Obsolescence Management of Station Control Computers at ... - IAEA
Obsolescence Management of Station Control Computers at ... - IAEA
Obsolescence Management of Station Control Computers at ... - IAEA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Obsolescence</strong> <strong>Management</strong> <strong>of</strong> <strong>St<strong>at</strong>ion</strong><br />
<strong>Control</strong> <strong>Computers</strong> <strong>at</strong><br />
NPP CERNAVODA UNIT 1:<br />
Dragos Popa-Nemoiu,<br />
CNE Cernavoda Romania<br />
Digital Systems Superintendent
Unit 1 initial obsolescence work -<br />
Peripheral replacements<br />
Replace old printers with laser<br />
printers<br />
Replace CRT monitors with LCD<br />
monitors<br />
Replace console with PC<br />
Add g<strong>at</strong>eway for D<strong>at</strong>a Acquisition<br />
Functions
Unit 1 SSCI 125 design deficiencies<br />
and work around to mitig<strong>at</strong>e effects<br />
Real Time Clock delays – build RTC Booster<br />
to correct RTC<br />
Scanner uncertainty – provide external<br />
monitor for timestamps<br />
CPU overload – restructure programs to<br />
reduce overload and provide resources for<br />
s<strong>of</strong>tware development<br />
Map Registers corruption – mitig<strong>at</strong>e effects<br />
by special s<strong>of</strong>tware<br />
Frequent Memory Parity Error restarts – no<br />
work around
Maintenance, <strong>Obsolescence</strong> and aging<br />
management programs<br />
Maintenance program – preserv<strong>at</strong>ion<br />
<strong>of</strong> current st<strong>at</strong>us<br />
Health Monitoring Program – observe<br />
and report degrad<strong>at</strong>ion<br />
Plant Life <strong>Management</strong>/Extention –<br />
solutions for hole life cycle including<br />
life extension
Choose replacement computer<br />
Available for next 20-30 years<br />
Guaranteed and proved reliability<br />
Allow easy partial replacement in 30<br />
days plant outage<br />
Allow porting <strong>of</strong> control programs<br />
without re-commissioning
COG (Candu Owners Group) Joint Poject<br />
4048 – Sustained by all CANDU owners<br />
Choose emul<strong>at</strong>or solution<br />
Reference computer is Cernavoda U2<br />
SSCI 890 CPU is an V75 Emul<strong>at</strong>or<br />
Secure IP rights for COG<br />
Resolve obsolescence <strong>of</strong> peripherals<br />
Secure electronic components repository<br />
based on Long Term Support<br />
Build and qualify prototype for all Candu<br />
computers refurbishments or new builds
Cernavoda U1 Refurbishment project<br />
Based on COG PDCCZ<br />
Project scope<br />
-Order New CPU<br />
-Order New Bulk Memory<br />
-Order New Power Supply<br />
Improvments<br />
- High CPU speed<br />
- More memory<br />
-Elimin<strong>at</strong>e obsolescence and<br />
design weaknesses<br />
-Increase reliability<br />
Challenge<br />
- Integr<strong>at</strong>e new and old HW<br />
-Build Executive which keep<br />
complete SSCI 125 functionality<br />
-Integr<strong>at</strong>e applic<strong>at</strong>ions with new<br />
hardware and executive
Cernavoda U1 st<strong>at</strong>ion computer<br />
replacement str<strong>at</strong>egy<br />
Use COG Joint Project prototype as<br />
reference<br />
Use oper<strong>at</strong>ion experience <strong>of</strong> U1 and<br />
U2 to avoid non m<strong>at</strong>ure new design<br />
Find solution for control s<strong>of</strong>tware<br />
porting to new computer<br />
Develop integr<strong>at</strong>ion str<strong>at</strong>egy<br />
Decide replacement and reduce risks
Design approach for Process Computer<br />
replacement project<br />
<strong>Control</strong> Programs<br />
Real Time<br />
Executive<br />
Processor 50%<br />
board<br />
SSCI125<br />
Peripheral<br />
devices<br />
Plant process<br />
Comp<strong>at</strong>ibility <strong>of</strong> control<br />
functions code with new<br />
hardware<br />
Rewrite <strong>of</strong> the Real Time<br />
Executive to solve all<br />
incomp<strong>at</strong>ibilities<br />
There is no comp<strong>at</strong>ibility<br />
to U1 SSCI125 or U2<br />
SSCI890 Executive<br />
Comp<strong>at</strong>ibility with<br />
peripheral devices is<br />
SSCI890 design key
S<strong>of</strong>tware Design str<strong>at</strong>egy<br />
1)Zero changes <strong>of</strong> control functions<br />
2) Redesign <strong>of</strong> Real Time Executive to<br />
keep functionality and accommod<strong>at</strong>e<br />
control functions in new CPU
Replacement project planing<br />
The replacement activity supose 3 major<br />
types <strong>of</strong> activities: replacement work,<br />
hardware tests and s<strong>of</strong>tware tests.<br />
To minimize the total amount <strong>of</strong> time<br />
required by those 3 activities during outage,<br />
each <strong>of</strong> them has been analized and<br />
solutions were find to optimize the process.
Test str<strong>at</strong>egy<br />
Multiple test environments<br />
The hardware Test Deck<br />
The PC based s<strong>of</strong>tware emul<strong>at</strong>or for<br />
SSCI890<br />
Unit 2 maintenance computer (DCCZ)<br />
and new computer prototype (L3MAPPS)
Test Deck<br />
Remove integr<strong>at</strong>ion testing risk from outage(No time). Build an<br />
exact replica <strong>of</strong> Unit 1 plant computers which could host<br />
integr<strong>at</strong>ion and testing work before plant outage. Use the<br />
complete set <strong>of</strong> SSCI125 computers initialy purchased for Unit 2<br />
and preserved as spares for Unit 1.Prepare for integr<strong>at</strong>ion test<br />
was the first refurbishment activitie. In a special site loc<strong>at</strong>ed in<br />
Training Center all peripheral repalcement and s<strong>of</strong>tware upd<strong>at</strong>es<br />
made during Unit 1 oper<strong>at</strong>ion years were also included in old Unit<br />
2 computers. In the end was otbained an exact copy <strong>of</strong> Unit 1<br />
computers, ready to start integr<strong>at</strong>ion and testing <strong>of</strong> new<br />
hardware.<br />
There are 3 objectives rel<strong>at</strong>ed with this Test Deck:<br />
- test and accomod<strong>at</strong>e new hardware and elimin<strong>at</strong>e any integr<strong>at</strong>ion<br />
incomp<strong>at</strong>ibility<br />
- train hardware staff for replacement activities in plant and<br />
minimize outage work<br />
- test and integr<strong>at</strong>e s<strong>of</strong>tware (new Executive and <strong>Control</strong> Programs<br />
<strong>of</strong> Unit 1)
Project St<strong>at</strong>us<br />
All test facilities mentionded before,<br />
togheter with s<strong>of</strong>tware development<br />
and tests made in-house by plant<br />
engineering staff, were all key steps<br />
in preparing the plant for receiving<br />
new replacement hardware.<br />
The replacment in plant was executed<br />
in 2010 Unit 1 Planned Outage.
January 2010<br />
Work <strong>at</strong> Test Deck<br />
started: demolition<br />
<strong>of</strong> S3 panel
2 weeks l<strong>at</strong>er<br />
SAT and s<strong>of</strong>tware<br />
testing may start
CONCLUSIONS<br />
The replacement str<strong>at</strong>egy deployed <strong>at</strong> CNE Cernavoda site<br />
allow rehabilit<strong>at</strong>ion <strong>of</strong> 25 years old computers <strong>of</strong> Unit 1.<br />
Following benefits were identified:<br />
Allowed mimized implement<strong>at</strong>ion risks due to preserv<strong>at</strong>ion<br />
<strong>of</strong> field proven control s<strong>of</strong>tware and multiple testing<br />
configur<strong>at</strong>ions<br />
Allowed achiving objectives with tenth <strong>of</strong> a complete<br />
project costs by isol<strong>at</strong>ing only the hardware parts which<br />
require s<strong>of</strong>tware changes (being also the most obsolete<br />
parts) and maximazing utiliz<strong>at</strong>ion <strong>of</strong> the plant staff<br />
expertise.<br />
Avoid any plant production loses by fitting all the<br />
replacement work in a regular plant outage and moving<br />
major tasks <strong>of</strong> integr<strong>at</strong>ion and testing necessary for project<br />
on a refurbished Test Deck.<br />
The new simul<strong>at</strong>ion facilitie built for this project open new<br />
ways for future development projects.
DCC Replacement Team : HW/SW Tehnic, Maintenance & Support
Thank You !