Doubling <strong>Alstom</strong>’s<br />

<strong>Malaysia</strong>n Steam<br />

stake with a new<br />

1 GW <strong>power</strong> plant<br />

3D-conceptualisation of the 1000 MW <strong>ultra</strong><strong>supercritical</strong><br />

<strong>coal</strong>-<strong>fired</strong> <strong>power</strong> plant at <strong>Tanjung</strong> <strong>Bin</strong><br />

CASE STUDY: steam POWER SOlUTiOnS<br />

<strong>Tanjung</strong> <strong>Bin</strong><br />

<strong>Malaysia</strong><br />

<strong>Alstom</strong> and its consortium partners (Mudajaya and Shin Eversendai) have signed a<br />

contract with <strong>Tanjung</strong> <strong>Bin</strong> Energy Issuer Bhd, the wholly owned subsidiary of Malakoff<br />

Corporation Berhad, to provide a 1000 MW <strong>ultra</strong>-<strong>supercritical</strong>, <strong>coal</strong>-<strong>fired</strong> <strong>power</strong> plant<br />

at <strong>Tanjung</strong> <strong>Bin</strong>, in the southern peninsular province of Johor, <strong>Malaysia</strong>.<br />

<strong>Alstom</strong> will supply all key <strong>power</strong> generation equipment and will be in charge of the<br />

overall engineering, project management and commissioning.<br />

The <strong>Tanjung</strong> <strong>Bin</strong> <strong>power</strong> plant is <strong>Alstom</strong>’s second contract for a <strong>supercritical</strong>, <strong>coal</strong>-<strong>fired</strong><br />

unit in <strong>Malaysia</strong>, following the order to build the 1000 MW Manjung 4 <strong>power</strong> plant<br />

last year. Combined with the new Manjung <strong>power</strong> plant, the <strong>power</strong> plants together will<br />

provide an additional capacity of 2000 MW for Peninsular <strong>Malaysia</strong>.<br />

This contract further strengthens <strong>Alstom</strong>’s position as the largest original equipment<br />

manufacturer in <strong>Malaysia</strong>, having supplied key equipment for nearly 7.5 GW of the<br />

country’s installed <strong>power</strong> generation capacity.<br />

Customer: ............................ <strong>Tanjung</strong> <strong>Bin</strong> Energy Issuer Bhd<br />

Scope of supply: .................. Full turnkey EPC* contract for an <strong>ultra</strong>-<strong>supercritical</strong>,<br />

<strong>coal</strong>-<strong>fired</strong> steam <strong>power</strong> plant including:<br />

- Overall plant engineering<br />

- Global procurement and logistics<br />

- Civil, electrical and mechanical construction<br />

- Comprehensive commissioning of the <strong>power</strong> plant<br />

Electrical output: ................. 1000 MW<br />

Fuel: ..................................... Coal<br />

Cooling System: ................... Direct cooling with seawater<br />

Application: .......................... Power generation<br />

advantages<br />

• High performance<br />

• Increased operational flexibility<br />

• Maximised fuel flexibility<br />

• Low NOx emissions over a wide load range.<br />

• With its environmental and economic advantages, this plant is another example<br />

of <strong>Alstom</strong>’s capability to deliver clean, integrated <strong>power</strong> solutions.<br />

* EPC = Engineering, Procurement, Construction<br />

TPW/LEAF/TJGMLS12/eng/THP/04.12/FR/7599 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation<br />

or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial<br />

circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written<br />

authorisation, is strictly prohibited. <strong>Alstom</strong> contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.


Our Plant Integrator approach offers more value for customers<br />

The Plant Integrator concept is <strong>Alstom</strong>’s unique way of creating more value for<br />

customers. We combine outstanding expertise at a component and plant level, as we<br />

are both an equipment designer and manufacturer. In addition, we are an Engineering,<br />

Procurement and Construction (EPC) contractor with proven worldwide references.<br />

Through close collaboration, we guarantee that our customers meet their business<br />

objectives and serve their market more effectively. There are six Plant Integrator<br />

factors that help increase the Net Present Value for our customers.<br />

PlAnT InTEgrATOrTM FACTOrS PlAnT InTEgrATOrTM FACTOrS<br />

INVESTMENT • Optimised capital investment<br />

LEAD TIME • Shorter lead times to produce electricity faster<br />

• Higher <strong>power</strong> plant efficiency for increased <strong>power</strong><br />

output over a wide range of operational modes<br />

PERFORMANCE<br />

• Reduced emissions to meet environmental responsibility<br />

AVAILABILITY<br />

• Better reliability, availability and flexibility<br />

& FLEXIBILITY<br />

LIFE EXTENSION • Extended <strong>power</strong> plant life options<br />

an environmentally friendly plant with high efficiency<br />

3D-conceptualisation of the 1000 MW <strong>ultra</strong>-<strong>supercritical</strong> <strong>coal</strong>-<strong>fired</strong> <strong>power</strong> plant at <strong>Tanjung</strong> <strong>Bin</strong><br />

TPW/LEAF/TJGMLS12/eng/THP/04.12/FR/7599 © ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation<br />

or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial<br />

circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written<br />

authorisation, is strictly prohibited. <strong>Alstom</strong> contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.<br />

CASE STUDY: steam POWER SOlUTiOnS<br />

tanjung <strong>Bin</strong> MAlAYSiA<br />

project features<br />

The <strong>Tanjung</strong> <strong>Bin</strong> Project benefits from<br />

the superior integration resulting from<br />

<strong>Alstom</strong>’s project management skills,<br />

EPC capabilities and state-of-the-art key<br />

components:<br />

• 1 two-pass, <strong>ultra</strong>-<strong>supercritical</strong>, oncethrough<br />

PC boiler (tangential firing,<br />

low-NOx combustion system), with<br />

mills and air pre-heaters<br />

• 1 STF100 steam turbine with one highpressure,<br />

one intermediate-pressure<br />

and two double-flow, low-pressure<br />

turbines for high efficiency and<br />

reliability<br />

• 1 two-pole GIGATOP turbogenerator<br />

with the most advanced waterhydrogen-cooling<br />

technology for<br />

generators, featuring high efficiency,<br />

outstanding reliability and simple<br />

maintenance<br />

• Closed cooling water cycle<br />

• <strong>Alstom</strong>’s latest ALSPA Series 6<br />

Distributed Control System<br />

• The highly efficient seawater flue gas<br />

desulphurisation facility and fabric<br />

filters to lower nitrous oxides, sulphur<br />

oxides and dust emissions.<br />

For more information<br />

please contact <strong>Alstom</strong> Power:<br />

<strong>Alstom</strong> Power<br />

Brown Boveri Strasse 7<br />

5401 Baden<br />

Switzerland<br />

Phone: +41 56 205 6923<br />

Visit us online:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!