<strong>TUNNEL</strong><br />

<strong>ABDALAJIS</strong> <strong>OST</strong><br />

Projektname / project name:<br />

Bauherr / client:<br />

Auftragssumme / contract amount:<br />

Bauzeit / construction period:<br />

Arbeitsgemeinschaft / Joint venture:<br />

Tunnel Abdalajis Ost, Spanien / Spain<br />

ADIF – Administrador de Infraestructuras Ferroviarias<br />

185,0 Mio EUR<br />

2002 - 2007<br />

Dragados - TECSA – Jäger Bau - SELI<br />

PROJEKTBESCHREIBUNG:<br />

Zweiröhriger Eisenbahntunnel für<br />

die Hochgeschwindigkeitsstrecke<br />

Malaga – Cordoba Länge: 7.050 m<br />

Universal Doppelschild TBM Ø 10,0 m<br />

Einschalige Auskleidung mittels<br />

Tübbingausbau (d=45 cm)<br />

Herstellung von 19 Stk. Querschlägen<br />

im Abstand von ca. 350 m<br />

TECHNISCHE DATEN:<br />

Monatsleistung bis zu 700 m.<br />

Einsatz von GFK Rohrschirmen und<br />

Schaum-injektionen zur Durchörterung<br />

der Störzonen, 75% des Tunnels unter<br />

dem Bergwasserspiegel (ca. 900 m,<br />

Wasserzutritt bis 500 l/sec,<br />

Ausgasungen)<br />

GEOLOGIE:<br />

Mergel, Kalkstein, Dolomit, Phyllit,<br />

Tonschiefer<br />

Jäger Bau, Batloggstr. 95, 6780 Schruns - Austria, +43(0)5556/7181-0, office@jaegerbau.com<br />

DESCRIPTION OF PROJECT:<br />

Twin-tube tunnel for high speed railway<br />

link Malaga – Cordoba<br />

Length: 7050 m<br />

Universal double shield TBM Ø 10.0 m<br />

Mono shell lining with<br />

precast segments (w=45 cm)<br />

Emergency cross passages<br />

every 350 m (19 units)<br />

TECHNICAL DATA:<br />

Monthly advance rate up to 700 m<br />

Application of fibre-glass micropiles and<br />

foam injections to pass through fault<br />

zones, 75% of the tunnel length below<br />

local ground water table (approx. 900 m,<br />

water inrushes up to 500 l/sec, methane<br />

gas intrusions)<br />

GEOLOGY:<br />

Marl, limestone, dolomite, phyllite,<br />

shale<br />

JÄGER BAU


<strong>ABDALAJIS</strong> <strong>OST</strong> – Details<br />

TBM Zusammenbau / TBM assembly TBM Bohrkopf / TBM cutterhead<br />

Tübbing Ausbau / Segment lining Tübbinglager / Precast segment storage yard<br />

Regelquerschnitt / Typical cross section<br />

Jäger Bau, Batloggstr. 95, 6780 Schruns - Austria, +43(0)5556/7181-0, office@jaegerbau.com<br />