February 2012<br />
Dee Development Engineers Limited<br />
An Overview<br />
Pioneers of <strong>Pre</strong>-Fabricated <strong>Piping</strong> Systems
DDEL<br />
Contents<br />
Company Overview<br />
Accreditions and Approvals<br />
Facilities at a glance<br />
- <strong>Pre</strong> <strong>Fabrication</strong> <strong>Piping</strong><br />
- Induction Bending<br />
- Pipe Fittings<br />
Engineering Division at a glance<br />
Exhibits<br />
2
DDEL – At a Glance
DDEL<br />
Located in India’s Fastest Growing Industrial belt<br />
STRATEGIC LOCATION : -<br />
ICD, Tughlakabad - 40 Kms.<br />
Airport, New Delhi - 58 Kms.<br />
National Capital, New Delhi - 31 Kms.<br />
PLANTS :-<br />
Plant 1 - North <strong>Pre</strong> <strong>Fabrication</strong> Plant ( 10000 MT/Year)<br />
Plant 1 - South Pipe Fittings Plant ( 2400 MT/Year)<br />
Plant 2 - <strong>Pre</strong> <strong>Fabrication</strong> Plant ( 12000 MT/Year)<br />
4
DDEL<br />
The Company is engaged<br />
in Design & Engineering<br />
<strong>Pre</strong>fabrication of <strong>Piping</strong><br />
Systems<br />
The Company has exclusive<br />
manufacturing facility for Pipe<br />
Fittings<br />
Mainly caters to<br />
Engineering, Procurement<br />
and Construction (EPC)<br />
contractors and multinational<br />
organizations in power<br />
generation, oil and gas,<br />
chemical and food industries<br />
Boast of <strong>Pre</strong> fabrication<br />
capacity of 24000 MT and<br />
Exclusive Fittings Capacity of<br />
2400 MT per annum<br />
Dee Development Engineers Limited<br />
One of the leading International engineering enterprises<br />
offering a single window solution for all piping systems<br />
MAJOR MILESTONES:<br />
1983 – Incorporated as a Design Consultancy firm<br />
1988 – A humble start with half acre facility for <strong>Pre</strong>-<strong>Fabrication</strong> <strong>Piping</strong><br />
1994 – Establish its own in-house Pipe Fitting Manufacturing facility<br />
1996 – Entered into the Power sector piping<br />
1999 – Started High value Product P91 <strong>Fabrication</strong><br />
2004 – Shifted <strong>Fabrication</strong> base to New location at Tatarpur, Palwal ( 12 Acre Facility )<br />
2004 – Entered into the EPC space, commissioned first Biomass Power plant in Punjab<br />
2007 – Grabbed the major export order worth 6 million Euros<br />
2009 – EPC of another Biomass Based Power plant in Punjab<br />
2010 – Commissioned the state of the art Induction Bending Machine<br />
2010 – Expanded its facility base to cater sub/super critical technology<br />
2011 – Banyan Tree & Capvent infused in DDEL<br />
2011 - BHEL awarded “Best Performance Award” in <strong>Piping</strong> System supplier category<br />
2011 - Largest Single order received from MHI Japan worth 11.40 Million USD<br />
5
DDEL<br />
CMD<br />
A well organized Customer oriented<br />
Fittings<br />
Bending<br />
Marketing<br />
Projects<br />
ED<br />
CEO<br />
Quality<br />
Engineering Materials<br />
Welding<br />
EHS<br />
Strategy HR<br />
Finance<br />
Structure in Place<br />
6
DDEL<br />
Mr. K.L. Bansal<br />
Chairman cum Managing<br />
Director<br />
Mr. M Kannappan<br />
Executive Director<br />
Mr. Atul Bansal<br />
Chief Executive Officer<br />
Management Profile<br />
Mechanical Engineer<br />
Total Experience - 30 years<br />
Mechanical Engineer<br />
Total Experience - 38 years<br />
Mechanical Engineer<br />
Total Experience - 8 years<br />
Specialized in Design & Engineering of Steam piping,<br />
Process <strong>Piping</strong>, Marketing, Project Management,<br />
Finance Management etc.<br />
Awarded as “ Business Leader of the Year ” FY 11 by<br />
Faridabad Industries Association<br />
Ex – BHEL <strong>Piping</strong> Centre Executive Director<br />
Specialized in welding technologies , Project<br />
Management , Operations and Planning control etc.<br />
Under his leadership the BHEL <strong>Piping</strong> Division saw<br />
350% growth in Turnover in just three years, INR 7500<br />
Mn in 2007-08 to INR 25000 Mn in 2010-11<br />
Operational Head ; particularly responsible for the<br />
export operations<br />
Also takes care of business development<br />
7
DDEL<br />
KEY PERSONNEL<br />
Name Department Education Total Experience<br />
Mr. AK Goel Head Projects DME (Mechanical) 28<br />
Mr. AK Jha Head Finance & Accounts C.A. 17<br />
Mr. Gaurav Narang Head Strategy BE ( Mechanical ) + MBA 7<br />
Ms. Haneet Kalra Head HR B.Com + MBA 7<br />
Mr. Harsh Bhatia Head Projects BE (Mechanical) 16<br />
Mr. S Jaya Kumar Head – Engineering Division MTech ( Mechanical ) 35<br />
Mr. Pankaj Agarwal Head Marketing & Projects Bsc.Engg. (Mechanical) 17<br />
Mr. Parimi Venu Head Quality BE (Mechanical) 19<br />
Mr. Pawan Arora Head Purchase BE (Mechanical) + MBA 10<br />
Mr. Piyush Bhatt Head Projects DME (<strong>Fabrication</strong>) 10<br />
Mr. Ramesh Kumar Head Projects BSc. Engg (Mechanical) 21<br />
Mr. Sanjay Jain Head Welding M. Tech. ( Mechanical ) 15<br />
Mr. SK Saini Head Store & MR DME (Mechanical) 23<br />
8
DDEL<br />
DDEL achieved excellent financial results with strong<br />
Sales growth<br />
9
DDEL<br />
Business Strategy………….The Road Ahead<br />
10
DDEL<br />
Product wise Turnover*<br />
Sector wise Turnover*<br />
* Based on last 3 years sales data<br />
Diversified in terms of Products manufactured,<br />
Target sectors & Sale locations<br />
Domestic Vs Export Turnover<br />
11
DDEL<br />
Key Customers<br />
Our clients list includes some of the most reputed<br />
names in the domestic as well international markets<br />
12
DDEL<br />
Key Suppliers<br />
Well entrenched supplier base comprising of domestic<br />
& international manufacturers of seamless pipes<br />
13
DDEL<br />
7%<br />
Diversified high quality customer base<br />
14%<br />
29%<br />
11% 18%<br />
5%<br />
17%<br />
% represent the share of exports in FY11<br />
14
DDEL<br />
Man Power at a Glance<br />
Department No. of Employees<br />
Engineers & Managers 170<br />
Skilled Manpower 310<br />
Semiskilled Manpower 125<br />
Helpers & Riggers 250<br />
Supporting Departments 135<br />
Total 990<br />
Average years of experience of the engineering staff : 8 years<br />
15
DDEL<br />
Contents<br />
Company Overview<br />
Accreditions and Approvals<br />
Facilities at a glance<br />
- <strong>Pre</strong> <strong>Fabrication</strong> <strong>Piping</strong><br />
- Induction Bending<br />
- Pipe Fittings<br />
Engineering Division at a glance<br />
Exhibits<br />
16
DDEL<br />
The wide range of Accreditions and Approvals<br />
showcase our Expertise and Experience<br />
ISO 9001:2008<br />
ISO 14001:2004<br />
OHSAS 18001:2007<br />
PED Certification<br />
(Directive (97/23/EC)<br />
17
DDEL<br />
ASME 'PP' & 'S’ Stamp Certification<br />
The company is one of the few test houses to be on the<br />
list of NABL Accredited laboratories<br />
NABL accredited Physical & Chemical Laboratory<br />
18
DDEL<br />
Contents<br />
Company Overview<br />
Accredit ions and Approvals<br />
Facilities at a glance<br />
- <strong>Pre</strong> <strong>Fabrication</strong> <strong>Piping</strong><br />
- Induction Bending<br />
- Pipe Fittings<br />
Engineering Division at a glance<br />
Exhibits<br />
19
DDEL<br />
Spread over 22 acres (90,000 sq. mt.)of land, our facility<br />
is the cynosure of all eyes…<br />
Existing Plant Layout<br />
Plant I Plant II (1 st Phase)<br />
Work Area 13,750 sq. mt. 12,800 sq. mt.<br />
Covered Area 15,270 sq. mt. 13,500 sq. mt.<br />
Uncovered Area 17,392 sq. mt. 28,000 sq. mt.<br />
Spool <strong>Fabrication</strong><br />
Pipe Fittings & Rolled Welded Pipe<br />
Production Line Outlook<br />
6 Acres of land is available for<br />
2 nd phase capacity expansion –<br />
Implementation already initiated<br />
4 Main Workshops having 11 Bays all equipped with EOT (upto 20<br />
ton) cranes & latest technology welding equipments<br />
Spread over 1 workshop having 1 Bay for R&W pipe<br />
manufacturing, 3 Bays for Pipe fittings manufacturing and one bay<br />
exclusively meant for Inspection, Packing and Shipment<br />
20
DDEL<br />
Contents<br />
Company Overview<br />
Accredit ions and Approvals<br />
Facilities at a glance<br />
- <strong>Pre</strong> <strong>Fabrication</strong> <strong>Piping</strong><br />
- Induction Bending<br />
- Pipe Fittings<br />
Engineering Division at a glance<br />
Exhibits<br />
21
DDEL<br />
New Plant Facility<br />
Induction Bending Machine<br />
<strong>Pre</strong> <strong>Fabrication</strong> Facility at a glance<br />
World class and Technologically advanced <strong>Fabrication</strong> Workshops<br />
Equipped with 100+ stations to carry out manual as well as<br />
mechanized welding via GTAW, Orbital GTAW, GMAW, SAW,<br />
MCAW, FCAW, Orbital FCAW, SMAW processes<br />
Orbital welding station for TIG welding<br />
Post weld heat treatment by furnace and local heating<br />
(Induction/Resistance)<br />
Fully equipped NABL accredited testing laboratory<br />
In house Non-destructive facilities like RT/MPT/UT/LPT<br />
Separate fabrication bays for Stainless Steel material<br />
Surface Treatment facilities – Shot blasting, Chemical cleaning<br />
and Painting<br />
World class Induction pipe bending machine (PB 400 SPL) with<br />
capacity of bending range 2” – 16” Diameter 5-65 mm thick<br />
pipes<br />
Range – 2” – 64 “<br />
22
DDEL<br />
Experience of more than 150000 MT of <strong>Pre</strong> <strong>Fabrication</strong> which<br />
includes more than 5000 MT of P91 <strong>Fabrication</strong><br />
HRSG <strong>Piping</strong><br />
Power Cycle <strong>Piping</strong><br />
Process Plant <strong>Piping</strong><br />
Balance of Plant <strong>Piping</strong><br />
Riser & Down comer <strong>Piping</strong><br />
Gas and Steam Turbine <strong>Piping</strong><br />
Cooling Water & Lube Oil <strong>Piping</strong><br />
Steam Distribution Headers<br />
Product Portfolio : <strong>Pre</strong> <strong>Fabrication</strong><br />
Gas Compressor <strong>Piping</strong><br />
Turbine Integral <strong>Piping</strong><br />
Boiler Integral <strong>Piping</strong><br />
23
DDEL<br />
Process Flow Chart<br />
START JOB<br />
BEND PIPES AS<br />
PER DRAWING<br />
FITUP AS PER<br />
DRAWING<br />
DIMENSION &<br />
ORIENTATION<br />
INSPECTION<br />
WELDING<br />
OK<br />
RECEIPT OF<br />
BOMS &<br />
SPOOLWISE<br />
DRAWINGS<br />
EDGE<br />
PREPARATION<br />
NOT OK<br />
<strong>Pre</strong> <strong>Fabrication</strong> Pipe spools<br />
Each process is followed by a Quality check<br />
REWORK<br />
NDT<br />
PROCESS<br />
REPAIR<br />
NOT OK<br />
CUT PIPES /<br />
SECTIONS AS<br />
PER MARKING<br />
PRODUCTION<br />
PLANNING<br />
VISUAL &<br />
DIMENSION<br />
INSPECTION<br />
OK<br />
JOB<br />
COMPLETION<br />
DIMENSION<br />
INSPECTION<br />
CS<br />
RECEIPT OF RAW<br />
MATERIAL (PIPES,<br />
FITTINGS &<br />
STRUCTURAL)<br />
SHOT BLASTING<br />
SPOOL<br />
SS<br />
SPOOL<br />
NOT OK<br />
SOLVENT CLEANING<br />
DISPATCH<br />
MARK PIPE /<br />
STRUCTURAL<br />
FOR CUTTING &<br />
BENDING<br />
VISUAL<br />
(SURFACE)<br />
INSPECTION<br />
VISUAL<br />
(SURFACE)<br />
INSPECTION<br />
PACKING<br />
INCOMING<br />
INSPECTION<br />
OK<br />
INTERNAL<br />
STORAGE<br />
PAINTING<br />
NOT OK<br />
REJECTED<br />
VISUAL / DFT<br />
INSPECTION<br />
FINAL<br />
INSPECTION<br />
24
DDEL<br />
Alstom Switzerland - GT 13 <strong>Piping</strong><br />
Alstom India - 270 MW HRSG <strong>Piping</strong><br />
GE – Tonnes of 7F/9F piping<br />
2007<br />
Major Orders Executed by DDEL in recent times<br />
2008<br />
Alstom Switzerland - 870 MW Critical <strong>Piping</strong><br />
Alstom India - CCPP HRSG <strong>Piping</strong><br />
GE Energy - Their 1 st IGCC Project<br />
Lanco Kondapalli Stage II 1*370 MW– Power Cycle <strong>Piping</strong><br />
Man Turbo AG - Process & Oil <strong>Piping</strong><br />
2009<br />
2010<br />
Adani Power – 7 X 660 MW Super Critical <strong>Piping</strong><br />
Doosan Babcock - 4*360 MW Pulverized fuel &<br />
4*360 External <strong>Piping</strong><br />
Lanco Kondapalli Stage III 2*370 MW– Power Cycle <strong>Piping</strong><br />
* DDEL caters to 95% and 75% of the total pipe spools requirement for ISGEC & Thermax respectively<br />
* Executing Power Cycle <strong>Piping</strong> of 5x660 MW Super critical TPS for Adani Power Tiroda , 2*660 MW for Kawai.<br />
MHI, Japan –<br />
<strong>Pre</strong>fabricated plant<br />
piping<br />
2011<br />
25
DDEL<br />
Contents<br />
Company Overview<br />
Accredit ions and Approvals<br />
Facilities at a glance<br />
- <strong>Pre</strong> <strong>Fabrication</strong> <strong>Piping</strong><br />
- Induction Bending<br />
- Pipe Fittings<br />
Engineering Division at a glance<br />
Exhibits<br />
26
DDEL<br />
Weld Less Technology at DDEL<br />
Induction Bending Machine<br />
27
DDEL<br />
Machine Specifications:<br />
Make<br />
COJAFEX BV, The Netherlands<br />
Nominal Pipe Range<br />
2” to 16”<br />
Thickness<br />
Up to 65mm<br />
Bend Radius<br />
76mm to 2032mm<br />
Bending Angle<br />
0’ to 180’<br />
Pipe Rotation<br />
0’ to 360’ Degree<br />
Induction Bending is a controlled means of Bending<br />
28
DDEL<br />
Induction Pipe Bending procedure<br />
shall comply with the following<br />
codes and standards:<br />
ASME B31.1 – Power <strong>Piping</strong><br />
ASME B31.3 – Process <strong>Piping</strong><br />
CSA Z245.11-05 – Steel Fittings<br />
TPA-IBS-98 – Recommended<br />
Std’s for Induction Bending of<br />
Pipe and Tube<br />
PFI ES – 24 – Pipe Bending<br />
Methods<br />
Indian Boiler Regulations<br />
Customer specific / Drawing<br />
requirements<br />
Leading the technology curve with State of the Art M/c’s<br />
29
DDEL<br />
Faster delivery period<br />
Benefits to the Customers<br />
Reduction in fabrication and welding offers significant quality assurance<br />
advantages over the use of fittings<br />
Reduces Inspection of weld joints<br />
Reduces number of field joints.<br />
Induction Bending produces excellent results in terms of dimensional, physical &<br />
chemical properties.<br />
With Bending Technology, we can make single spool with multiple bend in 0 to<br />
360 degree orientation,<br />
Machine is capable of bending:-<br />
Seamless, Spiral , ERW, L.SAW & H. SAW Types of pipes<br />
Carbon Steel, Alloy Steel, Austenitic Steel, Stainless Steel, Incoloy material<br />
30
DDEL Another Milestone: Bending Machine with 300 MT per month capacity<br />
Machine Specifications:<br />
Make<br />
AWS SCHAFER, Germany<br />
Nominal Pipe Range<br />
8” to 48”<br />
Thickness<br />
Up to 120mm<br />
Bend Radius<br />
280mm to 6500mm<br />
Bending Angle<br />
0’ to 182’<br />
Pipe Rotation<br />
0’ to 360’ Degree<br />
To be commissioned in beginning next financial year<br />
31
DDEL<br />
Contents<br />
Company Overview<br />
Accredit ions and Approvals<br />
Facilities at a glance<br />
- <strong>Pre</strong> <strong>Fabrication</strong> <strong>Piping</strong><br />
- Induction Bending<br />
- Pipe Fittings<br />
Engineering Division at a glance<br />
Exhibits<br />
32
Our Expertise in Pipe Fittings
DDEL<br />
As an Initiative for Backward Integration for <strong>Piping</strong>, we installed Pipe<br />
Fitting Manufacturing Facility<br />
1994<br />
17 Years of Huge<br />
Experience<br />
2003<br />
Started with 350 MT press<br />
Capacity ~~ 30 MT pm<br />
Major Operational Milestones<br />
2006<br />
Installed another 150 MT + 750 MT press<br />
Capacity ~~ 75 MT pm<br />
2009<br />
Installed another 1000 MT press<br />
Capacity ~~ 125 MT pm<br />
2010<br />
Installed Induction<br />
Mandrel, 3000 MT press<br />
Capacity ~~ 200 MT pm<br />
Installed Cold Forming Elbow making<br />
machine …Capacity ~~150 MT pm<br />
34
Elbow Making Machine<br />
DDEL<br />
Hot Formed<br />
Cold Formed<br />
Pipe Fitting : Facility at a glance<br />
One of the Best Fitting Workshops in Industry<br />
Hot Pushing Mandrel Elbow Forming Automatic M/c having<br />
capacity to form Elbows from 8-28 inch & thickness up to 50 mm<br />
2 Cold Forming Machines of different sizes for Elbow production<br />
complemented with 3 Edge <strong>Pre</strong>paration machines<br />
Various Hydraulic <strong>Pre</strong>sses ranging from 750 MT to 3000 MT for<br />
manufacturing of Pipe Fittings<br />
Hot forming section equipped with 2 furnaces and 4 hydraulic<br />
presses<br />
Machining section having over 20 lathes and other related<br />
machinery<br />
3 Semi-automated Shot Blasting machines for fittings<br />
Pipe Cutting Section having capability up to 52” with add on<br />
capacity of up to 28” from automated machinery<br />
35
DDEL<br />
Fittings : The Products we offer<br />
90 ° Elbow<br />
45 ° Elbow<br />
Half Socket Weld<br />
Coupling<br />
Concentric<br />
Reducers<br />
Eccentric<br />
Reducers<br />
Full Socket Weld<br />
Coupling<br />
36
DDEL<br />
Fittings : The Products we offer<br />
Equal Tee<br />
Weld olets<br />
End Caps<br />
Unequal Tee<br />
Long radius<br />
Induction Bends<br />
U Bends<br />
37
DDEL<br />
Start<br />
BOM<br />
RAW MATERIAL<br />
IISUE FOR<br />
PRODUCTION<br />
END<br />
CUTTING<br />
INSPECTION<br />
* Hot Forming Process<br />
RECEIPT OF<br />
BOM<br />
RAW<br />
MATERIAL<br />
CUTTING<br />
INSPECTION<br />
MACHINING<br />
Fittings* : The Process we follow<br />
Each process is followed by a Quality check<br />
PRODUCTION<br />
PLANNING<br />
RECEIPT OF<br />
RAW MATERIAL<br />
INSPECTION<br />
PLUGGING<br />
&<br />
DRAWING<br />
INSPECTION<br />
HEAT<br />
TREATMENT<br />
INSPECTION/<br />
NDT<br />
INSPECTION<br />
SHOT<br />
BLASTING<br />
&<br />
PAINTING<br />
INCOMING<br />
INSPECTION<br />
SAND<br />
FILLING<br />
RAW MATERIAL<br />
STORAGE<br />
INSPECTION<br />
PROFILING INSPECTION FORMING<br />
INSPECTION FINISHING<br />
FINAL<br />
INSPECTION<br />
End<br />
38
DDEL<br />
1500 MT<br />
2007<br />
Executed Tonnage ( Last 4 years Annual data )<br />
2008<br />
1800 MT<br />
2000 MT<br />
2009<br />
2010<br />
2400 MT<br />
We manufacture all type of Pipe Fittings i.e. Butt welding, Socket welding & Screwed in various grades of<br />
Carbon Steel, Alloy Steel and Stainless Steel<br />
Seamless – up to 28” Welded – up to 52”<br />
39
DDEL<br />
Contents<br />
Company Overview<br />
Accredit ions and Approvals<br />
Facilities at a glance<br />
- <strong>Pre</strong> <strong>Fabrication</strong> <strong>Piping</strong><br />
- Induction Bending<br />
- Pipe Fittings<br />
Engineering Division at a glance<br />
Exhibits<br />
40
DDEL<br />
Engineering Division : Facility at a glance<br />
Equipped with all latest software technology<br />
The division is presently lead by a highly experienced professional with more than 35yrs of<br />
experience in power equipment manufacturing industry and having worked in power piping<br />
design department for more than 23yrs<br />
11 Dedicated Engineers having varying hands on experience on the following Software's.<br />
AUTOCAD<br />
MODELLING IN PDMS<br />
STRESS ANALYSIS WITH CAESAR II.<br />
PIPE SIZING AND PRESSURE DROP CALCULATIONS USING PIPE FLOW<br />
Access to following reference standards and codes.<br />
ASME B16.5 – Pipe flanges and flanged fittings<br />
ASME B16.9 – Butt weld and wrought fittings.<br />
ASME B16.3 – Valves-flanged, threaded & welding end.<br />
ASME B16.11 – Forged and SW fittings.<br />
ASME B16.25 – Butt welding ends.<br />
ASME B31.1 – Power piping.<br />
ASME B31.3 – Process piping<br />
41
DDEL<br />
<strong>Pre</strong> - Bid Engineering<br />
Review Basic Enquiry<br />
Drawings/ Documents.<br />
Data Collection from<br />
Client/ Site.<br />
Conceive proposed Pipe<br />
Routing.<br />
Estimate Bill of Quantities<br />
for proposal Engineering<br />
Capabilities<br />
We are capable to perform the following activities :<br />
Basic Engineering<br />
<strong>Piping</strong> Design Criteria<br />
Development.<br />
Pipe Sizing Calculations<br />
<strong>Pre</strong>ssure Drop<br />
Calculations<br />
<strong>Piping</strong> Material Selection<br />
Specifications <strong>Pre</strong>paration<br />
Detailed Engineering<br />
Layout Engineering<br />
Materials Engineering<br />
Stress Analysis<br />
Support Engineering<br />
IBR calculations<br />
42
DDEL<br />
Layout Engineering<br />
<strong>Piping</strong> General Arrangement Drawings (Plan & Sections)<br />
<strong>Piping</strong> Isometrics<br />
Capabilities ( Contd… )<br />
Pipe Shop <strong>Fabrication</strong> Spools drawings<br />
Equipment Nozzle Orientation Plan<br />
Review of piping GAD’s with respect to P&IDs<br />
Review of Vendor Drawings/ Documents<br />
Stress Analysis<br />
Capable to carry out stress analysis using Caeser-II<br />
latest software package and suggest required changes<br />
in the layout drawings and select proper and optimal<br />
supports to bring the system with in permissible limits<br />
of stresses and forces and moments at the terminals<br />
Material Engineering<br />
<strong>Piping</strong> Items Procurement Specifications.<br />
Insulation Items Procurement Specifications.<br />
Painting Specifications,<br />
<strong>Piping</strong> Bill of Materials<br />
<strong>Pre</strong>liminary BOM Issue (Based on P&ID and Plot Plan)<br />
Intermediate (Based on <strong>Piping</strong> Layout)<br />
Final (Based on <strong>Piping</strong> Isometrics).<br />
- Pipe Supports Bill of Materials.<br />
- Technical Bid Evaluation for procurement<br />
Pipe Support Engineering<br />
Pipe Support Layouts, Pipe Support Detail<br />
Drawings<br />
Spring Hanger Data Sheets, specifications<br />
Inserts & Loading Drawings (Input to Civil)<br />
43
DDEL<br />
Key Highlights<br />
<strong>Fabrication</strong> of more than 150,000 MT<br />
<strong>Fabrication</strong> of P91 more than 5000 MT,<br />
<strong>Fabrication</strong> of WB 36 more than 1500 MT<br />
Bending Machine in operation since 2010 (2 years)<br />
Induction Bends P91 (BHEL) more than 500 Nos.<br />
Induction Bends other than P91 more than 200 ~400 MT<br />
Induction Bends (P91) other than BHEL more than 100 MT<br />
Another Bending Machine ( 8" to 48") being commissioned by July, 2012<br />
44
DDEL<br />
Contents<br />
Company Overview<br />
Accreditions and Approvals<br />
Facilities at a glance<br />
- <strong>Pre</strong> <strong>Fabrication</strong> <strong>Piping</strong><br />
- Induction Bending<br />
- Pipe Fittings<br />
Engineering Division at a glance<br />
Exhibits<br />
45
DDEL<br />
DDEL in Pictures<br />
Facility Outlook Storage Facility<br />
DDEL <strong>Fabrication</strong> Shop<br />
46
DDEL<br />
Men @ Job<br />
Furnace Heat Treatment<br />
Elbow Making Machine<br />
Induction Mandrel<br />
47
DDEL<br />
DDEL Head Office<br />
Client Visit at DDEL<br />
DDEL at Event “Boiler 2010”<br />
DDEL at ASSOCHAM Conference<br />
48
DDEL<br />
Thank You<br />
Looking forward for a Long term relationship<br />
For Further information please visit our Website<br />
www.deedevelopment.com<br />
49
DDEL<br />
Alstom Power Switzerland<br />
Project Details Scope of Supply Material Involved<br />
870 MW CCPP<br />
Langage Power Station at<br />
Plymouth – UK<br />
Power Cycle <strong>Piping</strong> consisting of<br />
Main Steam, Hot reheat, Cold<br />
Reheat and Feed Water<br />
Balance of Plant <strong>Piping</strong> CS and SS<br />
SA 335 Grade P11, P22 and<br />
P91 and SA106 Grade C<br />
Back to Projects Page<br />
50
DDEL<br />
Adani Power Limited - India<br />
Project Details Scope of Supply Material Involved<br />
5 * 660 MW Super Critical<br />
Thermal Power Station at<br />
Tiroda Maharashtra<br />
2 * 660 MW Super Critical<br />
Thermal Power Station at<br />
Kawai Maharashtra<br />
Power Cycle <strong>Piping</strong> consisting of<br />
Main Steam, Hot reheat, Cold<br />
Reheat and Feed Water<br />
Power Cycle <strong>Piping</strong> consisting of<br />
Main Steam, Hot reheat, Cold<br />
Reheat and Feed Water<br />
SA 335 Grade P11, P22 and<br />
P91 and WB36<br />
SA 335 Grade P11, P22 and<br />
P91 and WB36<br />
Back to Projects Page<br />
51
DDEL<br />
GE Energy - USA<br />
Project Details Scope of Supply Material Involved<br />
GE’s<br />
1 st IGCC Project<br />
Duke Energy – Edwardsport<br />
Riser and Downcomer large bore<br />
<strong>Piping</strong> with ASME Stamp<br />
SA 106 Grade B and SA 335<br />
Grade P11<br />
Back to Projects Page<br />
52
DDEL<br />
Lanco Infratech - India<br />
Project Details Scope of Supply Material Involved<br />
Lanco Kondapalli Stage II<br />
1*370 MW– Power Cycle<br />
<strong>Piping</strong><br />
Lanco Kondapalli Stage III<br />
2*370 MW– Power Cycle<br />
<strong>Piping</strong><br />
Power Cycle <strong>Piping</strong> consisting of<br />
Main Steam, Hot reheat, Cold<br />
Reheat and Feed Water<br />
Power Cycle <strong>Piping</strong> consisting of<br />
Main Steam, Hot reheat, Cold<br />
Reheat and Feed Water<br />
SA 335 Grade P11, P22 and<br />
P91 and SA 106 Grade B/C<br />
SA 335 Grade P11, P22 and<br />
P91 and SA 106 Grade B/C<br />
Back to Projects Page<br />
53
DDEL<br />
Mitsubishi Heavy Industries Ltd. - Takasago Japan<br />
Project Details Scope of Supply Material Involved<br />
Plant <strong>Piping</strong> for 2* 800 MW<br />
Nong Saeng CCPP Project at<br />
Thailand<br />
Plant <strong>Piping</strong><br />
SA 106 Grade B/C, SA 335<br />
Grade P11/P22/P91 and SA<br />
312 Grade TP304<br />
( Approximately 1750 MT )<br />
Back to Projects Page<br />
54