08 09 10 11<br />

01<br />

D D<br />

C C<br />

B B<br />

A A<br />

01<br />

02<br />

02<br />

03<br />

03<br />

04<br />

04<br />

05<br />

05<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011<br />

06<br />

06<br />

07<br />

07<br />

08<br />

08<br />

09<br />

09<br />

10<br />

10<br />

12<br />

12<br />

12<br />

11<br />

11<br />

12<br />

D<br />

C<br />

B<br />

A


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Loadbearing Structure<br />

Wall Panels:<br />

CLT 138-5 or CLT 161-5<br />

Floor Panels:<br />

CLT 182-5 or CLT 223-7<br />

Roof Panels:<br />

CLT 165-5 or CLT 182-5<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Loadbearing Structure<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Minimising of overall shrinkage<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Minimising of overall shrinkage<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

OVERALL LONG TERM<br />

SHRINKAGE 18mm<br />

≈ 40% LESS SHRINKAGE<br />

Minimising of overall shrinkage<br />

OVERALL LONG TERM<br />

SHRINKAGE 29mm<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Overall Stability - Crosswise<br />

01 02 03 04 05 06 07 08 09 10 11<br />

01 02 03 04 05 06 07 08 09 10 11<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011<br />

D<br />

C<br />

B<br />

A<br />

01<br />

D D<br />

C C<br />

B B<br />

A A<br />

01<br />

02<br />

02<br />

03<br />

03<br />

04<br />

04<br />

05<br />

05<br />

06<br />

06<br />

07<br />

07<br />

08<br />

08<br />

09<br />

09<br />

10<br />

10<br />

12<br />

12<br />

12<br />

11<br />

11<br />

12<br />

D<br />

C<br />

B<br />

A


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Overall Stability - Crosswise<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Overall Stability - Crosswise<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Overall Stability - Lengthwise<br />

01 02 03 04 05 06 07 08 09 10 11<br />

01 02 03 04 05 06 07 08 09 10 11<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011<br />

D<br />

C<br />

B<br />

A<br />

01<br />

D D<br />

C C<br />

B B<br />

A A<br />

01<br />

02<br />

02<br />

03<br />

03<br />

04<br />

04<br />

05<br />

05<br />

06<br />

06<br />

07<br />

07<br />

08<br />

08<br />

09<br />

09<br />

10<br />

10<br />

12<br />

12<br />

12<br />

11<br />

11<br />

12<br />

D<br />

C<br />

B<br />

A


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Overall Stability - Lengthwise<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Overall Stability - Lengthwise<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Logistics<br />

• Very tight site constraints<br />

• Transportation time from Austria to the UK<br />

• Crane and working time restriction<br />

• Follow-on trades<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Day 01<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Day 30<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Day 40<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


<strong>Bridport</strong> <strong>House</strong> / <strong>The</strong> Solution<br />

Topping-Out Party, 22 February 2011<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Summary<br />

• Layout was not the simplest for a CLT solution<br />

• <strong>The</strong> overall stability was the biggest challenge<br />

• CLT competitive when compared to concrete<br />

• 10+ storeys are possible with CLT<br />

• CLT is an attractive alternative to concrete or steel<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011


Thank you for listening<br />

Wood Talks 2011 <strong>Building</strong> Center Philipp Zumbrunnen 14 September 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!