Obsolescence Management of Station Control Computers at ... - IAEA

Obsolescence Management of Station Control Computers at ... - IAEA

Obsolescence Management of Station Control Computers at ... - IAEA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Obsolescence</strong> <strong>Management</strong> <strong>of</strong> <strong>St<strong>at</strong>ion</strong><br />

<strong>Control</strong> <strong>Computers</strong> <strong>at</strong><br />

NPP CERNAVODA UNIT 1:<br />

Dragos Popa-Nemoiu,<br />

CNE Cernavoda Romania<br />

Digital Systems Superintendent


Unit 1 initial obsolescence work -<br />

Peripheral replacements<br />

Replace old printers with laser<br />

printers<br />

Replace CRT monitors with LCD<br />

monitors<br />

Replace console with PC<br />

Add g<strong>at</strong>eway for D<strong>at</strong>a Acquisition<br />

Functions


Unit 1 SSCI 125 design deficiencies<br />

and work around to mitig<strong>at</strong>e effects<br />

Real Time Clock delays – build RTC Booster<br />

to correct RTC<br />

Scanner uncertainty – provide external<br />

monitor for timestamps<br />

CPU overload – restructure programs to<br />

reduce overload and provide resources for<br />

s<strong>of</strong>tware development<br />

Map Registers corruption – mitig<strong>at</strong>e effects<br />

by special s<strong>of</strong>tware<br />

Frequent Memory Parity Error restarts – no<br />

work around


Maintenance, <strong>Obsolescence</strong> and aging<br />

management programs<br />

Maintenance program – preserv<strong>at</strong>ion<br />

<strong>of</strong> current st<strong>at</strong>us<br />

Health Monitoring Program – observe<br />

and report degrad<strong>at</strong>ion<br />

Plant Life <strong>Management</strong>/Extention –<br />

solutions for hole life cycle including<br />

life extension


Choose replacement computer<br />

Available for next 20-30 years<br />

Guaranteed and proved reliability<br />

Allow easy partial replacement in 30<br />

days plant outage<br />

Allow porting <strong>of</strong> control programs<br />

without re-commissioning


COG (Candu Owners Group) Joint Poject<br />

4048 – Sustained by all CANDU owners<br />

Choose emul<strong>at</strong>or solution<br />

Reference computer is Cernavoda U2<br />

SSCI 890 CPU is an V75 Emul<strong>at</strong>or<br />

Secure IP rights for COG<br />

Resolve obsolescence <strong>of</strong> peripherals<br />

Secure electronic components repository<br />

based on Long Term Support<br />

Build and qualify prototype for all Candu<br />

computers refurbishments or new builds


Cernavoda U1 Refurbishment project<br />

Based on COG PDCCZ<br />

Project scope<br />

-Order New CPU<br />

-Order New Bulk Memory<br />

-Order New Power Supply<br />

Improvments<br />

- High CPU speed<br />

- More memory<br />

-Elimin<strong>at</strong>e obsolescence and<br />

design weaknesses<br />

-Increase reliability<br />

Challenge<br />

- Integr<strong>at</strong>e new and old HW<br />

-Build Executive which keep<br />

complete SSCI 125 functionality<br />

-Integr<strong>at</strong>e applic<strong>at</strong>ions with new<br />

hardware and executive


Cernavoda U1 st<strong>at</strong>ion computer<br />

replacement str<strong>at</strong>egy<br />

Use COG Joint Project prototype as<br />

reference<br />

Use oper<strong>at</strong>ion experience <strong>of</strong> U1 and<br />

U2 to avoid non m<strong>at</strong>ure new design<br />

Find solution for control s<strong>of</strong>tware<br />

porting to new computer<br />

Develop integr<strong>at</strong>ion str<strong>at</strong>egy<br />

Decide replacement and reduce risks


Design approach for Process Computer<br />

replacement project<br />

<strong>Control</strong> Programs<br />

Real Time<br />

Executive<br />

Processor 50%<br />

board<br />

SSCI125<br />

Peripheral<br />

devices<br />

Plant process<br />

Comp<strong>at</strong>ibility <strong>of</strong> control<br />

functions code with new<br />

hardware<br />

Rewrite <strong>of</strong> the Real Time<br />

Executive to solve all<br />

incomp<strong>at</strong>ibilities<br />

There is no comp<strong>at</strong>ibility<br />

to U1 SSCI125 or U2<br />

SSCI890 Executive<br />

Comp<strong>at</strong>ibility with<br />

peripheral devices is<br />

SSCI890 design key


S<strong>of</strong>tware Design str<strong>at</strong>egy<br />

1)Zero changes <strong>of</strong> control functions<br />

2) Redesign <strong>of</strong> Real Time Executive to<br />

keep functionality and accommod<strong>at</strong>e<br />

control functions in new CPU


Replacement project planing<br />

The replacement activity supose 3 major<br />

types <strong>of</strong> activities: replacement work,<br />

hardware tests and s<strong>of</strong>tware tests.<br />

To minimize the total amount <strong>of</strong> time<br />

required by those 3 activities during outage,<br />

each <strong>of</strong> them has been analized and<br />

solutions were find to optimize the process.


Test str<strong>at</strong>egy<br />

Multiple test environments<br />

The hardware Test Deck<br />

The PC based s<strong>of</strong>tware emul<strong>at</strong>or for<br />

SSCI890<br />

Unit 2 maintenance computer (DCCZ)<br />

and new computer prototype (L3MAPPS)


Test Deck<br />

Remove integr<strong>at</strong>ion testing risk from outage(No time). Build an<br />

exact replica <strong>of</strong> Unit 1 plant computers which could host<br />

integr<strong>at</strong>ion and testing work before plant outage. Use the<br />

complete set <strong>of</strong> SSCI125 computers initialy purchased for Unit 2<br />

and preserved as spares for Unit 1.Prepare for integr<strong>at</strong>ion test<br />

was the first refurbishment activitie. In a special site loc<strong>at</strong>ed in<br />

Training Center all peripheral repalcement and s<strong>of</strong>tware upd<strong>at</strong>es<br />

made during Unit 1 oper<strong>at</strong>ion years were also included in old Unit<br />

2 computers. In the end was otbained an exact copy <strong>of</strong> Unit 1<br />

computers, ready to start integr<strong>at</strong>ion and testing <strong>of</strong> new<br />

hardware.<br />

There are 3 objectives rel<strong>at</strong>ed with this Test Deck:<br />

- test and accomod<strong>at</strong>e new hardware and elimin<strong>at</strong>e any integr<strong>at</strong>ion<br />

incomp<strong>at</strong>ibility<br />

- train hardware staff for replacement activities in plant and<br />

minimize outage work<br />

- test and integr<strong>at</strong>e s<strong>of</strong>tware (new Executive and <strong>Control</strong> Programs<br />

<strong>of</strong> Unit 1)


Project St<strong>at</strong>us<br />

All test facilities mentionded before,<br />

togheter with s<strong>of</strong>tware development<br />

and tests made in-house by plant<br />

engineering staff, were all key steps<br />

in preparing the plant for receiving<br />

new replacement hardware.<br />

The replacment in plant was executed<br />

in 2010 Unit 1 Planned Outage.


January 2010<br />

Work <strong>at</strong> Test Deck<br />

started: demolition<br />

<strong>of</strong> S3 panel


2 weeks l<strong>at</strong>er<br />

SAT and s<strong>of</strong>tware<br />

testing may start


CONCLUSIONS<br />

The replacement str<strong>at</strong>egy deployed <strong>at</strong> CNE Cernavoda site<br />

allow rehabilit<strong>at</strong>ion <strong>of</strong> 25 years old computers <strong>of</strong> Unit 1.<br />

Following benefits were identified:<br />

Allowed mimized implement<strong>at</strong>ion risks due to preserv<strong>at</strong>ion<br />

<strong>of</strong> field proven control s<strong>of</strong>tware and multiple testing<br />

configur<strong>at</strong>ions<br />

Allowed achiving objectives with tenth <strong>of</strong> a complete<br />

project costs by isol<strong>at</strong>ing only the hardware parts which<br />

require s<strong>of</strong>tware changes (being also the most obsolete<br />

parts) and maximazing utiliz<strong>at</strong>ion <strong>of</strong> the plant staff<br />

expertise.<br />

Avoid any plant production loses by fitting all the<br />

replacement work in a regular plant outage and moving<br />

major tasks <strong>of</strong> integr<strong>at</strong>ion and testing necessary for project<br />

on a refurbished Test Deck.<br />

The new simul<strong>at</strong>ion facilitie built for this project open new<br />

ways for future development projects.


DCC Replacement Team : HW/SW Tehnic, Maintenance & Support


Thank You !