22.06.2013 Views

Allt Duine Wind Farm Issue 2 March 2011. - RWE

Allt Duine Wind Farm Issue 2 March 2011. - RWE

Allt Duine Wind Farm Issue 2 March 2011. - RWE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4 <strong>Allt</strong> <strong>Duine</strong> Newsletter | <strong>Issue</strong> 02 | February 2011<br />

Comment formally<br />

To formally submit your comments about the<br />

<strong>Allt</strong> <strong>Duine</strong> <strong>Wind</strong> <strong>Farm</strong> planning application,<br />

representations can be made by email to the<br />

Scottish Government, Energy Consent Unit<br />

mailbox at representations@scotland.gsi.<br />

gov.uk or by post to The Scottish Government<br />

Energy Consent Unit, Fourth Floor, 5 Atlantic<br />

Footnotes:<br />

1 Homes equivalent. Assuming the proposed wind<br />

farm has an installed capacity of 77.5MW, based<br />

on thirty one 2.5 MW turbines being erected on<br />

site . It has the potential to supply in the region of<br />

43,000 homes. Predicted energy generation has<br />

been calculated using an assumed capacity of<br />

30% (DTI Energy Trends UK regional capacity<br />

factors 1998-2004) and is based on an installed<br />

capacity of 77.5MW (note that the installed<br />

capacity maybe higher or lower, subject to the<br />

final turbine choice). The energy capture<br />

predicted and the derived homes equivalent<br />

Community<br />

benefits<br />

As reported in <strong>Issue</strong> One, if we are<br />

successful in gaining consent, <strong>RWE</strong> npower<br />

renewables intends to offer a community<br />

benefit package in association with <strong>Allt</strong><br />

<strong>Duine</strong> <strong>Wind</strong> <strong>Farm</strong>.<br />

The total value of the package is<br />

dependent on the installed capacity of the<br />

wind farm. Normally it takes the form of an<br />

annual fund, which is available when the<br />

wind farm is operational and throughout its<br />

operational lifetime – in <strong>Allt</strong> <strong>Duine</strong>’s case<br />

this is expected to be 25 years. We would<br />

consult with a wide cross section of<br />

community representatives before finalising<br />

the details of the package.<br />

Community benefit packages are a voluntary<br />

benefit that <strong>RWE</strong> npower renewables<br />

chooses to offer and are not a material<br />

consideration of any planning decision.<br />

You can help us shape the Community<br />

Benefits Package at <strong>Allt</strong> <strong>Duine</strong>, to make<br />

sure it really meets the needs of your<br />

community, we would welcome<br />

your feedback. Please contact our<br />

Community Investment Officer at<br />

community.investment@rwe.com<br />

Quay, 150 Broomielaw, Glasgow G2 8LU.<br />

Please clearly reference ‘<strong>Allt</strong> <strong>Duine</strong> <strong>Wind</strong> <strong>Farm</strong>’<br />

to ensure your comments are submitted for<br />

the correct planning application.<br />

The consultation period is open until<br />

13th April <strong>2011.</strong><br />

figures may change as site specific information is<br />

gathered. Equivalent homes supplied is based on<br />

an annual electricity consumption per home of<br />

4,700 kWh. This figure is supported by recent<br />

domestic electricity consumption data available<br />

from The Digest of UK Energy Statistics and<br />

household estimates and projections from the UK<br />

Statistics Authority.<br />

Ordnance survey Crown Copyright. All rights<br />

reserved licence number 100017907.<br />

If you would like<br />

this newsletter<br />

in larger print<br />

please contact<br />

us on:<br />

01738 825110<br />

Contact us<br />

For further information about the<br />

project you can contact <strong>RWE</strong> npower<br />

renewables on:<br />

E-mail<br />

<strong>Allt</strong>.<strong>Duine</strong>@npower-renewables.com<br />

Post<br />

<strong>RWE</strong> npower renewables<br />

North Range East Lodge<br />

Mill Road<br />

Stanley Mills<br />

Perthshire<br />

PH1 4QE<br />

Telephone<br />

01738 825 110<br />

Web<br />

You can visit our website at:<br />

www.npower-renewables.com/<br />

alltduine<br />

*Photomontages are computer generated<br />

illustrations that aim to represent an accurate<br />

image of the proposed site. These are not<br />

intended to replace photomontages within<br />

the Environmental Statement or the Highland<br />

Council Visualisations and are for illustrative<br />

purposes only.<br />

This newsletter is printed on paper which has<br />

been bleached without chlorine and made<br />

exclusively of wood from sustainable forests.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!