14.07.2013 Views

Contract No. CV/2002/09 Tai O Development – Sheltered Boat Anchorage

Contract No. CV/2002/09 Tai O Development – Sheltered Boat Anchorage

Contract No. CV/2002/09 Tai O Development – Sheltered Boat Anchorage

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Contract</strong> <strong>No</strong>. <strong>CV</strong>/<strong>2002</strong>/<strong>09</strong><br />

<strong>Tai</strong> O <strong>Development</strong> <strong>–</strong> <strong>Sheltered</strong> <strong>Boat</strong> <strong>Anchorage</strong><br />

Weekly Site Inspection Record Sheet<br />

Inspection Information<br />

Checklist Reference Number 30605<br />

Date 5 June, 2003<br />

Time 9:45 am <strong>–</strong> 11:00 am<br />

<strong>No</strong>n-Compliance Reference <strong>No</strong>.<br />

<strong>No</strong>ne<br />

Remarks/Observations<br />

A. Water Quality<br />

• Sandy water was overflowing near the sea wall. The <strong>Contract</strong>or indicated that they would<br />

rectify the situation by next week.<br />

B. Air Quality<br />

• <strong>No</strong> violation was observed during site inspection.<br />

C. <strong>No</strong>ise<br />

• <strong>No</strong> violation was observed during site inspection.<br />

D. Waste / Chemical Management<br />

• The drip tray on the jack-up pontoon was full of diesel oil. The <strong>Contract</strong>or was reminded<br />

to avoid the oil from overflowing and leaking to the sea.<br />

• <strong>No</strong> drip tray was provided for the drilling machine at sea wall.<br />

E. Permit / Licenses<br />

• <strong>No</strong> violation was observed during site inspection.<br />

CINOTECH MA3006<br />

Part B 5i<br />

Part F 3 iii<br />

Name Signature Date<br />

Recorded by Winniss Kong 6 June, 2003<br />

Checked by Priscilla Choy 6 June, 2003


<strong>Contract</strong> <strong>No</strong>. <strong>CV</strong>/<strong>2002</strong>/<strong>09</strong><br />

<strong>Tai</strong> O <strong>Development</strong> <strong>–</strong> <strong>Sheltered</strong> <strong>Boat</strong> <strong>Anchorage</strong><br />

Weekly Site Inspection Record Sheet<br />

Inspection Information<br />

Checklist Reference Number 30611<br />

Date 11 June, 2003<br />

Time 10:00 am <strong>–</strong> 11:00 am<br />

<strong>No</strong>n-Compliance Reference <strong>No</strong>.<br />

<strong>No</strong>ne<br />

Remarks/Observations<br />

A. Water Quality<br />

• Dredging was undertaking at marine access area during the inspection.<br />

B. Air Quality<br />

• <strong>No</strong> violation was observed during site inspection.<br />

C. <strong>No</strong>ise<br />

• <strong>No</strong> violation was observed during site inspection.<br />

D. Waste / Chemical Management<br />

• <strong>No</strong> violation was observed during site inspection<br />

E. Permit / Licenses<br />

• <strong>No</strong> violation was observed during site inspection.<br />

Name Signature Date<br />

Recorded by Henry Leung 11 June, 2003<br />

Checked by Winniss Wong 11 June, 2003<br />

CINOTECH MA3006


<strong>Contract</strong> <strong>No</strong>. <strong>CV</strong>/<strong>2002</strong>/<strong>09</strong><br />

<strong>Tai</strong> O <strong>Development</strong> <strong>–</strong> <strong>Sheltered</strong> <strong>Boat</strong> <strong>Anchorage</strong><br />

Weekly Site Inspection Record Sheet<br />

Inspection Information<br />

Checklist Reference Number 30618<br />

Date 18 June, 2003<br />

Time 10:15 am <strong>–</strong> 11:30 am<br />

<strong>No</strong>n-Compliance Reference <strong>No</strong>.<br />

<strong>No</strong>ne<br />

Remarks/Observations<br />

A. Water Quality<br />

• Overflow of water from sedimentation tank for drilling works was observed at portion<br />

M1. The contractor was reminded to avoid the overflowing of silty water into sea.<br />

B. Air Quality<br />

• <strong>No</strong> violation was observed during site inspection.<br />

C. <strong>No</strong>ise<br />

• <strong>No</strong> violation was observed during site inspection.<br />

D. Waste / Chemical Management<br />

• The drip tray on the dredging barge was full of oily water. The contractor was reminded to<br />

remove oil more frequently.<br />

• The drip tray on the jack-up pontoon was full of oily water. The contractor was reminded<br />

to remove oil more frequently.<br />

• The oil drum on the jack-up pontoon was not provided the drip tray. The contractor was<br />

reminded to follow up.<br />

E. Permit / Licenses<br />

• <strong>No</strong> violation was observed during site inspection.<br />

Name Signature Date<br />

Recorded by Henry Leung 18 June, 2003<br />

Checked by Priscilla Choy 18 June, 2003<br />

CINOTECH MA3006


<strong>Contract</strong> <strong>No</strong>. <strong>CV</strong>/<strong>2002</strong>/<strong>09</strong><br />

<strong>Tai</strong> O <strong>Development</strong> <strong>–</strong> <strong>Sheltered</strong> <strong>Boat</strong> <strong>Anchorage</strong><br />

Weekly Site Inspection Record Sheet<br />

Inspection Information<br />

Checklist Reference Number 30626<br />

Date 26 June, 2003<br />

Time 10:30 am <strong>–</strong> 11:30 am<br />

<strong>No</strong>n-Compliance Reference <strong>No</strong>.<br />

<strong>No</strong>ne<br />

Remarks/Observations<br />

A. Water Quality<br />

• <strong>No</strong> violation was observed during site inspection.<br />

B. Air Quality<br />

• <strong>No</strong> violation was observed during site inspection.<br />

C. <strong>No</strong>ise<br />

• <strong>No</strong> violation was observed during site inspection.<br />

D. Waste / Chemical Management<br />

• The drip tray on the dredging barge was full of oily water. The contractor was reminded to<br />

remove oil more frequently.<br />

• Oil drums were placed on the bare ground near the bus terminal. The contractor indicated<br />

that a chemical storage area / workshop is under construction and bounding for oil drums<br />

will be available.<br />

E. Permit / Licenses<br />

• <strong>No</strong> violation was observed during site inspection.<br />

Name Signature Date<br />

Recorded by Henry Leung 27 June, 2003<br />

Checked by Priscilla Choy 27 June, 2003<br />

CINOTECH MA3006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!