Contract No. CV/2002/09 Tai O Development – Sheltered Boat Anchorage
Contract No. CV/2002/09 Tai O Development – Sheltered Boat Anchorage
Contract No. CV/2002/09 Tai O Development – Sheltered Boat Anchorage
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Contract</strong> <strong>No</strong>. <strong>CV</strong>/<strong>2002</strong>/<strong>09</strong><br />
<strong>Tai</strong> O <strong>Development</strong> <strong>–</strong> <strong>Sheltered</strong> <strong>Boat</strong> <strong>Anchorage</strong><br />
Weekly Site Inspection Record Sheet<br />
Inspection Information<br />
Checklist Reference Number 30605<br />
Date 5 June, 2003<br />
Time 9:45 am <strong>–</strong> 11:00 am<br />
<strong>No</strong>n-Compliance Reference <strong>No</strong>.<br />
<strong>No</strong>ne<br />
Remarks/Observations<br />
A. Water Quality<br />
• Sandy water was overflowing near the sea wall. The <strong>Contract</strong>or indicated that they would<br />
rectify the situation by next week.<br />
B. Air Quality<br />
• <strong>No</strong> violation was observed during site inspection.<br />
C. <strong>No</strong>ise<br />
• <strong>No</strong> violation was observed during site inspection.<br />
D. Waste / Chemical Management<br />
• The drip tray on the jack-up pontoon was full of diesel oil. The <strong>Contract</strong>or was reminded<br />
to avoid the oil from overflowing and leaking to the sea.<br />
• <strong>No</strong> drip tray was provided for the drilling machine at sea wall.<br />
E. Permit / Licenses<br />
• <strong>No</strong> violation was observed during site inspection.<br />
CINOTECH MA3006<br />
Part B 5i<br />
Part F 3 iii<br />
Name Signature Date<br />
Recorded by Winniss Kong 6 June, 2003<br />
Checked by Priscilla Choy 6 June, 2003
<strong>Contract</strong> <strong>No</strong>. <strong>CV</strong>/<strong>2002</strong>/<strong>09</strong><br />
<strong>Tai</strong> O <strong>Development</strong> <strong>–</strong> <strong>Sheltered</strong> <strong>Boat</strong> <strong>Anchorage</strong><br />
Weekly Site Inspection Record Sheet<br />
Inspection Information<br />
Checklist Reference Number 30611<br />
Date 11 June, 2003<br />
Time 10:00 am <strong>–</strong> 11:00 am<br />
<strong>No</strong>n-Compliance Reference <strong>No</strong>.<br />
<strong>No</strong>ne<br />
Remarks/Observations<br />
A. Water Quality<br />
• Dredging was undertaking at marine access area during the inspection.<br />
B. Air Quality<br />
• <strong>No</strong> violation was observed during site inspection.<br />
C. <strong>No</strong>ise<br />
• <strong>No</strong> violation was observed during site inspection.<br />
D. Waste / Chemical Management<br />
• <strong>No</strong> violation was observed during site inspection<br />
E. Permit / Licenses<br />
• <strong>No</strong> violation was observed during site inspection.<br />
Name Signature Date<br />
Recorded by Henry Leung 11 June, 2003<br />
Checked by Winniss Wong 11 June, 2003<br />
CINOTECH MA3006
<strong>Contract</strong> <strong>No</strong>. <strong>CV</strong>/<strong>2002</strong>/<strong>09</strong><br />
<strong>Tai</strong> O <strong>Development</strong> <strong>–</strong> <strong>Sheltered</strong> <strong>Boat</strong> <strong>Anchorage</strong><br />
Weekly Site Inspection Record Sheet<br />
Inspection Information<br />
Checklist Reference Number 30618<br />
Date 18 June, 2003<br />
Time 10:15 am <strong>–</strong> 11:30 am<br />
<strong>No</strong>n-Compliance Reference <strong>No</strong>.<br />
<strong>No</strong>ne<br />
Remarks/Observations<br />
A. Water Quality<br />
• Overflow of water from sedimentation tank for drilling works was observed at portion<br />
M1. The contractor was reminded to avoid the overflowing of silty water into sea.<br />
B. Air Quality<br />
• <strong>No</strong> violation was observed during site inspection.<br />
C. <strong>No</strong>ise<br />
• <strong>No</strong> violation was observed during site inspection.<br />
D. Waste / Chemical Management<br />
• The drip tray on the dredging barge was full of oily water. The contractor was reminded to<br />
remove oil more frequently.<br />
• The drip tray on the jack-up pontoon was full of oily water. The contractor was reminded<br />
to remove oil more frequently.<br />
• The oil drum on the jack-up pontoon was not provided the drip tray. The contractor was<br />
reminded to follow up.<br />
E. Permit / Licenses<br />
• <strong>No</strong> violation was observed during site inspection.<br />
Name Signature Date<br />
Recorded by Henry Leung 18 June, 2003<br />
Checked by Priscilla Choy 18 June, 2003<br />
CINOTECH MA3006
<strong>Contract</strong> <strong>No</strong>. <strong>CV</strong>/<strong>2002</strong>/<strong>09</strong><br />
<strong>Tai</strong> O <strong>Development</strong> <strong>–</strong> <strong>Sheltered</strong> <strong>Boat</strong> <strong>Anchorage</strong><br />
Weekly Site Inspection Record Sheet<br />
Inspection Information<br />
Checklist Reference Number 30626<br />
Date 26 June, 2003<br />
Time 10:30 am <strong>–</strong> 11:30 am<br />
<strong>No</strong>n-Compliance Reference <strong>No</strong>.<br />
<strong>No</strong>ne<br />
Remarks/Observations<br />
A. Water Quality<br />
• <strong>No</strong> violation was observed during site inspection.<br />
B. Air Quality<br />
• <strong>No</strong> violation was observed during site inspection.<br />
C. <strong>No</strong>ise<br />
• <strong>No</strong> violation was observed during site inspection.<br />
D. Waste / Chemical Management<br />
• The drip tray on the dredging barge was full of oily water. The contractor was reminded to<br />
remove oil more frequently.<br />
• Oil drums were placed on the bare ground near the bus terminal. The contractor indicated<br />
that a chemical storage area / workshop is under construction and bounding for oil drums<br />
will be available.<br />
E. Permit / Licenses<br />
• <strong>No</strong> violation was observed during site inspection.<br />
Name Signature Date<br />
Recorded by Henry Leung 27 June, 2003<br />
Checked by Priscilla Choy 27 June, 2003<br />
CINOTECH MA3006