03.06.2013 Views

Share Fair Presentation AECC, Aberdeen, 11th November 2008 ...

Share Fair Presentation AECC, Aberdeen, 11th November 2008 ...

Share Fair Presentation AECC, Aberdeen, 11th November 2008 ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Share</strong> <strong>Fair</strong> <strong>Presentation</strong><br />

<strong>AECC</strong>, <strong>Aberdeen</strong>, 11 th <strong>November</strong> <strong>2008</strong><br />

Dorothy Daldry<br />

Phil Dymond


Working towards full compliance with the Supply Chain<br />

Code of Practice to…<br />

Improve performance<br />

Eliminate unnecessary costs<br />

Add value<br />

Boost competitiveness<br />

In support of the Code,<br />

our preferred suppliers<br />

are registered with FPAL.<br />

For more information or to<br />

register your company go<br />

to www.FPAL.com


Agenda<br />

• Company overview - globally and regionally<br />

• How to do business with ConocoPhillips<br />

• Indicative future requirements<br />

• Contacts


Company Profile<br />

• An international, integrated energy company<br />

• Worldwide, ConocoPhillips is the fifth largest<br />

refiner and the sixth largest reserves holder of<br />

non-government controlled companies.<br />

• Operates in nearly 40 countries<br />

• Approximately 33,000 employees worldwide.


Worldwide Exploration and Production


$ Billions<br />

9.7<br />

ConocoPhillips’ Capital Program<br />

Historical investment activity and <strong>2008</strong> projection<br />

11.9<br />

16.4<br />

12.9<br />

15.3<br />

2004 2005 2006* 2007 <strong>2008</strong><br />

*Excludes purchase price for Burlington Resources, but includes<br />

its capital program from purchase date of March 31, 2006 forward<br />

R&M<br />

13%<br />

Other<br />

3%<br />

<strong>2008</strong><br />

E&P<br />

84%


The SPIRIT of Performance<br />

Our Purpose Use our pioneering spirit to responsibly<br />

deliver energy to the world<br />

Our Values<br />

Safety<br />

People<br />

Integrity<br />

Responsibility<br />

Innovation<br />

Teamwork


Safety and Environment<br />

• At ConocoPhillips, our work is<br />

never so urgent or important<br />

that we cannot take time to do it<br />

safely.<br />

• Measurable safety, health and<br />

environmental objectives are set<br />

for all our operations and we<br />

continually strive to improve<br />

performance.<br />

• The environment we operate in<br />

makes committing to sustainable<br />

development an essential strategy<br />

for ConocoPhillips.


Sustainable Development<br />

ConocoPhillips’ commitment<br />

to sustainable development<br />

stems from our fundamental<br />

intent to thrive as an<br />

enterprise and to contribute<br />

to a better world long into the<br />

future.


2007 Production<br />

• These graphs show the Global<br />

E&P Production (1880mboed,<br />

including Syncrude) and Proved<br />

Reserves (10.6bboe) (both<br />

including LUKOIL) for 2007.<br />

(figs from 2007 Annual Report)<br />

11%<br />

13%<br />

5% 6%<br />

16%<br />

2007 E&P Production<br />

29%<br />

20%<br />

2007 Proved Reserves (Including LUKOIL)<br />

28%<br />

9%<br />

5%<br />

1%<br />

6%<br />

22%<br />

19%<br />

10%<br />

U.S. Lower 48<br />

Europe<br />

Alaska<br />

Canada<br />

Asia-Pacific<br />

Equity Affiliates<br />

Middle East & Africa<br />

U.S. Lower 48<br />

Europe<br />

Alaska<br />

Canada<br />

Asia-Pacific<br />

Equity Affiliates<br />

Middle East & Africa<br />

Russia & Caspian


North Sea Business Unit<br />

• Norway Key Facts:<br />

– Employees: approx 1,900<br />

• UK Key Facts<br />

– Employees: approx 1,000<br />

(<strong>Aberdeen</strong>, Theddlethorpe,<br />

Teesside)


UK Operations<br />

Central North Sea Southern North Sea East Irish Sea<br />

Britannia * LOGGS Millom and Dalton<br />

Britannia Satellites V-Fields Calder<br />

J-Block (Judy/Joanne/Jade) Saturn Unit Area Darwen & Crossans<br />

MacCulloch Victor Asland & Hodder<br />

Viking<br />

Caister<br />

Boulton<br />

CMS III<br />

Munro<br />

Kelvin<br />

Harrison<br />

Murdoch<br />

Onshore Terminals Non-Operated Assets<br />

Rivers Gas Terminal Alba<br />

Teesside Oil Terminal Clair<br />

Theddlethorpe Gas Terminal<br />

* Britannia Operator Limited, a joint venture between ConocoPhillips and Chevron


Norway operations<br />

COP Operated Partner Operated<br />

Ekofisk Statfjord<br />

Eldfisk Heidrun<br />

Embla Huldra<br />

Tor Troll<br />

Visund<br />

Grane<br />

Oseberg


North Sea Projects in Execution<br />

- Britannia additional accommodation Installation 2009<br />

- Judy additional accommodation Installation 2009<br />

- Ekofisk Cessation Phase II Ongoing<br />

- Ekofisk Life Of Field Seismic (LOFS) Internal approvals<br />

- Viking Transmission System (VTS) Replacement 2009 undertaking<br />

- Ekofisk Interim Accommodation (Jacktel) Ongoing<br />

- Ekofisk Structural Strengthening Ongoing


Supplier Registration<br />

• ConocoPhillips NSBU will only work with suppliers<br />

registered within FPAL and/or Achilles.<br />

• Because ConocoPhillips NSBU operates in both<br />

UK and Norway, registration in both will ensure<br />

maximum visibility of your company for both areas.


NSBU Procurement Principles<br />

• Comply with EU/Norway/UK Procurement<br />

Regulations (objective, transparent, non-<br />

discriminatory)<br />

• Use Oil & Gas Directory registered suppliers<br />

(FPAL & Achilles)<br />

• Competitive bidding is our preferred approach<br />

• Tendering through electronic medium is favoured<br />

• Bid evaluation is value based<br />

• Use Contract Management Plans reflecting value,<br />

risk and contract complexity<br />

• Access opportunities for regional and global<br />

leverage.


NSBU Procurement Activity 2007<br />

• Total procurement spend (*) of some $2.5 billion<br />

(invoiced)<br />

– 86% on services<br />

– 14% on materials and supplies<br />

• Used some 3,567 suppliers<br />

– 113 of these represented 80% of total spend<br />

• Over 700 active contracts at year end.<br />

• Around 89,000 material purchase orders issued.<br />

(*) covers operations and maintenance, well operations, logistics and capital<br />

projects


Indicative Forward Plans<br />

The information provided is offered in the<br />

spirit of the Supply Chain Code of Practice to<br />

give an indication of potential future<br />

opportunities. Such opportunities remain<br />

subject to further study and internal and<br />

partner approvals.


Potential Contracting 2009<br />

Well Operations<br />

Expiry<br />

• Drilling rigs Ongoing<br />

• Various Drilling Services Thru 2009<br />

• Cementing Services Q1 2009<br />

• Provision of Coiled Tubing Services Q1/2 2009<br />

• Completion Services Q2 2009<br />

• Slickline/Wireline Services Q3/4 2009<br />

• Wellheads / Xmas trees Q4 2009


Potential Contracting 2009<br />

Operations and Maintenance<br />

Expiry<br />

• MRO (Teesside) Q1 2009<br />

• Emergency Rapid Response Vessels Q2 2009<br />

• Tank Re-suspensions (Teesside) Q3 2009<br />

• Electrical Consumables Q3 2009<br />

• Platform Supply Vessels Q3 2009<br />

• Tank Cleaning (Teesside) Q4 2009<br />

Over 100 contracts expiring in 2009 in NSBU Region


ConocoPhillips North Sea BU Contacts<br />

Nils Svanberg – NSBU Procurement Manager<br />

Jens Melhus – NSBU Capital Projects Procurement Manager<br />

Russell Watt – UK Procurement Manager<br />

Tove Nina Klemmetsrud – Transactional Services Manager<br />

John Rait – Contracting Manager<br />

Dave Wallace – GEA Project Procurement &Contract Manager

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!