07.06.2013 Views

Coordinated Facility Protection Catalog - Erico

Coordinated Facility Protection Catalog - Erico

Coordinated Facility Protection Catalog - Erico

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Introduction<br />

By following the Six Point Plan of <strong>Protection</strong>, ERICO<br />

customers are able to implement the most effective<br />

solutions to individual lightning, grounding and surge<br />

problems while retaining an integrated protection<br />

philosophy.<br />

Point 5 of the Six Point Plan advocates a coordinated<br />

approach to surge protection, where the fi rst stage of<br />

defense is the installation of primary protection devices at<br />

the mains supply service entrance, followed by secondary<br />

protection at distribution branch panels and where<br />

necessary, at point-of-use applications.<br />

Point 6 recognizes the need to provide effective surge<br />

protection on cables supplying telecommunications,<br />

signal and data management equipment.<br />

Overhead<br />

Distribution<br />

Voltage<br />

Transmission<br />

Lines<br />

Direct Lightning Strike<br />

Telephone Lines<br />

AC Transformer<br />

Sub Station<br />

Power Ground<br />

Protect Low Voltage<br />

Data/Telecommunications<br />

Circuits<br />

PCS,<br />

Radio &<br />

Telemetry<br />

Equipment<br />

Capture the<br />

lightning<br />

strike<br />

Telephone Main<br />

Distribution<br />

Frame<br />

Power<br />

Distribution Panel<br />

Protect<br />

Incoming AC<br />

Power Feeders<br />

Safely Convey<br />

Energy to<br />

Ground<br />

Low Impedance Ground<br />

using fl at copper radials<br />

Ground Enhancement<br />

Material<br />

ERITECH ® SYSTEM 2000<br />

Conventional Lightning<br />

<strong>Protection</strong> System<br />

Inverter<br />

Rectifi er<br />

Inspection Well<br />

Ground Potential<br />

Equalization Bonding<br />

Dissipate Energy<br />

into the<br />

Grounding<br />

System<br />

www.erico.com 3<br />

The Six Point Plan of <strong>Protection</strong> from ERICO<br />

Capture the lightning strike.<br />

Capture the lightning strike to a known and preferred attachment point using a<br />

purpose-designed air terminal system.<br />

Convey this energy to ground.<br />

Conduct the energy to the ground via a purpose-designed downconductor.<br />

Dissipate the energy into the grounding system.<br />

Dissipate the energy into a low impedance grounding system.<br />

Bond all ground points together.<br />

Bond all ground points to eliminate ground loops and create an equipotential<br />

plane.<br />

Protect incoming AC power feeders.<br />

Protect equipment from surges and transients on incoming power lines to prevent<br />

equipment damage and costly operational downtime.<br />

Protect low voltage data/telecommunications circuits.<br />

Protect equipment from surges and transients on incoming telecommunications<br />

and signal lines to prevent equipment damage and costly operational downtime.<br />

PABX<br />

Batteries<br />

IS<br />

File<br />

Server<br />

Billing Printer<br />

Computer<br />

Bond All<br />

Ground Points<br />

Together<br />

SPD<br />

Sub-Distribution<br />

Board<br />

Remote<br />

Data<br />

Terminal<br />

ERITECH ® SYSTEM 3000<br />

Active Lightning<br />

<strong>Protection</strong> System<br />

Induced Surge<br />

Signal Control<br />

Lines<br />

Surge <strong>Protection</strong> Device<br />

Communications Line <strong>Protection</strong> Device<br />

Ground Electrode

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!