06.07.2013 Views

Porous Asphalt Pavements for Storm Water Management

Porous Asphalt Pavements for Storm Water Management

Porous Asphalt Pavements for Storm Water Management

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Materials & Design: Stone Recharge<br />

• Typically No. 3 Stone<br />

– Clean, Washed<br />

Bed<br />

• Typically Between 12 and 36 inches<br />

• ≈ 40% Voids<br />

– Typically stores Between 4.8 and 14.4 inches of<br />

Precipita=on<br />

– Since this Exceeds most <strong>Storm</strong> Events, Consider using<br />

Recharge Bed to Treat nearby Impermeable Surfaces.<br />

• Pretreatment by be Required

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!