Allt Duine Wind Farm Issue 2 March 2011. - RWE
Allt Duine Wind Farm Issue 2 March 2011. - RWE
Allt Duine Wind Farm Issue 2 March 2011. - RWE
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4 <strong>Allt</strong> <strong>Duine</strong> Newsletter | <strong>Issue</strong> 02 | February 2011<br />
Comment formally<br />
To formally submit your comments about the<br />
<strong>Allt</strong> <strong>Duine</strong> <strong>Wind</strong> <strong>Farm</strong> planning application,<br />
representations can be made by email to the<br />
Scottish Government, Energy Consent Unit<br />
mailbox at representations@scotland.gsi.<br />
gov.uk or by post to The Scottish Government<br />
Energy Consent Unit, Fourth Floor, 5 Atlantic<br />
Footnotes:<br />
1 Homes equivalent. Assuming the proposed wind<br />
farm has an installed capacity of 77.5MW, based<br />
on thirty one 2.5 MW turbines being erected on<br />
site . It has the potential to supply in the region of<br />
43,000 homes. Predicted energy generation has<br />
been calculated using an assumed capacity of<br />
30% (DTI Energy Trends UK regional capacity<br />
factors 1998-2004) and is based on an installed<br />
capacity of 77.5MW (note that the installed<br />
capacity maybe higher or lower, subject to the<br />
final turbine choice). The energy capture<br />
predicted and the derived homes equivalent<br />
Community<br />
benefits<br />
As reported in <strong>Issue</strong> One, if we are<br />
successful in gaining consent, <strong>RWE</strong> npower<br />
renewables intends to offer a community<br />
benefit package in association with <strong>Allt</strong><br />
<strong>Duine</strong> <strong>Wind</strong> <strong>Farm</strong>.<br />
The total value of the package is<br />
dependent on the installed capacity of the<br />
wind farm. Normally it takes the form of an<br />
annual fund, which is available when the<br />
wind farm is operational and throughout its<br />
operational lifetime – in <strong>Allt</strong> <strong>Duine</strong>’s case<br />
this is expected to be 25 years. We would<br />
consult with a wide cross section of<br />
community representatives before finalising<br />
the details of the package.<br />
Community benefit packages are a voluntary<br />
benefit that <strong>RWE</strong> npower renewables<br />
chooses to offer and are not a material<br />
consideration of any planning decision.<br />
You can help us shape the Community<br />
Benefits Package at <strong>Allt</strong> <strong>Duine</strong>, to make<br />
sure it really meets the needs of your<br />
community, we would welcome<br />
your feedback. Please contact our<br />
Community Investment Officer at<br />
community.investment@rwe.com<br />
Quay, 150 Broomielaw, Glasgow G2 8LU.<br />
Please clearly reference ‘<strong>Allt</strong> <strong>Duine</strong> <strong>Wind</strong> <strong>Farm</strong>’<br />
to ensure your comments are submitted for<br />
the correct planning application.<br />
The consultation period is open until<br />
13th April <strong>2011.</strong><br />
figures may change as site specific information is<br />
gathered. Equivalent homes supplied is based on<br />
an annual electricity consumption per home of<br />
4,700 kWh. This figure is supported by recent<br />
domestic electricity consumption data available<br />
from The Digest of UK Energy Statistics and<br />
household estimates and projections from the UK<br />
Statistics Authority.<br />
Ordnance survey Crown Copyright. All rights<br />
reserved licence number 100017907.<br />
If you would like<br />
this newsletter<br />
in larger print<br />
please contact<br />
us on:<br />
01738 825110<br />
Contact us<br />
For further information about the<br />
project you can contact <strong>RWE</strong> npower<br />
renewables on:<br />
E-mail<br />
<strong>Allt</strong>.<strong>Duine</strong>@npower-renewables.com<br />
Post<br />
<strong>RWE</strong> npower renewables<br />
North Range East Lodge<br />
Mill Road<br />
Stanley Mills<br />
Perthshire<br />
PH1 4QE<br />
Telephone<br />
01738 825 110<br />
Web<br />
You can visit our website at:<br />
www.npower-renewables.com/<br />
alltduine<br />
*Photomontages are computer generated<br />
illustrations that aim to represent an accurate<br />
image of the proposed site. These are not<br />
intended to replace photomontages within<br />
the Environmental Statement or the Highland<br />
Council Visualisations and are for illustrative<br />
purposes only.<br />
This newsletter is printed on paper which has<br />
been bleached without chlorine and made<br />
exclusively of wood from sustainable forests.