04.06.2013 Views

quantity of first schedule dangerous goods - MPA

quantity of first schedule dangerous goods - MPA

quantity of first schedule dangerous goods - MPA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4 Tuas Jetty<br />

(a) At the head <strong>of</strong> the jetty<br />

IMO Class 1 Hazard Division Maximum weight permitted (NEQ)<br />

(b) At the ramp <strong>of</strong> the jetty<br />

1.1 60 tonnes<br />

1.2 250 tonnes<br />

1.3 250 tonnes<br />

1.4 No limit<br />

IMO Class 1 Hazard Division Maximum weight permitted (NEQ)<br />

1.1 Prohibited<br />

1.2 Prohibited<br />

1.3 0.45 tonne*<br />

1.4 No limit<br />

Note: *For non propellant cargo only.<br />

5 Sudong Explosive Anchorage<br />

IMO Class 1 Hazard Division Maximum weight permitted (NEQ)<br />

1.1 or 1.5 500 tonnes<br />

Last Updated: 19 Jun 2009 Page 6 <strong>of</strong> 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!