Porous Asphalt Pavements for Storm Water Management
Porous Asphalt Pavements for Storm Water Management
Porous Asphalt Pavements for Storm Water Management
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Materials & Design: Other<br />
Considera=ons<br />
• Rou=ng <strong>Storm</strong>water from Impervious Areas<br />
– Roofs, Adjacent Roadways, ect…<br />
– Open Pipe Directly into Recharge Bed<br />
– Consider Sediment Control Devices<br />
– Remember 5:1 Ra=o<br />
• Provide Alternate Path<br />
– Good Prac=ce to Provide Alt. Path <strong>for</strong> Runoff to<br />
Enter Recharge Bed<br />
– Extreme <strong>Storm</strong>s, Clogging