Tanjung Bin (Malaysia) ultra-supercritical coal-fired power ... - Alstom
Tanjung Bin (Malaysia) ultra-supercritical coal-fired power ... - Alstom
Tanjung Bin (Malaysia) ultra-supercritical coal-fired power ... - Alstom
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Doubling <strong>Alstom</strong>’s<br />
<strong>Malaysia</strong>n Steam<br />
stake with a new<br />
1 GW <strong>power</strong> plant<br />
3D-conceptualisation of the 1000 MW <strong>ultra</strong><strong>supercritical</strong><br />
<strong>coal</strong>-<strong>fired</strong> <strong>power</strong> plant at <strong>Tanjung</strong> <strong>Bin</strong><br />
CASE STUDY: steam POWER SOlUTiOnS<br />
<strong>Tanjung</strong> <strong>Bin</strong><br />
<strong>Malaysia</strong><br />
<strong>Alstom</strong> and its consortium partners (Mudajaya and Shin Eversendai) have signed a<br />
contract with <strong>Tanjung</strong> <strong>Bin</strong> Energy Issuer Bhd, the wholly owned subsidiary of Malakoff<br />
Corporation Berhad, to provide a 1000 MW <strong>ultra</strong>-<strong>supercritical</strong>, <strong>coal</strong>-<strong>fired</strong> <strong>power</strong> plant<br />
at <strong>Tanjung</strong> <strong>Bin</strong>, in the southern peninsular province of Johor, <strong>Malaysia</strong>.<br />
<strong>Alstom</strong> will supply all key <strong>power</strong> generation equipment and will be in charge of the<br />
overall engineering, project management and commissioning.<br />
The <strong>Tanjung</strong> <strong>Bin</strong> <strong>power</strong> plant is <strong>Alstom</strong>’s second contract for a <strong>supercritical</strong>, <strong>coal</strong>-<strong>fired</strong><br />
unit in <strong>Malaysia</strong>, following the order to build the 1000 MW Manjung 4 <strong>power</strong> plant<br />
last year. Combined with the new Manjung <strong>power</strong> plant, the <strong>power</strong> plants together will<br />
provide an additional capacity of 2000 MW for Peninsular <strong>Malaysia</strong>.<br />
This contract further strengthens <strong>Alstom</strong>’s position as the largest original equipment<br />
manufacturer in <strong>Malaysia</strong>, having supplied key equipment for nearly 7.5 GW of the<br />
country’s installed <strong>power</strong> generation capacity.<br />
Customer: ............................ <strong>Tanjung</strong> <strong>Bin</strong> Energy Issuer Bhd<br />
Scope of supply: .................. Full turnkey EPC* contract for an <strong>ultra</strong>-<strong>supercritical</strong>,<br />
<strong>coal</strong>-<strong>fired</strong> steam <strong>power</strong> plant including:<br />
- Overall plant engineering<br />
- Global procurement and logistics<br />
- Civil, electrical and mechanical construction<br />
- Comprehensive commissioning of the <strong>power</strong> plant<br />
Electrical output: ................. 1000 MW<br />
Fuel: ..................................... Coal<br />
Cooling System: ................... Direct cooling with seawater<br />
Application: .......................... Power generation<br />
advantages<br />
• High performance<br />
• Increased operational flexibility<br />
• Maximised fuel flexibility<br />
• Low NOx emissions over a wide load range.<br />
• With its environmental and economic advantages, this plant is another example<br />
of <strong>Alstom</strong>’s capability to deliver clean, integrated <strong>power</strong> solutions.<br />
* EPC = Engineering, Procurement, Construction<br />
TPW/LEAF/TJGMLS12/eng/THP/04.12/FR/7599 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation<br />
or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial<br />
circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written<br />
authorisation, is strictly prohibited. <strong>Alstom</strong> contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.
Our Plant Integrator approach offers more value for customers<br />
The Plant Integrator concept is <strong>Alstom</strong>’s unique way of creating more value for<br />
customers. We combine outstanding expertise at a component and plant level, as we<br />
are both an equipment designer and manufacturer. In addition, we are an Engineering,<br />
Procurement and Construction (EPC) contractor with proven worldwide references.<br />
Through close collaboration, we guarantee that our customers meet their business<br />
objectives and serve their market more effectively. There are six Plant Integrator<br />
factors that help increase the Net Present Value for our customers.<br />
PlAnT InTEgrATOrTM FACTOrS PlAnT InTEgrATOrTM FACTOrS<br />
INVESTMENT • Optimised capital investment<br />
LEAD TIME • Shorter lead times to produce electricity faster<br />
• Higher <strong>power</strong> plant efficiency for increased <strong>power</strong><br />
output over a wide range of operational modes<br />
PERFORMANCE<br />
• Reduced emissions to meet environmental responsibility<br />
AVAILABILITY<br />
• Better reliability, availability and flexibility<br />
& FLEXIBILITY<br />
LIFE EXTENSION • Extended <strong>power</strong> plant life options<br />
an environmentally friendly plant with high efficiency<br />
3D-conceptualisation of the 1000 MW <strong>ultra</strong>-<strong>supercritical</strong> <strong>coal</strong>-<strong>fired</strong> <strong>power</strong> plant at <strong>Tanjung</strong> <strong>Bin</strong><br />
TPW/LEAF/TJGMLS12/eng/THP/04.12/FR/7599 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation<br />
or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial<br />
circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written<br />
authorisation, is strictly prohibited. <strong>Alstom</strong> contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.<br />
CASE STUDY: steam POWER SOlUTiOnS<br />
tanjung <strong>Bin</strong> MAlAYSiA<br />
project features<br />
The <strong>Tanjung</strong> <strong>Bin</strong> Project benefits from<br />
the superior integration resulting from<br />
<strong>Alstom</strong>’s project management skills,<br />
EPC capabilities and state-of-the-art key<br />
components:<br />
• 1 two-pass, <strong>ultra</strong>-<strong>supercritical</strong>, oncethrough<br />
PC boiler (tangential firing,<br />
low-NOx combustion system), with<br />
mills and air pre-heaters<br />
• 1 STF100 steam turbine with one highpressure,<br />
one intermediate-pressure<br />
and two double-flow, low-pressure<br />
turbines for high efficiency and<br />
reliability<br />
• 1 two-pole GIGATOP turbogenerator<br />
with the most advanced waterhydrogen-cooling<br />
technology for<br />
generators, featuring high efficiency,<br />
outstanding reliability and simple<br />
maintenance<br />
• Closed cooling water cycle<br />
• <strong>Alstom</strong>’s latest ALSPA Series 6<br />
Distributed Control System<br />
• The highly efficient seawater flue gas<br />
desulphurisation facility and fabric<br />
filters to lower nitrous oxides, sulphur<br />
oxides and dust emissions.<br />
For more information<br />
please contact <strong>Alstom</strong> Power:<br />
<strong>Alstom</strong> Power<br />
Brown Boveri Strasse 7<br />
5401 Baden<br />
Switzerland<br />
Phone: +41 56 205 6923<br />
Visit us online: