SL<br />

NO PROJECT/ CLIENT JOB <strong>EXECUTED</strong> APPROX. VALUE OF<br />

WORK DONE<br />

1 Shubhmangal Foundation<br />

Trust<br />

Development and beautification<br />

of CC road along with the side<br />

pavements and utilities at<br />

Palitana.<br />

2 Surat Municipal Corporation Construction of 37 MLD<br />

pumping station, Utran<br />

3 Surat Municipal Corporation Construction of RCC, Retaining<br />

wall, Platform, Amphitheatre,<br />

Steps and Masonary retaining<br />

wall at Gopitalav, in central<br />

Zone, Surat.<br />

4 Essar Construction Ltd Repairing and Rehabilitation of<br />

Jetty Structure at Hazira, Dist.<br />

Surat.<br />

5 Surat Municipal Corporation<br />

C/o. Rebuild Struct<br />

Associates<br />

6<br />

.<br />

Gujarat Industrial<br />

Development Corporation,<br />

Ankleshwar, Dist Bharuch<br />

(Gujarat )<br />

7 Palsana Enviro Protection<br />

Limited, Palsana,<br />

Kadodara, Dist. Surat<br />

Micro Concreting<br />

Polymer Modified Mortar<br />

Protective Coating<br />

Epoxy Injection Grouting<br />

Bar Anchoring<br />

Repairing and Rehabilitation of<br />

Nehru Bridge on River Tapi at<br />

Chowk, Surat.<br />

Concreting Work<br />

Polymer Modified Mortar<br />

Injection Grouting<br />

Rebar Anchoring<br />

Construction work for Designing<br />

and Construction of conventional<br />

STP of capacity 22.50 MLD<br />

including development of plot at<br />

GIDC Ankleshwar<br />

Construction of Civil Units for 100<br />

MLD Capacity Common Effluent<br />

Treatment Plant (C.E.T.P) at<br />

Kadodara.<br />

300.00 LACS<br />

250.00 LACS<br />

278.00 LACS<br />

225.00 LACS<br />

160.00 LACS<br />

2261.00 LACS<br />

600.00 LACS


8 Sisodra Gram Vikas Samity,<br />

Ta. Jalalpore,<br />

Dist. Navsari<br />

9 Construction of 10 Fast<br />

Track Court Building<br />

[ R.C.C Frame Structure]<br />

10 Construction of C.E.T.P plant<br />

- 25 lacs capacity<br />

[ R.C.C Work ]<br />

11 Construction of Staff<br />

Quarters Building<br />

12 Construction of Foundation &<br />

Tremix Flooring Work<br />

13 Repair, Rehabilitation and<br />

Strengthening of the RCC<br />

Chimney.<br />

14 Construction of School<br />

Building<br />

[ R.C.C Frame Structure]<br />

15 Construction of Cement<br />

Concrete Road by using<br />

Tremix System<br />

16 Epoxy Flooring<br />

Protective Coating<br />

Expansion Joint Filling<br />

17 Repairing & Restoring of<br />

Staff Quarters at<br />

Mandarwaja. And<br />

Earthquake Repairing of<br />

Various School Buildings<br />

18 Repairing, Rehabilitation<br />

and Strengthening of R.C.C<br />

Structure<br />

19 Repairing and Rehabilitation<br />

of Jetty Structure, Surat.<br />

Micro Concreting<br />

Polymer Modified Mortar<br />

Protective Coating<br />

Epoxy Injection Grouting<br />

Bar Anchoring<br />

… And many other projects<br />

Construction work of Service<br />

Trench, Storm water line,<br />

concrete road using tremix<br />

system<br />

PWD(R&B Subdivision –2)<br />

Athwalines,Surat<br />

C/o. Natvar Construction<br />

Aireff deTox Incineration Ltd<br />

Balotra at Jasol,<br />

Rajasthan,<br />

Essar Construction Limited,<br />

At : Nandniketan,<br />

Hazira,<br />

Surat<br />

Donear Industries Ltd,<br />

Jolwa, Kadodara,<br />

Surat<br />

.170.00 LACS<br />

152.00 LACS<br />

100.00 LACS<br />

100.00 LACS<br />

100.00 LACS<br />

M/s. Tata Chemicals Limited,<br />

Mithapur 100.00 LACS<br />

S.D. Jain Modern School, Vesu<br />

Chokdi, Surat.<br />

Tundi Gram Vikas Samity, Tal:<br />

Palsana,<br />

Dist. Surat.<br />

Kakrapar Atomic Power Station<br />

Kakrapar<br />

90. 00 LACS<br />

85.00 LACS<br />

82.00 LACS<br />

Surat Municipal Corporation 80.00 LACS<br />

South Gujarat University<br />

[ Library Building & Staff Qrtrs ]<br />

80.00 LACS<br />

M/s.Larsen & Turbo Ltd. 50.00 LACS


<strong>MAJOR</strong> <strong>PROJECTS</strong> ON HAND<br />

SL<br />

NO PROJECT/ CLIENT JOB SPECIFICATION JOB VALUE<br />

01. M/s. ONGC Ltd, Hazira Plant,<br />

Surat<br />

Special repair of pedestal raft,<br />

RCC columns, beams, flooring<br />

and revamping of drainage<br />

system of SRU Plant in ONGC<br />

Hazira, Surat<br />

02. M/s.Torrent Power Ltd., Construction of Document<br />

Storage Buillding<br />

03. M/s. Kakrapar Atomic Power<br />

Plant, Anumala, Tapi<br />

04. M/s.Sachin Infra Environment<br />

Limited<br />

05. M/s.Rashtriya Ispat Nigam<br />

Limited, Vizag, A.P<br />

. And many other projects.<br />

Construction of Sewage<br />

Treatment Plant of capacity<br />

500 m3 using FMR at Kakrapar<br />

Civil construction of<br />

clariflucculator, flash mixer,<br />

lime and ferrous sulfate<br />

solution at Sachin Infra<br />

Construction of pumping<br />

stations, WTP, and existing<br />

STP tertiary treatment<br />

<strong>IN</strong> RUPEES<br />

352.33 Lacs<br />

113.52 Lacs<br />

273.00 Lacs<br />

260.00 Lacs<br />

1200.00 Lacs


TURNOVER – M/s. SHRIPAD CONCHEM PVT.LTD<br />

YEAR AMOUNT<br />

[ Rs. In Lakhs ]<br />

2005-06 389.95<br />

2006-07 428.59<br />

2007-08 506.41<br />

2008-09 776.38<br />

2009-10 876.51<br />

2010-11 499.29<br />

TURNOVER – M/s. SHRIPAD CONSTRUCTION<br />

YEAR AMOUNT<br />

[ Rs. In Lakhs ]<br />

2005-06 219.28<br />

2006-07 243.81<br />

2007-08 613.14<br />

2008-09 2296.85<br />

2009-10 780.94<br />

2010-11 901.21<br />

TURNOVER – SHRIPAD GROUP<br />

YEAR AMOUNT<br />

[Rs. In Lakhs ]<br />

2005-06 1267.83<br />

2006-07 1708.73<br />

2007-08 2330.15<br />

2008-09 4398.84<br />

2009-10 2793.67<br />

2010-11 2659.25