30.06.2013 Views

1053 - American Society of Sanitary Engineering

1053 - American Society of Sanitary Engineering

1053 - American Society of Sanitary Engineering

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

What was the dwell time per cycle? _______seconds<br />

In compliance? Yes <br />

No<br />

3.5 Resistance to Bending.<br />

Load applied _______ lbs.( _______ kg)<br />

Supply pressure used for this test? _______psi (_______ kPa)<br />

Duration <strong>of</strong> test: _______minutes<br />

In compliance? Yes <br />

No<br />

3.6 Self-Drain Capabilities<br />

Did the Type 'A' device discharge 3.0 gallons (11.4 liters) <strong>of</strong> water after the base temperature was<br />

lowered to 0.0°F (-17.8°C) and the hose was removed?<br />

Yes <br />

No<br />

Did the Type 'B' device discharge 3.0 gallons (11.4 liters) <strong>of</strong> water after the base temperature was<br />

lowered to 0.0°F (-17.8°C) and the hose and nozzle were left attached?<br />

Yes <br />

No<br />

In compliance? Yes <br />

No <br />

Questionable<br />

If questionable, explain: _______<br />

3.7 Tightness <strong>of</strong> Outlet Check Valve.<br />

Was the inlet check valve blocked open and were the atmospheric vents sealed close?<br />

Yes <br />

No<br />

Begining height <strong>of</strong> water in the sight glass: _______ inches (_______ mm)<br />

Final height <strong>of</strong> water in the sight glass: _______inches ( _______ mm)<br />

Water was held in the sight glass for _______ minutes<br />

In compliance? Yes <br />

No <br />

<br />

3.8 Tightness <strong>of</strong> Inlet Check Valve.<br />

Was the outlet check valve blocked open and were the atmospheric vents sealed close?<br />

Yes <br />

No<br />

Begining height <strong>of</strong> water in the sight glass: _______inches (_______mm)<br />

Final height <strong>of</strong> water in the sight glass: _______inches ( _______ mm)<br />

Water was held in the sight glass for _______ minutes<br />

In compliance? Yes <br />

No<br />

3.9 Leakage from Vent Ports.<br />

What was the supply pressure used for this test? _______ psi ( _______ kPa)<br />

Was there any leakage at the vent ports at full flow? Yes <br />

No <br />

Questionable<br />

LABORATORY EVALUATION REPORT ASSE STANDARD <strong>1053</strong><br />

Page 4 <strong>of</strong> 7 pages (2004)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!