HOW dO YOu<br />

gET THINgS MOVINg<br />

duRINg A SHuTdOWN?<br />

Shutdown management from InfraServ Knapsack.<br />

With the integrated process optimisation of plant shutdowns, operators can minimise<br />

the costs incurred due to loss of production. InfraServ Knapsack takes charge of<br />

the planning, coordination and execution of partial and complete shutdowns. Taking<br />

into account the size, complexity and risk potential of individual plants, customised<br />

shutdown concepts are developed to the highest safety and quality standards.<br />

The constituent steps of the shutdown are entered into a database, systematically<br />

executed and monitored, so that the customer can follow the whole transparent<br />

process. During the shutdown itself, InfraServ Knapsack is able to fulfil requirements<br />

for any spare parts or repairs at short notice through direct access to its own<br />

workshop and production capacity without compromising the project schedule.<br />

With a large proportion of the staff involved in the execution stage being InfraServ<br />

Knapsack employees, the highest quality standards and adherence to schedules<br />

and budgets are guaranteed.<br />

Planning and entering of plant<br />

in planning tool<br />

Detailed planning and scheduling<br />

Shutdown management/<br />

supervision based on available<br />

planning documents and schedules<br />

for all relevant disciplines<br />

and trades in the stoppage<br />

timeframe<br />

Shutdown management<br />

SHUTDOWN PLANNING SHUTDOWN COORDINATION SHUTDOWN EXECUTION<br />

Execution of all scheduled<br />

shutdown activities, based on<br />

available planning documents<br />

and schedules, at the customer’s<br />

request for all relevant disciplines<br />

and trades in the<br />

stoppage timeframe<br />

Execution of all unscheduled<br />

shutdown activities<br />