PROCEEDINGS OF THE MEETING<br />

OF THE DISTRICT PLANNING COMMITTEE, NAYAGARH<br />

Date: 22 December 2009 Venue: Zilla Parishad Conference Hall, <strong>Nayagarh</strong><br />

Time: 4.30 P.M<br />

The District Planning Committee, <strong>Nayagarh</strong> met on 22 nd December 2009 at <strong>Nayagarh</strong> to discuss the<br />

draft district plan of the district for the year 2009-10 and <strong>2010</strong>-<strong>11</strong>. The meeting was presided by the<br />

Chairperson of the DPC and the Hon’ble Minister for Women & Child Development, Orissa<br />

Smt. Pramila Mallik in the presence of the DPC members, the Member Secretary and the<br />

Collector Sri Paresh Chandra Nayak, president of <strong>Nayagarh</strong> Zilla Parishad Sri Harekrushna<br />

Pradhan, vice president of the Zilla Parishad Smt Nirupama Maharana , Hon’ble MP Sri Rudra<br />

Madhav Ray, Hon’ble MLAs Sri Arun Kumar Sahu, Sri Kashinath Mallik and Sri Satyanarayan<br />

Pradhan; Project Director, DRDA; and the District Planning Officer Sri Amulya Kumar Mohanty.<br />

It was attended by various departmental officers also, and Sri Bikash Rath, Sr. Programme Officer,<br />

PRIA presented the draft district plan on behalf of the Technical Support Institution.<br />

The meeting began with the welcome address by the Collector, <strong>Nayagarh</strong> Sri Nayak who said that<br />

in the process of preparation of district plan, PRIA has undertaken various meetings and<br />

interactions to get information and opinion from officers and people as well. He also said that<br />

agriculture being the mainstay of the economy of the district, development of this sector alongwith<br />

agro-industries should be the focus of the developmental planning. This was followed by the<br />

observation of the Hon’ble MLAs and the MP. Sri Kashinath Mallik, Hon’ble MLA, Dasapalla said<br />

that the pension/allowance programme of the Govt of Orissa for the poor and disadvantaged people<br />

is the boon for the district, but this should be accelerated. Sri Satyanarayan Pradhan, Hon’ble MLA,<br />

Ranpur said that deserving people should get the allowance. He further said that given the fact that<br />

many parts of the district are quite disadvantaged having a sizeable population of SC & ST,<br />

<strong>Nayagarh</strong> should be recognized as a backward district and special attention should accordingly be<br />

given to it. He stressed on more such meetings so that the developmental issues of the district can<br />

be properly discussed and monitored.<br />

Hon’ble President, Zilla Parshad Sri Pradhan however drew attention of the House to the fact that<br />

allowances can’t be a sustainable solution to the livelihood issue of the district. He said that<br />

<strong>Nayagarh</strong> doesn’t have any mine or industry to depend on and flourish and hence development of<br />

the agriculture and other natural resource bases is very much required.<br />

Sri Rudra Madhav Ray, the Hon’ble MP, Kandhmal gave stress on the constitutional provision of<br />

district planning, and said that the district plan should identify thrust areas. He focused on irrigation<br />

development, development of communication including railway line, Rastriya Madhyamaik<br />

Sikshya Abhiyan, educational development of SC & ST people, and tourism, etc. Referring to the<br />

delayed railway line project from Khurdha to Bolangir, he suggested that things might improve if<br />

the Govt of Orissa agreed to give the required govt lands free of cost. The House was delighted to<br />

know from him that a thermal power plant has been proposed at Bhapur (and Boud) which may<br />

facilitate progress in the construction of the railway line.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

1


Hon’ble Chairperson of the DPC, <strong>Nayagarh</strong> remarked that the district plan should be prepared<br />

taking into consideration the resources available in the district, and that agriculture should be<br />

focused adequately. She asked the TSI representative to present the draft district plan<br />

department/sector-wise, and Sri Bikash Rath accordingly presented a detail plan with a proposed<br />

outlay of Rs. 334.95 crores and Rs. 502.76 crores for 2009-10 and <strong>2010</strong>-<strong>11</strong> respectively. The House<br />

discussed the plan with the following remarks/suggestions:<br />

1. DIC & Agriculture/Horticulture Departments should focus on agro-industries and value<br />

addition projects.<br />

2. Horticulture department should propose for cold chain, pat house and refrigerated vans;<br />

should provide the list of drip irrigation provided; and revive defunct horticulture centre at<br />

Nuagaon as demo unit. To ensure marketing of floriculture products, it should promote<br />

species that are better marketable locally (like marigold).<br />

3. Soil conservation department should be more dynamic and should propose for additional<br />

watershed projects. Water harvesting structures should be renovated.<br />

4. Panchayat should be declared as the unit for assessing crop failure/loss.<br />

5. For development of animal resources, genetic upgradation of existing population should be<br />

taken up, marketing of milk should be ensured, and fodder farms should be established.<br />

6. Given the fact that <strong>Nayagarh</strong> fish has a good demand, and supply from Andhra is being<br />

marketed in Bhubaneswar in the name of <strong>Nayagarh</strong> fish, the private sector should be<br />

encouraged so that fishery development in the district can take place adequately. There<br />

should be demonstration for fish farmers.<br />

7. The Cooperatives should encourage private entrepreneurs for cold storage through their<br />

subsidy programme. On the other hand, the district cooperatives should be brought under<br />

only one cooperative Bank, i.e. the <strong>Nayagarh</strong> Cooperative bank.<br />

8. The present grant under MO KUDIA scheme for 471 beneficiaries is highly insufficient for<br />

the district, and each Block should rather have at least a target for 400. Similarly, target for<br />

Indira Awas Yojna should be increased proportionately according to the BPL population of<br />

the district.<br />

9. Rs.100 crore should be proposed for Bruttanga irrigation project. The MI Division should<br />

see to it that more projects are incorporated under Triple ‘R’ scheme. The government<br />

should give subsidy to the LI users on electricity bills.<br />

10. Infrastructure development in the energy sector is very much required and to ensure<br />

effective & reliable supply to Ranapur area there should be two sections at Gopalpur &<br />

Darpanarayanpur. Presently three electrical divisions have jurisdiction over the district, but<br />

it should be brought under only the <strong>Nayagarh</strong> division. BGJY should be extended for the<br />

poor people of urban areas also.<br />

<strong>11</strong>. The Textiles Department should focus on powerloom issue, and should open training centre<br />

for the weavers of Badhipatana, Narendrapur, Uansapatana, and Rajsunakhala.<br />

12. The NH division should register FIR against those hindering the progress of the<br />

construction & repairing work. Rumbles should replace humps.<br />

13. More RD roads should be taken up by the PWD, and similarly more PS roads should be<br />

taken up be RD. Intermediate roads connecting NH to NH (like that from Pratapprasad to<br />

Chandpur, and from Sunakhala to Chandpur) should be treated at par with the NH.<br />

Panchayat monitoring may help reduce encroachment of roads.<br />

14. The Forest Department should develop the forest roads into metal roads at least, and should<br />

accelerate its road development program through NREGS.<br />

15. The Tourism Department should take up development of sites like Asurakumari and<br />

Jagannath temple of Ranpur.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

2


16. The District Welfare Department should see to it that each Ashram school has one 100seater<br />

hostel.<br />

17. There should at least one mobile health care unit in each Block.<br />

18. <strong>Nayagarh</strong> town should be converted into a municipality incorporating Patana. Similarly,<br />

Ranpur and Daspalla should be declared as NAC.<br />

19. The Social Welfare Department should propose for anganwadi stores, more orphanages,<br />

SWADHAR, working women’s hostel, old age home, short stay home, and staff quarter<br />

along with office building. Class VIII students should be eligible to be benefited under midday<br />

meal programme.<br />

20. Police out-posts should be opened at Chadheyapalli, Kurala, Gadabanikilo and Gopalpur.<br />

Cluster fortification will be more helpful for the police.<br />

21. The Jails should propose for their own security force.<br />

22. The Chairperson, <strong>Nayagarh</strong> NAC proposed for a park near <strong>Nayagarh</strong><br />

college and renovation of ponds, alongwith adequate drainage system.<br />

The District Planning Committee then approved the draft District Plan of <strong>Nayagarh</strong> district<br />

for years 2009-10 & <strong>2010</strong>-<strong>11</strong> with an instruction to PRIA (Technical Support Institution) to<br />

revise the Plan document as per the suggestions of the DPC. Instruction was also given to<br />

concerned departments to supply required information to PRIA within 2/3 days.<br />

The meeting ended with a vote of thanks to the Hon’ble Chairperson and other participants by the<br />

District Planning Officer, <strong>Nayagarh</strong>.<br />

Sd/- 31.12.2009<br />

Approved<br />

Chairperson,<br />

District Planning Committee, <strong>Nayagarh</strong><br />

& Minister, Women & Child Development, Orissa<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

3


A Note from the TSI<br />

Preparation of the Comprehensive District Annual Plan was attempted under the facilitation of<br />

Technical Support Institutions (TSI) during 2008-09, and PRIA was appointed as the TSI for<br />

Angul district for the said year. We are happy to see that our effort has been widely appreciated<br />

and the Government of Odisha has been pleased to appoint us as the TSI not only for Angul<br />

district but also for <strong>Nayagarh</strong> district for the year 2009-10. However, this year we have faced<br />

some new challenges and had to work under new limitations. Collection of GP-level plans, as<br />

per an innovative format designed by PRIA keeping in view the requirements of PlanPlus<br />

software, was one of these challenges and added to that was the difficulty of collecting data on<br />

resource envelope. Deadlines set by the district administration for submission of these<br />

documents failed many times. The current Plan has been prepared under several such<br />

limitations and constraints. However, we have tried to be innovative and dynamic, and as such a<br />

chapter on gender sub-plan has slo been incorporated.<br />

Despite our efforts errors are not unlikely. We apologize for any such unintentional errors.<br />

Projections based on GP-level planning need feasibility assessment which was not possible on<br />

our part partly because it was beyond of purview of our assignment, and partly because it needs<br />

a lot of time and resource. However, the wish list is available in annexure-12.<br />

The chapterization and the sections have largely followed the guidelines of the Planning &<br />

Coordination Department. Attempt has thus been made to make the main Plan document<br />

consise and precise, limited to 100 pages, so as to make to readable and reviewable easily. We<br />

hope that the present Plan would be useful despite its limitations.<br />

Last but not the least; even the best plans would hardly be successful without administrative<br />

reforms. We have seen that some of our planners, policy makers, and executing officials have<br />

the earnestness and vision to serve the people in a better way, but stereotype administrative<br />

procedures create the major hindrance for them. Hence, planning should be adequately<br />

supplemented by administrative reforms (vide annexure-<strong>11</strong> for detail suggestions). We strongly<br />

recommend that such reformative measures are adopted immediately so that the huge<br />

investment of the government for public benefit may be adequately and timely utilized with<br />

visible results.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

4<br />

BIKASH RATH<br />

Sr.Programme Officer<br />

PRIA-Odisha


Acknowledgement<br />

During the financial year 2009-10, PRIA has been involved in the district plan preparation process<br />

in two districts of Odisha, viz. Angul and <strong>Nayagarh</strong>. Each district has its own challenges and<br />

opportunities; so it’s not just a mere repetition of the process everywhere. Rather, each such case<br />

has been a new learning for us enriching our understanding of the process and enhancing our<br />

capability.<br />

We are grateful to the District Planning Committee, <strong>Nayagarh</strong> for their kind approval of the district<br />

plan for 2009-10 and <strong>2010</strong>-<strong>11</strong>. The dynamic & constructive observations of the Committee have<br />

not only helped us make this Plan more complete and more useful, but have also been a recognition<br />

to our endeavourer towards this goal. Needless to say, such a dynamic and constructive role of the<br />

DPC is a hope for the decentralized planning process.<br />

The district administration has repeatedly tried to ensure that the TSI gets the required information.<br />

The Collector, <strong>Nayagarh</strong> has been quite supportive to us, and the Project Director, DRDA; the<br />

District Planning Officer; Sarpanchs and Samiti Members; Block Development Officers; Executive<br />

Officers of Urban Local Bodies; and other departmental authorities have also tried to follow the<br />

suggestions made by us through the district administration. We take this opportunity to thank all of<br />

them.<br />

Sri Kashinath Mallik, Hon’ble MLA, Dasapalla has extended a special cooperation in our<br />

endeavour. We have also received support from other representatives of the people at various<br />

levels. PRIA is grateful to all of them for this support.<br />

Ms. Chandana Das and her team, Sri Rudra Prasanna Nayak, and Sri Pabitra Kumar Swain have<br />

rendered us professional services for facilitating/conducting Block-level consultations and<br />

planning. Further, Sri Bidyadhar Moharana, a senior agricultural expert, has helped us in the<br />

preparation of the CDAP. We are very much thankful to them for their support.<br />

We are happy that the Planning & Coordination Department, Government of Odisha has trusted<br />

PRIA to prepare the annual plan for <strong>Nayagarh</strong> district for the current year. We hope that this trust<br />

has been duly honoured through our work.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

5<br />

PRIA-Odisha


PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

6


CONTENTS<br />

Subject<br />

Chapter<br />

Page<br />

Chapter-I Executive Summary, Methodology and District Profile<br />

SWOT analysis<br />

<strong>11</strong><br />

Chapter-II<br />

District Vision and brief perspective plan<br />

38<br />

Chapter-III<br />

47<br />

Chapter-IV<br />

Chapter-V<br />

Chapter-VI<br />

Chapter-VII<br />

Chapter-VIII<br />

Chapter-IX<br />

Resource envelope for district 49<br />

Resource envelope for Blocks and GPs 52<br />

Sectoral District Plans and Schemes 55<br />

AGRICULTURE & ALLIED ACTIVITIES: 56<br />

RURAL DEVELOPMENT 73<br />

SPECIAL AREAS PROGRAMMES: 78<br />

IRRIGATION & FLOOD CONTROL 81<br />

ENERGY 90<br />

INDUSTRY & MINERALS 95<br />

TRANSPORT 102<br />

SCIENCE, TECHNOLOGY & ENVIRONMENT 105<br />

GENERAL ECONOMIC SERVICES 108<br />

SOCIAL SERVICES <strong>11</strong>3<br />

GENERAL SERVICES 129<br />

Tribal Sub-Plan 135<br />

Scheduled Caste Sub-Plan 136<br />

Recommendations of the District Planning Committee 137<br />

Section-II: GN statements and 10 th 5-year Plan outlays<br />

GENERAL ANNEXURES<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

7


LIST OF ABBREVIATIONS<br />

ACP Annual Credit Plan<br />

AH Animal Husbandry<br />

ANM Auxiliary Nurse Midwife<br />

APL Above Poverty Line<br />

ARCS Assistant Registrar of Cooperative Society<br />

ARD Animal Resource Department<br />

ATMA Agricultural Technology Management Agency<br />

AYUSH Ayurveda, Yunani, Siddha, Homaeopathy<br />

BCC Behaviour Change Communication<br />

BGJY Biju Grama Jyoti Yojna<br />

BPL Below Poverty Line<br />

BRCC Block Resource Centre<br />

BRGF Backward Region Grant Fund<br />

BSUP Basic Services to the Urban Poor<br />

CDAP Comprehensive District Agriculture Plan<br />

CDP Comprehensive District Plan<br />

CDVO Chief District Veterinary Officer<br />

CRCC Cluster Resource Centre<br />

CSP Centre State Plan<br />

DFO Divisional Forest Officer<br />

DIC District Industry Centre<br />

DPC District Planning Committee<br />

DPO District Planning Officer<br />

DRDA District Rural Development Agency<br />

DSP Deputy Superintendent of Police<br />

DSWO District Social Welfare Officer<br />

DW Diversion weir<br />

DWCUA Development of Women & Children in Urban Areas<br />

DWO District Welfare Officer<br />

FFDA Fish Farmers Development Agencies<br />

GDP Gross Domestic Product<br />

GGY Gopabandhu Grameen Yojna<br />

GoI Government of India<br />

GoO Government of Odisha<br />

GP Gram panchayat<br />

Ha Hectare<br />

IAY Indira Awas Yojna<br />

IEC Information, Education, Communication<br />

IHSDP Integrated Housing & Slum Development Programme<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

8


INM Integrated nutrition management<br />

IPM Integrated pest management<br />

IPPI Intensified Pulse Polio Immunization<br />

ISOPOM Integrated Scheme of Oilseeds, Pulses, Oilpalm and Maize<br />

IWDP Integrated Watershed Development Programme<br />

JFM Joint Forest Management<br />

KL Kendu leaf<br />

KVK Krushi Vigyan Kendra<br />

LAC Livestock Aid Centre<br />

LI Lift irrigation<br />

MADA Modified Area Development Approach<br />

MI Minor Irrigation<br />

MIDP Manual of Integrated District Planning<br />

MIP Minor Irrigation Project<br />

MLA Member of Legislative Assembly<br />

MP Member of Parliament<br />

MT Metric ton<br />

NABARD National Bank for Agriculture and Rural Development<br />

NAC Notified Area Council<br />

NFSM National Food Security Mission<br />

NGO Non government organization<br />

NH National Highway<br />

NHM National Horticulture Mission<br />

NREGA National Rural Employment Guarrentee Act<br />

NRHM National Rural Health Mission<br />

NTFP Non-timber Forest Produce<br />

NWDPRA National Watershed Development Project for Rainfed Areas<br />

NWFF National Welfare Fund for Fishermen<br />

OBC Other Backward Class<br />

OCTMP Orissa Community Tanks Management Programme<br />

OMFED Orissa State Cooperative Milk Producers' Federation<br />

OSFDC Orissa Scheduled caste & Scheduled Tribe Development Finance<br />

Corporation Limited<br />

PACS Primary Agricultural Cooperative Society<br />

PD Project Director<br />

PHC Public Health Centre<br />

PHED Public Health Engineering Department<br />

PHM Post harvest management<br />

PLP Potential Linked Plan<br />

PMGSY Pradhan Mantri Gram Sadak Yojna<br />

PR Periodic repairing<br />

PRI Panchayati Raj Institutions<br />

PWD Public Works Department<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

9


PYYKA Panchayat Yuva Krida Aur Khed Abhiyan<br />

R&B Road & Building<br />

RD Rural Development<br />

RGGVY Rajiv Gandhi Grameen Vidyutikaran Yojna<br />

RIDF Rural Infrastructure Development Fund<br />

RKVY Rastriya Krushi Vikash Yojna<br />

RMSA Rastriya Madhyamik Sikshya Abhiyan<br />

RWSS Rural Water Supply & Sanitation<br />

SC Scheduled Caste<br />

SCA Special Central Assistance<br />

SCRS Sugar Cane Research Station<br />

SCSP Scheduled Caste Sub-Plan<br />

SGSY SWARNAJAYANTI GRAM SWA-ROJGAR YOJANA<br />

SHG Self Help Group<br />

SJSRY Swarna Jayanti Sahari Rojgar Yojna<br />

SP State Plan<br />

SP Superintendent of Police<br />

SSA Sarva Sikshya Abhiyan<br />

ST Scheduled Tribe<br />

SWOT Strength, Weakness, Opportunity, Threat<br />

T Territorial<br />

TC Tissue culture<br />

TFC Twelfth Finance Commission<br />

TSI Technical Support Institution<br />

TSP Tribal Sub-Plan<br />

UIDSSMT Urban Instrstructural Development Scheme for Small & Medium Towns<br />

ULB Urban Local Bodies<br />

UPS Upper Primary School<br />

USEPS Urban Self Employment Programme Scheme<br />

UWEP Urban Wage Employment Programme<br />

VSS Van Samrakshan Samiti<br />

WL Wildlife<br />

WP Work Plan<br />

ZP Zilla Parishad<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

10


Chapter I<br />

-----------------------------------------------------------------<br />

EXECUTIVE SUMMARY OF DISTRICT PLAN FOR 2009-10 & <strong>2010</strong>-<strong>11</strong><br />

The proposed outlay for <strong>Nayagarh</strong> district for the year <strong>2010</strong>-<strong>11</strong> is Rs.650.39 crores. As the<br />

following chart would show, the highest share(24%) is that of irrigation(with priority to Bruttanga<br />

project) followed by education(22%, because of the proposal under Ratriya Madhyamik Sikshya<br />

Abhiyan). The share of energy sector has also increased as compared to that of 2009-10.<br />

Estimation for NREGS by Blocks and line departments often imply to a shelf of projects that might<br />

take 3 or more years to complete. Hence, only a realistic outlay of Rs.7 crores has been proposed<br />

for <strong>2010</strong>-<strong>11</strong> taking into consideration the achievements in 2009-10.<br />

Sectoral allocations some of the departments have been calculated with 10% increment on the<br />

financial target for 2009-10. Line department outlays exclude NREGS, and forestry sector budget<br />

excludes the Kendu Leaf operations.<br />

Sector Outlay for <strong>2010</strong>-<strong>11</strong> in lakh rupees<br />

Agriculture & allied 3064.26<br />

DRDA(excluding NREGS) 4789.21<br />

NREGS 700<br />

DSMS 13.5<br />

Grant under article 275(1) 138.93<br />

SCA to TSP 96.58<br />

Irrigation 15796.2<br />

Energy 2062.37<br />

Industry(DIC,Textiles,<br />

Sericulture) 243.161<br />

Road development 6885.142<br />

E-governance 12<br />

Tourism 54<br />

Civil Supply 2.43<br />

Forestry 617.6198<br />

Education(SSA+RMSA) 14574.21<br />

Sports 35.54<br />

Health 1973.043<br />

Water & sanitation 4454.796<br />

NAC(2) 915<br />

Art & Culture 23<br />

District welfare 438.3708<br />

Social welfare 4596.06<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

<strong>11</strong>


Police 1995<br />

Building 1559.066<br />

Total 65039.49<br />

Sectoral share in proposed annual financial<br />

outlay for <strong>Nayagarh</strong> district:<strong>2010</strong>-<strong>11</strong><br />

NAC(2)<br />

1%<br />

Sports<br />

(less than 1%)<br />

Art & Culture<br />

(less than 1%)<br />

Water & sanitation<br />

7%<br />

Social w elfare<br />

7%<br />

District w elfare<br />

1%<br />

Health<br />

3%<br />

Education<br />

22%<br />

Forestry<br />

1%<br />

Police<br />

3%<br />

Civil Supply<br />

(less than 1%)<br />

E-governance<br />

(less than 1%)<br />

Agriculture & allied<br />

5%<br />

Building<br />

2%<br />

Tourism<br />

(less than 1%)<br />

DRDA(excluding NREGS)<br />

7%<br />

NREGS<br />

1%<br />

DSMS<br />

(less than 1%)<br />

Irrigation<br />

24%<br />

Energy<br />

(less than 3%)<br />

Grant under article 275(1)<br />

(less than 1%)<br />

SCA to TSP<br />

(less than 1%)<br />

Industry(DIC,Textiles,<br />

Sericulture)<br />

(less than 1%)<br />

Road development<br />

<strong>11</strong>%<br />

The RKVY plan for the district has been carefully developed so as to be feasible and complying to<br />

the norms. Total outlay under RKVY has thus been Rs.4.56 crores for <strong>2010</strong>-<strong>11</strong>. Major share in this<br />

budget is that of the Soil Conservation Department followed by Horticulture and Cooperation.<br />

Most of the projections have been based on actual allocation or assured allocation, hence the<br />

resource gap is not supposed to be much. The original proposals have been modified in some cases,<br />

and a number of proposals under 2009-10 have been shifted to the Plan for <strong>2010</strong>-<strong>11</strong> so that the<br />

scope the same being sanctioned may increase substantially. Details of the proposed outlays are<br />

available in annexure-2.<br />

GP-level wish list suggesting a total financial requirement of Rs.585.87 crores has been generated<br />

during the participatory planning process of 2009-10, but due want of feasibility assessment these<br />

have not been incorporated in the proposed outlay.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

12


INTRODUCTION<br />

To achieve desired targets of economic growth and balanced regional development the efforts for<br />

decentralized planning commenced with the first Five <strong>Year</strong> Plan. The plan recognized the need to<br />

break up planning exercise into National, State, District and Local Government level. But it failed<br />

to spell out the process for the same. In the second Five <strong>Year</strong> Plan, two new elements, namely,<br />

establishment of District Development Council and drawing up of village plans were introduced.<br />

But again the attempt went futile due to lack of proper enabling framework. On the<br />

recommendations of Balwant Rai Mehta Committee in 1957, village, block and district level<br />

Panchayat Institutions were established in many states. But, they were not assigned with any<br />

meaningful role or resources. Administrative Reforms Commission (1967) highlighted in its Report<br />

that district planning needed to be focused in those areas where local variations in the pattern and<br />

process of development were likely to yield quick results in terms of growth. In 1969, the Planning<br />

Commission communicated guidelines to the states for formulating district plans detailing the<br />

concept and methodology of drawing up such plans. It gave some fruitful results but limited to few<br />

states. A Central Scheme was also operational from Fourth to Ninth Five <strong>Year</strong> Plan to assist states<br />

for strengthening their planning. This scheme was extended to district level in 1982-83. A Working<br />

Group headed by Prof. M. L. Dantwala (1978) identified remoteness of planning agencies at district<br />

level from actual scene of action as the cause for mismatch of financial allocations with location<br />

specific needs. The Group recommended Block as the appropriate sub-state planning unit. Planning<br />

Commission also issued guidelines on formulation of Block level plans in tune to these<br />

recommendations. The Ashok Mehta Committee (1978) in its report recommended that Panchayats<br />

ought to be strengthened for undertaking local planning. The Hanumantha Rao Committee (1984)<br />

brought out the fact that planning from below was undermined by different streams of funding the<br />

district plan. The Group recommends decentralization of function, powers and finances, setting up<br />

of district planning bodies and district planning cells. The G. V. K. Rao Committee (1985)<br />

reviewed the administrative arrangements for rural development and recommended district<br />

Panchayat to manage all development programmes. The Sarkaria Commission also highlighted the<br />

need for people’s participation in the planning and administrative machinery at local level. During<br />

Sixth and Seventh Plan role of Panchayats in rural development was also enlarged. In 1992-93, the<br />

73 rd and 74 th Amendments gave Constitutional status to local self- governments and provided a new<br />

and universalized platform for decentralized planning. In recent initiatives taken by MoPR<br />

regarding decentralized planning it is recommended that under Article 243ZD of the Constitution<br />

District Planning Committee (DPC) shall be constituted at the district level in every state to<br />

consolidate the plans prepared by the Panchayats and the Municipalities in the district and to<br />

prepare a draft development plan for the district. The object of district planning is to arrive at an<br />

integrated, participatory coordinated idea of development of a local area. The comprehensive<br />

district plan will integrate multiple programmes that are in operation in the district concerned and<br />

therefore address backwardness through a combination of resources that flow to the district.<br />

The process was made concrete through the help of Technical Support Institutions(TSI) since 2008-<br />

09 though under several limitations in respect of methodology and achievements. During 2009-10,<br />

new elements have been added to the process with a slightly modified approach, though bottlenecks<br />

of the previous year still persist. These elements have also influenced the plan for <strong>2010</strong>-<strong>11</strong>.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

13


METHODOLOGY<br />

PRIA, as the TSI for <strong>Nayagarh</strong> district, adopted the following methodology for preparation of<br />

district plan:<br />

Stakeholder consultation and orientation at GP-, Block-, ULB-, and district level<br />

Liasiaoning with district officials, PRI members and ULB functionaries<br />

Designing of special 3-step format for plan preparation and distribution of the same<br />

Publication of special booklet on CDP in Odia and distribution of the same as a guide book<br />

for plan preparation<br />

Distribution of necessary formats as per Manual of Integrated District Planning(MIDP) to<br />

various line departments and Blocks<br />

Focussed facilitation of GP level and Block level planning<br />

Personal guidance to various planning authorities for their respective plan preparation<br />

Engagement of an agriculture consultant<br />

Engagement of a district point person<br />

Consultation with MPs/MLAs<br />

Consultation with corporate sector(annexure-7)<br />

Data entry, processing and consultation.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

14


DISTRICT BACKGROUND AND PROFILE<br />

Location and history<br />

The present <strong>Nayagarh</strong> district was a princely state before 1948, and after independence it became the<br />

sub-division of Puri district. Following the recognition of the districts in Odisha in 1993, <strong>Nayagarh</strong><br />

was formed as a separate district and the district started functioning w.e.f. 01.04.1993, with the<br />

headquarters as <strong>Nayagarh</strong>. It lies between 19 0 54’ to 23 0 32’ North Latitude and 84 0 29’ to 85 0 27’<br />

Longitude. The border of <strong>Nayagarh</strong> district touches the districts of Angul and Cuttack in North and<br />

North-West, Boudh and Kandhamal in the West, Ganjam in the South and Khurda in the East.<br />

(Source: www.mapsofindia.com/maps/Odisha/districts/nayagarh.htm)<br />

This district is situated in the hilly ranges in the West and its North Eastern parts have formed a small<br />

well cultivated fertile valleys intersected by small streams. This district is in the higher altitude than<br />

the sea level and above flood level. River Mahanadi flows in the Eastern boundary of the district.<br />

Climate of the district carries a high temperature in hot months and cooler in winter.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

15


Agriculture being the main source of economy and subsistence for the rural people of <strong>Nayagarh</strong> district<br />

plays a critical role in the economy of the district and the livelihood of majority of its population.<br />

MIDP Table 1: District Over View<br />

Sl.No Feature Unit Value<br />

1 Geographical area Sq.Km 2443.70<br />

2 Total population Lakh 8.64<br />

3 Sub-division Number 1<br />

4 Blocks Number 8<br />

5 Revenue Villages<br />

Gram Panchayats<br />

Number 1695<br />

6 (Village councils)<br />

Taluka Panchayats<br />

Number 179<br />

7<br />

8<br />

9<br />

(block councils) Number 8<br />

Nagar panchayats<br />

(Municipal<br />

councils) 2<br />

Length of rail<br />

network KM 0<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

16


10 Irrigated agriculture Hectares 56591<br />

<strong>11</strong> Wasteland Hectares 25462<br />

12 Forests Sq.Km 2080.97<br />

Demographic profile:<br />

With the geographical area of 2443.70 sq km the district had 178231 households as per the 2001<br />

census. The population of the district is 864516 with density of 222 per sq km and sex ratio of<br />

938.Total male population is 446177 and total female population is 418339. Rural population<br />

constitutes 95.71 % of total population. ST and SC population of the district is 5.88% and 14.04% of<br />

the total population, respectively.<br />

The population is highest in the Odaganon Block followed by Ranpur- and <strong>Nayagarh</strong> Blocks. Gania<br />

has the lowest population.<br />

MIDP Table-2: Population composition<br />

Sl.No. Age group(yrs.) Male Female Total Sex<br />

ratio<br />

1 0-6 59450 53730 <strong>11</strong>3180<br />

2 All age groups 446177 418339 864506 938<br />

Note: The District Census Handbook for <strong>Nayagarh</strong> district does’t provide information on population<br />

figures for age groups like 0-3, 4-6, 7-18, 19-45, and 46-60, and 61+.<br />

MIDP Table-3: Demographic charachetristics<br />

Sl.No. Parameters/indicators Male Female Average<br />

1 Fertility rate --- --- 3.8<br />

2 Mortality rate --- --- 6<br />

3 Life expectancy at birth ---- --- 62<br />

4 Age at marraiage ---- 18 ----<br />

5 Family planning coverage ---- ---- 61%<br />

6 Total number of faimiles ---- ---- 178231<br />

7 Commonest family type --- ---- Joint<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

___<br />

17


8 Average family size ---- ---- 4.8<br />

Note: The age at marriage for female has been taken from District Census Handbook which mentions<br />

the data for undivided Puri district.<br />

MIDP Table 4: Social group composition<br />

Sl.No Social group Male Female Total %<br />

14.0435<br />

1 SC 61876 59533 121409 805<br />

5.88028<br />

2 ST 25778 25058 50836<br />

446<br />

99.3872<br />

3 Hindu Not available Not available 859219 872<br />

0.48963<br />

4 Muslim 2201 2032 4233<br />

813<br />

0.04626<br />

5 Christian Not available Not available 400<br />

866<br />

0.00034<br />

6 Buddhist Not available Not available 3<br />

701<br />

MIDP Table 5: Public infrastructure and services<br />

Sl. No. Infrastructure Availability norm Actual<br />

Status<br />

1 Pucca road Each habitation 551<br />

2 Bus service Each habitation Not<br />

available<br />

3 Electricity connection Each habitation <strong>11</strong>27<br />

4 Piped water Each habitation Not<br />

available<br />

5 Public toilet Each habitation 8(Communi<br />

ty sanitary<br />

complex)<br />

6 Drainage system Each habitation Not<br />

available<br />

7 Gram Panchayat/Ward Panchayat Each GP/WP<br />

170<br />

office<br />

headquarter<br />

8 Ration shop Per unit population 630<br />

9 Anganwadi Per unit population <strong>11</strong>42<br />

10 Primary school Each habitation 784<br />

<strong>11</strong> Secondary school Per unit population 242<br />

12 College Per unit population 44<br />

13 PHC Per unit population 38<br />

14 Sub-centre Per unit population 166<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

18


15 Hospital Per unit population 5<br />

16 Veterinary clinic Per unit population 16<br />

17 Police station Per unit population 13<br />

18 Post office Per unit population 203(2006-<br />

07)<br />

19 Banks Per unit population 14<br />

20 Public library Per unit population<br />

21 Agriculture marketing centre Per unit population ----<br />

22 Virtual connectivity Each habitation ----<br />

23 Major irrigation projects As per local conditions Nil<br />

24 Medium irrigation projects As per local conditions 3<br />

25 Minor irrigation projects As per local conditions 153<br />

26 Fully developed watersheds As per local conditions 18<br />

Socio-ecnomic conditions:<br />

Total workforce in the district is 288053 of which 85851 are cultivators and 94328 are agricultural<br />

labourers. Thus cultivators and agricultural labourers constitute 62.55% of the total workforce. The<br />

rate of literacy in the district is 70.52% against the state average of 63.08%. Of the 8 blocks in the<br />

district percentage of SC population is the highest in Gania block while that of ST population is the<br />

highest in Daspalla Block.<br />

Agriculture is the mainstay of the district economy. Forestry, particularly bamboo harvesting and other<br />

NTFP collection like siali leaf provides seasonal income to the people in some areas.<br />

Agro-Climatic Zone & Climate:<br />

On the basis of its topography, climate & sea types, the district comes under East and South Eastern<br />

coastal plain Agro-climatic Zone and all the eight Blocks are included in Raifed laterite Agro-<br />

Ecological Situation. The soil types are laterite, alluvial, red and mixed red and black. The climate of<br />

the district is sub-tropical hot and humid. May is the hottest month and Dec-January is the coldest<br />

months of the year. The maximum and minimum relative humidity is 89.86% and 62.8%, respectively<br />

(Table 1.1).<br />

Table 1.1 Weather indicators of <strong>Nayagarh</strong> district<br />

Parameters<br />

Temp. (<br />

Apr May June July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar.<br />

0 C)<br />

2004- Max 34.2 37.2 41.8 28.7 28.2 30.6 26.7 24.6 27.2 23.6 28.7 32.3<br />

05 Min 30.5 30.5 33.4 27.8 28.7 23.5 19.8 18.7 20.6 22.3 28.4 26.0<br />

2005- Max 35.6 39.8 37.5 31.3 30.1 31.4 30.0 30.3 28.7 23.0 29.5 36.6<br />

06 Min 28.1 29.2 27.0 27.4 27.4 26.4 25.9 21.1 19.7 18.1 25.6 22.6<br />

2006- Max 37.3 39.5 39.2 34.3 33.2 33.4 31.5 30.6 27.4 28.0 30.5 35.0<br />

07 Min 23.1 26.2 27.1 27.0 26.6 26.2 23.2 19.5 19.5 19.2 21.0 22.0<br />

Relative<br />

Humidity<br />

(%)<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

19


2004-05<br />

(Max)<br />

( Min)<br />

2005-06<br />

(Max)<br />

(Min)<br />

2006-07<br />

(Max)<br />

(Min)<br />

92<br />

62<br />

91<br />

59<br />

93<br />

66<br />

92<br />

63<br />

94<br />

64<br />

94<br />

64<br />

92 92 94<br />

61 64 64<br />

Source: SREP, ATMA, <strong>Nayagarh</strong><br />

96<br />

75<br />

96<br />

72<br />

91<br />

72<br />

Table 1.2 Month-wise rainfall (in mm) of <strong>Nayagarh</strong> district<br />

94<br />

77<br />

94<br />

78<br />

96<br />

68<br />

<strong>Year</strong> Apr May June July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Total<br />

2003- 43.6 22.2 168.0 317.3 491.9 169.9 324.9 21.7 32.9 - <strong>11</strong>.2 26.0 1629.6<br />

04<br />

2004-<br />

05<br />

2005-<br />

06<br />

2006-<br />

07<br />

2007-<br />

08<br />

94<br />

74<br />

93<br />

78<br />

96<br />

77<br />

73.5 20.4 147.7 424.5 207.3 127.5 199.1 - - 3.2 18.4 5.0 1226.6<br />

33.6 55.0 127.0 526.1 235.6 480.5 217.4 <strong>11</strong>.5 - 15.0 - 47.2 1749.0<br />

16.2 139.1 162.3 391.4 438.3 181.3 18.4 - - - - 26.8 1374.1<br />

18.4 72.67 384.5 145.8 286.5 404.2 56.8 0.5 - - 63.5 3.2 1436.0<br />

Source: SREP, ATMA, <strong>Nayagarh</strong><br />

Table 1.3 Rainfall & rainy days in different blocks of <strong>Nayagarh</strong> district<br />

Sl. Block<br />

Rain fall in mm. & rainy days<br />

No.<br />

2005 2006 2007<br />

1. <strong>Nayagarh</strong> 1743 82 1447 68 1356 73<br />

2. Odagaon 1581 64 1361 48 1501 64<br />

3. Khandapada 2692 79 1717 59 19<strong>11</strong> 64<br />

4. Bhapur 1605 77 1464 64 1284 67<br />

5. Ranapur 1695 69 1589 59 1291 65<br />

6. Daspalla 1741 73 1250 65 1402 82<br />

7. Nuagaon 1317 60 <strong>11</strong>20 54 1386 61<br />

8. Gania 1615 65 1069 57 1340 74<br />

Dist Av 1749 71 1374 59 1436 69<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

93<br />

65<br />

92<br />

67<br />

93<br />

63<br />

92<br />

55<br />

92<br />

58<br />

92<br />

54<br />

76<br />

49<br />

77<br />

48<br />

78<br />

49<br />

87<br />

66<br />

84<br />

64<br />

84<br />

65<br />

87<br />

53<br />

84<br />

54<br />

84<br />

54<br />

87<br />

55<br />

84<br />

53<br />

85<br />

51<br />

20


Land and Soil:<br />

MIDP Table 14 : Agriculture and allied farm sector activities<br />

Parameter/indicator Unit Status<br />

Total agriculture land ( including horticulture) Ha 147270<br />

Irrigated agriculture Ha 56591<br />

Non-irrigated agriculture Ha 80250<br />

Wastelands/uncultivable lands Ha 25462<br />

Average landholding Ha 1.17<br />

Landless families dependent on agriculture % 33<br />

Per capita agriculture produce (food grains) Quintals 2.10<br />

Per capita income from agriculture Rs. 4488<br />

Total dairy livestock Number 334143<br />

Total land under grazing Ha 10197<br />

Per capita milk production Litres 0.07<br />

Per capita income from dairy business Rs. 387<br />

Total number of registered dairies Number<br />

Total number of meat animals Number 241228<br />

Per capita meat production kg 0.04<br />

Per capita income from meat production Rs. 155<br />

Total number of registered poultries/piggeries/goat<br />

farms<br />

Number<br />

Total number of registered fisheries/fishing<br />

families/fishing farms<br />

Number<br />

Per capita fish production Quintals 0.07<br />

Per capita income from fish production Rs. 366<br />

The 2006-07 statistics of land use pattern in the district (Table-1.4) suggests that net area sown is<br />

maximum in the Ranapur Block followed by Nuagaon- and Dasapalla Blocks, and minimum in Gania<br />

Block. Area under current fallow is maximum in Dasapalla Block whereas, area under the culturable<br />

waste is maximum in the Odagaon Block. This indicates that the scope of extension of agriculture is<br />

highest in Odagaon block.<br />

The gross cropped area of the district is 2,27,000 ha with cropping intensity of 173 %.The topography<br />

of the district is both flat and undulating. The important soil groups of the district are laterite, alluvial,<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

21


ed and mixed red and black soils. The soils are mostly acidic in reaction ranging from 74 to 88%<br />

across the blocks while neutral soils range from <strong>11</strong> to 24 %. Alkaline soils are limited to 1 to 2%. The<br />

available nitrogen in the soils is low while availability of phosphorus and potassium is in medium<br />

range.<br />

Agricultural census 2000-01 indicates that out of the total 103995 operational holdings nearly 90 %<br />

belongs to marginal and small farmers while remaining 10% belongs to medium and large farmers. On<br />

the other hand, marginal and small farmers are in possession of 62 % land as operational holdings<br />

while the medium and large farmers have 38 % land (Table 1.5).<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

22


Table 1.4: Land use pattern of different Blocks of district <strong>Nayagarh</strong> during 2006-07<br />

(Area in hectares)<br />

Particulars<br />

Bhapur Dasapalla Gania<br />

Blocks<br />

Khandapara <strong>Nayagarh</strong> Nuagaon Odagaon Ranpur<br />

Urban<br />

Forests 276 17076 2188 1889 475 7530 5273 3100 174<br />

Misc. tree crops & Groves<br />

616<br />

not included in net area<br />

sown<br />

873 444<br />

718 642 1755 705 3864 77<br />

Barren & Uncultivable land <strong>11</strong>59 4274 2464 1364 309 2956 4347 318 846<br />

Land put to<br />

agricultural use<br />

non-<br />

4214 5254<br />

1230<br />

4088 2652 2782 2843 4788 386<br />

Culturable waste 464 970 364 897 617 1614 5233 531 243<br />

Permanent pastures<br />

other grazing land<br />

and<br />

280 1656<br />

473<br />

492 687 1754 1467 3378 10<br />

Current Fallows 224 4575 1065 902 593 748 940 314 70<br />

Other Fallows 709 5081 816 1291 438 2977 1630 27<strong>11</strong> 46<br />

Net area sown 12858 16888 6794 <strong>11</strong>790 13124 16931 13550 18336 329<br />

Source: District Statistical Handbook 1 (2007), <strong>Nayagarh</strong>; Dept. of Economic and Statistics, Odisha<br />

1<br />

Erroneous data published in the said Handbook on the area under ‘Land put to non-agricultural use’ for Dasapalla and <strong>Nayagarh</strong> Blocks, and on the net area<br />

sown for Khandapara and Urban areas have been rectified by the concerned Department.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

23


Land-use in <strong>Nayagarh</strong> district(2006-07)<br />

Net area sown<br />

45%<br />

Other Fallows<br />

6%<br />

Current Fallows<br />

4%<br />

Forests<br />

15%<br />

Permanent<br />

pastures and<br />

other grazing<br />

land<br />

4%<br />

Misc. tree<br />

crops & Groves<br />

not included in<br />

net area sown<br />

4%<br />

Barren &<br />

Uncultivable<br />

land<br />

7%<br />

Land put to non-<br />

agricultural use<br />

<strong>11</strong>%<br />

Culturable<br />

waste<br />

4%<br />

[Based on the cumulative data as provided in the District Statistical Handbook (2007), <strong>Nayagarh</strong>.<br />

However, this does not include Reserve Forests and Protected Forests, alongwith some other areas<br />

which is why the forest area has been shown as 15% only though the actual forest area is much<br />

higher. Being confined to revenue village boundaries(in Blocks) the crop survey data, that has been<br />

reflected in this chart, excludes Reserve Forest and Protected Forests(DPF?).]<br />

Table 1.5 Operational landholding<br />

Class Total No. Total Area<br />

in Ha.<br />

S.C. No. Area in Ha. S.T.<br />

No.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

Area in<br />

Ha.<br />

Marginal (< 1 Ha.) 68332 33771 7450 3106 5090 2804<br />

Small (1-2 Ha.) 24135 33967 1800 2469 3250 4614<br />

Semi-medium (2-4 Ha.) 9670 26069 555 1459 1905 5016<br />

Medium (4-10 Ha.) 1639 9410 60 306 350 2145<br />

Large (> 10 Ha.) 219 3823 - - 15 161<br />

TOTAL 10995 107040 9865 7340 10610 14740<br />

Source: Bulletin on operational holdings (Agricultural census 2000-01, Odisha)<br />

River System:<br />

The Mahanadi enters this district at Kuturi of Badasilinga G.P under Gania Block and takes an<br />

easterly course along Gania, Khandapara and Bhapur Blocks for about 55 km. The portion of its<br />

course from Boudh border to Baramul is known as Satakosia Gorge. The river here discharges a<br />

24


large volume of water in narrow channel flanked by high precipitous hills. During the flood,<br />

Mahanadi overflows its banks and floods the adjoining G.Ps of Gania , Khandapara and Bhapur<br />

Blocks.<br />

River Brutanga ,a tributary of river Mahanadi, rises from the hilly areas of Phulbani and<br />

Bhanjanagar and carries large volumes of water to the river Mahanadi. During high flood in river<br />

Mahadnadi the flood water of Brutanga River inundates the low lying areas of Gania Block being<br />

not discharged to river Mahanadi<br />

River Kusumi rises from Panchabati in Bhanjanagar Sub-Division of Ganjam District and takes its<br />

winding course. It meets with Duanta and Dahuka near Khandapara border and flows through<br />

Khandapara Tahasil area and merges into Mahanadi near Kantilo. The excess water discharges<br />

from Budhabudhiani project combined with water of Duant and Lunijhara also causes flood in<br />

<strong>Nayagarh</strong> Block area.<br />

River Malaguni emanates from the hills of Ranpur Tahasil and takes its winding course and merges<br />

in Chilika Lake passing through the areas of Khurda District.<br />

Other rivers are Budhabudhiani ,Kuanria and Dahuka rivers where medium Irrigation projects<br />

have been constructed .<br />

Irrigation Potential:<br />

The district has 31.8% of net sown area under irrigation of which contribution of medium,<br />

minor(flow) and minor (lift) is 7.2%, 12.6% and 2.47% respectively. <strong>Nayagarh</strong>, Khandapada and<br />

Odagan Blocks have more than 35% of cultivated area under irrigation while other 5 Blocks have<br />

less than 35% under irrigation. The Block-wise Kharif potential is indicated in Table1.6.<br />

.<br />

Table 1.6 Source-wise irrigation potential created in <strong>Nayagarh</strong> District<br />

Block Medium<br />

source<br />

Minot<br />

source<br />

Lift Wells WHS/Others Total % of<br />

cultivated<br />

area<br />

<strong>Nayagarh</strong> 1870 2475 436 1477 875 7133 49<br />

Odagaon 4129 3358 737 1618 1065 10907 48<br />

Khandapada 186 3544 679 639 990 6038 52<br />

Bhapur 402 630 122 664 1818 16<br />

Ranapur 3917 240 558 999 5714 29<br />

Daspalla 3780 2487 145 315 1389 8<strong>11</strong>6 29<br />

Nuagaon 733 480 518 997 2728 13<br />

Gania 348 37 122 631 <strong>11</strong>38 14<br />

Total 9965 17264 3384 5369 7610 43592 31.8<br />

Crops:<br />

Rice, pulses, vegetables and sugarcane are important crops of the district. The area, yield and<br />

production of major crops of the district are shown in Table 1.7.<br />

Table 1.7 Area, production and productivity of field crops of <strong>Nayagarh</strong> district<br />

(A-Area in ’000 ha., Y- Yield in Kg./ha., P-Production in ’000 MT )<br />

Crop<br />

2004-05 2005-06 2006-07<br />

A Y P A Y P A Y P<br />

Rice 95.02 1261 <strong>11</strong>9.83 99.80 1610 160.66 101.72 1502 152.75<br />

Wheat 0.08 1200 0.09 0.07 1787 0.13 0.08 1048 0.08<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

25


Maize 4.75 1091 5.19 4.37 1027 4.86 4.47 1060 4.74<br />

Ragi 0.64 860 0.55 0.57 454 0.26 0.65 500 0.33<br />

Mung 33.38 222 7.42 51.63 247 12.74 50.20 260 13.06<br />

Biri 16.10 280 4.51 17.60 313 5.51 15.35 335 5.14<br />

Kulthi 5.69 259 1.47 4.94 321 1.36 5.04 327 1.65<br />

Cowpea 0.64 569 0.36 0.87 6.09 0.53 0.30 550 0.17<br />

Arhar 1.31 610 0.80 1.33 625 0.83 1.24 628 0.78<br />

Gram 0.10 343 0.03 0.14 531 0.07 0.<strong>11</strong> 564 0.06<br />

Field pea 0.20 480 0.1 0.30 500 0.15 0.31 540 0.17<br />

Groundnut 1.00 1263 1.27 1.02 <strong>11</strong>37 1.16 0.93 <strong>11</strong>72 1.09<br />

Sesame 6.61 238 1.57 5.38 264 1.42 4.55 312 1.42<br />

Castor 0.07 395 0.30 0.08 375 0.03 0.05 400 0.02<br />

Sunflower 0.22 609 0.13 0.27 777 0.21 0.27 680 0.18<br />

Mustard 1.67 167 0.28 1.20 263 0.32 1.10 265 0.29<br />

Sugarcane 4.47 62124 276.26 5.16 64230 331.43 5.51 64235 353.93<br />

Source: Odisha Agriculture Statistics, DA&FP, Odisha<br />

The yields of major crops of the district are comparatively lower than the state and national average<br />

as shown in Table 1.8.<br />

Table: 1.8 Comparative statement of productivity of major crops (2006-07)<br />

Sl. No. Crop<br />

Productivity in Kg/ha<br />

<strong>Nayagarh</strong> Odisha India<br />

1. Rice 1502 1557 2084<br />

2. Maize 1060 1602 1783<br />

3. Pulses 300 444 594<br />

4. Arhar 628 803 712<br />

5. Oilseed 423 719 895<br />

6. Groundnut 1072 1599 860<br />

7. Sunflower 680 936 525<br />

8. Sugarcane 64235 70008 66833<br />

Source: Odisha Agriculture Statistics 2006-07<br />

Horticultural crops like vegetables, tropical fruits and spices including flowers are important for the<br />

district as there is demand for such crops in high income group of urban area. The production,<br />

productivity and area of such crops during last three years are indicated in Table 1.9.<br />

Table: 1.9 Area, production and productivity of horticultural crops<br />

(A-Area in ’000 ha., Y- Yield in Kg./ha., P-Production in ’000 MT )<br />

Crop<br />

2004-05 2005-06 2006-07<br />

A Y P A Y P A Y P<br />

Sweet potato 0.14 7875 1.10 0.26 8231 2.14 0.15 8364 1.25<br />

Potato 0.03 8835 0.26 0.02 7000 0.14 0.02 8727 0.13<br />

Other veg. 13.24 <strong>11</strong>225 148.6 10.15 10315 104.7 14.23 12176 173.26<br />

Onion 0.39 5738 2.23 0.52 6514 3.39 0.39 8795 3.43<br />

Chilli 0.49 737 0.36 0.53 849 0.45 0.53 849 0.45<br />

Garlic 0.25 2235 0.56 0.24 2167 0.76 0.24 3125 0.75<br />

Turmeric 2.37 2108 5.0 2.58 2124 5.48 2.54 2157 5.48<br />

Ginger 0.44 1825 0.8 0.49 1816 0.89 0.48 1833 0.88<br />

Source: SREP, ATMA, <strong>Nayagarh</strong><br />

The area, production and productivity of fruit crops of the district shown in Table 1.10 and Table<br />

1.<strong>11</strong> indicate comparatively lower productivity of such crops in the district.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

26


Table 1.10 Area, production and productivity of different fruit crops of <strong>Nayagarh</strong> district<br />

(A=’000ha, P=’000 MT, Y=t/ha)<br />

Sl. Name of the Fruit<br />

Area Production Productivity<br />

No. Crop<br />

1. Mango 0.285 10.132 3.39<br />

2. Guava 0.223 1.306 5.58<br />

3. Citrus 0.370 2.454 6.63<br />

4 Banana 1.020 13.971 13.7<br />

5 Papaya 0.012 0.220 18.33<br />

6 Coconut 4.301 26600000 no. 6185/ha<br />

7 Cashew 2.54 35.56 14<br />

Source: SREP, ATMA, <strong>Nayagarh</strong><br />

A comparative statement of productivity in respect of fruit crops in the district is presented in Table<br />

1.<strong>11</strong> which indicates the low productivity of fruit crops in the district.<br />

Table 1.<strong>11</strong> Comparative yield rate of important fruit crops in the district<br />

(A-Area in ’000 ha., Y- Yield in t/ha., P-Production in ’000 MT )<br />

Crops Odisha <strong>Nayagarh</strong><br />

Mango 3.9767 3.39<br />

Guava 6.8544 5.58<br />

Citrus 8.9312 6.63<br />

Banana 14.6454 13.7<br />

Papaya 20.1725 18.33<br />

Source: Directorate of Horticulture, Odisha, Bhubaneswar<br />

Livestock production:<br />

Livestock production is an important activity of landholders and landless families of the district.<br />

Cattle, buffalo, goat, sheep and poultry birds are important sources of livestock in the district.<br />

Breed upgrdataion, disease control, dairy development are important activities of Animal<br />

Resources Development Department in the district. There are 16 veterinary hospitals/dispensaries,<br />

54 LI centres and 69 AI centres in the district. There are 286440 cattle, 47703 buffaloes, 362<strong>11</strong><br />

sheep, 102946 goats, and 100585 poultry birds in the district. The ongoing programmes that are<br />

being implemented in the district are NPCBB, ASCARD, diary development, poultry development,<br />

goat and sheep breeding and fodder development along with training programmes. Annual<br />

production of milk, meat and eggs in the district are 14.61 ‘000 t. <strong>11</strong>46 t and 41.12 lakh numbers<br />

respectively. The productivity of livestock in the district is much lower in the district when<br />

compared to state and national average as a result of which availability per capita is comparatively<br />

less as shown in Table 1.12.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

27


Table 1.12: Animal products in <strong>Nayagarh</strong> district<br />

India Odisha <strong>Nayagarh</strong><br />

Product<br />

Production Per capita<br />

availability<br />

per year<br />

Milk 100869<br />

TMT<br />

Egg 55663<br />

million<br />

Meat 23.02<br />

88.56 1 1457.04<br />

TMT<br />

45 1424.64<br />

million<br />

2.61 kg 55.01<br />

TMT<br />

TMT<br />

Source: SREP, ATMA <strong>Nayagarh</strong><br />

N.B: TMT= Thousand Metric tonne<br />

Fishery:<br />

Production Per capita<br />

availability<br />

per year<br />

37.595 l 14.61<br />

34 4.<strong>11</strong><br />

Production Per capita<br />

availability<br />

per year<br />

33.58 l<br />

TMT<br />

27<br />

million<br />

1.45 kg <strong>11</strong>46 t 0.85 kg<br />

Fishery occupies an important place under the Agriculture & allied Sector in <strong>Nayagarh</strong>. In<br />

<strong>Nayagarh</strong> lot of potentialities are available to develop pisciculture. The public water bodies occupy<br />

80% of total resource. The lease of public water bodies is given for one year to villagers and the<br />

culture is undertaken by a single person. The growth rate lessens due to heavy stocking density.<br />

Due to vivid persuasions and creation of awareness by the FFDA the farmers are adopting<br />

scientific pisciculture in some public water bodies and the private water bodies are managed<br />

through scientific culture practices. In <strong>Nayagarh</strong> about 80% of its population prefer fresh water fish<br />

and its per capita consumption has gone high (9 kg/head/annum). The quality of fish produced from<br />

village tanks and rivers in the district is excellent for which it has commercial demand in urban<br />

markets.<br />

The water sources for fishery include 2395 ha of pond/tank, 1821 ha of MIP/Reservoire, 1564<br />

WHSs and 506 water logged areas. Capture fishery is confined to 68 km of river and canals in the<br />

district. There are 20216 fisher folks in 258 villages in the district.<br />

During 1980 to 1981 under different Developmental schemes viz. FFDA, SGSY/ IRDP, ERRP etc<br />

different water bodies have been developed. But during 80s most of the G.P. tanks were given to<br />

the individuals for 10 years lease for developed under FFDA, IRDP and ERRP. Now their lease<br />

periods have already been matured and the same water bodies are now under the control of G.Ps<br />

and leased out annually without adopting scientific culture for which the fish production from them<br />

are not up to mark. Due to gap of 20-25 years the public tanks as well as the private tanks have<br />

become derelict which need renovation. If renovation is under NREGS and leased out to<br />

SHGs/Individuals for 5 years in respect of G.P tanks and bank finance under FFDA is extended in<br />

respect of private tanks, the fish production will be definitely enhanced significantly.<br />

The current level of fish production in the district is indicated in Table 1.13.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

28


Table 1.13: Production of fish in <strong>Nayagarh</strong> district<br />

Block Production of fish in MT Production of<br />

fry in ‘000<br />

<strong>Nayagarh</strong> 457.1 2600<br />

Odagaon 661.74 1830<br />

Khandapada 394.57 2950<br />

Bhapur 4<strong>11</strong>.36 400<br />

Ranpur 605.83 1300<br />

Daspalla 766.07 876<br />

Nuagaon 459.2 2080<br />

Gania 280.63 -<br />

Total 4036.5 12036<br />

Source: SREP, ATMA, <strong>Nayagarh</strong><br />

The production of fish in the district has increased from 2075 t during 2002-03 to 4036 t in 2007-<br />

08. Similarly the productivity has increased from 1980 kg/ha to 2438 kg/ha during the<br />

corresponding period. However, there is scope to increase the productivity of fish to at least 5000<br />

kg/ha in the district.<br />

Soil Conservation:<br />

Land and water conservation along with plantation in waste lands are important activities of soil<br />

conservation organization. Management of watershed is the basic approach for successful crop<br />

production with in situ moisture conservation. At present 3 centrally sponsored schemes namely,<br />

N.W.D.P.R.A. (National Watershed Development Project for Rainfed Areas), I.W.D.P. (Integrated<br />

Wasteland Development Programme) & Hariyalli are under operation in the district. The funding<br />

pattern is 75 % grant by the Government of India and 25 % loan to state Government. Besides,<br />

Integrated Watershed Management Programme, which is fully funded by the Central government,<br />

Seven micro watersheds are implemented in each Block except Odagaon in an area of 3464.966 ha<br />

under NWDPRA. The watershed treatment is being taken up through the watershed committee<br />

(Bhumi Panchayat). Funds for the works are being placed in phased manner with the watershed<br />

committee.<br />

ORSAC has identified total 734 watersheds in the district out of which 18 are saturated, 83 are<br />

under ongoing programme, and 80 more have been proposed. The low rate of progress is partly due<br />

to lack of staff and partly due to various ground-level difficulties.<br />

Forest:<br />

The total area under forest in the district is 2080.97 sq km which is more than 85% of the total<br />

geographical area of the district. Local communities have been protecting forests since many<br />

decades, thereby conserving this valuable resource.<br />

The National Afforestation and Eco-Development Board (NAEB) took the initiative to promote a<br />

decentralized approach to the development of degraded forests areas and adjoining lands of through<br />

the establishment of Forest Development Agency (FDA) at the all forest division level in all states<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

29


for a period of five years from 2002-03 to 2006-07. Accordingly Forest Development Agency,<br />

<strong>Nayagarh</strong> has constituted with 50 (fifty) nos. of Vanasarankshyan Samitis and also registered under<br />

the Societies Act, 1860 vide Regd. No. 167 / 2313 of 2002. To meet the future requirement of car<br />

festival of Lord Jagannath, the Govt. has implemented a scheme named as “Jagannath Bana<br />

Prakalpa” and fixed a target of 2688 ha. Within 8 Divisions along with financial support from<br />

Panchayatiraj Dept. Accordingly, the target has been fixed to carryout plantation in <strong>Nayagarh</strong><br />

Forest Division over 400 ha. of Forest and Revenue land. Since 1999-2000, the plantation work is<br />

being carried out by the D.R.D.A. funding.<br />

Undemarcated<br />

forest<br />

7%<br />

Different categories of forest in<br />

<strong>Nayagarh</strong> district(2007)<br />

Other forest<br />

22%<br />

DPF<br />

9%<br />

Reserve<br />

Forest<br />

62%<br />

(Based on Table 6.01, District Statistical Hand Book, <strong>Nayagarh</strong>: 2007. Share of unclassified forest<br />

being negligible is not shown in the chart.)<br />

Transport & Communications:<br />

By 2005-06, the district had 97 km of National Highway, 51 km of State Highway, 125 km of<br />

Major District Roads(MDR), 235 km of Other District Roads(ODR), 366 km of forest roads, 5497<br />

km of Gram panchayat roads, and 506 kms of Panchayat Samiti Roads, data for urban roads and<br />

village roads being not available(District Statistical Handbook (2007), <strong>Nayagarh</strong>; Table <strong>11</strong>.02).<br />

The NH-5 passes close to the district whereas NH 224 passes through it. Although the road<br />

network is quite developed in many parts of the district, several interior pockets still lack adequate<br />

communication facilities. The forest regime is a limitation to the road development as most of the<br />

interior areas lie inside or near forest areas where black top roads are not allowed, and the earthen<br />

roads are either not available or underdeveloped or only fair weather roads.<br />

The Khurdha-Balangir railway, currently under little progress in respect of construction, has raised<br />

great hope in the <strong>Nayagarh</strong> district which otherwise had no railway link. Notable stations in this<br />

proposed line are Rajsunakhala, Dighiri, <strong>Nayagarh</strong>, Nuagaon, Dasapalla, and Banigochha<br />

( Source: http://Odishalinks.googlepages.com/railwayinfrastructureinOdisha). Unusual delay in the<br />

construction of this line has triggered resentment in Odisha whereas the Railways has made<br />

delayed land acquisition process responsible for this.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

30


Telecom service is provided by Bharat Sanchar Nigam Limited. Cellular tele-services (mobile) are<br />

provided by a number of companies like BSNL, Reliance, Tata Indicom and Airtel etc.<br />

Education:<br />

The literacy rate of the district is presented in Table 2. The table reveals that overall as well literacy<br />

rate of male and female population of district <strong>Nayagarh</strong> is more than Odisha and India whereas, on<br />

analyzing the literacy rates of different Blocks of district, it is found that overall literacy rate in<br />

Dasapalla Blocks is much lower(62.19%) than the district average. On the other hand, literacy rate<br />

in urban local bodies is quite higher than the district average.<br />

Table 2: Literacy status of district Angul (2001 census)<br />

Region Total Male<br />

(Percent)<br />

Female<br />

India 64.83 75.62 53.67<br />

Odisha 63.08 75.35 50.51<br />

<strong>Nayagarh</strong> district 70.51 82.65 57.64<br />

Source: Statistical Abstract of Odisha: 2008, table-1.05<br />

Literacy rate<br />

100<br />

80<br />

60<br />

40<br />

20<br />

0<br />

Literacy rate in different parts of <strong>Nayagarh</strong> district<br />

(2001 census)<br />

Bhapur<br />

Block<br />

Dasapalla<br />

Block<br />

Gania Block<br />

Khandapara<br />

Block<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

<strong>Nayagarh</strong><br />

Block<br />

Area<br />

Nuagaon<br />

Block<br />

Odagaon<br />

Block<br />

Ranpur<br />

Block<br />

Khandapara<br />

NAC<br />

<strong>Nayagarh</strong><br />

NAC<br />

Based on: District Statistical Hand Book 2007: <strong>Nayagarh</strong>; table-12.05<br />

The status of educational facilities is presented in Table 3:<br />

Table 3: Status of educational institutions in district <strong>Nayagarh</strong> (2006-07)<br />

Primary school<br />

Middle school<br />

Secondary school<br />

(No. of teachers) (No. of teachers/school) (No. of teachers/school)<br />

627(2094) 342(1239) 221(1825)<br />

Source: District Statistical Hand Book 2007: <strong>Nayagarh</strong><br />

However, the availability of teachers per school in different blocks of the district is quite uneven.<br />

The district is also very poor in technical institutions.<br />

31


Health & Family Welfare:<br />

The health facilities in the district are not satisfactory. Hospitals lack adequate staff and<br />

infrastructure. Superspecility service in government hospitals is a distant dream.<br />

As per the 2006-07 statistics, there are 52 allopathic, 20 homoeopathic, and 15 ayurvedic<br />

government medical units in the district. Of these, the status of the latter two is very poor as<br />

compared to allopathic units.<br />

Non-availability of doctors and trained paramedical staff is the major grievance particularly in rural<br />

areas. Modern medical care facilities are hardly accessible in many of the remote areas of the<br />

district.<br />

Trade & Commerce:<br />

Agricultural products are the chief items of commerce in the district among which sugar cane and<br />

mung dal in the raw form, and chhena poda, sugar & gur in the processed form are notable. Nonagricultural<br />

products include bamboo, sal leaf & siali leaf platters, brass- & bell metal artifacts, etc.<br />

are also commercially important.<br />

Law & order:<br />

The incidence of crime is increasing in the district as is evident from Table 4:<br />

Table 4: Crime in <strong>Nayagarh</strong> district<br />

<strong>Year</strong> Murder Dacoity Robbery Theft Kidnapping Rape<br />

(No. of cases registered)<br />

Rioting<br />

2004 30 5 20 <strong>11</strong>0 20 17 <strong>11</strong><br />

2005 28 7 13 109 25 17 33<br />

2006 35 8 13 125 21 17 27<br />

Source: District Statistical Hand Book: <strong>Nayagarh</strong>, 2007, table 16.03<br />

Overall statistics for 2004-06 suggests that criminal activities have remained more or less stable in<br />

the district in cases like Rape, Kidnapping, Decoity, and Murder. However, with total 1279 cases<br />

registered during 2006 as against 1038 in 2004 a rise in some kind of criminal activities(mostly<br />

miscellaneous cases) is also indicated.<br />

Disadvantaged areas:<br />

Overall statistics suggests that Dasapalla-, Gania- and Nuagaon Blocks are more backward and<br />

disadvantaged in terms of road development, irrigation development, and rural electrification, etc..<br />

However, in other Blocks also there are scattered pockets that are more or less equally<br />

disadvantaged.<br />

Resettlement & rehabilitation:<br />

Resettlement and rehabilitation of the displaced people (or, to be displaced in near future) in region<br />

of dams & reservoir projects have been among the local issues of the district. The displacement has<br />

in many cases badly weakened the moral, socio-economic and other strengths of the people because<br />

of lack of proper compensation or lack of integrated rehabilitation project management. Kuanria<br />

Irrigation Project is claimed to be an example of this.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

32


The new R&R Policy of the Govt of Odisha has promised better facilities/provisions for the<br />

displaced persons and according the cost of rehabilitation has increased for new projects. However,<br />

corruptions and inadequate/insincere implementation are likely to deprive the beneficiaries of their<br />

deserving rights to some extent.<br />

Innovative measures are urgently required to address the post-rehabilitation issues of families,<br />

particularly of the female members and next generations.<br />

Development indicators:<br />

The district is known for its hilly topography, community forestry, religious places, brass metal,<br />

and chhenapoda. More details of district profile are available in annexure-1. Given the fact that<br />

information as per annexure-I of the MIDP could not be available from the district despite an<br />

official effort, following abstract of the development indicators of the district hopefully substitutes<br />

the same to some extent:<br />

Sl.No Infrastructure componet District State Catagory<br />

1 Electricity<br />

a Percentage of village<br />

electrified as per 2003-04<br />

defination<br />

73.6% 76 -A<br />

b Percentages of rural<br />

consumers to total<br />

consumers<br />

48% 71.61 -<br />

2 Transportation<br />

a Road density per 1000<br />

sq.com<br />

b No of transport vehicles (all<br />

types) registered per<br />

1000sq.km<br />

c Villages connected by<br />

pucca roads<br />

3 Irrigation<br />

a %of irrigated area to net<br />

cropped area<br />

b % of area irrigated through<br />

ground water<br />

c % of area irrigated through<br />

surface water<br />

d No of tubewells per100 ha<br />

of cropped area<br />

1,728 1,518 A+<br />

7,830 12,103 B<br />

36% 40% A<br />

29.28% 48.25% C<br />

3.71% 21.36% D<br />

25.67% 78.64% B<br />

0.74 0.86 A<br />

4 Communication<br />

a No of telephone lines per<br />

hundred population<br />

1.98 4.50 D<br />

b Population served per post<br />

office<br />

4,075 4,509 A+<br />

c Average area served per 20 19 A<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

33


5<br />

post office (sq km)<br />

Education<br />

a Literacy rate 71.02% 63.08% A+<br />

b Literacy rate male 72.40% 75.35% A<br />

c Literacy rate-Female 50.09% 50.50% B<br />

d No of schools (elementary<br />

education up to 8 th per 1<br />

lakh population<br />

123 172 B<br />

e No of secondary and senior<br />

secondary schools per 1<br />

lakh population<br />

20 20.00 A+<br />

f No of Degree and<br />

Professional colleges per 1<br />

lakh popu lation<br />

1.38 6 DD,C<br />

g Teacher pupil ratio up to<br />

class V & VI to VII<br />

1:71.58,1:33.95 1:39,1:21 D,C<br />

6 Health<br />

a Birth rate per 100 persons 18 21.90 A+<br />

b Death rate pr 100 persons 6 9.30 A+<br />

c Maternal Mortality Rate<br />

(MMR)per 1 lakh live births<br />

21 301.00 A+<br />

d Infant Mortality Rate<br />

(MMR)per 1 lakh live births<br />

28 73.00 A+<br />

e Life expectancy at birth 62 61.00 A+<br />

f Sub centre/Primary health<br />

centres/Communitty health<br />

centres per 1 lakh<br />

population<br />

4.63 22.00 D<br />

g No of dispensaries and<br />

Hospitals per 1 lakh<br />

population<br />

1.15 4.00 D<br />

h No of beds in hospitals per<br />

1 lakh population<br />

57 38.50 A+<br />

i Docters (modern i.e.<br />

Allopathic system) per 1<br />

lakh population<br />

12 14.00 A<br />

7 Water supply% of villages<br />

having drinking water<br />

supply<br />

100 92.00 A+<br />

8<br />

Agriculture markets<br />

No of agriculture markets<br />

per 100 sq. km<br />

4.24 - -<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

34


9 Poverty<br />

% of rural people below<br />

poverty line<br />

10 Agriculture marketing<br />

No of regulated markets per<br />

100 sq. kms<br />

68 39.50 D<br />

0.02 0.22 D<br />

<strong>11</strong> Productivity of major<br />

Agrl. Crops in Kg/ha<br />

a Sugarcane 58,700 63,417 A<br />

b Rice 1,870 1,534 A+<br />

c Oil seed (kg/ha) 373 627 D<br />

d Pulses (kg/ha)<br />

451 378 A+<br />

(Source: NABARD 2009, Potential Linked Credit Plan: <strong>Nayagarh</strong> District)<br />

It is noteworthy that the NABRAD data needs updation, and the following information supplied by<br />

the District Planning Office is comparatively latest:<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

35


SL Item<br />

BLOCK LEVEL INFORMATION ON SOCIAL & ECONOMIC INDICATORS<br />

Name of Block<br />

NO<br />

Bhapur Daspalla Gania Khandapada <strong>Nayagarh</strong> Nuagaon Odagaon Ranpur<br />

1 % of village having<br />

paved approach road<br />

63.03 33.03 48.25 81.03 90.60 41.51 75 78.95<br />

2 % of land irrigated 15.72 30.19 22.64 60.45 47.43 12.02 39.3 44.84<br />

3 % of villages with<br />

safe source of<br />

drinking water<br />

34.97 76.31 66.40 55.52 51.15 64.2 63.90 62.56<br />

4 % of villages with<br />

electricity<br />

97 36 57 80 92 62 96 81<br />

5 % of literacy 70.18 22.07 69.43 70.53 73.05 51.50 69.55 74.52<br />

6 % villages with<br />

primary education<br />

facility<br />

99.21 88.63 87.1 92.5 92.<strong>11</strong> 82.94 92.94 91.29<br />

7 % villages with any<br />

health care facility<br />

90 80 80 90 100 85 90 85<br />

8 % of main workers<br />

to total worker<br />

70.56 70.74 76.77 71.94 80.17 67.34 69.09 71.18<br />

(Source: District Planning Office, <strong>Nayagarh</strong>)<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

36


Fact sheets of GP/Block/ULBs:<br />

Total number of Blocks: 8 (<strong>Nayagarh</strong>, Nuagaon, Odagaon, Ranpur, Dasapalla, Gania,<br />

Bhapur, & Khandapada)<br />

Total number of GPs: 179<br />

Total number of villages: 1695 villages (1531 inhabited)<br />

Total number of ULBs: 2 (<strong>Nayagarh</strong> NAC and Khandapada NAC)<br />

Number of wards in ULBs: <strong>Nayagarh</strong> NAC:13, Khandapara NAC:13<br />

Block-wise details of GPs are as under:<br />

Block No. of GP No. of revenue villages No. of inhabited villages<br />

Bhapur 19 <strong>11</strong>9 <strong>11</strong>1<br />

Daspalla 19 416 348<br />

Gania 8 <strong>11</strong>4 98<br />

Khandapara 21 195 172<br />

<strong>Nayagarh</strong> 26 149 144<br />

Nuagaon 20 235 212<br />

Odagaon 32 220 203<br />

Ranpur 34 247 237<br />

Total 179 1695 1525<br />

Human Development & Gender Equity:<br />

The Human Development Index (HDI) of <strong>Nayagarh</strong> district is 0.571 which is almost equal to the state<br />

average of 0.579. <strong>Nayagarh</strong> ranks 15 in the state in this respect. The income index is significantly<br />

lower(0.485) for the district as against the state average of 0.545. In case of Reproductive Health,<br />

<strong>Nayagarh</strong> had 53.5 percent of women married below 18 years as against the state average of 35.8<br />

percent. Sex ratio is lower(939) than the state average, but literacy rate is comparatively high(57.64%)<br />

for women in the district (Human Development Report, Odisha, 2004; District Statistical Handbook,<br />

<strong>Nayagarh</strong>:2007).<br />

Crime statistics indicates that during the year 2006 number of deaths due to dowry was lower i.e. 16 as<br />

compared to state average of 19 and the number of registered abduction and rape cases was 17 which<br />

are significantly lower than the state average of 33.2 (Statistical Abstract of Odisha, 2008).<br />

The participation rate of women in the total workforce of the district is significantly lower(15.99<br />

percent) than the state average of 31.54 percent. However, role of the women in agricultural activities<br />

and NTFP collection/processing is very significant.<br />

The overall position thus suggests for more efforts towards bringing gender equity. Building public<br />

awareness, social motivation, special schemes and provisions for women and girl child would help<br />

women to be in a more favourable position by 2020.<br />

_____________<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

37


Chapter II<br />

--------------------------------------------------------------<br />

SWOT ANALYSIS<br />

In the present chapter sector-wise SWOT analysis of district <strong>Nayagarh</strong> is presented which is largely<br />

based on the department-wise SWOT analysis as submitted by various line departments during the<br />

district planning exercise of 2009-10. This analysis provides inputs towards the formulation of the<br />

elements of district vision. However, the TSI observes that the suggestion to incorporate various data<br />

sources as per the specified tables of MIDP is not practicable under the present limitations although<br />

atleast some of the concerned line departments/agencies are definitely supposed to have a periodicity<br />

of data collection or updation and needless to say the ownership of their data usually rests with them<br />

with few exceptions (like, some social welfare data dependent on Health Department data). It is also<br />

observed that the periodicity as per the norm is not maintained in some cases as happened to the BPL<br />

survey.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

38


Department Strength Weakness Threats Opportunities<br />

DIC,<br />

<strong>Nayagarh</strong><br />

Cooperative<br />

Societies,<br />

<strong>Nayagarh</strong><br />

PH Sub-<br />

Division,<br />

<strong>Nayagarh</strong><br />

Available of agricultural<br />

products i.e. paddy, mung,<br />

sugarcane, fruits and NTFPs.<br />

Out of 157 primary<br />

agriculture cooperatives, 47<br />

are in good position.<br />

Increasing demand of pipe<br />

water supply<br />

Lack of railway<br />

communication<br />

Lack of adequate<br />

marketing arrangement<br />

Lack of advanced<br />

technical know how<br />

Uncertainty in power<br />

supply and land<br />

acquisition<br />

<strong>11</strong>0 Cooperatives are<br />

weak and in difficulties.<br />

Less per-capita supply<br />

then standard norm<br />

40% area still<br />

uncovered under pipe<br />

water supply<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

Marketing problem<br />

Required more<br />

electricity<br />

If <strong>11</strong>0 cooperatives do<br />

not function by<br />

31.03.<strong>2010</strong>, these may<br />

be closed.<br />

Water supply from<br />

river Dahuka decreases<br />

drastically from<br />

February to June every<br />

year<br />

Discharge from<br />

production well also<br />

decreases during above<br />

period<br />

Water layer in most of<br />

the hand tube wells<br />

decreases causing<br />

sever drinking water<br />

scarcity<br />

39<br />

Possibility in<br />

development of<br />

agriculture and forest<br />

produce based<br />

enterprises and<br />

engineering<br />

institutions<br />

Possibility of<br />

development of weak<br />

cooperatives by<br />

providing agriculture<br />

loan, non-Agriculture<br />

loan, mid-term loan<br />

and other agriculture<br />

instrument loan.<br />

After completion of<br />

UIDSSMT scheme<br />

per capita supply<br />

shall increase and<br />

uncovered area shall<br />

be covered with pipe<br />

water supply


RWS & S<br />

Division,<br />

<strong>Nayagarh</strong><br />

Office of the<br />

Inspector of<br />

Ayurveda,<br />

Eastern<br />

Circle, BBSR<br />

Agriculture,<br />

<strong>Nayagarh</strong><br />

Funding support under<br />

Central schemes<br />

Increasing demand of pipe<br />

water supply<br />

Availability of skilled<br />

doctors<br />

Availability of jungle<br />

product herbals for<br />

preparation of Ayurvedic<br />

medicines<br />

Availability of health service<br />

to the rural peoples<br />

Public interest in herbal<br />

products.<br />

Government programme for<br />

promotion of AYUSH<br />

Rich in natural resources like<br />

rivers and streams<br />

Soil fertility due to forest<br />

litters and more humus<br />

content<br />

85% of farm family depends<br />

on agriculture<br />

Total literacy percent is 70%<br />

in the district which the<br />

facilitates the adoption of<br />

new technologies<br />

Inconsistent fund flow<br />

Inadequate staff<br />

strength<br />

Lack of required land<br />

for construction of<br />

Ayurvedic dispensaries<br />

Lack of staff quarter<br />

and boundary<br />

Lack of drinking water,<br />

sanitation,<br />

electrification in the<br />

dispensaries<br />

Lack of herbal garden<br />

Irrigation potentiality is<br />

low i.e. about 28%<br />

Undulatory topography<br />

Women farmers are<br />

less involved in<br />

agriculture sector<br />

Unable to exploit the<br />

ground water due to<br />

low water table<br />

presence of hillocks in<br />

the cultivable lands<br />

Weak marketing<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

Failure of maintenance<br />

of installed systems<br />

due to reluctance of<br />

public in payment of<br />

user fees.<br />

Unauthorised use of<br />

the system by vested<br />

interest groups.<br />

Due to want of proper<br />

storage facility,<br />

medicines provided by<br />

government may be<br />

damaged.<br />

Poor maintenance of<br />

instruments may cause<br />

of damage.<br />

Chance of theft of<br />

medicines and<br />

instruments due nonrecruitment<br />

of<br />

watchman<br />

Major pulses are<br />

grown under residual<br />

soil moisture condition<br />

with local strains<br />

Natural calamities with<br />

drought situation<br />

occurs due to erratic<br />

and uneven distribution<br />

of rainfall during<br />

Kharif season<br />

Interference of middle<br />

men in marketing<br />

40<br />

Water supply to each<br />

hamlet of the district<br />

Infrastructure<br />

development under<br />

NRHM<br />

Herbal gardens in<br />

areas where land is<br />

available.<br />

Marketing facilities<br />

can be developed as<br />

good communication<br />

facilities to state<br />

capital<br />

Sugarcane cultivation<br />

can be developed as<br />

the Industry is located<br />

in the district<br />

Organic farming can<br />

be developed easily<br />

due to low


Soil<br />

Conservation,<br />

<strong>Nayagarh</strong><br />

Fisheriescum-DEO,<br />

FFDA,<br />

<strong>Nayagarh</strong><br />

The watershed work is in<br />

progress in each Block of the<br />

district and it has been<br />

fulfilled the minimum<br />

requirement<br />

Around 8313.16 ha of<br />

ponds/tanks,<br />

reservoirs/MIPs, rivers and<br />

water logged areas are<br />

available for pisci-culture.<br />

Have a dedicated and<br />

qualified technical work<br />

force at all the blocks<br />

Geo climatic condition and<br />

its soil are suitable for pisciculture<br />

Assured demand of fish in<br />

Bhubaneswar, the capital<br />

city is the nearest market<br />

Central Institute of<br />

Freshwater Aquaculture, a<br />

premier institute in the<br />

country is nearer to the<br />

district whose service is<br />

facilities<br />

Inadequate cold storage<br />

facility<br />

Due to shortage of field<br />

staff<br />

Under-utilized<br />

resources and<br />

manpower<br />

Field functionaries at<br />

Block level FEOs are<br />

mostly engaged in nonfishery<br />

work<br />

57% tanks are under<br />

Govt. sector competing<br />

use for water<br />

(community tank)<br />

Tanks under Private<br />

Sector are under<br />

multiple ownership<br />

Inadequate credit<br />

support and procedure<br />

of finance is not farmer<br />

friendly and high rate<br />

of interest unlike<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

network of agriculture<br />

produce<br />

HYV of pulses can not<br />

cope up with the agro<br />

climatic situation in<br />

comparison with the<br />

local varieties and their<br />

productivity is low.<br />

Undue interference of<br />

vested interest groups<br />

in the development and<br />

management of the<br />

programme at local<br />

level.<br />

Lack of policy support<br />

to check introduction<br />

of exotic species like<br />

garipineus/Big head in<br />

the culture system<br />

Ecological threat by<br />

Gambusia (Gambusia<br />

affinis) in the<br />

mainsteam<br />

Appearance of aquatic<br />

weed in<br />

MIPs/Reservoirs<br />

Lack of legislation<br />

with reference to “Seed<br />

certification” by<br />

Fisheries Department<br />

Import of poor quality<br />

seed from neighboring<br />

state through<br />

41<br />

consumption of<br />

chemical fertilizer in<br />

certain pockets of the<br />

district<br />

With sincere and<br />

committed<br />

involvement of the<br />

public, things can<br />

have a bright future.<br />

Presently, the<br />

commercial<br />

exploitation in this<br />

sector is at a nascent<br />

stage. Huge scope<br />

investment and<br />

increased production<br />

for inland fishery<br />

activities<br />

Expansion of farming<br />

activities through<br />

construction of new<br />

ponds and renovation<br />

of old tanks under<br />

NREGS/FFDA.<br />

More area can be<br />

brought into fresh<br />

water prawn culture.<br />

Fisheries has natural


RD/Rural<br />

Works<br />

being availed by the farmers<br />

14 no. of Primary Fishermen<br />

Cooperative Societies and 78<br />

nos. of SHG (W) are<br />

involved in fish farming in<br />

the district.<br />

New roads/upgradation of<br />

roads are being taken up<br />

under PMGSY<br />

Repair of roads and<br />

buildings are being taken up<br />

agriculture crop loan<br />

Delay in leasing of GP<br />

tanks<br />

Existence of stumps in<br />

MIPs/Reservoirs<br />

Lack of awareness and<br />

training<br />

Increasing cost of<br />

critical inputs<br />

No insurance<br />

coverage/support price<br />

of fish<br />

Lack of<br />

entrepreneurship<br />

Shortage of rearing<br />

space in Govt. sector<br />

Gap in demand and<br />

supply of quality seed<br />

(species and quantity)<br />

No proper insurance<br />

scheme in place for fish<br />

farming<br />

Up to date data base of<br />

water resource are not<br />

available<br />

537 km of roads and<br />

870 nos. of buildings<br />

are being maintained by<br />

this division. In-<br />

adequate of funds for<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

middlemen<br />

Natural calamities like<br />

fold and drought<br />

Use of dynamite,<br />

explosive and toxicant<br />

in capture fisheries<br />

Inadequate of funds<br />

Acquisition of funds<br />

for development of<br />

road and new building<br />

Acquisition of lands<br />

42<br />

linkage to agricultural<br />

activities and provide<br />

good option for<br />

additional income of<br />

farmers in form of<br />

integrated farming<br />

system through<br />

diversification of<br />

culture system like<br />

i) Integrated pisciculture<br />

ii) Fry<br />

rearing/yearling<br />

culture<br />

iii) Ornamental fish<br />

farming<br />

iv) Introduction of<br />

different new<br />

breeds<br />

Mechanical fish<br />

catching from<br />

MIPs/Reservoirs<br />

Effective<br />

management of<br />

PFCS/SHGs will<br />

definitely enhance<br />

their socio economic<br />

status<br />

In construction and<br />

maintenance of roads<br />

In rural connectivity<br />

In construction and<br />

maintenance of govt.


Inspector of<br />

Schools,<br />

Khurda<br />

MI Division,<br />

Khurda<br />

NRHM,<br />

<strong>Nayagarh</strong><br />

under TFC maintenance put this<br />

division in bad position<br />

to maintain its roads<br />

and buildings properly.<br />

Available of building – 70,<br />

Teacher-1332, Furniture –<br />

147<br />

Sarva Sikshya Abhiyan and<br />

Rastriya Madhyamik<br />

Sikshya Abhiyan.<br />

Abundant sources for<br />

irrigation development<br />

Various schemes<br />

Better scope under RRR<br />

scheme<br />

Department has become<br />

stronger over the past couple<br />

of years after the<br />

introduction of Programme<br />

Management Support<br />

Structure at all levels. Skilled<br />

manpower with upgraded IT<br />

structure at district / block<br />

level are in place to help<br />

Medical officers in planning,<br />

managing National & State<br />

Health Programmes.<br />

Hospital Manager appointed<br />

for the hospital to manage &<br />

Requirement of 200<br />

teachers, <strong>11</strong>4 high<br />

schools, furniture for 37<br />

high schools, electricity<br />

for 152 high schools<br />

Sanctioned fund has not<br />

been sufficient for<br />

maintenance of MI<br />

projects.<br />

Some of the projects<br />

require renovation and<br />

development.<br />

Acute shortage of<br />

Human Resource –<br />

Doctors/Paramedical<br />

staff at block &<br />

peripheral units.<br />

Service delivery at Out<br />

reach places and lack of<br />

confidence among<br />

people over govt. health<br />

facilities available<br />

Information<br />

dissemination about the<br />

programmes, schemes<br />

to improve community<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

for development of<br />

road and new building<br />

Natural calamity like<br />

flood, cyclone and<br />

drought<br />

Most of the schools are<br />

running in thatched<br />

houses and semi<br />

damaged rooms, that is<br />

dangerous to the<br />

students as well as<br />

teachers<br />

Poor or no<br />

maintenance of<br />

projects due to want of<br />

funds.<br />

Recruitment of Human<br />

Resource – Doctors &<br />

Paramedics<br />

Knowledge & Capacity<br />

Building of health staff<br />

to be strengthened<br />

particularly in the area<br />

of<br />

BCC/ICT/Management<br />

Data<br />

quality/Validation/feed<br />

back<br />

43<br />

buildings (Health,<br />

education & revenue<br />

department & other<br />

govt. buildings)<br />

Development of<br />

school infrastructure<br />

under SSA and<br />

RMSA<br />

Better irrigation<br />

development would<br />

mean better<br />

agriculture<br />

development and<br />

hence better rural<br />

economy.<br />

IEC/BCC to be<br />

improved with<br />

various innovative &<br />

informative ways to<br />

make public aware<br />

about their right to<br />

good health and also<br />

for in-house staff in<br />

their approach<br />

towards quality<br />

Training activities<br />

and Training Venues<br />

identified need<br />

improvement for


maintain day to day works to<br />

improve service delivery<br />

quality with all the required<br />

facilities. Monitoring &<br />

Evaluation activities started<br />

this year as per the<br />

achievements against the<br />

approved District<br />

Programme Implementation<br />

Plan (09.10). Block level<br />

planning & budgeting<br />

completed and submitted for<br />

approval. A systematic<br />

approach to monitoring has<br />

been started. Disease<br />

Surveillance Unit established<br />

and functioning in full<br />

capacity to track the disease<br />

burden of the district<br />

Service Delivery is improved<br />

since the inception of<br />

NRHM in 2005. AYUSH<br />

Doctors have been<br />

sanctioned at 32 PHC (N)<br />

along with 8 block PHCs to<br />

narrow the gap due to lack of<br />

doctors at peripheral units.<br />

Sub Centres are given extra<br />

ANM in highly populated<br />

areas/inaccessible area to<br />

meet the challenges of<br />

maternal & child health care.<br />

Total 865 ASHAs appointed<br />

participation activities<br />

(IEC/BCC)<br />

Lots of reporting<br />

burden to grass root<br />

health personnel &<br />

proper feedback<br />

mechanism down the<br />

line regarding<br />

implementation,<br />

planning etc.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

44<br />

departmental<br />

personnel. A pool of<br />

resource persons may<br />

be created to meet the<br />

knowledge resource<br />

pertaining to various<br />

programmes.<br />

Intersectoral<br />

coordination &<br />

monitoring activities<br />

to be made strong and<br />

a common forum to<br />

be established to<br />

monitor the<br />

programmes as<br />

against the plan<br />

To improve data<br />

quality and integrity,<br />

NRHM initiated<br />

DHIS 2.0, a web<br />

based platform for<br />

managing health<br />

information


and trained to function at<br />

grassroot level for basic<br />

health activities for rural<br />

population. To improve the<br />

service delivery and service<br />

availability at all levels of<br />

communities, Rogi Kalyan<br />

Samiti (8 block level, 1<br />

district level, 32 PHC New<br />

levels) & Gaon Kalyan<br />

Samitis (1368) are formed in<br />

block & village level.<br />

Infrastructure strengthening<br />

by new construction /repair<br />

and renovation of existing<br />

buildings, purchase of<br />

essential<br />

equipments/deployment of<br />

Ambulances/outsourcing of<br />

cleaning & Security<br />

activities in DHH and other<br />

Health Institutions.<br />

Introduction of Janani<br />

Suraakhya Yojana in the<br />

district has improved<br />

institutional delivery<br />

remarkably over the last 2<br />

years with reduction of<br />

infant & maternal deaths.<br />

Financial management<br />

structure improved with the<br />

introduction of double entry<br />

book keeping and accounts<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

45


Animal<br />

Resource<br />

Development,<br />

<strong>Nayagarh</strong><br />

personnel are in place at all<br />

block health institutions.<br />

Untied Fund & Annual<br />

Maintenance Grant have<br />

been provided to all Block<br />

PHCs/CHCs/UGPHCs/PHC<br />

(N) & Sub Centre.<br />

Popularization of artificial<br />

insemination to increase milk<br />

production.<br />

Vaccination coverage to<br />

prevent disease outbreak<br />

Acceptance of private AI<br />

worker (Gomitra) in rural<br />

Gram Panchayats<br />

Popularization of backyard<br />

poultry in tribal areas<br />

Improper disease<br />

diagnosis and<br />

surveillances of disease<br />

Lack of exposure of<br />

farmers to new<br />

improved technology<br />

Lack of knowledge of<br />

farmers on profit<br />

oriented byproduct<br />

marketing<br />

Lack of knowledge of<br />

advantage of fodder<br />

over feed to get high<br />

profit in milk<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

Unscientific practice in<br />

feeding and breeding<br />

Non-acceptance of<br />

fodder cultivation<br />

programme and UTPS,<br />

Azolla etc.<br />

Buffalo AI not<br />

popularized.<br />

Non popularization of<br />

goat AI<br />

46<br />

Popularization of<br />

layer farming<br />

Functioning of<br />

District Diagnostic<br />

Laboratory, <strong>Nayagarh</strong><br />

for Disease Diagnosis<br />

and Surveillance<br />

Small animal<br />

development through<br />

goat AI and improved<br />

buck supply<br />

Adoption of<br />

conventional feed like<br />

Azolla, UTPS and<br />

perennial fodder<br />

farms.<br />

(Source: respective departments though the TSI has modified the SWOT analysis submitted by them so as to make the same more<br />

appropriate and logical.)


Chapter III<br />

--------------------------------------------------------------<br />

District Vision 2020<br />

<strong>Nayagarh</strong> is a model district for the state where integrated natural resource management is the key to<br />

rural livelihood. Forestry is a boon, and emerging agro-industries reflect the holistic development of<br />

agriculture & allied sector with a focus on the socio- economic and intellectual well being of the<br />

citizens. Sustainable growth is ensured through adequate justice to the ecology & environment, and the<br />

people of <strong>Nayagarh</strong> retain their distinguished identity with a more noticeable and remarkable<br />

achievement that results out from a developed communication network, better health care &<br />

educational services, assuring employment opportunities, reliable public distribution system, and a<br />

secured life with well-protecting environment for women.<br />

Perspective Plan 2008-13<br />

The five year perspective plan that was prepared during 2008 projected a total outlay of Rs. 4222<strong>11</strong>.98<br />

lakhs that included an unrealistic NREGS budget of Rs.277152.86 lakhs. The considerable/apparent<br />

realistic projection that is minus this NREGS budget would therefore be roughly Rs. 145059.12 lakhs,<br />

i.e. Rs.1450.59 crores.<br />

The referred perspective plan suggested a budget of Rs. 261.36 crores for 2009-10 and Rs.287.49<br />

crores for <strong>2010</strong>-<strong>11</strong>, excluding NREGS. The current plan however demonstrates that the actual<br />

requirement is almost 1.5 times to 2 times of this projection.<br />

Startegy for realizing the Vision<br />

Human resource development through better education facilities, gender-balancing initiatives like<br />

focus on girl child education and SHG development, more anganwadi- and ICDS centres, better<br />

health care services, skill development programmes, etc.<br />

Infrastructure development through better communication network including the proposed<br />

Khurdha-Bolangir railway line, development in the energy sector, development of health care<br />

infrastructure, etc..<br />

Development of the production centre through irrigation development, introduction of new firming<br />

technologies and developed planting materals, promotion of agroindustries, participatory<br />

plantation, protection & conservation activities in forestry, etc.. (vide annexure-13 for more<br />

details)<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

47


Lead sectors<br />

The lead sectors identified in the district are as under:<br />

Agriculture & allied sector: Agriculture(Sugar cane and pulse in particular), and Fishery<br />

Irrigation: Minor irrigation, particularly under ‘Tripple R’ scheme<br />

Industry: Sugar industry and other agro-industries<br />

Tourism: Ecotourism<br />

______<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

48


Chapter IV<br />

___________________________________________<br />

RESOURCE ENVELOPE FOR <strong>2010</strong>-<strong>11</strong><br />

Introduction:<br />

Resource envelope is basically created by grants from the government except in cases like periphery<br />

development programmes of industries/mines. The 5-year plan for 2007-12 has estimated annual as<br />

well as 5-year outlays for each and every sector. And the funds are supposed to be released<br />

accordingly.<br />

The release of funds may be one-time, or in installments. Sometimes additional funds may be released<br />

under specific circumstances.<br />

The resource envelope excluded from the estimated cost of programmes suggests the resource gap.<br />

This gap implies that additional funds are to be ensured either from government sources or from other<br />

sources.<br />

Availability of resources:<br />

Due to want of adequate information from the concerned departments, it has been quite difficult for the<br />

TSI to estimate the resource envelope and resource gap at present. However, it is understood that most<br />

of the proposals made during the year <strong>2010</strong>-<strong>11</strong> are likely to receive financial sanction as these have<br />

been based on the actual allocations or availability of funds or assured funds.<br />

Requirement in lakh Likely availability of resources in<br />

Sector<br />

rupees for <strong>2010</strong>-<strong>11</strong> lakh rupees for <strong>2010</strong>-<strong>11</strong><br />

Agriculture & allied 3064.26 2515.36<br />

DRDA(excluding NREGS) 4789.21 4789.21<br />

NREGS 700 700<br />

DSMS 13.5 13.5<br />

Grant under article 275(1) 138.93 138.93<br />

SCA to TSP 96.58 96.58<br />

Irrigation 15796.2 3828.7<br />

Energy 2062.37 876.37<br />

Industry(DIC,Textiles, Sericulture) 243.161 227.061<br />

Road development 6885.14 6885.142<br />

E-governance 12 0<br />

Tourism 54 0<br />

Civil Supply 2.43 0<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

49


Forestry 617.62 617.6198<br />

Education(SSA+RMSA) 14574.2 3574.21<br />

Sports 35.54 35.54<br />

Health 1973.04 <strong>11</strong>43.043<br />

Water & sanitation 4454.8 4454.796<br />

NAC(2) 915 805<br />

Art & Culture 23 0<br />

District welfare 438.371 238.3708<br />

Social welfare 4596.06 2871.06<br />

Police 1995 0<br />

Total 63480.42 33810.49<br />

Major areas of resource gap:<br />

Major gaps are in the following sectors:<br />

Sector<br />

Agriculture(Farm mechanization(other than<br />

Approx. deficit amount for <strong>2010</strong>-<strong>11</strong><br />

in lakh rupees<br />

WP) & proposal under RKVY) 17.45<br />

Horticulture(as proposed under RKVY)<br />

Soil Conservation (as proposed under<br />

30<br />

RKVY)<br />

Animal Husbandry(as proposed under<br />

213.75<br />

RKVY)<br />

Fishery (as proposed under RKVY &<br />

39.00<br />

ATMA) 81.5<br />

Krushi Vigyan Kendra 37.4<br />

Sugar Cane Research Station<br />

Cooperation(for construction/renovation of<br />

19.8<br />

godowns) <strong>11</strong>0<br />

Bruttanga irrigation project 10000<br />

Medium irrigation project 1967.5<br />

Energy <strong>11</strong>86<br />

E-governance 12<br />

Sericulture(as proposed under RKVY) 16.1<br />

Civil Supplies<br />

2.43<br />

RMSA<br />

<strong>11</strong>000<br />

NRHM<br />

20.00<br />

Ayurveda 450<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

50


Homaeopathy 360<br />

<strong>Nayagarh</strong> NAC 30<br />

Khandapada NAC 80<br />

Tourism 54<br />

Art & Culture 23<br />

District Welfare 200<br />

Social Welfare(construction/repairing of<br />

anganwadi buildings, and ICDS buildings) 1725.00<br />

Police 1995<br />

Total 29669.93<br />

Major areas of resource gap are thus irrigation, RMSA, energy, and infrastructure development for<br />

police, social welfare, and infrastructure development for Ayurveda & Homaeopathy, soil<br />

conservation, and cooperation.<br />

________<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

51


Chapter V<br />

_____________________________________<br />

RESOURCE ENVELOPE<br />

FOR BLOCKS,GRAM PANCHAYATS & ULBs<br />

Introduction:<br />

Blocks and Gram Panchayats often receive funds from district headquarters so as to implement<br />

Panchayat Samiti(Block)-level or GP-level programmes. However, in few cases some of the grants are<br />

shared only with the PRIs at all the three stages, or with the GPs only.<br />

These grants have their specific norms that may change over time. Some of these have an uncertainty<br />

too pertaining to their allocation, and these may either be pending for one or more years, or else may<br />

be stopped. Receipt in installments is also in vogue in some cases.<br />

Revenue sources of PRI institutions:<br />

The Zilla parishads, Panchyat samitis, and Gram panchyats are supposed to have a number of sources<br />

of revenue that may be broadly categorized as internal- & external, or tax- & non-tax revenue. In actual<br />

practice however some of these sources may hardly have any significance. For instance, revenue<br />

collection from license fees on bicycles is hardly in practice at GP level.<br />

Presently, following sources of revenue are important for the PRI institutions:<br />

• Kendu leaf grant<br />

• Cess grant<br />

• NREGS funds<br />

• SGSY funds<br />

• IAY funds<br />

• GGY funds<br />

• GP ghar fund<br />

• TFC grant<br />

• MPLAD<br />

• MLA-LAD<br />

• Special Problem Fund<br />

Periphery development grants from local industries/mines are also received sometimes, but the<br />

distribution thereof may be quite erratic and/or uncertain.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

52


Kendu leaf grant:<br />

50% of the net revenue realized from kendu leaf business by the Kendu Leaf wing of the Forest<br />

Department is distributed as KL grant. Of this, 90% is allocated to Zilla Parishad, Panchayat Samitis,<br />

and Gram panchayats at the ratio of 8:10:72 respectively; and the rest(10%) may be retained by the<br />

government for distribution of socially relevant purposes and activities.<br />

<strong>Nayagarh</strong> district is a KL growing area, and the KL grant received is shared with the KL growing subdivisions<br />

on the basis of KL production. Blocks in each sub-division then receive equal share from the<br />

sub-divisional share.<br />

80% of the KL grant received by the PRIs is meant for infrastructure developments, 10% is for<br />

providing services to public in respect of education, drinking water, etc.; and rest 10% is meant for<br />

production activities (promoting agricultural production or handicraft production, etc.).<br />

Cess grant:<br />

This grant is related to land cess. Population is the key factor in deciding the share of GPs, in this<br />

grant. This is used for creating permanent assets basically useful for administrative purpose. The Zilla<br />

parishad is to use this fund for socially relevant purposes and activities.<br />

TFC grant:<br />

The Twelfth Finance Commission (TFC) has proposed grants of Rs 56,855 crore for bridging non-Plan<br />

revenue deficits of States, Rs 25,000 crore for local bodies and Rs 15,000 crore for roads and bridges.<br />

In addition, seven States would receive a total grant of Rs 5,887 crore for healthcare, while eight States<br />

would get Rs 10,171 crore for education. Another head would be calamity relief, where TFC has called<br />

for a provisioning of Rs 16,000 crore for all States. http://news.indiamart.com/news-analysis/tfcrecommendations--8829.html).<br />

The period of TFC is 2005-<strong>2010</strong>. The PRIs have received TFC grant during 2008-09 for the purpose of<br />

water supply and/or sanitation programme. The assistance of Twelfth Finance Commission is lkely to<br />

be continued by the Thirteenth Finance Commission.<br />

GP ghar:<br />

This fund is intended basically for construction/addition/alteration of GP buildings.<br />

Other sources like NREGS, etc. have been discussed in the chapters on Rural Development and<br />

General Economic Services.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

53


Likely position in <strong>2010</strong>-<strong>11</strong>:<br />

Statistics available for 2009-10 suggest that the total resource available to Blocks and GPs would<br />

Rs.5000.086 lakhs whereas at ZP & DRDA level the availability would Rs.391.671 lakhs.<br />

Considering 10% increment, the likely position in <strong>2010</strong>-<strong>11</strong> is expected to be Rs.5500.0946 lakhs and<br />

Rs. 430.836 lakhs respectively.<br />

Funds will also be received under MLALAD and MPLAD programme.<br />

Resource envelope for ULBs:<br />

Both Nayagah- and Khandapara NACs have proposed chiefly for ongoing activities under various<br />

schemes, and hence they are likely to receive the funds as per their proposal. However, for <strong>2010</strong>-<strong>11</strong>,<br />

they are likely to face a defict since few development activities have been added that donot have any<br />

assured funding.<br />

___________<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

54


Chapter VI<br />

______________________________________<br />

SECTORAL DISTRICT PLANS & SCHEMES<br />

There are various schemes being implemented in the district of <strong>Nayagarh</strong>. Some of these are central<br />

sector schemes like Rajiv Gandhi Grameen Vidyutikaran Yojna, some are centrally sponsored ones,<br />

and some are state plan schemes like GGY. However, the district plan is and can not be limited to<br />

these schemes only for there are several requirements that are not covered under these schemes. The<br />

following abstract, which excludes kendu leaf operations funded by Odisha Forest Development<br />

Corporation, and takes into consideration 10% increment of the outlay of 2009-10 in cases where the<br />

departments have not proposed outlay for <strong>2010</strong>-<strong>11</strong>, would reflect the proposed outlays under district<br />

plan for <strong>2010</strong>-<strong>11</strong>.<br />

Sector Outlay for <strong>2010</strong>-<strong>11</strong> in lakh rupees<br />

Agriculture & allied 3064.26<br />

DRDA(excluding NREGS) 4789.21<br />

NREGS 700<br />

DSMS 13.5<br />

Grant under article 275(1) 138.93<br />

SCA to TSP 96.58<br />

Irrigation 15796.2<br />

Energy 2062.37<br />

Industry(DIC,Textiles, Sericulture) 243.161<br />

Road development 6885.142<br />

E-governance 12<br />

Tourism 54<br />

Civil Supply 2.43<br />

Forestry 617.6198<br />

Education(SSA+RMSA) 14574.21<br />

Sports 35.54<br />

Health 1973.043<br />

Water & sanitation 4454.796<br />

NAC(2) 915<br />

Art & Culture 23<br />

District welfare 438.3708<br />

Social welfare 4596.06<br />

Police 1995<br />

Building 1559.066<br />

Total 65039.49<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

55


Details of various sectoral plans are as under:<br />

AGRICULTURE & ALLIED ACTIVITIES<br />

Agriculture and allied sectors are very important for livelihoods promotion of rural people of the<br />

district. Rice, pulses, fruits, vegetables and sugarcane are important field crops contributing<br />

substantially to the family income of the rural people. Livestock production and fishery are allied<br />

sectors contributing substantially to agricultural growth. The key indicators of these sectors are<br />

indicated in MIDP table-14 in Chapter-I.<br />

Agriculture<br />

Agriculture is the lead sector in the <strong>Nayagarh</strong> district which provides livelihoods to nearly two-thirds<br />

of total workforce. There is inter-Block disparity in agriculture development in the district mainly due<br />

to topographiacal variations, climatic variation, extent of irrigation and poverty. It is imperative to<br />

focus on better management of soil, water and other natural resources, enhance application of inputs<br />

and crop management through transfer of technology, risk management, commercialization of<br />

agriculture, creation of irrigation facilities, crop diversification, integrated farming, farm<br />

mechanization, post-harvest management, sustainable crop production practices like integrated<br />

nutrient, pest and water management, and development of rain-fed agriculture through watershed<br />

development approach.<br />

Development of agriculture has demonstrated a slow growth in the district due to various constraints<br />

like traditional method of cultivation in remote areas, inadequate capital formation and low investment,<br />

predominance of rainfed farming making the cropped land vulnerable to drought and moisture stress<br />

and uneconomic holding size. After implementation of Agriculture Policy 1996, the state government<br />

has launched a new agriculture Policy 2008 with following broad objectives:<br />

To bring in a shift from the present level of subsistence agriculture to a profitable commercial<br />

agriculture so that people would accept agriculture as a vocation;<br />

To promote sustainable agricultural development ;<br />

To enhance productivity of important crops at least to match with national average (enhancing<br />

seed replacement, availability of quality planting materials, INM, IPM, water management,<br />

farm mechanization and technology transfer) ;<br />

To encourage crop diversification particularly in uplands and medium lands (e.g. paddy to nonpaddy<br />

crops);<br />

To focus on horticultural crops including dry-land horticulture ;<br />

To encourage modern farming system approach;<br />

To enhance water use efficiency through peoples’ participation;<br />

To facilitate increased long term investment in agricultural sectors (on farm as well as off farm)<br />

both by private sector, public sector and private & public partnership (PPP), particularly for<br />

post harvest management, marketing, agro processing and value addition, etc;<br />

To encourage contract as well as compact farming;<br />

To increase access to credit for small and marginal farmers;<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

56


To facilitate appropriate market linkages for agricultural produce with respect to which the<br />

state has competitive advantages;<br />

To implement integrated watershed development programmes in watershed areas for Natural<br />

Resource Management (NRM), increased crop production as well as on-farm and non-farm<br />

income;<br />

To create appropriate institutions / facilities to undertake regulatory, enforcement and quality<br />

assurance activities matching to the emergent needs.<br />

To redefine the roles and responsibilities of the agricultural extension machinery by suitably<br />

restructuring the field extension set up.<br />

The objective of the Eleventh Plan is to achieve 4% sustainable annual growth in agricultural<br />

production. The following sectoral plan strategies have been envisaged for realizing the objective.<br />

Substantially improve irrigation potential and its utilization<br />

Improve water management. Rain water harvesting and watershed development<br />

Reclaim degraded land and focus on soil quality<br />

Bridge the knowledge gap through effective extension<br />

Diversify into high value outputs, fruits, vegetables, flowers, spices, medicinal herbs, bamboo,<br />

bio-diesel etc, but with adequate measures to ensure food security<br />

Encourage mixed farming and promote animal husbandry and fishery activities<br />

Provide easy access to credit at affordable rates<br />

Improve the incentive structure and functioning of markets<br />

Refocus on land reform issue<br />

Among major ongoing schemes of DAC, the largest is the Macro Management Scheme (MMA) which<br />

was initiated in 2000–01 so as to provide flexibility to the States to develop and pursue a mix of<br />

activities on the basis of their regional priorities. The approved pattern of assistance is in the ratio of<br />

90:10 for the Centre and the States, respectively. The Technology Mission on Oilseeds, Maize, Oil<br />

palm, and Pulses is being implemented under a new scheme ISOPOM. National Food Security Mission<br />

as a Central sector scheme in mission-mode has already been launched. It aims at increasing food<br />

grains production by at least 20 million ones by the end of Eleventh Plan at country level. This<br />

programme covers rice, wheat and pulses and concentrates particularly on increasing seed replacement<br />

and the replacement of older varieties by newer ones including transfer of technology. MMA- Work<br />

plan, ISOPOM and NFSM-pulses & rice are three major CSPs that are being implemented in the<br />

district. All these interventions will target at:<br />

1 Soil treatment for management of degraded soils<br />

2 Increasing seed replacement rate<br />

3 Water management in irrigated and rain fed lands<br />

4 Crop diversification from upland paddy to non-paddy crops and horticultural crops<br />

5 Farm mechanization<br />

6 Promotion of INM and IPM<br />

7 Promotion of organic farming<br />

8 Streamlining agricultural extension through ATMA<br />

9 Adoption of dry land crop production technology<br />

10 Post harvest management and marketing<br />

<strong>11</strong> Risk management<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

57


The schemes that are implemented for agricultural development in the district are indicated below.<br />

Name of scheme CSP/CP/SP Brief Description<br />

Agriculture Policy 2008 State Plan Incentives to farmers on inputs<br />

Management of acid<br />

soil<br />

State Plan Subsidy on soil amendments<br />

RKVY Central Sector Incentives to states on projects under<br />

stream I and II<br />

MMA-Work Plan CSP Incentives for rice, sugarcane development<br />

and farm mechanization<br />

ISOPOM CSP Incentives for promotion of oilseeds,<br />

pulses, maize and oil palm<br />

NFSM-Rice & Pulses Central Sector Incentives for promotion of pulse and rice<br />

crops<br />

Support to State CSP For extension reform through ATMA<br />

Extension (ATMA)<br />

Jalanidhi (RIDF loan) SP Subsidy on bore wells and tube wells<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

58


Table 22(MIDP) ABSTRACT OF FINANCIAL RESOURCES AT DISTRICT LEVEL ( in Lakh Rs)<br />

Department Scheme/Budget 2007-08 2008-09 2009-10<br />

head/Sub-head CSS CSP SS Grant others CSS CSP SS Grant others CSS CSP SS Grant others<br />

Agriculture ISOPOM 7.35 10.42<br />

Work Plan 22.35 6.78<br />

Mini MissionII 1.37<br />

Farm<br />

6.00<br />

Mechanisation<br />

SRI 25.48<br />

ATMA 28.70 40.20 60.66<br />

RKVY 14.60 7.10<br />

NFSM 26.09 35.40 63.67<br />

Sub-total 40.69 58.4 42.5 58.77 6 63.67 60.66 25.48<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

59


The annual plan of the Agriculture Department, <strong>Nayagarh</strong> is as under:<br />

Scheme-wise activities Financial target for <strong>2010</strong>-<strong>11</strong> in lakh rupees<br />

WP-Rice 8.79<br />

WP-Sugar Cane 5.94<br />

WP-Mesta<br />

WP:Farm Mech 229.7<br />

ISOPOM –Maize 4.42<br />

ISOPOM-Pulse 9.56<br />

ISOPOM-Oilseeds 9.46<br />

NFSM-Pulse 292<br />

NFSM-Rice 146.67<br />

ATMA 60.66<br />

Jalnidhi ------<br />

Farm mechanization<br />

(other than WP)<br />

14.15<br />

RKVY 3.30<br />

Sub-total 784.65<br />

Focus on sugar cane development<br />

The Sugar industry has the observation that the Agriculture Department in<br />

<strong>Nayagarh</strong> has not been successful or active in promoting sugar cane cultivation<br />

according to the potential of the district as well as requirement of the sugar<br />

industry. On the other hand, the Agriculture Department clarifies that whereas<br />

under the present limitations revolutionary achievements in this sector (sugar<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

60


cane) can’t be expected, the sugar industry also has some policies which<br />

discourage the farmers for supplying their produce to the industry(other factors<br />

also have their role). The TSI made an attempt to negotiate between the two<br />

sides with an understanding that the Agriculture Department should intensify its<br />

sugar cane development programme, but it is also a fact that this can be done<br />

only after proper capacity building(including additional human resource) and<br />

infrastructure development of the Department. However, it is heartening to<br />

mention here that the Sugar Cane Research Station has released two new<br />

varities of sugar cane that can add to the required development. Further, the MI<br />

division has submitted proposals for several MI projects (Modanali,<br />

Gayapathara, Mahisanali, Haguri, Diampada, Mohanguru, Panipoila, Baghua,<br />

Dholapathar, Kainphulia, Bhetabara, Randa, etc.) for consideration under the<br />

Tripple R scheme, and these projects are expected to enhance the sugarcane<br />

production through irrigation development.<br />

Details of the agricultural vision & mission in <strong>Nayagarh</strong> district are available in annexure-13. Specific<br />

suggestions regarding the development of pulses and sugar cane are available in annexure-14.<br />

Horticulture:<br />

Horticultural crops like vegetables, fruits and spices are potential crops of the district. In the area of<br />

horticulture, a major beginning has been made with the NHM. The most important constraints to<br />

establish the required linkages are in the area of agricultural marketing and processing. Since highvalue<br />

agriculture is based on perishable commodities, large investments are required in modern<br />

methods of grading, post-harvest management (PHM), and development of cold chains. Such<br />

investment in turn requires that new players, including large corporate players, be able to enter existing<br />

markets and set up new marketing channels. The NHM therefore incentivizes the ongoing marketing<br />

reforms based on amending existing Agricultural Product Marketing Committee (APMC) Acts to<br />

allow this. This process has started with amendment of APMC Act.<br />

The major thrust for horticultural development in the district would be:<br />

1 Commercial cultivation of fruits, floriculture and mushrooms<br />

2 Production and supply of quality planting materials<br />

3 Hybrid and off-season vegetable cultivation<br />

4 Increasing water use efficiency through micro-irrigation<br />

5 Organic farming<br />

6 Post harvest management of fruits and vegetables<br />

The schemes that are being implemented in the district are indicated below.<br />

Name of scheme Sector Brief description<br />

NHM CSP (85:15) For production enhancement<br />

of fruits through supply of<br />

quality planting materials<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

61


and subsidy on inputs ,<br />

demonstration etc<br />

Micro irrigation programme CSP (40:10: 50) Subsidy on drip and<br />

sprinkler irrigation<br />

Following is the annual plan of the Horticulture Department for <strong>Nayagarh</strong> District for <strong>2010</strong>-<strong>11</strong>:<br />

Proposed activities Financial target in lakh rupees for<br />

<strong>2010</strong>-<strong>11</strong><br />

Seed Infrastructure<br />

Establishment of New Garden<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

3.5<br />

88.693<br />

Floriculture 15.56<br />

Plantation crops including Coastal<br />

Horticulture<br />

15.56<br />

Protected cultivation<br />

12.375<br />

Organic Farming<br />

0.95<br />

Human Resource Development<br />

(exposure visits for farmers<br />

inside & outside the state) 3.08<br />

Mission Management<br />

2.445<br />

Ongoing activities<br />

( maintenance of Plantation)<br />

RKVY<br />

47.3715<br />

(Post Harvest Management) 30<br />

Grand total<br />

219.5345<br />

NRM & Watershed Development:<br />

To sustain people’s participation, it is necessary to have longer treatment and inclusion of a farming<br />

systems component in watershed development programme. There is a need to utilize resources<br />

available from the RKVY for watershed development. Odisha Watershed Development Mission has<br />

already prepared a perspective plan to rehabilitate all watersheds of the states by the end of 13 th Plan.<br />

The schemes that are being implemented in the district are indicated below.<br />

62


Name of scheme Sector Brief description<br />

NWDPRA CSP (90:10) Sustainable natural<br />

resource management<br />

IWDP CSP(<strong>11</strong>:1) Watershed rehabilitation<br />

IWMP CP Watershed management<br />

Following is the annual plan of the Soil Conservation Department for <strong>Nayagarh</strong> District:<br />

Livestock Promotion:<br />

Scheme-wise<br />

activities<br />

Financial target<br />

for <strong>2010</strong>-<strong>11</strong> in lakh<br />

rupees<br />

Remarks<br />

2 4 5<br />

NWDPRA 99.43<br />

IWDP-I 80.00<br />

IWDP-II 30.00<br />

IWDP-III 30.00<br />

IWDP-IV 91.20<br />

IWDP-V 45.00<br />

RKVY 213.75<br />

NREGS 140.00<br />

IWMP 990.00<br />

Sub-Total 1719.38<br />

50% relates to Soil<br />

Conservation Department<br />

and 50% relates to Forest<br />

Department<br />

Relates to Forest<br />

Department<br />

Livestock plays an important role in Indian economy and is an important sub-sector of Indian<br />

agriculture. The contribution of livestock to the GDP is about 4.5% and the sector employs about 5.5%<br />

of the workforce. Major part of the livestock population is concentrated in the marginal and small size<br />

of holdings. Growth during the Tenth Plan has been at the rate of 3.6%. The National Project on Cattle<br />

and Buffalo Breeding is the flagship scheme initiated in October 2000 for a period of 10 years. This<br />

envisages genetic up-gradation of indigenous cattle and buffaloes, development and conservation of<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

63


important indigenous breeds, and to evolve sustainable breeding policy. The allocation for dairy<br />

development by the Central and State Governments has also diminished over the last two plans.<br />

Consequently, in the first four years of the Tenth Five <strong>Year</strong> Plan, the growth rate of milk has been less<br />

than 3% per annum.<br />

The goals for the Eleventh Five <strong>Year</strong> Plan for the livestock sector would be (i) to achieve an overall<br />

growth between 6% and 7% per annum for the sector as a whole with milk group achieving a growth<br />

of 5.0% per annum and meat and poultry group achieving a growth of 10% per annum; (ii) the benefit<br />

of growth should be equitable, benefiting mainly the small and marginal farmers and landless labourers<br />

and should benefit poorly endowed areas like draught prone, arid, and semi-arid areas; (iii) to provide<br />

adequate animal health services for effective disease control; (iv) the sector should generate additional<br />

employment opportunity to people in the rural areas especially to the female population; (v) livestock<br />

should provide major source of income in the selected areas having potential for growth in the sector<br />

should result in the improvement of environment, specially in the rural areas.<br />

The trust activities of ARD Department in the district are:<br />

1 Monitoring livestock disease control programme<br />

2 Transfer of knowledge and technology on improved AH & Dairying practices<br />

3 Establishment of LACs<br />

4 Up-gradation of skill of farmers/ un-employed educated youth for self-employment<br />

5 Fodder development for dairying<br />

6 Breed up-gradation through AI and natural crossing<br />

The major schemes that are being implemented in the district for achieving the above objectives are:<br />

Scheme Sector Brief description<br />

Up-gradation of skill in self State plan Organising training camps<br />

employment under ARD sector<br />

Training and demonstration in State Plan On-farm demonstration and<br />

fodder cultivation<br />

training<br />

Assistance to states for control of CSP(75:25) Vaccination and diagnosis of<br />

animal diseases<br />

diseases<br />

Fodder seed distribution CSP(75:25) To encourage fodder<br />

cultivation by multiplication<br />

and<br />

seeds<br />

distribution of fodder<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

64


MIDP Table 22: ABSTRACT OF FINANCIAL RESOURCES AT DISTRICT LEVEL ( in Lakh Rs) FOR ARD<br />

Scheme/Budget 2007-08 2008-09 2009-10<br />

head/Sub-head CSS CSP SS Grant others CSS CSP SS Grant others CSS CSP SS Grant others<br />

33-2403-AH-CSP 0.5 4.28 0.46<br />

33-2402-00-800-1640 1.03 0.34<br />

33-2403-00-101 0.32 0.32<br />

Sub-total 0.50 1.35 4.28 0.66 0.46<br />

Amount in rupees<br />

Trend of allocation versus utilization by Animal Resource<br />

Development Department in <strong>Nayagarh</strong> district from Centrally<br />

Sposored Schemes<br />

500000<br />

450000<br />

400000<br />

350000<br />

300000<br />

250000<br />

200000<br />

150000<br />

100000<br />

50000<br />

0<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

2002-03<br />

2003-04<br />

2004-05<br />

2005-06<br />

<strong>Year</strong><br />

Allocation Expenditure Linear (Allocation)<br />

2006-07<br />

2007-08<br />

2008-09<br />

2009-10<br />

65


<strong>Nayagarh</strong> district seems to have a lower production profile than the Odisha average in respect of milk<br />

and egg. Particularly, the potential in milk production needs to be developed as the base of already<br />

existing.<br />

Marketing of milk:<br />

OMFED collects surplus milk from the farmers through PUMUL(Puri Milk Union).<br />

There are 5 milk routes of OMFED in the district as under:<br />

1. Itamati-Odagaon<br />

2. Itamati-Bijipur<br />

3. Itamati-Khandapada<br />

4. Itamati-Nuagaon<br />

5. Itamati-Beguniapatana<br />

There is a chilling plant(rather a BMC complex) at Itamati with a capacity of 3000 litre. Besides, there<br />

are Bulk Milk Coolers(BMC) each of 500 litre capacity at Sarankul, Dasapalla, and Karabara. More<br />

BMCs are proposed at Gania and Ranpur, but due to lack of potentiality these have not been installed.<br />

Present collection by OMFED is about 2000 litres/day on an average whereas it supplies about 3000<br />

litres. The gap is largely due to diversion of the milk for local use, particularly because the farmers get<br />

better earning from direct sales. There are about 50 working MPCSs(Milk Producing Cooperative<br />

Societies), while some are defunct. Lack of cross-breed cattle population is the major factor limiting<br />

the production of milk. Further, malnutrition, and diseases weaken the potentiality of the district in<br />

milk production. Accordingly, PUMUL has suggested for the following initiatives by the Animal<br />

Resource Development Department:<br />

Induction of animals<br />

Artificial implementation<br />

Fodder development<br />

Calf-rearing centre<br />

Treatment camp for deworming & infertility<br />

Vaccination<br />

Presently OMFED is taking up some vaccination activities and is promoting Azola cultivation for<br />

production of nutritional fodder, however this is done in limited areas; hence the ARD department is<br />

expected to accelerate these activities throughout the district.<br />

OMFED also wants SHG development along the present milk routes. Survey is being taken up for<br />

more milk routes.<br />

The National Project for Cattle and Buffalo Breeding (NPCBB) is being implemented in the district,<br />

and genetic upgradation of cattle is being carried out by the Department under this programme. The<br />

following action plan would take care of other requirements:<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

66


Proposed activity Financial target for <strong>2010</strong>-<strong>11</strong> in lakh rupees<br />

Skill upgradation 1.38<br />

Control of animal disease 0.64<br />

Fodder nursery 1.44<br />

RKVY 39.00<br />

Sub-total 41.36<br />

Fishery:<br />

Presently, fisheries and aquaculture contribute 1.04% to the national GDP of the country and 5.34% to<br />

agriculture and allied activities. The fisheries sector has been providing employment to fishermen<br />

whose occupation is highly prone to natural calamities. Sustainable fisheries can only be achieved<br />

through improvement of the quality, technical skills, and management of human resource managing<br />

fisheries in the country, in consonance with the rapidly changing needs.<br />

The priority areas in fishery sector in the district are:<br />

1 To promote sustainable development of inland fishery<br />

2 To produce and stock fingerlings/yearlings for enhancement of fish production<br />

3 To enhance contribution of fishery sector to food and livelihoods security of the people<br />

engaged in fishery<br />

4 To develop human resource through capacity building<br />

The major schemes that are being implemented in the district are:<br />

Scheme Sector Brief description<br />

Upgradation of skills for self- State Plan To impart training to unemployment<br />

in fisheries<br />

employed youth<br />

Inland capture fishery CSP(75:25) Training<br />

Development fishery and aquaculture CSP (75:25) Excavation and renovation of<br />

through FFDA<br />

pisciculture tanks<br />

Welfare programme for fishermen CSP (50:50) Insurance and low cost<br />

housing for fishermen<br />

The Fishery Department in <strong>Nayagarh</strong> produces only about 1 lakh fingerlings per year, against a<br />

district requirement of 200 lakhs, because of poor infrastructure facility. There are 6 tanks of the<br />

Department at <strong>Nayagarh</strong> town out of which 2 are not in use because of contamination by biomedical<br />

waste. It is likely that in near future the <strong>Nayagarh</strong> NAC may take over the tanks or may ask to close<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

67


down activities there because of expansion of the town. Hence, the Department plans for a good fish<br />

breeding farm for which site selection in under survey. There are also proposals to establish model<br />

fish farmers’ villages at Khandapada, Dasapalla, and Ranapur; and to construct hygienic fish markets<br />

at <strong>Nayagarh</strong> and Odagaon by <strong>2010</strong>-<strong>11</strong>. The following annual plan has been proposed accordingly:<br />

Proposed activity Financial target for <strong>2010</strong>-<strong>11</strong> in lakh rupees<br />

RKVY:<br />

Establishment of fish breeding farm 20<br />

Construction of aquashop 20<br />

Fish farmer's training hall<br />

Demonstration on fish farming 3.25<br />

Ornamental fish farming 1<br />

Soil & water testing kit<br />

NWFF:<br />

Model fishermen village 20<br />

FFDA:<br />

Construction & renovation of tanks for intensive<br />

culture 12<br />

Fish farmers’ training 5<br />

ATMA:<br />

Exposure visit 10<br />

Advanced fingerling/yearling culture 4.25<br />

Introduction of new breed 1<br />

Insurance to fishermen 4.64<br />

Construction of fish landing shed 6<br />

Establishment of hygienic fish market 25<br />

Total 132.14<br />

Credit:<br />

Credit is an essential requirement for revitalizing agriculture .The findings of the National Sample<br />

Survey Organization (NSSO) 59th Round (2003) revealed that only 27% of the total number of<br />

cultivator households received credit from formal sources while 22% received credit from informal<br />

sources. The remaining households, comprising mainly small and marginal farmers, had no credit outstanding.<br />

It is unlikely that the situation has changed much since 2003. The annual credit plan for<br />

different Blocks as prepared by the Lead Bank Officer sets a target of annual credit requirement of Rs<br />

294 crores for agriculture, allied, non-farm sectors and other priority sectors . Agriculture sector alone<br />

has a credit requirement of 68% of these sectors:<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

68


Cooperatives:<br />

The credit disbursal by commercial banks covers only <strong>11</strong>.7% of operational holdings in the country.<br />

The most potent means for widening and deepening access to institutional credit to the innumerable<br />

small and marginal farmers are the co-operative credit societies that are autonomous and democratic.<br />

The revitalization of the co-operative credit structure in order to transform them into vibrant and viable<br />

democratic financial institutions is therefore vital.<br />

The thrust areas of cooperation department are share capital assistance to short-term credit cooperative<br />

societies, crop insurance, distribution of agro-inputs and agricultural marketing.<br />

In <strong>Nayagarh</strong> district, there are 157 primary agriculture cooperative societies(PACSs) under the<br />

jurisdiction of the Asst. Registrar of Cooperative Societies, <strong>Nayagarh</strong> Circle. The total membership<br />

was 140314 during 2007-08 which increased to 155463 by the end of 2008-09. It is likely to further<br />

increase by 5000 or more. The number of Kissan Credit Card holders is <strong>11</strong>9000(2009-10).<br />

The PACSs procured rice of 2062 MT during 2008-09 against a target of 2000 MT, but given the fact<br />

that in 2009-10 the policy has changed and the government wanted them to act as agents of the Civil<br />

Society Corporation in this procurement, they are likely to procure 15000 to 20000 MT of rice.<br />

Proposal under RKVY for the cooperation sector:<br />

Out of the 157 PACSs, <strong>11</strong>0 have godowns, but 40 of them require immediate repairing & renovation.<br />

47 require construction of godowns. The following proposal has been developed accordingly under<br />

RKVY:<br />

Financial year Proposed activity Cost<br />

rupees<br />

in lakh<br />

<strong>2010</strong>-<strong>11</strong> Construction of godowns for 10 PACSs(Kantilo, 70.00<br />

Purusottamprasad,Baigunia,Ghugudiapada,Khalamada,United<br />

Solapata-<br />

Raghunathpur,Dimisara,Hariharpur,Ranapurgarh,Sankhajodi)<br />

@Rs.7 lakhs/unit<br />

Repairing & renovation of 20 godowns@Rs.2 lakhs/unit 40.00<br />

Agricultural Research:<br />

Sub-total <strong>11</strong>0.00<br />

Krushi Vigyan Kendra and the Sugar Cane Research Station, both established at <strong>Nayagarh</strong> and<br />

working under Odisha University of Agriculture & Technology have been involved research and<br />

extension activities. Whereas the Sugar Cane Research Station has developed new variety of sugar<br />

cane, KVK has facilitated the introduction/promotion of following activities in the district:<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

69


Dual purpose backyard poultry<br />

Integrated farming<br />

New onion varieties<br />

Mushroom cultivation<br />

Fresh water prone culture<br />

Bio-control of pests<br />

Tissue culture of banana & papaya<br />

The major achievement however is the recent release of two new varieties of sugar cane, viz. Sabita<br />

and Nilamadhava, by the Sugar Cane Research Station.<br />

In absence of any concrete proposal for <strong>2010</strong>-<strong>11</strong>, the TSI estimates a budget of Rs.37.4 lakh rupees<br />

for KVK in <strong>2010</strong>-<strong>11</strong> considering 10% increment over the estimate for 2009-10.<br />

Similarly, in absence of any concrete proposal for <strong>2010</strong>-<strong>11</strong>, the TSI estimates a budget of Rs.19.8<br />

lakh rupees for SCRS in <strong>2010</strong>-<strong>11</strong> considering 10% increment over the estimate for 2009-10.<br />

Forestry and Wild Life:<br />

Forests provide livelihoods to the rural poor living around and create opportunities for wage<br />

employment. They maintain a natural balance in the ecosystem and reduce the impact of natural<br />

calamities. The strategies for forest sector development are:<br />

1 Conservation of dense forest growth<br />

2 Regeneration of forest cover<br />

3 Afforestatin<br />

4 Capacity building of the community for participatory forest management<br />

5 Promotion of eco-tourism and eco-development<br />

6 Implementation of forest policy<br />

The schemes that are being implemented in the district are working of coupes, working of sal leaves,<br />

supply of timber for car festival, plantation under NREGS, bamboo plantation, subsidiary silviculture,<br />

joint forest management, Forest Development Agency, National Bamboo Mission, and forest<br />

protection. Details of the plan and programme of <strong>Nayagarh</strong> Forest Division(territorial), Mahanadi<br />

Wild Division, and Phulbani Kendu Leaf Division has been discussed separately.<br />

Sericulture:<br />

Sericulture involves raising of food plants for silk worms, rearing for production of cocoons, reeling<br />

and spinning of cocoons for production of yarn. Sericulture has been started in Daspalla and Odagon<br />

Blocks of the district. There is scope for mulberry sericulture in the district in micro project mode.<br />

Details of this sectoral plan have been discussed separately, but under RKVY proposals for Chowki<br />

rearing centre, Common rearing centre(late age silk worm rearing), Barbed wire fencing, irrigation<br />

facility, and equiments have been included.<br />

.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

70


Marketing:<br />

Marketing is a driving force for agricultural development. Currently agricultural markets are regulated<br />

under APMC Act. Besides, there are other regulations, viz. Essential Commodities Act and various<br />

Control Orders issued there under. All these have created restrictive and monopolistic marketing<br />

structures, which have resulted in inefficient operation and high degree of marketing costs. They have<br />

also had an adverse impact upon agricultural production and system, inefficient flow of commodities,<br />

and lack of competitiveness. When the APMCs were first initiated there was significant gain in market<br />

infrastructure development. However, this infrastructure is now out of date, especially given the needs<br />

of a diversified agriculture. The Krushak Bazars created for marketing have to be strengthened and<br />

made operational.<br />

RASTRIYA KRUSHI VIKASH YOJANA (RKVY):<br />

RKVY is a major agricultural scheme launched during the Eleventh Plan with the following<br />

objectives.<br />

• To incentivise the states so as to increase public investment in Agriculture and allied sectors.<br />

• To provide flexibility and autonomy to states in the process of planning<br />

• To ensure the preparation of agriculture plans based on agro-climatic conditions, availability of<br />

technology and natural resources.<br />

• To ensure that the local needs/crops/priorities are better reflected in the<br />

agricultural plans of the states<br />

• To achieve the goal of reducing the yield gaps in important crops, through focused<br />

interventions.<br />

• To maximize returns to the farmers in Agriculture and allied sectors.<br />

• To bring about quantifiable changes in the production and productivity<br />

The scheme has already been implemented in the district during 2008-09. The proposals submitted by<br />

the line departments for implementation of the scheme during 2009-10 and <strong>2010</strong>-<strong>11</strong> are given below.<br />

RKVY PROPOSAL FOR 2009-10 & <strong>2010</strong>-<strong>11</strong> (Financial in Lakh Rupees)<br />

Name of<br />

Department<br />

Name of Proposal<br />

<strong>2010</strong>-<strong>11</strong><br />

Phy Fin<br />

Agriculture<br />

Vermicompost 50 1.50<br />

SRI Village 2 1.80<br />

Sub-Total 3.30<br />

Horticulture Model Nursery at<br />

Public sector<br />

Post harvest<br />

30.00<br />

management<br />

Innovative<br />

programme<br />

Sub-total 30.00<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

71


ARD<br />

Construction of hostel<br />

Construction of calf-<br />

rearing centre<br />

1 15.00<br />

Fodder nursery 4 24.00<br />

Sub-Total 39.00<br />

Fisheries Establishment of a fish<br />

breeding farm<br />

20.00<br />

Construction<br />

Aquashop<br />

of 4 20.00<br />

Training<br />

farmers<br />

hall for<br />

Soil and water testing<br />

kit<br />

Ornamental<br />

farming<br />

fish<br />

Demonstration on fish<br />

farmong<br />

25 3.25<br />

Sub-total 44.25<br />

Soil<br />

Conservation<br />

Watershed Dev 2250ha 213.75<br />

Sub-total 213.75<br />

Cooperation<br />

KVK<br />

Sugar Cane<br />

Research<br />

Station<br />

Sericulture<br />

Construction of new 10 70.00<br />

godowns for PACSs<br />

Repair & renovation of<br />

PACS godowns<br />

20 40.00<br />

Sub-total <strong>11</strong>0.00<br />

Farm mechanization<br />

Development of training<br />

module for SRI<br />

Sub-total<br />

Farm development<br />

Production of QPM of<br />

recently released<br />

varieties<br />

Sub-total<br />

Chowki rearing centre<br />

Common rearing<br />

centre(late age silk worm<br />

rearing)<br />

Barbed wire fencing 1400<br />

running<br />

ft<br />

7.00<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

72


Borewell irrigation 6 7.50<br />

Rearing equipments 2.10<br />

Sub-total 16.60<br />

Grand total 456.4<br />

RURAL DEVELOPMENT<br />

The District Rural Development Authority(DRDA), headed by its Project Director has been<br />

implementing various programmes for rural development. The interventions are mainly of three<br />

categories, as under:<br />

1. Special programme for rural development:<br />

These include Drought Prone Area Programme (DPAP), Desert Development Programme (DDP), and<br />

Integrated Wasterland Development Projects(IWDP) Scheme,(etc.). DPAP and DDP are not<br />

implemented in <strong>Nayagarh</strong> district whereas IWDP is being implemented through the soil conservation<br />

department. Details of IWDP are therefore available in the respective section on soil conservation.<br />

Gopabandhu Gramin Yojna(GGY) is a special programme for rural development launched by the Govt<br />

of Odisha in the non-BRGF districts. Each district(non-BRGF) is to get Rs. 15.00 crore from the state<br />

every year (during the <strong>11</strong> th plan period) under this scheme the principal objective of which is to<br />

provide additional funds to the targeted districts to provide infrastructure consisting primarily of<br />

bijli(electricity), sadak(road) and pani (water) to every revenue village in a phased manner. The<br />

amount received under GGY is equally reallocated among the blocks to take up projects.<br />

2. Rural employment:<br />

Various programmes/schemes like the Swaranjyanti Gram Swarozgar Yojana (SGSY), Sampoorna<br />

Gram Rozgar Yojana (SGRY), National Food for Work Programme and/or National Employment<br />

Guarantee Programme, and National Rural Employment Guarantee Scheme (NREGS) have been<br />

implemented to provide employment to the poor people at rural level. Of these, only SGSY and<br />

NREGS are presently being implemented in the district.<br />

Panchayati Raj Development has been implementing three important types of schemes viz-self<br />

employment, and wage employment.<br />

A) Self Employment through SGSY : -<br />

Creation of Self Employment otherwise means addition to the existing nation output. Presently<br />

Swaranjayanti Gram Swarozgar Yojana has been implemented through Panchayati Raj Institutions<br />

since 1999. The basic objective of the scheme is to create self employment opportunities among the<br />

rural BPL families. It is a credit cum subsidy scheme.<br />

Objective of the Scheme<br />

1. To bring about the BPL families to above the poverty line.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

73


2. To establish micro enterprises in the rural areas.<br />

3. To Reduce the degree of regional imbalance through upliftment of the rural economy.<br />

4. To ensure social justice through emphasizing the SC/ST and Women beneficiaries.<br />

5. To achieve Women Empowerment through finance WSHGs.<br />

6. To reduce the pressure of work force on Agriculture through diversification of occupation.<br />

Thrust Areas of the Scheme<br />

1. Women literacy rate is to be raised so as to enable women swarozgaries to manage their<br />

own economic activities.<br />

2. Banking sector has to play a pro-active role in SGSY finance.<br />

3. Man Power Planning of the Pancahyati Raj Department should be as per the practical<br />

situations of the blocks.<br />

B) Wage Employment<br />

Creation of Wage Employment otherwise means addition to the existing national employment.<br />

Presently National Rural Employment Guarantee Scheme has been implemented through<br />

Panchayati Raj Institutions. The basic objective of the scheme is to assure 100 days wage<br />

employment opportunities to all rural families in a year.<br />

Objective of the Scheme<br />

1. To provide minimum 100 days unskilled wage employment to all rural families in a year on<br />

demand.<br />

2. To provide wage employment to the rural job seekers in their respective localities.<br />

3. To create durable assets in the rural areas.<br />

4. To ensure justice through emphasizing the SC/ST, women workers in the scheme.<br />

5. To reduce the pressure of work force on Agriculture through diversification of occupation.<br />

6. To reduce the rate of migration for employment to distant places.<br />

Thrust areas of the Scheme<br />

1. Since the Action Plan has to be finalized by the respective Local Bodies like GP, PS and ZP the<br />

projects should be need based and completed with in the same financial year.<br />

2. The job seekers should be enthusiastic for the works opened in their localities.<br />

Mahatma Gandhi Rural Employment Guarantee Scheme:<br />

The Govt. of India passed the NREGAs Act on September-2005 and launched new centrally sponsored<br />

National Rural Employment Guarantee Scheme (NREGS). Centrally Sponsored Scheme NFFWP<br />

has been merged into NREGA. This is essentially a demand-driven programme which offers jobs to<br />

deserving rural people for minimum 100 days in a year, per household. The current wage rate is<br />

Rs.90/worker/day.<br />

NREGS has been renamed as Mahatma Gandhi Rural Employment Guarantee Scheme on 2 nd October<br />

2009. It takes up specific projects for creating rural employment, and also creates assets for villages.<br />

Construction of roads, and farm ponds etc. are included in the list of projects sanctioned under the<br />

scheme.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

74


Persons desiring jobs under NREGS need to apply for job cards.Norms specify the maximum duration<br />

of payment of wages, the ratio of wage & material cost; etc..The progress is monitored online.<br />

3. Other rural development programmes:<br />

Among other rural development projects, Indira Awas Yojna is the major one. This is a housing<br />

scheme which DRDA is implementing for the deserving BPL families. Mo Kudia is a state plan<br />

housing scheme for the poor people.<br />

More details of the programme have been separately discussed..<br />

12 th Finance Commission (TFC) Award is also being received for rural development activities. The<br />

State Finance Commission also gives grants for certain developmental activities. IWDP is thw<br />

watershed development programme implemented by the Soil Conservation Department though the<br />

funds are channelised through DRDA.<br />

Details of various DRDA programmes have been made available in annexure-3.<br />

DRDA Annual plan for <strong>2010</strong>-<strong>11</strong>:<br />

Annual plan for non-NREGS activities:<br />

Financial<br />

<strong>Year</strong><br />

Physical Target (Scheme wise) Financial Target (Est. Cost) in lakh rupees<br />

<strong>2010</strong>-<strong>11</strong> SGSY<br />

481.68<br />

IAY<br />

2409.00<br />

GGY<br />

770.00<br />

MO KUDIA<br />

181.335<br />

TFC<br />

660.00<br />

SFC<br />

24.00<br />

Minor Irrigation<br />

96.00<br />

DRDA Admn.<br />

167.20<br />

Total 4789.21<br />

Annual plan for NREGS activities:<br />

Being a demand driven project, the annual plan of NREGS essentially depends on the needs of the<br />

people from time to time, and also on the focus and strategy of the programme itself. NREGS<br />

programme to be implemented in the Blocks & GPs through the BDOs directly may be regarded as the<br />

core NREGS. On the other hand, NREGS implemented through different departments may be regarded<br />

as Departmental NREGS.<br />

Presently the Blocks are preparing only annual plans for NREGS, based on latest palli sabha<br />

resolutions. Fresh resolutions are seeked each year, and projects pending from the previous year are<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

75


ignored if fresh resolutions no more enlist them. The Zilla Parishad, <strong>Nayagarh</strong> has approved total<br />

<strong>11</strong>523 projects for 2009-10 under NREGS which comes under Core NREGS.<br />

Some of the line Departments like DFO, Nayagah and Soil Conservation Department also have<br />

activities under NREGS as mentioned in their respective sections.<br />

Given the good progress in NREGS in the district during 2009-10, the financial target for <strong>2010</strong>-<strong>11</strong> is<br />

Rs.700.00 lakhs under NREGS.<br />

Whereas NREGS has been hailed for its potential and objectives, it is a fact that socio-economic<br />

factors have been responsible in some cases for low utilization of this potential. A suggestion for<br />

necessary steps to counter this problem is available in annexure-10.<br />

SHG Development Programme of DSMS:<br />

Orissa Rural Development & Marketing Society(ORMAS), an agency under the Panchyati Raj<br />

Department, Odisha has its district level centre(DSMS or District Supply & Marketing Society) at<br />

<strong>Nayagarh</strong>.<br />

DSMS, <strong>Nayagarh</strong> has taken 4 major activities, as under, in the district of <strong>Nayagarh</strong> considering the<br />

mass production and mass involvement of producers:<br />

• Agarabatti Making: The agarabatti making activity is currently going on in Bhapur Block.<br />

The marketing tie up of the product will be with Indian Tobacco Company (ITC) traders at<br />

Berhampur, Bhubaneswar and Kalapathar. DSMS plans to expand the activity in other blocks<br />

like Ranpur, Khandapada, Daspalla and <strong>Nayagarh</strong> and to produce ITC standard agarbattis. For<br />

this, it will provide skill training to 354 SHG members in Ranpur, Bhapur and Khandapada<br />

Blocks.<br />

• Roasted Moong Dal: As we all know that <strong>Nayagarh</strong> moong dal is famous owing to its quality,<br />

taste and has got good name in the district & as well as outside. At present, one Moong dal unit<br />

at Lodhachua of Ranpur block (managed by Dahikha Jubak Sangha) is producing the roasted<br />

moong dal.<br />

Proposal to expand the activity: A proposal has been moved to NABARD for machinery<br />

support for 4 units for producing roasted moong dal (including up gradation of existing<br />

Lodhachua and Kirdashpur units and two new units at Banmalipur-Khandapada block and<br />

Ikeri-<strong>Nayagarh</strong> block). Marketing tie up will be with Reliance Fresh, INS-Chilika and other<br />

Corporate houses.<br />

• Siali Leaf Cup and Plates: The leaf cup making unit at Buguda colony, Daspalla will be<br />

revived with Procurement and Production of Siali Leaf Cup and Plates. The tribals, surrounding<br />

the centre, will collect, stitch and sale siali leaf plates to the centre.<br />

• Marketing Tie-up for Bamboo Stick: Producers of Agarabatti of Bhapur & Ranpur Block<br />

will be tied- up with the producers of Bamboo stick of Ranpur Block. As a result the Bamboo<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

76


stick producers selling their sticks to the agarabatti producers directly and getting remunerative<br />

price.<br />

For enhancing the above key activities, working capital support is being provided to SHGs/SHPIs<br />

as loan @ 8% per annum, under the provision of Revolving Fund received from ORMAS,<br />

Bhubaneswar.<br />

Marketing Support to other SHGs/Artisans/Producers<br />

DSMS, <strong>Nayagarh</strong>, also provides marketing support to the SHGs/Artisans/Producers who are<br />

involved in other products like Brass bell, terracotta, patch work, food items, leather work, docra<br />

crafts, handlooms, wood works, etc through exhibition. The SHGs are sponsored to participate the<br />

exhibition both inside and out side the state, where DSMS(ORMAS) provides logistic support like<br />

free stall, accommodation and TA/DA to participants for their participation.<br />

Following is the activity plan of DSMS, <strong>Nayagarh</strong>:<br />

Products/<br />

Activities SHG Membrs<br />

Roasted<br />

Moong Dal<br />

Agarbatti<br />

Making<br />

Siali leaf<br />

plate<br />

Marketing<br />

of Rural<br />

products<br />

through<br />

Exhibitions<br />

Marketing<br />

Tie up of<br />

Bamboo<br />

Stick<br />

Target for the year <strong>2010</strong>-<strong>11</strong><br />

Producers to be involved Sales turn over<br />

Non-<br />

SHG<br />

members<br />

Total Quantity Unit<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

Working<br />

capital<br />

support in<br />

lakh Rs.<br />

24 350 0 350 600-800 Qtl 9.5<br />

40 525 120 645 1000 Qtl 0<br />

0 0 55 55 250 lakhs Nos. 4<br />

30 0 0 0 250 lakhs Rupees 0<br />

1 <strong>11</strong> 24 35 100 Qtl.<br />

77


Total working capital support required(loan amount)<br />

SPECIAL AREAS PROGRAMME<br />

III.1 Introduction:<br />

Special Areas Programme of the Government of India focuses on the development of specific areas<br />

having distinguished geographical, socio-economic, and/or anthropological characteristics. In the<br />

district of <strong>Nayagarh</strong>, the Hill Areas Development Programme, and Border Area Development<br />

Programme, etc. are not implemented. It is also not a BRGF district.<br />

III.2 Development in tribal areas:<br />

The Ministry of Tribal Affairs have been providing Special Central Assistance as an additionally to the<br />

Tribal Sub-Plan for carrying out programmes to assist tribal households with income generation<br />

schemes and for creation of infrastructure in the Tribal Sub-Plan areas to support economic activities.<br />

A portion of the SCA is allocated to OSFDC for implementation of Dispersed Tribal Development<br />

Programme (DTDP). A part of the SCA is being utilized for supporting the educational infrastructure<br />

created specially for the tribal children in TSP areas. Leaving these aside, the SCA funds are passed on<br />

to the ITDAs, Micro Projects and the MADA/Cluster Blocks for implementation of Income Generation<br />

Scheme (IGS) and Infrastructure Development Schemes (IDS) in the ratio of 70:30. (Source:<br />

http://Odishagov.nic.in/stsc/ActivitiesReport2004-05.htm )<br />

Odisha is implementing 17 micro-projects for the development of primitive tribal groups in the state,<br />

but none of them are in the <strong>Nayagarh</strong> district.<br />

III.3 Grants under Article 275(1) of the ‘Constitution of India’:<br />

Grants under Article 275(1) of the ‘Constitution of India’ guarantees grants from the Consolidated<br />

Fund of India each year for promoting the welfare of Scheduled Tribes and in pursuance to this<br />

constitutional obligation, the Ministry of Tribal Affairs provides fund through a Central Sector Scheme<br />

"Grants under Article 275(1) of the Constitution".<br />

OBJECTIVE:<br />

1. The objective of the Scheme is promotion of welfare of Scheduled Tribes and administration of<br />

Scheduled Areas.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

13.5<br />

78


COVERAGE:<br />

2. The Scheme covers all Tribal Sub Plan and 4 tribal majority States of the country.<br />

FUNDING PATTERN:<br />

3. This is a Central Sector Scheme and 100% Grants are provided by the Ministry to meet the cost<br />

of each project for tribal development as may be undertaken by the State Government for<br />

raising the level of administration of Scheduled Areas therein and for welfare of the tribal<br />

people to bring them at par with the rest of the State.<br />

SALIENT FEATURES:<br />

4. The Grants are provided on the basis of ST population percentage in the State.<br />

• The Ministry, which used to release the funds without identifying the projects in earlier years,<br />

has now decided to release fund to the State Governments against specific infrastructure<br />

development and welfare projects from the year 2000-2001.<br />

The grants under the Scheme are available for any project on welfare of Scheduled Tribes and<br />

strengthening of administration of tribal areas. , With a view to provide ST students to the accessibility<br />

to quality education it was decided to establish 100 Residential Schools from the grants available under<br />

the Scheme, during Ninth Plan Period on the pattern of Navodaya Schools. Each school is provided<br />

with a non-recurring grant of Rs.2.5 Crores. (Source: http://www.tribal.nic.in/chapter6.html )<br />

In the district of <strong>Nayagarh</strong>, the provision under article 275(1) is implemented in 4 MADA (Modified<br />

Area Development Approach) Blocks, as under:<br />

• Dasapalla<br />

• Gania<br />

• Ranpur<br />

• Nuagaon<br />

The grant is basically used for infrastructure development that can include irrigation facilities.<br />

III.4 Special Central Assistance (SCA) to TSP:<br />

The Special Central Assistance (SCA) is provided by the Ministry of Tribal Affairs (MOTA) to the<br />

State Government as an additive to the State Tribal Sub- Plan (TSP), where state plan provisions are<br />

not normally forthcoming to bring about a more rapid economic development of Tribals. From the<br />

Tenth Five <strong>Year</strong> Plan period, the objective and scope of SCA to TSP, which was originally meant for<br />

filling up of the critical gaps in the family based income generation activities of the TSP, has been<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

79


expanded to cover the employment-cum-income generation activities and the infrastructure incidental<br />

thereto not only family based, but also run by the Self Help Groups (SHGs) Community. Thus, SCA is<br />

primarily meant for family oriented income generating schemes in sectors of agriculture, horticulture,<br />

sericulture, animal husbandry and cooperation and a part of SCA (not more than 30%) is permitted to<br />

be used for development of infrastructure incidental to such income generating schemes. Ministry of<br />

Tribal Affairs, Government of India releases Special Central Assistance in the shape of grant-in-aid to<br />

the State Government keeping in view the tribal population percentage of the state. Further,<br />

Information, Education and Communication (I.E.C) related programmes in tribal areas have been<br />

implemented under the funding of S.C.A. to T.S.P. The Ministry of Tribal Affairs have been providing<br />

Special Central Assistance as an additionality to the Tribal Sub-Plan for carrying out programmes to<br />

assist tribal households with income generation schemes and for creation of infrastructure in the Tribal<br />

Subplan areas to support economic activities. A portion of the SCA is allocated to OSFDC for<br />

implementation of Dispersed Tribal Development Programme (DTDP). A small portion of the SCA is<br />

being utilized for supporting the educational infrastructure created specially for the tribal children in<br />

areas covered under TSP. Leaving these aside, the SCA funds are passed on to the I.T.D.As, Micro<br />

Projects and the MADA/Cluster Blocks for implementation of Income Generation Schemes (IGS) and<br />

Infrastructure Development Schemes (IDS) in the ratio of 70:30. During the Xth Plan Period (2002-03<br />

to 2006-07),a total amount of Rs.346.05 crore has been received as under SCA to TSP. (GoO, SC &<br />

ST Development Department, Annual Report 2007-08, p.14)<br />

SCA is released for the economic development of the following:-<br />

*Integrated Tribal Development Project (ITDP) area contiguous large area in which ST population is<br />

50% or more out of a total population.<br />

*Modified Area Development Approach (MADA) pockets: identification of pockets containing 50%<br />

or more of ST population out of a total population of 10000 and above.<br />

*Clusters-identified pockets containing 50% or more ST Population out of a total population of 5000.<br />

(Source: http://www.tribal.nic.in/index1.html)<br />

IBO(Individual Benefit Oriented) and CBO(Community Benefit Oriented) schemes are the two<br />

components of the proposals under SCA to TSP.<br />

Project proposal for MADA Blocks:<br />

For the year 2009-10, the District Welfare Officer, <strong>Nayagarh</strong> submitted an outlay of Rs.126.3 lakhs<br />

under article 275(1) and Rs.87.8 lakhs under SCA to TSP. Physical targets and other details are<br />

available in annexure-4.<br />

In the absence of any concrete proposal for <strong>2010</strong>-<strong>11</strong>, the TSI estimates a budget of Rs.138.93 lakhs<br />

under article 275(1) and Rs.96.58 lakhs under SCA to TSP considering 10% increment over the<br />

budget of 2009-10.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

80


IRRIGATION AND FLOOD CONTROL<br />

Introduction:<br />

The district of <strong>Nayagarh</strong> has no major irrigation project, and huge potential for irrigation development<br />

has but been partially utilized. Three medium irrigation projects, viz Kuanria Irrigation Project,<br />

Budhabudhiani Irrigation Project and Dahuka Diversion weir project are functioning covering an<br />

ayacut of 3780 ha.4290 ha. & 2278 ha. respectively. Besides, a major project namely Brutanga<br />

Irrigation Project is under active consideration of Government for execution and by now, it has got<br />

environmental clearance from Ministry of Forest and Environment, Government of India with a<br />

proposed ayacut of about 23,000 ha, covering Nuagaon, Khandapara, <strong>Nayagarh</strong> and Odagaon Block<br />

areas. Also two nos. of Mega Lift Irrigation Projects namely Banapur Mega lift and Padmabati Mega<br />

Lift Projects are in the pipelines with a proposed ayacut of 9890 ha. and 1600 ha. at an estimated cost<br />

of Rs.130.00 crore and Rs.150.00 crores respectively. Both the projects await clearance from<br />

C.W.C.,New Delhi. To enhance the ayacut of Dahuka diversion Weir Project, a proposal for another<br />

diversion weir on the down stream of the existing diversion weir has been submitted to the Chief<br />

Engineer, Planning and Project Formulation for Rs.419.00 lakh only to cater an ayacut of about 548 ha.<br />

Similarly another proposal for construction of one diversion weir across river Kusumi has also been<br />

submitted to Chief Engineer, Project Planning & Project Formulations, Bhubaneswar amounting to<br />

Rs.31.03 crores which will irrigate 4575 ha. of land. The said two projects are under active<br />

consideration of Government for execution on availability of funds.<br />

In addition to this the Minor Irrigation wing of this department has got 153 nos. of projects providing<br />

irrigation to 16291ha. of land in the district.Besides,two more minor irrigation projects are under<br />

execution stage(Source: http://nayagarh.nic.in/govtsection/irrigation.htm) . In a significant<br />

development, the Central Government has agreed to consider sanction for about 50 minor irrigation<br />

projects for this district under the ‘Tripple R’ scheme.<br />

Actual development of irrigation potential is not very satisfactory. 35% irrigation potential is available<br />

only in three Blocks, viz. <strong>Nayagarh</strong>, Odagaon, and Khandapada. The potential is nearer to 30% in<br />

Dasapall Block, between 22-24% in Ranpur and Gania Blocks, 15.08% in Bhapur Block, and lowest in<br />

Nuagaon Block(10.82%). (Source: NABARD 2009, PLP-09-10, <strong>Nayagarh</strong> District, p.15)<br />

The following chart reflects that conventional sources are at par with modern irrigation structures to<br />

provide irrigation facility in the district:<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

81


Irrigation Potential in <strong>Nayagarh</strong> District in Ha.<br />

(rabi 2007-08)<br />

Other sources<br />

50%<br />

Water<br />

harvesting<br />

structures<br />

2%<br />

Medium<br />

Irrigation<br />

projects<br />

15%<br />

Dugwells<br />

6%<br />

Minor Irrigation<br />

projects<br />

<strong>11</strong>%<br />

Lift irrigation<br />

projects<br />

16%<br />

(Based on NABARD 2009, PLP-09-10, <strong>Nayagarh</strong> District, p.16)<br />

Following is a brif account of various irrigation projects alongwith their annual plans:<br />

A. Major Irrigation:<br />

The proposed irrigation project on Bruttanga river is the only major irrigation project for the <strong>Nayagarh</strong><br />

district which is expected to revolutionalize the irrigation scenario of the district. However, the project<br />

is still at the investigation stage, and no work has been started chiefly due to want of forest clearance.<br />

The TSI has been informed that the concerned authorities are carrying out necessary consultation<br />

activities with the grama sabha so as to make a progress in this respect. As such, the suggestion of the<br />

District Planning Committee to propose Rs.10000 lakhs for this proposed project has been<br />

incorporated by the TSI in the outlay of <strong>2010</strong>-<strong>11</strong>.<br />

B. Medium Irrigation:<br />

Khurdha Irrigation Division has the jurisdiction over the medium irrigation projects of <strong>Nayagarh</strong><br />

district. The <strong>Nayagarh</strong> Irrigation Sub-Division is working under this office which also looks after flood<br />

control measures.<br />

For the year <strong>2010</strong>-<strong>11</strong>, the following proposals have been made by the Asst. Engineer, <strong>Nayagarh</strong><br />

Irrigation Sub-division focusing on the flood damages, in addition to conservation & improvement of<br />

the irrigation structures:<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

82


Proposed activity<br />

Budhabudhiani Irrigation Project<br />

Cost in lakh<br />

rupees<br />

Improvement to Budhabudhiani Dam<br />

Improvement to service road of Nandhighara distributary of Budhabudhiani<br />

80<br />

Dam 65<br />

Improvement to Panchrida distributary 75<br />

Improvement to Guanga minor including lining 80<br />

Dahuka Irrigation Project<br />

Improvement to Dahuka Irrigation project 25<br />

Improvement to service road of Itamati distributary 45<br />

Improvement to service road of Balugaon distributary 35<br />

Improvement to Dahuka Right Embankment near Govindapur 25<br />

Improvement to Dahuka Left Embankment near Taliamada(Nuagaon Block) 25<br />

Improvement to Dahuka Right Embankment near Udaypur(Nuagaon Block)<br />

Improvement to Dahuka Right Embankment near Bakalabandha(Nuagaon<br />

35<br />

Block) 15<br />

Improvement to Kusumi Right Embankment near Ekantabasi 15<br />

Improvement to Kusumi Left Embankment near Hariharpur 25<br />

Improvement to Kusumi Right Embankment near Sarankul 35<br />

Improvement to Duanto Right Embankment near Chadheyapalli 15<br />

Improvement to Duanto Right Embankment near Banibhandar 25<br />

Improvement to Duanto Left Embankment near Haripur 25<br />

Sub-total 645.00<br />

Note: Dahuka project usually comes under the <strong>Nayagarh</strong> Blocks whereas Budhabudhiani Project<br />

comes under the Odagaon Block.<br />

Additional embankments<br />

Sl.<br />

Name of work with location Block Amount in Lakh<br />

No.<br />

Rs<br />

1 2 3 4<br />

1 Duanto Right Embankment near Goudaput Odagaon 25.00<br />

2 Duanto Right Embankment near Dhabalei Odagaon 12.00<br />

3 Mahanadi Right embankment near Karabara Bhapur 18.00<br />

4 Mahanadi Right embankment near Akrurabandha Khandapada 8.00<br />

5 Duanto Right Embankment near village Notar <strong>Nayagarh</strong> 23.00<br />

6 Mandakini Right embankment near kandabindha Ranapur 25.00<br />

7 Duanto left Embankment near Chandrasekharpur <strong>Nayagarh</strong><br />

Deuli<br />

15.00<br />

8 Kusumi left embankment near Krushnaprasad <strong>Nayagarh</strong> 22.00<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

83


9 Dahuka Right at KhamariSahi on Sulia mouth Nuagaon 8.00<br />

10 Lunijhara Right Embankment near <strong>Nayagarh</strong> 49.00<br />

SanapandusarSaluni<br />

<strong>11</strong> Kusumi Right embankment near Patapur Khandapada 15.00<br />

12 Lunijhara Left Embankment at the U/S of PWD<br />

bridge Champtipur<br />

<strong>Nayagarh</strong> 12.00<br />

13 Lunijhara left Embanment at Gunthuni Khandapada 40.00<br />

14 Kusumi Right Embankment near Kadua Khandapada 22.00<br />

15 Kusumi left Embankment near Gunthuni Khandapada 22.00<br />

16 Sulia left and right near Nadiali <strong>Nayagarh</strong> 14.00<br />

17 Sluice of Raipur Nuasahi of Dahuka left Nuagaon 6.00<br />

Embankment<br />

18 Lunijhara left Embanment near Gunthuni Khandapada 20.00<br />

19 Duanta Right embankment near Chadhyapalli,<br />

Abhimanpur<br />

Odagaon 20.00<br />

20 Kusumi Left and Right Embankment near Odagaon 20.00<br />

Hariharpur<br />

21 Kusumi Left Embankment near Lathipada <strong>Nayagarh</strong> <strong>11</strong>.00<br />

22 Kusumi left embankment near Khedaberana <strong>Nayagarh</strong> 9.00<br />

23 Sulia left and right embankment near lathipada,<br />

lausena<br />

<strong>Nayagarh</strong> 12.00<br />

24 Dahuka left embankment near kirdaspur <strong>Nayagarh</strong> 20.00<br />

25 Kusumi left embankment near Bodasa including<br />

repair to Sluice<br />

Khandapada 9.00<br />

26 Baghamari left & right embankment near Malisahi <strong>Nayagarh</strong> 10.00<br />

27 Duanta Left & Right Emabnkment near Panchirida Odagaon 12.00<br />

28 Kusumi Right Embankment near Sarapada <strong>Nayagarh</strong> 7.50<br />

29 Kusumi Right at Abhimanpur <strong>Nayagarh</strong> 6.50<br />

30 Kusumi Right at Ekantabasi <strong>Nayagarh</strong> 5.00<br />

31 Duanta Right Emabnkment near Telapada &<br />

Ratnamala Temple<br />

Odagaon 14.00<br />

32 Kuanria Right Embankment near Sundarinallah Khandapada 20.00<br />

33 Lunijhara left Embanment at Saluni <strong>Nayagarh</strong> 21.00<br />

34 Lunijhara left Embanment at Chandi <strong>Nayagarh</strong> 14.00<br />

35 Duanta Left Emabnkment near Haripur Odagaon 14.00<br />

36 Duanta Right embankment near Godipali Odagaon 14.00<br />

37 Kusumi Right Embankment near Odagaon 17.00<br />

Badagarada,Sanagarada<br />

38 Mandakini Left Embankment near Pipal Ranapur 14.00<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

84


39 Duanto Right embankment near Nuagaon including<br />

renovation of sluice<br />

<strong>Nayagarh</strong> 8.50<br />

40 Dahuka Right Embankment near Gadhadharprasad <strong>Nayagarh</strong> 7.00<br />

41 Duanta Left Embankment near Arada odagaon 7.00<br />

42 Duanta Left Embankment near Arada Harijan Sahi odagaon 7.00<br />

43 Kuanria Right Embankment near Sasan Khandapada 8.00<br />

44 Kuanria left embankment near Rakesia Khandapada 10.00<br />

45 Kuanria left embankment near Kunjabeli Khandapada 15.00<br />

46 Kuanria Right Embankment near Saradhapur Khandapada 8.00<br />

47 Kuanria Right Embankment near Jakela Khandapada 8.00<br />

48 Kusumi Right Embankment near Ranicheli Khandapada 8.00<br />

49 Kusumi left embankment near Baradabadi Khandapada 6.00<br />

50 Kusumi Right Embankment PWD bridge to<br />

Banamalipur<br />

Khandapada 10.00<br />

51 Kusumi Right Embankment from Betakhali tu<br />

Nuapali including repair of Sluice<br />

Khandapada 10.00<br />

52 Kusumi Right embankment near Tikiripada Khandapada 12.00<br />

53 Kusumi left Embankment near Sahaspur Khandapada 15.00<br />

54 Kusumi left Embankment near Salajharia Harijan<br />

Sahi including repair of 3 nos of spurs<br />

Khandapada 12.00<br />

55 Kusumi left embankment from Anlamada to<br />

Salajharia<br />

Khandapada 10.00<br />

56 Kamei left embankment RD 2250mt to 2280mt Khandapada 8.00<br />

57 Dahuka left embankment near village Totasahi to<br />

similisahi<br />

<strong>Nayagarh</strong> 10.00<br />

58 Mandakini Right Embankment near Sanagada Ranapur 8.00<br />

59 Mandakini Right Embankment near Balarampur Ranapur 7.00<br />

60 Mandakini Left Embankment near Ranapur Ranapur 10.00<br />

61 Baunsagad Right Embankment near Gaudiasahi Ranapur 15.00<br />

62 Mandakini Left Embankment near Brajabiharipur Ranapur 18.00<br />

Sub-Total 863.50<br />

CANAL<br />

1 Canal syphon of Itamati disty near Itamati <strong>Nayagarh</strong> 15.00<br />

2 Itamati Distributary at village Ghadual and<br />

Barapalli.<br />

<strong>Nayagarh</strong> 8.00<br />

3 Canal syphon of Goudaput minor and link channel<br />

at Kuradhighasa<br />

Odagaon 8.00<br />

4 Tail cluster of Itamati Disty <strong>Nayagarh</strong> 8.00<br />

5 Canal syphon of Krusnaprasad Minor near RD <strong>Nayagarh</strong> 10.00<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

85


700mt.<br />

6 Balugaon Disty near RD 2100mt <strong>Nayagarh</strong> 6.00<br />

7 VRB at RD 2850mt of Balugaon Disty <strong>Nayagarh</strong> 12.00<br />

8 Balugaon Distributary near village Kridaspur <strong>Nayagarh</strong> 8.00<br />

9 Balugaon Distributary near village Saradhapur <strong>Nayagarh</strong> 6.00<br />

10 Balugaon Distributary near village Palagunthuni. <strong>Nayagarh</strong> 8.00<br />

<strong>11</strong> Arada Water course near Arda Odagaon 10.00<br />

12 Panchirida disty at RD 7150mt, 7300mt,7420mt<br />

including reconstruction of outlet No.25L<br />

Odagaon 6.00<br />

13 Guando minor at RD 8250mt, 8300mt,8630mt<br />

including reconstruction of outlet No.15L<br />

14 Gaudaput minor at RD 1290mt, 1700mt,1870mt<br />

including reconstruction of outlet No.L<br />

Odagaon 8.00<br />

Odagaon 9.00<br />

15 Nandighore Minor at RD 620mt,1820mt,2150mt Odagaon 10.00<br />

16 Balugaon disty near Gopalipada Khandapada 12.00<br />

17 Reconstruction of Tail cluster of Badaput Minor Odagaon 8.00<br />

18 Salajharia Minor including reconstruction of guard<br />

wall<br />

Khandapada <strong>11</strong>.00<br />

19 Service bank of Itamati Distributary from R.D.500<br />

M.to 2270M.<br />

20 service bank of Balugaon distributary from<br />

R.D.1000M.to 3000M.<br />

<strong>Nayagarh</strong> 45.00<br />

<strong>Nayagarh</strong> 48.00<br />

21 Nandighore Disty at RD 4120mt, 6320mt,6500mt Odagaon 8.00<br />

22 Improvement to approach road from Goudaput to<br />

Budhabudhiani dam including construction of High<br />

Level bridge<br />

Odagaon 195.00<br />

Sub-Total 459.00<br />

GRAND TOTAL 1967.50<br />

C. Minor Irrigation:<br />

An irrigation project facilities irrigation potential for 40 ha. above and up to 2000 ha. is coming under<br />

classification of Minor Irrigation project, which is maintained by Minor Irrigation (wing) under Water<br />

Resource Department. The MI Division, Khurdha has jurisdiction over the MI projects in the district of<br />

<strong>Nayagarh</strong>.<br />

MI projects receive funding under the following schemes/projects:<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

86


• RIDF:<br />

NABARD has provided financial assistance for minor irrigation projects under the Rural Infrastructure<br />

Development Fund(RIDF) scheme. RIDF-I was launched in 1995-96 with an initial corpus of Rs.2000<br />

crore through contributions both from public and private sector, and RIDF XIV is effective since 2008-<br />

09.<br />

• OCTMP:<br />

Government of Odisha has initiated a community-based tanks rehabilitation project under World Bank<br />

support. There are many tanks fit for irrigation, but mainly due to deficient maintenance, most of them<br />

are performing at well below capacity with the percentage of actual area irrigated to potential created<br />

varying between 40-60% depending on rainfall. The project of community-based tank management<br />

plans to rehabilitate such tanks.<br />

The project development objective is to improve tank based livelihoods and strengthen community<br />

management of selected tank systems.<br />

‘Triple R’ project:<br />

The Government of India has decided to provide special financial assistance for the repair, renovation,<br />

and restoration (RRR) of minor irrigation projects in naxalite affected districts. Since <strong>Nayagarh</strong> district<br />

has been affected by the naxalite attack, hence it has been provisionally selected under the scheme. In<br />

the first phase, 56 proposals were submitted by the Executive Engineer, MI Division, Khurdha for this<br />

district under the RRR scheme, and the Technical Advisory Committee has cleared 43 projects out of<br />

them. Rest of the projects alongwith 64 additional projects are likely to be considered for <strong>2010</strong>-<strong>11</strong>..<br />

Details of the proposals submitted under RRR schemes are available in annexure-5. Total project cost<br />

is Rs.2028.20 lakhs for <strong>2010</strong>-<strong>11</strong>.<br />

EC-aided projects:<br />

The European Commission grant is utilized for development of the distributary system of the MI<br />

projects whereas for basin development of the same projects ‘Triple R’ scheme is being utilized. List<br />

of 13 such projects included in the 2 nd phase of RRR scheme is available in annexure-5.<br />

NREGS:<br />

In December 2008, 62 projects were sanctioned by the Collector, <strong>Nayagarh</strong> for the NREGS activities<br />

by the MI Division with a project cost of 673 lakhs having 456.5 lakhs towards labour component and<br />

216.5 lakhs towards material component. So far none of these projects have been taken up, partly<br />

because of the better scope under RRR- and similar projects. It may be mentioned however that<br />

NREGS activities are usually limited to the development of the distribution system so that the water<br />

can reach to the Tail and the Ayacutdars.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

87


Proposal under OCTMP:<br />

Under the District Project Monitoring Unit at <strong>Nayagarh</strong> so far 32 projects (vide annexure-15) have<br />

been identified under OCTMP, in addition to 34 projects for the Khurdha district. These 32 projects are<br />

proposed for <strong>2010</strong>-<strong>11</strong>.<br />

For the year <strong>2010</strong>-<strong>11</strong> the following proposals have been made:<br />

Scheme Targeted<br />

number<br />

projects<br />

of<br />

Budget in lakh rupees<br />

for 2009-10<br />

RIDF Bhalujhara 100.00<br />

Dimisara 390.00<br />

Dahuka 170.00<br />

Majhiakhanda 140.00<br />

Kaibalyapur 60.00<br />

Sub-total 860.00<br />

Critical --- <strong>11</strong>9.5<br />

RRR 77 2018.2<br />

OCTMP 32 450.00<br />

Total 3447.70<br />

(Source: Asst. Engineer, MI Sub-Division, <strong>Nayagarh</strong>)<br />

Note: Projects to be financed by the Central Finnace Commission (TFC) for <strong>2010</strong>-<strong>11</strong><br />

are not yet ascertained. Projection under Critical head is tentative only.<br />

Additional proposals under consideration for RIDF finance:<br />

The following 14 project proposals have been cleared by the State-level High Power Committee for<br />

consideration under RIDF finance, and these are likely to be sanctioned in <strong>2010</strong>-<strong>11</strong>:<br />

Project Cost in lakh rupees<br />

Haridabandha (Ranpur) 49.71<br />

Thakathakinala(Odagaon) 96<br />

Pithakhai (Bhapur) 44.28<br />

Khairagadia (Bhapur) 207<br />

Tulasinala (Nuagaon) 152<br />

Baijhari(Daspalla) 298<br />

Dura(Daspalla) 57.5<br />

Handbihanala(Daspalla) 44.28<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

88


Janipadar(Daspalla) 41.4<br />

Ambalimba (Dasapalla) 50.03<br />

Khalisahi (Odogaon) 32.5<br />

Deokunda (Odogaon) 61.5<br />

Kaliamba (Nuagaon) 285<br />

Bangalibandha<br />

(Nuagaon) 400<br />

Total 1819.2<br />

D. Lift Irrigation:<br />

The Lift Irrigation Divisional office at Bhubaneswar having it sub-divisional office in <strong>Nayagarh</strong><br />

district had proposed 59 projects for the district under Biju Krushi Vikash Yojana during 2008-09. Of<br />

of these, 3 were dropped due to lack of feasibility (Ghanasalia and Biridi 2 in Khandapada Block,<br />

Kendupali in Gania Block). Rest 56 projects are near completion this year.<br />

There are total 392 LI points in the district of which 144 are supposed to be defunct. Most of the<br />

projects are river-linked. More than 260 pani panchayats have been formed of which about 35 are said<br />

to be defunct.<br />

For <strong>2010</strong>-<strong>11</strong>, the following proposal is under finalization:<br />

No. of Ayacut in Tentative cost in lakh<br />

Block projects Ha.<br />

rupees<br />

Ranpur 5 100 35<br />

Odagaon 10 200 64<br />

<strong>Nayagarh</strong> 9 180 55<br />

Nuagaon 10 200 55<br />

Khandapara 7 140 45<br />

Bhapur 2 40 10<br />

Dasapalla 8 160 50<br />

Gania <strong>11</strong> 220 67<br />

Total 62 1240 381.00<br />

(Source: Asst. Engineer, <strong>Nayagarh</strong> LI sub-division)<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

89


ENERGY<br />

Introduction:<br />

<strong>Nayagarh</strong> district is completely dependent on external production of power. Although renewable<br />

energy sources have been introduced in the district since many years, but their contribution is<br />

negligible.<br />

Rajiv Gandhi Grameen Vidyutikaran Yojna (RGGVY):<br />

RGGVY is a central government programme that is implemented through National Thermal Power<br />

Corporation (NTPC), but CESCO is the local agency to provide monitoring support for this<br />

programme. (RGGVY) was launched in April-05 by merging all ongoing schemes.<br />

The RGGVY aims at:<br />

Electrifying all villages and habitations as per new definition<br />

Providing access to electricity to all rural households<br />

Providing electricity Connection to Below Poverty Line (BPL) families free of charge<br />

Infrastructure under RGGVY:<br />

o Rural Electricity Distribution Backbone (REDB) with 33/<strong>11</strong> KV (or 66/<strong>11</strong> KV) sub-station of<br />

adequate capacity in blocks where these do not exist.<br />

o Village Electrification Infrastructure (VEI) with provision of distribution transformer of<br />

appropriate capacity in villages/habitations.<br />

o Decentralized Distributed Generation (DDG) Systems based on conventional & non<br />

conventional energy sources where grid supply is not feasible or cost-effective.<br />

As per the new definition, a village would be declared as electrified, if :<br />

1) Basic infrastructure such as Distribution Transformer and Distribution lines are<br />

provided in the inhabited locality as well as the Dalit Basti/ hamlet where it exists.<br />

2) Electricity is provided to public places like Schools, Panchayat Office, Health<br />

Centers, Dispensaries, Community centers etc.<br />

3) The number of households electrified should be at least 10% of the total number of<br />

households in the village.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

90


Following statistics reveal the status of RGGVY in <strong>Nayagarh</strong> district(as on 28-10-2009):<br />

Number of Villages Targeted for Electrification / Intensive Electrification<br />

under RGGVY<br />

(State : ODISHA , District : NAYAGARH)<br />

S. No. Block<br />

No. of Villages<br />

Un-<br />

Electrified<br />

De-<br />

Electrified<br />

Electrified Total<br />

1 Dasapalla 212 66 70 348<br />

2 Gania 39 16 42 97<br />

3 Khandapada 9 51 <strong>11</strong>0 170<br />

4 Bhapur 5 14 92 <strong>11</strong>1<br />

5 <strong>Nayagarh</strong> 1 16 127 144<br />

6 Nuagaon 75 37 104 216<br />

7 Odagaon 19 5 179 203<br />

8 Ranapur 32 61 148 241<br />

TOTAL OF ALL BLOCK 392 266 872 1530<br />

Villages Completed Under RGGVY for State:ODISHA and District:NAYAGARH<br />

S<br />

No.<br />

Block<br />

No. of Villages<br />

Electrified Un-Electrified(*) Total<br />

1 Dasapalla 36 219 255<br />

2 Gania 26 26 52<br />

3 Khandapada 47 56 103<br />

4 Bhapur 49 19 68<br />

5 <strong>Nayagarh</strong> 28 15 43<br />

6 Nuagaon 32 109 141<br />

7 Odagaon 76 23 99<br />

8 Ranapur 38 73 <strong>11</strong>1<br />

TOTAL OF ALL<br />

BLOCK<br />

332 540 872<br />

(Source: http://rggvy.gov.in/rggvy/rggvyportal/index.html )<br />

PROJECT SUMMARY-RGGVY-NAYAGARH AS ON <strong>11</strong>-10-2009<br />

SL NO Name of the Total Villages Villages Deleted Balance<br />

Block Villages to<br />

be electrified<br />

charged made ready<br />

1 Daspalla 336 74 183 45 34<br />

2 Gania 76 31 21 7 17<br />

3 Khandapada 170 46 66 4 54<br />

4 Bhapur <strong>11</strong>1 57 13 0 41<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

91


5 <strong>Nayagarh</strong> 144 23 26 2 93<br />

6 Nuagaon 214 51 93 1 69<br />

7 Odagaon 203 83 24 1 95<br />

8 Ranpur 222 51 67 1 103<br />

TOTAL 1476 416 493 61 506<br />

However, the TSI has been reported that owing to certain administrative problems contractors are not<br />

encouraged to take up RGGVY work resulting in unnecessary delay in the progress.<br />

Biju Gram Jyoti Yojna (BGJY):<br />

BGJY is a Government of Odisha programme augmenting RGGVY in areas where RGGVY is not<br />

implemented. Under this programme, each Block will share Rs.50 lakhs out of total Rs.4 crores.<br />

Biju Gram Jyoti Yojana aims to ensure supply of electricity to thousands of small villages and<br />

habitations in the State.Implemented with funds to be made available by the State Government from its<br />

own resources, this programme has the District Collector as the implementing authority for the<br />

scheme. CESCO acts in the capacity of the supervising agency, as in case of RGGVY; but unlike in<br />

case of the latter, in BGJY CESCO gets paid for its service.<br />

The villages that would not be covered under the Rajiv Gandhi Gram Vidyutirakan Yojana of the<br />

Centre will be given priority under the Biju Gram Jyoti Yojana.<br />

The target villages under BGJY for 2009-10 are yet to be selected (13 th November 2009). However,<br />

work is in progress for remaining activities of previous year(s) as under:<br />

<strong>Year</strong> No.of<br />

habitations<br />

programme<br />

to be<br />

electrified<br />

2007-<br />

08<br />

2008-<br />

09<br />

2009-<br />

10<br />

Biju Gram Jyoti Yojana (BGJY)<br />

<strong>Nayagarh</strong> district<br />

No. of<br />

habitations<br />

electrified<br />

% of<br />

completion<br />

Allotment<br />

In Crore<br />

Rs<br />

Expenditure No. of<br />

Households<br />

electrified<br />

169 154 91.12 4.00 1.64 0<br />

60 13 22.56 4.00 0 97<br />

Action plan<br />

under<br />

preparation<br />

Where conventional supply of electricity is not found viable (like in remote areas), renewable energy is<br />

the hope. The Renewable Energy Cell of OREDA works in the district for this purpose<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

92


Development of Power sector:<br />

<strong>Nayagarh</strong> district comes under the jurisdiction of three electricical divisions, viz, the <strong>Nayagarh</strong><br />

Division, the Khurdha Division, and the Balugaon Division. Of these , most parts come under the<br />

<strong>Nayagarh</strong> Electrical Division whereas the Ranapur Block is under the Khurdha- and Balugaon<br />

Divisions. Schemes like RGGVY and BGJY has substantially increased the number consumers thereby<br />

causing increasing loan on existing infrastructure most of which is quite old. In fact, the area under<br />

Balugaon Division used to have supply from the Tangi grid/feeder which is now unable to<br />

accommodate the load and accordingly work to ensure supply from <strong>Nayagarh</strong> feeder has been strated<br />

and is expected to be completed by March <strong>2010</strong>. The following table reflects the position as regards<br />

consumer strength:<br />

Consumer strength <strong>Nayagarh</strong> Electrical Balugaon Electrical<br />

Division<br />

Division<br />

Current position 66000 7000<br />

Likely position after<br />

6 months<br />

1,00,000<br />

9000<br />

It may be mentioned here that despite repeated approaches by the TSI, the concerned authority of<br />

Khurdha Electrical Division has not submitted the required information.<br />

Replacement of old conductors and introduction of high voltage systems is necessary for effective<br />

power supply in the district. The following development plan for power sector has accordingly<br />

proposed on the basis of a rough estimation (except for RGGVY & BGJY):<br />

NED, <strong>Nayagarh</strong>:<br />

Financial<br />

<strong>Year</strong><br />

<strong>2010</strong>-<strong>11</strong><br />

Physical target Approx. financial target<br />

in lakh rupees<br />

RGGVY & BGJY with 10% increment<br />

on allocation of 2009-10<br />

730.345<br />

Replacement of 3-wire <strong>11</strong> KV 1050.00(for total 15 sections)<br />

conductor(15 km) per section<br />

Transformer upgradation of 16 KVA(30),<br />

25 KVA(30), 63 KVA(30), 100 KVA(15)<br />

per section<br />

Sub-total 1780.345<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

93


BED, Balugaon:<br />

Financial<br />

<strong>Year</strong><br />

<strong>2010</strong>-<strong>11</strong><br />

Physical target Approx. financial<br />

Conversion of 1.6 MVA power transformer to<br />

3.15 MVA(1)<br />

target in lakh rupees<br />

23.00<br />

Conversion of 3.15 MVA power transformer to 5<br />

MVA(2)<br />

6.00<br />

Replacement of <strong>11</strong> KV conductor(55 mm sq.<br />

AAAC): 50 km<br />

15.00<br />

Areai Bunch Conductors(ABC): 3 phase(20 km)<br />

and 1 phase(20 km)<br />

New transformers: <strong>11</strong> KVA(5), 63 KVA(5), 25<br />

KVA(10)<br />

22.00<br />

40.00<br />

New 33/<strong>11</strong> KV structure at Darpanarayanpur 30.00<br />

Total 136.00<br />

The District Planning Committee has suggested for some additional initiatives particularly for the<br />

Ranapur area, and these are available in chapter IX.<br />

Renewable Energy:<br />

The District Renewable Energy Cell basically works for promotion of different non-conventional<br />

sources of energy as per provision of different schemes & programme heads being allotted/sanctioned<br />

by the Govt. time to time.<br />

Out of different scheme head only NBMMP (National Biogas & Manure Management Programme and<br />

SPV (Solar Photovoltaic) are the two programmes being monitored on continual basis. Though the<br />

potential in the district is much higher in comparison to the achievement, the progress is restricted<br />

mainly due to two major reasons, i.e. high cost involvement for one common beneficiary and secondly<br />

limitation in allocation of physical target to avail the subsidy. The programme could be more<br />

successful if some additional financial assistance can be provided under the programme.<br />

During 2008-09, 50 targets were fixed for this district and the allotment was Rs.50,000/-, under the<br />

NBMMP for instllation of biogas. It may be mentioned here that the government grants 40% subsity<br />

on the project cost, and 60% is to be borne by the beneficiary.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

94


Under RVEP (Remote Village Electrification Programme) 54 villages had been identified in remote<br />

inaccessible hilly and reserve forest areas. Of these, Ranla, Jamugada, and Jaripada in the Ranapur<br />

Block have been excluded. By 7 th December’09 16 villages in Ranapur Block, 2 in Nuagaon Block,<br />

and 7 in Dasapalla Block have been given street lighting and household points.<br />

Major source of funding for the RE programme is the Central Government grant. Following was the<br />

annual plan for this programme in the <strong>Nayagarh</strong> district for 2009-10:<br />

Proposed activity Scheme Budget for 2009-10<br />

Installation of biogas plants NBMMP 1.75 lakh (50 nos.)<br />

Repair & maintenance of biogas<br />

plants NBMMP Not finalised<br />

Remote village Electrification RVEP 131 lakh (54 villages)<br />

Total 132.75 lakhs<br />

(Source: Asst. Engineer, RE Cell, DRDA, <strong>Nayagarh</strong>)<br />

So far repair & maintenance of biogas plants is concerned, a survey is being taken up to decide the<br />

target. Regarding promotion of jatropha cultivation under EPBP(Energy Plantation & Bio-Diesel<br />

Production) programme, there is no fixed target or budget and as per the recent decision this<br />

cultivation can be taken up under NREGS too. Promotion of solar water heater doesn’t seem feasible<br />

due to lack of subsidy, and solar light promotion as well as solar power plant installation under SPV<br />

also doesn’t seem feasible as people are hardly interested in it. High cost of maintenance, and poor or<br />

nil effecitivity during bad weather are some of the major limitations causing decreased interest of<br />

people in solar equipments. Moreover, as electricity netework is being expanded to various areas of the<br />

district, and the government is also promoting LPG at rural level, biogas is also losing ground.<br />

In absence of any concrete proposal for the year <strong>2010</strong>-<strong>11</strong>, the TSI estimates the tentative projection for<br />

<strong>2010</strong>-<strong>11</strong> to be Rs. 146.025 lakhs considering 10% increment over the projection for 2009-10.<br />

Details of the villages selected under remote village electrification programme are available in<br />

annexure-9.<br />

INDUSTRIES & MINERALS<br />

Introduction<br />

The district of <strong>Nayagarh</strong> is enriched with abundant natural resources like forest, and rivers etc.<br />

Agriculture is however still the main base of economy since industrialization and mining has not been<br />

able to expand in this district partly due to lack of adequate infratrsucture and uncertainity of raw<br />

material supply, and partly because of poor or no accessibility to technical know-how.<br />

Agroindustries have a good scope in this district, and sugar industry comes foremost among them.<br />

However, except for only one sugar industry at <strong>Nayagarh</strong>, this potential lies underutilized. Similarly,<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

95


maize-based processing industries can be set up, but the farmers prefer selling green maize and not<br />

processing.<br />

On the other hand there are traditional and non-traditional cottage industries that produce handicrafts,<br />

textiles, and other consumable products. In the following sections we would have a brief profile of<br />

these industries in the district. Further, the status of sericulture and minerals would also be discussed.<br />

Lack of railways is a major disadvantage for the district. The proposed Khurdha-Bolangir railway is<br />

yet to be completed.<br />

District Industries Centre (DIC) and the ongoing schemes:<br />

The District Industries Centre, <strong>Nayagarh</strong> is the pivotal agency through which the major income<br />

generating schemes are being implemented. The list of the schemes is as follows.<br />

a) Micro Small & Medium Enterprises ( MSME)<br />

b) Development of MSME cluster<br />

c) Prime Minister’s Employment Generation Programme ( PMEGP )<br />

d) Development of handicraft clusters<br />

e) Rehabilitation of Handicraft Artisans( RHA )<br />

A) MICRO , SMALL & MEDIUM ENTERPRISES ( MSME )<br />

Micro, Small & Medium Enterprises play an important role in generating the employment. Following<br />

was the Plan under this programme for 2009-10:<br />

Particulars 2009-10<br />

Nos. of enterprises to be<br />

set up<br />

Investment by concerned<br />

enterprenerurs(in lakhs)<br />

Employment(in Nos.) to be<br />

generated<br />

90<br />

540<br />

450<br />

B) DEVELOPMENT OF MSME CLUSTERS:<br />

Particulars <strong>2010</strong>-<strong>11</strong><br />

No. of clusters to be<br />

promoted<br />

1 rice mill cluster in the<br />

district<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

96


Nos. of Units to be covered 20 (existing and new)<br />

No. of employment to be<br />

generated<br />

---<br />

C) PRIME MINISTER’S EMPLOYMENT GENERATION PROGRAMME (PMEGP )<br />

During 2008-09, the target under KVIB sector was 19 with a financial target of Rs.22.82052 lakhs and<br />

employment generation of 210. The achievement was 23 numbers with an investment of Rs.21.27650<br />

lakhs with employment generation of 127. Similarly, in KVIC sector the target was 19, Rs.22.78993<br />

lakhs, and 190(employment) respectively and achievement was 5(nos), Rs. <strong>11</strong>.61641 lakhs, &<br />

28(empl. generated). During 2009-10, total investment under PMEGP was proposed to be Rs.63.609<br />

lakhs with physical target of 540 persons.<br />

D) DEVELOPMENT OF HANDICRAFT CLUSTERS<br />

Proposed investment to develop the clusters in 2009-10 was Rs.22.45 lakhs.<br />

E) REHABILITATION OF HANDICRAFT ARTISANS (RHA)<br />

This is a scheme implemented through the Directorate of Handicraft & Cottage Industries, Odisha,<br />

Bhubaneswar for Handicraft artisans. There is provision of providing margin money grant of 25%<br />

limiting to Rs 5,000/- for each artisan. Proposed investment to rehabilitate aritisans in 2009-10 was<br />

Rs.0.95 lakhs.<br />

Total investment (subsidy/margin money) proposal of the DIC, <strong>Nayagarh</strong> thus comes out to be<br />

Rs.87.009 lakhs for 2009-10. In absence of any concrete proposal for the year <strong>2010</strong>-<strong>11</strong>, the TSI<br />

estimates the tentative projection for <strong>2010</strong>-<strong>11</strong> to be Rs. 95.7099 lakhs considering 10% increment over<br />

the projection for 2009-10.<br />

Development of handicrafts:<br />

DIC is the nodal centre for promotion of handicraft industries in the district; hence the annual plan of<br />

DIC includes interventions for this sector. This Centre has already developed a handicraft cluster under<br />

the craft’s village programme at Kantilo where 30 applique artisans received skill upgradation training<br />

at the cost of Rs.2.245 lakhs(2008-09). During 2009-10, two clusters have been proposed for<br />

development, viz. at Gholahandi and adjoining villages (Dasapall Block) with 90 beneficiaries<br />

producing bamboo craft, and at Panchirida(Odagaon Block) with 60 beneficaries producing terracotta<br />

articles.<br />

During 2008-09, the achievement under RHA was: 17 artisans rehabilitated with a magin money<br />

investment of Rs.0.85 lakhs as agisnt the respective targets of 20 and 1 lakh. During 2009-10, 19<br />

beneficiaries have been targeted with a proposed investment of Rs.95000.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

97


Development of ‘gud’ industry:<br />

‘Gud’, which is preferred to sugar for its mineral value, taste and traditional uses, is a flourishing<br />

cottage industry of <strong>Nayagarh</strong> district. The pot-packed gud of <strong>Nayagarh</strong> is supplied to other parts of<br />

Odisha and has its distinguished market and customers. However, during the recent times the market<br />

rate of gud has either equaled that of sugar or has even exceeded it, thereby luring farmers to prefer to<br />

go for gud production rather than selling their sugar cane to the sugar industry. It has also been alleged<br />

that country liquor producers facilited a substantial increase in the market price of gud as they wanted<br />

molasses for liquor production. As a result, the sugar industry feels threatened by increasing<br />

production of gud in the district. However, the government through its DIC should see to it that the<br />

traditional gud industry of the district maintains (rather improves) its quality (through proper filtration<br />

and packaging etc. without any substantial additional cost) and demand without threatening the<br />

sustenance of the sugar industry. For this purpose, diversion of gud for liquor production should be<br />

checked.<br />

The TSI has suggested the DIC to consider developing/reviving the cluster of leather workers of<br />

Dasapalla and has been clarified that it has lraedy been taken into consideration.<br />

Suggestion of the District Planning Committee:<br />

Given the fact that <strong>Nayagarh</strong> district doesn’t have any important mining and mineral-based industrial<br />

activity, and the economy is centre around agriculture, hence promotion of agro-industries is the only<br />

hope for the district for socio-economic development through industrial activities. Accordingly, the<br />

DIC should promote agroindustries, and Agriculture & allied departments including KVK and SCRC<br />

should also facilitate the same through promotion of value addition and food processing industries.<br />

HANDLOOM & TEXTILES:<br />

There are 4995 weaver families in <strong>Nayagarh</strong> district. Total number of weavers is 9030 of which 5858<br />

are within the cooperative fold. Total number of looms is 6789 of which 4359 are within cooperative<br />

fold. Number of working looms is 5597 of which 3857 are within cooperative fold.<br />

Total number of weaver’s cooperative societies (WCS) is <strong>11</strong>1 out of which only 30 are active, 13<br />

defunct and 68 are under liquidation.<br />

Block Working Defunct Total<br />

<strong>Nayagarh</strong> 6 3 9<br />

Odagaon 9 8 17<br />

Khandapara 2 0 2<br />

Ranapur 7 1 8<br />

Bhapur 5 0 5<br />

Nuagaon 1 1 2<br />

Total 30 13 43<br />

(Source: Asst. Director of Textiles, <strong>Nayagarh</strong>)<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

98


Rekha saree of Sunakhala and Bhapur area, gamchha of Ranapur area, and dress materials of Bhapur<br />

area are some of the known handloom products of the district.<br />

The handloom sector is facing great problems in marketing due to want of social reorganization and<br />

acceptance. Besides, comparatively cheaper and similar looking powerloom products are another<br />

major challenge for the sustenance of handloom products in the market. The weavers usually procure<br />

average- or low grade raw materials from local traders, and the dyeing quality is also not upto the<br />

mark, limiting the scope of marketing at the production level itself.<br />

Hence, the strategy for development of this sector should include the following:<br />

• Modernizing the weaving mechanism<br />

• Modernizing the working environment<br />

• Skill upgradation to meet market demand<br />

• Organization of handloom exhibitions<br />

• Cluster development<br />

The Assistant Director of Textiles, <strong>Nayagarh</strong> has however proposed the following annual plan for<br />

<strong>Nayagarh</strong> district (rupees in lakhs) for the year 2009-10:<br />

Name of the Activity<br />

<strong>2010</strong>-<strong>11</strong><br />

Skill up-gradation training 2(40) 6.04<br />

Construction of Workshed 60(6<br />

Blocks)<br />

21.10<br />

Repair and renovation of godown<br />

of Weaver’s Coop. Society<br />

3 4.50<br />

Cluster approach 2(300 ) 40.00<br />

Group approach 1(20) 8.00<br />

District level exhibition 1 2.00<br />

Construction of godown 1 3.00<br />

Capacity building 3 0.12<br />

Exposure visit 20 1.10<br />

Margin money 6(120) 2.40<br />

Supply of weaving materials 6(150) 3.00<br />

Mahatma Gandhi Bunakar Bima<br />

Yojna<br />

1200 1.80<br />

Health insurance scheme 3500 25.62<br />

Marketing incentive to WCS 15 WCS 6.00<br />

Total<br />

124.68<br />

Note: Photo identity cards are also proposed without specified budget.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

99


During 2008-09 the Department had proposed, under the Self Employment Programme, for the<br />

training of Maninag Women’s Cooperative Society(Ranpur Block) for weaving in zalla & dobbi<br />

design. The financial target was Rs.3.38 lakhs for 20 beneficaries. Same programme was proposed for<br />

Kainphulia Society (Bhapur Block). During 2009-10, training has been proposed for 20 beneficaries of<br />

Annapurna Women’s Cooperative Society, Uansapatana with a financial target of Rs.1.65 lakhs for tiedie<br />

design; and for 10 members of Women’s Cooperative Society, Rajsunakhala in jacquard design<br />

with a financial target of Rs.2.75 lakhs.<br />

Under IHDS(Integrated Handloom Development Scheme) programme with a group approach,<br />

Dadhibaman Society, Dimisara received training during 2008-09 for 20 members in zalla & dobbi<br />

design with a financial target of Rs.3 lakhs.<br />

Business trasaction:<br />

The following statistics, which is tentative/approximate particularly for the production & sale outside<br />

cooperatives societies, suggests an increase in the transaction value during 2007 and 2009.<br />

Under Cooperatives<br />

Value in lakh rupees<br />

Outside Cooperatives<br />

<strong>Year</strong> Production Sale Production Sale<br />

2006-07 321.<strong>11</strong> 325.53 195.3 195.3<br />

2007-08 503.28 507.16 335.9 335.9<br />

2008-09 500.92 486.85 394.06 394.06<br />

(Source: Asst. Director, Textiles, <strong>Nayagarh</strong>)<br />

SERICULTURE:<br />

Sericulture is an agro based cottage industry and is a source of income to large rural population in the<br />

state. Out of four verities of silk, the Sericulture Department is developing two varieties i.e. Mulberry<br />

& Eri in <strong>Nayagarh</strong> district, considering favorable agro-climatic condition of the area.<br />

Considring the viable production of mulberry cocoons, 3 numbers of Mulberry Rearers Cooperative<br />

Societies(MRCSs) are organized by the Department at Dasapalla, Odagaon, and Ranpur Blocks for<br />

marketing.<br />

There is no support price system to silk cocoons, unlike other agricultural crops. Hence marketing is<br />

the biggest challenge in Sericulture Industry as cocoons are perishable commodity and cocoon<br />

production exhibit large seasonal fluctuations. However, the quality of cocoons being grown in<br />

<strong>Nayagarh</strong> district seems to have a better scope in marketing.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

100


At present with the support of the government mostly tribals and also few non-tribal people are<br />

practicing sericulture and they usually belong to the BPL category. In Dasapalla Block their number is<br />

30, and in Odagaon Block, 15. Besides, in Odagaon Block 60 families are practicing Eri rearing as<br />

plenty of castor plantations are there.<br />

Sericulture development started in the district with mulberry cultivation in 1980s, but whereas the<br />

cultivation failed in Ranapur Block it survived in Dasapalla and Odagaon Blocks.<br />

The M.R.C.S wise memberships are as follows:<br />

Sl.<br />

No<br />

Name of<br />

the MRCS<br />

No. of registered members<br />

S.C S.T OBC Male Female Grand .Total<br />

1. Dasapalla 52 33 156 214 27 241<br />

2. Odogaon 50 36 83 133 36 169<br />

3. Ranpur 19 45 17 72 9 81<br />

Total 121 <strong>11</strong>4 256 499 72 491<br />

Production:<br />

During 1989-90 the production of cocoon was about 4000 kg in the Dasapalla Block. In 1991, it was<br />

2500 kg in the Odagaon Block. This, when compared to the following figues, suggests that the<br />

production has reduced and this is partly due to limitations of the trade, unprotected culture, and<br />

availability of other better alternatives.<br />

Block<br />

Cocoon production during<br />

2007-08<br />

(in kg)<br />

Cocoon production<br />

during 2008-09<br />

(in kg)<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

No. of beneficiaries<br />

involved<br />

Mulberry Eri Mulberry Eri<br />

Dasapalla 577.6 516.75 15<br />

Odagaon 194 306 60<br />

Ranpur 10 10 10<br />

Total 577 204 516.75 316<br />

Strategy for sericulture development:<br />

1. The mulberry cultivation should be taken up in <strong>Nayagarh</strong> diustrict on cluster approach in<br />

microproject mode.<br />

2. Mulberry sericulture should be taken up under irrigated condition.<br />

3. All financial support should be available under single window system.<br />

4. Support price should be fixed for marketing mulberry and eri cocoons.<br />

5. Strengthening of grainage infrastructure for production of quality mulberry and eri .<br />

101


Annual plan:<br />

The proposals submitted by the Sericulture Department have been slightly modified by the TSI as<br />

under:<br />

For <strong>2010</strong>-<strong>11</strong>, the following proposal has been developed:<br />

Proposed activities for <strong>2010</strong>-<strong>11</strong> Target Financial target in lakh rupees<br />

Regular activities for promotion of<br />

sericulture<br />

Under RKVY:<br />

6.171<br />

Borwell for irrigation(3 for Odagaon<br />

Block and 3 for Dasapalla Block)<br />

6 7.50<br />

Rearing equipments @Rs.7500/unit 2.10<br />

Barbed wire fencing 1400 running<br />

ft.<br />

7.00<br />

Total 22.771<br />

MINING:<br />

The district has good potential of building stones like laterites and other stones. However, the TSI does<br />

not recommend mining of the potential hills considering the adverse ecological impacts of the same<br />

though exploitation of hills have been reported from certain areas like Dasapalla Block.<br />

TRANSPORT<br />

Introduction:<br />

<strong>Nayagarh</strong> district is comparatively developed so far road communication is considered though it is<br />

another matter that many of the roads may require improvement and repairing. Further, there is ample<br />

scope of developing the river routes for transportation purpose.<br />

Improved transportation system not only bring all round development but also saves fuel, maintenance<br />

cost of the road, were-tear cost of vehicle, and the most important factor is that its saves much valuable<br />

time of the road users. As a result there is a great save of national property.<br />

Roads & bridges:<br />

There are four categories of roads in the district, as under:<br />

• National Highways<br />

• State Highways<br />

• Major District Roads(MDR)<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

102


• Other District Roads(ODR)<br />

Developments in each of the above categories are described below:<br />

1. National Highways:<br />

There is one National Highway that passes through <strong>Nayagarh</strong> district, i.e. NH 224. It is 89 km long,<br />

and is known as the Khurdha-Bolangir National Highway, the lifeline of <strong>Nayagarh</strong> district. Declared as<br />

a NH since 2005-06, part of this NH still requires improvement and repairing. Improvement work for<br />

the portion from Maichheli to Lunisera and Lunisera to Dasapalla is nearing completion. For 2009-10,<br />

the following activities have been proposed:<br />

Sl. Name of the scheme/work Budget for <strong>2010</strong>-<strong>11</strong><br />

No.<br />

in lakh rupees<br />

1 Improvement of the portion from Bijipur<br />

Gate to Itamati<br />

461.55<br />

2 Improvement of the portion from Itamati<br />

to <strong>Nayagarh</strong> town<br />

420.08<br />

3 PR to the portion from <strong>Nayagarh</strong> to<br />

Kirialanji<br />

____<br />

4 Improvement of the portion from<br />

Dasapalla to Buguda<br />

640.00<br />

5 Improvement of the portion from Buguda<br />

to Banigochha<br />

600.00<br />

Total 2121.63<br />

(Source: Sri H.R.Panda, SDO, NH sub-division, <strong>Nayagarh</strong>)<br />

However, the slow progress of the work has been a matter of concern. Electric pole shifting and road<br />

side tree cutting are the major factors responsible for this.<br />

2. State Highways, MDR & ODR:<br />

The Works Department, otherwise known as the Road & Buildings Division, has jurisdiction over the<br />

State Highways (SH), ODR, and MDR. The total length of Sttae Highways in the district is 13 k.m.,<br />

that of MDR, 163.2 k.m., and that of ODR, 240.2 k.m..<br />

Following is the annual plan of this Department for development of SH, MDR and ODR:<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

103


Financial<br />

<strong>Year</strong><br />

<strong>2010</strong>-<strong>11</strong><br />

Proposed activity Financial target in lakh rupees<br />

Construction of 14 km MDR from 800.00<br />

Pratapprasad to Darpanarayanpur<br />

Construction of 13 km ODR from 800.00<br />

<strong>Nayagarh</strong> to Putulisahi<br />

Total 1600.00<br />

(Source: Executive Engineer, Khurdha R&B Division)<br />

The following roads managed under the Rural Works Division have been proposed to be taken up by<br />

the R&B Division as per the resolution of the Zilla Parishad, <strong>Nayagarh</strong> on 18-4-2007:<br />

Balugaon-Mahipur Road via Malisahi: 13 km<br />

Itamati-Khandapada via Gunthuni: 14 km<br />

Darapada-Odagaon via Baunshagadia: 14 km<br />

Banushiapada-Notara via Ikiri: 10 km<br />

Rajpatana-Itamati via Lathipada: 8 km<br />

Godipada-Kurala road: 10 km(Source: Asst. Engineer, <strong>Nayagarh</strong> R&B sub-Division)<br />

3. Rural roads under Rural Works Division:<br />

The Rural Work Division, <strong>Nayagarh</strong> covers the whole territorial jurisdiction of Angul district. Major<br />

activities of this Division are construction of PMGSY Road, Repair and Maintenance of Rural Roads<br />

and Buildings.<br />

The Departments has proposed the an outlay of Rs.2875.92 lakhs for 2009-10. In absence of any<br />

concrete proposal for the year <strong>2010</strong>-<strong>11</strong>, the TSI estimates the tentative projection for <strong>2010</strong>-<strong>11</strong> to be Rs.<br />

3163.512 lakhs considering 10% increment over the projection for 2009-10.<br />

4. Other roads:<br />

Other roads include Panchayat Samiti & GP roads constructed by the District Rural Development<br />

Agency, and roads under the management of Forest Department and Irrigation Department.<br />

PRIA is an International Centre for learning and promotion of participation and democratic governance<br />

104


SCIENCE & TECHNOLOGY<br />

E-GOVERNANCE:<br />

The TSI has not received any proposals for e-governence in the district though scattered proposals for<br />

purchase of computers have been made by few departments. However, that doesn’t necessarily suggest<br />

that there is no requirement for development of e-governance sector in the district. Many departments<br />

have computers but without adequate anti-virus protection. On the other hand, some of the computers<br />

require upgradation and high-speed internet connection. Accordingly, the following investment<br />

proposal is being added by the TSI:<br />

<strong>Year</strong> Sector/Agency Tentative budget in lakh rupees<br />

<strong>2010</strong>-<strong>11</strong><br />

FOREST & ENVIRONENT:<br />

DRDA 7.00<br />

Others 5.00<br />

Total 12.00<br />

Forestry reflects clean and green civilization. The production aspect of ancient forestry has shifted its<br />

momentum to diversified aspects with the participation of people in management and protection of<br />

forest. This paradigm shift of the management with the principle of sustained yield can face the<br />

burgeoning needs of the growing civilization.<br />

Bio-geographically <strong>Nayagarh</strong> district covers the forests <strong>Nayagarh</strong> Division, Khurdha Division,<br />

Mahanadi Wild Life Division and the Kendu Leaf Division of Phulbani.<br />

The district is not only bestowed with rich forests, but also community forestry of <strong>Nayagarh</strong> has a<br />

remarkable history. Community forest protection is widespread in the district, thanks to initiatives of<br />

Brukshya-O-Jeevara Bandhu Parishad, <strong>Nayagarh</strong> Jangala Mancha, and Maa Maninaga Jangala<br />

Suraksya Parishad, etc.. A number of non-government organizations took major role in facilitating this<br />

development. The Forest Department has launched similar initiatives under Joint Forest Management<br />

programme, but the spirit, rights and benefits are limited under JFM as compared to that under selfinitiated<br />

community forest protection.<br />

Sustainable development of Forestry:<br />

In order to ensure sustainable forestry it is essential to protect the existing forestry from fire, illicit<br />

feeling, poaching and encroachment.<br />

• To build up growing stock and improve stand structure by suitable silvicultural operation.<br />

• To expand the non-forest area under forestry.<br />

• To reclaim the unsuitable forest area and covered under AR<br />

105


• To rehabilitate the degraded forest by artificial interference & improve site condition<br />

• To maintain and improve biodiversity.<br />

• To improve the habitat of Wild animals, density, condition and composition of forest cover<br />

• To establish natural regeneration of indigenous species.<br />

Division-wise annual plans of the Forest Department are being given below:<br />

A.1 DFO, <strong>Nayagarh</strong>(territorial):<br />

<strong>Nayagarh</strong> Forest Division has jurisdiction over 1063.16 sq. km. of forest of which more than 80% is<br />

reserve forest. This Division supplies timber for the Puri rathyatra, and provides sal leaves for the<br />

livelihood of poor people. There are 291 VSSs created as per JFM resolution.<br />

For the year <strong>2010</strong>-<strong>11</strong>, the following tentative financial targets are proposed:<br />

Proposed activity for <strong>2010</strong>-<strong>11</strong> Budget in lakh rupees<br />

Activities under State Plan 37.95<br />

Activities under Central Plan 14.3<br />

Activities under Centrally Sponsored Plan 257.6688<br />

Total 309.9188<br />

Note: Activities under Centrally Sponsored Plan include financial target of Rs.150 lakhs under<br />

CAMPA and Rs.30 lakhs for ecotourism project.<br />

A.2 DFO, Khurdha (territorial ):<br />

Only a small part of <strong>Nayagarh</strong> district, i.e. the Ranapur forest area comes under the jurisdiction of the<br />

DFO, Khurdha(T) who has submitted the following financial targets only:<br />

Proposed activity Target for 2009-10 in<br />

lakh rupees<br />

Central Sector Schemes 50.00<br />

Centrally Sponsored Schemes 3.00<br />

State Sector Schemes 55.00<br />

State Finnace Commission 10.00<br />

Total <strong>11</strong>8.00<br />

(Source: DFO(T), Khurdha)<br />

A.3: DFO, Mahanadi WL Division:<br />

106


The Baisipalli WL Sanctuary comes under the jurisdiction of this Division, and is located at a distance<br />

of 60 km from the <strong>Nayagarh</strong> town.The moderately sized sanctuary encompasses a net area of 166 sq.<br />

km and is laced by the Mahanadi River along the passage carved out by the Satkosia Gorge. Located in<br />

the Eastern Ghats, the jungle clad hills offer shelter to numerous species of wild animals. The<br />

sanctuary's pride rests in the tigers, elephants, mouse deer, the state animal sambar as well as a plethora<br />

of other wild species that inhabit the sanctuary. The sanctuary is also the home of variegated species of<br />

domestic as well as migratory birds whose dulcet chirps and colored plumes augment the charm of the<br />

surroundings. The sanctuary is doted with sylvan water bodies that gleam prettily like a mirage of<br />

quicksilver.<br />

Myriads of tourists, nature lovers and wildlife enthusiasts are attracted by the scenic beauty of the<br />

vibrant vistas of the Baisipalli Wildlife Sanctuary. The hoary mist at dawn, the panoramic sunrise and<br />

the sunset and the river water changing shade from a gold amber heat haze in the afternoon to a<br />

shimmering aquamarine at dusk is indeed a sight to behold. (Source:<br />

http://www.mapsofindia.com/Odisha/tourism/baisipalli-wildlife-sanctuary.html)<br />

For 2009-10, an outlay of Rs.177.91 lakhs was proiposed by the DFO, Mahanadi WL Division. In<br />

addition, proposal for Rs.172 lakhs(for 10 projects) under NREGS was also submitted by this Division.<br />

For the year <strong>2010</strong>-<strong>11</strong>, the tenatative financial target for ongoing activities is estimated at Rs. 189.701<br />

which includes Rs.5 lakhs under ecotourism development. It may be mentioned here that total project<br />

cost for ecotourism development at Chhamundia and Kuanria is Rs.15 lakhs for 2009-10 & <strong>2010</strong>-<strong>11</strong><br />

from which the TSI has tentatively considered Rs.10 lakhs for 2009-10 and rest for <strong>2010</strong>-<strong>11</strong>.<br />

A.3 PHULBANI (KL) DIVISION:<br />

The jurisdiction of Phulbani K.L Division extends over the <strong>Nayagarh</strong> district. Under its Dasapalla<br />

Range Kendu leaf is collected mostly from the Dasapalla Block, Nuagaon Block and some parts of<br />

Ranapur Blocks, and the verage quality is grade-IV. There are 60 phadis and 3 collection centres, and<br />

number of registered pluckers is about 4800. Some phadis now in the Baisipalli sanctuary area have<br />

been closed whereas few phadis lraedy closed in the Ranapur area showing reason of lack of feasibility<br />

have been revived by popular demand. (Source: Range Officer, Dasapalla KL Range)<br />

During 2008-09, collection from this Range amounted to 2406 quintals. During 2009-10, almost an<br />

equal quantity was targeted with a tentative financial target of Rs.95 lakhs. (Source: DFO, Phulbani<br />

KL Division). No projections have been received for <strong>2010</strong>-<strong>11</strong>.<br />

107


GENERAL ECONOMIC SERVICES<br />

Introduction:<br />

General economic services include services provided by the departments of Tourism, Civil Supplies,<br />

and Weights & Measures, etc.. Following is a brief account of these services:<br />

Tourism:<br />

The district of <strong>Nayagarh</strong> has a number of places of tourist attraction. The already identified tourist<br />

spots are as under:<br />

Places of religious interest: Famous Ladu Baba temple at Sarankul, Temple of Lord Raghunathjeu at Odagaon,<br />

Siva Temple at Dutikeswar, famous Nila Madhava temple at Kantilo, and Mahavir temple of Dasapalla.<br />

Places of scenic interest: Kuanria Dam near Dasapalla, water-fall at Asurakumari(Ranapur Block), picnic spots<br />

between Gania & Kuturi, Baisipalli sanctuary, and the hot sulphur springs of Tarabalo<br />

Places for scholars: There are several places of historical/archival interest. The library of the<br />

legendary personality Dashia aja (late Dasarathi Pattnaik) is at Udaypur is visited by scholars<br />

for its rich and distinguished collections.<br />

During 2008-09, the Department of Tourism had sanctioned two interpretation centres, one at Kantilo<br />

and another at Khandapada. Besides, Odisha Tourism Development Corporation planned to establish a<br />

bell metal craft centre at Kantilo. (Source: Tourist Officer, <strong>Nayagarh</strong>)<br />

As per the recommendations of the District Planning Committee, the following proposals are being<br />

made for the year <strong>2010</strong>-<strong>11</strong>:<br />

Place Project cost in lakh rupees<br />

Development of Asurakumari tourist<br />

spot(Ranpur Block) 15.00<br />

Development of Sri Jagannath temple,<br />

Ranpur 12.00<br />

Development of the tourist spot at<br />

Tarabalo hot springs 15.00<br />

Development of Ladu Baba temple,<br />

Sarankul 12.00<br />

Total 54.00<br />

108


Census, survey & statistics:<br />

District Statistical Office is currently conducting surveys and census at district level implemented by<br />

Director Economics and statistics, Odisha, under administrative guidance of P & C Deptt., Odisha,<br />

Bhubaneswar.<br />

Various schemes/ Surveys conducted by the D.S.O. are as under:-<br />

1) EARAS (C.P)<br />

2) F & V (C.P)<br />

3) Socio economic studies conducted by the N.S.S.O on various rounds.<br />

4) Collection of price Statistics<br />

5) Agricultural Labour wages, etc.<br />

Besides, the DSO is entrusted with conducting various adhoc surveys and census, namely:<br />

1) Agricultural Census ( Once in five years)<br />

2) Economic census (Once in years)<br />

3) Minor Irrigation( Once in years)<br />

Moreover DSO(District Statistical Officer) has taken the responsibility of publishing a more valuable<br />

Publication at District level namely District Statistical Hand book once in two years. To enhance the<br />

frequency of the publication and to ensure the quality of data relating to various socio economic<br />

aspects of the district, co-operation of the officers/institutions are very much essential. Lack of<br />

adequate data and cooperation often delays the work of DSO.<br />

The TSI has not received any Plan from the DSO, but has been informed that whereas the present staff<br />

strgenth is more or less satisfactory, increase to the strength of Field Investigators from the present<br />

position of 32 to the sanctioned number of 38 would be further useful.(Source: Statistical Investigator,<br />

District Statistical Office, <strong>Nayagarh</strong>).<br />

Civil Supplies:<br />

District Civil Supplies office, <strong>Nayagarh</strong> is functioning under the Food Supplies and Consumer Welfare<br />

Department of Govt. of Odisha . The main objective of the department is to maintain the supplies<br />

(availability) of essential commodities to make it available at affordable (subsidized) rate.<br />

The service of the office is meant for :-<br />

-<strong>11</strong>0540 BPL families in the District<br />

-30049 Antyoday Anna Yojana families in the District<br />

- 1602 Annapurna beneficiaries in the district.<br />

- 94973 APL families in the district.<br />

109


The District Civil Supplies Officer has expressed interest, through the TSI, for the following<br />

requirements for better functioning which is proposed for <strong>2010</strong>-<strong>11</strong>:<br />

Proposed activity Estimated cost in lakh ruppes<br />

Partitioning<br />

building<br />

of office 1.73<br />

Purchase of 2 computers 0.70<br />

Total 2.43<br />

Weight & Measures:<br />

While the measuring instruments are getting digitized, and both traders and buyers are not very much<br />

acquainted with the sophisticated instruments, the role of Weights & Measure Department(Legal<br />

Metrology) has become renewed with new dimensions of intervention. However, the fact is that lack of<br />

adequate human resource and other facilities has reduced the activism of this Department, not to speak<br />

of the allegations of intentional under-activism.<br />

Assisteant Controller of Legal Metrology, Puri is the district officer for <strong>Nayagarh</strong> under whom a Sr.<br />

Inspector and one manual assistant are working in <strong>Nayagarh</strong> district. No developmental Plan has been<br />

received from this Department by the TSI, but it is suggested that sufficient funds may be allotted to<br />

organize awareness camp on Weight and Measures to educate the Consumers of their rights and also<br />

the traders of the limitations, advantages, and risks of the newly introduced sophisticated systems.<br />

Further, as understood from the Sr. Inspector, own office building, one office vehicle, and recruitment<br />

of one chowkidar would be very useful for the Department.<br />

District Planning Office:<br />

The District Planning Office, <strong>Nayagarh</strong> is the district unit of Planning & Co-Ordination department,<br />

Govt. of Odisha. The District Planning Officer is the head of the office and also the drawing &<br />

disbursing officer.<br />

The main function of the Dist. Planning Office is to provide secretarial assistance to District Planning<br />

Committee (DPC). The work of integration and consolidation of annual plan and five years plan<br />

prepared by the panchayats and ULBs are rest with this office. The consolidated plan is placed before<br />

the DPC for approval. After getting the approval from the DPC, then the plan is sent to the Govt. for<br />

final approval. Besides, inter blocks disparities and inter GPs disparities are being examined and<br />

transmitted to the Regional Imbalance Enquiry committee for their necessary action.<br />

The following different schemes are dealt in this office.<br />

MPLAD SCHEME<br />

MPLAD is a plan scheme of Govt. of India implemented in the States/ Union Territories of India since<br />

1993. It is 100% Grant-in –Aid provided by the Govt. of India without any matching share from the<br />

<strong>11</strong>0


State govt. and is used for creating durable community infrastructure assets for the State. The MPs are<br />

entitled to recommend work up to 200 lakhs per annum for developmental work in their respective<br />

constituencies (LAD means local area development).<br />

MLALAD SCHEME:<br />

The MLALAD Scheme is a plan scheme of Govt. of Odisha for better improvement / development of<br />

all Assembly Constituencies. It has been implemented since 1997-98 according to the guidelines<br />

intended to be utilized for small but essential projects /works based on the felt needs of the local public<br />

The fund is sanctioned basing on the proposal/recommendation/request of concerned MLAs.<br />

Special Problem Fund<br />

The Scheme Special Problem Fund is received as Grant-in-Aid of State from the plan budget. It is<br />

operational since 1997-98. The main objective of the scheme is to provide funds to small but essential<br />

projects which are left incomplete and require completion for providing immediate benefit to the<br />

public.<br />

No projections/proposals have been received under the above schemes for <strong>2010</strong>-<strong>11</strong>.<br />

Zilla Parishad:<br />

Zilla Parishad is the district–level apex body in the Panchayati Raj System. The Odisha Zilla Parishad<br />

Act- 1994 has provided the following in this regard:<br />

The Government may by notification, constitute a Parishad for every district. Every Parishad<br />

shall, by the name of the district for which it is constituted, be a body corporate having<br />

perpetual succession and a common seal and subject to any restriction and qualification<br />

imposed by or under this Act or any other enactment shall have the power to acquire and hold<br />

property, both movable ;and immovable, to transfer any such property held by it, to enter into<br />

contracts and to do all other things as my be considered necessary, proper or expedient for the<br />

purposes of this Act and may sue and be sued in its corporate name.<br />

Every Parishad shall have the power to—<br />

(i) undertake schemes or adopt measures including giving of financial assistance relating to the<br />

development of agriculture, social forestry, live stock, industries, co-operative movement, rural<br />

credit, water-supply, distribution of essential commodities, rural electrification including<br />

distribution of electricity, minor irrigation, public health and sanitation including establishment<br />

of dispensaries and hospitals, communications, primary, secondary and adult education<br />

including<br />

welfare and other objects of general public utility.<br />

(ii)undertake execution of any scheme, or management of any institution entrusted to it by the<br />

Government or any other authority from time to time;<br />

(iii)manage or maintain any work of public utility or any institution vested in it or under its<br />

control and management;<br />

iv) giant aid to any school, public library, public institution or public welfare organization<br />

within the district;<br />

<strong>11</strong>1


v) contribute such sums as may be agreed upon towards the cost of maintenance of any<br />

institution situated outside the district which is beneficial to and habitually used by the<br />

inhabitants of the district;<br />

(vi) establish scholarships or award stipends within the State for the furtherance of technical or<br />

ether special forms of education;<br />

(vii) acquire and maintain village hats and markets either directly or through the Panchayat<br />

Samitis or Grama Panchayats ;<br />

(viii) make grants to Samitis or Grama Panchayats within the district;<br />

(ix) contribute, with the approval of Government,, such sums as it may decide towards the cost<br />

of water-supply or anti-epidemic measures undertaken by a Municipality or Notified Area<br />

Council within the district ;<br />

(x) adopt measures for the relief of distress ;<br />

(xi) co-ordinate and integrate the development plans and the schemes prepared by a Samiti in<br />

the district ;<br />

(xii) examine and approve the budget estimates of Samitis in the district ;<br />

(xiii) prepare, execute and supervise the district plan relating to—<br />

(a) monitoring and supervision of programmes to be directly implemented by Grama Panchayat<br />

and Panchayat Samitis ;<br />

(b) implementation of anti-poverty programmes and monitoring supervision thereof;<br />

(c) disharge of responsibilities and functions as assigned to the District Rural Development<br />

Agencies from time to time ; and<br />

The Zilla Parishad is headed by a President. The Parishad shall consist of the following members,<br />

namely;<br />

(a) one member elected directly on the basis of adult suffrage from every constituency within the<br />

Parishad area;<br />

(b) Chairman of each Samiti situated within the district;<br />

(c) every member of the House of the People and of the State Legislative Assembly representing<br />

constituencies which comprise wholly or partly the area of the Parishad ;<br />

(d) members of the Council of States who are registered as electors within the area of the<br />

Parishad.<br />

Seats shall be reserved for the Scheduled Castes and the Scheduled Tribes in every<br />

Parishad<br />

ZILLA PARISHAD FUND:<br />

The sources of income of a Parishad shall consist of—<br />

(i) the Central or State Government funds allotted to the Parishad;<br />

(ii) grants from All-India Bodies and Institutions for the development of cottage, village and small<br />

scale industries and the like;<br />

(iii) such share of the land cess or any other cess or State taxes allotted under any law or.<br />

fees as may be prescribed;<br />

(iv) income from endowments, trusts or other institutions administered by the<br />

Parishad;<br />

(v) donations and contributions from the Samitis or from the public in any form.<br />

<strong>11</strong>2


The expenses of the Parishad shall include the salaries and allowances of its employees,<br />

honorarium payable to the President and Vice-President, the traveling expenses incurred by the<br />

members of the Parishad for attending the meetings of the Parishad and any item of expenditure<br />

directed by the government for carrying out the provisions of this Act.<br />

(Source: www.Odishapanchayat.gov.in/English/download/Zilla_Parishad_Act.pdf )<br />

The annual plan:<strong>2010</strong>-<strong>11</strong> of the <strong>Nayagarh</strong> ZP for utilization of the share/grants specifically meant for it<br />

has not been made aviulable to the TSI.<br />

SOCIAL SERVICES<br />

X.1 Introduction:<br />

Social services include diverse and sometimes complex assignments that have short-term and/or long<br />

term impacts. These include sectors like education, health & sanitation, and social welfare, etc..<br />

Various schemes are operational to effect the development of various sections of the society<br />

particularly addressing their disadvantageous status, and their intervention strategies vary as under:<br />

• Direct financial benefit to the individual/group<br />

• Indirect financial benefit to the individual/group through assistance in<br />

kind(equipment/material)<br />

• Infrastructure development<br />

• Securing better health & sanitation<br />

• Securing better environment<br />

We shall discuss below various such social development strategies for the district of <strong>Nayagarh</strong>.<br />

X.2 General Education:<br />

X.2.1 Elementary Education<br />

Universalisation of Elementary Education have been envisaged as the national priorities in the<br />

educational development of our country since independence, which is supposed to be achieved through<br />

the instrument of Sarva Shikshya Abhiyan(SSA), an ambitions, judicious country wide programme.<br />

Recently, the programme of SSA has been extended upto class VIII.<br />

During 2009-10, there was a proposal for opening 6 upgaraded/new upper primary schools.<br />

The annual plan for development of elementary education in <strong>Nayagarh</strong> district has been prepared by<br />

SSA, <strong>Nayagarh</strong> for 2009-10 with an outlay of Rs. 3249.28 lakhs(excluding salary).<br />

In the absence of any concrete proposal for <strong>2010</strong>-<strong>11</strong>, the TSI estimates a budget of Rs.3574.208 lakhs<br />

considering 10% increment over the budget of 2009-10.<br />

<strong>11</strong>3


X.2.2 Secondary Education:<br />

The Inspector of Schools stationed at Khurdha is in the overall charge of Secondary Education of the<br />

<strong>Nayagarh</strong> district. It is understood from his office that there is a lot of requirement of developmental work in<br />

this sector in the <strong>Nayagarh</strong> district because most of the schools are running in thatched houses or semidamaged<br />

buildings, 15 schoold have no electricity connection, and only 5% of the scholls have separate or<br />

integrate laboratory facility. Other facilities liking drinking water and separate toilet for girls etc. are also<br />

lacking in many schools.<br />

The Government of India has launched in March 2009 the secondary education counterpart of SSA which<br />

will hopefully help reduce the resource gap, and give a boost to secondary education. This new programme<br />

is known as Rastriya Madhyamik Siksha Abhiyan(RMSA). Currently, the action plan under RMSA has to be<br />

prepared at the end of SSA, <strong>Nayagarh</strong>; and the TSI has been shared the following tentative action plan<br />

which is subject to modification/revision after reworking :<br />

• New schools (Govt. only): Total of UPS to be upgraded to class IX in the GP where there is no<br />

secondary school=17(proposed)<br />

Teacher:-<br />

No. of new upgraded school(S&ME)=25<br />

No. of new upgraded school (SC&ST)=18<br />

Proposed new schools =17<br />

Total No. of new schools =60<br />

Total no. of teachers required =60X4=240nos.<br />

Existing schools (Govt.) including ST & SC Devt. Dept. : Data is not available regarding No.<br />

of additional teachers, but Teachers Training(978 Govt.+349 Aided+6 local) is required.<br />

Schools grant (128 govt.+ 42 Govt. Aided) and Residential facility approximately for 50<br />

schools @6 teacher/school(approx.) is also required.<br />

Other requirements have been suggested as under:<br />

Activity<br />

New<br />

Schools(govt.)<br />

Existing<br />

schools(govt.)<br />

Civil works 3690 5664<br />

Furnitures, fixtures and<br />

fittings 60 128<br />

Major repair 220<br />

Minor repair 33.5<br />

Existing<br />

schools(aided)<br />

<strong>11</strong>4


Laboratory equipment 32<br />

Teachers' training 13.33<br />

School grant 25.8<br />

Residential facility 1800<br />

Books 12.8<br />

Research and evaluation 1.28<br />

(Source: District Project Coordinator, SSA, <strong>Nayagarh</strong>)<br />

Total project cost is Rs.<strong>11</strong>680.71 lakhs.<br />

Given the fact that it is less likely that the district (and state) would receive any fund under RMSA for 2009-<br />

10 chiefly due to technical reasons, the TSI proposed only Rs.680.71 lakhs for 2009-10 and Rs.<strong>11</strong>000.00<br />

lakhs for <strong>2010</strong>-<strong>11</strong>.<br />

X.4 Sports & Youth Services:<br />

The Department of Sports & Youth Services, Odisha has its District Sports Office at <strong>Nayagarh</strong> which<br />

is headed by the District Sports Officer. Also, it has one Sport Hostel in football that has been<br />

functioning in the district in the old hostel building of Brajendra High School, <strong>Nayagarh</strong>. Strength of<br />

this Hostel is 22. Performance of this Hostel has so far been quite remarkable though better facilities<br />

and financial support can enhance this performance record.<br />

Football has assumed importance in the district’s sports history, and players like Ruben Singh and<br />

Benudhar Routray are still remembered for their outstanding records in this field.<br />

Mostly the activities of this Department were being covered under state finance, but since 2008-09 a<br />

revolutional scope has been created through the PYYKA scheme. The Panchayat Yuva Krida Aur<br />

Khel Ahiyan (PYKKA),which is the sports sector equivalent of programmes like NRHM and SSA, is a<br />

recently introduced central scheme that aims at providing basic sports infrastructure and equipment at the<br />

panchayat level and encouraging sports and games in rural areas through annual competitions at the Block<br />

and district levels. PYKKA will help States in promoting sport at the grassroots level, which they have not<br />

been able to achieve on their own so far due to severe resource constraints. It will also deepen and widen<br />

the seedbed of sporting talent, leading to better performances by our sportspersons in national and<br />

international events.<br />

Recently Govt. of Odisha under State Plan Budget 2008-09 have introduced a scheme for broad basing<br />

sports games at grass root level to provide facilities for promotion of games and sports by way of<br />

development of sports infrastructure like development of play fields of the Panchayat as one time grant<br />

not exceeding Rs.5.00 lakhs and also for development of Mini Stadium at Block Headquarter of each<br />

district. Under the scheme the district administration can utilize the funds from any other ongoing<br />

<strong>11</strong>5


schemes like NREGS/ LAD funds / RLTAP/SGRY/SCA/ITDA/WODC/BRGF/RSVY whereever<br />

admissible to develop the play fields to use for development of sports and games in that areas.<br />

Under the State plan scheme for development of play fields in the district, Rs.33 lakhs were received<br />

out of the total Rs.40 lakhs(@Rs.5 lakh/Block). Progress regarding utilization of this fund has<br />

reportedly been very slow at Block level, and the Collector’s intervention has been requested in this<br />

matter. Rest 7 lakhs are likely to be received too.<br />

In the scheme 2.5 acres of G.P. level government land free from encumbrances can be identified for<br />

development of play fields. Also public institutions like government schools having existing play fields<br />

can be developed which can be used by the public beyond the school hours.<br />

The following facilities are to be required for development under the scheme:<br />

1) Leveling of ground – An ideal green and natural play fields can be created; it is developed<br />

by the earthen ridge all round the play field.<br />

2) Bor bed fancing/boundary wall – The developed play field with grass turfing over the<br />

ridges and plantation with shady and ornamental trees made around so that villagers can<br />

enjoy the sports activities.<br />

3) Entry Gate- Entrance gate can be erected in the each play field for restricting the cows and<br />

other animals to be field.<br />

4) Changing Room- 4 medium size room / hall with all facility and like sanitation water<br />

supply can be constructed in any side of the field which will be used as changing room and<br />

storage room purpose of the players.<br />

The PYYKA scheme provides scope for the development of rural sports infrastructure in the following<br />

ways:<br />

1) Development and creation of play fields in each villages Panchayat @ Rs.1.00 lakh (one<br />

time grant)<br />

2) Development and creation of play fields in each Block Panchayat at @ Rs.5.00 lakhs one<br />

time grant (Funding will be on share basis of 75% and 25% between the Central & State<br />

Governments)<br />

During 2008-09, the following high schools were identified under this activity as per the criteria 10%<br />

GP/year and 1 Block:<br />

Name of the Block(No. of GP H.S.s selected) Name of the GP High School(H.S.)<br />

Dasapalla(2) Madhyakhand H.S.<br />

Govt H.S., Banigochha<br />

Nuagaon(2) Gatikesh H.S., Malisahi<br />

Nuagaon H.S.<br />

Ranpur(2) Kural H.S.<br />

<strong>11</strong>6


Satrughna H.S., Panderipada<br />

R.D. High School, Nandighor<br />

Odagaon(3)<br />

Kural H.S.<br />

Satrughna H.S., Panderipada<br />

Jabahara Bidyapitha, Nandighora<br />

<strong>Nayagarh</strong>(4) Barapalli H.S.<br />

N.S.S.M.P.S.N. High School,<br />

Nabaghanapur<br />

Badapandusara H.S.<br />

Rajapatana H.S.<br />

Khandapada(2) Kelasubudhi Girls H.S., Banamalipur<br />

G.J. High School, Sidhamulia<br />

Bhapur(3) Baladianuagaon H.S.<br />

Weaver's Coooperative H.S., Beigunia<br />

Golapokhari H.S.<br />

Bhapur Bhapur Block H.S.<br />

Regarding the district stadium, leveling work was done last year, and this year construction is to begin.<br />

During 2008-09, Rs.10.24 lakhs were received for supply of sports materials to villages<br />

@Rs.2000/village. Accordingly, 512 villages were identified.<br />

Besides, sports hostel selection programme was conducted in July 2009 at Khandapada and <strong>Nayagarh</strong><br />

and 5 boys thus selected were sent to attend state level camp.<br />

For <strong>2010</strong>-<strong>11</strong>, the following proposal has been prepared:<br />

Activities Outlay for <strong>2010</strong>-<strong>11</strong> in lakh rupees<br />

Rural Sports(PYYKA) 5.6<br />

Development of play<br />

field(PYYKA) 23<br />

Stipend 5.94<br />

Other activities 1.00<br />

Total 35.54<br />

(Source: District Sports Officer, <strong>Nayagarh</strong>)<br />

<strong>11</strong>7


X.6 Medical & Public Health:<br />

ALLOPATHY SERVICES:<br />

The Chief District Medical Officer, based at <strong>Nayagarh</strong> is in overall charge of family welfare and health<br />

services in the district. The National Rural Health Mission(NRHM) works under the supervision of<br />

CDMO, and is presently the chief source of funding for health care development services.<br />

NRHM Plan:<br />

National Rural Health Mission (NRHM) was launched on 12th April 2005 in India and on 17 th June<br />

2005 in Odisha. It is one of the biggest – ever integrated health initiatives in the health sector during<br />

the last 50 years. NRHM is not a project but an over arching umbrella integrating on going vertical<br />

programmes and addressing issues related to the determinants of health like sanitation, nutrition,<br />

hygiene and safe drinking water.<br />

The Mission seeks to adopt a sector wide approach and aims at systematic reforms to enable efficiency<br />

in health services delivery. NRHM subsumes key national programmes namely the RCH- II,<br />

Immunization, National Disease Control Programmes (NDCP) and the Integrated Disease Surveillance<br />

Project (IDSP). NRHM will also enable the mainstreaming of Ayurvedic, Yoga, Unani, Siddha and<br />

Homeopathy system of medicine (AYUSH). Its core strategy includes decentralized health planning<br />

and management, engagement of Accredited Social Helath Activists (ASHA) to facilitate access to<br />

health services and strengthening the public health service delivery infrastructure at the primary and<br />

secondary level. Multi sectoral convergence, promoting healthy behaviour, increasing social<br />

participation and empowerment are also emphasized. (Source:<br />

www.Odishahealth.org/Filefetch.aspx?FileName=2NDdraft%20PIP%20Balasore.doc)<br />

For 2009-10, an outlay of Rs.1039.13 lakhs was proposed for NRHM for the district of <strong>Nayagarh</strong>. To<br />

incorporate the cost of 3 additional mobile units @Rs.5 lakh/unit, the grand total for 2009-10 comes to<br />

be Rs.1054.13 lakhs . Rest 4 are to be considered in the Plan of <strong>2010</strong>-<strong>11</strong>.<br />

In the absence of any concrete proposal for <strong>2010</strong>-<strong>11</strong>, the TSI estimates a budget of Rs.<strong>11</strong>43.043 lakhs<br />

considering 10% increment over the budget of 2009-10. To incorporate the cost of 4 additional mobile<br />

units @Rs.5 lakh/unit, the grand total for <strong>2010</strong>-<strong>11</strong> comes to be Rs.<strong>11</strong>63.043 lakhs .<br />

AYURVEDA HOSPITALS:<br />

The Inspector of Ayurveda, Bhubaneswar Circle, Bhubaneswar has the juridction over government<br />

ayurvedic helath care services in the <strong>Nayagarh</strong> district. Presently there are 15 ayurvedic dispensaries in<br />

the district almost all of which need infrastructure development. It may be mentioned gere that whereas<br />

as absence of allopathic doctors in remote areas has been a concern, and whereas AYUSH doctors are<br />

ready to be appointed there, it is very pertinent that the latter should be given adequate training and<br />

other facilities for that purpose. In <strong>Nayagarh</strong> district, Ayurvedic dispensaries at places like Sentery,<br />

Dhipisahi, and Brajarajpur are reportedly fetching a good number of patients; and given the fact that<br />

<strong>11</strong>8


Ayurveda can work better than any other system for diaseases like psoriasis and rheumatism, etc., the<br />

TSI recommend that necessary steps may be taken to strengthen this health care service.<br />

The annual plan for strengthening Ayurvedic health care system in the district is as under:<br />

Construction of hospital building,<br />

staff quarter,boundary wall, water<br />

suply, electrification,sanitation, Cost in lakh<br />

herbal garden, and purchase of rupees for <strong>2010</strong>-<strong>11</strong><br />

Block Place instruments at:<br />

Lunisara Government Ayurveda Hospital,<br />

Nuagaon<br />

Lunisara, Block- Nuagaon 50.00<br />

Sentari Government Ayurveda Hospital,<br />

Nuagaon<br />

Sentari, Block- Nuagaon 50.00<br />

Godipada Government Ayurveda Hospital,<br />

Odogaon<br />

Godipada, Block- Odogaon 50.00<br />

Baunsabati Government Ayurveda Hospital,<br />

Khandapada<br />

Baunsabati, block- Bhapur 50.00<br />

Koska Government Ayurveda Hospital,<br />

Khandapada<br />

Koska, Block- Khandapada<br />

Kishorprasad Government Ayurveda Hospital,<br />

50.00<br />

Gania<br />

Kishorprasad, Block- Gania 50.00<br />

Dipisahi Government Ayurveda Hospital,<br />

Gania<br />

Dipisahi, Block- Gania 50.00<br />

Baramula Government Ayurveda Hospital,<br />

Ranpur<br />

Baramula, Block- Ranpur 50.00<br />

Brajarajpur Government Ayurveda Hospital,<br />

Ranpur<br />

Brajarajpur, Block- Ranpur 50.00<br />

Total 450.00<br />

HOMAEOPATHY HOSPITALS:<br />

Homaeopathy is the humble wonder of medicine because at a negligible price it can cure some diseases<br />

which otherwise would have costed significantly high in other health care systems. Also, it is less risky<br />

for use.<br />

There are 20 Homaeo dispensaries in <strong>Nayagarh</strong> district most of which are in remote areas. The status<br />

of the dispensaries is very poor. Lack of own building, and staff quarters with provision of water<br />

supply, electricity and lavatory etc. are some of the major grievances of the departmental staff. The<br />

following proposals have accordingly been developed by the Inspector of Homaeopathy,<br />

Bhubaneswar:<br />

<strong>11</strong>9


Annual Plan of the Inspector of Homaeopathy for <strong>2010</strong>-<strong>11</strong>(Rs. in lakhs):<br />

Construction of hospital building, staff quarter,boundary wall, water suply,<br />

electrification,sanitation, and purchase of instruments at:<br />

Ghugudipada 30<br />

Golapokharai 30<br />

Karadapada 30<br />

Kendudipi 30<br />

Khalamoda 30<br />

Natugaon 30<br />

Poibadi 30<br />

Rajigiri 30<br />

Sampada 30<br />

Solapata 30<br />

Subalaya 30<br />

Surukabadi 30<br />

Total Rs.360 lakhs<br />

It may be mentioned here that construction of hospital building is in progress at Fategarh and Karabara<br />

whereas it has been sanctioned under NRHM for Sakeri.<br />

X.6 Water supply & sanitation:<br />

X.6.1 Urban Water supply & sanitation:<br />

The water supply and santitation in urban areas are maintained by the Public Health Engineering<br />

Department (PHED). The PHED Division at Puri has jurisdiction over <strong>Nayagarh</strong> district having a subdivisional<br />

head(Asst. Engineer) at <strong>Nayagarh</strong>.<br />

W/S SYSTEM UNDER DIFFERENT SCHEMES IMPLEMENTED BY PHED:<br />

There are two nos. of chargeable head for which the augmentation works on water system is being<br />

proposed in the ULBs:<br />

a. STATE PLAN<br />

b. UIDSSMT (Urban Infrastructural Development Scheme for Small and Midium Towns)<br />

Present arrangements of water supply are quite inadequate in all the NACs both in terms of quantity<br />

and quality. The requirement of <strong>Nayagarh</strong> NAC is 1.8 mld as aginst the current supply of 1.05 mld.<br />

Simlarly, requirement of Khandapara NAC is 1 mld as agisnt current supply of 0.4 mld. For <strong>Nayagarh</strong><br />

town, water is supplied from the river as well as from production wells whereas for Khandapara NAC<br />

this is done from the MI reservoir and Kusumi river. Infiltration gallery and chlorination are the<br />

purification systems adopted. However, things are not very satisfactory and the PHED Plan as under<br />

reflects an initiative to address this issue to some extent:<br />

120


For <strong>2010</strong>-<strong>11</strong>, a tentative estimation of Rs.600 lakhs have been proposed for the district by the PHED.<br />

The work proposed for water supply to <strong>Nayagarh</strong> town under the UIDSSMT scheme has a technical<br />

sanction of total Rs.2079.39 lakhs and is expected to be completed in next 3 years starting from<br />

December 2009. This includes 33 km pipe line project, intake well at Banabanapur near Kantilo,<br />

construction of 1 water treatment plant of 6.5 MLD and construction of 1 underground reservoir at<br />

Khandapada, construction of 1 clear-water reservoir near <strong>Nayagarh</strong> town, and construction of 2<br />

underground reservoirs on hill-top at <strong>Nayagarh</strong> For 2009-10, Rs.1000.00 lakhs have been sanctioned<br />

for expenditure under this Head.<br />

The project has taken into consideration of the requirement of Khandapara NAC, and since a part of<br />

the project work is to be constructed at/near Khandapara, hence PHED has planned to extend the<br />

facilities of the UIDSSMT water supply project to this NAC in case a need for the same arises in<br />

future.<br />

X.6.2 Rural water supply and sanitation:<br />

The Rural Water Supply and Sanitation agency, having its district headquarters at <strong>Nayagarh</strong>, has the<br />

responsibility of safe water supply to rural areas. In addition, it also has to execute the total sanitation<br />

programme.<br />

Proposed outlay for 2009-10 was Rs. 3599.58 lakhs for RWSS including total sanitation programme.<br />

In the absence of any concrete proposal for <strong>2010</strong>-<strong>11</strong>, the TSI estimates a budget of Rs.3854.796 lakhs<br />

considering 10% increment over the budget of 2009-10 excluding anganwadi toilets and school toilets<br />

as their targets are supposed to be achieved within 2009-10..<br />

X.6 State Housing Board:<br />

The Odisha State Housing Board had proposed a commercial residential complex near <strong>Nayagarh</strong> town<br />

at Muktapur. The demand survey has been done, but commercial vialbility is still uncertain since the<br />

cost of the houses is not so attractive for the local people.<br />

X.7 Police Housing:<br />

Odisha State Police Housing and Welfare Corporation Limited was incorporated in May 1980 as a<br />

wholly owned State Government Company with the main objective of:<br />

• Formulating and executing housing schemes for both residential and non-residential purposes<br />

for the Police, Vigilance and Fire Service Departments of Government of Odisha (GoO) as well<br />

as Government of India (GoI);<br />

• Taking up construction, repair, maintenance, modification and renovation of roads, buildings<br />

and other civil structures through competitive tender or on the basis of direct placement of<br />

works.<br />

121


In pursuance of the objectives, the Company had undertaken allotted works of the GoO since inception<br />

and deposit works of State Universities and other bodies since 1989.<br />

Presently, the Company is taking up construction activities for Police, Fire, Court, Jail, and Health<br />

departments. Details of the work take up by the Corporation in <strong>Nayagarh</strong> district have been furrnished<br />

in annexure-6.<br />

X.8 Rural housing:<br />

Indira Awas Yojana (IAY) is the main housing scheme implemented through the PR Dept. for<br />

providing houses to the disadvantageous people belonging to the BPL category. This scheme is an<br />

integral part of the Bharat Nirman Yojana of the Union Govt.<br />

Mo Kudia is another scheme that is to benefit those poor people who are deprived of the IAY benefit.<br />

It is implemented by the Government of Odisha.<br />

The District Planning Committee has observed that the physical allotment under both the schemes is<br />

very insufficient, and that each Block should have atleast 400 houses under the MO KUDIA scheme.<br />

X.8 URBAN DEVELOPMENT<br />

X.8.1 Introduction:<br />

Dasapalla, Ranpur, Khandapada, and <strong>Nayagarh</strong> were the four ex-state headquarters in the district and<br />

accordingly received importance than the rural areas. However, <strong>Nayagarh</strong> developed faster for obvious<br />

reasons and other three lagged behind. Khadapada, Ranapur and Dasapalla are now developed to more<br />

or less equal extent. However, only <strong>Nayagarh</strong> and Khandapada have formed Notified Area Councils<br />

(NAC) whereas Dasapalla and Ranapur are yet to form any. There is no municipality in the district.<br />

<strong>Nayagarh</strong> and Khandapara are the two statutory towns of the district whereas Kantilo and Chandpur<br />

are the two census towns. Itamati is growing as the sub-urban area of <strong>Nayagarh</strong> and the latter is likely<br />

to assimilate the former in future.Itamati is growing as the sub-urban area of <strong>Nayagarh</strong> and the latter is<br />

likely to assimilate the former in future.<br />

X.8.2 Population:<br />

Total urban population(which is said to include population of NACs and census towns) of the district,<br />

as per 2001 census, was 37,000 which was but 4.28% of the total population of the district. Further, to<br />

consider only the population of two NACs, it is still less; i.e. 2.66%. Population of the <strong>Nayagarh</strong> town<br />

is the single largest urban concentration. Population of Kantilo and Chandpur was 8735 and 5260<br />

respectively (2001 census, as provided in District Census Handbook for <strong>Nayagarh</strong>, p. xxii).<br />

122


X.8.3 Urban development programme:<br />

The urban counterpart of DRDA is District Urban Development Agency (DUDA) which is headed by<br />

the Project Director-cum-Additional District Magistrate (ADM).This agency is responsible for the<br />

overall coordination of urban development programmes in the district.<br />

The urban local bodies are responsible for the basic developmental activities in their respective areas.<br />

In addition, some special schemes are also implemented through them. Swarna Jayanti Sahari Rojgar<br />

Yojana(SJSRY), which is currently in operation with effect from 01.12.1997 is a substitution of the<br />

earlier programmes like Urban Basic Services for the Poor (UBSP), Prime Minister Integrated Urban<br />

Poverty Eradication Yojana (NRY), and Environmental Improvement of Urban Slums (EIUs).<br />

UIDSSMT is another programme of the Union Government through which water supply to <strong>Nayagarh</strong><br />

town is being panned. Khandapara town is presently not eligible for UIDSSMT support.<br />

X.8.4 <strong>Nayagarh</strong> N.A.C.:<br />

This is the largest ULB in the district with a geographiacal area of 15.54 sq.km.. As per 2001 census,<br />

there were 2805 households and the population was 14314 of which 1278 were SC and 137 were ST.<br />

The total number of workers was 3931.<br />

The NAC has 13 wards. The area is sloppy with a hill range almost traversing the town, and this causes<br />

overflow of water during heavy rains. Hence, adequate drainage development is required for the town.<br />

The NH-224 passes through it, and recently a demand has been put forth to construct a by-pass so that<br />

accidents may be avoided.<br />

Soild waste management is one of the issues, and the development of wards is not uniform. Given the<br />

extention activities of the town on various sides, proper planning is also required.<br />

The TSI has learnt that whereas only about 25% of the total income of the NAC comes from own<br />

sources, there is a lot of scope of augmenting the same since the revenue in demand is significantly<br />

undercollected. For instance, a large part of holding tax is pending with the people. Due to lack of<br />

proper delineation and boundary marking it has not been possible for the NAC staff to successfully<br />

counter the claim of some of the residents that they belong to the Block area and hence do not need to<br />

pay holding tax to the NAC. Such issues should be quickly and effectively addressed so that the own<br />

income of the NAC is increased considerably which can ultimately help it to take up more<br />

developmental actrivities.<br />

For <strong>2010</strong>-<strong>11</strong>, the following proposals have been prepared by the TSI in absence of a concrete<br />

submission by the NAC:<br />

Proposed activity Likely source of funding Budget in lakh rupees<br />

Solid Waste Management TFC 30<br />

Maintenance of road & building TFC 30<br />

123


Maintenance & development of<br />

roads State Plan <strong>11</strong>5<br />

IHSDP Central Plan 460<br />

Other schemes 150<br />

Construction of park 15<br />

Renovation of tank 15<br />

Total 815<br />

X.8.5 Khandapada NAC:<br />

Khandapara NAC, with an area of 13.06 sq.km, had a population of 8757 only as per 2001 census, of<br />

which 1414 were SC and 296 were ST. This suggests that the concentration of marginalized<br />

communities is more in Khandapara town than in <strong>Nayagarh</strong> town. Total number of households was<br />

1671, and that of workers, 2209.<br />

Total number of wards is 13. Like <strong>Nayagarh</strong> NAC, uniformity of development is also lacking here in<br />

various wards which has caused irrigation among the concerned councilors. Some of the wards lack<br />

adequate drinking water facility and electric connection.<br />

There are about 10 ponds under the NAC that can be developed for commercial purposes like fishery.<br />

Unlike <strong>Nayagarh</strong>, it’s a relatively calm & quite town with low traffic dynamics which adds to its<br />

beauty. Proper developmental planning may further add to this beauty.<br />

Following is the annual plan of the Khandapara NAC for <strong>2010</strong>-<strong>11</strong>(as modified by the TSI):<br />

<strong>2010</strong>-<strong>11</strong> Proposed activity Likely source of fund<br />

Financial target in<br />

lakh rupees<br />

Construction of park<br />

Construction of Yatri<br />

Special grant(any) 10.00<br />

Nibas(ward number 13)<br />

Construction of Kalyan<br />

Special grant(any) 10.00<br />

mandap(ward number 13)<br />

Construction of Town<br />

Special grant(any) 15.00<br />

hall(ward number 13)<br />

Construction of shops(10) in<br />

Special grant(any) 25.00<br />

ward No.1<br />

Construction of office<br />

Special grant(any) 10.00<br />

building(ward number 1) Special grant(any) 10.00<br />

Construction of crematorium<br />

Compost Yard(ward number<br />

MLA LAD 5.00<br />

1) TFC 15.00<br />

Sub-total 100.00<br />

124


X.9 Information, Publicity, Art & Culture:<br />

The Information & Publicity Department is in charge of a Information & Public Relations<br />

Officer(DIPRO). This Departmement seems to have been cornered in the main line of developmental<br />

activities because its actual potential is underutilized. It is a fact that lack of awareness among the<br />

people about various schemes and programmes of the government has been one of the important<br />

factors responsible for low rate of success of these programmes. Whereas the Information & Publicity<br />

Department can be well utilized to solve this issue, this has hardly been done.<br />

As regards Art & Culture, the district has a rich tradition of culture. Atleast 23 archaelogical sites have<br />

been identified in the district and placed in the national database (Source:<br />

http://www.ignca.nic.in/img_0002_as_or_nayagarh.htm). Following activities are suggested for the<br />

conservation and development of art & culture:<br />

Name of work Financial target for the year <strong>2010</strong>-<strong>11</strong><br />

in lakh rupees<br />

Promotion<br />

mahotshav<br />

of zilla<br />

6.00<br />

Promotion of art & culture 5.00<br />

Renovation of Sanskruti<br />

Bhawan at <strong>Nayagarh</strong><br />

12.00<br />

Total 23.00<br />

X.10 Development of SCs, STs & OBCs:<br />

The District Welfare Department, headed by the District Welfare Officer, coordinates the<br />

developmental work for scheduled caste, scheduled tribe, and other backward caste communities.<br />

Several Central- as well as State schemes are implemented for this purpose. The District Welfare<br />

Department basically intervenes through development of educational facilities for the SC/ST people.<br />

Following scholls and hostels are being managed for this purpose:<br />

• Residential High Schools(HS): 4<br />

These are at Banigochha, Takara, and Buguda in the Dasapalla Block and at Dimiri palli in the<br />

Nuagaon Block.<br />

• Ashram Schools(AS): 1<br />

There is only one AS which is at Jakeda(Nuagaon Block).<br />

• Residential Sevashram School(SS): 23<br />

125


Most of these are in the Dasapalla Block.<br />

• ST hostels(girls): 18<br />

Most of these are in the Dasapalla Block.<br />

However, the Department feels that the present state of development is not satisfactory, and the<br />

existing residential schools in this district require construction of additional hostel building, and other<br />

facilities like more tube wells.<br />

Given the fact that the existing 23 hostels have insufficient accommodation facility, the following<br />

activity plan is being incorporated:<br />

Name of work Financial target for the<br />

year <strong>2010</strong>-<strong>11</strong> in lakh<br />

rupees<br />

Extention of hostel<br />

building@Rs.10 lakhs/unit<br />

OSFDC targets for <strong>2010</strong>-<strong>11</strong>:<br />

200.00(20)<br />

The Odisha Scheduled Castes & Scheduled Tribes Development Finance Corporation (OSFDC) has<br />

been financing SCs, STs, Safai Karmacharis(scavengers) to take up small enterprises . During 2009-<br />

10, 60 SC groups and 14 ST groups were to be benefited under this programme with a total cost of<br />

Rs.6.14 lakhs. No target is known to have been fixed for <strong>2010</strong>-<strong>11</strong> by the time of preparation of this<br />

Plan.<br />

• Scholarship:<br />

The scholarships include expenditure on supply of free school dresses. Total amount of prematric<br />

scholarship was Rs.232.2308 lakhs for 2009-10.<br />

High Cost loan:<br />

During 2009-10, 13 SC applicants and 2 ST applicants were to be provided with high cost loan.<br />

Total budget for OFSDC loan and scholarship thus comes to be Rs.238.3708 lakhs for 2009-10. In the<br />

absence of any concrete proposal for <strong>2010</strong>-<strong>11</strong>, the TSI estimates the same budgetary requirement for<br />

2009-10 given the fact that the scholariship component is less likely to be increased @10%/annum.<br />

126


X.10 Labour & Employment<br />

The human resources of any country need proper management and utilization for effective<br />

advancement in work culture to help the national development in all respects. These responsibilities<br />

have been entrusted to Labour & Employment Department of Government of India/Odisha, but we<br />

have yet to achieve a lot.<br />

.<br />

The District Labour Office at <strong>Nayagarh</strong> has been functioning under the Labour & Employment<br />

Department, Government of Odisha to look after maintenance of industrial peace & harmony, better<br />

industrial relations, protect the interest of all working class people in organized sector, enforcement of<br />

23 labour enactments including the Minimum Wages Act, the Child Labour (P & R) Act, etc.<br />

However, the District Labour Officer has not submitted any development proposal for 2009-10 though<br />

he has mentioned that whereas the National Child Labour Project is running in the district, no grant-inaid<br />

has been received against the same since 2008-09.<br />

National Child Labour Project:<br />

The project aims to benefit 50 children per school in total 40 schools of the district. The distribution of<br />

the schools is as under:<br />

Block/NAC No. of schools<br />

Bhapur 6<br />

<strong>Nayagarh</strong> 6<br />

Nuagaon 6<br />

Dasapalla 5<br />

Ranpur 3<br />

Odagaon 4<br />

Khandapara 6<br />

Gania 2<br />

<strong>Nayagarh</strong><br />

NAC 2<br />

Total 40<br />

Total project cost is 210 lakhs for the project period of 2007-08 to 2009-10. Of this, Rs.54.275 was<br />

received in the 1 st installment during 2007-08.<br />

Welfare of bidi workers:<br />

Implementation of welfare schemes for bidi workers of the district has been one of the responsibilities<br />

of the District Labour Office. Major concentration of these home-workers is in the Khandapara Block,<br />

and the total number in the district is estimated to be 5620 out of which 4670 have identity card.<br />

127


Financial assistance for housing purpose has been sanctioned for 442 bidi workers, the total project<br />

cost being estimated at Rs.1679.60 lakhs. Out of this, total Rs.88.40 lakhs have been received so<br />

far(December 1 st week, 2009) in two phases.<br />

X.<strong>11</strong> Employment:<br />

Consequent upon creation of <strong>Nayagarh</strong> district in the year 1993, the Sub-Employment Exchange,<br />

<strong>Nayagarh</strong> has been given the status of District Employment Exchange since 1993. The District<br />

Employment Exchange has so many activities besides Registration and submission of names, like<br />

Employment Market Information and Vocational Guidance. However, no development proposal of this<br />

Department has ben received by the TSI for 2009-10 and <strong>2010</strong>-<strong>11</strong>.<br />

X.12 Social security, social welfare, women empowerment and child welfare:<br />

The District Department of Social Welfare, headed by a District Social Welfare Officer based at<br />

<strong>Nayagarh</strong> looks after the implementation of various Central- and State government schemes meant for<br />

the social welfare, women empowerment, and child welfare. Integrated Child Development<br />

Services(ICDS) is one of the major programmes implemented through this Department.<br />

There are <strong>11</strong>42 anganwadi centres of which 63 have own buildings whereas as construction work is in<br />

progress for 10 more. This suggests that a big investment is necessary so as to provide own buildings<br />

to the rest of the anganwadi centres.<br />

There are two orphanages in the district as under:<br />

1. Anatha Parityakta Balashrama, Tikiriapada(Ranapur Block)<br />

2. Mother Abasika Vidyalaya, <strong>Nayagarh</strong><br />

Of these, only the first one is getting financial ssustance from the Department. Besides, there is a<br />

SWADHAR home managed by an NGO AHEAD at <strong>Nayagarh</strong>.<br />

SCHEMES IMLEMENTED:<br />

• ICDS(Integrated Child Development Sevices)<br />

• MADHU BABU PENSION YOJANA (MBPY)<br />

• NATIONAL OLD AGE PENSION (NOAP)<br />

NATIONAL FAMILY BENEFIT SCHEME (NFBS)<br />

• PH SCHOLARSHIP<br />

• SUPPLEMENTARY NUTRITION PROGRAMME (SNP )<br />

128


• Mid–Day–Meal ( MDM )<br />

• MISSION SHAKTI<br />

For the year <strong>2010</strong>-<strong>11</strong>, the following proposals are made:<br />

Physical Financial target in<br />

Proposed activities<br />

target lakh rupees<br />

Construction of AWC building @Rs.2.5 lakhs/centre 500 1250<br />

Repair of AWC building @Rs.0.50 lakhs/unit 40 20<br />

Construction of ICDS office building alongwith store<br />

@Rs.30 lakhs/unit 2 60<br />

MDM (Primary) ---- 497.2<br />

MDM (Upper Primary) ---- 308<br />

SNP ---- 965.855<br />

Other regular activities like MBPY & NOAP ---- <strong>11</strong>00.00<br />

Orphanage 15.00<br />

Construction of working women’s hostel at <strong>Nayagarh</strong> 15.00<br />

Construction of Old Age Home at <strong>Nayagarh</strong> 15.00<br />

Construction of SWADHAR building at <strong>Nayagarh</strong> 15.00<br />

Construction of short stay home at <strong>Nayagarh</strong> 15.00<br />

Construction of staff quarter(32) 320.00<br />

Total 4596.055<br />

GENERAL SERVICES<br />

XI.1 Introduction:<br />

In this chapter we shall discuss the plan and prospects relating to the Police Department, Jails, and<br />

Public Works. Printing & Stationeries also comes under the purview of this chapter, but is not<br />

applicable in district planning as there is no separate district department for this and also the<br />

expenditure accrued under this head is comparatively insignificant.<br />

XI.2 Police Department:<br />

The police department in <strong>Nayagarh</strong> district basically depends on a centralized planning process<br />

controlled by the state police headquarters at Cuttack. It is understood that infrastructure development<br />

is still necessary not only in <strong>Nayagarh</strong> town but also in other parts of the district so as to provide<br />

adequate residential as well as office space for the police staff. It is also understood that the lessons<br />

learnt in the Maoist confrontations have been utilized for better organization of the Department.<br />

However, whereas further measures need to be taken for strengthening security measures in remote<br />

129


and vulnerable areas and the police base is to be adequately created inside the Baisipalli sanctuary, the<br />

district administration should ensure that the communication network, both roads and telephone (cell<br />

phone in particular) extends to all those vulnerable/sensitive areas where the police may need to take<br />

action any time. On the other hand, the Department should plan for womens’ police stations, and give<br />

more stress on ethical policing so as to be more people-friendly. The TSI suggests that the Police<br />

Department should work as a development partner for the district and should extend its intelligence<br />

services to intimate the district administration about underdevelopment issues in various parts of the<br />

district which will not only help in taking preventing measures but also would help the Deartment get<br />

an image that it works for the people. The Maoists and Naxalites have been stressing on the issues of<br />

underdevelopment and social injustice; and the Police Department can very well help the district<br />

administration to address such issues before it takes a dangerious turn 2 .<br />

Presently there are 12 police stations, 1 energy PS, and 13 police outposts, but not a single mahila<br />

thana or women’s police station. At least one mahila than is required at Nayagarah town, and a tollfree<br />

number should be available for the district to provide necessary assistance to women requiring<br />

justice even in the remote areas. Construction and fortification of own buildings of police stations/outposts,<br />

and upgradation of eligible outposts like that of Bhapur, Rajsunakhala, and Chandpur should be<br />

given priority alongwith adequate capacity building measures. Unless adequate human resource<br />

development is done alongwith proportionate development of infrastructure, better performance can<br />

not be expected from the staff.<br />

The TSI has received a detail list of proposals from the office of the SP, <strong>Nayagarh</strong> and has modified<br />

the same as under:<br />

REQUIREMENT OF GOVT. QUARTER FOR THE STAFF:<br />

.<br />

Sl. No. Name of PS/OP ‘E’ type ‘F’ type ‘D’ type Amount<br />

required<br />

1. <strong>Nayagarh</strong> PS 5 nos <strong>11</strong> nos --- 65<br />

2. Khandapada PS 5 nos 6 nos --- 45<br />

3. Nuagaon PS 3 nos 6 nos --- 35<br />

4. Ranapur PS 4 nos 6 nos --- 40<br />

5. Odagaon PS 5 nos 6 nos --- 45<br />

6. Daspalla PS 4 nos 6 nos --- 40<br />

7. Gania PS 4 nos 6 nos --- 40<br />

8. Fategarh PS 5 nos 6 nos --- 45<br />

9. Itamati PS 5 nos <strong>11</strong> nos ---- 65<br />

10. Banigochha PS 5 nos <strong>11</strong> nos --- 65<br />

<strong>11</strong>. Sadar PS 5 nos 6 nos --- 45<br />

12. Saranakul PS 4nos 6 nos --- 40<br />

13. Energy PS 5 nos 6 nos --- 45<br />

2 As per the suggestion of the TSI, an exclusive meeting on development interventions in sensitive pockets of <strong>Nayagarh</strong><br />

district was organized at <strong>Nayagarh</strong> on <strong>11</strong> th November 2009 under the chairmanship of the Collector, and the House very<br />

much agreed that development interventions needs to be accelerated in remote and vulnerable areas and also the Police<br />

Department should take more people-friendly measures like the one suggested by the TSI. This meeting was attended by<br />

the DSP(DIB), <strong>Nayagarh</strong> as representative of the SP, <strong>Nayagarh</strong>. Proceedings of this meeting are available in annexure-8.<br />

130


14. Rajasunakhela PS 1 nos 3 nos --- 15<br />

15. Darpanarayanpur OP 1 nos 4 nos --- 25<br />

16. Bahadajhola OP 1 nos 3 nos ---- 15<br />

17. Koska OP 1 nos 4 nos --- 25<br />

18. Madhyakhanda OP 1 nos 4 nos --- 25<br />

19. Nuagadia Sahi OP 1 nos 4 nos --- 25<br />

20. Kantilo OP 1 nos 3 nos --- 15<br />

21. Chandpur OP 1 nos 3 nos --- 15<br />

22. TOP <strong>Nayagarh</strong>. 1 nos 3 nos --- 15<br />

23. Malisahi OP 1 nos 8nos --- 30<br />

24. Mahipur OP 1 nos 4 nos --- 25<br />

25. <strong>Nayagarh</strong> Court 4 nos 6 nos --- 40<br />

26. Ranpur Court 1 nos 3 nos --- 15<br />

27. Daspalla Court 2 nos 3 nos --- 20<br />

28. Khandapada Court 2 nos 4 nos --- 20<br />

29. Godipada OP 1 nos 4 nos --- 25<br />

30. Jagannath Prasad OP 1 nos 3 nos --- 15<br />

31. Binayakpur Beat ---- 2 nos --- 8<br />

House<br />

32. Bhapur Beat House 1 nos 2 nos --- 10<br />

33. D.P.O <strong>Nayagarh</strong> 16 nos 2 nos 6nos 72<br />

34. RO,<strong>Nayagarh</strong> 6 nos 65 nos 250<br />

Total 1320<br />

CONSTRUCTION OF BOUNDARY WALL.<br />

Sl.No. Name of projects Amount required<br />

1. Boundary wall for D.P.O &<br />

R.O<br />

145.00<br />

2. All Police posts 215.00<br />

Total 360.00<br />

REPAIR AND RENOVATION OF GOVT BUILDING<br />

Sl. No. Name of projects Amount required For which purpose<br />

1. (a) Re construction of old<br />

PS/OPs<br />

80.00 Rs.25 lakhs for Electrical.<br />

Rs. 25 lakhs for installation<br />

of Tube well & Well .<br />

2. (b) R.O/D.P.O Staff quarter . 25.00 Rs. 5.00 lakhs for<br />

installation of two nos<br />

motors & white washing.<br />

Total 105.00<br />

131


OTHER PROPOSALS<br />

1 Police Hospital 55.00 Land available at Construction<br />

at R.O<br />

R.O<br />

work is required<br />

2 Vehicle Stand 10.00 Land available - Do-<br />

3 Cycle Stand/<br />

M.C<br />

50.00 -Do- - Do-<br />

4 60 seated men<br />

barrack<br />

55.00 -Do- - Do-<br />

5 RRT for<br />

Nuagaon<br />

10.00 -Do- - Do-<br />

6 RRTfor Itamati<br />

PS.<br />

10.00 Land available - Do-<br />

7 RRT for<br />

Banigochha PS.<br />

10.00 -Do- - Do-<br />

8 RRT for Energy<br />

PS<br />

10.00 Land not available - Do-<br />

Total 210.00<br />

Note: Work order for 30 women’s barrack being already issued on 24 th September’09 for Rs.32 lakhs,<br />

this proposal has been removed from the list by the TSI. RRT means rest room and toilet.<br />

Total budgetary requirement for <strong>2010</strong>-<strong>11</strong> thus comes to be Rs.1995.00 lakhs.<br />

X.3 Jail:<br />

<strong>Nayagarh</strong> district has the following jails at present:<br />

• Sub- Jail, <strong>Nayagarh</strong><br />

• Sub- Jail, Khandapada<br />

• Sub- Jail, Ranpur<br />

• Sub- Jail, Daspalla<br />

Of these, the <strong>Nayagarh</strong> sub-jail has recently been shifted to its new premise whereas that at Ranapur<br />

was constructed few years back.<br />

The Directorate of Prisons & Correctional Services (DPCS), Bhubaneswar is the planning authority for<br />

the jails. The plans are made for the state, and not district-wise though sometimes sub-division (jail)<br />

wise projects are mentioned. Though none of the jails are presently overcrowded, The TSI has learnt<br />

from the Superintendents of respective sub-jails that there are various other issues which need the<br />

attention of the concerned planning authority. The following table reflects jail-wise requirements:<br />

132


Sub-jail Requirement<br />

<strong>Nayagarh</strong> Increase in the height of peremeter wall, construction of kitchen,<br />

construction of approach road, additional toilets and drainage,<br />

bathing facility, construction of partition wall of wards, 4 numbers<br />

of borewell.<br />

Dasapalla Drainage, water supply, light(internal and external), sewage tank,<br />

4 watch towers, increase in the height of compound wall,<br />

development of staff quarters<br />

Khandapada Repairing of permeter wall, and recruitment of staff<br />

Ranapur Effective power supply 3<br />

Given the fact that Dasapalla and Ranapur sub-jails are more prone to extremist attacks, necessary<br />

steps may be taken to strengthen the secutiry/fortification system there.<br />

The DPCS, Bhubaneswar has sanctioned Rs.15 lakhs in 2009-10 for the special repair to peremetre<br />

wall & kitchen, for renovation of water tank & drain, and for repairing of staff quarters of Dasapall<br />

sub-jail. Further, proposal has been submitted to the government, in the supplementary budget of 2009-<br />

10, for fortification and construction of watch tower of <strong>Nayagarh</strong> sub-jail.<br />

For the year <strong>2010</strong>-<strong>11</strong>, it has been proposed by the DPCS for electrification of Ranapur- and <strong>Nayagarh</strong><br />

sub-jails at the cost of Rs.10.58 lakhs and Rs.16 lakhs respectively. (Source: DPCS, Bhubaneswar)<br />

XI.4 Public Works(Buildings):<br />

Public Works include construction activities for roads and buildings under the ownership of<br />

government. The R&B Division, Rural Works Division, and NH Division are the implementing<br />

agencies for such projects. As the road development part has already been discussed previously, we<br />

shall discuss here only the plans pertaining to the construction of government buildings.<br />

XI.4.1 R&B Division:<br />

For <strong>2010</strong>-<strong>11</strong>, the following tentative proposal has been prepared:<br />

Proposed activity Cost in lakh rupees<br />

Construction of District Stadium at <strong>Nayagarh</strong> 20.00<br />

Construction of polytechnique building at Odagaon 1000.00<br />

Total<br />

1020.00<br />

3 The TSI discussed the matter with the Executive Engineer, Balugaon Electrical Division; and he has assured all possible<br />

measures provided the issue is brought to his notice officially.<br />

133


XI.4.2 Rural Works Division:<br />

Proposed outlay was Rs.490.06 lakhs for the Rural Works Division for construction of buildings. In the<br />

absence of any concrete proposal for <strong>2010</strong>-<strong>11</strong>, the TSI estimates a budget of Rs.539.066 for <strong>2010</strong>-<strong>11</strong><br />

considering 10% increments over the budget of <strong>2010</strong>-<strong>11</strong>.<br />

____________<br />

134


Chapter VII<br />

______________________________________<br />

TRIBAL SUB-PLAN<br />

Total ST Population, as per 2001 census, was 50836 of which 25778 were male and 25058<br />

were female. This was only 5.88% of the total population of the district. Largest<br />

concentration of the ST community was in the Dasapalla Block (19167) followed by<br />

Nuagaon Block (10222). (Source: District Statistical Handbook: <strong>Nayagarh</strong>, 2007, table-2.03)<br />

The literacy rate of ST population was 47.09% of which male literacy rate was 64.81% and<br />

female literacy was 28.83%. (Source: Statistical Abstract of Orissa: 2008, table-1.07).<br />

The tribals are usually forest-dwellers and depend on forest collection. Bamboo cutting for<br />

paper mills, and forest development activities of the Forest Department has been among their<br />

sources of income. This has helped them to live a hand-to-mouth life. Agriculture land is<br />

either lacking with them, or is meagre, or is without tenancy rights. However, the<br />

implementation of the Forest Rights Act has provided them a new hope as they are now to get<br />

land rights in the forests based on their past records or required evidences. The District<br />

Welfare Department has been quite active for progressive achievements in this respect as the<br />

Central government as well as the State government has been keen on this issue.<br />

Some of the line departments/agencies have special budgetary provisions for scheduled tribes<br />

which is known as the TSP(Tribal Sub-Plan) component. The major agencies/departments<br />

having this component in their annual plan and budget are DRDA, District Welfare, Energy,<br />

etc.. Following is an abstract of the provisions under TSP for <strong>Nayagarh</strong> district for 2009-10<br />

as per the statistics available with the TSI: 4<br />

Total budget TSP share in lakh % of TSP<br />

Department<br />

in lakh rupees rupees allocation<br />

Agriculture & Food Production 402.17 14.43 3.588035<br />

Horticulture 53.28 10.65 19.98874<br />

Soil Conservation 60.75 27.34 45.00412<br />

Watershed Mission 90 5.833 6.48<strong>11</strong><strong>11</strong><br />

Animal Resource Development 53.4 13.8 25.8427<br />

Energy 263.95 13 4.925175<br />

(Note: These statistics have been collected from District Sector Outlays for Rural & Urban sectors as<br />

provided to the P&C Department, Govt of Odisha by various Departments; and hence these may not<br />

match with the proposed outlay in the district agencies which often require more funds for additional<br />

activities.)<br />

Needless to mention, the already discussed proposals for, MADA clusters, artcle 275(1),<br />

developmental activities for educational institutions under District Welfare Department, are<br />

fully or mostly devoted to the development of tribals.<br />

4 The abstract is incomplete due to non-submission of relevant data by several departments.<br />

135


Chapter VIII<br />

______________________________________<br />

SCHEDULED CASTE SUB-PLAN<br />

Total SC population, as per 2001 census, was 121409 of which 61876 were male and 59533<br />

were female. This was 14.04 % of the total population of the district. Largest concentration of<br />

the SC community was in the Odagaon Block (20056) followed by Dasapalla-(18872),<br />

Khandapara-(18292) and <strong>Nayagarh</strong>-(14960), and Nuagaon-(14637) Blocks.<br />

The literacy rate of SC population was 57.27% of which male literacy rate was 72.13% and<br />

female literacy was 41.96%. (Source: Statistical Abstract of Orissa: 2008, table-1.08).<br />

The SC community has been socially and economically backward since centuries. Most of<br />

the artisans belong to this group. Besides, many work as wage labourers.<br />

Some of the line departments/agencies have special budgetary provisions for scheduled caste<br />

people which is known as the SCSP(Scheduled Caste Sub-Plan) component. The<br />

agencies/departments having this component in their annual plan and budget are DRDA,<br />

District Welfare, Forest, Energy, etc.. Following is an abstract of the provisions under SCSP<br />

for <strong>Nayagarh</strong> district for 2009-10 as per the statistics available with the TSI: 5<br />

.<br />

136<br />

Total budget in SCSP share in lakh<br />

% of<br />

SCSP<br />

Department<br />

lakh rupees rupees<br />

allocation<br />

Agriculture & Food Production 402.17 22.8 5.669244<br />

Horticulture 53.28 8.87 16.6479<br />

Soil Conservation 60.75 10.02 16.49383<br />

Watershed Mission 90 15.53 17.25556<br />

Animal Resource Development 53.4 10.15 19.00749<br />

Energy 263.95 33.95 12.86228<br />

(Note: These statistics have been collected from District Sector Outlays for Rural & Urban sectors as<br />

provided to the P&C Department, Govt of Odisha by various Departments; and hence these may not<br />

match with the proposed outlay in the district agencies which often require more funds for additional<br />

activities.)<br />

The District Welfare Department provides financial and other kinds of support for SC<br />

students. The Forest Department sometimes takes initiatives for livelihood support of the<br />

forest-dependent SC people like bamboo artisans.<br />

_____________<br />

5 The abstract is incomplete due to non-submission of relevant data by several departments.


Chapter IX<br />

______________________________________<br />

RECOMMENDATIONS OF THE DISTRICT<br />

PLANNING COMMITTEE<br />

The District Planning Committee of <strong>Nayagarh</strong> met on 22 nd December 2009 to discuss the<br />

draft annual plans for 2009-10 and <strong>2010</strong>-<strong>11</strong>. Following are the recommendations of the DPC:<br />

137<br />

22. DIC & Agriculture/Horticulture Departments should focus on agro-industries and<br />

value addition projects.<br />

23. Horticulture department should propose for cold chain, pat house and refrigerated<br />

vans; should provide the list of drip irrigation provided; and revive defunct<br />

horticulture centre at Nuagaon as demo unit. To ensure marketing of floriculture<br />

products, it should promote species that are better marketable locally(like marigold).<br />

24. Soil conservation department should be more dynamic and should propose for<br />

additional watershed projects. Water harvesting structures should be renovated.<br />

25. Panchayat should be declared as the unit for assessing crop failure/loss.<br />

26. For development of animal resources, genetic upgradation of existing population<br />

should be taken up, marketing of milk should be ensured, and fodder farms should be<br />

established.<br />

27. Given the fact that <strong>Nayagarh</strong> fish has a good demand, and supply from Andhra is<br />

being marketed in Bhubaneswar in the name of <strong>Nayagarh</strong> fish, the private sector<br />

should be encouraged so that fishery development in the district can take place<br />

adequately. There should be demonstration for fish farmers.<br />

28. The Cooperatives should encourage private entrepreneurs for cold storage through<br />

their subsidy programme. On the other hand, the district cooperatives should be<br />

brought under only one cooperative Bank, i.e. the <strong>Nayagarh</strong> Cooperative bank.<br />

29. The present grant under MO KUDIA scheme for 471 beneficiaries is highly<br />

insufficient for the district, and each Block should rather have atleast a target for 400.<br />

Similarly, target for Indira Awas Yojna should be increased proportionately according<br />

to the BPL population of the district.<br />

30. Rs.100 crore should be proposed for Bruttanga irrigation project. The MI Division<br />

should see to it that more projects are incorporated under Triple ‘R’ scheme. The<br />

government should give subsidy to the LI users on electricity bills.<br />

31. Infrastructure development in the energy sector is very much required and to ensure<br />

effective & reliable supply to Ranapur area there should be two sections at Gopalpur<br />

& Darpanarayanpur. Presently three electrical divisions have jurisdiction over the<br />

district, but it should be brought under only the <strong>Nayagarh</strong> division. BGJY should be<br />

extended for the poor people of urban areas also.<br />

32. The Textiles Department should focus on powerloom issue, and should open training<br />

centre for the weavers of Badhipatana, Narendrapur, Uansapatana, and Rajsunakhala.<br />

33. The NH division should register FIR against those hindering the progress of the<br />

construction & repairing work. Rumbles should replace humps.<br />

34. More RD roads should be taken up by the PWD, and similarly more PS roads should<br />

be taken up be RD. Intermediate roads connecting NH to NH(like that from<br />

Pratapprasad to Chandpur, and from Sunakhala to Chandpur) should be treated at par<br />

with the NH. Panchayat monitoring may help reduce encroachment of roads.


138<br />

35. The Forest Department should develop the forest roads into metal roads atleast, and<br />

should accelerate its road development program through NREGS.<br />

36. The Tourism Department should take up development of sites like Asurakumari and<br />

Jagannath temple of Ranpur.<br />

37. The District Welfare Department should see to it that each Ashram school has one<br />

100-seater hostel.<br />

38. There should ateast one mobile health care unit in each Block.<br />

39. <strong>Nayagarh</strong> town should be converted into a municipality incorporating Patana.<br />

Similarly, Ranpur and Daspalla be declared as NAC.<br />

40. The Social Welfare Department should propose for anganwadi stores, more<br />

orphanage, SWADHAR, working women’s hostel, old age home, short stay home,<br />

and staff quarter alongwith office building. Class VIII students should be eligible to<br />

be benefited under mid-day meal programme.<br />

41. Police out posts should be opened at Chadheyapalli, Kurala, Gadabanikilo, and<br />

Gopalpur. Cluster fortification will be more helpful for the police.<br />

42. The Jails should propose for their own security force.<br />

______________


(This section contains data for those departments<br />

only whose data was received by the TSI)<br />

139


GN STATEMENTS<br />

(Based on actual submissions to the TSI)<br />

140


Sl<br />

No<br />

Major Head /<br />

Minor Heads<br />

of<br />

Development<br />

(Scheme-wise)<br />

Implementi<br />

ng Agency<br />

State Govt.<br />

/ Public<br />

Sector<br />

Enterprises<br />

/ Local<br />

Bodies<br />

State<br />

Govt.<br />

GN STATEMENT<br />

Soil Conservation Department<br />

ANNEXTURE – I<br />

DRAFT ANNUAL PLAN – 2009 – 10: PROPOSED OUTLAYS (SCHEME – WISE)<br />

IN RESPECT OF SOIL CONSERVATION SUB-DIVISION, NAYAGARH<br />

Eleventh Plan (2007-12)<br />

Projected Outlay (at 2006-<br />

07 Prices)<br />

Total<br />

Continu<br />

ing<br />

Scheme<br />

s<br />

New<br />

Sche<br />

mes<br />

(Rs. In Lakh)<br />

Annual Plan: 2007-08<br />

Annual Plan: 2008-09<br />

Actual Expenditure Agreed Outlay Anticipated Expenditure<br />

Total Continuing<br />

Schemes<br />

New<br />

Sche<br />

mes<br />

Total<br />

Continui<br />

ng<br />

Schemes<br />

Ne<br />

w<br />

Sc<br />

he<br />

me<br />

s<br />

Total<br />

Continui<br />

ng<br />

Scheme<br />

s<br />

1<br />

N. W. D. P.<br />

R. A.<br />

432.29 432.29 - 26.81 26.81 - 146.<strong>11</strong> 146.<strong>11</strong> - 35.40 35.40 -<br />

2 R. K. V. Y. -do- 712.50 712.50 - - - - 106.875 106.875 - 52.50 52.50 -<br />

3<br />

I. W. D. P. –<br />

II (Hariyalli)<br />

-do- 300.00 300.00 - 90.00 90.00 - 90.00 90.00 - 90.00 90.00 -<br />

4<br />

I. W. D. P. –<br />

III (Hariyalli)<br />

-do- 300.00 300.00 - 90.00 90.00 - 90.00 90.00 - 90.00 90.00 -<br />

5<br />

I. W. D. P. –<br />

V (Hariyalli)<br />

-do- 300.00 300.00 - 45.00 45.00 - 90.00 90.00 - 90.00 90.00 -<br />

Sl No<br />

Major Head /<br />

Minor Heads of<br />

Development<br />

(Scheme-wise)<br />

Implementing Agency<br />

State Govt. / Public<br />

Sector Enterprises /<br />

Local Bodies<br />

Annual Plan: 2009-10 and <strong>2010</strong>-<strong>11</strong>.<br />

Proposed Outlay<br />

Total<br />

Continuing<br />

Schemes<br />

New Schemes<br />

1 N. W. D. P. R. A. State Govt. 302.41 302.41 -<br />

2 R. K. V. Y. -do- 427.50 427.50 -<br />

3 I. W. D. P. – II -do- 75.00 75.00 -<br />

New<br />

Sche<br />

mes<br />

141


4<br />

5<br />

(Hariyalli)<br />

I. W. D. P. – III<br />

(Hariyalli)<br />

I. W. D. P. – V<br />

(Hariyalli)<br />

Sl No Item Unit<br />

-do- 75.00 75.00 -<br />

-do- 135.00 135.00 -<br />

ANNEXTURE – II<br />

DRAFT ANNUAL PLAN – 2009-10: PHYSICAL TARGETS AND ACHIEVEMENTS<br />

Eleventh Plan<br />

(2007 – 12)<br />

Target)<br />

Annual Plan<br />

2007-08 Actual<br />

Achievement<br />

Annual Plan: 2008-09<br />

Anticipated<br />

Target<br />

Achievement<br />

Annual Plan<br />

2009-10 Target<br />

1<br />

Treatment of<br />

Watershed<br />

Ha 3975Ha 596 Ha 315 Ha 315 Ha 1828.62 Ha<br />

2 -do- Ha 7500 Ha - <strong>11</strong>25 Ha 552.63 Ha 2250 Ha<br />

3 -do- Ha 5000 Ha 1500 Ha 1500 Ha 1500 Ha 750 Ha<br />

4 -do- Ha 5000 Ha 1500 Ha 1500 Ha 1500 Ha 750 Ha<br />

5 -do- Ha 5000 Ha 750 Ha 1500 Ha 1500 Ha 1500 Ha<br />

142


Sl No Name of Item / Programme<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

ANNEXTURE – III<br />

DRAFT ANNUAL PLAN – 2009-10: BHARAT NIRMAN PROGRAMMES: PROPOSED OUTLAYS<br />

Irrigation<br />

Rural Drinking Water Supply<br />

Rural Roads<br />

Rural Housing<br />

Rural Electrification<br />

Rural Telephone<br />

TOTAL (1 to 6)<br />

Eleventh Plan<br />

(2007-12)<br />

Projected Outlay<br />

Annual Plan<br />

(2007-08)<br />

Annual<br />

Expenditure<br />

Annual Plan: 2008-09<br />

Agreed Outlay<br />

NIL<br />

Anticipated<br />

Expenditure<br />

Annual Plan<br />

(2009-10)<br />

Proposed Outlay<br />

ANNEXTURE – IV<br />

DRAFT ANNUAL PLAN – 2009-10 AND <strong>2010</strong>-<strong>11</strong>: CENTRALLY SPONSORED SCHEMES: PROPOSED OUTLAYS<br />

(Rs in Lakh)<br />

Sl<br />

No<br />

1<br />

2<br />

Name of<br />

the<br />

Scheme Central<br />

N. W. D.<br />

P. R. A.<br />

R. K. V.<br />

Y.<br />

Pattern of<br />

Funding (%)<br />

Share<br />

State<br />

Share<br />

Eleventh Plan<br />

(2007-12)<br />

Centra<br />

l Share<br />

State<br />

Share<br />

Annual Plan:<br />

2007-08<br />

Annual Plan: 2008-09<br />

Anticipated<br />

Agreed Outlay<br />

Expenditure<br />

Central State Central State Central State<br />

Share Share Share Share Share Share<br />

Annual Plan:<br />

2009-10 and<br />

Central<br />

Share<br />

<strong>2010</strong>-<strong>11</strong><br />

State<br />

Share<br />

90% 10% 389.06 43.23 24.129 2.681 65.53 7.28 31.86 3.54 272.17 30.24<br />

6000/-<br />

per Ha<br />

3500/per<br />

ha<br />

450.00 262.50 - - 67.50<br />

39.37<br />

5<br />

52.50 - 270.00 157.50<br />

143


Sl<br />

No<br />

1<br />

3<br />

4<br />

5<br />

Major<br />

Head / Sub<br />

head /<br />

I. W. D.<br />

P. – II<br />

(Hariyalli)<br />

I. W. D.<br />

P. – III<br />

(Hariyalli)<br />

I. W. D.<br />

P. – V<br />

(Hariyalli)<br />

Schemes Total<br />

Outlay<br />

N. W. D.<br />

P. R. A.<br />

2 R. K. V. Y.<br />

3<br />

4<br />

5<br />

I. W. D. P.<br />

– II<br />

(Hariyalli)<br />

I. W. D. P.<br />

– III<br />

(Hariyalli)<br />

I. W. D. P.<br />

– V<br />

(Hariyalli)<br />

5500/per<br />

ha<br />

500/-<br />

per Ha<br />

275.00 25.00 82.50 7.50 82.50 7.50 82.50 7.50 68.75 6.25<br />

-do- -do- 275.00 25.00 82.50 7.50 82.50 7.50 82.50 7.50 68.75 6.25<br />

-do- -do- 275.00 25.00 41.25 3.75 82.50 7.50 82.50 7.50 123.75 <strong>11</strong>.25<br />

TRIBAL SUB-PLAN (TSP) - I<br />

ANNEXTURE – V (A)<br />

DRAFT ANNUAL PLAN – 2009-10: FINANCIAL OUTLAYS: PROPOSALS FOR TSP<br />

(Rs in Lakh)<br />

Eleventh Plan (2007-12)<br />

Projected Outlays (At<br />

2006 – 07 Prices)<br />

Of which<br />

flow to<br />

TSP<br />

Annual<br />

Plan 2007-<br />

08<br />

Actual<br />

Expenditure<br />

under TSP<br />

Annual Plan: 2008-09 Annual Plan: 2009-10<br />

Proposed Outlay Anticipated Expenditure Proposed Outlay<br />

Total<br />

Outlay<br />

Of which<br />

flow to<br />

TSP<br />

NIL<br />

Total<br />

Outlay<br />

Of which<br />

flow to<br />

TSP<br />

Total<br />

Outlay<br />

Of which<br />

flow to<br />

TSP<br />

144


Sl No<br />

Sl No<br />

Major Head /<br />

Sub-head /<br />

Schemes<br />

Major<br />

Head /<br />

Sub-Head /<br />

Schemes Total<br />

Outlay<br />

TRIBAL SUB-PLAN (TSP) - II<br />

ANNEXTURE – V(B)<br />

DRAFT ANNUAL PLAN – 2009-10: PHYSICAL AND ACHIEVEMENTS: PROPOSALS FOR TSP<br />

(Rs in Lakh)<br />

Unit<br />

Eleventh Plan<br />

(2007-12)<br />

Target<br />

Annual Plan<br />

2007-08<br />

Actual<br />

Achievement<br />

NIL<br />

SCHEDULED CASTE SUB-PLAN (SCSP) - I<br />

Annual Plan: 2008-09 Annual Plan<br />

Target<br />

Anticipated<br />

Achievement<br />

2009-10<br />

Target<br />

ANNEXTURE – VI (A)<br />

DRAFT ANNUAL PLAN – 2009-10: FINANCIAL OUTLAYS: PROPOSALS FOR SCSP<br />

(Rs in Lakh)<br />

Eleventh Plan (2007-12)<br />

Projected Outlays (At<br />

2006-07 prices)<br />

Of which<br />

flow to<br />

SCSP<br />

Annual<br />

Plan 2007-<br />

08<br />

Actual<br />

Expenditure<br />

under SCSP<br />

Annual Plan: 2008-09 Annual Plan: 2009-10<br />

Proposed Outlay Anticipated Expenditure Proposed Outlay<br />

Total<br />

Outlay<br />

NIL<br />

Of which<br />

flow to<br />

SCSP<br />

Total<br />

Outlay<br />

Of which<br />

flow to<br />

SCSP<br />

Total Outlay<br />

Of which<br />

flow to<br />

SCSP<br />

145


Sl No<br />

Major Head /<br />

Subhead/Schemes<br />

Sl No Scheme<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

…<br />

SCHEDULED CASTE SUB-PLAN (SCSP) - II<br />

ANNEXTURE – VI (B)<br />

DRAFT ANNUAL PLAN – 2009-10: PHYSICAL TARGETS AND ACHIEVEMENTS: PROPOSALS FOR SCSP<br />

(Rs in Lakh)<br />

Unit<br />

Eleventh Plan<br />

(2007-12)<br />

Target<br />

Annual Plan<br />

2007-08<br />

Actual<br />

Achievement<br />

NIL<br />

DRAFT ANNUAL PLAN – 2009-10: PROPOSED OUTLAYS<br />

Annual Plan: 2008-09 Annual Plan<br />

Target<br />

Anticipated<br />

Achievement<br />

2009-10<br />

Target<br />

ANNEXTURE – VII<br />

FINANCIAL OUTLAYS / EXPENDITURE FOR VOLUNTARY SECTOR<br />

(Rs in Lakh)<br />

Eleventh Plan<br />

(2007-12)<br />

Projected Outlay<br />

(at 2006-07 prices)<br />

Annual Plan 2007-<br />

08 Actual<br />

Expenditure<br />

NIL<br />

Annual Plan: 2008-09<br />

Agreed Outlay<br />

Anticipated<br />

Expenditure<br />

Annual Plan 2009-<br />

10 Proposed<br />

Outlay<br />

146


…<br />

…<br />

Sl No Major<br />

Head /<br />

Sub-head /<br />

Schemes<br />

Sl No<br />

TOTAL<br />

WOMEN COMPONENT (WC) IN THE STATE PLAN PROGRAMME - I<br />

ANNEXTURE – VIII-A<br />

DRAFT ANNUAL PLAN – 2009-10: FINANCIAL OUTLAYS: PROPOSALS FOR WC<br />

(Rs in Lakh)<br />

Eleventh Plan (2007-12)<br />

Projected Outlays (At<br />

2006-07 Prices)<br />

Total<br />

Outlay<br />

Of which<br />

flow to<br />

WC<br />

Annual<br />

Plan 2007-<br />

08<br />

Actual<br />

Expenditure<br />

under WC<br />

Annual Plan: 2008-09 Annual Plan: 2009-10<br />

Proposed Outlay Anticipated Expenditure Proposed Outlay<br />

Total<br />

Outlay<br />

NIL<br />

Of which<br />

flow to<br />

WC<br />

Total<br />

Outlay<br />

Of which<br />

flow to<br />

WC<br />

WOMEN COMPONENT (WC) IN THE STATE PLAN PROGRAMME - II<br />

Total<br />

Outlay<br />

ANNEXTURE – VIII-B<br />

DRAFT ANNUAL PLAN – 2009-10: PHYSICAL TARGETS AND ACHIEVEMENTS: PROPOSALS FOR WC<br />

(Rs in Lakh)<br />

Major Head /<br />

Sub-head /<br />

Schemes<br />

Unit<br />

Eleventh<br />

Plan(2007-12)<br />

Target<br />

Annual Plan<br />

(2007-08)<br />

Actual<br />

Achievement<br />

NIL<br />

Annual Plan: 2008-09 Annual Plan<br />

2009-10<br />

Target<br />

Anticipated<br />

Achievement Target<br />

Of which<br />

flow to<br />

WC<br />

147


Sl No Sector / Scheme<br />

DRAFT ANNUAL PLAN: 2009-10<br />

ANNEXTURE – IX<br />

BACKWARD REGIONS GRANT FUND (BRGF) - OUTLAYS<br />

Outlay proposed for 2009-10<br />

under State Plan (Exclussive<br />

BRGH)<br />

NIL<br />

Outlay Proposed out BRGF<br />

for gap filling<br />

GGY<br />

148


Sericulture Department<br />

DRAFT DISTRICT ANNUAL PLAN – 2009- 10 PROPOSED OUTLAY<br />

Sl.no Major Heads/<br />

Minor Heads of<br />

Development<br />

Eleventh Plan<br />

(2007-12)<br />

projected outlay<br />

(at 2006-07<br />

prices)<br />

Annual Plan 2007-<br />

08<br />

149<br />

(Rs. In Lakh)<br />

Annual plan 2008 –09 Annual plan<br />

2009-10 proposed<br />

outlay<br />

Actual Agreed outlay Anticipated<br />

Expenditure<br />

Expenditure<br />

0 1 2 3 4 5 6<br />

1 VSSI 2851-107-<br />

Seri (Promotion of<br />

seri industries)<br />

Nil 2.31 Lakhs Rs.16.78 Lakhs 10.00 Lakhs Rs.5.61 Lakhs<br />

DRAFT DISTRICT ANNUAL PLAN – 2009- 10 PROPOSED OUTLAY (from State<br />

Budget)<br />

Sl.no Major Heads/<br />

Minor Heads of<br />

Development<br />

Eleventh Plan<br />

(2007-12)<br />

projected outlay<br />

(at 2006-07<br />

prices)<br />

Annual Plan 2007-<br />

08<br />

(Rs. In Lakh)<br />

Annual plan 2008 –09 Annual plan<br />

2009-10 proposed<br />

outlay<br />

Actual Agreed outlay Anticipated<br />

Expenditure<br />

Expenditure<br />

0 1 2 3 4 5 6<br />

1 VSSI 2851-107-<br />

Seri (Promotion of<br />

seri industries)<br />

Nil 2.31 Lakhs Rs.16.78 Lakhs 10.00 Lakhs Rs.5.61 Lakhs


Major/ Head/<br />

Minor<br />

heads of<br />

development<br />

Implementing<br />

agency<br />

State govt /<br />

Public sector<br />

enterprises/<br />

local bodies<br />

DRAFT DISTRICT ANNUAL PLAN – 2009- 10: PROPOSED OUTLAY (SCHEME WISE)<br />

Eleventh Plan (2007-12) Annual Plan 2007 – 08 Annual Plan 2008 –09<br />

Projected outlay (at 2006-<br />

07 prices) Actual Expenditure Agreed Outlay Anticipated Expenditure<br />

Total<br />

Continuing<br />

schemes<br />

New schemes<br />

Total<br />

Continuing<br />

schemes<br />

New<br />

schemes<br />

Total<br />

Continuing<br />

schemes<br />

New<br />

schemes<br />

Total<br />

Continuing<br />

schemes<br />

New schemes<br />

150<br />

(Rs. In Lakh)<br />

Actual Plan 2009 –10<br />

Proposed outlay<br />

1 2 3 4 5 6 7 8 9 10 <strong>11</strong> 12 13 14 15 16 17<br />

VSSI 2851-<br />

107-Seri<br />

(Promotion of<br />

sericulture<br />

industries)<br />

State Govt<br />

Rs.3.21<br />

Promotion<br />

of<br />

sericulture<br />

Industries<br />

-<br />

Rs.2.31<br />

Promotion<br />

of<br />

sericulture<br />

Industries<br />

-<br />

16.78<br />

Promotion<br />

of<br />

sericulture<br />

Industries<br />

DRAFT DISTRICT ANNUAL PLAN – 2009- 10 Physical targets and achievement<br />

-<br />

Rs.10.00<br />

P.S.I S.P &<br />

C.S.P<br />

-<br />

Total<br />

Rs.5.61<br />

Continuing<br />

schemes<br />

P.S.I- S.P &<br />

CSP<br />

(Rs. In Lakhs)<br />

Item Unit Eleventh Plan Annual Plan 2007- Annual plan 2008 –09 Annual plan<br />

(2007-12) target<br />

08<br />

2009-10 target<br />

Actual achievement Target Achievement<br />

1 2 3 4 5 6 7<br />

RHC 1. MRCS Daspalla RHC-36 RHC-16<br />

RHC-28 -<br />

RE 2. MRCS Odagaon RE-20<br />

RE-20<br />

RE-28 -<br />

-<br />

Plantation 3. MRCS Ranpur Plantation- 100 Plantation- 43 acre Plantation-35 9 acre<br />

Irrigation 4. Eri centre<br />

Odagaon<br />

acre<br />

New schemes<br />

-


DRAFT DISTRICT ANNUAL PLAN – 2009-10 NAYAGARH DISTRICT<br />

CENTRALLY SPONSORED SCHEMES: PROPOSED OUTLAY<br />

Name of<br />

the<br />

schemes<br />

Pattern of<br />

funding (%)<br />

Central<br />

Share<br />

State<br />

Share<br />

Eleventh Plan (2007-<br />

12) Projected outlay<br />

(2007-09)<br />

Central<br />

Share<br />

State<br />

Share<br />

Annual Plan 2007-<br />

08<br />

Actual<br />

Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Annual Plan 2008-09<br />

Agreed outlay Anticipated<br />

Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

151<br />

(Rs.in Lakh)<br />

Annual Plan 2009-10<br />

Proposed outlay<br />

Central<br />

Share<br />

2 3 4 5 6 7 8 9 10 <strong>11</strong> 12 13 14<br />

P.S<br />

Industries<br />

SSfCSP<br />

Centre<br />

share of<br />

CSB<br />

under<br />

CDP<br />

50% 50% &<br />

25%<br />

5.71 6.06 1.002 1.99 4.71 4.07 3.00 3.00 3.61 3.61<br />

State<br />

Share


Annexure -I<br />

Sub-sector M<br />

aj<br />

or<br />

h<br />

ea<br />

d<br />

M<br />

in<br />

or<br />

h<br />

ea<br />

d<br />

CDAP Tables and GN statement for agriculture & allied sectors 6<br />

DRAFT ANNUAL PLAN 2009-10 & <strong>2010</strong>-<strong>11</strong>: PROPOSED OUTLAY SCHEME-WISE<br />

Name of the<br />

scheme<br />

Imple<br />

mentin<br />

g<br />

Eleventh Plan<br />

projection (2007-<br />

12)<br />

agency Total Co<br />

nti<br />

nui<br />

ng<br />

sch<br />

em<br />

e<br />

Ne<br />

w<br />

sch<br />

em<br />

e<br />

Annual Plan 2007-08 actual Annual Plan 2008-09<br />

actual<br />

Total Conti<br />

nuing<br />

schem<br />

e<br />

New<br />

scheme<br />

Total Contin<br />

uing<br />

scheme<br />

New<br />

sche<br />

me<br />

Annual plan 2009-10<br />

proposed<br />

Total Continu<br />

ing<br />

scheme<br />

Fishery FFDA 25.00<br />

NREGS 266.00<br />

RKVY 86.25 23.25<br />

ATMA 17.50<br />

CSP 54.64<br />

Sub-Total 449.39<br />

Agriculture WP-Rise DAO 41.76 C 8.69 23.5 8.76 8.79<br />

WP-SC 28.26 22.02 4.43 5.66 5.94<br />

WP-Mests 1.37<br />

Farm Mech 141.1<br />

9<br />

22.02 6 22.3 22.97<br />

ISOPOM -M 22.03 4.40 1.93 4.4 4.42<br />

ISOPOM-P 47.13 8.89 4.03 9.44 9.56<br />

ISOPOM-O 48.85 9.37 4.46 9.38 9.46<br />

NFSM-P 1061.<br />

03<br />

13.13 189.36 292.37 292.00<br />

NRFS-R 252.2<br />

9<br />

2.81 164.55 146.67 146.67<br />

ATMA 129.5<br />

24.49<br />

60.66<br />

6<br />

40.2<br />

60.66<br />

RKVY 21.71 14.60 7.1 3.30<br />

Sub-total 1793.<br />

130.42<br />

562.94 560.47<br />

81<br />

446.93<br />

Sericulture Promotion<br />

of<br />

sericulture<br />

AD,<br />

Sericul<br />

ture<br />

3.21 c 2.31 16.78 c 5.61 6.17<br />

6 This table alongwith the GN statements for agriculture and ARD was prepared and submitted by the respective departments prior to the DPC meeting, and<br />

hence subsequent revisions have not been reflected here.<br />

New<br />

sche<br />

me<br />

152<br />

Annual Plan <strong>2010</strong>-<strong>11</strong> proposed<br />

Total Continui<br />

ng<br />

scheme<br />

New<br />

scheme


Horticulture NHM<br />

Model<br />

Nursery<br />

58.50<br />

Veg seed 10.00<br />

Establishme<br />

nt of new<br />

71.34<br />

garden<br />

Mango<br />

-<br />

Floriculture<br />

Protected<br />

cultivation<br />

12.07<br />

14.60<br />

Promotion<br />

of<br />

INM/IPM<br />

0.30<br />

Vermicomp<br />

osting<br />

10.80<br />

HRD 7.94<br />

Cold<br />

storage<br />

50.00<br />

Low<br />

onion<br />

storage<br />

cost<br />

48.00<br />

District<br />

0.50<br />

level show<br />

Sub-total 318.42<br />

ARD Skill<br />

upgradation<br />

CDVO 5.17 C<br />

0.34 1.38 1.38<br />

Control<br />

animal<br />

disease<br />

of<br />

3.20 c 0.32 0.64 0.64<br />

Fodder<br />

nursery<br />

4.50 c 0.18 1.44 1.44<br />

Sub-total 12.87 0.55 2.46 2.36<br />

Soil<br />

Conservation<br />

NWDPRA ASCO 432.2<br />

9<br />

IWDP-II 300.0<br />

0<br />

IWDP-III 300.0<br />

0<br />

IWDP-V 300.0<br />

0<br />

RKVY 712.5<br />

0<br />

35.40 202.98 99.43<br />

90.00 45.00 30.00<br />

90.00 45.00 30.00<br />

90.00 90.00 45.00<br />

52.50 213.75 213.75<br />

153


Sub-Total 2044.<br />

79<br />

357.90 596.73 418.18<br />

Forest 219.46 241.40<br />

Annexure II<br />

DRAFT ANNUAL PLAN 2009-10: PHYSICAL TARGET AND ACHIEVEMENT<br />

Sub-sector Item Unit Eleventh Annual Plan Annual Plan Annual plan 2009-10<br />

Plan Target 2007-08- 2008-09 Target Anticipated<br />

Actual<br />

achievement<br />

achievement<br />

achievement<br />

Fisheries Establishment of fish<br />

2.ha<br />

breeding farm under RKVY<br />

Construction<br />

(RKVY)<br />

of aquashop<br />

8<br />

Training Hall (RKVY) 1<br />

Soil and water testing<br />

8<br />

Kit(RKVY)<br />

ARD Training No 30<br />

Control of animal diseases No 160<br />

Fodder development Plots 16<br />

Construction of hostel 1 1<br />

Agriculture WP-Sugarcane<br />

Development<br />

Demonstration Acre 130 125<br />

FFS no 8 9<br />

Exposure visit no 20 35<br />

Subsidy on seed cane Ton 330<br />

WP-Rice<br />

FFS no 1<br />

Exposure visit no 30<br />

Seed distribution Q 880<br />

Exhibition no 2<br />

Farm Mechanisation no 104 153<br />

ISOPOM-Pulse<br />

Seeds Q 95 100<br />

154<br />

Annual<br />

Plan <strong>2010</strong>-<br />

<strong>11</strong> Target


Demonstration ha 36 10<br />

PP equipment No 50 150<br />

Implements No 31<br />

PP chemical Ha <strong>11</strong>6 10<br />

Sprinkler No 42<br />

Biofertiliser Ha 190 300<br />

Training No 14<br />

ISOPOM-Oilseed<br />

Seeds Q 245 93<br />

Demonstration ha 23<br />

PP equipment No 67 130<br />

Implements No 7<br />

PP chemical Ha<br />

Sprinkler No 22<br />

Biofertiliser ha 56 58<br />

Training No 2 8<br />

Gypsum Ha 362 7<strong>11</strong><br />

Vermicompost no 8 30<br />

ISOPOM-Maize<br />

Seeds Q 10.5 5<br />

PP equipment No <strong>11</strong>3 150<br />

Demonstration ha 10<br />

Training no 5<br />

Jalanidhi (RIDF) No 453<br />

NFSM-Rice<br />

Demonstration No 1914 337<br />

Seeds Q 1521 <strong>11</strong>960<br />

FFS No 24 32<br />

Community Nursery Acre 4 2<br />

Community threshing floor No 4<br />

Liming Ha 3510 5292<br />

Minikit No 2370 2550<br />

PP Chemical Ha 158 1620<br />

Implements no 1222 1320<br />

Micronutrients Ha 353 <strong>11</strong>979<br />

NFSM-Pulses<br />

Seeds Q 221 308<br />

155


Gypsum ha 13<strong>11</strong>4 3420<br />

Micronutrient ha 1383 3420<br />

IPM ha 1455 2800<br />

Training no 26 14<br />

Machinery no 1292 923<br />

Sprinkler no 238 339<br />

Demonstration no 140<br />

Community threshing floor no 4<br />

ATMA<br />

Training no 164<br />

Demonstration no 262<br />

Formation of GKM 600<br />

FFS 4<br />

Exposure visit 17<br />

Soil<br />

Conservation<br />

Treatment of watersheds Ha 26475 4346 4930 5078<br />

Forestry Plantation Ha 6814<br />

Sericulture RHC<br />

RE<br />

Plantation<br />

Horticulture<br />

Soil<br />

Conservation<br />

No<br />

Ac<br />

No<br />

36<br />

100<br />

20<br />

NWDPRA Ha 3975 596 315 896<br />

IWDP Ha 15000 552 2250<br />

RKVY Ha 7500 3750 3000 1750<br />

16<br />

43<br />

20<br />

Annexure IV<br />

DRAFT ANNUAL PLAN 2009-10:CENTRALLY SPONSORED SCHEMES- PROPOSED OUTLAYS<br />

9<br />

156


Major/Minor<br />

Dev. Heads<br />

Name of<br />

Scheme<br />

Pattern of Funding Eleventh Plan (2007-<br />

12) Proposed<br />

Outlays<br />

Central State Central State<br />

Share<br />

Share<br />

Share<br />

Share<br />

Annual Plan 2007-<br />

08 Actual<br />

Expenditure<br />

Central State<br />

Share<br />

Agriculture WP 32.43 3.62<br />

ISOPOM<br />

ARD 33-2403-AH-<br />

CSP<br />

Soil<br />

conservation<br />

Sericulture PS industries<br />

SSW&CSP<br />

Share<br />

Annual Plan 2008-09<br />

Agreed outlays Expenditure<br />

Central<br />

Share<br />

State<br />

Share<br />

Central<br />

Share<br />

State<br />

Share<br />

157<br />

Annual Plan 2009-<br />

10 Proposed<br />

outlays<br />

Central<br />

Share<br />

50 50 2.49 1.79 2.08 2.08 2.45 2.45<br />

NWDPRA 90 10 389.06 43.23 24.12 2.68 65.53 7.28 31.86 3.54 182.68 20.30<br />

IWDP-I <strong>11</strong> 1 275.00 25 82.50 7.50 82.50 7.50 82.50 7.50 41.25 3.75<br />

2.50IWDP-II 275..00 25.00 82.50 7.50 82.50 7.50 82.50 7.50 41.25 3.75<br />

2.50IWDP_III 275.00 25.00 82.50 7.50 82.50 7.50 82.50 7.50 41.25 3.75<br />

2.50RKVY 6000 3500 450 262 67.50 39.37 52.50 135.00 78.75<br />

1389.06 380.23 271.62 25.18 380.53 69.15 331.86 26.04 441.43 <strong>11</strong>0.3<br />

50 50 5.71 6.06 1.00 1.99 4.71 4.07 3.00 3.00 3.61 3.61<br />

Annexure V-A<br />

DRAFT ANNUAL PLAN 2009-10 & <strong>2010</strong>-<strong>11</strong>: FINANCIAL OUTLAYS: PROPOSAL FOR TSP ( In lakh Rs)<br />

Major Eleventh Plan Actual flow Actual flow Annual plan 2009-10 Annual Plan <strong>2010</strong>-<strong>11</strong><br />

Head/Sub head Total Flow to TSP to TSP during to TSP during Total Flow to TSP Total Flow to TSP<br />

/scheme<br />

Agriculture<br />

2007-08 2008-09<br />

ISOPOM 5.21 38.62<br />

Jalanidhi 4.36<br />

Workplan 1.41<br />

Sub total 6.62 42.98<br />

DRAFT ANNUAL PLAN 2009-10 & <strong>2010</strong>-<strong>11</strong>: Physical targets and Achievements : Proposal for TSP<br />

Sub-sector Major head/sub Unit Eleventh Plan Annual Plan Annual Plan<br />

head/scheme<br />

Target 2007-08 Ach 2008-09 Ach<br />

Agriculture Farm<br />

Mechanisation<br />

No 6<br />

Annexure V-B<br />

Annual Plan<br />

2009-10 Target<br />

State<br />

Share<br />

Annual Plan<br />

<strong>2010</strong>-<strong>11</strong> Target


Jalanidhi no 23<br />

Annexure VI-A<br />

DRAFT ANNUAL PLAN 2009-10 & <strong>2010</strong>-<strong>11</strong>: FINANCIAL OUTLAYS: PROPOSAL FOR SCSP ( In lakh Rs)<br />

Major Head/Sub Eleventh Plan Actual flow Actual flow Annual plan 2009-10 Annual Plan <strong>2010</strong>-<strong>11</strong><br />

head<br />

Total Flow to to SCSP to SCSP Total Flow to Total Flow to<br />

/scheme<br />

SCSP during 2007- during 2008-<br />

SCSP<br />

SCSP<br />

08<br />

09<br />

Agriculture<br />

ISOPOM 3.85 3.44<br />

Jalanidhi 14.68<br />

WORKPLAN 2.08<br />

Sub-Total 5.93 90.59<br />

Annexure VI-B<br />

DRAFT ANNUAL PLAN 2009-10 & <strong>2010</strong>-<strong>11</strong>: Physical targets and Achievements : Proposal for SCSP<br />

Sub-sector Major head/sub Unit Eleventh Plan Annual Plan Annual Plan Annual Plan Annual Plan<br />

head/scheme<br />

Target 2007-08 Ach 2008-09 Ach 2009-10 Target <strong>2010</strong>-<strong>11</strong> Target<br />

Agriculture Farm Mechanisation 24<br />

Jalanidhi 60<br />

Annexure VII-A<br />

DRAFT ANNUAL PLAN 2009-10 & <strong>2010</strong>-<strong>11</strong>: FINANCIAL OUTLAYS: PROPOSAL FOR Women Component ( In lakh Rs)<br />

Major Head/Sub Eleventh Plan Actual flow Actual flow Annual plan 2009-10 Annual Plan <strong>2010</strong>-<strong>11</strong><br />

head<br />

Total Flow to WC to WC during to WC during Total Flow to WC Total Flow to WC<br />

/scheme<br />

2007-08 2008-09<br />

ARD 8.37 0.40 0.19 2.02 0.59 2.02 0.59<br />

Annexure VII-B<br />

DRAFT ANNUAL PLAN 2009-10 & <strong>2010</strong>-<strong>11</strong>: Physical targets and Achievements : Proposal for Women Component<br />

Sub-sector Major head/sub Unit Eleventh Plan Annual Plan Annual Plan Annual Plan Annual Plan<br />

head/scheme<br />

Target 2007-08 Ach 2008-09 Ach 2009-10 Target <strong>2010</strong>-<strong>11</strong> Target<br />

ARD No 2940 348 276 624 624<br />

158


DRAFT ANNUAL PLAN – 2009-10: BHARAT NIRMAN PROGRAMMES: PROPOSED OUTLAYS FOR NAYAGARH DISTRICT<br />

Sl No Name of Item / Programme<br />

Annual Plan (2009-10)<br />

Proposed Outlay<br />

1 Irrigation 1614.87<br />

2 Rural Drinking Water Supply 2729.48<br />

3 Rural Roads 2542.92<br />

4 Rural Housing 2189.60<br />

5 Rural Electrification 263.95<br />

6 Rural Telephone 3.00<br />

TOTAL (1 to 6) 9343.82<br />

Note: Under the Bharat Nirmam programme AIBP-funded irrigation projects are considered for major- and medium irrigation<br />

structures, and at present no AIBP-funded exists for <strong>Nayagarh</strong> district. However, for minor irrigation projects, ‘Repair, Renovation, &<br />

Restoration of water bodies directly linked to agriculture’ are considered and under this scheme <strong>Nayagarh</strong> district has proposed an<br />

outlay of Rs.1614.87 lakhs. For rural roads, the proposed outlay for PMGSY has been taken into consideration, for rural housing<br />

Indira Awas Yojna, and for rural electrification RGGVY. For rural telephones, BSNL has provided village public telephones (VPT)<br />

and in <strong>Nayagarh</strong> district total 12 such phones(WLL) have been provided for 2009-10 under Bharat Nirman[Source: AGM(USO),<br />

CGMT Office, BSNL, Bhubaneswar). ]. .<br />

159


10 th 5-YEAR PLAN OUTLAYS & EXPENDITURE<br />

(Based on actual submissions to the TSI)<br />

160


Source of<br />

the Revenue<br />

Central<br />

Sector<br />

Schemes<br />

Centrally<br />

sponsored<br />

schemes<br />

State Sector<br />

schemes<br />

Central<br />

Finance<br />

commission<br />

State Finance<br />

commission<br />

Untied funds<br />

from state<br />

Allocation<br />

Name of the Department: Animal Resource Development Department<br />

(Office of the Chief District Veterinary Officer, <strong>Nayagarh</strong>)<br />

Financial <strong>Year</strong>(amount in rupees)<br />

2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

- - - - 70685 70685 - - 24000 24000 32000 32000 32000 32000 - -<br />

215020 206320 226019 220341 130261 130261 56290 21209 6500 6350 22000 22000 454000 428000 73380 71333<br />

- - - - - - - - 99000 99000 128500 128500 123500 123500 29000 29000<br />

- - - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - - -<br />

MLA fund - - - - - - - - - - - - - - - -<br />

MP fund - - - - - - - - - - - - - - - -<br />

Local receipt - - - - - - - - - - - - - - - -<br />

People’s - - - - - - - - - - - - - - - -<br />

contribution<br />

NGO<br />

contribution<br />

- - - - - - - - - - - - - - - -<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

161<br />

Allocation<br />

Anticipated<br />

Expenditure


Any other - - - - - - - - - - - - - - - -<br />

source<br />

Analysis: Allotment under central sector schemes and centrally sponsored schemes substantially reduced by 2009-10. Expenditure<br />

under centrally sponsored schemes has been usually less than the allotment amount except for years 2004-05 and 2007-08. Allotment<br />

& expenditure under state sector schemes more than 1 lakh/year for 2007-08 and 2008-09, but reduced only to Rs.0.29 lakhs during<br />

2009-10. Major source of funding has been centrally sponsored schemes. No other sources of funding.<br />

Name of the Department: Inspector of Ayurveda, Eastern Circle, BBSR under H & FW, Deptt<br />

Source of<br />

the Revenue<br />

Central<br />

Sector<br />

Schemes<br />

Centrally<br />

Sponsored<br />

Schemes<br />

State sector<br />

schemes<br />

Central<br />

Finance<br />

commission<br />

State Finance<br />

Commission<br />

Untied funds<br />

from state<br />

Financial <strong>Year</strong><br />

Allocation<br />

2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

- - - - - - - - - - - - - - - -<br />

Rs.41.<br />

53<br />

Lakh<br />

Rs.41.<br />

53<br />

Lakh<br />

Rs.47.<br />

01<br />

Lakh<br />

Rs.47.<br />

01<br />

Lakh<br />

Rs.51.<br />

72<br />

Lakh<br />

Rs.51.<br />

72<br />

Lakh<br />

Rs.56.<br />

68<br />

Lakh<br />

Rs.56.68<br />

Lakh<br />

Allocation<br />

Rs.60.23<br />

Lakh<br />

Expenditure<br />

Rs.60.<br />

23 Lakh<br />

Allocation<br />

Rs.44.<br />

96<br />

Lakh<br />

Expenditure<br />

Rs.44.<br />

96<br />

Lakh<br />

Allocation<br />

Rs.52.67<br />

Lakh<br />

- - - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - - -<br />

- - - - - - - - - - - - - - - -<br />

MLA fund - - - - - - - - - - - - - - - -<br />

Expenditure<br />

Rs.52.<br />

67<br />

Lakh<br />

Allocation<br />

Rs.59.<br />

09<br />

Lakh<br />

162<br />

Anticipated<br />

Expenditure<br />

Rs.59.<br />

09 Lakh


MP fund - - - - - - - - - - - - - - - -<br />

Local receipt - - - - - - - - - - - - - - - -<br />

People’s<br />

contribution<br />

- - - - - - - - - - - - - - - -<br />

NGO<br />

contribution<br />

- - - - - - - - - - - - - - - -<br />

Any other<br />

source<br />

- - - - - - - - - - - - - - - -<br />

Analysis: The only source of funding for this Department has been state schemes. The fund flow showed an increasing trend<br />

alongwith a parallel trend in expenditure during the period of 2002-03 to 2006-07, but experienced a decline during 2007-08 and<br />

2008-09 though the expenditure for 2008-09 was greater than the allotment amount. Slight increase in allotment is seen during 2009-<br />

10. No other sources of funding.<br />

Source of the<br />

Revenue<br />

Central Sector<br />

Schemes<br />

Centrally<br />

Sponsored<br />

Schemes<br />

State sector<br />

schemes<br />

Central Finance<br />

commission<br />

Allocation<br />

Name of the Department: Handloom & Textiles<br />

(Office of the Asst. Director of Textiles, <strong>Nayagarh</strong>)<br />

Financial <strong>Year</strong>(amount in lakh rupees)<br />

2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

- - - - 0.359 0.359 - - 37.942 37.942 55.88 55.88 44.65 13.73 - 5.75<br />

1.66 1.66 4.70 4.70 - - 1.89 1.89 4.02 4.02 9.83 9.83 30.159 29.454 - 54.73<br />

- - - - - - - - 1.50 1.50 21.72 20.73 17.08 14.79 - 36.27<br />

- - - - - - - - - - - - - - - -<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

163<br />

Anticipated<br />

Expenditure


State Finance<br />

Commission<br />

- - - - - - - - - - - - - - - -<br />

Untied funds<br />

from state<br />

- - - - - - - - - - - - - - - -<br />

MLA fund - - - - - - - - - - - - - - - -<br />

MP fund - - - - - - - - - - - - - - - -<br />

Local receipt - - - - - - - - - - - - - - - -<br />

People’s<br />

contribution<br />

- - - - - - - - - - - - - - - -<br />

NGO<br />

contribution<br />

- - - - - - - - - - - - - - - -<br />

Any other source - - - - - - - - - - - - - - - -<br />

Analysis: Major source of funding has been central schemes and centrally sponsored schemes. Lowest allotment is recorded for 2004-<br />

05 for central sector schemes, for 2002-03 to 2006-07 for centrally sponsored schemes, and for 2006-07 for state sector schemes.<br />

Expenditure has been less for all schematic sectors more particularly for the period 2008-09. No other sources of funding.<br />

Source of the<br />

Revenue<br />

Central Sector<br />

Schemes<br />

Name of the Department: Textiles and Handloom, Orissa<br />

(Office of the Asst. Director, Sericulture, Bhubaneswar)<br />

Financial <strong>Year</strong><br />

2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

- - 0.90 0.90 1.30 1.30 1.0082 1.0082 4.71 - - -<br />

Centrally Sponsored<br />

Schemes<br />

- - 0.90 0.90 2.72 2.72 1.99 1.99 4.07 - 3.61 -<br />

State sector schemes 1.00575 1.00575 0.63 0.63 0.49 0.49 0.32 0.32 12.71 - - -<br />

Central Finance<br />

commission<br />

- - - - - - - - - - - - - - - -<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Expenditure<br />

Allocation<br />

Anticipated<br />

Expenditure<br />

164


State Finance<br />

Commission<br />

- - - - - - - - - - - - - - - -<br />

Untied funds from<br />

state<br />

- - - - - - - - - - - - - - - -<br />

MLA fund - - - - - - - - - - - - - - - -<br />

MP fund - - - - - - - - - - - - - - - -<br />

Local receipt - - - - - - - - - - - - - - - -<br />

Peoples contribution - - - - - - - - - - - - - - - -<br />

NGO contribution - - - - - - - - - - - - - - - -<br />

Any other source - - - - - - - - - - - - - - - -<br />

Analysis: Only three sources of funding: central sector schemes, centrally sponsored schemes, and state sector schemes. Expenditure has been<br />

equal to the allotment over the years of concern. Maximum allotment was Rs.12.71 lakhs during 2008-09 and this was from the state sector.<br />

165


GENERAL<br />

ANNEXURES<br />

166


Annexure-1<br />

POSSIBLE AREAS OF CONVERGENCE<br />

There are two directions of convergence: horizontal, and vertical. In horizontal convergence, rural<br />

planning and urban planning merge into each other for common area- and common issue strategies.<br />

The following sectors create a scope for horizontal convergence:<br />

Health<br />

Education<br />

Police administration<br />

Agriculture<br />

Horticulture<br />

Fishery<br />

Forestry<br />

E-governance<br />

Sports<br />

Power<br />

SC/ST welfare ( etc.)<br />

On the other hand, in vertical convergence GP-plans merge at Block level and Block plans at Zilla<br />

Parishad level.<br />

One of the major responsibilities of the District Planning Committee is to ensure rural-urban<br />

convergence. At present however the DPCs do not have adequate capacity and infrastructure to do this.<br />

On the other hand, various sectoral authorities themselves work on the rural-urban convergence in their<br />

respective fields though that may not be sufficient. For instance, the district head quarter hospital is<br />

attended by not only patients of the town, but also by patients from all over the district. Similarly, a<br />

distinguished educational institution attracts students from both rural and urban areas.<br />

Development of pisciculture in rural areas is very much associated with the demand in urban areas.<br />

Same is more or less applicable for agriculture and horticulture (for instance, floriculture).<br />

___________<br />

167


Annexure-2<br />

Proposed Outlay for <strong>Nayagarh</strong> District for 2009-10 and <strong>2010</strong>-<strong>11</strong><br />

Sectors Sub-sectors<br />

Proposed Outlay<br />

in lakh Rs. for<br />

2009-10<br />

Proposed<br />

Outlay in lakh<br />

Rs. for <strong>2010</strong>-<strong>11</strong><br />

Agriculture &<br />

allied sector Agriculture 874.49 784.65<br />

Horticulture 241.215 219.5345<br />

Soil Conservation 1013.946 1719.38<br />

Animal Husbandry 13.46 41.36<br />

Fishery 157.14 132.14<br />

Cooperation 68.00 <strong>11</strong>0.00<br />

KVK 34.00 37.4<br />

SCRS<br />

SGSY, GGY, IAY,<br />

Mo Kudia, DRDA<br />

18 19.8<br />

Rural<br />

Admn<br />

4362.15 4789.21<br />

Development NREGS 500.00 700.00<br />

Special Areas<br />

Programme<br />

Irrigation<br />

DSMS<br />

Grant under article<br />

19.5 13.5<br />

275(1) 126.3 138.93<br />

SCA to TSP 87.8 96.58<br />

Bruttanga irrigation<br />

project 10000.00<br />

Medium Irrigation<br />

Divn. 840.47 1967.5<br />

Minor Irrigation<br />

Division<br />

1917.77<br />

3447.70<br />

168


Energy<br />

Mining &<br />

Industries DIC<br />

Lift Irrigation 470.00 381.00<br />

<strong>Nayagarh</strong> &<br />

Balugaon Electrical<br />

Divn. 663.95 1916.345<br />

Renewable Energy 132.75 146.025<br />

87.009<br />

95.7099<br />

Textiles 127.88 124.68<br />

Sericulture 32.21 22.771<br />

Transport NH-224 844.99 2121.63<br />

R&B(roads) 1930.00 1600.00<br />

Rural Works<br />

Division(roads) 2875.92 3163.512<br />

Science &<br />

Technology E-governance 10.00 12.00<br />

DFO, <strong>Nayagarh</strong>(T) 339.624 309.9188<br />

DFO, Khurdha(T) for<br />

Ranpur area 77.25 <strong>11</strong>8.00<br />

DFO, Mahanadi WL 177.91 189.701<br />

General Economic<br />

Services Tourism 65.43 54.00<br />

Civil Supply<br />

Elementary<br />

2.43<br />

Social Services Education(SSA) 3249.28 3574.208<br />

RMSA 680.71 <strong>11</strong>000.00<br />

Sports 35.468 35.54<br />

NRHM, etc 1054.13 <strong>11</strong>63.043<br />

169


Ayurveda 285 450<br />

Homaeopathy <strong>11</strong>7 360<br />

PHED 1006.5 600.00<br />

RWSS 3599.58 3854.796<br />

<strong>Nayagarh</strong> NAC 762.0725 815.00<br />

Khandapada NAC 83 100<br />

Art & Culture 9.00 23.00<br />

District Welfare :<br />

OSFDC targets 262.2308 438.3708<br />

Scholarship<br />

Educational<br />

infrastructure<br />

Social Welfare 3708.7 4596.055<br />

General Services Police 666.5 1995.00<br />

R&B (Building) 275.15 1020.00<br />

Rural<br />

Works(Building) 490.06 539.066<br />

Total: 34393.55<br />

65039.49<br />

170


Name of the Block/<br />

Agency<br />

Funds<br />

Allotted<br />

GP/Ps<br />

during<br />

2008-09<br />

Funds<br />

Allotted<br />

GP/Ps<br />

during<br />

2009-10<br />

Total<br />

funds<br />

Annexure-3<br />

DRDA information<br />

NREGA 2008-09 AND 2009-10<br />

Funds<br />

utilised<br />

during<br />

2008-09<br />

Funds<br />

utilised<br />

during<br />

2009-10<br />

Total<br />

expenditure<br />

(Rs in lakh)<br />

Balance No. of<br />

project<br />

sanctioned<br />

No. of<br />

project<br />

under<br />

progress<br />

as per on<br />

line<br />

No. of<br />

project<br />

actually<br />

taken up<br />

BHAPUR 19.62 6.59 26.21 6.15 6.13 12.28 13.93 31 8 20 1.70<br />

DASPALLA 19.63 21.86 41.49 19.82 13.92 33.74 7.75 53 32 32 5.39<br />

GANIA 8.65 18.60 27.25 4.74 9.80 14.54 12.71 22 <strong>11</strong> 15 1.88<br />

KHANDAPADA 21.60 21.97 43.57 5.71 14.43 20.14 23.43 31 21 26 2.16<br />

NAYAGARH 27.19 12.16 39.35 22.35 14.88 37.23 2.12 52 18 27 9.00<br />

NUAGAON 20.60 4.63 25.23 9.27 1.99 <strong>11</strong>.26 13.97 46 15 20 0<br />

ODAGAON 32.69 144.76 177.45 50.47 86.24 136.71 40.74 80 50 50 13.34<br />

RANPUR 34.64 38.14 72.78 14.79 33.03 47.82 24.96 71 34 38 <strong>11</strong>.38<br />

DFO, NAYAGARH 10.00 21.18 31.18 0.00 0.87 0.87 30.31 9 0 0<br />

PM (Corpus funds) 50.00 0.00 50.00 0.00 0.000 0.00 50.00 0<br />

ATDEDA Level 5.64 10.<strong>11</strong> 15.75 2.36 0.00 2.36 13.39 0<br />

TOTAL<br />

250.26 300.00 550.26 135.66 181.29 316.95 233.31 395 189 228 44.85<br />

Rs.300.00 lakh has been received from State Employment Guarantee funds<br />

Rs.22.95 lakh for the year 2008-09 & Rs.1.93 lakh for the year 2009-10 as administrative expenditure<br />

171<br />

Expenditure<br />

during the<br />

month


Sl.<br />

No<br />

Name of the<br />

Block<br />

BLOCK WISE PHYSICAL & FINANCIAL TARGET AND ACHIEVEMENT UNDER SGSY FOR 2008-2009<br />

AS ON 31.03.2009<br />

Physical target of Application sponsored Application Sanctioned Application disbursed Subsidy Disbursed<br />

in<br />

172<br />

Credit Disbursed<br />

Swor Grp Ind Total Swor Grp Ind Total Swor Grp Ind Total Swor Grp Ind Total Swor Ind Total Swor Ind Total<br />

1 2 4 5 6 7 8 9 10 <strong>11</strong> 12 13 14 15 16 17 18 19 20 21 22 23 24 25<br />

1 BHAPUR 295 24 33 328 365 31 60 425 318 27 37 355 318 27 37 355 30.8<br />

2 DASPALLA 307 29 34 341 366 31 46 412 323 28 40 363 312 27 35 347 28.5<br />

3 GANIA 124 12 14 138 198 15 13 2<strong>11</strong> 153 12 13 166 139 <strong>11</strong> 7 146 12.0<br />

4 KHANDAPA<br />

DA<br />

291 28 32 323 401 36 46 447 289 26 27 316 289 26 27 316 28.7<br />

5 NAYAGARH 342 34 38 380 482 40 47 529 390 33 37 427 390 33 34 424 34.5<br />

6 NUAGAON 290 29 31 321 626 52 12 638 339 29 5 344 327 28 5 332 32.1<br />

7 ODAGAON 436 41 49 485 627 50 13<br />

4<br />

761 434 34 50 484 395 31 49 444 34.2<br />

8 RANPUR 450 42 50 500 594 52 57 651 493 43 45 538 465 41 37 502 46.0<br />

TOTAL 2535 239 281 2816 3659 307 41<br />

5<br />

4074 2739 232 25<br />

4<br />

2993 2635 224 23<br />

1<br />

0<br />

6<br />

5<br />

0<br />

0<br />

5<br />

5<br />

7<br />

2866 247.<br />

08<br />

3.2<br />

3<br />

3.0<br />

0<br />

0.7<br />

0<br />

2.6<br />

8<br />

2.7<br />

5<br />

0.3<br />

8<br />

5.8<br />

5<br />

4.6<br />

4<br />

23.<br />

23<br />

34.0<br />

3<br />

31.5<br />

6<br />

12.7<br />

5<br />

31.3<br />

8<br />

37.2<br />

5<br />

32.5<br />

3<br />

40.1<br />

0<br />

50.7<br />

1<br />

270.<br />

31<br />

69.1<br />

0<br />

75.9<br />

8<br />

28.9<br />

5<br />

53.0<br />

8<br />

90.3<br />

3<br />

66.2<br />

5<br />

82.9<br />

3<br />

99.7<br />

5<br />

566.<br />

37<br />

in<br />

14.<br />

18<br />

14.<br />

94<br />

2.8<br />

0<br />

8.9<br />

0<br />

9.4<br />

0<br />

1.6<br />

8<br />

20.<br />

75<br />

14.<br />

48<br />

87.<br />

13<br />

83.2<br />

8<br />

90.9<br />

2<br />

31.7<br />

5<br />

61.9<br />

8<br />

99.7<br />

3<br />

67.9<br />

3<br />

103.<br />

68<br />

<strong>11</strong>4.<br />

23<br />

653.<br />

50


Sl.<br />

No<br />

Name of the<br />

Block<br />

BLOCK WISE PHYSICAL & FINANCIAL TARGET AND ACHIEVEMENT UNDER SGSY FOR 2009-<strong>2010</strong><br />

AS ON 10.10.2009<br />

Physical target of Application sponsored Application Sanctioned Application disbursed Subsidy Disbursed<br />

Swarozgari (in Nos)<br />

in Lakh<br />

173<br />

Credit Disbursed<br />

Swor Grp Ind Total Swor Grp Ind Total Swor Grp Ind Total Swor Grp Ind Total Swor Ind Total Swor Ind Total<br />

1 2 4 5 6 7 8 9 10 <strong>11</strong> 12 13 14 15 16 17 18 19 20 21 22 23 24 25<br />

1 BHAPUR 299 29 107 406 371 33 46 417 47 4 0 47 12 1 0 12 0.50 0.0<br />

2 DASPALLA 3<strong>11</strong> 31 86 397 334 30 89 423 67 6 20 87 41 6 12 53 0.65 1.0<br />

3 GANIA 126 12 35 161 181 14 29 210 31 2 0 31 0 0 0 0 0.00 0.0<br />

4 KHANDAPA<br />

DA<br />

295 28 81 376 381 30 20 104 0 0 0 0 0 0 0 0 0.00 0.0<br />

5 NAYAGARH 346 32 96 442 414 34 53 467 84 6 1 85 37 3 1 38 3.20 0.0<br />

6 NUAGAON 292 29 81 373 404 34 19 423 129 <strong>11</strong> 0 129 49 4 0 49 4.85 0.0<br />

7 ODAGAON 443 44 121 564 400 35 90 490 25 2 13 38 25 2 13 38 2.45 0.9<br />

8 RANPUR 456 45 125 581 430 39 70 500 35 3 3 38 25 2 1 26 0.65 0.0<br />

TOTAL 2568 250 732 3300 2915 249 41<br />

6<br />

3331 418 34 37 455 189 18 27 216 12.3<br />

0<br />

0<br />

5<br />

0<br />

0<br />

7<br />

0<br />

9<br />

8<br />

2.1<br />

9<br />

in Lakh<br />

0.50 0.50 0.0<br />

0<br />

1.70 1.30 0.0<br />

0<br />

0.00 0.00 0.0<br />

0<br />

0.00 0.00 0.0<br />

0<br />

3.27 8.49 0.3<br />

2<br />

4.85 7.15 0.0<br />

0<br />

3.44 5.75 5.5<br />

1<br />

0.73 1.20 0.4<br />

14.4<br />

9<br />

24.3<br />

9<br />

3<br />

6.2<br />

6<br />

0.50<br />

3.50<br />

0.00<br />

0.00<br />

8.81<br />

7.15<br />

<strong>11</strong>.2<br />

6<br />

1.63<br />

32.8<br />

5


MO-KUDIA (State Plan)<br />

For Mo Kudia during 2008-09, against target of 900 houses received from Govt. of Odisha, full<br />

work orders have been issued. Rs.315.00 lakh allotment received for the purpose. So far 72no of<br />

houses has been completed with Rs.<strong>11</strong>1.85 lakh utilisation.<br />

Details of work orders under MOKUDIA is given below<br />

Sl.No Block Total target Work Order issued<br />

1 2 3 4<br />

1 BHAPUR 85 85<br />

2 DASPALLA 150 150<br />

3 GANIA 51 51<br />

4 KHANDAPADA <strong>11</strong>0 <strong>11</strong>0<br />

5 NAYAGARH <strong>11</strong>3 <strong>11</strong>3<br />

6 NUAGAON <strong>11</strong>1 <strong>11</strong>1<br />

7 ODAGAON 142 142<br />

8 RANPUR 138 138<br />

Sl.No Block Total<br />

target<br />

900 900<br />

No of houses<br />

completed<br />

Total funds<br />

allotted (Rs in<br />

lakh)<br />

1 BHAPUR 85 15 29.75 9.20<br />

2 DASPALLA 150 10 52.50 18.00<br />

3 GANIA 51 0 17.85 4.55<br />

4 KHANDAPADA <strong>11</strong>0 20 38.50 19.20<br />

5 NAYAGARH <strong>11</strong>3 7 39.55 12.00<br />

6 NUAGAON <strong>11</strong>1 0 38.85 5.55<br />

7 ODAGAON 142 20 49.70 35.75<br />

8 RANPUR 138 0 48.30 7.60<br />

Funds utilized<br />

(Rs. in lakh)<br />

TOTAL 900 72 315.00 <strong>11</strong>1.85<br />

174


Sl.No Name of the<br />

Block<br />

GOPABANDHU GRAMIN YOJANA (GGY) 2008-09<br />

Funds<br />

Released<br />

Funds<br />

utilized<br />

Balance Project<br />

approved<br />

Project<br />

taken up<br />

175<br />

AS ON 09.10.2009<br />

Project Balance<br />

completed<br />

1 2 3 4 5 6 7 8 9<br />

1 BHAPUR <strong>11</strong>0.00 107.00 3.00 61 61 59 2<br />

2 DASPALLA 109.00 106.00 3.00 54 54 51 3<br />

3 GANIA 48.00 30.00 18.00 22 22 13 9<br />

4 KHANDAPADA 120.00 105.45 14.55 79 79 69 10<br />

5 NAYAGARH 157.00 157.00 0.00 102 102 102 0<br />

6 NUAGAON 99.00 94.00 5.00 66 66 63 3<br />

7 ODAGAON 183.00 170.00 13.00 <strong>11</strong>1 <strong>11</strong>1 103 8<br />

8 RANPUR 174.00 165.00 9.00 97 97 91 6<br />

TOTAL 1000.00 934.45 65.55 592 592 551 41<br />

Name of Block Funds<br />

received<br />

12 TH FINANCE COMMISSION 2008-09 AS ON 09.10.2009<br />

Cement Concrete ROADS<br />

Funds<br />

utilized<br />

Balance<br />

funds<br />

No. of<br />

project to be<br />

taken up<br />

No. of<br />

Project<br />

completed<br />

Balance<br />

project<br />

1 2 3 4 5 6 7<br />

BHAPUR 22.00 22.00 0.00 3 3 0<br />

DASPALLA 22.00 22.00 0.00 3 3 0<br />

GANIA 22.00 15.00 7.00 3 1 2<br />

KHANDAPADA 22.00 22.00 0.00 3 3 0<br />

NAYAGARH 22.00 17.00 5.00 3 2 1<br />

NUAGAON 22.00 10.00 12.00 3 1 2<br />

ODAGAON 28.50 28.50 0.00 4 4 0<br />

RANPUR 28.19 0.00 28.19 4 0 4<br />

TOTAL 188.69 136.50 52.19 26 17 9


12 TH FINANCE – 2008-09<br />

O & M Cost of Water supply work<br />

Name of Block Funds Funds Balance<br />

received utilized funds<br />

1 2 3 4<br />

BHAPUR 22.75 22.75 0.00<br />

DASPALLA 22.52 22.52 0.00<br />

GANIA 9.45 9.45 0.00<br />

KHANDAPADA 25.01 25.01 0.00<br />

NAYAGARH 31.14 31.14 0.00<br />

NUAGAON 23.46 23.46 0.00<br />

ODAGAON 37.94 37.94 0.00<br />

RANPUR 40.21 33.10 7.<strong>11</strong><br />

TOTAL 212.48 205.37 7.<strong>11</strong><br />

Name of Block Funds<br />

received<br />

Funds<br />

utilized<br />

12 TH FINANCE – 2008-09<br />

Balance<br />

funds<br />

No. of<br />

project to be<br />

taken up<br />

No. of<br />

Project<br />

completed<br />

Balance<br />

project<br />

1 2 6 7 8 9 10<br />

BHAPUR 21.04 21.04 0.00 35 35 0<br />

DASPALLA 20.86 20.86 0.00 20 20 0<br />

GANIA 8.75 8.75 0.00 16 16 0<br />

KHANDAPADA 23.16 19.00 4.16 25 20 5<br />

NAYAGARH 28.83 28.83 0.00 46 46 0<br />

NUAGAON 21.74 20.74 1.00 13 <strong>11</strong> 2<br />

ODAGAON 35.14 35.14 0.00 130 130 0<br />

RANPUR 37.26 27.00 10.26 28 20 8<br />

TOTAL 196.78 181.36 15.42 313 298 15<br />

176


STATE FINANCE COMMISSION REPAIR AND GRANT FOR COMPLETION OF GP BUILDING<br />

WORKS<br />

AS ON 09.10.2009<br />

Name of Block Funds Funds Target No. of Projects completed<br />

received<br />

utilized<br />

Projects<br />

1 2 3 4 5<br />

BHAPUR 23.50 23.50 7 7<br />

DASPALLA 18.25 14.00 5 3<br />

GANIA 5.00 4.00 1 0<br />

KHANDAPADA 6.50 0.00 3 0<br />

NAYAGARH 23.00 20.00 <strong>11</strong> 10<br />

NUAGAON 6.00 4.00 3 0<br />

ODAGAON 22.50 15.00 12 6<br />

RANPUR 20.25 9.00 10 3<br />

TOTAL 125.00 89.50 52 29<br />

! ! " " #" " ! $<br />

%$ ! & ' " "<br />

Name of Block Funds received<br />

2008-2009<br />

Funds utilized Target No. of Projects completed<br />

Projects<br />

1 2 3 4 5<br />

BHAPUR 2.00 2.00 1 1<br />

KHANDAPADA 2.00 2.00 1 1<br />

ODAGAON 7.00 7.00 2 2<br />

RANPUR 5.00 0.00 2 0<br />

TOTAL 16.00 <strong>11</strong>.00 6 4<br />

! ! " " #" " ! $<br />

%$ ! & ' " "<br />

2009-10<br />

Name of Block Funds received Funds utilized Target No. of<br />

Projects<br />

Projects<br />

completed<br />

1 2 3 4 5<br />

BHAPUR 3.00 3.00 1 1<br />

DASPALLA 7.00 0.00 18 0<br />

KHANDAPADA 5.00 2.00 3 1<br />

ODAGAON 7.00 0.00 2 0<br />

TOTAL 22.00 5.00 24 2<br />

177


STATE FINANCE COMMISSION FOR COMPLETION OF GP BUILDING WORKS 2008-09<br />

AS ON 09.10.2009<br />

Name of Block Funds Funds Target No. Projects Balance<br />

received<br />

utilized<br />

of Projects<br />

completed<br />

1 2 3 4 5 6<br />

BHAPUR 5.00 5.00 1 1 0<br />

DASPALLA 3.50 3.50 2 2 0<br />

GANIA 0.00 0.00 0 0 0<br />

KHANDAPADA 0.00 0.00 0 0 0<br />

NAYAGARH 8.00 6.00 4 3 1<br />

NUAGAON 0.00 0.00 0 0 0<br />

ODAGAON 10.50 10.50 5 5 0<br />

RANPUR 2.00 0.00 1 0 1<br />

TOTAL 29.00 25.00 13 <strong>11</strong> 2<br />

PERFORMANCE LINKED INCENTIVES FOR PISCICULTURE AND MARKET COMPLEX<br />

PANCHAYATS – 2008-09<br />

Name of Block Funds Funds Target No. Projects Balance<br />

received<br />

utilized<br />

of Projects<br />

completed<br />

1 2 3 4 5 6<br />

BHAPUR 3.90 3.90 3 3 0<br />

DASPALLA 3.90 3.00 3 2 1<br />

GANIA 3.90 2.60 3 2 1<br />

KHANDAPADA 3.90 1.30 3 1 2<br />

NAYAGARH 3.90 2.60 3 2 1<br />

NUAGAON 3.90 0.00 3 0 3<br />

ODAGAON 3.90 2.30 3 1 2<br />

RANPUR 3.90 1.30 3 1 2<br />

TOTAL 31.20 17.00 52 12 12<br />

178


IAY 2008-09<br />

For the year 2008-09, against target of 4257 IAY houses received from govt, so far 4565 work<br />

orders have been issued to eligible beneficiaries. Rs.1578.53 lakh allotment received for the<br />

purpose. 3% reservation for the BPL physically and mentally challenged persons and 15% for<br />

minority community are there. Block wise details given below.<br />

Sl. No Block Total Target Work order<br />

issued in<br />

No.<br />

House<br />

Completed in<br />

No.<br />

Total funds<br />

allotted (Rs. In<br />

lakh)<br />

1 BHAPUR 402 402 75 146.00<br />

2 DASPALLA 712 1046 155 264.9<br />

3 GANIA 240 240 42 88.92<br />

4 KHANDAPADA 519 519 109 193.53<br />

5 NAYAGARH 533 533 51 194.23<br />

6 NUAGAON 527 501 4 193.97<br />

7 ODAGAON 670 670 170 252.29<br />

8 RANPUR 654 654 76 277.06<br />

TOTAL 4257 4565 682 1610.90<br />

MO-KUDIA 2008-09<br />

For Mo Kudia during 2008-09, against target of 900 houses, all the work orders have been issued<br />

and So far 147 houses has been completed Rs.315.00 lakh is the allotment received Rs.133.75 lakh<br />

has been utilized so far<br />

Sl.<br />

No<br />

Block Total Target Work order<br />

issued in No.<br />

No. Of<br />

Houses<br />

Completed<br />

Total funds<br />

allotted (Rs.<br />

In lakh)<br />

Funds<br />

utilized (Rs.<br />

In lakh)<br />

1 BHAPUR 85 85 32 29.75 12.20<br />

2 DASPALLA 150 150 15 52.50 23.00<br />

3 GANIA 51 51 15 17.85 7.80<br />

4 KHANDAPADA <strong>11</strong>0 <strong>11</strong>0 20 38.50 16.50<br />

5 NAYAGARH <strong>11</strong>3 <strong>11</strong>3 22 39.55 17.50<br />

6 NUAGAON <strong>11</strong>1 <strong>11</strong>1 0 38.85 9.30<br />

7 ODAGAON 142 142 43 49.70 36.75<br />

8 RANPUR 138 138 0 48.30 10.70<br />

TOTAL 900 900 147 315.00 133.75<br />

179


ABSTRACT OF PROJECT PROPOSALS UNDER NREGS: 2009-10 IN THE ZILLA PARISHAD MEETING<br />

No. of projects approved<br />

Sl.No Name of the Block Water Flood Water Rural Drought Farm Irrigation M.I Others Total<br />

conservation control bodies connectivity proofing pond<br />

1 BHAPUR 4 0 445 792 0 <strong>11</strong>71 0 40 0 2452<br />

2 DASPALLA 0 0 21 77 0 137 0 0 0 235<br />

3 GANIA 5 0 179 252 0 184 0 0 146 766<br />

4 KHANDAPADA 0 0 229 231 0 10 0 0 0 470<br />

5 NAYAGARH 3 0 393 387 0 272 0 0 55 <strong>11</strong>10<br />

6 NUAGAON 150 20 217 451 3 177 9 0 54 1081<br />

7 ODAGAON 0 0 0 0 0 <strong>11</strong>71 0 40 0 2452<br />

8 RANPUR 44 0 320 480 0 620 0 0 89 1553<br />

TOTAL 206 20 1804 2670 3 3195 9 40 3576 <strong>11</strong>523<br />

180


Sl.No Name of the Block Funds received<br />

during 2008-09<br />

CLUSTER HOUSES 2008-09 AS ON 03.09.2009<br />

Funds<br />

utilized<br />

Balance No. Of<br />

quarters taken<br />

up<br />

No. Of<br />

quarters<br />

completed<br />

181<br />

Balance UC<br />

submitted<br />

1 2 3 4 5 6 7 8 9<br />

1 BHAPUR 0<br />

2 DASPALLA 26.25 13.50 12.75 5 0 5 13.50<br />

3 GANIA 0 0<br />

4 KHANDAPADA 0 0<br />

5 NAYAGARH 0 0<br />

6 NUAGAON 0 0<br />

7 ODAGAON 0 0<br />

8 RANPUR 0 0<br />

TOTAL 26.25 13.50 12.75 5 0 5 13.50


Annexure-4<br />

Details of MADA proposals for 2009-10<br />

ANNUAL ACTION-PLAN UNDER ARTICLE 275 (1) OF THE CONSTRUCTION DURING 2009 -10 OF GANIA BLOCK<br />

Name of<br />

MADA<br />

Sl.<br />

No<br />

Name of the<br />

work<br />

Block District Population % OF ST Total area in Sq.<br />

(Rs. In lakhs)<br />

Area covered by ST<br />

of MADA POPULATION Km.<br />

population<br />

Gania <strong>Nayagarh</strong> 34650 3917 416 212<br />

Location Unit Details of the work Implementa<br />

tion period<br />

Norms<br />

followed for<br />

estimates<br />

Amount<br />

required for<br />

2009-10 in<br />

lakhs<br />

No. Of<br />

villages to<br />

be<br />

benefited<br />

1 2 3 4 5 6 7 8 9<br />

1 Const. of Sundarkump Bridg Const. of Dimuhani 1 year Govt 3.00 2<br />

Dimuhani a bridge e bridge at Oskamaska<br />

guidelines<br />

bridge<br />

Oskamaska<br />

at<br />

2 Completion of<br />

submersible<br />

bridge<br />

chilipathar<br />

Chilipathar Construction of bridge 1 year Do 5.00 1<br />

3 Completion of Sundarkump Completion of classroom 1 year Do 1.50 2<br />

classroom & a<br />

& finishing work at<br />

finishing work<br />

at<br />

sundarakumpa<br />

R/S<br />

Sundarakumpa R/S<br />

4 Construction<br />

of submersible<br />

bridge<br />

Gamisiri Construction of bridge 1 year Do 1.50 2<br />

5 Construction<br />

of submersible<br />

bridge on road<br />

at Kalamba<br />

Kalamba Construction of bridge 1 year Do 1.50 2<br />

Total 12.50 9<br />

182


PROPOSAL FOR DEVELOPMENT OF INFRASTRUCTURE AND MINOR IRRIGATION SCHEMES UNDER ARTICLE 275 (1) OF THE<br />

CONSTRUCTION FOR THE YEAR 2009-10 OG NUAGAON BLOCK<br />

Name of<br />

the Mada<br />

Block<br />

Name of<br />

the<br />

District<br />

Total<br />

population<br />

(2001<br />

cenus)<br />

ST<br />

POPULATION<br />

Nuagaon <strong>Nayagarh</strong> 84632 10200 12.05<br />

Sl.<br />

No<br />

Name of<br />

the work<br />

% OF ST<br />

POPULATION<br />

Location Unit Details of the work Cost<br />

the<br />

of<br />

scheme as<br />

per<br />

technical<br />

Total area in Sq.<br />

Km<br />

Implem<br />

entation<br />

period<br />

of<br />

Area covered by St<br />

population<br />

Norms Amount to be<br />

followed for sought for<br />

estimates 2008 2009-<br />

-09 10<br />

1 Bridge Badibari Completion of bridge over<br />

badibari<br />

4.00 Govt guidelines 4.00 4<br />

2 Cause way Muriamba Construction of cause way 3.00 Do 3.00 3<br />

3 Bridge Dhipamala Construction of Dhipamala<br />

bridge<br />

4.00 Do 4.00 4<br />

4 Road Kantiamba Construction of road from<br />

Kantiamba to Pokasunga<br />

1.00 Do 1.00 1<br />

5 CD work Chakundamada CD work from 4.00 Do 4.00 4<br />

6 Do Koragadu<br />

Chakundamada to Podasahi<br />

Road from Koragadu to<br />

Akhuamunda<br />

2.00 Do 2.00 2<br />

7 Road Pokasunga Road from Pokosungha to<br />

Badapokhora<br />

1.00 Do 1.00 2<br />

8 Adibandha Burudei Construction of adibandha 2.00 Do 2.00 2<br />

9 Boundary Jakeda Construction of Boundary 3.00 Do 3.00 1<br />

wall &<br />

wall<br />

10<br />

Adibandha<br />

Road Beguniasahi Road from Beguniasahi to<br />

Malisahi<br />

2.00 Do 2.00 5<br />

<strong>11</strong> Bridge Kapagadu Completion of bridge over<br />

Hatiamunda Nala<br />

3.00 Do 3.00 3<br />

12 Bridge Dendubani Construction of bridge at<br />

Kendubania<br />

3.00 Do 3.00 3<br />

Envisa<br />

ged<br />

outco<br />

me<br />

183<br />

No. Of No of<br />

villages beneficiaries<br />

benefited Total No.<br />

Of<br />

STs


PROPOSAL FOR DEVELOPMENT OF INFRASTRUCTURE AND MINOR IRRIGATION SCHEMES UNDER ARTICLE 275 (1) OF THE<br />

CONSTRUCTION DURING 2009 -10 (Rs. In lakhs)<br />

Name of<br />

MADA<br />

Sl.<br />

No<br />

Name of the<br />

work<br />

BLOCK Name of<br />

the<br />

District<br />

Population<br />

of MADA<br />

ST<br />

POPULATION<br />

Dasapalla <strong>Nayagarh</strong> 92497 19167 20.7<br />

Location Unit Details of the work Implement<br />

ation of<br />

period<br />

% OF ST<br />

POPULATION<br />

Norms<br />

followed<br />

for<br />

estimates<br />

Allocation made<br />

by State Govt.<br />

Amount<br />

required<br />

for 2009-10<br />

in lakhs<br />

No. Of<br />

villages to<br />

be<br />

benefited<br />

1 2 3 4 5 6 7 8 9<br />

1 Renovation of Sundarkump Bridg Renovation of 1 year Govt 12.00 5<br />

submersible a bridge e submersible bridge on<br />

guidelines<br />

bridge on<br />

Sundarkumpa road<br />

2<br />

Sundarkumpa<br />

road<br />

Completion of Chilipathar Bridg Completion of 1 year Govt 6.00 3<br />

submersible<br />

e submersible bridge at<br />

guidelines<br />

bridge<br />

chilipathar<br />

at<br />

chilipathar<br />

3 Completion of Sundarkump Scho Completion of classroom 1 year Govt 4.00 1<br />

classroom & a<br />

ol & finishing work at<br />

guidelines<br />

finishing work<br />

at<br />

sundarakumpa<br />

R/S<br />

Sundarakumpa R/S<br />

4 Construction Gamisiri Bridg Construction of 1 year Govt 10.00 5<br />

of submersible<br />

e submersible bridge at<br />

guidelines<br />

bridge at<br />

Gamisirinallah<br />

5<br />

Gamisirinallah<br />

Completion of Kujamendhi WHS Completion of Ludubadi 1 year Govt 25.00 2<br />

Ludubadi nala<br />

WHS.<br />

Kujamendhi<br />

nala WHS. Kujamendhi<br />

guidelines<br />

184


6 Completion of<br />

Sirikibadi<br />

RCC culvert<br />

7 Construction<br />

of surface<br />

cause way and<br />

CC road on<br />

Tilabadi to<br />

Munduli S/S<br />

8 Completion of<br />

school<br />

building of<br />

munduli S/S<br />

Sirikibadi Culve<br />

rt<br />

Tilabadi Cause<br />

way<br />

Munduli Scho<br />

ol<br />

Completion of Sirikibadi<br />

RCC culvert<br />

Construction of surface<br />

cause way and CC road<br />

on Tilabadi to Munduli<br />

S/S<br />

Completion of school<br />

building of Munduli S/S<br />

1 year Govt<br />

guidelines<br />

1 year Govt<br />

guidelines<br />

1 year Govt<br />

guidelines<br />

5.00 3<br />

10.00 2<br />

2.00 1<br />

Total 74.00 22<br />

185


PROPOSAL FOR DEVELOPMENT OF INFRASTRUCTURE AND MINOR IRRIGATION SCHEMES UNDER ARTICLE 275 (1) OF THE<br />

CONSTRUCTION DURING 2009 -10<br />

Name of<br />

the Mada<br />

Block<br />

Name of<br />

the<br />

District<br />

Total<br />

population<br />

(2001<br />

cenus)<br />

ST<br />

POPULATION<br />

% OF ST<br />

POPULATION<br />

Total area in<br />

Sqr. Km<br />

(Rs. In lakhs)<br />

Area covered by ST<br />

population<br />

Ranpur <strong>Nayagarh</strong> 8194 3155 38.5 50 38<br />

Sl.No Name Location Unit Details of the work Cost of Imple- Norms Amount to be Envisaged No. Of No of beneficiaries<br />

of the<br />

the mentation followed sought for outcome villages<br />

work<br />

scheme as period for 2008- 2009-<br />

benefited Total No. No.<br />

per<br />

estimates 09 10<br />

Of Of<br />

technical<br />

STs ST<br />

sanction<br />

women<br />

1 Sankhajodi Building Const. Of addl. Class 2.00 1 year Govt - 2.00 - - - - -<br />

room in Abasika<br />

guidelines<br />

Ucha Engraji<br />

Vidyalaya,<br />

Sankhajodi<br />

2 Kadamjhola Culvert Const. Of culvert 1.50 1 year Do - 1.50 - - - - -<br />

and causeway on the<br />

road from<br />

Kadamjhola<br />

Jiripada<br />

to<br />

3 Nathapur Road Important of 1.50 1 year Do - 1.50 - - - - -<br />

Nathapur<br />

road<br />

village<br />

4 Jamuganda Boundary Completion of 0.80 1 year Do - 0.80 - - - - -<br />

wall boundary wall in<br />

Jamunganda primary<br />

school<br />

5 Kendua Building Const. Of Addl. 2.00 1 year Do - 2.00 - - - - -<br />

Class room at<br />

Kendua Sevashram<br />

Total<br />

(ST Girls hostel)<br />

7.80 7.80<br />

186


PROPOSAL FOR INCOME GENERATING ACTIVITIES FROM NAYAGARH DISTRICT UNDER SCA TO TSP DURING 2009 -10<br />

NAME<br />

OF<br />

MADA<br />

Sl.No Name of<br />

the<br />

scheme/<br />

project<br />

BLOCK DISTRICT POPULATION<br />

OF MADA<br />

ST<br />

POPULATION<br />

Gania <strong>Nayagarh</strong> 2947 2343 79.5<br />

Location Unit Details of<br />

work<br />

Cost of<br />

the<br />

scheme<br />

No. Of<br />

families to<br />

be<br />

benefitted<br />

% OF ST<br />

POPULATION<br />

Investment<br />

per family<br />

ALLOCATION<br />

MADE BY STATE<br />

GOVT.<br />

No.<br />

beneficiaries<br />

Of<br />

No. No. Of<br />

Of ST<br />

STs women<br />

Addl.<br />

Income<br />

per family<br />

per year<br />

to be<br />

generated<br />

1 2 3 4 5 6 7 8 9 10 <strong>11</strong> 12<br />

1 IGS Sikhargochha SHG Maa<br />

Mahila<br />

Tarini 2.50 18 0-10 - 18 - -<br />

2 IGS Duising WHS<br />

Mandal,<br />

Sikhargochha<br />

Jhurungibari<br />

WHS<br />

2.00 10 0-10 10 10 - -<br />

3 IGS Sektapalli WHS Sektapalli<br />

WHS<br />

2.00 20 0-10 12 8 - -<br />

4 IGS Buriapeju WHS Buriapaju<br />

WHS<br />

2.00 20 0-10 12 8 - -<br />

5 IDS Sikhargochha Diversion Construction 1.00 10 0-10 8 2 - -<br />

weir of<br />

Sikhargochha<br />

diversion<br />

weir<br />

6 IGS Badasilinga Boundary Completion 1.20 - 0-10 - - - -<br />

wall of boundary<br />

wall of<br />

Badasilinga<br />

Total no<br />

of<br />

members<br />

in the<br />

SHG<br />

187


PROPOSAL FOR INCOME GENERATING ACTIVITIES FROM NAYAGARH DISTRICT UNDER SCA TO TSP DURING 2009 -10<br />

NAME<br />

OF<br />

MADA<br />

Sl.No Name of<br />

the<br />

scheme/<br />

project<br />

BLOCK DISTRICT POPULATION<br />

OF MADA<br />

ST<br />

POPULATION<br />

Ranpur <strong>Nayagarh</strong> 8194 3155 38.5<br />

Location Unit Details of work Cost of<br />

the<br />

scheme<br />

% OF ST<br />

POPULATION<br />

No. Of<br />

families<br />

to be<br />

benefitted<br />

Investment<br />

per family<br />

ALLOCATION<br />

MADE BY STATE<br />

GOVT<br />

No.<br />

beneficiaries<br />

Of<br />

No. Of No. Of<br />

STs ST<br />

women<br />

Addl.<br />

Income<br />

per<br />

family<br />

per year<br />

to be<br />

generated<br />

Total<br />

no of<br />

mem<br />

-bers<br />

in<br />

the<br />

SHG<br />

188<br />

Allotment<br />

received<br />

during 09-<br />

10<br />

1 2 3 4 5 6 7 8 9 10 <strong>11</strong> 12 13<br />

1 MADA/IGS Jamuganda Construction of C.I.P<br />

at Jamunganda<br />

1.20 12 - 12 5 - - 1,23,000.00<br />

2 MADA/IGS Dimiribadi Construction of C.I.P<br />

at Dimiribadi<br />

6.00 6 - 6 2 - -<br />

3 MADA/IGS Jamuganda Improvement of 0.40 4 - 4 1 - -<br />

Ostajhole<br />

Jamuganda<br />

CIP at<br />

4 MADA/IGS Betuli,<br />

Bankable finance in 2.00 20 - 20 8 - 20<br />

Sanchakunda two SHG<br />

jhar,<br />

Nathapur,<br />

Jamuganda<br />

Bandhamunda GP area<br />

5 IDS Rautarapur Improvement of 1.00 - - 10 4 - -<br />

drainage work at<br />

6 IDS Brahman<br />

Rautarapur village<br />

Improvement of road 1.00 - - 10 4 - -<br />

Kumei<br />

from forest toad to<br />

Brahmankumei


PROPOSAL FOR INCOME GENERATING ACTIVITIES FROM NAYAGARH DISTRICT UNDER SCA TO TSP DURING 2009 -10<br />

NAME<br />

OF<br />

MADA<br />

Sl.No Name of<br />

the<br />

scheme/<br />

project<br />

BLOCK DISTRICT POPULATION<br />

OF MADA<br />

ST<br />

POPULATION<br />

Nuagaon <strong>Nayagarh</strong> 13479 8634 64<br />

Location Unit Details of work Cost of<br />

the<br />

scheme<br />

% OF ST<br />

POPULATION<br />

ALLOCATION<br />

MADE BY STATE<br />

GOVT<br />

Investment No. Of beneficiaries<br />

per family No. Of No. Of ST<br />

STs women<br />

Addl. Income<br />

per family<br />

per year to be<br />

generated<br />

Total no of<br />

members<br />

in the<br />

SHG<br />

1 2 3 4 5 6 7 8 9 10 <strong>11</strong> 12<br />

1 IGS Makarapalli Nala bandha Construction<br />

Kantiama<br />

Nalabandha<br />

of 2.00 - 20 0-10 12 - -<br />

2 IGS Ameinmunha WHS Construction<br />

WHS<br />

of 1.50 - 15 0-10 10 - -<br />

3 IGS Kadaligadia WHS Construction of 2.00 - 20 0-10 12 - -<br />

Kadaligada WHS<br />

4 IGS Raipalli Nala Bandha Construction<br />

Akhumunda<br />

Nalabandha<br />

of 2.00 - 20 0-10 12 - -<br />

5 IGS Ghundakabari WHS Construction<br />

WHS<br />

of 2.00 - 20 0-10 12 - -<br />

6 IGS Belabani to WHS Improvement of 2.00 - 20 0-10 12 - -<br />

Ragadimadia<br />

Belabani WHS &<br />

extension of canal<br />

7 IGS Kaliamba WHS Construction of 2.00 - 20 0-10 12 - -<br />

Kaliamba WHS<br />

8 IGS Vetapalli WHS Improvement of 1.00 - 10 0-10 6 - -<br />

Kadamjhara WHS<br />

extension canal<br />

9 IGS Sima WHS Improvement<br />

Sima WHS<br />

of 1.00 - 10 0-10 6 - -<br />

10<br />

<strong>11</strong><br />

IGS<br />

IGS<br />

Sandhamara<br />

Singipur<br />

WHS<br />

WHS<br />

Rajgirinala WHS<br />

Construction of<br />

2.00<br />

2.00<br />

-<br />

-<br />

20<br />

20<br />

0-10<br />

0-10<br />

12<br />

12<br />

-<br />

-<br />

-<br />

-<br />

189<br />

Allotm<br />

ent<br />

receive<br />

d<br />

during<br />

09-10


12 IGS Purunapani WHS<br />

Sisipur WHS<br />

Improvement of<br />

Purunapani WHS<br />

13 IGS Kusabida WHS Construction of<br />

Kusabida WHS<br />

14 IGS Bhuinragada WHS Construction of<br />

Bhuinragada<br />

WHS<br />

15 IGS Kantiamba Bandha Construction of<br />

Kantiamba<br />

bandha<br />

2.00 - 20 0-10 12 - -<br />

2.00 - 20 0-10 12 - -<br />

1.00 - 10 0-10 6 - -<br />

2.00 - 20 0-10 12 - -<br />

PROPOSAL FOR INCOME GENERATING ACTIVITIES FROM NAYAGARH DISTRICT UNDER SCA TO TSP DURING 2009 -10<br />

NAME<br />

OF<br />

MADA<br />

Sl.No Name of<br />

the<br />

scheme/<br />

project<br />

BLOCK DISTRICT POPULATION<br />

OF MADA<br />

ST<br />

POPULATION<br />

Daspalla <strong>Nayagarh</strong> 92497 19167 20.7<br />

Location Unit Details of work Estimated<br />

cost of the<br />

scheme in<br />

lakhs<br />

% OF ST<br />

POPULATION<br />

Financial<br />

projection<br />

for 2009-<br />

10 in lakhs<br />

No. Of<br />

families to<br />

be<br />

benefited<br />

ALLOCATION<br />

MADE BY STATE<br />

GOVT<br />

Investment No. Of beneficiaries<br />

per family No. Of No. Of ST<br />

STs women<br />

190<br />

Addl. Income<br />

per family<br />

per year to be<br />

generated<br />

1 2 3 4 5 6 7 8 9 10 <strong>11</strong> 12<br />

1 MADA/ Saliagochha WHS Completion of 5.00 3.00 30 0.10 30 12 0.30<br />

2<br />

IGS<br />

IGS Rangamatia WHS<br />

Saliagochha WHS<br />

Completion of<br />

Rangamatia WHS<br />

4.00 2.00 20 0.10 20 8 0.20<br />

3 IGS Pokharigochha WHS Completion of 5.00 3.00 30 0.10 30 12 0.30<br />

Arjuna<br />

WHS,<br />

Jadinala<br />

4 IGS Kainyadiha WHS<br />

Pokharigochha<br />

(Canal system)<br />

Completion of 2.00 2.00 20 0.10 20 8 0.20<br />

Kainyadiha WHS<br />

5 IGS Ambalimba WHS Completion of 4.00 2.00 20 0.10 20 8 0.20<br />

Ambalimba WHS<br />

(Canal system)<br />

6 IGS Bojpaju WHS Completion of 5.00 3.00 30 0.10 30 12 0.30


Sorismuli WHS<br />

Boipaju (Canal<br />

System)<br />

7 IGS Polara WHS Completion of<br />

Polara diversion<br />

weir (Canal<br />

System)<br />

8 IGS Dadara WHS Completion of<br />

Dadara WHS<br />

9 IGS Kurudangi WHS<br />

(Canal System)<br />

Construction of<br />

Kurudangi WHS<br />

10 IGS Hanumanta WHS Construction of<br />

Hanumanta WHS<br />

<strong>11</strong> IGS Mitukuli WHS Completion of<br />

Centrikana Mela<br />

WHS Mitukuli<br />

12 IGS Banigochha WHS Construction of<br />

Banigochha WHS<br />

13 IGS Banibari WHS Completion of<br />

Banibiri WHS<br />

14 IGS Gundurisahi WHS Completion<br />

Kandhakutibari<br />

WHS<br />

of<br />

15 IGS Gurha WHS Construction of<br />

Gurha WHS<br />

16 IGS Tangisahi WHS Construction of<br />

Jholanala WHS<br />

2.00 2.00 20 0.10 20 8 0.20<br />

4.00 2.00 20 0.10 20 8 0.20<br />

5.00 3.00 30 0.10 30 12 0.30<br />

4.00 2.00 20 0.10 20 8 0.20<br />

4.00 2.00 20 0.10 20 8 0.20<br />

6.00 3.00 30 0.10 30 12 0.30<br />

4.00 2.00 20 0.10 20 8 0.20<br />

4.00 2.00 20 0.10 20 8 0.30<br />

6.00 3.00 30 0.10 30 12 0.30<br />

6.00 3.00 30 0.10 30 12 0.30<br />

191


Annexure-5<br />

Details of RRR projects for phase-I (2009-10)<br />

Project Block Cost in lakjh rupees<br />

Sunamuhi Khandapada 60<br />

Modanali (Res) Khandapada 50<br />

Kuahara Khandapada 10<br />

Gayapathar Bhapur 20<br />

Madhapur Bhapur 15<br />

Baladianuagaon Bhapur 13.2<br />

Arakhapalli Bhapur 13.5<br />

Haguri Dasapalla 59.17<br />

Adabandha <strong>Nayagarh</strong> 14<br />

Adakata <strong>Nayagarh</strong> 12<br />

Bulibandha <strong>Nayagarh</strong> 14<br />

Circuit House <strong>Nayagarh</strong> 17<br />

Diampada <strong>Nayagarh</strong> 40<br />

Gopalpur <strong>Nayagarh</strong> 13<br />

Kalamain <strong>Nayagarh</strong> 12<br />

Kesarpur <strong>Nayagarh</strong> 12<br />

Kestapada <strong>Nayagarh</strong> 13<br />

Ladukesharpur <strong>Nayagarh</strong> 20<br />

Mohanguru <strong>Nayagarh</strong> 75<br />

Panipolia <strong>Nayagarh</strong> 145<br />

Ranatank <strong>Nayagarh</strong> 18<br />

Saradhapur <strong>Nayagarh</strong> 12<br />

Udayapur <strong>Nayagarh</strong> 12<br />

Baghua Odogaon 280<br />

Chadheyapalli Odogaon 21.5<br />

Dholapathar Odogaon 90<br />

Gambharidihi Odogaon 13.5<br />

Giridipalli Odogaon 14<br />

Kainfullia Odogaon 100<br />

Katarajhar Odogaon 90<br />

Kural Odogaon 15<br />

Kushadhipijhatia Odogaon 15<br />

Saradhapur Odogaon 12<br />

Bhuinmundia Ranpur 14<br />

Bancha Bandha Ranpur 15<br />

Gumpha Ranpur 10<br />

192


Giridharpur Ranpur 10<br />

Pachilagodi Ranpur 10<br />

Kakalama Ranpur 25<br />

Bhetabar Ranpur 150<br />

Badajhar Ranpur 10<br />

Randa Ranpur 40<br />

Handrakhole Ranpur 10<br />

Total 1614.87<br />

Details of RRR projects for phase-II (<strong>2010</strong>-<strong>11</strong>)<br />

Block-wise projects Cost in lakh rupees<br />

Khandapada<br />

Singapada 45<br />

Raghunathpur 12<br />

Modanala 55<br />

Koska (DW) 50<br />

Koska (Res.) 50<br />

Kendua 36<br />

Gosinganala 20<br />

Dattapokhari 12<br />

Dasakadi 12<br />

Bhapur<br />

Chakradharprasad 12<br />

Nimani 12.9<br />

Odagaon<br />

Ambakhole 18<br />

Garjani 22.9<br />

Bolagaon 18<br />

Kadambanala 17<br />

Kumbhiapali 20<br />

Magarbandha 20<br />

Mashabari 64<br />

Mathakhajuria 20<br />

Rabigadia 16<br />

Solapata 18<br />

Uchhei Nagadhar 240<br />

Weir at Odagaon 19<br />

Bedatank Nandighara 16<br />

Jatia tank 16.5<br />

Puania 16<br />

Similitaila 16.5<br />

<strong>Nayagarh</strong><br />

Baulasahi 18<br />

Brajaballavpur 29<br />

Gamei 27<br />

193


Nagamunduli 21<br />

Pratap Prasad 20<br />

Rankadeuli 31<br />

Shulia 40<br />

Baunsiapada 30<br />

Rajagoda 42<br />

Mangalabandha 23<br />

Khandasingbandha 21<br />

Ranpur<br />

Andharikote 55<br />

Baghamara 24<br />

Baunsagarh 35<br />

Dahangira <strong>11</strong>.6<br />

Dantakathi 15<br />

Darpanarayanpur 25<br />

Derabaj 12.7<br />

Jharapada 32<br />

Kendudhipi <strong>11</strong>.2<br />

Khatiari 18<br />

Kiapala <strong>11</strong>.25<br />

Kusapalla <strong>11</strong>.6<br />

Maninaga 14<br />

Nuapada <strong>11</strong>.9<br />

Patana 17.5<br />

Rankadeuli 19<br />

Sapuani 35<br />

Bhagabandha 10.2<br />

Nuagaon<br />

Abhayapur 25<br />

Deuli 12<br />

Dhulipaunsia 35<br />

Kirialanji <strong>11</strong>.5<br />

Malisara 18<br />

Panaskhal 32.51<br />

Gania<br />

Dankadisahi 13<br />

Ghagara 37.42<br />

Ghatimuhana 12<br />

Dasapalla<br />

Arasahi <strong>11</strong>.6<br />

Banigochha 15.81<br />

Jagapur 12.5<br />

Jhuntamara 12.2<br />

Kadalibadi <strong>11</strong>.55<br />

Kalasakhaman 54<br />

Kulurukumpa 10.2<br />

Kumbhinala 12<br />

194


Mahisa nala 77.5<br />

Mahantipalli 30<br />

Puruna Daspalla 12<br />

Nuapoibadi 25.66<br />

Total 2028.2<br />

Name of 13<br />

MIPs discarded<br />

from the<br />

original project<br />

proposal and<br />

incorporated in<br />

2nd phase of<br />

RRR proposal Block Amount in lakh rupees<br />

Koska (Res.) Khandapada 50.00<br />

Gosinganall Khandapada 20.00<br />

Koska (D/W) Khandapada 50.00<br />

Nuapoibadi Dasapalla 25.66<br />

Panaskhal Nuagaon 31.95<br />

Ghagara Gania 42.29<br />

Baulasahi <strong>Nayagarh</strong> 12.00<br />

Sulia <strong>Nayagarh</strong> <strong>11</strong>5.00<br />

Darpanarayanpur Ranpur 25.00<br />

Sapuani Ranpur 35.00<br />

Dantakathia Ranpur 15.00<br />

Baunsagada Ranpur 35.00<br />

Total 456.90<br />

195


Annexure-6<br />

Progress Report of Police Housing Corporation on works in <strong>Nayagarh</strong> District<br />

NAYAGARH DISTRICT (Police works Under Puri Zone) PROGRESS REPORT AS ON 01.09.2009<br />

Scheme – Non Plan<br />

Details of the Projects<br />

Sl.No Name of the project Amount of A/A Letter<br />

reference<br />

&<br />

Date of<br />

issue of<br />

W.O<br />

Actual<br />

expenditure<br />

incurred so<br />

far<br />

196<br />

Present Progress Remarks<br />

1 2 3 4 5 7 9 <strong>11</strong><br />

1 Repair of Daspalla P.S 3,61,400.00 14.3.2008 361,400.00 Completed<br />

2 Repair of R.O<br />

<strong>Nayagarh</strong><br />

6,29,900.00 14.3.2008 629,900.00 Completed<br />

3 Repair of Nuagaon P.S 1,10,800.00 14.3.2008 <strong>11</strong>0,800.00 Completed<br />

4 Repair of <strong>Nayagarh</strong> P.S 1,37,700.00 14.3.2008 137,700.00 Completed<br />

5 Repair of Mahipur O.P 1,15,200.00 14.3.2008 <strong>11</strong>5,200.00 Completed<br />

6 Repair & Renovation<br />

of PTS <strong>Nayagarh</strong><br />

8,02,700.00 14.3.2008 802,700.00 Completed<br />

Scheme – O.C.F Fund <strong>Year</strong>: 2007 - 2008<br />

Details of the Projects<br />

Constn & Fortn of<br />

police station at<br />

<strong>Nayagarh</strong> town<br />

41,00,000.00 29.08.2008 Work stopped due to<br />

shifting the site to<br />

Gania


Constn & Fortn of out<br />

post at banigochha O.P<br />

41,00,000.00 20.01.2009 1,550,000.00 1 st floor roof<br />

centering completed<br />

Scheme – modernisation Grant plan <strong>Year</strong>: 2008 - 2009<br />

Details of the Projects<br />

Armoury Bldg. PTS<br />

<strong>Nayagarh</strong><br />

Class Room at PTS<br />

<strong>Nayagarh</strong><br />

594,000.00 22.10.2008 500,000.00 Finishing work going<br />

on<br />

2,586,000.00 07.<strong>11</strong>.2008 2,400,000.00 Finishing work going<br />

on<br />

6 E at <strong>Nayagarh</strong> 6,300,000.00 05.12.2008 1,850,000.00 1 st Scheme – State non Plan<br />

roof centring<br />

completed<br />

Fortn. Nuagaon PS 4,100,000.00 22.01.2009 1,800,000.00 1 st roof centring<br />

completed<br />

Fortn. Mahipur OP 4,100,000.00 22.01.2009 1,800,000.00 1 st roof centring<br />

completed<br />

Fortn Sarankul PS 4,100,000.00 22.01.2009 1,800,000.00 1 st roof centring<br />

completed<br />

Fortn Odagaon PS 4,100,000.00 22.01.2009 1,800,000.00 1 st roof centring<br />

completed<br />

Fortn. Gania OP 4,100,000.00 22.01.2009 1,800,000.00 1 st roof centring<br />

completed<br />

Scheme – Modernisation Grant Plan (Supplementary)<br />

Details of the Projects<br />

30 women Barrack at 3,200,000.00 24.09.2009 Work order issued<br />

<strong>Nayagarh</strong><br />

197


NAYAGARH DISTRICT (Fire works Under Puri Zone) PROGRESS REPORT AS ON 01.09.2009<br />

Scheme – Non Plan <strong>Year</strong> : 2008 - 2009<br />

Details of the Projects<br />

Sl.No Name of the project Amount of A/A Letter<br />

reference<br />

&<br />

Date of<br />

issue of<br />

W.O<br />

Actual<br />

expenditure<br />

incurred so<br />

far<br />

198<br />

Present Progress Remarks<br />

1 2 3 4 5 7 9 <strong>11</strong><br />

Construction of<br />

564,100.00 564,100.00 Completed<br />

boundary wall, Barbed<br />

wire fencing, site<br />

development & external<br />

electrification to the<br />

exist. F.S Bldg at<br />

Odagaon<br />

Scheme – State Plan <strong>Year</strong>: 2009 - <strong>2010</strong><br />

Details of the Projects<br />

Gania F.S 4,350,000.00 Work order issued


NAYAGARH DISTRICT (Judicial works Under Puri Zone) PROGRESS REPORT AS ON 01.09.2009<br />

Scheme – <strong>Year</strong>: 2008 - 2009<br />

Details of the Projects<br />

Sl.No Name of the project Amount of A/A Letter<br />

reference<br />

&<br />

JMFC court Bldg at<br />

Daspalla<br />

Date of<br />

issue of<br />

W.O<br />

Actual<br />

expenditure<br />

incurred so<br />

far<br />

1,82,07,500.00 05.02.2009 Land handed over<br />

199<br />

Present Progress Remarks<br />

NAYAGARH DISTRICT (Prison works Under Puri Zone) PROGRESS REPORT AS ON 01.09.2009<br />

Sl.No Name of the project Amount of A/A Letter Date of Actual<br />

Present Progress<br />

reference issue of expenditure<br />

& W.O incurred so far<br />

1 2 3 4 5 7 9<br />

External electrification at<br />

Sub Jail Ranpur<br />

600,000.00 20.06.2008 Work under issued<br />

Fortn. & Constrction Of 7,317,000.00 06.08.2008 4,850,000.00 15 nos barrack completed, 2<br />

watch Tower Sub Jail<br />

nos watch tower roof casting<br />

<strong>Nayagarh</strong><br />

completed. 2 nos upto roof<br />

level<br />

Reconstruction of 100 100,000.00 24.12.2008 Work started<br />

users septic tank, soak pit<br />

& inspection chamber at<br />

sub Jail Ranpur<br />

Internal & ext. 10,58,000.00 24.12.2008 Work order issued<br />

Electrification works sub<br />

Jail Ranapur<br />

Installation of air 49,000.00 17.01.2008 Work order issued<br />

conditioner & point<br />

wiring in SP office of Sub


jail Ranapur<br />

Construction of approach<br />

road & site development,<br />

sub Jail, <strong>Nayagarh</strong><br />

Sl.No Name of the project Amount of A/A Letter<br />

reference<br />

&<br />

4,452,174.00 30.<strong>11</strong>.2007 Handed over<br />

Date of<br />

issue of<br />

W.O<br />

Actual<br />

expenditure<br />

incurred so far<br />

Present Progress<br />

1 2 3 4 5 7 9<br />

Improvement of Sanitation<br />

& Water supply to Sub jail<br />

Khandapada<br />

200,000.00 30.01.2009 Work started<br />

Reconstruction of soak pit<br />

mail hole chamber septic<br />

tank, inspection chamber<br />

and repair of latrines and<br />

bath room with glaze tile<br />

flooring & sewerage line<br />

at sub jail Ranapur<br />

200,000.00 17.06.2009 Work order issued<br />

200


Annexure-7<br />

Proceedings of the Consultation Meeting with the Corporate Sector<br />

Proceeding of the Consultation meeting with the Corporate Sector on CDP 2009-<strong>11</strong><br />

For<br />

<strong>Nayagarh</strong> district<br />

Date: 17 th September 2009 Time: 1.30 p.m.<br />

Venue: DRDA Conference Hall, <strong>Nayagarh</strong><br />

A consultation meeting on CDP 2009-<strong>11</strong> was organized with the Corporate Sector of<br />

<strong>Nayagarh</strong> district on 17 th September 2009. It was presided by Sri Amulya Mohanty, District<br />

Planning Officer; and was attended by Sri Manmohan Mishra, ED, <strong>Nayagarh</strong> Sugar Ltd. and his<br />

team; Sri Niranjan Mohapatra, Proprietor, Ashoka Food Products; and Sri Bikash Rath, TSI<br />

representative, with his team. Also present was the GM, DIC.<br />

Sri Mohanty welcomed the representatives of the Corporate sector, and said that after economic<br />

liberalization policies in India the industrial sector has been liberated from the inspector-raj<br />

thereby experiencing a tremendous growth which in turn has significantly benefited the country as<br />

the tax revenue realized from the industrial sector has also increased substantially helping the<br />

government make huge investments in various developmental schemes. Referring to the book<br />

‘India Unbound’, he however said that the Corporate sector still faces certain difficulties and the<br />

present consultation would create a scope to discuss similar issues of the local industries.<br />

Sri Bikash Rath then apprised the House about the district planning process and the objective of the<br />

present consultation meeting. He said that whereas it is a fact that the district of <strong>Nayagarh</strong> hardly<br />

has any industry of significance, he would like to know if industry can be the lead sector for this<br />

district. In response to this, Sri Mohapatra strongly expressed his opinion that industry can certainly<br />

become one of the lead sectors for this district, but it should be natural resource based, particularly<br />

agriculture based. He said that new commercial crops like papaya may be very much beneficial in<br />

this context as papaya is a multi-purpose plant yielding papaya slab, papaya powder, pectin, etc..<br />

Sri Mishra also agreed to this, but said that the present potential of the district is being unutilized or<br />

partially utilized discouraging the Sugar mill. Giving example, he said that increased production of<br />

illicit liquor consumed more gud and as farmers diverted most of their sugar cane to gudproduction,<br />

his sugar mill received only 50000-60000 MT of sugar cane against the requirement of<br />

3 lakh tons, which forced for only 20% utilization of the mill’s production capacity. As a result,<br />

<strong>Nayagarh</strong> Sugar, which is the only important industry in the district, is in a dying condition, he<br />

said.<br />

Various problems hindering the growth of agro-industries in the district, according to Sri Mishra<br />

and Sri Mohapatra, are as under:<br />

201


1. Lack of technical knowhow<br />

2. Lack of technically sound people<br />

3. Lack of efficient labour forcing procurement of labourers from other states.<br />

4. Migration of local labour<br />

5. Inconsistent industrial policy<br />

6. Inadequate irrigation facility<br />

7. Inadequate intervention on the part of agriculture department<br />

8. Insufficient service provided by the DIC 7<br />

Sri Mishra and his team raised a concern that whereas the young generation doesn’t prefer direct<br />

involvement in cultivation activities, the farmers currently engaged in agriculture are unwilling to<br />

accept new technology or methodology that could save their time & labour with an increase in the<br />

production. There is a significant gap is the productivity and production in the district, lack of<br />

consolidation(chakabandi) has but added to the undulatory terrain limitations thereby rendering<br />

commercial farming not feasible even with machines, and government research station has hardly<br />

contributed any thing. Traditional varieties of sugar cane suffer from a genetic deterioration after<br />

long use, and hence varietal replacement with varieties like CO93A145, CO87A298, etc. is very<br />

much required whereas the agriculture department has not progressed much in ensuring this. The<br />

sugar mill is trying on its own to ensure this replacement, but without government support the cost<br />

would not be affordable for extensive varietal replacement. Moreover, land is hardly available for<br />

demonstration purpose. People have become less industrious and more interested in easy money;<br />

and some developmental schemes of the government is accelerating this degeneration of value<br />

system.<br />

The TSI representative wanted to know about the corporate social responsibility of the local<br />

industries, and Sri Mishra described the following points:<br />

Sugar mill is not exactly an industry, but a socio-economic development agency helping the<br />

farmers directly, organizing them, and improving their potential.<br />

<strong>Nayagarh</strong> Sugar provides life insurance coverage of Rs. 1 lakh/individual and health<br />

insurance coverage of Rs.50,000/family, for the farmers registered with it.<br />

It also provides them soft loans without any deposit.<br />

As the executant of Jalanidhi yojna, it develops irrigation facilities in PPP mode.<br />

It has proposed for a mega-project that would lift water from Mahanadi basis to supply<br />

water to <strong>Nayagarh</strong> and Cuttack district.<br />

The sugar mill employs 600-700 labourers during the crushing season and 200-300 during the noncrushing<br />

season. About 80% of the employees are local people, as clarified by Sri Mishra.<br />

Sri Mishra and his team alleged that some of the claims of the agriculture department are not<br />

reliable. For instance, the department claims the area under standing crop of sugar cane to be 7000<br />

hectares whereas the survey by <strong>Nayagarh</strong> Sugar found it to be as less as 6200 acres only. Odisha<br />

produces only 10% of the sugar it consumes, and <strong>Nayagarh</strong> district has the potential to sustain 4<br />

sugar mills of 1250 MT capacity, but this potential is underdeveloped or utilized otherwise, they<br />

said.<br />

7 The DIC has however not only objected to this allegation, but has also provided to the TSI certain references which<br />

suggest that some entrepreneurs have not properly complied with the required norms/instructions. It seems therefore<br />

that the one-sided allegation can’t be taken as a conclusion without an impartial enquiry.- TSI<br />

202


Sri Mohapatra was of the view that exploitation of the farmers led to the diversion of the sugar cane<br />

to gud-making. Sri Mishra agreed to this, but tried to clarify that his industry was not responsible<br />

for this exploitation.<br />

Sri Mohapatra said that there is scope for fodder factory, handloom industry, milk products<br />

industry, and jute industry in the district. His unit produces biscuits, bread, and health products like<br />

VITAGOLD which he is trying for further improvement. According to him, the district’s potential<br />

in commercial agriculture has remained underutilized. For instance, the hilly belts can produce<br />

maize, but this is not being so, the district imports maize from Umarkote and Paralakhemundi.<br />

Papaya cultivation can provide a net profit of Rs.2.5 lakhs per acre, and Soya bin cultivation can<br />

also be highly profitable.<br />

Sri Rath wanted the opinion of Sri Mohapatra on the establishment of a cold storage under the<br />

support of the horticulture department. He was told that whereas few entrepreneurs dare to make<br />

the required investment, the growing power crisis has discouraged them.<br />

Both Sri Mohapatra and Sri Mishra were of the view that paper mill would not be viable in the<br />

district. Sri Mishra said that in order to sustain under the present limitations of short supply of sugar<br />

cane, <strong>Nayagarh</strong> Sugar Mill is planning to diversify with production of rectified spirit, enriched<br />

press mud, and ethanol. However, he also said that increased production of ethanol would mean<br />

significant decrease in the production of sugar.<br />

The House felt concerned regarding the SHG-based entrepreneurship because this has largely<br />

remained confined to cash credits only. Some microfinance companies/agencies are actually<br />

charging much higher interest rates on their loans to SHGs, but indirectly, as discussed in the<br />

House.<br />

Sri Rath thanked the representatives of the local industries for their active participation in the<br />

meeting, and said that he would discuss the matter with the agriculture department.<br />

___________<br />

203


Annexure-8<br />

PROCEEDINGS OF THE MEETING<br />

ON<br />

DEVELOPMENT INTERVENTIONS IN SENSITIVE POCKETS OF NAYAGARH<br />

DISTRICT<br />

Date: <strong>11</strong> th November 2009 Time: <strong>11</strong>.30 A.M.<br />

Venue: DRDA Conference Hall, <strong>Nayagarh</strong><br />

A special meeting was convened on <strong>11</strong>-<strong>11</strong>-09 at <strong>Nayagarh</strong> under the chairmanship of Sri Paresh<br />

Chandra Nayak, I.A.S., Collector & District Magistrate, <strong>Nayagarh</strong> on the issue of development<br />

interventions in sensitive pockets of <strong>Nayagarh</strong> district. The meeting was organized at the<br />

suggestion of PRIA, the Technical Support Institution for <strong>Nayagarh</strong> district for the year 2009-10;<br />

and the objective was to focus on special development interventions in areas otherwise vulnerable<br />

to naxalite influence in the name of underdevelopment. It was attended by the Project Director,<br />

DRDA; the District Planning Officer; DSP(DIB), representative of SP, <strong>Nayagarh</strong>; DFO, <strong>Nayagarh</strong><br />

and DFO, Mahanadi(WL) Division; the District Welfare Officer; Assistant Engineer, MI Division,<br />

Khurdha; and the Lead Bank Manager, <strong>Nayagarh</strong>. On behalf of PRIA, Sri Bikash Rath participated<br />

in this meeting.<br />

The discussion began with a welcome address by the District Planning Officer, <strong>Nayagarh</strong> who said<br />

that it has been a basic realization of the government that development interventions have not been<br />

able to reach grassroots areas quite successfully. The Collector said that whereas we must<br />

strengthen our security system without any compromise, we must simultaneously see to it that<br />

socio-economic issues are properly addressed at grassroots level so that no body can take undue<br />

advantage of the situation. He stressed on the fact that despite our claims people in some areas are<br />

still devoid of even some basic facilities, which is a matter of grave and immediate concern. He<br />

said that people in remote areas should not feel neglected. However, despite the keenness of the<br />

district administration sometimes things do not materialize in time and as an example of this he<br />

cited the case of the proposed Chadheyapalli Bridge for which tender for 7 th time did not succeed<br />

and the process is still going on. Emphasizing that lack of communication is biggest issue, he said<br />

that health services, education, and support for daily sustenance are the three other major factors<br />

that need to be focused on for development interventions in the vulnerable areas. If these four<br />

things can be ensured at grassroots level, then people would be least prone to extremist motivation,<br />

he reiterated; and said that priority should be given to the thrust areas. As an example, he said that<br />

when the polio vaccination programme began in the district, he insisted it to start not from<br />

<strong>Nayagarh</strong> town but from some interior area. And the response was encouraging.<br />

However, he cautioned that while prioritizing development interventions in remote areas, we also<br />

need to ensure that funds are not misutilized. Resources are always limited, so the strategy should<br />

be to gain maximum from the investment.<br />

204


The Collector reiterated his stand that the Police can’t be allowed to be demoralized, but at the<br />

same time accelerating development interventions can really do wonders. He referred to the<br />

encouraging impact of the remote village electrification programme in 18 villages under<br />

Badhamunda GP of Ranapur Block, that has made the local people very happy.<br />

Sri Bikash Rath explained the objective behind this meeting, and said that he wanted the Police to<br />

be a development partner in the district. He raised the issue of underdevelopment in Reserve Forest<br />

and sanctuary areas because of certain restrictions of the forest regime, and recommended to<br />

accelerate development interventions in such areas. Referring to the idiom that ‘Prevention is Better<br />

Than Cure’, he suggested the district administration to take special measures for development of<br />

those areas which are otherwise vulnerable to extremist influence/movement. He also clarified that<br />

although the naxalites attacked <strong>Nayagarh</strong> with a limited objective(to loot arms & ammunitions of<br />

the Police), given the fact that issues of underdevelopment & social injustice have been their major<br />

pleas, the district administration should take no chances in this regard and address such issues<br />

before that can lead to any danger. Further, he expected the Police Department identify those<br />

sensitive pockets where development interventions need to be accelerated.<br />

The DSP(DIB) intimated the House that whereas the Naxalites have been using ultramodern<br />

techniques like satellite phone, the Police Department has taken various steps to counter the naxals.<br />

However, lack of communication, both road and telephonic, has been the major difficulty for the<br />

Police, he explained. Clarifying on this he said that whereas VHF communication is not secure for<br />

maintaining secrecy, cell phone services are not accessible in all parts of the district. Various<br />

programme executing authorities usually stay away from the remote areas as a result of which<br />

because of underdevelopment and lack of awareness people in those areas still practice things like<br />

witchcraft; and the naxals are able to take advantage of the situation. He said that though people<br />

fear police, they are actually not angry with police; rather they can’t distinguish police from the<br />

excise- and forest officials as all of them wear khaki.<br />

The PD, DRDA strongly advised that Police need to be people-friendly, and that they should<br />

change their attitude. The DSP said that the Police regime of the British era has changed a lot, and<br />

it can’t practice autocracy because of so many provisions like the Human Rights Commission. On<br />

the other hand, the Police has started giving importance to ethical policing, and has recruited many<br />

staff from the SC & ST communities. He further said that the tribals are so innocent that when they<br />

murder somebody and cut his head, they take the cut head to the police station while surrendering.<br />

His point was that pressure from police is not the root cause of discontent in the vulnerable areas;<br />

rather there are other factors like undue interference of forest officials. And he advised the district<br />

administration to look into those factors so as to root out the causes of any possible discontent in<br />

remote areas.<br />

The Collector, on the other hand, advised the officials, particularly the police, to be sensitive to the<br />

people. The TSI representative Sri Rath suggested the Police Department to utilize their<br />

intelligence services to intimate the district administration about issues of underdevelopment and<br />

injustice so that necessary steps may be taken in times to address such issues before they attract any<br />

violent activity. This, he said, would help the Police to gain the faith and good will of the people.<br />

The DFO(T), <strong>Nayagarh</strong> said that underdevelopment was not the real issue behind Naxalite/Maoist<br />

influence. According to him, had it been so, the Maoists would not have extended their operations<br />

to relatively developed areas like the Sundargarh district. On the contrary, the forest-dwellers love<br />

to live in forests(despite apparent underdevelopment) and the Forest Department is providing them<br />

employment opportunities. Similarly, the Forest Rights Act is being implemented and the right-<br />

205


holders are getting patta for their land in forests. The government doesn’t allow black-topping of<br />

forest roads, but under this limitation also forest roads are being developed as a result of which the<br />

Pankua-Nuagaon road has now become a good one. Earlier forest management was only protection<br />

oriented, but now it is both protection and community oriented. However, lack of health services is<br />

still a major problem in many areas, the DFO said.<br />

The DFO(WL) said that while it is true that people inside Protected Areas do suffer because of<br />

certain restrictions, it is also a fact that we have lost valuable forest areas and Protected Areas have<br />

been created to conserve the forests(and wildlife). According to him, people need to sacrifice<br />

development to some extent for the sake of forest(and wildlife) conservation which is necessary for<br />

the human civilization. He also supported his fellow officer of <strong>Nayagarh</strong> Forest Division that<br />

underdevelopment is not the actual cause, rather people are interested to stay inside forest areas and<br />

do not prefer to get displaced. Hence, in situ development programmes are being implemented for<br />

them. However, he suggested that the Police should create/strengthen its base in the Baisipalli<br />

sanctuary in view of the possible naxalite movements through the sanctuary.<br />

The PD, DRDA drew the attention of the House to the fact that the district has two major issues,<br />

viz. mass migration, and women trafficking. The district administration has identified the<br />

concerned areas(like, Badsilinga of Gania Block, and Kaptapalli & Jakara of Nuagaon Block, etc.),<br />

and has taken various steps to address the problem under NREGS, NABARD-assisted programmes,<br />

etc.. While new BPL survey is to be conduced, irrigation potential is being created/increased, and<br />

other measures like NTFP plantations are also being taken for the underdeveloped areas.<br />

The DSP wanted to know how the produce of farmers/primary gatherers is to be marketed in<br />

remote areas, and if any procurement centre has been opened in tribal areas. The PD, DRDA<br />

clarified that DSMS is helping for this purpose, and leaf plate is being procured from Dasapalla<br />

whereas ITC is procuring agarbatti from Bhapur. If ITC establishes a scenting factory at<br />

Bhubaneswar, then its procurement would increase substantially, he expressed a hope.<br />

The Assistant Engineer, MI Division requested the district administration for necessary help so as<br />

to ensure sanction of projects under the ‘Repair, Renovation, and Restoration’ schemes of the Govt<br />

of India. On the other hand, the Lead Bank Manager wanted that target of SC/ST beneficiaries<br />

under OSFDC financial assistance programme should be substantially increased.<br />

The meeting ended with a vote of thanks by the TSI representative.<br />

_______<br />

206


List for 20091-10:<br />

Annexure-9<br />

List of villages selected under remote village electrification programme<br />

Sl.No Block Village/Habitation Remarks<br />

1 Daspalla Nidhi Kiari Reserve Forest<br />

2 Daspalla Pehelaju Reserve Forest<br />

3 Daspalla Tapida Reserve Forest<br />

4 Daspalla Sidingi Reserve Forest<br />

5 Daspalla Sirisabadi Reserve Forest<br />

6 Daspalla Chakapaju Reserve Forest<br />

7 Daspalla Genagenda Reserve Forest<br />

8 Daspalla Kanapaju Reserve Forest<br />

9 Daspalla Sahajipanga Reserve Forest<br />

10 Daspalla Bhuruda Reserve Forest<br />

<strong>11</strong> Daspalla Tamundi Reserve Forest<br />

12 Daspalla Bebri Reserve Forest<br />

13 Gania Kuturi Reserve Forest<br />

14 Gania Purunapani Reserve Forest<br />

15 Gania Geregedi Reserve Forest<br />

16 Gania Dhipasahi Reserve Forest<br />

17 Gania Sakatapalli Reserve Forest<br />

18 Gania Osamaska Reserve Forest<br />

19 Gania Kuchumara Reserve Forest<br />

20 Gania Endagadu Reserve Forest<br />

21 Gania Dimiripada Reserve Forest<br />

22 Gania Senapeli Reserve Forest<br />

23 Gania Buriapaju Reserve Forest<br />

24 Gania Idei Reserve Forest<br />

25 Gania Bankajhari Reserve Forest<br />

26 Gania Duising Reserve Forest<br />

27 Gania Kumuri Reserve Forest<br />

28 Gania Bedadi Reserve Forest<br />

29 Gania Damaghati Reserve Forest<br />

30 Gania Tudungi Reserve Forest<br />

31 Gania Janakajhali Reserve Forest<br />

32 Gania Seranda Reserve Forest<br />

33 Gania Rekadi Reserve Forest<br />

34 Gania Gahandi Reserve Forest<br />

35 Nuagaon Badajiri Reserve Forest<br />

36 Nuagaon Tukuda Reserve Forest<br />

37 Ranpur Wallpada Reserve Forest<br />

38 Ranpur Sirikuti Reserve Forest<br />

39 Ranpur Bandhamunda Reserve Forest<br />

40 Ranpur abadihi Reserve Forest<br />

207


41 Ranpur Ukutakumei Reserve Forest<br />

42 Ranpur Brahmuria Reserve Forest<br />

43 Ranpur Badachakundajhar Reserve Forest<br />

44 Ranpur Dimiribadi Reserve Forest<br />

45 Ranpur Nelipada Reserve Forest<br />

47 Ranpur Betuli Reserve Forest<br />

46 Ranpur Tikiraipada Reserve Forest<br />

47 Ranpur Sankhjodi Reserve Forest<br />

48 Ranpur Seketasala Reserve Forest<br />

List for <strong>2010</strong>-<strong>11</strong>:<br />

Block Village/habitation Remarks<br />

Ranpur Gachhapatna Reserve Forest<br />

Daspalla Ganderi Inaccessible & Dense forest<br />

Daspalla Nardigochha Inaccessible & Dense forest<br />

Daspalla Nendurijhari Inaccessible & Dense forest<br />

Daspalla Fularia Inaccessible & Dense forest<br />

Daspalla Baijhari Inaccessible & Dense forest<br />

Daspalla Ranijhari Inaccessible & Dense forest<br />

Daspalla Minagadu Inaccessible & Dense forest<br />

Daspalla Lingirisahi Inaccessible & Dense forest<br />

Daspalla Jorakhani Inaccessible & Dense forest<br />

Daspalla Dhundugadia Inaccessible & Dense forest<br />

Daspalla Putungi Inaccessible & Dense forest<br />

Daspalla Badasikharpanga Inaccessible & Dense forest<br />

Daspalla Julungi Inaccessible & Dense forest<br />

Daspalla Badasaratha Inaccessible & Dense forest<br />

Daspalla Dudurupada Inaccessible & Dense forest<br />

Daspalla Gendali Inaccessible & Dense forest<br />

Daspalla Purungu Inaccessible & Dense forest<br />

Daspalla Sirisira Inaccessible & Dense forest<br />

Daspalla Fgadiapada Inaccessible & Dense forest<br />

Daspalla Sadarpadar Inaccessible & Dense forest<br />

Daspalla<br />

Kurudangi<br />

Khesara Inaccessible & Dense forest<br />

Daspalla Kurudangi Inaccessible & Dense forest<br />

Daspalla uparadikiri Inaccessible & Dense forest<br />

Daspalla Birapaju Inaccessible & Dense forest<br />

Daspalla Dahangi Inaccessible & Dense forest<br />

Daspalla Gambhariganda Inaccessible & Dense forest<br />

Daspalla Jirikibadi Inaccessible & Dense forest<br />

Daspalla Gochhabari Inaccessible & Dense forest<br />

Odagaon Nepal Inaccessible & Dense forest<br />

Daspalla Khalighati Top of the Hill, Inaccessible & dense forest<br />

Daspalla Kurumi Top of the Hill, Inaccessible & dense forest<br />

Daspalla Kathapatani Top of the Hill, Inaccessible & dense forest<br />

Daspalla Birigada Top of the Hill, Inaccessible & dense forest<br />

208


Daspalla Asarada Top of the Hill, Inaccessible & dense forest<br />

Daspalla Panabari Top of the Hill, Inaccessible & dense forest<br />

Daspalla Tabada Top of the Hill, Inaccessible & dense forest<br />

Daspalla Raguda Wild life sanctury & inaccessible<br />

Daspalla Nekaraganda Wild life sanctury & inaccessible<br />

Gania Kanipokhari Wild life sanctury & inaccessible<br />

Gania Gochhabari Wild life sanctury & inaccessible<br />

Gania Sagadabhanga Wild life sanctury & inaccessible<br />

Gania Sanasilinga Wild life sanctury & inaccessible<br />

Gania Malasapadar Wild life sanctury & inaccessible<br />

Gania Musugoda Wild life sanctury & inaccessible<br />

Gania Salapaganda Wild life sanctury & inaccessible<br />

Daspalla Uipada Two household with no BPL<br />

Khandapada Badaphokhania One household<br />

Daspalla Mundulinuagaon One household<br />

(Source: RE Cell, <strong>Nayagarh</strong>)<br />

Why Social Mobilization?<br />

Annexure-10<br />

A Plan of Action for Social Mobilization<br />

for Stimulating Labour Flow under NREGS<br />

209<br />

Amulya Kumar Mohanty<br />

Orissa Planning Service<br />

APD, DRDA &<br />

District Planning Officer, <strong>Nayagarh</strong><br />

In <strong>Nayagarh</strong> district, the experience of last one and half year in the implementation of NREGS has<br />

not been rosy. The most significant observation has been the absence of large scale voluntary<br />

demand for work as against about 1 lakh registered families. So far hardly <strong>11</strong>,000 families have<br />

demanded work in 2 years. We have seen how we had to pursue and motivate local PRI people for<br />

labour mobilization, and also the lack of response to the persuasion by Block officials as reflected<br />

in various review meetings. Two possible reasons that seem to account for this kind of development<br />

are as under:<br />

1. May be there is better alternative wage employment opportunity both inside and outside<br />

district, by wage amount and the work comfort. Hence, NREGS is not the priority and<br />

attraction for the people. In the Employment generation report of the district 2006, the<br />

author had calculated that about 27 lakh persondays(otherwise written as ‘mandays’<br />

though women do work under NREGS) was created by different schemes of GoI & Orissa<br />

goverment such as SGRY, PMGSY, RPWS, LIFT IRRIGATION , IRRIGATION , FDR,<br />

CRITICAL , MPLADS, MLALADS, and 12 TH FCA , etc.. These schemes do not<br />

primarily aim to generate wage employment but by their operation some wage employment<br />

is created for natural necessity of the schemes. In addition to it, wage employment is also<br />

generated in private sector like house construction, agriculture work etc. though we do not


have statistics in this regard. In addition to it, there is also migration to nearby cities for<br />

wage employment.<br />

2. The other view is that, whereas there is visible deprivation, poverty, malnutrition, and<br />

low rate of income in the terrain, but the demand as regards NREGS is dormant because the<br />

working class has not been much sensitized about the benefits of the scheme. There has not<br />

been social mobilization. In addition, procedural hurdles are also there.<br />

All these have created a psychological barrier to NREGS. The accessibility to work as a result has<br />

been insignificant.<br />

In order to land in any particular theory, we should take supplementary steps for stimulating the<br />

flow of laborers.<br />

The following statistical analysis gives clues to the need for generation of additional wage<br />

employment and employment shortage in the district:<br />

Out the total 2 lakh main workers, the district has about 50,000 agriculture labourers. From the<br />

table below, it is revealed that a sizable section of the working force is engaged in agricultural- and<br />

other wage based labor activities.<br />

Occupational Classification of the Work force in <strong>Nayagarh</strong> District - 2001 Census<br />

Sl.No. / Type of Worker No. of Workers % of workers to total<br />

workers<br />

1. Cultivators 72,558 25.19<br />

2. Agricultural Labours 49,465 17.17<br />

3. Household Industry <strong>11</strong>,555 4.01<br />

4. Other workers 72,068 25.01<br />

5. Total Main workers 205,676<br />

6. Marginal workers 82,377 28.59<br />

7. Total workers 288,053<br />

In year 2006-07, 27 lakh persondays of wage employment have been created through various<br />

Central- and State government schemes (excluding SGRY) operating in the district through<br />

different departments. So far about 1 lakh families have registered for work under NREGS.<br />

Compared to the demand of <strong>11</strong>,000 families made so far 8 , if we take a conservative figure of<br />

50,000 households, for giving 100 days of guaranteed wage employment in a year to each of<br />

50,000 households, the district requires generation of 50 lakh persondays in a year. Thus, there is a<br />

gap between demand and supply as regards official schemes. People still migrate to other districts<br />

or even out-of-state to work in the construction- and other such unorganized sectors under private<br />

entrepreneurship. This suggests the need for generation of additional days of wage employment in<br />

rural areas. Financially, the required funds to generate 50 lakh persondays, at the current wage<br />

level, amount to Rs. 35 crore wage expenditure in a year + matching material expenditure of Rs.<br />

23 crore. Hence, the total funds requirement comes to Rs. 58 crore. The current flow of funds is,<br />

however, significantly less.<br />

Thus, the initial advertisement and awareness programme made in 2008-09 needs subsequent<br />

strengthening. To make the potential demand active, social mobilization is required that may break<br />

all psychological and real barriers. Then only we can arrive at a conclusion as regards the fate of<br />

8 This article was submitted in September 2009.<br />

210


NREGS. The focus can be concentrated to launch a massive drive for social awareness and<br />

stimulation of labour flow.<br />

Following are the recommendations that can ensure the required social mobilization:<br />

Special Palli Sabha be convened in all panchayats for discussion, for sensitization and social<br />

mobilization and informal identification of needy, poor families who should be motivated for work.<br />

THIS IS THE MOST IMPORTANT.<br />

Special drive for Job card distribution, opening up of pass book accounts, demand form (C-1 )<br />

filling by GRS & other people .<br />

Adoption of mass media & advertisement techniques like distribution of Oriya leaflets in villages,<br />

mentioning the basic rules for work, display of Banners in Oriya in all Panchayats etc., and<br />

involvement of ZP & PS members, SHGs and NGOs in sensitization.<br />

Annexure-<strong>11</strong><br />

ADMINISTRATIVE REFORMS<br />

2<strong>11</strong><br />

Amulya Kumar Mohanty<br />

Orissa Planning Service<br />

APD, DRDA &<br />

District Planning Officer, <strong>Nayagarh</strong><br />

After assuming power, the Hon’ble Chief Minister of Orissa, in a meeting of all Secretaries on 13.6.2009, had<br />

given his observations and directions to enhance the quality of public services and effectiveness of<br />

development programmes. He has referred to good governance/ managerial efficiency in administration so<br />

that the gap between government and people and social tensions because of it are reduced substantially.<br />

Rightfully, Hon’ble Chief Minister has given directions to activate administrative reforms. This is a non –<br />

controversial issue and intellectuals at all levels unanimously agree that without necessary administrative<br />

reforms pro-people policies can not be implemented effectively. Unfortunately such reforms have been long<br />

due in this country.<br />

Planning is not just allocation of funds , but for successful management of plan and programmes, conducive<br />

organizational structure should be created . Experiences show that procedural , organizational and work<br />

culture reforms are essential . In the greater interest of the district, the District Planning Committee may<br />

kindly give the following broad suggestions regarding administrative and managerial reforms, to the<br />

government:<br />

1. A Campaign / slogan at all levels should be launched by Government for making reforms and initiating<br />

debates in this regard. SPEED, SIMPLE, EFFECTIVE, PLEASANT should be the basis of Management<br />

culture.<br />

2. Administrative reforms cell/ committee should be formed in every department, consisting of rich variety<br />

of people, to look into the functioning of system, and also to suggest reforms basing on prevailing situations<br />

and emerging ideas.<br />

3. For KBK region, a team of inspired professionals from within government and outside government<br />

should be created, and the team to be inducted in the area should be allowed to stay for a longer term of 5-<br />

10 years, alongwith the freedom to monitor, guide , and supervise the utilization of special funds flowing to<br />

the area.


3. The focus in managerial reforms should shift from control and self- assertiveness to cooperation, fellow<br />

feeling, logic, understanding human psychology and consciousness approach in work place. The work<br />

place needs to be pleasant. In light of modern management philosophy, standard managerial principles/<br />

skills should be practiced at all levels.<br />

4. Awards & incentive for employees should be introduced in every department for excellence in public<br />

service as in West Bengal government, to encourage efficiency, ethics and significant work in service. A<br />

separate policy for good performance should be made. On the other hand, defaulters should be adequately<br />

penalized.<br />

5. The system has become heavy with luxurious procedures adding to difficulties. Meaningless, superficial<br />

rules/ procedures/ regulations in every department should be dismantled / simplified to the minimum.<br />

____________<br />

Annexure-12<br />

GP-WISH LISTS 9<br />

Roads<br />

Block GP Proposed work Estimated cost<br />

in lakh rupees<br />

<strong>Nayagarh</strong> Banigochha Road construction from Uparbana to Putibari 10<br />

<strong>Nayagarh</strong> Banigochha Road construction from Gumurukhola to Kulurukumpa 10<br />

<strong>Nayagarh</strong> Banigochha Road construction from Burupalu to Bentaribata via<br />

Padhanasi<br />

<strong>Nayagarh</strong> Banigochha Road construction from Burupalu to Bidapaju 5<br />

<strong>Nayagarh</strong> Banigochha Road construction from Baragachha to Nadi road,<br />

Burupalu<br />

<strong>Nayagarh</strong> Banigochha Road concrete work of Burupalu, Harijan Sahi road 5<br />

<strong>Nayagarh</strong> Banigochha Road construction from Burupalu, Kalas Sahi to Budha<br />

Sahi road<br />

<strong>Nayagarh</strong> Banigochha Road construction from Bidapaju to Kankan Mendhi 5<br />

<strong>Nayagarh</strong> Banigochha Road construction from Bidapaju to Burupalu 8<br />

<strong>Nayagarh</strong> Banigochha Road construction from Banagaon to Sahi road 5<br />

<strong>Nayagarh</strong> Banigochha Road construction from Banagaon to Chandarimunda 10<br />

<strong>Nayagarh</strong> Banigochha Road construction from Kenjari to Nadi road 5<br />

<strong>Nayagarh</strong> Banigochha Road construction of Kenjari Jharana Khole 5<br />

<strong>Nayagarh</strong> Banigochha Road concrete work of Tumudi Bana road 8<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Banigochha to Kuasahi road 10<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Druna to Darakibadi 8<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Druna to Kuruli road 10<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Druna school to drain 5<br />

9 These wishlists have been prepared on the basis of GP-level plans submiited to the TSI. Some GPs have either not<br />

submitted the plan, or have made very bold projections without any specific details. As such, necessary editing has<br />

been done at the end of TSI more particularly n contradictory cases.<br />

10<br />

5<br />

5<br />

212


<strong>Nayagarh</strong> Banigochha Road construction work from Kakadi to Balar sahi 5<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Kakadi to Tarali sahi road 5<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Kutibari to Uparbana 8<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Pachhada to Sarasa 10<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Pachhada to Gumur khola 10<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Sarasa to Gurudugumma 10<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Gurudu to Sarasa 10<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Tarakibadi to Kurubangi 5<br />

<strong>Nayagarh</strong> Banigochha Road construction work from Burupalu to school 8<br />

<strong>Nayagarh</strong> Etamati Village CC road work 50<br />

<strong>Nayagarh</strong> Bhata Sahi Road construction 500<br />

Dasapalla Chacheyapalli Road repairing work from RD to Hanumanta road 2<br />

Dasapalla Chacheyapalli Road repairing work from Kerabari to Dalakaranda 4<br />

Dasapalla Chacheyapalli Road construction work from Pusiganda to Hanumanta<br />

road<br />

Dasapalla Chacheyapalli Road repairing work of Kerabari to Kalibesula 5<br />

Dasapalla Chacheyapalli Road and bridge work of Araniganda and Sundargumma 8<br />

Dasapalla Chacheyapalli Road and bridge construction work of Baliberana to<br />

Talapaju road<br />

Dasapalla Chacheyapalli Road and bridge construction work of Duraganda to<br />

Majuribadi road<br />

Dasapalla Chacheyapalli Road and bridge repairing work of Bam to Sundarkunda<br />

road<br />

Dasapalla Chacheyapalli Road repairing work of Telisahi-Bhapamaja road 10<br />

Dasapalla Chacheyapalli Road repairing work of Malikasahi-Dilartati 5<br />

Dasapalla Chacheyapalli Construction of Julungi-Dilartati road 10<br />

Dasapalla Chacheyapalli Construction of Khajurisaga-Bhatagada road 10<br />

Dasapalla Chacheyapalli Construction of Bhatagada-Duda road 10<br />

Dasapalla Chacheyapalli Construction of Odabaji-Osalaxmi road 5<br />

Dasapalla Chacheyapalli Construction of Tamundi-Chachethapalli road 10<br />

Dasapalla Dihagaon Road development 1.4<br />

Dasapalla Gholahandi Construction of metal road/bridge from Gholahandi, PWD<br />

to Jilinda<br />

Dasapalla Gholahandi Repairing of metal road of Gholahandi High school 6<br />

Dasapalla Gholahandi Repairing of concrete road from Gholahandi to<br />

Gholahandi temple<br />

Dasapalla Gholahandi Repairing of Madanpur bridge and it's Kacha road 5<br />

Dasapalla Gholahandi Repairing of metal road from Gholahandi to Haliasahi 3<br />

Dasapalla Gholahandi Repairing of Kishore chandraput concrete road 5<br />

Dasapalla Gholahandi Repairing of Yubak Sangha concrete road 2<br />

Dasapalla Gholahandi Repairing of Panchayat concrete road 3<br />

Dasapalla Gholahandi Repairing of concrete road from PWD to Kalia Parija<br />

residence<br />

Dasapalla Gholahandi Repairing of Gholahandi Talasahi concrete road 2<br />

10<br />

20<br />

5<br />

10<br />

10<br />

10<br />

5<br />

213


Dasapalla Gholahandi Repairing of concrete road from Govindpur to Panchayat<br />

office<br />

Dasapalla Gholahandi Repairing of PWD, Telera village concrete road 4<br />

Dasapalla Gholahandi Repairing of PWD, Guriabari concrete road 5<br />

Dasapalla Gholahandi Repairing of PWD, Baghuapani concrete road 5<br />

Dasapalla Gholahandi Road repairing from Nadigochha to Gohiriamada 10<br />

Dasapalla Gholahandi Road repairing from Lendurijhari to Sanpada basti 10<br />

Dasapalla Ghugudipada Construction of road from Makar prasad to Kumbhir khani\ 1200<br />

Dasapalla Ghugudipada Construction of road from Bargadiha to Jhuntamua 100<br />

Dasapalla Ghugudipada Construction of road from Raimata to Khali ghati 60<br />

Dasapalla Ghugudipada Construction of road from Kadalibari to Saradhapur 100<br />

Dasapalla Ghugudipada Road construction from Makar prasad to Jhankara 300<br />

Dasapalla Ghugudipada Road construction from Makar prasad to Nekarganda 60<br />

Dasapalla Jagadeipur Construction of road and drain 50<br />

Dasapalla Kalasa Khaman Construction of new road from Gendali to Panderi 5<br />

Dasapalla Kalasa Khaman Construction of new road from Gendali to Kurumi via<br />

Kathapatani<br />

Dasapalla Kalasa Khaman Construction of road from Kurumi to Khajuri gochha 3<br />

Dasapalla Kalasa Khaman Construction of road from Kanapabu to Kasokhaman 8<br />

Dasapalla Kalasa Khaman Construction of road from Madhikumpa to Nuasahi 4<br />

Dasapalla Kalasa Khaman Construction of road from Khanikumpa, Khardi sahi to<br />

Kalasa Khaman<br />

Dasapalla Kalasa Khaman Construction of road from Purungu to Kalamba 3<br />

Dasapalla Khamar Sahi Construction of road from PWD to Kauda 50<br />

Dasapalla Khamar Sahi Construction of road from PWD to Damodarpur 50<br />

Dasapalla Khamar Sahi Construction of road from Kauda to Sareniganda 70<br />

Dasapalla Khamar Sahi Construction of road from Subalaya to Nuasahi 100<br />

Dasapalla Khamar Sahi Construction of road from Puruna Dasapalla to Dumara 50<br />

Dasapalla Khamar Sahi Construction of road from Gohiriapada to PWD 60<br />

Dasapalla Khamar Sahi Construction of road from Arasahi to Subalaya 100<br />

Dasapalla Khamar Sahi Construction of road from Padmapur to Fauda baghua<br />

bereni<br />

Dasapalla Khamar Sahi Construction of road from PWD to Chakradharpur 30<br />

Dasapalla Khamar Sahi Construction of Puruna Dasapalla Thakur road 25<br />

Dasapalla Khamar Sahi Road construction of Puruna Dasapalla school road 5<br />

Dasapalla Khamar Sahi Road construction from Bhogarai to Nadipada 5<br />

Dasapalla Khamar Sahi Road repairing from PWD to Paika Baghua Bereni 10<br />

Dasapalla Kujamendhi Construction of road work from Kujamendhi to Bani 30<br />

Dasapalla Kujamendhi Road construction from Bani to Pradhan pada 10<br />

Dasapalla Kujamendhi Road construction work from Pradhan pada to Phulbani<br />

Border<br />

4<br />

5<br />

2<br />

50<br />

10<br />

214


Dasapalla Kujamendhi Road construction work from Mundula to Bani 20<br />

Dasapalla Kujamendhi Road construction work from Mundula to Phulbani Border 10<br />

Dasapalla Kujamendhi Road construction work from Pradhan pada to Gadiapada 50<br />

Dasapalla Kujamendhi Road construction work from RD road to Kujamendhi 20<br />

Dasapalla Kujamendhi Road construction work from Bandhakhaman to<br />

Kumbhikila<br />

Dasapalla Kujamendhi Road construction work from Kumbhikila to Kuradhinisha 40<br />

Dasapalla Kujamendhi Road construction work from Kuradhinisha to Shirishira 50<br />

Dasapalla Kujamendhi Road construction work from Shirishira to Kurudangi 50<br />

Dasapalla Kujamendhi Road construction work from Shirishira to Gadiapada 40<br />

Dasapalla Kujamendhi Road construction work from Gadiapada to Kurudangi 50<br />

Dasapalla Kujamendhi Road construction work from Kurudangi to Duda 40<br />

Dasapalla Kujamendhi Road construction work from Kurudangi to Dadakibadi 30<br />

Dasapalla Kujamendhi Road construction work from Kuradhinisha to Dasanipada 40<br />

Dasapalla Kujamendhi Road construction work from Dasanipada to Nepajhari 50<br />

Dasapalla Kujamendhi Road construction work from Kuradhinisha to Karadigada 20<br />

Dasapalla Kujamendhi Road construction work from Karadigada to Bandharsahi 40<br />

Dasapalla Kujamendhi Road construction work from Ambalimba to Nayak gaon 50<br />

Dasapalla Kujamendhi Road construction work from Ambalimba to Burupalu 40<br />

Dasapalla Kujamendhi Road construction work from Kankadamedhi to RD road 20<br />

Dasapalla Kujamendhi Road construction work from Rupajhari, RD to<br />

Karadigada<br />

Dasapalla Kujamendhi Road construction work from RD road to Baderi gochha 5<br />

Dasapalla Kujamendhi Road construction work from RD Rupajhari 5<br />

Dasapalla Kujamendhi Road construction work of Ambalimba village 2<br />

Dasapalla Kujamendhi Road construction work from Kujamendhi to RD 2<br />

Dasapalla Kujamendhi Road construction work from Kujamendhi to RD road 3<br />

Dasapalla Kujamendhi Road construction work from Kujamendhi to Chhitukuli,<br />

Nuagaon<br />

Dasapalla Kujamendhi Road construction work from Chhitukuli RD to<br />

Chancharapalli RD, via Gundurisahi, Sarupada,<br />

Gunduribadi, Kalakiari<br />

20<br />

Dasapalla Kujamendhi Road construction work from Sarupada to RD 5<br />

Dasapalla Kujamendhi Road construction work from RD to Kalakiari 2<br />

Dasapalla Kujamendhi Road construction work from RD to Chancharapalli,<br />

Harijan sahi<br />

Dasapalla Kujamendhi Road construction work from RD to Andharbadi 5<br />

Dasapalla Kujamendhi Road construction work from Kankadamedhi to Burupalu 10<br />

Dasapalla Kujamendhi Road construction work from Gunduribadi to Saratabadi 10<br />

50<br />

50<br />

3<br />

2<br />

215


Dasapalla Kujamendhi Road construction work from Kujamendhi to Ludubadi 10<br />

Dasapalla Kunjabanagarh Construction and repair of road 100<br />

Dasapalla Madhyakhanda Mohantypalli road 3<br />

Dasapalla Madhyakhanda Tentuliapalli road 3<br />

Dasapalla Nachhipur Jhuntamara road 10<br />

Dasapalla Nachhipur Srirampur road 5<br />

Dasapalla Nachhipur Talasahi Sulia road 3<br />

Dasapalla Nachhipur Gambharikhole road 5<br />

Dasapalla Nachhipur Raisar road 2<br />

Dasapalla Nachhipur Road from Gobardhanpur to Padhuria 5<br />

Dasapalla Nachhipur Guriabari road 2<br />

Dasapalla Nachhipur Jamusahi road 3<br />

Dasapalla Nuagaon Construction of road from Badasikhar to Kanipokhari 10<br />

Dasapalla Nuagaon Construction of road from Kanipokhari to Nuagaon 8<br />

Dasapalla Nuagaon Construction of road from Abhayapur to Kutibari 10<br />

Dasapalla Nuagaon Construction of road from Minagau to Nuagaon 10<br />

Dasapalla Nuagaon Construction of road from Genegenda to Badasikhar 5<br />

Dasapalla Nuagaon Construction of road from Jorakani Dadara 5<br />

Daspalla Pokharigochha Bhegabadipankua RD road via bebari 50<br />

Daspalla Pokharigochha RD road from bhegabadi to gramashree 50<br />

Daspalla Pokharigochha road from Bebari to Bulunda via Polakhi,Khalamada 40<br />

Daspalla Pokharigochha RD road from Sanakamiti to 20<br />

Daspalla Pokharigochha road from Bulunda to Kuabaria canal 40<br />

Daspalla Pokharigochha RD road from Putubari to Sebashram 50<br />

Daspalla Pokharigochha road from Sebashram to Jantrapadar 25<br />

Daspalla Pokharigochha RD road from Pipalapadara 25<br />

Daspalla Pokharigochha RD road from Nedisahi to Sabdasahi 20<br />

Daspalla Pokharigochha road from Nedisahi to Dalamada 30<br />

Daspalla Pokharigochha RD road from Kayadira 10<br />

Daspalla Pokharigochha RD road from Ududa 10<br />

Daspalla Pokharigochha RD road from Pikisaju 5<br />

Daspalla Pokharigochha RD road from Sundaroela 10<br />

Daspalla Pokharigochha road from Sadabhuin to Bhelabadi 5<br />

Daspalla Pokharigochha RD road rom Khalaserena 2<br />

Daspalla Pokharigochha RD road from Gramashree to Patharakhanda 2<br />

Daspalla Pokharigochha road from Pokharigochha to Patharakhanda 2<br />

Daspalla Similisahi road from bijanagar to godipada 5<br />

Daspalla Similisahi road from jagapur P.W.D to P.N.B 5<br />

Dasapalla Kujamendhi Road construction of Bani 2<br />

Dasapalla Kulurukumpa Construction of road and bridge from Guraha AWD to<br />

Baijhari<br />

Dasapalla Kulurukumpa Construction of road and bridge from Gunduribari to<br />

Baijhari via Uparatakiri<br />

Dasapalla Kulurukumpa Construction of road and bridge from Baijhari to Rashijhari 5<br />

Dasapalla Kulurukumpa Construction of road and bridge from Kulurukumpa chhak<br />

to Gochhabari<br />

10<br />

10<br />

10<br />

216


Dasapalla Kulurukumpa Construction of road and bridge from Banibiri Sunaripadar<br />

to Kulurukumpa<br />

Dasapalla Kulurukumpa Construction of road and bridge from Kulurukumpa PWD<br />

to Parasa via Kurutghati<br />

Dasapalla Kulurukumpa Construction of road and bridge from Guraha Niala sahi to<br />

Bachhapadar<br />

Dasapalla Kulurukumpa Construction of road and bridge from Jamusahi to<br />

Jamereda via Bhangamunda<br />

Dasapalla Kulurukumpa Construction of road and bridge from Buraha to Dhipasahi 5<br />

Dasapalla Kulurukumpa Construction of road and bridge from Janipadar to<br />

Gunduribari<br />

Dasapalla Kulurukumpa Construction of road from Tanganadi to Bidapaju 5<br />

Dasapalla Kulurukumpa Construction road from Gandhari khole to Kolab 5<br />

Dasapalla Kulurukumpa Construction of road from Salabhanga to Gambhariganda 7<br />

Dasapalla Kulurukumpa Construction of road and bridge from Gunduribari to<br />

Bhagamunda<br />

Dasapalla Kulurukumpa Construction of road and bridge from PWD to Dudukipaju,<br />

Tailasahi<br />

Dasapalla Kulurukumpa Construction of road and bridge from Tanganadi to<br />

Jamereda<br />

Dasapalla Kulurukumpa Construction of road and bridge from Kulurukumpa,<br />

Khetrabandipur to Guraha Kelaha sahi<br />

Dasapalla Kulurukumpa Construction of road and bridge from Durgaprasad PWD<br />

road to Taralasahi<br />

Dasapalla Kulurukumpa Construction of road and bridge from PWD to<br />

Krushnaprasad via pathar khand<br />

Dasapalla Kulurukumpa Construction of road and bridge from Banibiri PWD road<br />

to Julungi<br />

Dasapalla Kulurukumpa Construction of road and bridge from Sampered school to 5<br />

Dasapalla Kulurukumpa Construction of road from Banibiri to Harijan sahi 3<br />

Daspalla Similisahi sepalsahi road development 5<br />

Daspalla Similisahi road construction from similisahi RD to kainmanadi 5<br />

Daspalla Similisahi road at rangamatia 5<br />

Daspalla Similisahi road and drain construction at kalapati 5<br />

Daspalla Similisahi similisahi village road & drain 5<br />

Daspalla Similisahi school road from badadiha to tendabadi 5<br />

Daspalla Tendabadi Road from gram panchayat head quarter to P-S 5<br />

Daspalla Tendabadi road from sakeni to gram panchayat head quarter<br />

road from dugudi via kusumagadia to gram panchayat<br />

5<br />

Daspalla Tendabadi head quarter 5<br />

Daspalla Tendabadi road from kusumagadia via tendabadi<br />

road from khalisahi,dihasahi via nuasahi to gram<br />

4<br />

Daspalla Tendabadi panchayat 5<br />

Daspalla Tendabadi road from bateni to kusumagadia 5<br />

Daspalla Tendabadi road from P.W.D road via masabadi to kusumasahia 5<br />

Daspalla Tendabadi construction of road from lembugochha to P.W.D 3<br />

Daspalla Tendabadi road from ganderi via nedisahi to P.W.D 5<br />

Daspalla Tendabadi old poibadi to poibadi road construction 5<br />

Daspalla Tendabadi road from bhogara to tendabadi<br />

road construction from gandatota to pankakasahi via<br />

1.5<br />

Daspalla Tendabadi P.W.D 4<br />

Daspalla Tendabadi road from pankua RD to gothasahi khahalabania 4<br />

Daspalla Tendabadi road from poibadiharijana sahi to dihasahi 5<br />

8<br />

5<br />

10<br />

10<br />

5<br />

6<br />

7<br />

3<br />

3<br />

5<br />

5<br />

5<br />

217


Daspalla Tendabadi road from khalisahi to poibadi 3<br />

Daspalla Tendabadi road from kusumakania to khalisahi 5<br />

Daspalla Tendabadi road construction from nuasahi to tendabadi 3<br />

Daspalla Tendabadi road construction from tendabadi to barasahi 5<br />

Daspalla Tendabadi road from P.W.D road to gundapaju changirapali 5<br />

Daspalla Tendabadi road from tendabadi to school<br />

road from khalisahi harijana sahi via adibasi sahi to<br />

1<br />

Daspalla Tendabadi P.W.D road 5<br />

Daspalla Tendabadi road from dugudi to tenduasahi 2<br />

Daspalla Tumandi road from tumandi to naradipada 10<br />

Daspalla Tumandi road from naradipada to badakurubari 10<br />

Daspalla Tumandi road from tiapadara to badakurubari 10<br />

Daspalla Tumandi road from PWD to asinidegena 10<br />

Daspalla Tumandi road from takera to peheladu 10<br />

Daspalla Tumandi road from gopalapur to chilipathara 50<br />

Daspalla Tumandi road from buguda to dankachela 10<br />

Daspalla Tumandi road from tilabada to malari 20<br />

Bhapur Fategarh Construction of concrete road 90<br />

Bhapur Fategarh Road construction work 50<br />

Bhapur Fategarh Road construction from Manipur to Masanipada 5<br />

Bhapur Karabar Concrete road 35<br />

Bhapur Karabar Earthen road 20<br />

Bhapur Bhagabanpur Road from Bhagabanpur to Hatakata 10<br />

Bhapur Bhagabanpur Road from bhokilapada to Kusumi river ghat 5<br />

Bhapur Bhagabanpur Road of Luniauti Balunkeswar 5<br />

Bhapur Bhagabanpur Road of Betakholi nadighat 5<br />

Bhapur Bhagabanpur Road repairing work 70<br />

Bhapur Badasahara Road construction work 50<br />

Bhapur Chakradhar<br />

Prasad<br />

Construction of road 20<br />

Bhapur Kainfulia Construction of road from Kainfulia to Bhapur 10<br />

Bhapur Kainfulia Construction of road from Kainfulia to Jaharbenta 10<br />

Bhapur Kainfulia Construction of road from Duadia to Kainfulia 8<br />

Bhapur Kainfulia Construction of road from Baraputa to Duadia 5<br />

Bhapur Kainfulia Construction of road from Kainfulia to Maliberani 20<br />

Bhapur Kainfulia Construction of road from Kainfulia to Khalajharia 20<br />

Bhapur Kainfulia Construction of road from Kainfulia to Rakom 20<br />

Bhapur Kainfulia Construction of road from Baraputa to Aligarh 30<br />

Bhapur Rakama Construction of road from Badilo to Jhagadapada 20<br />

Bhapur Rakama Construction of road from Rakama to Kainfulia 5<br />

Bhapur Rakama Construction of road from Rakama to Manapur 15<br />

Bhapur Baunsabati Road construction from Baunsabati Talasahi to<br />

Natabarpur<br />

Bhapur Bhapur Road work from Baharkote to Jhadeswari 10<br />

Bhapur Bhapur Road work from Mandarberani to Galapada 10<br />

Bhapur Nimani Road work from Badabhuin to UP school 5<br />

Bhapur Salapada Road work from Salapada Mangala Mandir to Barabati 200<br />

Bhapur Salapada Construction of concrete road 38<br />

3<br />

218


Bhapur Balgunia Concrete road from Balgunia UP school to Badasahi<br />

Baritala<br />

Bhapur Balgunia Concrete road from Badasahi to Panchayat office 3<br />

Bhapur Balgunia Concrete road from College chhak to Nal shop 5<br />

Bhapur Balgunia Road from Telisahi to Smasan 6<br />

Bhapur Balgunia Road from Nuapatanasahi to Odosahi and college road 10<br />

Bhapur Balgunia Road from RD road to Harijan sahi 3<br />

Bhapur Balgunia Road from Dhalabani to Gopal prasad 10<br />

Bhapur Balgunia Road from Dhandabandha to Jakelapalli 5<br />

Bhapur Balgunia Road from Guntupada to Painsara 5<br />

Bhapur Balgunia Road from Kunjabana prasad to Guntupada 5<br />

Bhapur Balgunia Road from Kesharsing to Luniabati 5<br />

Bhapur Balgunia Road from Kesharsing to Nuapalli 10<br />

Bhapur Balgunia Road from Nuapalli to bridge 15<br />

Bhapur Balgunia Road from RD road to Kunjaban prasad 10<br />

Bhapur Baghuapalli Road from Dhandabandha to Purusottamapur 50<br />

Bhapur Baghuapalli Road and bridge work from Ainsiakhole Odasa 10<br />

Bhapur Baghuapalli Road from Patanabandhadwar to Ainsiakhole 10<br />

Bhapur Baghuapalli Road from Bandahdwar to Guntupada 10<br />

Bhapur Baghuapalli Road from Odasa to Budidei 5<br />

Bhapur Baghuapalli Road from RD to Tolakabani Odasa 20<br />

Bhapur Padmabati<br />

Bhapur Sasan<br />

Bhapur Sasan<br />

Bhapur Sasan<br />

Bhapur Sasan<br />

Bhapur Sasan<br />

Bhapur Bijipur<br />

Bhapur Bijipur<br />

Bhapur Bijipur<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Road<br />

Construction of road from Kamara sahi to Baritala<br />

Construction of drain in Ragadipada<br />

Construction of road from PMSY to University in<br />

Ragadipada<br />

Construction of road from jasobantpur to Karbar<br />

Construction of road of nadabar<br />

Bijipur ward No 8 & 9 concrete road<br />

Cement concrete road from Dubapali brahmanidevi to<br />

Chariman<br />

Cement concrete road from RD road to sunkhala<br />

Construction of Road from Gadgadi Danda to<br />

Samsnapada<br />

Construction of road from Mathabari to play ground<br />

Gadi sahi Khafamal Road<br />

Construction of Road from PWD to Gadisahi<br />

Construction of Road Madhapur PWD to Samsanapada<br />

Madhapur Jagnyapada Road<br />

Construction of Drain in Mundia, south side of Madhapur<br />

Construction of Road from Kendupali PWD to<br />

Goudabandha<br />

Construction of Road from Kendupali PWD to<br />

Goudabandha<br />

Construction of Road from Kendupali Goudabandha to<br />

Malunibadha<br />

10<br />

30.00<br />

10.00<br />

8.00<br />

10.00<br />

10.00<br />

10.00<br />

5.00<br />

5.00<br />

5.00<br />

10.00<br />

10.00<br />

10.00<br />

15.00<br />

12.00<br />

15.00<br />

15.00<br />

10.00<br />

10.00<br />

15.00<br />

219


Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Bhapur Golapokhari<br />

Bhapur Golapokhari<br />

Bhapur Golapokhari<br />

Bhapur Golapokhari<br />

Bhapur Golapokhari<br />

Bhapur Golapokhari<br />

Bhapur Golapokhari<br />

Bhapur Golapokhari<br />

Bhapur Golapokhari<br />

Bhapur Golapokhari<br />

Bhapur Golapokhari<br />

Construction of Road from Kendupali Goudabandha to<br />

Malunibadha<br />

Construction of drain in madhapur<br />

Construction of road & drain from Nilakantha prasad<br />

harijan sahi to Ghasimundia<br />

Cement concrete road from RD road to Benua gramya<br />

road<br />

Construction of road & drain in Nilakantha prasad<br />

prasabana<br />

Construction of road & drain from Pathapur check gate to<br />

prasaban road<br />

Construction of drain<br />

Cement concrete road from Karadapali RD to village<br />

Cement concrete road from RD road to Danadeba prasad<br />

nuasahi road<br />

Construction of Road from Golapokhari RD road to<br />

Raibani road<br />

Construction of Road from Golapokhari RD road to<br />

Haribandha sahi baritala<br />

Cement concrete road from RD road to Marachepa<br />

Construction of drain from Nilakanthaprasad RD road to<br />

Samsana<br />

Bhapur Golapokhari Cement concrete road in all south side village of<br />

Golapokhari<br />

15.00<br />

5.00<br />

20.00<br />

10.00<br />

50.00<br />

100.00<br />

Ranpur Mayurjhalia Construction of road 58<br />

Ranpur Balabhadrapur Construction of road 200<br />

Ranpur Surkabadi Construction of concrete road 45<br />

Ranpur Surkabadi Construction of village road from Patana to Hatibari,<br />

Hatibari-Musakari RD road, Kodalpari-Surkabadi,<br />

Kodalpari-Sinduria, Sinduria-Kalia Sandha RD road,<br />

Patana-Jamusahi (metal road), Uparsahi (Surkabadi)<br />

Transformer, Surkabadi-Goudiapada (Brahman bandha),<br />

Surkabadi-Hatibari<br />

Ranpur Brundabanapur Construction of concrete road 12<br />

Ranpur Darpanarayanpur Construction of road 100<br />

Ranpur Ranpur Garh Construction of concrete road from Ranpur high school<br />

chhak to Nuagaon, Nuagaon school to Harijan sahi road,<br />

Patana sahi to PWD road, Chandeswar sahi Mandir to<br />

Kadamba sahi chhak, Khuntia sahi, Paiksahi, Belapada,<br />

Rajabati sahi, Maninagasahi, Badakuasahi to Paiksahi,<br />

Baurisahi, Harijansahi, Damasahi, Kadam sahi,<br />

Harachandi sahi to Tala sadak, Raghunath Mandir to Tala<br />

sadak, Tala sadak, Bhandari sahi to Mangal Chandia<br />

sahi, Bibha Mandap to Nelia pokhari, Biswakarma Mandir<br />

to Nelia Pokhari, RD road to Nuagaon Ketha road,<br />

Nuagaon Ketha road to Ghadei sahi road, Khatia sahi to<br />

Beruk sahi road, Beruk sahi chhak to Tala sadak road,<br />

Mangarajpur Nuasahi to Raghunathpur Baritala road,<br />

Brajaballabh Baritala road, PWD road to Harachandi sahi<br />

road<br />

5.00<br />

10.00<br />

10.00<br />

10.00<br />

5.00<br />

5.00<br />

5.00<br />

5.00<br />

70<br />

46<br />

220


Ranpur Pimpal Concrete road from Gourangapur to Kankia village 20<br />

Ranpur Pimpal Moram and concrete road from Kendupalli to<br />

Bhagabanpur<br />

Ranpur Pimpal Moram and metal road from Kankia to Kasipur 12<br />

Ranpur Pimpal Moram and metal road from Pimpal to Kendupalli 8<br />

Ranpur Pimpal Moram and metal road from Pimpal to Rajnagar Nuagaon 10<br />

Ranpur Pimpal Moram and metal road from Kankia to Durdanda road 20<br />

Ranpur Pimpal Concrete road of Pimpal Majhisahi road 5<br />

Ranpur Pimpal Concrete road from Pimpal Talasahi to Nodal school 3<br />

Ranpur Pimpal Concrete road of Kashipur village road 2<br />

Ranpur Pimpal Moram and metal road from Kankia to Mandakini river 20<br />

Ranpur Pimpal Moram and metal road from Kankia Ramachandi to Bapuji<br />

Yubak Sangha<br />

Ranpur Pimpal Drainage system 20<br />

Ranpur Lodhachua Construction of Pacca road in revenue and pada villages 65<br />

Ranpur Talakani Construction of drain and concrete road 12<br />

Ranpur Talakani Development of road from Talakani to Bhalukhia 10<br />

Ranpur Kulasar Construction of road 10<br />

Ranpur Kulasar Construction of road 10<br />

Ranpur Kulasar Road from Kulasar RD road to Nilapalli Panimundia 8<br />

Ranpur Kulasar Road from RD road to Keniapalli Kulasar High school<br />

road<br />

Ranpur Kulasar Concrete road from RD road to Arakhapalli village 5<br />

Ranpur Khairapalli Construction of concrete road in the village of Balia-2,<br />

Taria-1, Badabhuin-1, Gunduria-, Badapathuria-2,<br />

Giridharpur-2, Ambajhar-2, Khairapalli (Nuasahi)-1,<br />

Gadabanikilo-2<br />

Ranpur Khairapalli Construction of road in Khairapalli-2, Taria-2, Balia-3,<br />

Badabhuin-1, Ambajhar-2, Sanakilo-2, Gadabanikila-3,<br />

Sanapathuria-1, Badapathuria-2, Gunduria-1, Belugaon-1<br />

Ranpur Khairapalli Construction of road from Taria to Sanakilo, PWD to<br />

Khairapalli (east), RD to Bhalukhia mundia, Sanapathuria<br />

to Gunduria, Gunduria to Badapathuria, Ambajhar to<br />

Belugaon<br />

Ranpur Kasanda Construction of concrete road 60<br />

Ranpur Kasanda Construction of road from Kotanisila to Kotagada-3 km -3<br />

lakh, Kotanisila to Dakadevi road-1km-1 lakh, Katakpada<br />

to Balabhadrapatana-1 km - 1 lakh, Kandaragadia to<br />

Jamusah road (bridge)- 5km - 18 lakh, Gambharikhole to<br />

Barapalli road-1.5 km - 3 lakh, Kasanda to Hinjala pond-<br />

1.5 km - 2 lakh, Development of Puruna Baritala road and<br />

road to land and jungle - 20 nos. - 30 lakh<br />

Ranpur Raipada<br />

Ranpur Raipada<br />

Ranpur Kandapada<br />

Ranpur Kandapada<br />

Construction of Road Kiapalli<br />

Construction of Road Panaspur<br />

Road Construction (Metal)<br />

Road Construction (Concrete road)<br />

8<br />

2<br />

8<br />

18<br />

40<br />

30<br />

58<br />

5.00<br />

5.00<br />

6.00<br />

6.00<br />

221


Ranpur Kandhanayagarh<br />

Ranpur Khatia<br />

Ranpur Majhiakhanda<br />

Ranpur Majhiakhanda<br />

Ranpur Bandhamunda<br />

Ranpur Raj Jhankia<br />

Ranpur Raj Jhankia<br />

Ranpur Gopalpur<br />

Ranpur Kerandatanga<br />

Ranpur Rankadeuli<br />

Ranpur Damasahi<br />

Ranpur Brajarajpur<br />

Ranpur Narasinghapur<br />

Ranpur Champagarh<br />

Ranpur Baunsagarh<br />

Ranpur Narendrapur<br />

Ranpur Narendrapur<br />

Ranpur Narendrapur<br />

Construction of Road<br />

Gram panchayat pukka road construction<br />

Construction of Road<br />

C.C road<br />

Road<br />

Road to Pond<br />

Road to village<br />

Gram Panchayat Road construction<br />

Construction of village committee road<br />

Construction of pukka road<br />

Construction of pukka road<br />

Construction of Road<br />

C. C Road<br />

Road<br />

Construction of Road<br />

Road<br />

Concrete Road<br />

Concrete Road<br />

18.00<br />

100.00<br />

10.00<br />

5.00<br />

20.00<br />

40.00<br />

40.00<br />

15.00<br />

40.00<br />

10.00<br />

20.00<br />

85.00<br />

44<br />

50.00<br />

100.00<br />

Gania Badasilia development of road 100<br />

Gania Adakata road development 7.5<br />

Odagaon<br />

Kural Road from Kural toGodali 25<br />

Odagaon<br />

Kural Road from Kural to Kemand 25<br />

Odagaon<br />

Kural Road from Kural to via Halamandia Nauria 200<br />

Odagaon<br />

Kural Road from Dandor to Lingarajprasad 20<br />

Odagaon<br />

Kural Dandor Road 20<br />

Odagaon<br />

Kural Falua Road 25<br />

Odagaon<br />

Kural Kural M.I.P Road 25<br />

Odagaon<br />

Kural Valia Road 100<br />

Odagaon<br />

Giridipalli Development of all Road Under G.P 20<br />

Giridipalli Construction of Road from Jhadasahi to Khangarpali 10<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

20.00<br />

25.00<br />

Giridipalli Constructionof road from Ajhola to Jamudalia 10<br />

Giridipalli Road from Jhadasahi to Siarimala 10<br />

Giridipalli Road fromPanakhajuria to Panderipada 10<br />

Giridipalli Road from Giridipalli to Panderipada 10<br />

Giridipalli Construction of road from Tanivusapali to Panchupandav<br />

Road<br />

Panderipada Construction of road from Deongaon to Dandor Post<br />

office<br />

Panderipada Valiadihi to Barapurikia 15<br />

Panderipada Valia dihi to Sakadara 15<br />

Panderipada Madanpur to Dahaki Via-Panamasani 15<br />

Panderipada Panderigada to dahani 15<br />

Panderipada Panderipada to Garugiridipali 15<br />

5.00<br />

5<br />

20<br />

222


Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Panderipada Construction of Paderipada Village Road &Drain 15<br />

Panderipada Deongaon to panthakhari road 15<br />

Panderipada Valiadiha Village Road &Drain 15<br />

Panderipada Deongaon Village Road &Drain 15<br />

Panderipada Madanpur Village Road &drain 15<br />

Panderipada Panderiapada & Sudanda 15<br />

Panderipada Madanpur to Kaithapali Road 15<br />

Panderipada Road from Deogaon to Dandor 15<br />

Panderipada RD Road From Valiadiha to Panderipada 10<br />

Angisingi Connection of Road From Angisingi to Gujabaran 50<br />

Angisingi Road from Angisingi To Juania 10<br />

Angisingi Road from Angisingi To Kapileswar 10<br />

Angisingi Road from Angisingi To Masani 15<br />

Angisingi Road from Angisingi To Thakurani 20<br />

Angisingi Road from Angisingi To Baditala 10<br />

Angisingi Road from DhumusaTo Bilagorada 10<br />

Angisingi Road from DhumusaTo Maligadia 5<br />

Angisingi Road fromGujabaran to Juania 50<br />

Sunamuhin CC Road : 1-Sunamuhini Gramya Road,2-<br />

SunamuhiniKeluapadaGramya Road,3-<br />

SunamuhiniBalisina,4-Sunamuhini Maredi<br />

Ranganipatana Jamusahi Village Road 10<br />

Ranganipatana Road side drain(Ranganipatana) 25<br />

Ranganipatana Road side drain(Godipalli) 10<br />

Ranganipatana Roadside drain(Bahadapatha sabarnasahi) 5<br />

Ranganipatana Roadside Drain (Bahadapatha harijansahi) 5<br />

Ranganipatana From Raghu Nath Sahi R.W.D to Mundabadia Through<br />

Jungle Road<br />

Odagaon Construction Drain to Drainage Water on Road 20<br />

Odagaon Construction of Drain &Road at Odagaon 10<br />

Odagaon Afforestation & Construction of Road From Odagaon to<br />

Kumbhiapali<br />

Odagaon Construction of Concrete Road in Dalak 10<br />

Odagaon Constructi on of Jaringi Road From Dalak 5<br />

Odagaon Dasahara Mandap Sahi & Back side of Block Sahi Road<br />

Construction<br />

Odagaon Construction of Paikasahi Kharitala,Odagaon 5<br />

Odagaon Construction of Concrete from RD road to Rabara Village 5<br />

Odagaon Concrete Road From Bilamanpur To RD Road 5<br />

Odagaon Construction of Road from Puruna Jaringi To Nua Jaringi 5<br />

Odagaon Construction of Road From PWD Road To Rangajsahi 5<br />

Dimisar Dimisar Village Road 10<br />

Dimisar Road from PWD to Adacher 10<br />

Dimisar From PWD Road to Dimisar(Mania Malasahi) 5<br />

Dimisar Concrete Road For Haripur Village 10<br />

Dimisar Construction of CC Road From Haripur To Adacher 10<br />

Dimisar Construction of Kurujanga Patulisahi Road 5<br />

Dimisar Road till to The Village Dimisar Khatagodia 5<br />

3<br />

75<br />

10<br />

10<br />

223


Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Dimisar Construction of Dimisar RD Road 10<br />

Dimisar Construction of Kurujanga Village Drain 5<br />

Rohibanka Construction of Concrete Road 15<br />

Rohibanka Metal,earthen & moram Road Construction 30<br />

Magarbandha From Fasipali Adibasisahi Sahi To Bali Sahi Road Work 10<br />

Magarbandha From Mahinshigothapali To DholaPathara Road Work 5<br />

Magarbandha From Magarbandha to Ambaraapada Sshi Road Work 10<br />

Magarbandha From Gundarabari to Magarabandha Road wark 5<br />

Magarbandha Magarbandha Smashana Ghata Road Work 5<br />

Magarbandha From Barapada to Mahinshigothapali Road Work<br />

Magarbandha Sabideipur Smashan Ghat Road<br />

Magarbandha Road Work From RD Road to Bitalagadia 5<br />

Magarbandha Road Work From Fasipali Balisahi to Magarbandha 10<br />

Komanda From Kemand to Udaypur Road 5<br />

Komanda Kemand Harijansahi Road 5<br />

Komanda Kemand High School Road 5<br />

Komanda Kemand Village Road CC 10<br />

Komanda Chamadarpali CC 3<br />

Komanda Kemand Bada Bhuin Road Mentalling 5<br />

Komanda CC Road Raghunathpur,Machapada,Podagada<br />

Mental,Cement -2-k-m& Kumbharia 1-k.mMachapada<br />

35<br />

Odagaon<br />

Road<br />

Odagaon<br />

Saradha pur Repair of Road From Kadali Bandha ToGundasahi 10<br />

Odagaon<br />

Saradha pur Gundasahi Baunsagadia Road 5<br />

Odagaon<br />

Saradha pur Road From Baunsagadia to Gajendrapali 7<br />

Odagaon<br />

Saradha pur Road from Odagaon to Darapada 5<br />

Odagaon Pantikhari Bedha road 15<br />

Odagaon Pantikhari Barapurikia road 20<br />

Odagaon Rabigadia Bedha road 50<br />

Odagaon Rabigadia Mahulgadani road 50<br />

Odagaon Rabigadia Bhaliadiha road 75<br />

Odagaon Rabigadia Kurumbankatara to Paikbanktara road 50<br />

Odagaon Rabigadia Dholamaska to Madanpur road, Kaithapali 200<br />

Odagaon Rabigadia Dolagovindpur road 20<br />

Odagaon Rabigadia Dholamska road 5<br />

Odagaon Rabigadia Kurumbankatara vill.road 100<br />

Odagaon Rabigadia Jamupatna vill. Road 40<br />

Odagaon Rabigadia Madanmohanpur Khadia road 10<br />

Odagaon Rabigadia Vill.road 5<br />

Odagaon Rabigadia PWD to Balabhadrapur road 100<br />

Odagaon Rabigadia Rabigadia vill road 5<br />

Odagaon Rabigadia Balabhadrapur vill road 5<br />

Odagaon Rabigadia Anandapur road 100<br />

Odagaon Korapitha concrete road to all village 50<br />

224


Odagaon Hariharpur Hariharpur Galapokhari to PWD via Kusuminadi road 10<br />

Odagaon Hariharpur Karadabadi concrete road 7<br />

Odagaon Hariharpur Asurdhipa badsahi road 10<br />

Odagaon Hariharpur Badaputa vill.road 10<br />

Odagaon Banapur Road construction 28<br />

Khandapada Bodasa Road construction 150<br />

Khandapada Benagadia Road construction 80<br />

Khandapada Sikharapur Road construction 100<br />

Khandapada Ranipada Road construction 80<br />

Khandapada Banamalipur Construction of road 500<br />

Khandapada Ranichheli Road construction 100<br />

Khandapada Kumbharapada Construction of road 800<br />

Khandapada Sidhamula Road construction 150<br />

Khandapada Kiajhar Construction of road 500<br />

Khandapada Mardarajpur Road construction 75<br />

Khandapada Khalisahi Road construction 300<br />

Khandapada Jagannath prasad Construction of Pucca road 50<br />

Khandapada Salajharia Road development 100<br />

Khandapada Koshaka Road development 100<br />

Khandapada Rayat Dholamara Road development 200<br />

Khandapada Gunthuni Road development 100<br />

Khandapada Jogiapalli Road development 100<br />

Khandapada Badabanapur Road development Not mentioned<br />

Khandapada Kantilo Road development 200<br />

Nuagaon Badagotha<br />

road construction from Khutubandha Janisahi to Pathara<br />

Sahi Nalakantha sahi via crematorium ground 15<br />

Nuagaon Badagotha Road from Badagotha to Bakulabandha 5<br />

Nuagaon Badagotha Road of Badagotha 5<br />

Nuagaon Badagotha road construction from Bakulabandha Via E.W 3<br />

Nuagaon Badagotha Road and bridge construction work of Dimirijhari 5<br />

Nuagaon Badagotha<br />

road construction from Banusahi to Haridabandha via<br />

Andikiari 2.5<br />

Nuagaon Badagotha Road construction of Brajasundarpur 5<br />

Nuagaon Badagotha Road from Badagotha (Kha) to Banuasahi 10<br />

Nuagaon Badagotha Road construction from Radhanathpur to Ekatala 5<br />

Nuagaon Udaypur Road consutuction of Rural development 30<br />

Nuagaon Udaypur Road consutuction of Panchayat 25<br />

Nuagaon Kurasa Road development from Kurasa to Ragadipara 15<br />

Nuagaon Kurasa Road and bridge construction work from Kurasa to Gutura 15<br />

Nuagaon Kurasa All Road and bridge construction work from Dharupada 15<br />

Nuagaon Khandugaon Construction of road 20<br />

Nuagaon Dudura Road development 20<br />

Nuagaon Dudura Road Construction of Panchayat 25<br />

Nuagaon Paradhipi RD road from Balanda to Similisahi 10<br />

Nuagaon Paradhipi Road construction from Balanda to Chadakamara 10<br />

Nuagaon Nuagoan From Nuagaon to Pokharisahi road 5<br />

Nuagaon Nuagoan From khalamada Nuagoan pond to Harijansahi road 5<br />

225


Nuagaon Kaptapalli Construction of P.W.D road 15<br />

Nuagaon Kaptapalli From P.W.D road to Kampala,Purunapani road 10<br />

Nuagaon Kaptapalli From Kapta to Vandaripalli Dengari road 10<br />

Nuagaon Korada Construction of Sub phc 5<br />

Nuagaon Paradhipi From Bainda to Similisahi R.D road 10<br />

Nuagaon Paradhipi Bainda to Chadakmara road 10<br />

Nuagaon Durudura Construction of pacca road 25<br />

Nuagaon Durudura Village devlopment road pacca road 20<br />

Nuagaon Jakeda Similisahi to Kushabida Road 25<br />

Nuagaon Jakeda Similisahi to Luni 25<br />

Nuagaon Jakeda Kushabida to Chadakamara 20<br />

Nuagaon Chahali Chahali Adibasisahi road 3<br />

Nuagaon Chahali Dhulipaunsia road 5<br />

Nuagaon Bahadajhola Ghadei bandha to Panashakhai road 25<br />

Nuagaon Singarpalli R.D road construction 0.5<br />

Nuagaon Mahipur Road development 12<br />

Nuagaon Sikrida<br />

Devlopment of road work from Sikrida to<br />

Jagannathprasad 20<br />

Nuagaon Sikrida From Krushnaprasad R.D road to Andharamani 15<br />

Nuagaon Sikrida Jagannathprasad Patanasahi to Andharamani 15<br />

Nuagaon Sikrida Sikrida Nuasahi to the Kuakhia river 10<br />

Nuagaon Dhenkana Balavadrapur to Petapalli new road 20<br />

Nuagaon Malisahi Balugaon Mahisur R.D road 10<br />

Nuagaon Malisahi Balavadrapur chakapathar road<br />

From Haripur P.W.D road to play ground road<br />

15<br />

Nuagaon Haripur<br />

construction 3<br />

Nuagaon Haripur Road construction of road from Hatisahi to Gopapur 3<br />

Nuagaon Haripur Hatiasila to P.W.D road pacca road 10<br />

Nuagaon Haripur Haripur road construction from Hingiligadia 5<br />

Nuagaon Haripur Road construction to Nua Pokhari from Hatiasila village 3<br />

Nuagaon Haripur Road construction to Smasanghat from village pond 5<br />

Nuagaon Haripur From Hatasahi Primary School to Siarimala road 5<br />

Nuagaon Haripur From hatasahi to P.W.D concrete road 10<br />

Nuagaon Haripur From Siarimala village end to PWD road concrete 12<br />

Nuagaon Haripur Darapur road construction from Siarimala School 5<br />

Nuagaon Haripur Jaypur to Jhadasahi road construction 4<br />

Nuagaon Haripur Road construction from Jaypur to Juarimala 5<br />

Nuagaon Haripur Siarimala road construction from Jaipur Harijansahi 5<br />

Nuagaon Badagotha From Badagotha to Bakalabar road 5<br />

Nuagaon Badagotha Badagotha Ekapika road 5<br />

Nuagaon Badagotha Bakala bar east side road 3<br />

Nuagaon Badagotha Timirijhari river & bridge road 5<br />

Nuagaon Badagotha Radhanathpur one way road 5<br />

Nuagaon Badagotha From Banusahi to Andikiari via Haridabandha 25<br />

Nuagaon Badagotha Badagotha ( Kha) to Banuasahi road 5<br />

Nuagaon Badagotha Brajasundarpur road 10<br />

226


Nuagaon Badagotha<br />

Khutu bar from Janisahi to Patharasahi through<br />

Nalakanthasahi to Smasanghat road<br />

Nuagaon Korada Korada to Rasadimada road devlopment 15<br />

Nuagaon Korada Korada to Gunurabari road & bridge construction 15<br />

Nuagaon Korada Construction of road & bridge from Arupada to NH 15<br />

Nuagaon Khandugaon Road construction 20<br />

Odagaon Goudaput<br />

Road construction<br />

8.00<br />

Odagaon Goudaput<br />

Road construction<br />

8.00<br />

Odagaon Badagorada<br />

PWD road to Tota sahi<br />

10.00<br />

Odagaon Badagorada<br />

Badagorada to Bilagorada road<br />

30.00<br />

Odagaon Badagorada<br />

Maidipa road to Badagorada<br />

20.00<br />

Odagaon Badagorada<br />

Sanagorada to Bilagorada road<br />

30.00<br />

Odagaon Badagorada<br />

Sanagorada to Gopinathprasad road<br />

40.00<br />

Odagaon Badagorada<br />

Gopinathprasad to Konapur road<br />

50.00<br />

Odagaon Badagorada<br />

PWD to samsana road sanagorada<br />

30.00<br />

Odagaon Badagorada<br />

PWD to swarga mandir road<br />

20.00<br />

Odagaon Nandighore<br />

Road construction<br />

20.00<br />

Odagaon Nandighore<br />

Road construction<br />

10.00<br />

Odagaon Nandighore<br />

Road construction<br />

20.00<br />

Odagaon Nandighore<br />

Road construction<br />

20.00<br />

Odagaon Nandighore<br />

Road construction<br />

20.00<br />

Odagaon P.Manpur<br />

Panchirida to Kopanda road<br />

10.00<br />

Odagaon P.Manpur<br />

Paikgada to Ambali road<br />

10.00<br />

Odagaon P.Manpur<br />

2 km road construction<br />

10.00<br />

Odagaon P.Manpur<br />

Panjigada Nuasahi to Amblani road<br />

10.00<br />

Odagaon Panchumu<br />

Construction of road<br />

30.00<br />

Odagaon Panchumu<br />

Construction of road<br />

10.00<br />

Odagaon Panchumu<br />

Construction of road<br />

5.00<br />

Odagaon Panchumu<br />

Construction of road<br />

5.00<br />

Odagaon Panchumu<br />

Construction of road<br />

5.00<br />

Odagaon Panchumu<br />

Construction of pond<br />

10.00<br />

Odagaon Solapata<br />

Solapata Musapalli concrete road<br />

20.00<br />

Odagaon Solapata<br />

Padmadeipur village concrete road and drain<br />

20.00<br />

Odagaon Solapata<br />

Balipatia sahi concrete road<br />

20.00<br />

Odagaon Solapata<br />

Gaseisahi road concrete<br />

20.00<br />

Odagaon Solapata<br />

Pokhari to Dasili solapata concrete<br />

20.00<br />

Odagaon Solapata<br />

Kanakata village CC road<br />

20.00<br />

<strong>Nayagarh</strong> Sinduria<br />

Sinduria road construction<br />

25.00<br />

Total 16023.4<br />

Bridges<br />

Block GP Proposed work Estimated<br />

cost in lakh<br />

rupees<br />

Dasapalla Chacheyapalli Construction work of Sarikibadi bridge 5<br />

Dasapalla Ghugudipada Construction of Bruttanga bridge 1200<br />

Dasapalla Nuagaon Construction of bridge of Bhaliadihi (Nuagaon) 20<br />

15<br />

227


Dasapalla Nuagaon Construction of bridge on Nuagaon river 30<br />

Bhapur Karabar Construction of fair weather bridge 30<br />

Construction of bridge from RD road to<br />

University<br />

Bhapur Sasan<br />

30.00<br />

Odagaon Pantikhari Bridge construction 25<br />

Nuagaon Badagotha Janisahi Bridge 3<br />

Nuagaon Badagotha Baliai guhi bridge of Khutubandha 3.5<br />

Nuagaon Bahadajhola Bridge at Jamujhulasahi Bahadajhola<br />

From Daleivaga to Gotibadharajpur<br />

5<br />

Nuagaon Bahadajhola BRIDGE 10<br />

Nuagaon Dhenkana Construction of bridge in the Dahuka river 800<br />

Nuagaon Badagotha Janisahi bridge 3<br />

Nuagaon Badagotha Baliagohi bridge Khatubandha 3<br />

Total 2167.5<br />

Irrigation<br />

Block GP Proposed work Estimated cost in lakh rupees<br />

<strong>Nayagarh</strong> Banigochha embankment of Kansari Jharanakhole 8<br />

<strong>Nayagarh</strong> Banigochha embankment of Banigochha Kalan 10<br />

<strong>Nayagarh</strong> Banigochha embankment of Kanadi Jharana 10<br />

<strong>Nayagarh</strong> Banigochha embankment of Phalapaju kayan 10<br />

<strong>Nayagarh</strong> Banigochha embankment of Taladhipa Sulapaju 10<br />

<strong>Nayagarh</strong> Etamati Adi bandha construction within river 100<br />

<strong>Nayagarh</strong> Bada Pandusar LI Point 50<br />

<strong>Nayagarh</strong> Ghaduala LI Point 10<br />

<strong>Nayagarh</strong> Bhata Sahi Irrigation <strong>11</strong>00<br />

<strong>Nayagarh</strong> Lenkudipada Anicut in Suliamala & embankment in Godigadia 20<br />

<strong>Nayagarh</strong> Baunsiapada LI Point 25<br />

<strong>Nayagarh</strong> Natugaon Irrigation 20<br />

<strong>Nayagarh</strong> Kalika Prasad LI Point 50<br />

Dasapalla Chacheyapalli embankment of Lembu Taila, Polara 2<br />

Dasapalla Chacheyapalli embankment of Dudurupaju Canal 3<br />

Dasapalla Chacheyapalli embankment of Badajhar Mankadkendu 5<br />

Dasapalla Chacheyapalli embankment work of Bandaghai 3<br />

Dasapalla Chacheyapalli Construction work of embankment and bridge in<br />

Perpendi water fall<br />

Dasapalla Chacheyapalli embankment work of Kerandinal 5<br />

Dasapalla Chacheyapalli embankment work of Kuruninal 10<br />

Dasapalla Chacheyapalli embankment work of Chadeyapalli -Goudagadhua 15<br />

Dasapalla Dihagaon Maintenance of Dandabhuin Mahulia embankment 4<br />

Dasapalla Dihagaon Renovation of Dihagaon-Kalajari canal 5<br />

Dasapalla Ghugudipada M. I project from Makarprasad to Kaluanal 15<br />

Dasapalla Ghugudipada Construction of embankment for Ghungudipada<br />

Siligudi Bruttanga river<br />

10<br />

1500<br />

228


Dasapalla Ghugudipada Construction of L.I. Point in Makarprasad,<br />

Mardabadi, Ghungudipada, Kamartapur, Silibadi<br />

and Khalisahi<br />

Dasapalla Jagadeipur Construction of L. I. Point 5<br />

Dasapalla Khamar Sahi Construction of culvert at Puruna Dasapalla Harijan<br />

sahi<br />

Dasapalla Khamar Sahi Construction of culvert at Puruna Dasapalla Mandir 15<br />

Dasapalla Khamar Sahi Construction of Damodarpur road culvert 25<br />

Dasapalla Khamar Sahi Construction of Kauda road culvert 30<br />

Dasapalla Khamar Sahi embankment at Bhimaranal Ghodahata 20<br />

Dasapalla Kujamendhi embankment at Ludubadi canal of Kujamendhi 50<br />

Dasapalla Kujamendhi Construction of embankment at Andharbadi 20<br />

Dasapalla Kujamendhi Construction of embankment at Gunduribari 20<br />

Dasapalla Kujamendhi Construciton of embankment at Mundula canal 10<br />

Dasapalla Kujamendhi Construciton of embankment at Pradhanpada 20<br />

Dasapalla Kujamendhi Construciton of embankment at Bani 30<br />

Dasapalla Kujamendhi Construciton of embankment at Ambalimba 30<br />

Dasapalla Kujamendhi Construciton of embankment at Kurudangi 30<br />

Dasapalla Kujamendhi Construciton of embankment at Gadiapada 30<br />

Dasapalla Kujamendhi Construciton of embankment at Dasanipada 30<br />

Dasapalla Kujamendhi Construction of embankment at Chhitukuli 5<br />

Dasapalla Kujamendhi Construction of embankment at Kuradhinisha 40<br />

Dasapalla Kulurukumpa Renovation of Dudukipaju M.I.P 10<br />

Dasapalla Kulurukumpa Construction of Pathar Khand embankment 5<br />

Dasapalla Kulurukumpa Construction of Julungi banka embankment 5<br />

Dasapalla Kulurukumpa Construction of Samperan Kelubana WHS<br />

embankment<br />

Dasapalla Kulurukumpa Construction of Guraha Kahania embankment 4<br />

Dasapalla Kulurukumpa Construction of Kulurukumpa embankment 5<br />

Dasapalla Kulurukumpa Construction of Tangabadi embankment 3<br />

Dasapalla Kulurukumpa Construction of Krushnaprasad embankment 5<br />

Dasapalla Kulurukumpa Construction of Guraha Siala sahi embankment 3<br />

Dasapalla Kulurukumpa Banibiri canal surplus 3<br />

Dasapalla Kulurukumpa embankment at Janipadar, Kabukua 5<br />

Dasapalla Nachhipur Bidapaju embankment 3<br />

Dasapalla Nachhipur Srirampur embankment 3<br />

Daspalla Tendabadi barasahi canal rennovation 5<br />

Daspalla Tendabadi old poibadi canal rennovation 5<br />

Daspalla Tendabadi jahakana canal rennovation 3<br />

Daspalla Tumandi takera canal 10<br />

150<br />

10<br />

10<br />

229


Daspalla Tumandi brutanga embarkment 10<br />

Daspalla Tumandi 25<br />

Bhapur Fategarh New embankment 100<br />

Bhapur Fategarh L.I. point 50<br />

Bhapur Karabar L.I. point 60<br />

Bhapur Karabar L.I. point 30<br />

Bhapur Karabar embankment at Kaligiri canal 50<br />

Bhapur Karabar embankment 100<br />

Bhapur Karabar Karabar embankment 5<br />

Bhapur Karabar embankment from Karabar Harijan sahi to Nuasahi 50<br />

Bhapur Karabar embankment from Nandabar to Badabar Mahanadi 200<br />

Bhapur Bhagabanpur embankment 50<br />

Bhapur Bhagabanpur embankment 10<br />

Bhapur Chakradhar<br />

Prasad<br />

Bhapur Chakradhar<br />

Prasad<br />

Bhapur Chakradhar<br />

Prasad<br />

embankment of Chakradhar Prasad 50<br />

embankment 50<br />

L.I. point 50<br />

Bhapur Kainfulia Baraputa small irrigation 100<br />

Bhapur Rakama Minor irrigation 100<br />

Bhapur Dhanachangada Irrigation point 50<br />

Bhapur Bhapur Brahmanidevi embankment work 25<br />

Bhapur Nimani embankment work of Nimani Katabandh 10<br />

Bhapur Salapada irrigation point at Kasibandha 50<br />

Bhapur Salapada embankment work of Nuagaon, Kendupalli<br />

Godhinali<br />

Bhapur Salapada L.I. point 32<br />

Bhapur Balgunia embankment 10<br />

Bhapur Balgunia embankment work of Sateipata 20<br />

Bhapur Baghuapalli embankment of Malanda 20<br />

Bhapur Baghuapalli embankment work of Tasara bandh 20<br />

Bhapur Baghuapalli Jharana embankment 20<br />

Bhapur Baghuapalli Ankibapi embankment 20<br />

Bhapur Baghuapalli Kadambasole embankment 20<br />

Bhapur Padmabati<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Irrigation<br />

Construction of Canal-Madhapur banabasi<br />

Madhapur Irrigation project<br />

Construction of adhibandha in Begunia canal<br />

Bhapur Golapokhari<br />

10.00<br />

Ranpur Mayurjhalia L.I. point 30<br />

Ranpur Balabhadrapur Construction of embankment and repairing 70<br />

Ranpur Mahatapalla L.I. point at Panthanibandha 100<br />

Ranpur Patia L. I. point at Diripada Badajhar 5<br />

Ranpur Patia embankment work at Meliabandh 10<br />

Ranpur Surkabadi embankment 80<br />

Ranpur Brundabanapur L. I. point 30<br />

50<br />

50.00<br />

20.00<br />

50.00<br />

230


Ranpur Brundabanapur Renovation work of old embankment 24<br />

Ranpur Darpanarayanpur L.I. point and maintenance 80<br />

Ranpur Pimpal Kankia Agadi embankment work 15<br />

Ranpur Pimpal L. I point 15<br />

Ranpur Lodhachua L. I. point in Adal, Lodhachua, Bagal, Rajnagar 20<br />

Ranpur Talakani embankment work of Talakani and renovation work<br />

Radhamohanpur pond<br />

<strong>11</strong><br />

Ranpur Talakani Irrigation facility 7<br />

Ranpur Kulasar Check dam 3<br />

Ranpur Kulasar L. I. point 3<br />

Ranpur Kasanda L. I. Point 20<br />

Ranpur Kasanda Renovation of embankment 24<br />

Ranpur Khatia<br />

Ranpur Majhiakhanda<br />

Ranpur Bandhamunda<br />

Ranpur Narendrapur<br />

Ranpur Gopalpur<br />

Ranpur Rankadeuli<br />

Ranpur Damasahi<br />

Ranpur Brajarajpur<br />

Ranpur Brajarajpur<br />

Ranpur Brajarajpur<br />

Ranpur Gourangapur<br />

Ranpur Gourangapur<br />

Ranpur Gourangapur<br />

Ranpur Champagarh<br />

Ranpur Baunsagarh<br />

Construction of Dam & Lift irrigation<br />

embankment construction<br />

embankment<br />

LI point<br />

Lift Irrigation<br />

Lift Irrigation & available of instruments<br />

Lift Irrigation & available of instruments<br />

Irrigation facility<br />

Irrigation facility<br />

Irrigation facility<br />

Minor irrigation<br />

Lift irrigation in all villages<br />

embankments<br />

Minor irrigation<br />

Construction and Reparing of Canal<br />

500.00<br />

6.00<br />

9.00<br />

50.00<br />

30.00<br />

20.00<br />

10.00<br />

450.00<br />

540.00<br />

105.00<br />

Gania Chamundia bunding construction(malabandha) 1000<br />

Gania Chamundia bunding construction(malabandha) 500<br />

Gania<br />

Chamundia Lift irrigation project work 25<br />

Gania<br />

Chamundia 600<br />

Odagaon Kural L.I Point 10<br />

Odagaon Kural Kural M.I.P 100<br />

Odagaon Kural Budhipeta 50<br />

Odagaon Kural Kusumianikata 50<br />

Odagaon Giridipalli M.I.P Near Ajahola Panchupandav mountain<br />

20<br />

Odagaon Giridipalli L.I Point in Giridipalli 2.5<br />

Odagaon Giridipalli L.I Point in JHADASAI(Bebartadali) 5<br />

Odagaon Giridipalli L.I Point in Ajhola 5<br />

Odagaon Panderipada Construction of Kendumania Embankment 50<br />

Odagaon Panderipada Construction of Kusumi Embankment 50<br />

Odagaon Panderipada Panderipada Kochilagadia Excavation 50<br />

Odagaon Panderipada Madanpur Big Embankment, Small Embank<br />

ment&Construction of Step<br />

10.00<br />

10.00<br />

50.00<br />

25.00<br />

80.00<br />

30<br />

231


Odagaon Panderipada Panderiapada & Big Embankment & Small<br />

Embankment Excavation & Construction of steps<br />

Odagaon Panderipada Construction of New Embankment in Deogaon,<br />

Khunta & Nelia Embankment & Step Construction<br />

Odagaon Panderipada Panderipada Gauda Embankment Construction 15<br />

Odagaon Angisingi Duanta Barrage in Dhusama 20<br />

Odagaon Angisingi Canal for Angisingi BudhaBudhiani 20<br />

Odagaon Angisingi L.I Point House Building 10<br />

Odagaon Sunamuhin Sunamuhin Godi Khadia M.I.P 5<br />

Odagaon Sunamuhin Balisina Jhirinala M.I.P 1<br />

Odagaon Sunamuhin Landabahu Sadhu SanghaM.I.P 4<br />

Odagaon Sunamuhin Luni Ladusahi M.I.P 1<br />

Odagaon Sunamuhin Malia Chakhela M.I.P 0.40<br />

Odagaon Ranganipatana Jamunalia Water Project Programme 200<br />

Odagaon Odagaon Repair &Excavation of MathaKhajuria Canal 3<br />

Odagaon Odagaon Odagaon Chiana Embankment Renovation &<br />

Excavation<br />

Odagaon Odagaon Construction of Barriage in Bilamanpur River 3<br />

Odagaon Dimisar Malabandha In the Bank of River Juani 30<br />

Odagaon Komanda Baghua M.I.P 5<br />

Odagaon Komanda Kemand Godi Bandha Excavation 5<br />

Odagaon Komanda From Biharitota to Thakura Pokhari LI Point<br />

(Machapada,Makan River Li Point Raghunathpur,LI<br />

Point in Sulia River Podagada,Boring LI Point<br />

Kumbharia-Sulia River<br />

Odagaon Komanda PodagadaBara Embankment ProjectPodagadaSulia<br />

Embankment ProjectKhajurikhala Mala<br />

EmbankmentBiharitota Sulia Embankment<br />

Odagaon Saradha pur Canal Project Jharananala 20<br />

Odagaon Pantikhari canal 10<br />

Odagaon Pantikhari Lift Irrigation 15<br />

Odagaon Rabigadia Sundarijhar LI 25<br />

Odagaon Rabigadia Godibandh 10<br />

Odagaon Rabigadia Naristaila 20<br />

Odagaon Rabigadia Gauria 10<br />

Odagaon Rabigadia Jatia LI 25<br />

Odagaon Rabigadia Nuabandh LI 10<br />

Odagaon Rabigadia Rabigadia bandh 20<br />

Odagaon Rabigadia Kharia bandh 10<br />

Odagaon Rabigadia Chandi bandh 10<br />

Odagaon Rabigadia Neliabandh 10<br />

Odagaon Rabigadia Khajuria bandh 10<br />

Odagaon Rabigadia Matigadia 50<br />

Odagaon Rabigadia Adi bandh-3 65<br />

Odagaon Korapitha G.P. LI 50<br />

30<br />

50<br />

3<br />

55<br />

30<br />

232


Odagaon Korapitha Anicut in every canal 10<br />

Odagaon Korapitha Korapitha Kaibalyapur bridge 20<br />

Odagaon Sikharpur Sikharpur Rampanala water project 4<br />

Odagaon Sikharpur Sikharpur Duant river barriage from duduma<br />

Sikharpur Aagyanchavarasankha to Angarbindu<br />

40<br />

Odagaon Sikharpur<br />

barriage construction<br />

100<br />

Khandapada Bodasa Lift irrigation 200<br />

Khandapada Bodasa Construction of bandha 100<br />

Khandapada Benagadia Irrigation 30<br />

Khandapada Sikharapur Irrigation 500<br />

Khandapada Ranipada Irrigation 40<br />

Khandapada Banamalipur Construction of lift irrigation canal 500<br />

Khandapada Banamalipur Development of Malabandha 100<br />

Khandapada Ranichheli Flood control 20<br />

Khandapada Ranichheli Irrigation 50<br />

Khandapada Kumbharapada Lift irrigation 300<br />

Khandapada Kumbharapada Widening of Malabandha 50<br />

Khandapada Sidhamula Lift irrigation / Construction of embankment 300<br />

Khandapada Kiajhar Construction of Malabandhar 200<br />

Khandapada Kiajhar Lift irrigation 200<br />

Khandapada Mardarajpur Irrigation 25<br />

Khandapada Khalisahi Lift irrigation 400<br />

Khandapada Khalisahi<br />

Jagannath<br />

Devlopment of Malabandha 50<br />

Khandapada prasad<br />

Jagannath<br />

Barriage in drain & river 30<br />

Khandapada prasad Mala bar in the Kusumi river 25<br />

Khandapada Salajharia Malabandha(MI) 100<br />

Khandapada Koshaka Mala bandha 100<br />

Khandapada Koshaka LI point 52<br />

Khandapada Rayat Dholamara Malabandha 150<br />

Khandapada Rayat Dholamara Agriculture 55<br />

Khandapada Gunthuni Malabandha 100<br />

Khandapada Gunthuni Agriculture 50<br />

Khandapada Jogiapalli Agriculture 50<br />

Khandapada Badabanapur Malabandha 100<br />

Khandapada Kantilo Malabandha 200<br />

Nuagaon Badagotha<br />

Construction of embakment for Dimirijhari Dahuka<br />

river 50<br />

Nuagaon Udaypur Construction work of embankment 25<br />

Nuagaon Udaypur L.I.Point 15<br />

Nuagaon Kurasa constuction Embankment at Pathara Rriver 10<br />

Nuagaon Kurasa constuction Embankment at Belagaon Rriver 10<br />

Nuagaon Khandugaon Renovation of Nadibandha 10<br />

Nuagaon Khandugaon Construction of Irrigation 10<br />

Nuagaon Dudura Construction of embakment 20<br />

Nuagaon Dudura L.I Point 10<br />

Nuagaon Gateri Valiapadar bar renovation 10<br />

Nuagaon Gateri Damuni bar renovation 10<br />

233


Nuagaon Gateri Adipadasuni Bar 5<br />

Nuagaon Nuagoan Construction of 5nos barriage 15<br />

Nuagaon Kaptapalli Barriage 5<br />

Nuagaon Beruanbari Construction of embankment 10<br />

Nuagaon Beruanbari Renovation of Dholaamba bar 10<br />

Nuagaon Beruanbari Mada bar Beladhara 10<br />

Nuagaon Beruanbari Jharinala embankment 2<br />

Nuagaon Beruanbari Renovation Talagadia bar 5<br />

Nuagaon Jakeda Construction of barriage in Badabari river 10<br />

Nuagaon Singarpalli Singarpali swiss,canal embankment construction<br />

In sundijhula Badabandha Canal & swiss<br />

8<br />

Nuagaon Singarpalli construction 8<br />

Nuagaon Mahipur Lift Irrigation 18<br />

Nuagaon Mahipur 3nos embankment 18<br />

Nuagaon Sikrida Construction of barriage in the river Birupa 10<br />

Nuagaon Singarpalli Dimiripadar LI Point 2<br />

Nuagaon Sikrida Construction of barriage in the river Birupa 10<br />

Nuagaon Sikrida Construction of barriage in the river Birupa 10<br />

Nuagaon Sikrida Lift irrigation in the river Kuakhia 20<br />

Nuagaon Malisahi Barriage in the river Dahuka 8<br />

Nuagaon Malisahi Embankment at Gudupokhari(?) 5<br />

Nuagaon Haripur Renovation of Banndhapada bar 8<br />

Nuagaon Haripur Construction of embankment at Saliapada 7<br />

Nuagaon Badagotha Khatubar Budhakusuma Bar 25<br />

Nuagaon Badagotha Dahuka river barriage at Timirijhari river 50<br />

Nuagaon Udayapur Construction of barriage 25<br />

Nuagaon Udayapur L.I point 15<br />

Nuagaon Korada Construction of barriage in the river Pathara 10<br />

Nuagaon Korada Construction of barriage in the river Belana 10<br />

Nuagaon Khandugaon Embankment repairing 10<br />

Nuagaon Khandugaon Irrigation 10<br />

Nuagaon Durudura Construction of barriage 20<br />

Nuagaon Durudura L.I point 10<br />

Nuagaon Paradhipi<br />

Anicut<br />

8<br />

Nuagaon Paradhipi<br />

embankment<br />

12<br />

Odagaon Badagorada<br />

Jamukhola Anicut, Badagorada<br />

Parikhya pokhari duanta nadi canal construction<br />

10.00<br />

Odagaon Badagorada<br />

Odagaon Badagorada<br />

<strong>Nayagarh</strong> Nadiali<br />

<strong>Nayagarh</strong> Lathipada<br />

<strong>Nayagarh</strong> Nabaghanpur<br />

<strong>Nayagarh</strong> Balugaon<br />

<strong>Nayagarh</strong> Biruda<br />

<strong>Nayagarh</strong> Nadiali<br />

<strong>Nayagarh</strong> Kendudhipi<br />

<strong>Nayagarh</strong> Sinduria<br />

<strong>Nayagarh</strong> Jemadeipurpatna<br />

Desanala anicut, & canal construction<br />

Lift Irrigation (10 nos)<br />

LI Points<br />

MI<br />

LI Points<br />

Mohanagar canal excavation<br />

Sindusa River anicut<br />

LI Points<br />

LI Points<br />

Irrigation<br />

5.00<br />

5.00<br />

50.00<br />

7.50<br />

50.00<br />

20.00<br />

20.00<br />

10.00<br />

20.00<br />

10.00<br />

25.00<br />

Total 16145.4<br />

234


Ponds<br />

Block GP Proposed work Estimated<br />

cost in<br />

lakh<br />

rupees<br />

<strong>Nayagarh</strong> Banigochha Pond renovation work of Banigochha pond 10<br />

<strong>Nayagarh</strong> Banigochha Pond renovation work of Burupalu 25<br />

<strong>Nayagarh</strong> Saradhapur karanjakhola tank 30<br />

<strong>Nayagarh</strong> Saradhapur maidala tank 10<br />

<strong>Nayagarh</strong> Etamati Tank renovation 40<br />

<strong>Nayagarh</strong> Kridaspur Excavation of pond 25<br />

Dasapalla Chacheyapalli Renovation work of Bam pond 10<br />

Dasapalla Ghugudipada Construction of Makarprasad ideal pond 25<br />

Dasapalla Ghugudipada Excavation of Ghungudipada pond 8<br />

Dasapalla Khamar Sahi Renovation of Puruna Dasapalla Jadurei pond 15<br />

Dasapalla Khamar Sahi Renovation of Bhogara pond 10<br />

Dasapalla Khamar Sahi Renovation of Subalaya Harijan sahi pond 10<br />

Dasapalla Khamar Sahi Renovation of Sareniganda pond 10<br />

Dasapalla Kujamendhi Excavation of pond at Ambalimba 25<br />

Dasapalla Kujamendhi Renovation work of Kankadamendhi pond 3<br />

Dasapalla Kujamendhi Renovation work of Kujamendhi pond 3<br />

Dasapalla Kujamendhi Renovation work of Bani pond 3<br />

Dasapalla Kujamendhi Renovation work of Mundula pond 3<br />

Dasapalla Kujamendhi Renovation work of Gadiapada pond 3<br />

Dasapalla Kujamendhi Renovation work of Baderigochha pond 3<br />

Dasapalla Kulurukumpa Excavation of Gochhabari pond (Bada pokhari) 25<br />

Dasapalla Kulurukumpa Renovation work of Dudukipaju pond 5<br />

Dasapalla Kulurukumpa Renovation work of Gunduribari pond 5<br />

Dasapalla Kulurukumpa Renovation work of Tangabadi pond 5<br />

Dasapalla Kulurukumpa Renovation work of Kulurukumpa Badabandha 10<br />

Dasapalla Kulurukumpa Renovation work of Ranijhari pond 5<br />

Dasapalla Kulurukumpa Renovation work of Baijhari pond 5<br />

Dasapalla Kunjabanagarh Renovation work of all ponds 100<br />

Dasapalla Madhyakhanda mohantypalli pond 4<br />

Dasapalla Madhyakhanda Tentuliapalli pond 4<br />

Dasapalla Fategarh Renovation of pond 90<br />

Dasapalla Fategarh Excavation of pond 50<br />

Dasapalla Karabar Renovation work of ponds 50<br />

Dasapalla Karabar Excavation of ponds and tree plantation 30<br />

Daspalla Pokharigochha Excavation of 13 ponds 65<br />

Daspalla Similisahi dedhasara pond development 5<br />

235


Daspalla Tendabadi kusumagadia New pond 5<br />

Daspalla Tendabadi digging of New pond at nedisahi 4<br />

Daspalla Tumandi dugudacolony pond 5000<br />

Bhapur Bhagabanpur Renovation work of Bhagabanpur Dara pokhari 5<br />

Bhapur Bhagabanpur Renovation work of Bhokilapada Topo pond 5<br />

Bhapur Bhagabanpur Renovation of ponds 45<br />

Bhapur Badasahara Renovation of pond 50<br />

Bhapur Badasahara Excavation of pond 20<br />

Bhapur Chakradhar<br />

Prasad<br />

Renovation of ponds 10<br />

Bhapur Kainfulia Renovation work of Madhusahu pond 10<br />

Bhapur Dhanachangada Renovation of Mahulaberana pond 20<br />

Bhapur Dhanachangada Renovation of all village ponds in GP 15<br />

Bhapur Baunsabati Renovation of Khalibakata pond 25<br />

Bhapur Baunsabati Renovation of Nuataila pond 40<br />

Bhapur Bhapur Renovation work of Elpada Nua pond 5<br />

Bhapur Nimani Renovation work of Arakhapalli Hatibari pond 10<br />

Bhapur Nimani Renovation work of Kobal pond, Kalika prasad 20<br />

Bhapur Salapada Excavation of New ponds 30<br />

Bhapur Salapada Renovation of Old ponds 35<br />

Bhapur Balgunia Excavation of pond at Guntupada 5<br />

Bhapur Baghuapalli Renovation work of Katapokhari 15<br />

Bhapur Baghuapalli Renovation work of Baragadia pond 15<br />

Bhapur Champapedi Excavation of pond 5<br />

Bhapur Champapedi Excavation of pond 5<br />

Bhapur Champapedi Excavation of pond 5<br />

Bhapur Champapedi Excavation of pond 5<br />

Bhapur Sasan<br />

Cleaning of pond and digging<br />

10.00<br />

Bhapur Sasan<br />

Digging of Pond in Ragadipada<br />

8.00<br />

Bhapur Sasan<br />

Cleaning of pond in Hemantapatna<br />

10.00<br />

Bhapur Sasan<br />

Cleaning of pond in Jasobantpur<br />

0.80<br />

Bhapur Bijipur<br />

Cleaning of pond<br />

5.00<br />

Bhapur Bijipur<br />

Digging of pond in Barakahani<br />

5.00<br />

Bhapur Bijipur<br />

Excavation of pond and<br />

10.00<br />

Bhapur Kainfulia Renovation work of Dalatara bandha 20<br />

Bhapur Kainfulia Renovation work of Chakara bandha 20<br />

Bhapur Baghuapalli Construction work of Cheri bandh 20<br />

Bhapur Golapokhari<br />

Digging of Pond & construction of guardwall in<br />

Nilakanthaprasad<br />

15.00<br />

Ranpur Champapedi Excavation of pond 5<br />

Ranpur Champapedi Excavation of pond 5<br />

Ranpur Champapedi Excavation of pond 5<br />

Ranpur Champapedi Excavation of pond 5<br />

Ranpur Champapedi Excavation of pond 5<br />

Ranpur Champapedi Excavation of pond<br />

Ranpur Champapedi Road construction 5<br />

236


Ranpur Mayurjhalia Excavation of New ponds 170<br />

Ranpur Surkabadi Renovation of Old ponds 35<br />

Ranpur Surkabadi Excavation of New ponds 70<br />

Ranpur Brundabanapur Excavation of New ponds 22<br />

Ranpur Brundabanapur Renovation work of Old ponds 30<br />

Ranpur Ranpur Garh Renovation work of Baragadia pond, Brajaballavpur<br />

Patara bandh, Ranpur Nuagaon Nuapokhari,<br />

Brajaballavpur Mandir pond, Subhadrapur<br />

Ranpur Pimpal Renovation work of Ramachandi pond 10<br />

Ranpur Pimpal Renovation work of Kankia Ramachandi pond 8<br />

Ranpur Pimpal Renovation work of Pimpal pond 8<br />

Ranpur Pimpal Renovation work of Kenduaplli Nuapokhari 4<br />

Ranpur Pimpal Kendupalli Kutanijhar embankment work 18<br />

Ranpur Pimpal Excavation of New ponds 10<br />

Ranpur Lodhachua Renovation of all ponds of GP 135<br />

Ranpur Talakani Renovation of ponds in the village of Chandipokhari,<br />

Talakani, Talagadia, Govindpur, Gopisagar,<br />

Nachhipur<br />

Ranpur Kulasar Renovation work of Old ponds 22<br />

Ranpur Kulasar Excavation of New ponds 5<br />

Ranpur Khairapalli Renovation of Kansagadia pond and embankment of<br />

Dakua and Ratnamale<br />

Ranpur Khairapalli Renovation of ponds and embankment work 50<br />

Ranpur Khairapalli Renovation work of ponds of Khairapalli,<br />

Purunapokhari, Godipokhari, Nuapokhari,<br />

Khandiabandh<br />

Ranpur Kasanda Renovation work of Old ponds 80<br />

Ranpur Majhiakhanda<br />

Excavation of pond<br />

Ranpur Majhiakhanda<br />

Cleaning of pond<br />

Ranpur Bandhamunda<br />

Pond Renovation<br />

Ranpur Kerandatanga<br />

Pond Renovation<br />

50<br />

Ranpur Narasinghapur<br />

Cleaning of Old Pond<br />

50.00<br />

Ranpur Narasinghapur<br />

Digging of New Pond<br />

Ranpur Narendrapur<br />

Digging of New Pond<br />

25.00<br />

Ranpur Narendrapur<br />

Cleaning of Old Pond<br />

15.00<br />

Ranpur Narendrapur<br />

Cleaning of Old Pond<br />

18.00<br />

Panderipada Valiadihi Bedasaran,Parbatira Pond Excavation &<br />

50<br />

Odagaon<br />

Construction of Steps<br />

Odagaon<br />

Angisingi rennovation of 3 Ponds & Afforestation 40<br />

Angisingi rennovation of 4 Ponds in Dhusama Gadwal 40<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Angisingi rennovation of Gujabaran Pond 10<br />

Sunamuhin Rennovation of New Ponds In<br />

Sunamuhini&Renger,Lunijelia,Landababupadma,Kan<br />

ti,Satapatia,Balisana,Khangarpali,Maliakhela-No-12<br />

Odagaon Construction of steps & rennovationof Sri Sri<br />

Raghunath Jiu Pond<br />

Odagaon Excavation of Pond in Odagaon Smashan Ghat 10<br />

12<br />

15<br />

21<br />

28<br />

5<br />

50<br />

237


Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon<br />

Odagaon Devlopment of KumbhiaPali Ramsagar 5<br />

Odagaon Pond Excavation & Renovation 3<br />

Odagaon In Rabara Village Digging of Kaithasahi & Nuasahi<br />

Pond<br />

Odagaon Renovation of Rangadi SahiKhanjasagar Pond 5<br />

Odagaon Construction of Steps & Renovation of Khajuri<br />

Bandha Bilamanpur<br />

Dimisar Excavation &Renovation of 3 Ponds in Dimisar 30<br />

Dimisar Excavation of Pond at Haripur&Kurujanga 30<br />

Rohibanka Renovation,Spread & Devlopment of Old Tank 50<br />

Rohibanka Digging of New Pond 50<br />

Magarbandha Fasipali Nuagaon Westside Pond Excavation Work 5<br />

Magarbandha Bitala gadia New Pond Excavation Work<br />

Magarbandha Magarbandha New Pond Renovation Work<br />

Magarbandha Gundarabari Village end Pond Excavation Work 5<br />

Magarbandha Darapada Kadambajhara Pond Excavation Work 10<br />

Magarbandha Renovation of Sabideipur pond 10<br />

Magarbandha Excavation of Magarbandha Kaitha Pond 10<br />

Magarbandha Mahinshigothapali pond Excavation Work 5<br />

Magarbandha Binayakpur Betha Pond Excavation work 5<br />

Komanda AmbaJholi Pond Renovation 3<br />

Komanda Nabaratnapur Pond Renovation 5<br />

Komanda Renovation of pond in Ranibali,Machapada<br />

pond,MachapadaKusumagadia<br />

&Khajurisala,Podagada,Kumbharia<br />

Odagaon<br />

Odagaon<br />

Saradha pur Excavation of Ambarapur Pond 3<br />

Odagaon<br />

Saradha pur<br />

Excavation of Gajendrapali Pond<br />

2<br />

Odagaon<br />

Saradha pur Excavation of Korabani 3<br />

Odagaon<br />

Saradha pur Bedabandha Excavation 7<br />

Odagaon<br />

Saradha pur Excavation of Gundasahi pond 5<br />

Odagaon<br />

Saradha pur VadikalaVillage end Pond 7<br />

Odagaon<br />

Saradha pur Vadikala Giligadiha 3<br />

Odanga Pantikhari Pond digging 10<br />

Odanga Korapitha G.P. ponds development 20<br />

Odanga Hariharpur Hatipokhari Hariharpur 25<br />

Odanga Hariharpur Badaputa pokhari khanan 10<br />

Odanga Hariharpur Karada pokhari khanan 10<br />

Odanga Hariharpur Karada nua sahi pokhari khanan 10<br />

Odanga Hariharpur Pathargarh pokhari khanan 10<br />

Odanga Hariharpur Asurdhipa Baidyanath pokhari khanan 10<br />

Odagaon Sikharpur Renovation of Sikharpur Kamalabandha pond 10<br />

Odagaon Sikharpur Renovation of Sikharpur Anishigadia pond 10<br />

10<br />

3<br />

40<br />

238


Odagaon Sikharpur Renovation of Sikharapur Barapokharia pond 10<br />

Odagaon Sikharpur Renovatoin of Sikharpur Garjani pond 10<br />

Nuagaon Badagotha Khutubandha Budha Kusuma pond 25.5<br />

Nuagaon Paradhipi Paradhipi Jharinala Pond 12<br />

Nuagaon Paradhipi Construction of Balanda Pond 8<br />

Nuagaon Chahali Jagannathpur pond 3<br />

Nuagaon Chahali Chahali pond 2<br />

Nuagaon Dhenkana A New pond in Peta Palli 30<br />

Nuagaon Malisahi Deulighai Charapokhari 15<br />

Nuagaon Haripur rennovation of mashani bandha 5<br />

Nuagaon Haripur Pilajotanalia pond renovation 5<br />

Nuagaon Haripur Karanjagadia pond renovation 5<br />

Nuagaon Haripur Hingiligadia pond renovation 5<br />

Nuagaon Haripur Renovation of Hatasahi village pond 5<br />

Nuagaon Haripur Siarimala Village pond renovation 7<br />

Nuagaon Haripur Jaypur upper pond renovation<br />

Jaypur lower pond renovation & Gardwal<br />

5<br />

Nuagaon Haripur construction 8<br />

Nuagaon Haripur Siarimala Nalia pond renovation 5<br />

Nuagaon Paradhipi Bainda pond 8<br />

Odagaon Goudaput<br />

Construction of Pond<br />

10.00<br />

Odagaon Goudaput<br />

Construction of Pond<br />

10.00<br />

Odagaon Goudaput<br />

Construction of Pond<br />

Parikhya pond digging & guardwall construction<br />

10.00<br />

Odagaon Badagorada<br />

Odagaon Badagorada<br />

Odagaon Badagorada<br />

Odagaon Badagorada<br />

Odagaon Badagorada<br />

Odagaon Badagorada<br />

Odagaon Badagorada<br />

Odagaon Badagorada<br />

Odagaon Nandighore<br />

Odagaon Nandighore<br />

Odagaon Nandighore<br />

Odagaon Nandighore<br />

Babaji pond digging & guardwall construction<br />

Padma pond digging & guardwall construction<br />

Bada pond digging & guardwall construction<br />

Bela Pond Sanagorada<br />

Biligorada new pond<br />

Gahiri pond Patulisahi<br />

Kerekena Pond Patulisahi<br />

Construction of pond<br />

Construction of pond<br />

Construction of pond<br />

Construction of pond<br />

8.00<br />

5.00<br />

5.00<br />

5.00<br />

5.00<br />

5.00<br />

5.00<br />

5.00<br />

25.00<br />

Odagaon Banapur Excavation of pond at Chemidi 10<br />

Odagaon Banapur Excavation of pond at Banapur 10<br />

Odagaon Banapur Excavation of pond at Nepala & Turabi 10<br />

Odagaon Banapur Excavation of pond at Nandigiri & Duruva 10<br />

Odagaon P.Manpur<br />

Mahadev Pond<br />

20.00<br />

Odagaon P.Manpur<br />

Podinalabandha<br />

20.00<br />

Odagaon P.Manpur<br />

Ambalni Pond<br />

20.00<br />

Odagaon P.Manpur<br />

Nuapokhari<br />

20.00<br />

Odagaon Panchumu<br />

Construction of pond<br />

25.00<br />

Odagaon Panchumu<br />

Construction of pond<br />

25.00<br />

Odagaon Panchumu<br />

Hospital<br />

25.00<br />

Odagaon Panchumu<br />

Digging of pond<br />

10.00<br />

Odagaon Panchumu<br />

Digging of pond<br />

10.00<br />

Odagaon Solapata<br />

Padmadeipur Hemasagar pond digging<br />

5.00<br />

5.00<br />

5.00<br />

5.00<br />

239


Odagaon Solapata<br />

Odagaon Solapata<br />

Solapata amaripadia pond digging<br />

Solapata Jalisari Pond digging<br />

Total<br />

Health<br />

5.00<br />

5.00<br />

8363.3<br />

Block GP Proposed work Estimated cost in<br />

lakh rupees<br />

<strong>Nayagarh</strong> Itamati Extension of health centre 50<br />

<strong>Nayagarh</strong> Saranakul(Janhipada) ANM Centre 10<br />

<strong>Nayagarh</strong> Khuntubandha ANM Centre 5<br />

<strong>Nayagarh</strong> Bada Pandusar PHC 5<br />

<strong>Nayagarh</strong> Ghaduala Sub health centre 5<br />

<strong>Nayagarh</strong> Bhata Sahi Sub health centre 20<br />

<strong>Nayagarh</strong> Champatipur Sub health centre 10<br />

<strong>Nayagarh</strong> Natugaon Sub health centre 20<br />

<strong>Nayagarh</strong> Kalika Prasad PHC 5<br />

Daspalla Tumandi sub health centre 5<br />

Daspalla Tendabadi sub health center construction 5<br />

Daspalla Pokharigochha homeopathy health centre at Bhegabadi 5<br />

Daspalla Pokharigochha pokharigochha A.N.M centre 3<br />

Dasapalla Ghugudipada Sub health centre 8<br />

Dasapalla Jagadeipur Construction of LHP Quarter 5<br />

Dasapalla Khamar Sahi Construction/opening of Ayurvedic<br />

hospital at Khamar sahi<br />

Dasapalla Kulurukumpa Construction of health sub-centre at<br />

Kulurukumpa<br />

5<br />

Dasapalla Kunjabanagarh Purchase of medical instruments 20<br />

Dasapalla Dihagaon ANM Centre 1.15<br />

Dasapalla Nuagaon Necessary medicine supply to Sub-<br />

Health Centre<br />

5<br />

Bhapur Fategarh Construction of hospital boundary 10<br />

Bhapur Karabar Repairing work of hospital building 5<br />

Bhapur Bhagabanpur Sub-PHC 2<br />

Bhapur Badasahara Sub-PHC 10<br />

Bhapur Chakradhar Prasad Construction of sub-PHC 10<br />

Bhapur Kainfulia Sub-PHC in GP 5<br />

Bhapur Rakama Sub-PHC 10<br />

Bhapur Dhanachangada Sub-PHC 10<br />

30<br />

240


Bhapur Salapada PHC at Salapada village 100<br />

Bhapur Balgunia PHC 20<br />

Bhapur Padmabati<br />

Bhapur Sasan<br />

Bhapur Bijipur<br />

PHC<br />

PHC in Tikripada<br />

PHC in Bijipur sadar mahakumar<br />

Bhapur Patharchakada<br />

Construction of Health centre in<br />

Madhapur 25.00<br />

Bhapur Golapokhari<br />

PHC in Nilakanthaprasad village<br />

5.00<br />

Ranpur Champapedi Sub-PHC 10<br />

Ranpur Mayurjhalia Maintenance and improvement of<br />

hospital<br />

20<br />

Ranpur Balabhadrapur Sub-PHC 10<br />

Ranpur Mahatapalla PHC 10<br />

Ranpur Patia PHC 10<br />

Ranpur Surkabadi PHC & ANM Centre 5<br />

Ranpur Brundabanapur Sub-PHC 3<br />

Ranpur Darpanarayanpur Sub-PHC 10<br />

Ranpur Pimpal New sub-PHC at Pimpal GP 5<br />

Ranpur Talakani New PHC or sub-PHC 5<br />

Ranpur Kulasar New PHC 7<br />

Ranpur Kasanda PHC 7<br />

Ranpur Kandapada<br />

Ranpur Khatia<br />

Ranpur Bandhamunda<br />

Ranpur Gopalpur<br />

Ranpur Rankadeuli<br />

Ranpur Damasahi<br />

Ranpur Gourangapur<br />

Ranpur Narasinghapur<br />

Ranpur Champagarh<br />

Ranpur Baunsagarh<br />

PHC<br />

Construction of PHC<br />

Sub-Health Centre<br />

PHC<br />

Appointment of doctors & supply of<br />

medicine<br />

Appointment of doctors & supply of<br />

medicine<br />

PHC<br />

PHC<br />

Sub Health Centre<br />

Sub-Health Centre<br />

Gania Chhamundia Construction of health centre 10<br />

Gania Badasilia health care donation(dispensary) 50<br />

Gania Kishor Prasad ayurvedic health centre 100<br />

Gania Belapada patana kelapada block&hospital development 50<br />

Gania Adakata Health centre 1.5<br />

Gania Karadapada ANM room 2<br />

Odagaon Kural A.N.M Centre 10<br />

Odagaon Kural Additional PHC Centre 20<br />

Odagaon Giridipalli A.N.M Centre In Giridipalli 5<br />

Odagaon Giridipalli Constrution of hospital 10<br />

Odagaon Panderipada A.N.M.Centre 5<br />

Odagaon Angisingi PHC at Angisingi 20<br />

Odagaon Sunamuhin Additional Health Centre, Sunamuhin:<br />

House & Lawn<br />

4<br />

Odagaon Ranganipatana Hospital 15<br />

Odagaon Ranganipatana A.N.M.Centre 5<br />

Odagaon Odagaon Development & Construction: govt<br />

hospital<br />

50.00<br />

25.00<br />

10.00<br />

6.00<br />

8.00<br />

7.00<br />

20.00<br />

12.00<br />

10.00<br />

5.00<br />

10.00<br />

20<br />

241


Odagaon Dimisar Medical Building At Dimisar 30<br />

Odagaon Rohibanka Construction of Rohibanka Sub PHC<br />

Building<br />

3<br />

Odagaon Komanda Komanda PHC 5<br />

Odagaon Komanda A..N.M Centre 5<br />

Odagaon Saradha pur Baunsagadia Sub PHC 5<br />

Odagaon Saradha pur A.N.M.Centre 5<br />

Odagaon Pantikhari health centre 15<br />

Odagaon Rabigadia Ayurvedic hospital 20<br />

Odagaon Rabigadia ANM house 5<br />

Odagaon Korapitha PHC 10<br />

Odagaon Korapitha ANM centre 5<br />

Odagaon Hariharpur Homeopathic hospital 10<br />

Odagaon Banapur Health 2<br />

Khandapada Bodasa Construction of sub PHC 7<br />

Khandapada Benagadia Sub PHC 35<br />

Khandapada Sikharapur Health centre 30<br />

Khandapada Sikharapur Primary health centre 25<br />

Khandapada Ranipada Sub PHC 35<br />

Khandapada Banamalipur Construction of health centre 5<br />

Khandapada Ranichheli Health centre 30<br />

Khandapada Kumbharapada Construction of sub PHC building 5<br />

Khandapada Sidhamula Construcyion of sub PHC 10<br />

Khandapada Kiajhar Construction sub PHC 10<br />

Khandapada Mardarajpur Sub health centre 30<br />

Khandapada Khalisahi Sub PHC construction 7<br />

Khandapada Salajharia Health centre 15<br />

Khandapada Koshaka Health centre 14<br />

Khandapada Rayat Dholamara Health centre 10<br />

Khandapada Gunthuni Health centre 15<br />

Khandapada Jogiapalli Health centre 15<br />

Khandapada Badabanapur Health centre 300<br />

Khandapada Kantilo Health centre 70<br />

Nuagaon Udaypur Primary health centre 12<br />

Nuagaon Udaypur ANM Centre 6<br />

Nuagaon Kurasa Sub health centre 5<br />

Nuagaon Dudura Construction of Primary Health Centre 10<br />

Nuagaon Dudura ANM Centre 4<br />

Nuagaon Paradhipi Construction of sub health centre 10<br />

Nuagaon Gateri Sub PHC construction<br />

Construction of new building of Nuagaon<br />

10<br />

Nuagaon Nuagoan<br />

Medical 10<br />

Nuagaon Jakeda Sub PHC at Similisahi 5<br />

Nuagaon Bahadajhola Construction of A.N.M centre 7<br />

Nuagaon Mahipur Construction of Mahipur PHC centre<br />

Construction of additional building for sub<br />

15<br />

Nuagaon Sikrida<br />

PHC 5<br />

Nuagaon Dhenkana Construction of A.N.M centre 1<br />

Nuagaon Malisahi Sub PHC 10<br />

242


Nuagaon Udayapur PHC 12<br />

Nuagaon Udayapur ANM Centre 6<br />

Nuagaon Paradhipi Construction of sub PHC 10<br />

Nuagaon Durudura Construction of PHC 10<br />

Nuagaon Durudura Construction of 2 nos ANM centre 4<br />

Odagaon Badagorada<br />

Badagorada hospital<br />

15.00<br />

<strong>Nayagarh</strong> Nadiali<br />

Construction of Hospital<br />

5.00<br />

<strong>Nayagarh</strong> Lathipada<br />

PHC<br />

30.00<br />

<strong>Nayagarh</strong> Nabaghanpur<br />

PHC<br />

20.00<br />

<strong>Nayagarh</strong> Laxmiprasad<br />

ANM Centre<br />

5.00<br />

<strong>Nayagarh</strong> Kendudhipi<br />

PHC<br />

15.00<br />

<strong>Nayagarh</strong> Biruda<br />

PHC<br />

10.00<br />

<strong>Nayagarh</strong> Gambharidihi<br />

Construction of health centre<br />

10.00<br />

<strong>Nayagarh</strong> Jemadeipurpatna<br />

Heath centre<br />

5.00<br />

Total 2081.65<br />

Water & sanitation<br />

Block GP Proposed work Estimated<br />

cost in<br />

lakh<br />

rupees<br />

<strong>Nayagarh</strong> Itamati Drinking water supply through pipe to all 50<br />

<strong>Nayagarh</strong> Etamati Drain work 60<br />

<strong>Nayagarh</strong> Itamati Sulabh Sauchalay 10<br />

<strong>Nayagarh</strong> Bada Pandusar water supply(?) 60<br />

<strong>Nayagarh</strong> Ghaduala Drinking water 10<br />

Dasapalla Ghugudipada Drinking water supply to every village 150<br />

Dasapalla Jagadeipur Provision for supply of drinking water 5<br />

Dasapalla Kulurukumpa Pump house for water supply at Banibiri 2<br />

Dasapalla Kulurukumpa Pump house for water supply at Tangabadi 2<br />

Dasapalla Kulurukumpa Pump house for water supply at Baijhari 3<br />

Dasapalla Kunjabanagarh Provision of cold drinking water 0.015<br />

Dasapalla Kunjabanagarh Sulabh Sauchalaya 10<br />

Daspalla Tendabadi drinking water supply to all villages of tendabadi 20<br />

Bhapur Fategarh Sanitation work 60<br />

Bhapur Karabar Sanitation work 26<br />

Bhapur Bhagabanpur Sanitation work 12.5<br />

Bhapur Bhagabanpur Provision of cold drinking water 30<br />

Bhapur Badasahara Drinking water 10<br />

Bhapur Rakama Water supply 50<br />

243


Bhapur Karabar Construction of Karabar drain 50<br />

Bhapur Bhagabanpur Construction of drain 15<br />

Bhapur Salapada Sanitation work 16<br />

Bhapur Padmabati<br />

Sauchalay 50<br />

Ranpur Mayurjhalia Supply of drinking cold water 50<br />

Ranpur Surkabadi Sanitation work 13<br />

Ranpur Brundabanapur Drinking water 12<br />

Ranpur Brundabanapur Sanitation work 16<br />

Ranpur Ranpur Garh Supply drinking water 12<br />

Ranpur Ranpur Garh Tube-well of Sagarsahi, Kansarisahi, Maninagsahi, Hatasahi, Harijan sahi,<br />

Nuagaon, Raghunath Mandir, Harachandisahi, Ranpur<br />

Ranpur Pimpal Drinking water 20<br />

Ranpur Pimpal Sanitation work 15<br />

Ranpur Lodhachua Sanitation work and drain system in Lodhachua, Rajnagar, Adal, Bagal,<br />

Sarangadharpur and Pataberana villages<br />

Ranpur Talakani Drinking water 15<br />

Ranpur Talakani Sanitation work 20<br />

Ranpur Khairapalli Sanitation work 16<br />

Ranpur Kasanda Sanitation work 26<br />

Ranpur Kandhanayagarh<br />

Drinking water (Borewell)<br />

Ranpur Champapedi Construction of drain 5<br />

Ranpur Champapedi Construction of drain 5<br />

Ranpur Mayurjhalia Construction of drain 20<br />

Ranpur Brundabanapur Drainage system 16<br />

Ranpur Ranpur Garh Drainage work of Tala sadak sahi, Khundiasahi, Kadambasahi, Badakuasahi,<br />

Tarasiasahi, Damasahi, Harijansahi, Harachandisahi, Patarasahi, Bhandari<br />

sahi, Nuagaon<br />

Ranpur Kulasar Drainage work 12<br />

Ranpur Raj Jhankia<br />

Ranpur Kerandatanga<br />

Ranpur Narendrapur<br />

Ranpur Chandpur<br />

Construction of drain<br />

Construction of drain<br />

Drainage system<br />

Drinking water (Borewell)<br />

Gania Adakata water supply&sanitation 5.5<br />

Odagaon Rabigadia Kurumabankatara drain 200<br />

Odagaon<br />

Angisingi Sanitation: Dhushura village 10<br />

Odagaon<br />

Angisingi<br />

Sanitaion: Gujabaran village<br />

3<br />

Odagaon Kural Kural,Jathiapali,Jardiagada(proposed work & places indecipherable) 400<br />

3.5<br />

120<br />

<strong>11</strong><br />

20.00<br />

30.00<br />

12.00<br />

244


Odagaon Kural Sulabha sauchalaya 100<br />

Odagaon Giridipalli Supply of Pipe Water to 7 Revenew Village Under Giridipalli G.P 10<br />

Odagaon Panderipada Construction of Water Tank 15<br />

Odagaon Panderipada Piped water supply 10<br />

Odagaon Angisingi Angisingi Village sanitation 10<br />

Odagaon Ranganipatana Water Tank 10<br />

Odagaon Odagaon Supply of Drinking Water 30<br />

Odagaon Odagaon Construction of 2 Toilets near Sri Sri Raghunathjew Temple 7<br />

Odagaon Dimisar Supply of Drinking Water to Haripur Village 10<br />

Odagaon Dimisar Supply of Drinking Water to Kurujanga 10<br />

Odagaon Rohibanka Supply of Drinking Water 25<br />

Odagaon Rohibanka Construction of Drain,Spred,Latrin,Well&Tube Well Digging 30<br />

Odagaon Magarbandha Well Drinking Water System At<br />

Magarbandha,Sabideipur,Gundarabari,Binayakpur,BitalagGadiFashipaliVillage<br />

Odagaon Komanda Sulava Sauchalaya at Kemand 25<br />

Odagaon Komanda Supply of Drinking water 10<br />

Odagaon Komanda Drinking Water Supply throughPipe Line to<br />

Raghunathpur,Podagada,,Kumbharia&Machapada<br />

Odagaon<br />

Odagaon<br />

Rabigadia Water tank- 4 40<br />

Korapitha Drinking water 20<br />

Odagaon Sikharpur Construction of drain in each road of Sikharpur 100<br />

Odagaon Banapur Drinking water supply 5<br />

Khandapada Benagadia Sanitation 20<br />

Khandapada Benagadia Drinking water supply 70<br />

Khandapada Sikharapur Sanitation 30<br />

Khandapada Sikharapur Drinking water 100<br />

Khandapada Ranipada Sanitation 10<br />

Khandapada Ranipada Village drinking water 20<br />

Khandapada Ranichheli Sanitation 10<br />

Khandapada Ranichheli Drinking water 30<br />

Khandapada Sidhamula Sanitation 3<br />

Khandapada Mardarajpur Sanitation 15<br />

Khandapada Mardarajpur Drinking water supply 25<br />

Khandapada Salajharia Sanitation 5<br />

Khandapada Salajharia Drinking water 20<br />

Khandapada Koshaka Sanitation 4<br />

Khandapada Koshaka<br />

Rayat<br />

Drinking water 23<br />

Khandapada Dholamara<br />

Rayat<br />

Sanitation 8<br />

Khandapada Dholamara Drinking water 40<br />

Khandapada Gunthuni Sanitation 5<br />

Khandapada Gunthuni Drinking water 20<br />

Khandapada Jogiapalli Sanitation 5<br />

Khandapada Jogiapalli Drinking water 20<br />

3<br />

55<br />

245


Khandapada Badabanapur Sanitation 5<br />

Khandapada Badabanapur Drinking water 45<br />

Khandapada Kantilo Sanitation 10<br />

Khandapada Kantilo Drinking water 30<br />

Nuagaon Udaypur Drinking water supply 30<br />

Nuagaon Udaypur Construction 600nos of Latrine 20<br />

Nuagaon Dudura drinking water supply to all villages through well 50<br />

Nuagaon Dudura Construction 800nos of Latrine 20<br />

Nuagaon Paradhipi drinking water supply 20<br />

Nuagaon Bahadajhola 1nos drinking water supply 80<br />

Nuagaon Mahipur Drinking water supply 6<br />

Nuagaon Dhenkana Drinking water supply 80<br />

Nuagaon Malisahi Drinking water supply 20<br />

Nuagaon Paradhipi Drinking water supply 20<br />

Nuagaon Durudura Drinking water supply ( open well ) 7nos 50<br />

Nuagaon Durudura construction: 800 nos latrine 20<br />

Odagaon Goudaput<br />

Provision of Drinking water<br />

50.00<br />

Odagaon Nandighore<br />

Provision of drinking water<br />

5.00<br />

Odagaon Rabigadia Khalpadabandh water supply 30<br />

Odagaon Badagorada<br />

Odagaon P.Manpur<br />

<strong>Nayagarh</strong> Balugaon<br />

Sanaporada Drinking water reservoir<br />

10.00<br />

Manpur village drain construction<br />

15.00<br />

Soulab Sochalaya<br />

4.00<br />

Total 3417.515<br />

Education<br />

Block GP Proposed work Estimated<br />

cost in lakh<br />

rupees<br />

Daspalla Similisahi regional high school development 5<br />

Daspalla Similisahi kainma upper primary school development 5<br />

Daspalla Pokharigochha bhegabadi P.C highschool 7<br />

Daspalla Pokharigochha bhegabadi primary M.E school 5<br />

Daspalla Pokharigochha kulanda primary school 2<br />

Daspalla Pokharigochha kayadi primary M.E school 3<br />

Daspalla Pokharigochha pokharigochha primary M.E school 3<br />

Daspalla Pokharigochha pilikhaju primary school 2<br />

Daspalla Pokharigochha raduda primary school 2<br />

Daspalla Pokharigochha bebiri primary school 2<br />

Daspalla Pokharigochha kandharekhabadi primary school 2<br />

Daspalla Pokharigochha sadabhuin primary school&bhegabadi sebashram 6<br />

246


Dasapalla Gholahandi Repairing work of Jilinda, Talera, Gholahandi,<br />

Govindpur Patana schools<br />

Dasapalla Ghugudipada Construction of Ghungudipada school hostel 16<br />

Dasapalla Ghugudipada Construction of school building in Makarprasad,<br />

Mardabadi, Ghungudipada<br />

Dasapalla Khamar Sahi Repairing work of Subalaya UGSE schoool<br />

building<br />

Dasapalla Khamar Sahi Repairing work of Puruna Dasapalla UP school<br />

building<br />

Dasapalla Khamar Sahi Repairing work of Sareniganda UP school building 10<br />

Dasapalla Khamar Sahi Repairing work of Khamarsahi ME & High school<br />

building<br />

Dasapalla Khamar Sahi Repairing work of Bhogara UP school building 10<br />

Dasapalla Khamar Sahi Repairing work of Chakradharpur UP school<br />

building<br />

Dasapalla Khamar Sahi Formation of new UP school at Kauda 10<br />

Dasapalla Kujamendhi Construction of Shirishira school 5<br />

Dasapalla Kujamendhi Repair work of Kurudangi school 5<br />

Dasapalla Kujamendhi Construction of Dasanipada school 5<br />

Dasapalla Kulurukumpa Construction of Ranijhari school 5<br />

Dasapalla Kulurukumpa Construction of Gunduribari school 5<br />

Dasapalla Kunjabanagarh UP school 50<br />

Bhapur Fategarh Construction of school boudary 100<br />

Bhapur Bhagabanpur Improvement of Bhagabanpur govt. ME School 5<br />

Bhapur Bhagabanpur UP School boundary 15<br />

Bhapur Salapada High school at Salapada village 50<br />

Bhapur Salapada College at Salapada village 100<br />

Bhapur Salapada Construction of school boundary 12<br />

Madhapur High school building cementing<br />

Bhapur Patharchakada<br />

5.00<br />

Bhapur Balgunia Construction of Balgunia ME school boundary 5<br />

Bhapur Balgunia Construction of Balgunia high school boundary 3<br />

Bhapur Balgunia Construction of Joregaon UP school boundary 3<br />

Bhapur Balgunia Construction of Dhanabandha UP school boundary 3<br />

Bhapur Balgunia Construction of Nuapalli UP school boundary 3<br />

Bhapur Balgunia Construction of Kedarsing UP school boundary 3<br />

Bhapur Sasan<br />

Bhapur Sasan<br />

Construction of Jujimai School Boundary wall<br />

Construction of Hemantapatna Primary School<br />

Boundary wall<br />

Golapokhari High school play ground renovation<br />

2<br />

30<br />

10<br />

10<br />

15<br />

10<br />

10.00<br />

Bhapur Golapokhari<br />

5.00<br />

Ranpur Champapedi Construction of school 5<br />

Ranpur Mayurjhalia Construction of school, school boundary and<br />

playground<br />

Ranpur Balabhadrapur Construction of school 20<br />

8.00<br />

30<br />

247


Ranpur Patia M.E. School at Paikasahi 5<br />

Ranpur Brundabanapur New UP school 7<br />

Ranpur Brundabanapur Repairing work of old UP school 30<br />

Ranpur Darpanarayanpur Construction of classroom 25<br />

Ranpur Pimpal Kendupalli new UP school 6<br />

Ranpur Pimpal Govindpur and Kajapur new UP school 6<br />

Ranpur Pimpal Construction of classroom of Kankia old school 8<br />

Ranpur Pimpal Construction of classroom of Pimpal old Nodal<br />

school<br />

Ranpur Pimpal Construction of new boundary of Pimpal<br />

Ladukeswar high school<br />

Ranpur Lodhachua Construction of UP school boundary 90<br />

Ranpur Raipada<br />

Ranpur Brajarajpur<br />

Ranpur Baunsagarh<br />

High school<br />

Construction of School building<br />

Construction of School building<br />

8<br />

7<br />

10.00<br />

2.42<br />

25.00<br />

Gania Chamundia Construction of school class room 5<br />

Gania Chamundia Construction of school class room 5<br />

Gania Kishor Prasad highschool class room construction 10<br />

Gania Kishor Prasad primary school class room construction 10<br />

Gania Karadapada High School establishment<br />

Panchayat girls high school class room<br />

6<br />

Gania Gania<br />

construction<br />

Dadhibamana jiu highschool construction&field<br />

80<br />

Gania Belapada patana dev. 80<br />

Gania Badasilia development of badasilia residential school<br />

field development work of kishore chandra<br />

50<br />

Gania Gania<br />

bidyapitha 100<br />

Gania<br />

Adakata Construction of 12 class rooms 4.5<br />

Gania<br />

Adakata college 2.5<br />

Odagaon Kural Kural High school 40<br />

Odagaon Kural Kural Central School 10<br />

Odagaon Kural JayaNarayan primary School 10<br />

Odagaon Kural Hanumantia Jarkhada School 20<br />

Odagaon Kural Jathiapali,Dandor,Lingaraj prasad School 20<br />

Odagaon Giridipalli Establishment Of High School In Giridipalli 10<br />

Odagaon Giridipalli Construction of Jhadasahi U.P School Boundary 2.5<br />

Odagaon Giridipalli Construction of Panakhajuria U.P School Boundary 5<br />

Odagaon Giridipalli Construction of AjaholaU.P School Boundary 2.5<br />

Odagaon Panderipada Panderipada U.P. School Building 10<br />

Odagaon Panderipada Valia dihi U.G.M.E School Building 10<br />

Odagaon Panderipada Madanpur U.P school 10<br />

Odagaon Panderipada Dibyasakti Bidyaniketan Deogaon Validiha 10<br />

Odagaon Panderipada Satrughna High School Panderpada 10<br />

Odagaon Sunamuhin Sunamuhi Nodal School Room & Lawn<br />

Construction<br />

Odagaon Sunamuhin Sunamuhini G.P High School Room&Lawn<br />

Construction<br />

Odagaon Sunamuhin Luni Primary School & Lawn Construction 3.5<br />

4<br />

5<br />

248


Odagaon Sunamuhin Landababu Primary School & Lawn Construction 35<br />

Odagaon Sunamuhin Malia Chakhela Primary SchoolRoom & Lawn<br />

Construction<br />

Odagaon Sunamuhin Balisina JhirinalaPrimary School Rooom & Lawn<br />

Construction<br />

Odagaon Sunamuhin Khangarpali Primary SchoolRoom&Lawn<br />

Construction<br />

Odagaon Ranganipatana School Building 10<br />

Odagaon Ranganipatana School Building 8<br />

Odagaon Odagaon Construction of Rabara School building&Wall 7<br />

Odagaon Odagaon Construction of Jaringi School Building 3<br />

Odagaon Dimisar Construction of SchoolBuilding 30<br />

Odagaon Rohibanka Primary Education Centre 30<br />

Odagaon Komanda Primary Education Centre 5<br />

Odagaon Komanda Womens College 5<br />

Odagaon Komanda Primary Education Centre in<br />

Machapada,Raghunathpur,Podagada?&Kumbharia<br />

Odagaon Saradha pur GunthasahiU.P.S Building 2<br />

Odagaon Saradha pur BaunsagadiaM.E School Building 2<br />

Odagaon Saradha pur Ambarapali M.E.School Building 2<br />

Odagaon Saradha pur Baunsagadia U.P.Sbuilding 2<br />

Odagaon Saradha pur Baunsagadia High School Building 2<br />

Odagaon Pantikhari school house construction 6<br />

Odagaon Rabigadia school house- 6 90<br />

Odagaon Rabigadia Gayatri vidyamandir house 10<br />

Odagaon Korapitha School building, Korapitha, samareisahi,<br />

Kanamareisahi<br />

Odagaon Banapur Primary School 4<br />

Khandapada Bodasa School building 20<br />

Khandapada Benagadia Construction of building/class rooms 25<br />

Khandapada Sikharapur Construction of school building<br />

Khandapada Ranipada Construction of school building 12<br />

Khandapada Banamalipur Construction of school building 50<br />

Khandapada Ranichheli Construction of school building 10<br />

Khandapada Kumbharapada Construction of School building 4<br />

Khandapada Sidhamula School building 15<br />

Khandapada Kiajhar School building 20<br />

Khandapada Mardarajpur Construction of school building 20<br />

Khandapada Khalisahi Construction of school building 56<br />

Khandapada Salajharia Construction of school building 15<br />

Khandapada Koshaka Construction of school building 20<br />

Khandapada Rayat Dholamara Construction of school building 18<br />

Khandapada Gunthuni Construction of school building 15<br />

Khandapada Jogiapalli Construction of school building 15<br />

Khandapada Badabanapur Construction of school building 20<br />

Khandapada Kantilo Construction of school building 15<br />

Nuagaon Badagotha Bakulabandha High School 10<br />

35<br />

35<br />

35<br />

35<br />

20<br />

249


Nuagaon Badagotha Dimirijhari High School 10<br />

Nuagaon Udaypur primary school class room construction 12<br />

Nuagaon Udaypur High school class room construction 20<br />

Nuagaon Kurasa Construction of Class room at Kurasa high school 10<br />

Nuagaon Khandugaon Education 8<br />

Nuagaon Dudura highschool class room construction 15<br />

Nuagaon Dudura primary school class room re-construction 8<br />

Nuagaon Gateri Construction of High school building<br />

Construction of Nuagaon College +3 deptt.<br />

15<br />

Nuagaon Nuagoan Building 10<br />

Nuagaon Beruanbari Construction of High School building 5<br />

Nuagaon Jakeda Construction of Jakeda High School 10<br />

Nuagaon Chahali Construction of school building 4<br />

Nuagaon Sikrida Own building of Jagannathprasad High School <strong>11</strong><br />

Nuagaon Badagotha Bakalabandha High School 10<br />

Nuagaon Badagotha Timirijhari High School 10<br />

Nuagaon Udayapur Construction of primary school building 12<br />

Nuagaon Udayapur construction of High school building<br />

Construction of Own High School building of<br />

20<br />

Nuagaon Korada<br />

Korada 10<br />

Nuagaon Khandugaon Construction of school building 8<br />

Nuagaon Durudura Construction of high School building 15<br />

Nuagaon Durudura Primary school building<br />

Badagorada Primary school construction<br />

8<br />

Odagaon Badagorada<br />

Odagaon Badagorada<br />

Odagaon Badagorada<br />

Odagaon Badagorada<br />

Odagaon Nandighore<br />

Odagaon Solapata<br />

Odagaon Solapata<br />

Sanagorada Primary school construction<br />

5.00<br />

Patulisahi Primary school construction<br />

5.00<br />

5.00<br />

Badagorada High school<br />

8.00<br />

Primary school<br />

5.00<br />

Solapata UG Maischool construction<br />

Padmadeipur UP School Building Boundary<br />

5.00<br />

construction<br />

5.00<br />

Total 2433.92<br />

Anganwadi centres<br />

Block GP Proposed work Estimated<br />

cost in lakh<br />

rupees<br />

<strong>Nayagarh</strong> Notara Construction of Anganwadi centre 4<br />

<strong>Nayagarh</strong> Kridaspur Anganwadi centre 5<br />

<strong>Nayagarh</strong> Lenkudipada Anganwadi centre 4<br />

<strong>Nayagarh</strong> Baunsiapada Anganwadi centre 8<br />

<strong>Nayagarh</strong> Khuntubandha Anganwadi centre 16<br />

Dasapalla Gholahandi Construction of Talera Anganwadi centre 1.5<br />

250


Dasapalla Gholahandi Construction of Jilinda Anganwadi centre 1.5<br />

Dasapalla Ghugudipada Construction of Gohirapada Anganwadi school 8<br />

Dasapalla Ghugudipada Construction of Aimani Anganwadi centre 8<br />

Dasapalla Jagadeipur Construction of Anganwadi centre and school 30<br />

Dasapalla Kalasa Khaman Construction of ANM Centre 3<br />

Dasapalla Kalasa Khaman Construction of Anganwadi centre at Kalasa<br />

khaman<br />

2<br />

Dasapalla Kalasa Khaman Construction of Anganwadi centre at Hamadiha 2<br />

Dasapalla Kalasa Khaman Construction of Anganwadi centre at Kalamba 2<br />

Dasapalla Khamar Sahi Construction of Anganwadi centre at Puruna<br />

Dasapalla Harijan sahi<br />

Dasapalla Khamar Sahi Construction of Khamarsahi Angawadi centre 10<br />

Dasapalla Khamar Sahi Construction of Damahandi, Chakradharpur<br />

Anganwadi centre<br />

Dasapalla Khamar Sahi Construction of Gaudabaghua bereni Anganwadi<br />

centre<br />

10<br />

Dasapalla Khamar Sahi Formation of sub-centre at Khamar sahi 5<br />

Dasapalla Kujamendhi Construction of Kurudangi Anganwadi centre 3<br />

Dasapalla Kujamendhi Construction of Dasanipada Anganwadi centre 3<br />

Dasapalla Kujamendhi Construction of Bani Anganwadi centre 2<br />

Dasapalla Kulurukumpa Construction of Anganwadi centre at Jamusahi 1.5<br />

Dasapalla Kulurukumpa Construction of Baijhari Anganwadi centre 1.5<br />

Dasapalla Kulurukumpa Construction of Pamperena Anganwadi centre 1<br />

Dasapalla Kulurukumpa Construction of Janipadar Anganwadi centre 1.5<br />

Dasapalla Kulurukumpa Construction of Gunduribari Anganwadi centre 1.5<br />

Dasapalla Kunjabanagarh Anganwadi centre 50<br />

Dasapalla Nuagaon Construction of Nuagao Anganwadi centre 3<br />

Dasapalla Nuagaon Construction of Kutibari Anganwadi centre 3<br />

Dasapalla Nuagaon Construction of Dolamundei Anganwadi centre 3<br />

Daspalla Pokharigochha pipalpadara anganwadi house construction 3<br />

Daspalla Pokharigochha pilipaju anganwadi house construction 3<br />

Daspalla Pokharigochha sanakamiti anganwadi house construction 3<br />

10<br />

10<br />

251


Daspalla Pokharigochha sanakamiti anganwadi house construction 2<br />

Daspalla Pokharigochha pokharigochha anganwadi house construction 2<br />

Daspalla Pokharigochha sukiapahada anganwadi house construction 2<br />

Daspalla Pokharigochha bebari anganwadi house construction 2<br />

Daspalla Pokharigochha bhegabadi anganwadi house construction 2<br />

Daspalla Tendabadi tendabadi AWC house construction 1.5<br />

Daspalla Tendabadi poibadi AWC house construction 1.5<br />

Daspalla Tendabadi kusumagadia AWC house construction 1.5<br />

Daspalla Tendabadi sakeni AWC house construction 1.5<br />

Daspalla Tendabadi nuasahi AWC house construction 1.5<br />

Daspalla Tendabadi masabadi AWC house construction 1.5<br />

Daspalla Tendabadi nuasahi AWC house construction 1.5<br />

Daspalla Tumandi anganwadi house 5<br />

Daspalla Tumandi anganwadi house 5<br />

Daspalla Tumandi anganwadi house 3<br />

Daspalla Tumandi anganwadi house 3<br />

Daspalla Tumandi anganwadi house 5<br />

Bhapur Fategarh Anganwadi centre 45<br />

Bhapur Karabar Anganwadi centre 30<br />

Bhapur Bhagabanpur Anganwadi centre 12<br />

Bhapur Badasahara Anganwadi centre 40<br />

Bhapur Chakradhar<br />

Prasad<br />

Anganwadi centre 25<br />

Bhapur Kainfulia Kainfulia Uparsahi Anganwadi centre 5<br />

Bhapur Kainfulia Kainfulia Talasahi Anganwadi centre 5<br />

Bhapur Kainfulia Duadia Anganwadi centre 5<br />

Bhapur Kainfulia Baraputa Anganwadi centre 3<br />

Bhapur Salapada Anganwadi centre 24<br />

Bhapur Balgunia Anganwadi centre 35<br />

Bhapur Baghuapalli Anganwadi centre 10<br />

Bhapur Padmabati<br />

Bhapur Sasan<br />

Bhapur Sasan<br />

Bhapur Sasan<br />

Bhapur Sasan<br />

Anganwadi centre<br />

Construction of Anganwadi centre in<br />

Tikripada<br />

Construction of Anganwadi centre in<br />

Ragadipada<br />

Construction of Hemantapatna Anganwadi<br />

centre<br />

Construction of Jasobantpur Anganwadi<br />

centre<br />

20.00<br />

25.00<br />

15.00<br />

15.00<br />

15.00<br />

252


Bhapur Bijipur<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Bhapur Patharchakada<br />

Bhapur Golapokhari<br />

Construction of anganwadi centre in Bijipur<br />

GP<br />

Madhapur anganwadi centre construction<br />

Patharchakada anganwadi centre construction<br />

Kendupali anganwadi centre construction<br />

Construction of anganwadi centre of<br />

Golapokhari GP<br />

50.00<br />

20.00<br />

15.00<br />

10.00<br />

40.00<br />

Ranpur Champapedi Anganwadi centre 15<br />

Ranpur Mayurjhalia Construction of Anganwadi centre 30<br />

Ranpur Balabhadrapur Anganwadi centre 18<br />

Ranpur Surkabadi New Anganwadi Centre 15<br />

Ranpur Brundabanapur Anganwadi centre 18<br />

Ranpur Darpanarayanpur Anganwadi centre 25<br />

Ranpur Pimpal Construction of Kankia Anganwadi centre 5<br />

Ranpur Pimpal Pimpal Anganwadi centre 5<br />

Ranpur Talakani Construction of Anganwadi centre 12<br />

Ranpur Kulasar Anganwadi centre 12<br />

Ranpur Khairapalli Anganwadi centre 18<br />

Construction of Anganwadi centre<br />

Ranpur Raipada<br />

2.00<br />

Ranpur Kandapada Anganwadi Centre 15.00<br />

Construction of Anganwadi centre<br />

Ranpur Khatia<br />

4.00<br />

Construction of Anganwadi centre<br />

Ranpur Majhiakhanda<br />

15.00<br />

Ranpur Bandhamunda Anganwadi Building 15.00<br />

Ranpur Bandhamunda Anganwadi Building<br />

Ranpur Bandhamunda Anganwadi Building<br />

Ranpur Bandhamunda Anganwadi Building<br />

Ranpur Bandhamunda Anganwadi Building<br />

Constructruction of anganwadi centre<br />

Ranpur Gopalpur<br />

5.00<br />

Construction of Anganwadi centre<br />

Ranpur Rankadeuli<br />

3.00<br />

Construction of Anganwadi centre<br />

Ranpur Damasahi<br />

3.00<br />

Ranpur Brajarajpur Anganwadi centre 9.00<br />

Construction of Anganwadi centre<br />

Ranpur Narasinghapur<br />

33<br />

Ranpur Champagarh Anganwadi centre 2.00<br />

Ranpur Champagarh Anganwadi centre<br />

253


Ranpur Champagarh Anganwadi centre<br />

Ranpur Champagarh Anganwadi centre<br />

Ranpur Baunsagarh Anganwadi centre 25.00<br />

Ranpur Narendrapur Anganwadi centre 8.00<br />

Odagaon Kural 10 Nos Anganwadi Centre 50<br />

Odagaon Giridipalli Giridipalli,Ajhola,Ajohala Anganwadi Centre 2<br />

Construction<br />

Odagaon Panderipada Construction of Anganwadi Centre in<br />

Valiadiha,Madanpur,Panderipada&Deongaon<br />

Odagaon Angisingi 5 Anganwadi centre in Angisingi 2<br />

Odagaon Angisingi Anganwadi centre 2<br />

Odagaon Angisingi Anganwadi centre 3<br />

Odagaon Sunamuhin Anganwadi Centre House Construction 3<br />

Odagaon Ranganipatana Anganwadi centre 10<br />

Odagaon Ranganipatana Anganwadi centre 5<br />

Odagaon Ranganipatana Anganwadi centre 5<br />

Odagaon Ranganipatana Anganwadi centre 5<br />

Odagaon Dimisar Construction of Anganwadi Centre in 3<br />

Villages<br />

30<br />

Odagaon Rohibanka Construction of Anganwadi Building 20<br />

Odagaon Magarbandha Construction of Anganwadi Centre 25<br />

Odagaon Komanda Anganwadi centre 5<br />

Odagaon Komanda 3 Anganwadi Centre in Machapada,1-in<br />

Raghunathpur,1-in Podagada<br />

15<br />

Odagaon Odagaon Construction of 12 Anganwadi building At<br />

Odagaon G.P<br />

30<br />

Odagaon Saradha pur <strong>11</strong>-Centre for Anganwadi Building 22<br />

Odagaon Pantikhari AWC 5<br />

Odagaon Rabigadia AWC house- 5 50<br />

Odagaon Korapitha Anganwadi house in GP 10<br />

Odagaon Hariharpur AWC, Hariharpur 3<br />

Odagaon Hariharpur AWC, Asurdhipa 3<br />

Odagaon Hariharpur AWC, Badaput 3<br />

Odagaon Hariharpur AWC, Karada 3<br />

Khandapada Bodasa Anganwadi building 8<br />

Khandapada Benagadia Anganwadi 20<br />

Khandapada Sikharapur Anganwadi 10<br />

Khandapada Ranipada Anganwadi centre 10<br />

Khandapada Banamalipur Construction Anganwadi building 16<br />

Khandapada Ranichheli Anganwadi centre 10<br />

Khandapada Kumbharapada Anganwadi Building 6<br />

10<br />

254


Khandapada Gadiasahi Anganwadi centre<br />

Khandapada Sidhamula Anganwadi building 10<br />

Khandapada Kiajhar Anganwadi building 10<br />

Khandapada Mardarajpur Anganwadi 15<br />

Khandapada Khalisahi Anganwadi building 14<br />

Nuagaon Badagotha anganwadi house of Khutubandha 3<br />

Nuagaon Jakeda Construction of Similisahi Anganwadi centre 3<br />

Nuagaon Jakeda Construction of Jakeda Anganwadi centre<br />

Construction of Khalamaja Anganwadi<br />

3<br />

Nuagaon Jakeda<br />

centre 3<br />

Nuagaon Jakeda Construction of Kalia Anganwadi centre<br />

Construction of Kendubania Anganwadi<br />

3<br />

Nuagaon Jakeda<br />

centre 3<br />

Nuagaon Badagotha anganwadi house of Bhiruda 3<br />

Nuagaon Badagotha anganwadi house of Dimirijhari 3<br />

Nuagaon Kurasa Construction of Anganwadi centre 3<br />

Nuagaon Kurasa Construction of Anganwadi centre 3<br />

Nuagaon Kurasa Construction of Anganwadi centre 3<br />

Nuagaon Kurasa Construction of Anganwadi centre 3<br />

Nuagaon Khandugaon Anganwadi centre 9<br />

Nuagaon Gateri Anganwadi Centre building<br />

Construction of 4nos Anganwadi centre<br />

6<br />

Nuagaon Nuagoan building 12<br />

Nuagaon Kaptapalli Anganwadi 20<br />

Nuagaon Beruanbari Construction of Anganwadi building 15<br />

Nuagaon Jakeda Construction of Similisahi Anganwadi centre 3<br />

Nuagaon Jakeda Construction of Jakeda Anganwadi centre<br />

Construction of Khalamaja Anganwadi<br />

3<br />

Nuagaon Jakeda<br />

centre 3<br />

Nuagaon Jakeda Construction of Kalia Anganwadi centre<br />

Construction of Kendubania Anganwadi<br />

3<br />

Nuagaon Jakeda<br />

centre 3<br />

Nuagaon Chahali Anganwadi 3<br />

Nuagaon Bahadajhola Anganwadi centre at Kaliamba 2<br />

Nuagaon Singarpalli Construction of Anganwadi building 16<br />

Nuagaon Mahipur Anganwadi centre 12<br />

Nuagaon Sikrida Construction of 6nos Anganwadi centre 12<br />

Nuagaon Dhenkana Anganwadi centre in Petapalli 2<br />

Nuagaon Haripur Hatasahi Anganwadi centre 4<br />

Nuagaon Haripur Hatiasila Anganwadi centre 4<br />

Nuagaon Haripur Haripur Anganwadi centre 4<br />

Nuagaon Badagotha Khatubandha Anganwadi centre 3<br />

Nuagaon Badagotha Viruda Anganwadi 3<br />

Nuagaon Badagotha Timirijhari Anganwadi 3<br />

Nuagaon Korada Construction of Anganwadi building 3<br />

Nuagaon Korada Anganwadi centre building 3<br />

Nuagaon Korada Anganwadi centre building 3<br />

Nuagaon Korada Anganwadi centre building 3<br />

255


Nuagaon Khandugaon Anganwadi 9<br />

Odagaon Badagorada Anganwadi centre Patulisahi 2.00<br />

Odagaon Badagorada Sangorada Anganwadi centre 2.00<br />

Odagaon Badagorada Badagorada Anganwadi centre 2.00<br />

Odagaon P.Manpur Anganwadi centre 10.00<br />

Odagaon Solapata Anganwadi centre No I 2.00<br />

Odagaon Solapata Anganwadi centre No II<br />

Padmadeipur anganwadiwadi centre<br />

2.00<br />

Odagaon Solapata<br />

<strong>Nayagarh</strong> Ikiri Anganwadi centre 4.00<br />

<strong>Nayagarh</strong> Gambharidihi Anganwadi Centre 4.00<br />

<strong>Nayagarh</strong> Sinduria Anganwadi centre 6.00<br />

<strong>Nayagarh</strong> Jemadeipurpatna Anganwadi Centre 5.00<br />

Total 1,733.50<br />

Veterinary services<br />

Block GP Proposed work Estimated cost in<br />

lakh rupees<br />

<strong>Nayagarh</strong> Kridaspur Veterinary hospital 2<br />

Dasapalla Jagadeipur Construction of L. I. Centre 5<br />

Dasapalla Khamar Sahi Formation of Veterinary hospital at<br />

Khamarsahi<br />

30<br />

Dasapalla Kujamendhi Construction of Veterinary hospital 5<br />

Dasapalla Kulurukumpa Veterinary hospital at Jamusahi 5<br />

Daspalla Pokharigochha veterinary house construction 5<br />

Ranpur Champapedi Veterinary hospital 5<br />

Ranpur Mayurjhalia Construction of Veterinary hospital 15<br />

Ranpur Balabhadrapur Veterinary hospital 5<br />

Ranpur Surkabadi Veterinary hospital 5<br />

Ranpur Darpanarayanpur Veterinary hospital 5<br />

Ranpur Lodhachua Veterinary hospital 4.5<br />

Ranpur Kulasar Veterinary hospital 2.5<br />

Ranpur Brajarajpur veterinary hospital 4.50<br />

Ranpur Baunsagarh veterinary hospital 5.00<br />

Gania Badasilia veterinary hospital 50<br />

Gania Karadapada Animal husbandry Centre 3<br />

Odagaon Angisingi Veterinary hospital at Angisingi 5<br />

Odagaon Sunamuhin Additional Veterinary House<br />

Construction<br />

4<br />

Odagaon Ranganipatana Veterinary Medical 20<br />

2.00<br />

256


Odagaon Ranganipatana L.I Centre 5<br />

Odagaon Dimisar Construction of Veterinary Medical<br />

Building<br />

10<br />

Odagaon Komanda veterinary Medical 5<br />

Odagaon Saradha pur L.I Centre 5<br />

Odagaon Pantikhari livestock centre 10<br />

Odagaon Rabigadia livestock centre 15<br />

Odagaon Korapitha Livestock centre construction 10<br />

Khandapada Sikharapur Primary veterinary medical 25<br />

Nuagaon Badagotha<br />

Formation of Veterinary hospital at<br />

Dimirijhari<br />

Construction of Sub Veterinary health<br />

3<br />

Nuagaon Kurasa<br />

centre 3<br />

Nuagaon Khandugaon Construction of Veterinary Hospital 4<br />

Nuagaon Gateri L.I centre construction<br />

Construction of Khalamada Sub<br />

5<br />

Nuagaon Nuagoan veterinary Medical centre 5<br />

Nuagaon Kaptapalli veterinary Medical 6<br />

Nuagaon Beruanbari Construction of building for L.I centre 5<br />

Nuagaon Jakeda Sub-veterinary Medical 5<br />

Nuagaon Jakeda Sub-veterinary Medical 5<br />

Nuagaon Chahali veterinary hospital 6<br />

Nuagaon Sikrida veterinary sub -medical 3<br />

Nuagaon Badagotha Timirijhari veterinary Hospital 3<br />

Nuagaon Korada Sub veterinary Medical 3<br />

Nuagaon Singarpalli Establishment of animal helping centre 5<br />

Nuagaon Khandugaon veterinary Medical 4<br />

Odagaon Badagorada LI Centre building construction 2.00<br />

<strong>Nayagarh</strong> Laxmiprasad veterinary hospital 5.00<br />

<strong>Nayagarh</strong> Gadadharprasad veterinary hospital 5.00<br />

Odagaon Ranganipatana L.H.V CENTRE 5<br />

Ranpur Darpanarayanpur Veterinary hospital 5<br />

Total 357.5<br />

Block GP<br />

Agriculture<br />

Proposed work Estimated<br />

cost in lakh<br />

rupees<br />

Dasapalla Kulurukumpa Agriculture office at<br />

Jamusahi<br />

5<br />

Odagaon Saradha pur Mango Plantation 1<br />

Odagaon Panderipada Plantation of Coconut &<br />

Nut Trees in River<br />

Embankment<br />

5<br />

Odagaon Rohibanka Creation of fruit garden 10<br />

Odagaon Komanda A Cold Store at<br />

Machapada market<br />

Odagaon Rabigadia Cold store 65<br />

257


Ranpur Baunsagarh<br />

<strong>Nayagarh</strong> Nadiali<br />

Construction of Krushak<br />

Bazar 25.00<br />

Construction of<br />

coldstore 20.00<br />

Total 131<br />

Plantation<br />

Block GP Proposed work Estimated cost in lakh<br />

rupees<br />

Daspalla Pokharigochha<br />

afforestration on both sides of<br />

road from bebari to 2<br />

Dasapalla Dihagaon Tree plantation (Bagayat) 1<br />

Dasapalla Jagadeipur Tree plantation 5<br />

Dasapalla Kunjabanagarh Protection and creation of jungle 100<br />

Bhapur Fategarh Tree plantation 50<br />

Bhapur Bhagabanpur Tree plantation 10<br />

Bhapur Badasahara Tree plantation 25<br />

Bhapur Dhanachangada Tree plantation 30<br />

Bhapur Salapada Tree plantation 10<br />

Bhapur Balgunia Tree plantation 5<br />

Bhapur Bijipur Tree plantation 10.00<br />

Bhapur Golapokhari<br />

Tree plantation in<br />

Nilakanthaprasad ghasimundia<br />

Ranpur Mayurjhalia Tree plantation for protection of<br />

land and jungle<br />

5.00<br />

30<br />

Ranpur Surkabadi Tree plantation 50<br />

Ranpur Lodhachua Tree plantation 10<br />

Ranpur Kasanda Tree plantation 25<br />

Gania Adakata<br />

forest environment & tree<br />

plantation 4<br />

Odagaon Kural Afforestation 10<br />

Odagaon Panderipada Plantation in Govt land 10<br />

Odagaon Panderipada Plantation of Trees in Panchayat<br />

Area<br />

5<br />

Odagaon Komanda Afforestation 10<br />

Odanga Korapitha Plantation for polution control 30<br />

Odagaon Banapur Afforestation 10<br />

Odagaon Goudaput Tree plantation 0.10<br />

Odagaon Nandighore Tree plantation 5.00<br />

<strong>Nayagarh</strong> Nadiali Tree plantation 5.00<br />

Total 457.1<br />

258


Electricity<br />

Block GP Proposed work Estimated<br />

cost in lakh<br />

rupees<br />

Dasapalla Dihagaon Electrification 4<br />

Dasapalla Kalasa Electrification to every village of Gram<br />

100<br />

Khaman Panchayat<br />

Dasapalla Kulurukumpa Electric sub-station at Guraha 5<br />

Dasapalla Nuagaon Electrification to every village of Gram<br />

Panchayat<br />

100<br />

Ranpur Brundabanapur Electrification 50<br />

Ranpur Talakani Electrification to Radhamohanpur village 10<br />

Ranpur Khatia Street light to village 0.30<br />

Gania Badasilia electricity supply 50<br />

Odagaon Panderipada Electrification in G.P 30<br />

Odagaon Ranganipatana Street Light In Ranganipatana Road 10<br />

Odagaon Odagaon Street lights 10<br />

Odagaon Magarbandha Street lights 30<br />

Odagaon Komanda Lights in<br />

Machapada,Raghunathpur,Podagada&Kumbharia<br />

6<br />

Odagaon Rabigadia Street light 75<br />

Odagaon Korapitha Street light<br />

From Haripur village to G.P office: Electric<br />

5<br />

Nuagaon Haripur connection 1.5<br />

Total 486.8<br />

Buildings<br />

Block GP Proposed work Estimated<br />

cost in lakh<br />

rupees<br />

<strong>Nayagarh</strong> Itamati Market complex of 100 rooms 40<br />

<strong>Nayagarh</strong> Itamati Kalyan mandap 20<br />

<strong>Nayagarh</strong> Notara Market complex 5<br />

<strong>Nayagarh</strong> Kridaspur Market Complex 5<br />

<strong>Nayagarh</strong> Lenkudipada Market complex 10<br />

<strong>Nayagarh</strong> Baunsiapada Market Complex 10<br />

Daspalla Similisahi gate construction at Similisahi block 5<br />

Daspalla Similisahi GP house construction 5<br />

Dasapalla Ghugudipada Construction of guest house 50<br />

Dasapalla Khamar Sahi Construction of GP office at Khamar<br />

sahi<br />

15<br />

Dasapalla Kunjabanagarh Construction of Kalyani Mandap 5<br />

259


Dasapalla Kunjabanagarh Construction of Indira Awas Yojana<br />

house<br />

35<br />

Daspalla Pokharigochha GP house construction<br />

Radhagovindjiu club house<br />

10<br />

Daspalla Similisahi<br />

construction 5<br />

Bhapur Bhagabanpur GP meeting hall 5<br />

Bhapur Baunsabati GP Office 5<br />

Bhapur Nimani GP Office 5<br />

Bhapur Balgunia College Chhak market complex 10<br />

Bhapur Bijipur Flood shelter<br />

Construction of house and boundary<br />

8.00<br />

Bhapur Golapokhari wall in Golapokhari GP 10.00<br />

Ranpur Mayurjhalia Construction of Revenue office 15<br />

Ranpur Brundabanapur Construction of GP office 12<br />

Ranpur Brundabanapur Construction of building in GP 30<br />

Ranpur Ranpur Garh Construction of market complex 7<br />

Ranpur Pimpal Construction of Pimpal GP office 10<br />

Ranpur Pimpal Construction of Kankia Nuasahi<br />

building<br />

3<br />

Ranpur Pimpal Construction of Kendupalli village<br />

building<br />

3<br />

Ranpur Lodhachua Vocational training centre and<br />

market complex at GP office<br />

15<br />

Ranpur Raipada Revenue Inspectors Office 3.00<br />

Ranpur Raipada GP building 3.50<br />

Ranpur Majhiakhanda Community Hall 3.00<br />

Ranpur Raj Jhankia Construction of market complex<br />

Construction of Market complex (20<br />

6.00<br />

Ranpur Kerandatanga<br />

shops)<br />

construction of guest house,mandap<br />

8.00<br />

Gania Adakata<br />

& temple 5<br />

Gania<br />

construction of guest house& Kalyan<br />

Gania<br />

mandap 100<br />

Gania Gania club/cultural hall and theater 300<br />

Gania<br />

construction of guest house&<br />

Belapada patana<br />

Kalyani mandap 100<br />

Odagaon Kural Construction of market complex 15<br />

Odagaon Kural Market complex 20<br />

Odagaon Kural Kalyan Mandap 10<br />

Odagaon Kural Constrution of police Quarter 10<br />

Odagaon Kural Constrution of G.P Rooms 10<br />

Odagaon Panderipada Panchayat Building 5<br />

Odagaon Sunamuhin G.P Office Building & lawn 25<br />

Odagaon Sunamuhin Gramasebak House Construction 2<br />

Odagaon Sunamuhin RestShed Construction 2<br />

Odagaon Odagaon Construction & Development in G.P<br />

Office<br />

10<br />

Odagaon Odagaon Kalyan Mandap 30<br />

Odagaon Odagaon Market Complex 30<br />

260


Odagaon Rohibanka Constructionof Gate & Market<br />

Complex & G.P Building<br />

10<br />

Odagaon Rohibanka Construction of Communitte Centre<br />

Building<br />

20<br />

Odagaon Rohibanka Kalyan Mandap building<br />

Construction<br />

15<br />

Odagaon Komanda Construction of G.P Building 5<br />

Odagaon Komanda Kalyanmandap 5<br />

Odagaon Komanda IAY House Building 5<br />

Odagaon Komanda Kalyanmandap & Auditorium 40<br />

Odagaon Saradha pur G.P Building 5<br />

Odagaon Saradha pur VLW Quarter Construction 7<br />

Odagaon Rabigadia GP house 50<br />

Odagaon Korapitha G.P office staff quarter 10<br />

Odagaon Korapitha Market complex 10<br />

Odagaon Korapitha Meeting hall in all village 10<br />

Odagaon Korapitha G.P. house construction 10<br />

Odagaon Hariharpur GP Office building construction 5<br />

Odagaon Hariharpur VLW Quarter 8<br />

Odagaon Hariharpur LI quarter 7<br />

Odagaon Banapur Panchayat building 3<br />

Khandapada Ranichheli Cyclone shelter 10<br />

Khandapada Kumbharapada IAY 35<br />

Khandapada Gadiasahi Construction of panchayat house 5<br />

Nuagaon Korada Own pacca building of G.P office 5<br />

Nuagaon Sikrida<br />

Construction of own pacca building<br />

of G.P<br />

Construction of pucca building of<br />

2<br />

Nuagaon Jakeda<br />

G.P office 5<br />

Nuagaon Badagotha G.P Office<br />

Construction own building of G.P<br />

5<br />

Nuagaon Kurasa<br />

Office<br />

Boundary wall & meeting hall<br />

5<br />

Nuagaon Khandugaon<br />

construction of G.P 5<br />

Nuagaon Gateri Construction of G.P building<br />

Construction of own pacca building<br />

5<br />

Nuagaon Nuagoan<br />

of G.P office<br />

Construction of own pacca building<br />

5<br />

Nuagaon Beruanbari<br />

of G.P office 5<br />

Nuagaon Chahali Own building of G.P 5<br />

Nuagaon Badagotha G.P office 5<br />

Nuagaon Khandugaon G.Ps meeting room boundary 5<br />

Odagaon Goudaput GP office building construction 8.00<br />

Odagaon Badagorada GP office construction 5.00<br />

Odagaon Badagorada Badagorada community centre 3.00<br />

261


Odagaon Badagorada Sanagorada community centre 3.00<br />

Odagaon Badagorada Patulisahi community centre 3.00<br />

Odagaon Badagorada Market complex near Parikhya pond 5.00<br />

Odagaon Solapata Gunasathala Centre Solapata 5.00<br />

Total 1419.5<br />

Others<br />

Block GP Proposed work Estimated<br />

cost in<br />

lakh<br />

rupees<br />

<strong>Nayagarh</strong> Itamati Establishment of industry & computer training<br />

centre<br />

50<br />

<strong>Nayagarh</strong> Itamati Entertainment park & play ground 10<br />

Dasapalla Gholahandi Renovation of drain near Nuasahi 3<br />

Dasapalla Ghugudipada Construction of mini stadium in Makarprasad<br />

Saradhapur<br />

Dasapalla Ghugudipada Formation of Nursery 30<br />

Dasapalla Kulurukumpa Basusahi Ambili Amba Surplus 3<br />

Dasapalla Kulurukumpa Durgaprasad domuhani surplus 3<br />

Dasapalla Kulurukumpa Baijhari W.H.S 10<br />

Dasapalla Kunjabanagarh Construction of mini stadium 20<br />

Bhapur Karabar Cold storage 25<br />

Bhapur Karabar Crematorium 25<br />

Bhapur Chakradhar<br />

Prasad<br />

Play ground 10<br />

Bhapur Dhanachangada Kamei Malbandh 100<br />

Bhapur Balgunia Construction of Rama Charita Manas Gruha and<br />

cementing work of temple boundary<br />

6<br />

Bhapur Balgunia Construction of Hunuman temple 5<br />

Bhapur Balgunia Construction of Telisahi Om Shanti temple 3<br />

15<br />

262


Construction of new temple<br />

Bhapur Sasan<br />

8.00<br />

Construction of play ground at Madhapur<br />

Bhapur Patharchakada<br />

20.00<br />

Bhapur Golapokhari<br />

Construction of Water Reservoir In Nilakantha<br />

prasad village 15.00<br />

Ranpur Champapedi Krushak Bazar 5<br />

Ranpur Champapedi Loan to SHGs 15<br />

Ranpur Mayurjhalia Construction of Yubak Sangha office 30<br />

Ranpur Mayurjhalia Construction of temple and community house 30<br />

Ranpur Balabhadrapur Krushak Bazar 10<br />

Ranpur Balabhadrapur Loan to SHGs 10<br />

Ranpur Darpanarayanpur Krushak Bazar 20<br />

Ranpur Darpanarayanpur Loan to SHGs 20<br />

Ranpur Lodhachua Post office 1<br />

Ranpur Talakani Post office 1<br />

Ranpur Kulasar Play ground 5<br />

Ranpur Kulasar 2 nos. Smasan at Kulasar 3<br />

Stockman centre<br />

Ranpur Raipada<br />

3.00<br />

Ranpur Brajarajpur Self help groups 20.00<br />

Ranpur Baunsagarh Self help groups loan 25.00<br />

Gania Belapada patana development of tourist place bholeswara<br />

Development of goddess place, Dasipur; and<br />

50<br />

Gania Belapada patana development of Katachandi tourist place 20<br />

Gania Adakata Developmental work(house, well, and plantation) 4.5<br />

Gania Adakata play ground 2<br />

Odagaon Kural Kural Bus Stand Shed 15<br />

Odagaon Kural Constrution of Library Room 5<br />

Odagaon Panderipada Construction of Boundary in Valiadiha Temple 20<br />

Odagaon Panderipada Construction of all boundary in Pandery pada<br />

Temple<br />

20<br />

Odagaon Panderipada Construction of Deogaon Boundary 20<br />

Odagaon Panderipada Construction of crematorium in<br />

Deongaon,Valiadiha,Panderipada,Madanpur<br />

6<br />

Odagaon Panderipada Construction of Building in Panderipada<br />

,Madanpur Valiadiha,Deongaon<br />

10<br />

Odagaon Panderipada Built a Temple in Deongaon 5<br />

Odagaon Panderipada Construction of Bus stand in Valiadiha,<br />

Deogaon,Madanpur,Panderipada<br />

7<br />

Odagaon Panderipada Construction of Playground in every Village 20<br />

Odagaon Panderipada Fire Station 10<br />

Odagaon Panderipada Police outpost 10<br />

Odagaon Panderipada Construction of Park & Boundary in Panchayat 5<br />

263


Odagaon Panderipada Toilet & Electrification in Panchayat 3<br />

Odagaon Panderipada Provide Pension To Old,Widow,artisans 3<br />

Odagaon Angisingi New Park In Angisingi 10<br />

Odagaon Angisingi Playground In Angisingi 10<br />

Odagaon Angisingi Dhusuma Playground 10<br />

Odagaon Angisingi Park in Gujabaran 10<br />

Odagaon Angisingi Satsanga Prayer house in Angisingi 10<br />

Odagaon Angisingi Prayer house in Dhusuma 10<br />

Odagaon Angisingi Prayer house in Gujabaran 15<br />

Odagaon Ranganipatana Library 5<br />

Odagaon Ranganipatana Playground 5<br />

Odagaon Ranganipatana Cold Store 10<br />

Odagaon Ranganipatana Library 5<br />

Odagaon Odagaon Market for Farmer & Construction of Bus Stand 30<br />

Odagaon Odagaon Digging of Bank Embankment, construction of 20<br />

steps, and Plantation of trees in bank of Pond<br />

Odagaon Odagaon Construction of Mini Stadium At Odagaon 30<br />

Odagaon Rohibanka Construction of Smasanghat Restshed 20<br />

Odagaon Komanda Women's Samiti Building 5<br />

Odagaon Komanda Revenue Office 5<br />

Odagaon Komanda Smashan ghat 10<br />

Odagaon Komanda Construction of Youbak Sangha Building 15<br />

Odanga Rabigadia Koiliki crematorium 7<br />

Odanga Rabigadia Kaithapali crematorium 2<br />

Odanga Rabigadia Jamupatana crematorium 2<br />

Odanga Rabigadia Madanamohanpur crematorium 2<br />

Odanga Rabigadia Rabigadia crematorium 2<br />

Odanga Rabigadia Balachandrapur crematorium 2<br />

Odanga Rabigadia library- 3 30<br />

Odanga Rabigadia Patharabandh 10<br />

Odanga Rabigadia Playground 50<br />

Odanga Korapitha Crematorium in every village 10<br />

Odanga Korapitha Playground at Korapitha 10<br />

Odanga Korapitha Korapitha , stone packing in Kusumi river 10<br />

Odanga Korapitha Guard wall in Korapitha nal 10<br />

264


Odanga Hariharpur river side stone packing, karada 20<br />

Odanga Hariharpur Hariharpur patnasahi river side stone packing 15<br />

Odagaon Sikharpur<br />

Construction of building, road, smasan ghat from<br />

Sikharpur Janguasahi 10<br />

Khandapada Singhapada Sambarabandha 10<br />

Khandapada Banamalipur Cottage industry<br />

Business- Construction of cold store & market<br />

100<br />

Khandapada Banamalipur<br />

complex 100<br />

Khandapada Gadiasahi Revenue village name given to Pada village<br />

Nuagaon Kurasa WHS renovation work of Khandasalia 10<br />

Nuagaon Khandugaon Construction 3nos of Temple 6<br />

Nuagaon Khandugaon Construction of Kitchen Room 2<br />

Nuagaon Jakeda Renovation of Similisahi Baghamara W.H.S 15<br />

Nuagaon Jakeda Badibarisinga Khola W.H.S 10<br />

Nuagaon Jakeda Kushabida Pada Gandia W.H.S 10<br />

Nuagaon Jakeda Business centre 10<br />

Nuagaon Mahipur Dahuka river bank 10<br />

Nuagaon Sikrida Khalataila W.H.S 10<br />

Nuagaon Sikrida Barapakhamani W.H.S 10<br />

Nuagaon Sikrida Krushnaprasad W.H.S 15<br />

Nuagaon Sikrida Lunisara W.H.S 15<br />

Nuagaon Sikrida Sorada W.H.S 15<br />

Nuagaon Sikrida Jagannathprasad W.H.S 10<br />

Nuagaon Sikrida Sikrida W.H.S 10<br />

Nuagaon Korada Renovation of Khandanalia WHS 10<br />

Nuagaon Khandugaon 3nos Prayer house 6<br />

Nuagaon Khandugaon Kitchen room 2<br />

Gania Rasanga<br />

From Kendurpur to Malatiput Mahanadi<br />

Manabandha construction 1,600.00<br />

Odagaon Badagorada Badagorada play ground 3.00<br />

Odagaon Badagorada Patulisahi play ground 3.00<br />

Odagaon P.Manpur Manpur River embakment 100.00<br />

Daspalla Tendabadi tendabadi,lahagada WHS 5<br />

Daspalla Tendabadi ganderi,tavaghati WHS 5<br />

Daspalla Tendabadi lembugochha,mugara WHS 5<br />

Daspalla Pokharigochha culvert construction at bhegabadi kidhilaari 5<br />

Daspalla Pokharigochha bhegabadi,bebeari culvert construction 10<br />

Daspalla Pokharigochha culvert construction from gramashree to RD road 10<br />

Daspalla Pokharigochha bebari,pankua,RD road culvert construction 3<br />

Daspalla Pokharigochha sundaradaela culvert construction 3<br />

Daspalla Pokharigochha pipalapadara culvert construction 5<br />

Daspalla Pokharigochha putubari culvert construction 5<br />

Total 3369.5<br />

265


Annexure-13<br />

Vision & strategy for agriculture & allied sector in <strong>Nayagarh</strong> district<br />

The total area of the district is 2.5% of state area and 2.29% of state’s net sown area. Cropping<br />

intensity of the district is 173% against the state’s cropping intensity of 158%.Thus agricultural<br />

development holds the key for all-out development of the district. The cultivated area of the district<br />

is about 34% of the geographical area. Kharif paddy is cultivated in about 102 000 ha and<br />

remaining 32, 000 ha is covered by non-paddy crops. Erratic rainfall, decreased soil fertility, hilly<br />

terrains, uneven and inadequate irrigation development , weather aberrations , poor socioeconomic<br />

condition of the farmers are some of the factors leading to unsustainable agricultural<br />

growth in the district. This has been further accentuated by the problems of animal menace, transfer<br />

of agricultural land for non-agricultural purpose, inadequate market infrastructure, low input use<br />

and poor extension and research services in the district with low capital investment in agriculture<br />

and allied sector. Unabated soil erosion, natural calamities and climatic change are posing serious<br />

threat to sustainable agriculture in the district .There has been wide gap between the achieved<br />

productivity and achievable productivity due to reasons like moisture stress at critical stages of crop<br />

(s) , soil acidity, iron toxicity, low Seed Replacement Rate (SRR), poor infrastructure, poor postharvest<br />

management and low adoption of both material and crop production technologies.<br />

With the projected population of 10.409(8.94 lakh adult equivalent) lakh by 2020 the district would<br />

require 2.03 lakh tons of food grains, 0.46 lakh tons of oil seeds, 0.69 lakh tons of milk, 0.<strong>11</strong> lakh<br />

tons of meat and fish,0.27 lakh tons of potato. 0.12 lakh tons of sugar and 0.13 lakh tons of fruits .<br />

Since the current level of production of food grains in the district is 1.81 lakh tons and that of oil<br />

seeds is 0.03 lakh tons (Orissa Agriculture Statistics 2006-07), there is a need to enhance the<br />

production in such crops by 12% and 15 times respectively by the end of 2020. With limited scope<br />

for horizontal expansion of cropped area, the enhanced production is likely to come from higher<br />

level of crop productivity. Similarly there is a need for substantial increase in production of milk,<br />

fish, egg and meat during the period to meet the demand of the growing population. A major<br />

revival package is essential for the growth and development of the agricultural sector linked to<br />

higher investment and strategies to make the agriculture attractive and profitable. Differential<br />

strategies across the gram Panchayats in combination with technology, low cost credit, marketing,<br />

infrastructure development, risk management and institutional support would be required to<br />

revitalise the agricultural economy of the district<br />

Vision & Mission:<br />

A vibrant, competitive, technology-based, sustainable, stable and equitable agricultural economy at:<br />

• A growth rate of 4% per annum through higher production, productivity and increased<br />

cropping intensity,<br />

• Doubling the production and income of farmers and farm labourers in next 10 years,<br />

• Ensuring household food security,<br />

• Conservation of natural resources like soil, water, vegetation and bio-diversity for<br />

sustainable agriculture production,<br />

• Encouragement of value addition and agro-processing<br />

• Expansion of vegetable and fruit cultivation, and<br />

• Enhancing fish, meat, egg and milk production to meet the demand of consumers.<br />

266


Reasons for backwardness & issues impending growth<br />

• Low crop productivity due low SRR, low fertiliser consumption, gap in technology adoption,<br />

moisture stress, handicapped ecology, non-availability of key inputs and failure of extension<br />

service to enhance decision making power of the farmers.<br />

• Low farm income due to constraints in agricultural marketing, storage, value addition, agroprocessing<br />

and poor infrastructure development.<br />

• Low investment in agriculture and allied sector, both in public and private sector.<br />

• Slow pace of land reform and inappropriate land tenure.<br />

• Pollution of environment due to impact of industries and mining.<br />

• Slow pace of irrigation development and low water use inefficiency.<br />

• Low level of literacy and poor socio-economic condition of people as reflected in more<br />

number of families below poverty line.<br />

• Degradation of natural resources like land water, vegetation and bio-diversity affecting<br />

growth of agriculture and allied sectors.<br />

• Degradation of grazing land and unavailability of green fodder for livestock promotion<br />

• Indigenous breeds of farm animals with low yielding capacity.<br />

• Low productivity of fish in water bodies due to unscientific farming, non-availability of<br />

quality fingerlings. And contamination of river water.<br />

Broad Vision<br />

Agriculture<br />

The crisis of stagnation in agriculture needs urgent attention. This sector still provides livelihood to<br />

nearly two thirds of our people and remains vital for food security. To ensure a better life for<br />

women and men engaged in agriculture, it is necessary to double the growth rate achieved in 10th<br />

Plan and put agriculture on a growth path of around 4 per cent. As pointed out by the National<br />

Commission on Farmers, we need a new deal that rebuilds hope about farming.<br />

The vision statements for the district are:<br />

Enhancing Yield of Major Commodities<br />

Integrated nutrient management<br />

Arresting deceleration in total factor productivity<br />

Bridging Yield Gaps<br />

Water for Sustainable Food Security<br />

Emphasis on Rainfed Ecosystem<br />

Diversification of Agriculture and Value Addition<br />

Post-Harvest Management, Value Addition and Cost-Effectiveness<br />

Increased Investment in Agriculture and Infrastructures<br />

Empowering the Small Farmers<br />

Disaster Management<br />

The monitorable indicators would be as follows:<br />

i. Provision of certified seeds for seed replacement at least with 15 per cent by end of <strong>11</strong>th<br />

Plan and to 25 per cent with 2020.<br />

ii. Doubling the production of food-grains by 2020<br />

267


iii. Enhance use of chemical fertilizer to an average of 70 kg per hectare by end of <strong>11</strong>th<br />

Plan and to 100 kg by 2020.<br />

iv. Replacement of upland paddy by pulses and oilseeds under crop diversification<br />

v. Enhancing cropping intensity from 173% to 190%<br />

vi. Increasing the productivity of pulse and oilseed crops to national level<br />

vii. Stabilising sugarcane production to meet the demand of sugar factory<br />

viii. Establishment of one Agro-service centre in every GP<br />

ix. Establishment of market yard / market place at every GP level.<br />

x. Demonstration of System of Rice Intensification (SRI) in all GPs and establishment of<br />

SRI villages in every GP.<br />

xi. Increasing capital investment in agriculture<br />

xii. Upscaling productivity of dryland crops by watershed development approach<br />

xiii. PPP in agricultural extension and technology transfer<br />

Horticulture<br />

In the area of horticulture, a major beginning has been made with the NHM. The most important<br />

constraints to establish the required linkages are in the area of agricultural marketing and<br />

processing. Since high-value agriculture is based on perishable commodities, large investments are<br />

required in modern methods of grading, post-harvest management (PHM), and development of cold<br />

chains. Such investment in turn requires that new players, including large corporate players, be able<br />

to enter existing markets and set up new marketing channels. The NHM therefore incentivizes the<br />

ongoing marketing reforms based on amending existing Agricultural Product Marketing Committee<br />

(APMC) Acts to allow this. This process has started with amendment of APMC Act.<br />

Keeping the above objective in view the vision seeks to:<br />

1 Substantial increase in fruit and vegetable area in the district<br />

2 Introduction of floriculture around urban areas<br />

3 Growing fruits and vegetables including spices organically.<br />

4 Establishment of one cold store at Block headquarters<br />

5 Establishment of nurseries at block head quarters to be self sufficient in supply of planting<br />

materials<br />

Animal Husbandry & Dairying<br />

The livestock and fisheries sectors together account for about 30% of the value of the output of<br />

Agriculture & Allied Sector and provide full time or part time employment to 5.5% of the total<br />

working population, the majority of who are women. Yet the per capita availability of milk and<br />

animal products are much lower than the quantity recommended by ICMR.<br />

Some of the important initiatives that are needed are:<br />

(i) Promotion of appropriate crossbreeds while conserving indigenous breeds of livestock.<br />

(ii) Establishment of livestock marketing system.<br />

(iii) Promotion of rural backyard poultry.<br />

(iv) Promotion of dairy.<br />

268


(v) Enhancing livestock extension services.<br />

(vi) Provision of an insurance package to avoid distress and mortality.<br />

(vii) Access to financial resources enables the poor to exploit investment opportunities<br />

The vision would seek to:<br />

1 To increase milk production for per capita availability of at least 200 ml/day<br />

2 To increase production of eggs to make per capita availability of at least 100 eggs/year<br />

3 To increase production of meat to make per capita availability of at least 5 kg/year<br />

4 Promote fodder cultivation in the district in irrigated areas for dairy development.<br />

Fisheries<br />

The major objectives of the Vision for fisheries management and development in the district for the<br />

next 15 years are:<br />

1 To promote the sustainable development of inland and capture fishery and increase<br />

production by five fold<br />

2 To enhance the contribution of the fisheries sector to food and livelihood security of the<br />

people of the district.<br />

3 To promote a balanced approach to fisheries management based on sound ecological,<br />

economic and precautionary principles to ensure that fish populations remain viable,<br />

productive and accessible to future generations.<br />

4 To promote public – private partnership in developing, managing, conserving and sharing<br />

the fishery resources for the benefit of our society.<br />

5 To create a human resource base for fisheries development and management, through<br />

capacity building.<br />

6 Renovation of all GP tanks, construction of 400 farm ponds and 16 Mahabandhas for<br />

pisciculture<br />

7 To double the productivity of fish<br />

8 Introduction of new breed of fish species like Puntius spp, Labeo gonionotus, GIFT in the<br />

district<br />

Forestry<br />

Forests are home to flora and fauna, build soil, regulate water flows, provide quality water as well<br />

as small wood, timber and Non-timber Forest Products (NTFP). They provide inputs to the<br />

agricultural economy, income to the impoverished and subsistence livelihood to all. Forests are<br />

managed under a range of participatory options Joint Forest Management (JFM)), for local use, sale<br />

of surplus and commercial use. The vision for forest development is:<br />

1 More Trees Outside Forests<br />

2 Sustainable Forest Management<br />

3 Forest Based Subsistence Use & Livelihoods<br />

4 Value Addition to forest produce & Forest Based Enterprises<br />

5 Biodiversity conservation<br />

6 Conservation outside Protected Areas<br />

7 Participatory Forestry<br />

8 Linkage with Self Help Groups (SHG)<br />

269


Preservation of Wildlife and Bio-diversity<br />

Increasing the Green Cover<br />

Timber and non-timber benefits must be optimised with adequate investment for regeneration. Joint<br />

Forest Management (JFM) evolved in 1990s aimed at involving communities in improving<br />

degraded forests. This was largely based on benefit sharing. It failed where the forests managed by<br />

the communities were so degraded that no significant benefits accrued to the communities.<br />

i. In the forestry sector the present area under forest account for about 21 per cent of the total<br />

land. The effort would be to increase the total forest area including village forest and the<br />

plantation in degraded land to 25 per cent of the total area of the district.<br />

ii. Special emphasis would be given to propagation, conservation and planting of medical<br />

plants in forest areas covering around 2000 hectares.<br />

Plantation<br />

There is potential for plantation of cashew, jatropha and forest species in the district. The vision<br />

would seek to:<br />

1 Take up plantation on a priority basis through national afforestation programme as well as<br />

other programmes including NREGA .<br />

2 Encourage plantation of medicinal plants and herbal gardens in every GP.<br />

The broad strategies for the <strong>11</strong> th Plan in different sectors would be as follows:<br />

Sub-sector Broad strategies<br />

Agriculture Technology transfer<br />

Irrigation development and water management<br />

Natural Resource Management and Watershed Development<br />

Strengthening input and support services<br />

Food security<br />

Diversification<br />

Risk management<br />

Marketing<br />

Livestock<br />

promotion<br />

Equity<br />

Adequate animal health services for effective disease control<br />

Breed upgradation through AI<br />

Fodder development<br />

Strengthening input and support services<br />

Equity<br />

Technology transfer<br />

Fishery Seed production and rearing<br />

Infrastructure development<br />

Technology transfer<br />

Strengthening input and support services<br />

Forestry Joint Forest Management<br />

Afforestation<br />

270


Promotion of agro-forestry<br />

Strengthening forest management<br />

Eco-tourism<br />

Private forest initiatives<br />

Preservation of wild life and forest diversity<br />

Annexure-14<br />

Development of Pulse crops and Sugarcane in <strong>Nayagarh</strong> District<br />

Pulse crops such as moong, black gram, arhar, khesari and cow pea are important in the economy<br />

of the district. <strong>Nayagarh</strong> pulses had a reputation for their taste and consumers’ preference. Since<br />

pulse is a triple beneficiary crop having soil enriching capacity, high protein content and adaptation<br />

to drought situations and multiple cropping system. But gradually with the passage of time the crop<br />

has been neglected by the farmers. The bio-physical constraints are also responsible for the poor<br />

yield of the crop. Some of the technological constraints for lower yield of the crop are lack of<br />

suitable variety, soil depletion in phosphorous nutrient and other micro-nutrients, environmental<br />

impact on beneficial soil organisms responsible for biological nitrogen fixation, biotic and abiotic<br />

stress etc. There has been fluctuation in area, productivity and production of pulse crops in the<br />

district as indicated in Table.1. With proper crop planning and incentives to the farmers along with<br />

appropriate technology the production of pulse crops in the district can be 50,000 tons from<br />

1,00,000 ha with a minimum productivity level of 500 kg/ha. The strategy could be expansion of<br />

area under bund plantation., crop substitution, pulses under irrigated situation, and increasing crop<br />

productivity by providing irrigation and sowing the crop early, using a better variety with short<br />

duration, inoculation with bacterial culture, phosphorus manuring, line showing, pest management<br />

and improved post-harvesting technologies.<br />

Sugarcane is a cash crop which is grown by the farmers of the district. Some of the farmers also<br />

grow sugarcane under leased terms. The yield level of the crop is also appreciable and in earlier<br />

occasions the farmers of the district have been awarded with National Prize for the best yield in the<br />

region. The district has a sugar factory and a research station to support the crop along with office<br />

of the Project Officer, Sugarcane. It is now seen that the area and production of cane has been on<br />

the decline (Table 1.) The existing sugar factory at <strong>Nayagarh</strong> is not performing well and the<br />

Khandasari factory at Khandapada has been closed. Inappropriate minimum support price, lack of<br />

crop insurance, delay in issuing cutting order and lifting cane to the factory and releasing late<br />

payment are some of the major constraints for low production. Want of quality planting materials,<br />

natural calamities and high cost of inputs are some of the major constraints leading tom poor<br />

performance of the crop. The area under sugarcane can go up to 10,000 ha with production of 8<br />

lakh tons with proper crop planning, government initiatives under sugarcane development of Work<br />

Plan, farmers’ participation and support from Sugar factory. Besides, sugarcane based industries<br />

could be installed in the district. The strategy for boosting crop yield could be planting a high<br />

yielding variety with multiple resistance against drought, flood and pest attack, integrated nutrient<br />

management, integrated pest management, planting in trenches and pits, timely irrigation and<br />

timely harvest.<br />

271


Table 1. Area under sugarcane and pulses in ha<br />

<strong>Year</strong><br />

sugarcane Pulses<br />

Area Yield Produc Area in Yield Produc<br />

in in tion in ‘000 ha in q/ha tion in<br />

‘000 q/ha ‘000<br />

‘000<br />

ha<br />

ton<br />

ton<br />

1995-96 5.87 81700 479.60 84.29 594 35.58<br />

1996-97 4.57 80000 365.60 39.87 436 17.40<br />

1997-98 5.21 80000 416.80 75.37 437 32.97<br />

1998-99 5.22 75530 394.27 70.00 438 30.65<br />

1999-00 3.00 75730 227.19 73.49 431 31.70<br />

2000-01 5.22 76070 397.09 51.40 263 13.53<br />

2001-02<br />

2002-03 (severe drought)<br />

1.99 76000 151.24 80.47 322 25.95<br />

2003-04 3.01 68590 206.46 80.98 288 23.30<br />

2004-05 4.44 62124 276.26 57.44 256 14.70<br />

2005-06 5.16 64230 331.43 81.40 284 23.09<br />

2006-07 5.51 64235 353.93 77.66 300 23.29<br />

Source : Orissa Agricultural Statistics, DA &FP, Orissa<br />

Nuagaon Block<br />

Abhayapur<br />

Deuli<br />

Dhulipaunshia<br />

Gochhabari<br />

Golagola<br />

Jhaulakati<br />

Kirialanji<br />

Kukudakhai<br />

Maduabandha<br />

Malisara<br />

Pipeijhara<br />

Paradhipi-Jharinala<br />

Dhipisahi<br />

Patkanala<br />

Biruda<br />

Haridandha<br />

Gania Block<br />

Dankarisahi<br />

Kusumakhola<br />

Bhalukuda<br />

Nadikhola<br />

Daspalla Block<br />

Bhimara<br />

Annexure-15<br />

Projects proposed under OCTMP<br />

Golahandi<br />

Kauda<br />

Balichhatra<br />

Mahanti palli<br />

Patharapunji<br />

Kunjamendhei<br />

Puruna Daspalla<br />

Saliagochha<br />

Surenigart<br />

Sirisira<br />

Takera<br />

272


Annexure-16<br />

GENDER SUB-PLAN<br />

NABARD observes that whereas the 2001 census indicates that women constitute 48 % of the total<br />

population in the district, they share a negligible benefit of various schemes implemented by the<br />

govt. This section of the population is also deprived of the full benefit of the credit due lack of<br />

enterpreneureship, literacy 10 , lack of knowledge and exposure, male dominance and several other<br />

social problems. However, a silver lining now-a-days seen in the entire society is that the women<br />

havee come out of the shell to form Self Helf Groups on a massive scale. The district has more than<br />

6000 SHGs and most of these groups are women SHGs. In recent years emphasis has been giving<br />

on financing SHGs under SGSY and other Govt. sponsored Programmes.<br />

Gender budgeting and gender subplan are the concepts which focus on specific developmental<br />

plans and activities for the development of women. NRHM has specific programmes for this<br />

purpose like Janani Suraksya Yojana and Maternal Health. The District Social Welfare Department<br />

also has various programmes under Mission Shakti and ICDS, etc.. The District Welfare<br />

Department provides financial and other kinds of support for the education of girls of SC and ST<br />

communities. In MADA areas, women’s SHGs receive special financial support through this<br />

Department. Even the SJSRY programme implemented in urban areas provide support to women.<br />

DRDA provides Indira Awas house to deserving widows. The Sports Department promotes<br />

women’s sports activities, and most of the pluckers working for the Kendu Leaf wing of Forest<br />

Department are women who deserve specific welfare activities like cretch for their children.<br />

NABARD is conducting gender sensitization programmes for women and also has assisted SHGs<br />

in getting training NGOs for self employment. The women SHGs were imparted training on<br />

pisiculture,diary, agarbatti,wax candle,coir,mushroom tc.For taking up income generating activities.<br />

These women-centric developmental activities are now being reflected in what is known as the WC<br />

(women component) of the budget.<br />

During 2009-10, the TSI has received only one such plan in the <strong>Nayagarh</strong> district and that is from<br />

the Animal Resource Development Department, as reproduced below:<br />

10 Female literacy rate in the district: 57.64%(total); 41.96%(SC), and 28.83%(ST).<br />

273


DRAFT ANNUAL PLAN 2009-10 & <strong>2010</strong>-<strong>11</strong>: FINANCIAL OUTLAYS: PROPOSAL FOR Women Component ( In lakh Rs)<br />

Major Head/Sub Eleventh Plan Actual flow Actual flow Annual plan 2009-10 Annual Plan <strong>2010</strong>-<strong>11</strong><br />

head<br />

Total Flow to WC to WC during to WC during Total Flow to WC Total Flow to WC<br />

/scheme<br />

2007-08 2008-09<br />

ARD 8.37 0.40 0.19 2.02 0.59 2.02 0.59<br />

Annexure VII-B<br />

DRAFT ANNUAL PLAN 2009-10 & <strong>2010</strong>-<strong>11</strong>: Physical targets and Achievements: Proposal for Women Component<br />

Sub-sector Major head/sub Unit Eleventh Plan Annual Plan Annual Plan Annual Plan Annual Plan<br />

head/scheme<br />

Target<br />

2007-08 2008-09 2009-10 Target <strong>2010</strong>-<strong>11</strong> Target<br />

Achievement Achievement<br />

ARD No 2940 348 276 624 624<br />

274


Annexure-17<br />

BLOCK PLAN & GP PLAN<br />

In the decentralized planning process followed by the TSI during 2009-10 GP-level wish lists were<br />

generated (annexure-12). Block Plans were expected from all 8 Blocks, but none of them submitted<br />

their respective Plans/proposals. However, from DRDA, <strong>Nayagarh</strong> the Block-wise financial targets<br />

have been obtained.<br />

On the other hand, GP-level plans, because of their erroneous/ambiguous information, could not be<br />

much useful for convergence at Block level. However, the indicated budget in GP-level plans<br />

seems to include some Block-level activities.<br />

Following is a brief description of the Block-wise finacial plans for 2009-10(rupees in lakhs):<br />

Block SGSY NREGS IAY GGY<br />

tentative<br />

TFC<br />

tentative<br />

SFC MO<br />

KUDIA<br />

275<br />

MI<br />

tentative<br />

Bhapur 38.20 6.59 2<strong>11</strong>.25 50.00 76.12 3.00 15.75 10.00<br />

Dasapalla 39.70 21.86 257.95 100.00 76.12 7.00 27.65 10.00<br />

Gania 16.10 18.60 126.35 50.00 76.12 9.10 10.00<br />

Khadapada 37.60 21.97 273.35 100.00 76.12 5.00 19.95 13.00<br />

<strong>Nayagarh</strong> 44.20 12.16 280.35 100.00 76.12 20.65 10.00<br />

Nuagaon 37.30 4.63 277.90 100.00 76.12 20.65 5.00<br />

Odogaon 56.40 144.76 352.80 100.00 76.12 7.00 25.90 10.00<br />

Ranapur 58.10 38.14 345.<strong>11</strong> 100.00 76.12 25.20 20.00<br />

23.56<br />

( Forest<br />

deptt)<br />

On the other hand, categorization of GP wishlists has reflected the following financial requirement:<br />

Category Estimate in lakh rupees<br />

Road 16023.4<br />

Bridge 2167.5<br />

Irrigation 16145.4<br />

Agriculture 131<br />

Health 2081.65<br />

Education 2433.92<br />

Building 1419.5<br />

Water & sanitation 3417.515<br />

Anganwadi centre 1733.5<br />

Veterinary service 357.5<br />

Plantation 457.1<br />

Ponds 8363.3<br />

Electricity 486.8<br />

Others 3369.5<br />

Total 58587.585


The wish list indicates that the maximum financial requirement is for irrigation development<br />

followed by road development. However, roads & bridge taken together would exceed requirement<br />

for irrigation. The ‘estimated’ (?) requirement for anganwadi centres may actually be much reduced<br />

since in a number of cases the estimates seem to be exaggerated. Also, proposal for some of the<br />

anganwadi centres has already been submitted in the proposal of DSWO.<br />

Whatever the wishlist may suggest, actual acceptance of these suggestions would necessarily<br />

depend on the feasibility assessment and other parameters. However, MPLAD and MLALAD<br />

funds may be utilized for the same in suitable cases.<br />

_________<br />

Annexure-18<br />

ANNUAL CREDIT PLAN 2009-10:<br />

NAYAGRAH DISTRICT<br />

Sector ACP Projection (Rs. Lakhs)<br />

Minor irrigation 506.14<br />

Land Devlopment 195.20<br />

Farm Mechanisation 828.92<br />

Plantation & Horticulture 719.95<br />

Forestry & Wast Land Devlopment 132.80<br />

Diary 676.22<br />

Polutry 196.82<br />

Ship/Goat/Piggery 296.80<br />

Fishery 469.18<br />

Storage Godown/Market Yards 817.10<br />

Bio-Gas /Agriculture (Others) 31.64<br />

Total term loan to agriculture 4870.77<br />

Crop Loan 17900.97<br />

Total Agriculture Credit (Term Loan<br />

and Crop Loan)<br />

22770.97<br />

Non-Farm Sector 1424.50<br />

Other Priority sector 5231.84<br />

Grand Total 29427.31<br />

(Source: Lead Bank(SBI), <strong>Nayagarh</strong>: Annual Credit Plan of <strong>Nayagarh</strong> District 2009-<strong>2010</strong>)<br />

276


Annexure-19<br />

A Brief Note on the Consultation Process on CDP in <strong>Nayagarh</strong><br />

for 2009-10 and <strong>2010</strong>-<strong>11</strong><br />

1 st district-level stakeholder meeting on CDP 2009-<strong>11</strong> for <strong>Nayagarh</strong> district:<br />

The first district-level consultation meeting of stakeholders on comprehensive district planning for<br />

the year 2009-10 was organized at DRDA Conference Hall, <strong>Nayagarh</strong> on 10 th August 2009.The<br />

meeting was presided over by Sri Debendra Prasad Das, Project Director, DRDA, <strong>Nayagarh</strong>; and<br />

was attended by the members of Zilla parishad, BDOs, representatives of various departments,<br />

District Planning Officer Sri Amulya Mohanty, and Sri Bikash Rath, representative of PRIA, the<br />

Technical Support Institution for <strong>Nayagarh</strong> district. Also present was Sri Aruna Kumar Mohanty,<br />

representative of the local NGO NISWARTHA.<br />

Sri Das, the PD, DRDA welcomed the participants followed by a brief introduction to the<br />

programme by Sri Mohanty, District Planning Officer. Then Sri Bikash Rath briefed the House<br />

about various aspects and requirements of the participatory CDP process. He said that his<br />

organization is committed towards grassroots planning through participatory methodology, and that<br />

the Government of Orissa has assigned PRIA the task of preparing the CDP of <strong>Nayagarh</strong> for the<br />

years 2009-10 and <strong>2010</strong>-<strong>11</strong>. He further said that given the fact that the previous year’s exercise in<br />

the district, by Indian Institute of Forest Management, has not produced a perspective plan, we need<br />

to work out the District Plan for the years 2009-10 and <strong>2010</strong>-<strong>11</strong> on our own. However, before<br />

starting the actual planning process, we need to have a stock-taking of the previous year’s Plan, as<br />

well as to know the views of various district stakeholders on the process, he said.<br />

Various departmental representatives briefed the House about their progress during 2008-09.<br />

Responding to a query by a ZP member, the District Agriculture Officer said that though they have<br />

a Pulse specialist, the Pulse Development Centre has gradually been closed. He further said that<br />

due to undulatory terrain conditions mechanized farming is difficult in many parts of the district.<br />

The ZP members expressed their dismay over that fact that the agriculture sector has not received<br />

due attention, and that the development centre for pulse(mung dal in particular which is a famous<br />

agri-product of the district because of its taste) has been closed.The representative of DSMS said<br />

that one mung processing centre is already working in the Lodhachua area of Ranapur block and<br />

his organization would try to establish more such centres. However, there was a disagreement in<br />

the House regarding the actual existence and/or performance of this processing centre. The PD said<br />

that the district also requires a soil testing centre. The representative of Horticulture Department<br />

said that despite poor staff strength, they are trying to promote fruit crops as cash crops, and<br />

cashew, mango, & banana are their priority crops. The quality of the mango crop promoted by the<br />

Department was however questioned by the Project Director based on his own experience. Some<br />

ZP members wanted to know about the Department’s initiative for floriculture as they were not<br />

satisfied with the negligible progress in this field. The representative of Horticulture Department<br />

replied that the planting materials supplied by them for floriculture are hybrid in nature, and hence<br />

require adequate nutrition for growth. The representative of Fishery Department said that as most<br />

of the community tanks are leased out in the district, hence they do not get enough scope for<br />

fingerling production. Cold storage facility is also very inadequate in the district though <strong>Nayagarh</strong><br />

fish is in good demand in outside markets. In this context, the PD, DRDA informed the House that<br />

the Government has sanctioned two mahabandhs for each GP, and that one of these mahabandhs in<br />

the GP would be made available to the Fishery Department for fingerling production. However, the<br />

ZP members suggested for more demonstration programmes. The representative of Soil<br />

277


Conservation Department informed the House that they have good watershed development projects,<br />

but funds are lacking for the renovation and maintenance of such projects of the past. He also<br />

suggested for watershed plus activities that stress on livelihood. Some ZP members expressed their<br />

concern over the fact that some old but good projects of the district, like the Khuntubandh project,<br />

are turning useless gradually.<br />

The representative of Textiles Department reported of development interventions for the weavers.<br />

The areas of focus are weaver cluster area in Ranapur Block, and also the Bhapur and Khandapara<br />

Blocks. Given the good market demand of the gamcha produced by the Maninag Society in<br />

Ranapur Block, the House expressed an opinion that interventions to strengthen the weavers’<br />

societies would be very beneficial for them.<br />

The PD, DRDA informed the House about the proposal for 5 visible projects in each GP. There<br />

was concern expressed for the cottage leather industry of Dasapalla, and also for Tourism<br />

development. The DFO, <strong>Nayagarh</strong> Forest Division suggested that the Dasapalla area be added to<br />

the list of agarbatti promotion areas, and assured for raw material supply.<br />

There was a difference of opinion about role of goats in forest destruction. While the Forest<br />

Department is of the view that goats hinder the growth of forests by chewing the tender leaves of<br />

plants, people’s representatives argued that earlier there were large number of goats in the district<br />

but there was no significant destruction of forest by them. The representative of Veterinary<br />

Department informed about the establishment of a district diagnostic laboratory, and a district<br />

hatchery. The PD, DRDA said that livestock aid centres would be opened in 35 places.<br />

The representative of the local NGO NISWARTH suggested for specific development Plan for<br />

underdeveloped areas. He also advised for a Plan to stop migration.<br />

Bikash Rath informed the House about the formats developed by PRIA and also the booklet<br />

guiding for the planning process. He said that these would soon be provided to the concerned<br />

planning units.<br />

ULB consultation meeting on CDP:<br />

<strong>Nayagarh</strong> NAC: An ULB-consultation meeting on CDP was organized at the Council Meeting<br />

Hall of <strong>Nayagarh</strong> NAC on 20 th August’09 at <strong>11</strong>.00 a.m.. It was presided by the Chairperson Smt.<br />

Nirupama Khatei. The meeting was attended by the Executive Officer, and Councilors of the NAC.<br />

Also present were Sri Bikash Rath and his team on behalf of PRIA, the TSI for <strong>Nayagarh</strong> district.<br />

The Executive Officer gave the welcome address, and the District Planning Officer briefed the<br />

House about the objective of the meeting. This was followed by interaction of the TSI<br />

representative with the councilors. Sri Rath wanted to know the financial status of the NAC, and<br />

was told that only about 25% of the total revenue earned comes from the own source. The<br />

councilors gave various reasons which create problems to increase the revenue from own source.<br />

Like, a number of people are not giving holding tax, and lack of demarcation of the NAC area has<br />

created an opportunity for some residents to claim that they belong to the panchayat area and hence<br />

need not pay holding tax(example: Jamusahi mousa).<br />

Drainage, parking, solid waste management, and shortage of drinking water are some of the major<br />

issues here. The tender invited for construction of water supply system from Mahanadi river to<br />

<strong>Nayagarh</strong> is yet to be finalized. The expenditure on electricity is around Rs.8 lakhs/year whereas<br />

278


the income from this source(light tax) is about Rs.2 lakhs. Bikash Rath raised a concern about such<br />

huge deficits, and suggested that the Council to approach the 3 rd State Finance Commission for<br />

more grants. He also advised the Council to work collectively for the development of the area, and<br />

utilize appropriate constitutional provisions to secure funds.<br />

Sri Rath then demonstrated the format in which the NAC is supposed to do the planning. He<br />

explained the elements of the format, and also showed a booklet to guide the planners.<br />

(Attendace sheet of consultation meeting at <strong>Nayagarh</strong> NAC)<br />

279


Khandapara NAC: The consultation meeting on CDP was also organized at the Council Meeting<br />

Hall of Khandapara NAC on 20 th August at 3.00 p.m.. It was presided by the Chairperson Smt.<br />

Urmila Barik. The meeting was attended by the Executive Officer, and Councilors of the NAC.<br />

Also present were Sri Bikash Rath and his team on behalf of PRIA, the TSI for <strong>Nayagarh</strong> district.<br />

The Executive Officer gave the welcome address, and Sri Bikash Rath briefed the House about the<br />

objective of the meeting. This was followed by interaction of the TSI representative with the<br />

councilors. The councilors narrated various local issues of the NAC like lack of piped drinking<br />

water in 10 wards, and inadequate supply of water in 3 wards. For Solid Waste Management, a<br />

space has been provided by the district administration, but sanction from Pollution Control, Board<br />

is pending. Similarly, disadvantaged people of ward number 12 and 13 lack electricity.<br />

The TSI representative wanted to stress on areas that could augment the income of the NAC, and<br />

was informed that about 10 ponds under the NAC can be suitable for fishery. Tax on brick kilns<br />

was also proposed by some councilors, but Sri Rath said that whereas the NAC should not promote<br />

the brick kiln industry because of the environmental impacts of the same, it can consider revenue<br />

from the existing units.<br />

The TSI representative suggested the Council to approach the 3 rd State Finance Commission for<br />

more grants. Sri Rath then demonstrated the format in which the NAC is supposed to do the<br />

planning. He explained the elements of the format, and also showed a booklet to guide the planners.<br />

Block-level consultations:<br />

Gania: A consultation meeting on participatory district level planning process was organized in<br />

the Gania Block on 21 st August’09 at <strong>11</strong>.00 a.m..All the Block level officials including line<br />

department representatives along with the PRI members participated in the meeting. In the<br />

beginning, the BDO, Mr. Narayan Sethi introduced the TSI team with the staff and PS members of<br />

Gania Block. Mr.Ram Govind Panda, one of the TSI members summarized the need and concept<br />

of planning and participatory planning. He narrated eight important formulae of comprehensive<br />

district level planning.<br />

The consultation resulted in the following SWOT analysis:<br />

STRENGTH WEAKNESS OPPORTUNITY THREAT<br />

Office infrastructures,<br />

conference hall,<br />

communication<br />

equipments like<br />

computers, having 24 hour<br />

online service.<br />

Three of LI centres are<br />

owned by the block<br />

No vehicle for<br />

BDO and all<br />

other Block staffs<br />

which hampers<br />

the development<br />

works.<br />

Two panchayats-<br />

Bada Silingi,<br />

Champa Diha has<br />

cut up<br />

communication<br />

due to flood<br />

Staff position can<br />

increase. Vehicle<br />

can be arranged or<br />

be hired for staff<br />

movement.<br />

More LI centres<br />

and buildings can<br />

be constructed.<br />

Less involvement<br />

of the people for<br />

availing various<br />

government<br />

schemes. The socalled<br />

political<br />

agents are<br />

manipulating the<br />

system.<br />

Corruption and<br />

political<br />

interference are<br />

the major<br />

hindrance for the<br />

growth and<br />

280


One TRW school No hostel for the<br />

girl student<br />

300 cycles are distributed<br />

to the girl students.<br />

Honey collection, goatery,<br />

and leaf plate making are<br />

rural sources of livelihood,<br />

besides agriculture.<br />

Half of the target<br />

has been<br />

achieved.<br />

Insufficient<br />

market yards and<br />

lack of EDP<br />

training to the<br />

growers.<br />

Girls’ hostel can be<br />

constructed and<br />

residential school<br />

for the girls can be<br />

increased.<br />

More cycles can be<br />

distributed to the<br />

students and orders<br />

can be booked.<br />

More market place<br />

and subsidy to the<br />

growers can be<br />

increased.<br />

Promotion to the<br />

allied/small-scale<br />

industries can be<br />

established.<br />

SHG are graded regularly. Regular grading,<br />

capacity building<br />

and microenterprising<br />

training can be<br />

Only 20% OAP, NOP,<br />

IAY, and AAW have been<br />

left up.<br />

30 acres of agricultural<br />

lands have been cultivated<br />

through SRI methods.<br />

The funds are not<br />

being<br />

channelized<br />

properly through<br />

the agricultural<br />

department and<br />

the staffs are not<br />

adequately giving<br />

attention to the<br />

SRI technology.<br />

undertaken.<br />

More provisions<br />

can be made to the<br />

actual and needy<br />

people.<br />

Advanced<br />

methodology can<br />

be adopted for<br />

enhancement of<br />

food production.<br />

The TSI members explained the process to be following for plan preparation.<br />

proper<br />

implementation<br />

of the<br />

programmes.<br />

Work hampered<br />

due to staff<br />

shortage.<br />

Target is not<br />

achieved due to<br />

lack of proper<br />

coordination.<br />

Dasapalla: A block level consultation was organized on 21 st August 2009 at the Panchayat Samiti<br />

Conference Hall, Daspalla block . Total 19 representatives consisting PRI members, NGOs and<br />

Line Department Officials participated in the process.<br />

281


A detail discussion was conducted through participatory approach in order to initiate the SWOT<br />

analysis process. The core issues identified were irrigation, lack of adequate facility for higher<br />

education, improper use of natural resources, inadequate transportation & communication, and<br />

inadequate health care services.<br />

The participants stated that they want to see their block developed in all sectors by the year 2020<br />

i.e. improved by health, education, irrigation, communication and industry facilities<br />

Nuagaon: A block level consultation was organized on 21 st August 2009 at the Panchayat Samiti<br />

Conference Hall, Nuagaon block . Total 20 representatives consisting PRI members and Line<br />

Department Officials participated in the process. The discussion identified the core issues like lack<br />

of adequate irrigation facility, lack of adequate drinking water supply, inadequate higher education<br />

system, inadequate transportation & communication, and inadequate health care services.<br />

Khandapara: A block level consultation was organized on 22 nd August 2009 at the Panchayat<br />

Samiti Conference Hall, Khandapada Block. Total 22 representatives consisting PRI members and<br />

Line Department Officials participated in the process.<br />

Ms Gitanjali Behera,the Chair person, Panchayat samiti, Khandapada inaugurated and presided in<br />

the meeting. The core issues identified were poor irrigation facility, regular flood, hard soil type,<br />

improper use of natural resources, inadequate health services, etc.<br />

<strong>Nayagarh</strong>: A Block level consultation was organized on 22 nd August 2009 at the Panchayat Samiti<br />

Conference Hall, <strong>Nayagarh</strong> Block . Total 26 representatives consisting PRI members and Line<br />

Department Officials participated in the process.<br />

Ms Nirmala Mohanty, the Chairperson, Panchayat samiti, <strong>Nayagarh</strong> inaugurated and presided the<br />

meeting .A detail discussion was conducted through participatory approach in order to initiate the<br />

SWOT analysis process. The core issues identified were more or less similar to that of other<br />

Blocks.<br />

Bhapur: A consultation meeting on participatory district level planning was organized at Bhapur<br />

on 21 st August’09 in the Block office. It was attended by various Block level officials including<br />

line department representatives, PRI members, doctor, and ICDS supervisor. The House analyzed<br />

the SWOT of the Block, and recommended the following:<br />

• Coordination among line departments and PRI members is highly essential for the<br />

successful implementation of the programmes.<br />

• Effective measures can be taken for increasing ground water resources.<br />

• More and more MIP projects can be initiated for handling the drought situation.<br />

• Various programmes can be made under PMEGP programme for development of the<br />

youths.<br />

• Comprehensive planning and designing can be made for utilization of the Mahanadi water.<br />

• Adequate arrangements can be made for control over the flood situation.<br />

• Irrigation programmes (LI points) can be undertaken by effective utilization of the<br />

Mahanadi water.<br />

282


Odogaon:<br />

A consultation meeting on participatory district level planning process was organized at Odogaon<br />

on 21 st August’09 in the Block office. The Assistant Engineer, GPO and other PS members had<br />

participated in the meeting. The House analyzed the SWOT of the Block as under:<br />

Strength:<br />

• There are 6 colleges, 25 high schools, 13 UGME schools, 21 ME schools, <strong>11</strong>3 primary<br />

schools, one sevashram school, 2 PS primary schools, one outpost, one PHC, 4 veterinary<br />

dispensaries, 14 LI centres in the block.<br />

• There are 12 PS roads of 64 kms and 381 GP roads of 962 kms.<br />

• All funds under NREGA programme have been utilized.<br />

• There is one market yard in the block for selling of rural products.<br />

Weakness:<br />

• Services do not reach to the remote villages, especially health, education and welfare<br />

measures.<br />

• No irrigation facilities. Hardly 2 to 3 percent covered under irrigation.<br />

• No information centre for general public to understand the various government schemes and<br />

provisions.<br />

• No suitable market place to sell agricultural and forest products.<br />

Opportunity:<br />

• Vast opportunity for vegetable cultivation and preservation.<br />

• Optimum use of natural resources to raise socio-economic status of the rural poor.<br />

• Forest conservation/protection measures can be taken up to provide employment<br />

opportunity to the people.<br />

• Existing perennials, water resources can also be developed using government resources<br />

under NREGA and other schemes.<br />

• Need for improvement of knowledge, attitude and skill of the stake holders.<br />

Threat:<br />

• Malaria-prone area.<br />

• Corruption and political interference at all level is also a major hindrance for the proper<br />

implementation of the government programmes.<br />

• Ground water resources going down.<br />

Ranpur: A consultation meeting on participatory district level planning process was organized at<br />

Ranapur on 21 st August’09 in the Block office. The BDO, Mr.Promod Padhi, Jilla Parishad member<br />

Mr.Girija Kanta Mohapatra, VLW, NGO representatives, and ICDS supervisor participated in the<br />

meeting. The House analyzed the SWOT of the area as under:<br />

Strength:<br />

• Ranpur Block has established the biggest MIP in the district.<br />

283


• Good connective roads.<br />

• 40% achievements of NREGA programmes.<br />

• Vast agricultural lands, vast forest lands.<br />

• The local youths are running the broiler farms and supplying chicken to Jharkhand and<br />

other states of India.<br />

• Vast land for sugarcane cultivation.<br />

• Empowered forest preservation committee.<br />

• Forest protection committees are formed in 227 villages.<br />

• Ranpur is famous for local Black gram and teak woods.<br />

• Gadjat and Praj Andolon Area<br />

Weakness:<br />

• Vast agricultural lands are not utilized due to lack of modern technical methods.<br />

• No marketing facilities for selling of the products.<br />

• No road connection in Bandhamunda GP.<br />

• There is a little bit of controversy between the forest land and agricultural land.<br />

• Low voltage and power cutting are one of the major problems in electricity supply.<br />

• Ground water resources are reducing day by day.<br />

Opportunity:<br />

• Opportunities for establishing poultry farms by engaging rural youths.<br />

• Forest conservation/protection measures can be taken up to provide employment<br />

opportunities to the people.<br />

• Need for improvement of cottage industries, local products.<br />

• Complete irrigation plans can be developed.<br />

• Marketing and cold storage facilities for preservation of agricultural products.<br />

Threat:<br />

• Reducing ground water resources.<br />

• Lack of coordination among the staffs and the PRIs.<br />

• Possible drought.<br />

• Controversy between forest land and agricultural land are the hindrance for construction of<br />

roads.<br />

GP-level planning:<br />

GP-level PRI members and officials used the formats supplied by PRIA to prepare GP-level plans.<br />

The TSI facilitated this activity in a number of ways.<br />

284


(A GP-plan as prepared and submitted in PRIA format, by Sasan GP, Bhapur)<br />

285


(A resolution adopted by Similisahi GP, Nuagaon under district planning 2009-10)<br />

286


The Consultative & Participatory Process of District Planning in <strong>Nayagarh</strong>: 2009-10<br />

A Pictorial Briefing<br />

(Block consultation at <strong>Nayagarh</strong>)<br />

(Representative of PRIA explaining district planning methodology at Nuagaon Block)<br />

287


(Block consultation at Gania)<br />

(Consultation with Council members of <strong>Nayagarh</strong> NAC)<br />

288


(Consultation at Khandapara NAC)<br />

(Representatives of the Corporate sector in a consultation meeting with<br />

PRIA at <strong>Nayagarh</strong>)<br />

289


Annexure-20<br />

Introduction to various schemes<br />

ISOPOM: INTEGRATED SCHEME OF OILSEEDS, PULSES, MAIZE AND<br />

OILPALM<br />

The Department of Agriculture & Cooperation has been implementing the following Centrally<br />

Sponsored Schemes under TMOP&M for increasing production of oilseeds, pulses, maize and oil<br />

palm in the country :<br />

i. Oilseeds Production Programme (OPP)<br />

ii. National Pulses Development Project (NPDP)<br />

iii. Accelerated Maize Development Programme (AMDP)<br />

iv. Oil Plam Development Programme (OPDP)<br />

To provide flexibility to the States in implementation of these programmes based on regionally<br />

differentiated approach, to promote crop diversification to provide focused approach to the<br />

programmes and in view of the suggestions of the Planning Commission the above four schemes<br />

have been modified and merged into one Centrally Sponsored Integrated Scheme of Oilseeds,<br />

Pulses, Oil Palm and Maize (ISOPOM) during the 10 th Five <strong>Year</strong> Plan. The Integrated Scheme of<br />

Oilseeds, Pulses, Oil Palm and Maize (ISOPOM) are being implemented since 2004-05.<br />

NHM:<br />

A National Horticulture Mission(NHM) has been launched as a Centrally Sponsored Scheme to<br />

promote holistic growth of the horticulture sector through an area based regionally differentiated<br />

strategies. The scheme is fully funded by the Government and different components proposed for<br />

implementation financially supported on the scales laid down.<br />

To achieve the above objectives, the mission would adopt the following strategies:<br />

1. Ensure an end-to-end holistic approach covering production, post harvest management,<br />

processing and marketing to assure appropriate returns to growers/producers.<br />

2. Promote R&D technologies for production, post-harvest management and processing.<br />

3. Enhance acreage, coverage, and productivity through.<br />

a. Diversification, from traditional crops to plantations, orchards, vineyards, flower<br />

and vegetable gardens.<br />

b. Extension of appropriate technology to the farmers for high-tech horticulture<br />

cultivation and precision farming<br />

290


4. Assist setting up post harvest facilities such as pack house, ripening chamber, cold storages,<br />

Controlled Atmosphere (CA) storages etc, processing units for value addition and marketing<br />

infrastructure.<br />

5. Adopt a coordinated approach and promotion of partnership, convergence and synergy<br />

among R&D, processing and marketing agencies in public as well as private sectors, at the<br />

National, Regional, State and sub-State levels.<br />

6. Where appropriate and feasible, promote National Dairy Development Board (NDDB)<br />

model of cooperatives to ensure support and adequate returns to farmers.<br />

7. Promote capacity-building and Human Resource Development at all levels.<br />

NWDPRA:<br />

National Watershed Development Project for Rainfed Areas (NWDPRA) is a centrally introduced<br />

programme. The activities undertaken in this programme include soil and moisture conservation<br />

measures like construction of check dams, water harvesting structures, desilting of village ponds,<br />

treatment of drainage lines/ gullies, land leveling, bunding of farms, treatment of problem soils,<br />

agro-forestry, agri- horticulture,silvi-pasture, organic farming, use of bio-fertilizers, value addition<br />

and marketing of produce through farmers groups, training & capacity building of staff &<br />

beneficiaries etc.<br />

IWDP: INTEGRATED WASTELAND DEVELOPMENT PROGRAMME:<br />

Development of wastelands mainly in non-forest areas aimed at checking land degradation , putting<br />

such wastelands of the country to sustainable use & increasing bio-mass availability especially that<br />

of fuelwood , fodder , fruits, fiber & small timber. Government of India is taking up this colossal<br />

task through its INTEGRATED WASTELAND DEVELOPMENT PROJECT SCHEME (IWDP)<br />

by revitalizing & reviving village level institutions & enlisting people's participation. It is people's<br />

own programme which aims at giving them actual decision making powers in terms of project<br />

implementation & fund disbursal.<br />

It is one programme which is making sincere efforts towards the empowerment of the people so<br />

that a sense of collective responsibility can be evolved among them. The new guidelines for<br />

watershed development provides a paradigm shift in the traditional approach where the role of the<br />

Government is changed from that of governance to facilitation. The approach of watershed<br />

development in a holistic manner automatically strikes a prudent balance between environmental<br />

concerns & developmental aspirations. The efforts being made under the guidelines can be termed<br />

as sincere & honest as here the survival of life itself is at stake with the watershed development<br />

rather than the quality of life itself as compared to similar situations in the developed countries. In<br />

fact , the effective community control has been an integral part of the Indian social fabric which<br />

was fragmented by the colonial rule. This programme is an effort towards its restoration & a small<br />

step in the achievement of this goal which might turn into a big leap with the support from the<br />

people.<br />

291


RKVY:<br />

National Agriculture Development Programme or Rashtriya Krishi Vikas Yojana (RKVY)<br />

aims at achieving 4% annual growth in the agriculture sector during the XI Plan period, by ensuring<br />

a holistic development of Agriculture and allied sectors. The main objectives of the scheme are :<br />

(i) To incentivise the states so as to increase public investment in Agriculture and<br />

allied sectors.<br />

(ii) To provide flexibility and autonomy to states in the process of planning and<br />

executing Agriculture and allied sector schemes.<br />

(iii) To ensure the preparation of agriculture plans for the districts and the states<br />

based on agro-climatic conditions, availability of technology and natural<br />

resources.<br />

(iv) To ensure that the local needs/crops/priorities are better reflected in the<br />

agricultural plans of the states.<br />

(v) To achieve the goal of reducing the yield gaps in important crops, through<br />

focussed interventions.<br />

(vi) To maximize returns to the farmers in Agriculture and allied sectors.<br />

(vii) To bring about quantifiable changes in the production and productivity of<br />

various components of Agriculture and allied sectors by addressing them in a<br />

holistic manner.<br />

FFDA: FISH FARMERS DEVELOPMENT AGENCY:<br />

The FFDA scheme was initiated as a pilot project by the Department of Agriculture & Corporation,<br />

Govt. of India in 1974-75 in some states of the country in order to utilize village tanks and ponds<br />

for the purpose of aquaculture by setting up district level agencies. The scheme was introduced to<br />

more states and thus the number of agencies also increased.<br />

FFDAs are provided with necessary funds, Extension Service Units and required infrastructure so<br />

as to develop freshwater fish culture in each district. The FFDAs enjoy reasonable autonomy in<br />

their operations.<br />

BKVY: Biju Krushak Vikash Yojana<br />

Minor irrigation projects are environment-friendly and they provide gainful employment<br />

opportunities to the rural population, resulting in optimum utilization of resources. A large number<br />

of small irrigation projects on streams & rivulets can provide irrigation to the lands of tribal<br />

beneficiaries. The technology close to the heart of the tribal and the projects are therefore amply<br />

suitable for self-management. The Pani Panchayat scheme has aroused widespread enthusiasm<br />

Requests are pouring in to set up new minor and lift Irrigation Project and revive the derelict ones.<br />

It is, therefore, felt that new emphasis on Minor & Lift Irrigation projects can be cast in the mould<br />

of Pani Panchayats, which will provide increased momentum to the campaign. With the above<br />

objectives in view, Government launched a new scheme name as ”Biju Krushak Vikash Yojana”<br />

during 2001.<br />

292


PMGSY:<br />

Rural Road Connectivity is not only a key component of Rural Development by promoting access<br />

to economic and social services and thereby generating increased agricultural incomes and<br />

productive employment opportunities in India, it is also as a result, a key ingredient in ensuring<br />

sustainable poverty reduction. Notwithstanding the efforts made, over the years, at the State and<br />

Central levels, through different Programmes, about 40% of the Habitations in the country are still<br />

not connected by All-weather roads. It is well known that even where connectivity has been<br />

provided, the roads constructed are of such quality (due to poor construction or maintenance) that<br />

they cannot always be categorised as All-weather roads.<br />

With a view to redressing the situation, Government have launched the Pradhan Mantri Gram<br />

Sadak Yojana on 25th December, 2000 to provide all-weather access to unconnected habitations.<br />

The Pradhan Mantri Gram Sadak Yojana (PMGSY) is a 100% Centrally Sponsored Scheme. 50%<br />

of the Cess on High Speed Diesel (HSD) is earmarked for this Programme.<br />

The primary objective of the PMGSY is to provide Connectivity, by way of an All-weather Road<br />

(with necessary culverts and cross-drainage structures, which is operable throughout the year), to<br />

the eligible unconnected Habitations in the rural areas, in such a way that all Unconnected<br />

Habitations with a population of 1000 persons and above are covered in three years (2000-2003)<br />

and all Unconnected Habitations with a population of 500 persons and above by the end of the<br />

Tenth Plan Period (2007). In respect of the Hill States (North-East, Sikkim, Himachal Pradesh,<br />

Jammu & Kashmir, Uttaranchal) and the Desert Areas (as identified in the Desert Development<br />

Programme) as well as the Tribal (Schedule V) areas, the objective would be to connect Habitations<br />

with a population of 250 persons and above.<br />

The PMGSY will permit the Upgradation (to prescribed standards) of the existing roads in those<br />

Districts where all the eligible Habitations of the designated population size have been provided allweather<br />

road connectivity. However, it must be noted that Upgradation is not central to the<br />

Programme and cannot exceed 20% of the State’s allocation as long as eligible Unconnected<br />

Habitations in the State still exist. In Upgradation works, priority should be given to Through<br />

Routes of the Rural Core Network, which carry more traffic .<br />

RIDF: Rural Infrastructure Development Fund (RIDF):<br />

The Department of Agriculture is participating under RIDF programme financed by NABARD<br />

(90% Share by NABARD in shape of loan & 10% State Share up to Trenche-VII and onwards 95%<br />

share by NABARD and 5% State Share) since 1995-1996 and brief details of minor irrigation<br />

projects executed under various trenches are as under. Under RIDF-I, Agriculture Department has<br />

executed 15 No's Deep Tube Well Irrigation Schemes with an expenditure of Rs.312.90 lacs<br />

covering 612.00 hectare CCA. Similarly under RIDF-II, 12 No's Deep Tube Well Irrigation<br />

Schemes were executed by the Department with an expenditure of Rs 312.33 lacs covering 470<br />

hectare CCA. Under RIDF-III and IV, Agriculture Department did not participate. Under RIDF-V,<br />

Department executed 157 Minor Irrigation Projects with an expenditure of Rs 147.14 lacs covering<br />

3588.49 hectare CCA. Under RIDF-VI, Agriculture Department executed 140 Minor Irrigation<br />

Schemes with an expenditure of Rs 1091.95 lacs covering 3031.06 hectare CCA. Under RIDF-VII,<br />

Department of Agriculture executed 125 Minor Irrigation Schemes with an expenditure of Rs<br />

779.22 lacs covering 2380.52 hectare CCA. Beside this Department also executed 90 community<br />

293


ased Water Harvesting and Natural Resource Management Project in Hamirpur District with a<br />

expenditure of Rs.678.96 lacs covering CCA 6128.21 hectare. Under RIDF-VIII, Department did<br />

not participate. During RIDF-IX, 28 Minor Irrigation Schemes are executed with an expenditure of<br />

Rs 144.76 lacs covering CCA 390.62 hectare. Under RIDF-X, Department executed 60 Minor<br />

Irrigation Schemes with an expenditure of Rs.406.63 lacs having CCA 1025.31 hectare. During<br />

RIDF-XI, 68 Projects are executed with an expenditure of Rs.577.90 lacs covering CCA <strong>11</strong>82.51<br />

hectare. Under RIDF-XII, the NABARD has sanctioned 3 No's Tube wells, 5 No's Water<br />

Harvesting Structure and 53 Minor Irrigation Schemes amounting to Rs.633.67 lacs having CCA<br />

987 hectare for the year 2006-2007.<br />

SSA:<br />

The Sarva Shiksha Abhiyan (SSA) is a programme for universalization of Elementary Education<br />

for providing quality education to the primary students.<br />

The main objectives of the Scheme are:<br />

1. Reaching the hardest to reach out of school children<br />

2. Addressing quality issues<br />

3. Enhance reading skills of primary students<br />

4. Improve monitoring and supervision<br />

RMSA:<br />

RASHTRIYA MADHYAMIK SHIKSHA ABHIYAN(RMSA) is a SCHEME FOR<br />

UNIVERSALISATION OF ACCESS TO AND IMPROVEMENT OF QUALITY AT THE<br />

SECONDARY AND HIGHER SECONDARY STAGE. Since universalisation of elementary<br />

education has become a Constitutional mandate, it is absolutely essential to push this vision<br />

forward to move towards Universalisation of secondary education, which has already been<br />

achieved in a large number of developed countries and several developing countries. The scheme<br />

assigns due importance to the preparatory activities as these have been conceived as a necessary<br />

condition for quality implementation of the programme. The states are expected to put in place<br />

certain basic reforms as a precondition for receiving central assistance under the Scheme. Many of<br />

the State Governments have constituted a high level Task Force to work out comprehensive<br />

Policies, plan and programmes for their states. All other states are expected to constitute the Task<br />

Force without further delay.<br />

PYKKA: PANCHAYAT YUVA KRIDA AUR KHEL ABHIYAN (PYKKA)<br />

The Panchayat Yuva Krida Aur Khel Abhiyan (PYKKA) has been launched with the following<br />

aims and objectives:<br />

a. To create a network of basic sports infrastructure throughout the country<br />

b. To provide universal access to sports in rural and promote a sports culture among both boys &<br />

girls.<br />

c. To harness available and potential sporting talent among rural youth through a well designed<br />

competition structure from the block level.<br />

d. To put in place an effective mechanism to identify and nurture sporting talent in rural areas.<br />

e. To make focused efforts to give adequate training and exposure under existing schemes of the<br />

Ministry of Youth Affairs & Sports (MYAS), Sports Authority of India (SAI) and various<br />

schemes of States/UTs to promising sports persons coming out of this process.<br />

f. To promote both indigenous and modern games; and<br />

294


g. To create seamless integration between the competition structure rights from the panchayat level<br />

through to the national level in order to facilitate exponential growth in the number of high<br />

performing sports persons.<br />

NRHM:<br />

Recognizing the importance of Health in the process of economic and social development and<br />

improving the quality of life of our citizens, the Government of India has resolved to launch the<br />

National Rural Health Mission to carry out necessary architectural correction in the basic health<br />

care delivery system. The Mission adopts a synergistic approach by relating health to determinants<br />

of good health viz. segments of nutrition, sanitation, hygiene and safe drinking water. It also aims<br />

at mainstreaming the Indian systems of medicine to facilitate health care. The Plan of Action<br />

includes increasing public expenditure on health, reducing regional imbalance in health<br />

infrastructure, pooling resources, integration of organizational structures, optimization of health<br />

manpower,<br />

decentralization and district management of health programmes, community participation and<br />

ownership of assets, induction of management and financial personnel into district health system,<br />

and operationalizing community health centers into functional hospitals meeting Indian Public<br />

Health Standards in each Block of the Country.<br />

The Goal of the Mission is to improve the availability of and access to quality health care by<br />

people, especially for those residing in rural areas, the poor, women and children.<br />

UISDDMT: URBAN INFRASTRUCURE DEVELOPMENT SCHEME FOR<br />

SMALL & MEDIUM TOWNS<br />

Urban infrastructure Development Scheme for Small & Medium Towns aims at improvement in<br />

urban infrastructure in towns and cities in a planned manner. It shall subsume the existing schemes<br />

of Integrated Development of Small and Medium Towns (IDSMT) and Accelerated Urban Water<br />

Supply Programme (AUWSP).<br />

OBJECTIVES:<br />

The objectives of the scheme are to:<br />

a) Improve infrastructural facilities and help create durable public<br />

assets and quality oriented services in cities & towns<br />

b) Enhance public-private-partnership in infrastructural development<br />

and<br />

c) promote planned integrated development of towns and cities.<br />

IAY: Indira Awaas Yojana (IAY):<br />

The aim of Indira Awaas Yojana is to provide financial assistance to the rural poor living Below<br />

the Poverty Line (BPL) for construction of a house. BPL rural households of Scheduled Castes,<br />

Scheduled Tribes, non- Scheduled Castes & non-Scheduled Tribes, Ex-servicemen of the armed &<br />

paramilitary forces killed in action, physically & mentally challenged persons, freed bonded<br />

labourers & Minorities are eligible to get assistance<br />

under Indira Aawas Yojana. Funding of IAY is shared between the Centre & State in the ratio of<br />

75:25. in case of UTs, entire fund of IAY is provided by the Centre to District<br />

295


Rural Development Agencies (DRDAs) which release funds to beneficiaries through Gram<br />

Panchayat.<br />

MO KUDIA:<br />

This is the IAY counterpart of a state scheme in Odisha providing similar opportunities particularly<br />

for those rural poor who have been deprived of getting the benefit under IAY.<br />

ICDS:<br />

The Integrated Child Development Sevices Programme aims at providing services to children of 0-<br />

6 years age in an integrated manner so as to ensure proper growth and development of children in<br />

rural, tribal and slum areas. ICDS is a centrally sponsored scheme.<br />

Objectives:<br />

• To improve the nutritional and health status of children in the age group of 0 to 6 years.<br />

• To lay the foundations for proper psychological, physical and social development of the<br />

child.<br />

• To reduce the incidence of mortality, morbidity, malnutrition and school drop-out.<br />

• To achieve effective coordination of policy and implementation amongst the various<br />

departments to promote child development.<br />

• To enhance the capability of the mother to look after the normal health and nutritional needs<br />

of the child through proper nutrition and health education. (http://www.icds.gov.in/)<br />

MADHU BABU PENSION YOJANA (MBPY):<br />

i) The State Old Age Pension (SOAP) Scheme is being implemented in the State w.e.f.<br />

1.4.1975. Destitute elderly of 60 years of Age and above, cure leprosy patient and widow<br />

irrespective of their age are the beneficiaries under the scheme. The present target of<br />

beneficiaries under this scheme for Angul Dist. is 27504.<br />

ii) The ODP scheme is being implemented in the State on 2 nd . Oct, 1984. Persons who are 5<br />

years of age or above and are totally blind, orthopedically handicapped, mentally retared or<br />

affected by cerebral palsy are the beneficiaries under the scheme. The present target of<br />

beneficiaries under this scheme for Angul Dist. is 5210.<br />

By getting the above two schemes merged the Madhu Babu Pension Yojana came into force<br />

w.e.f. 1 st . Jan, 2008. A person shall be eligible for the pension under the scheme if he/ she<br />

has family income from all sources is not exceeding Rs.12,000/- per annum.<br />

NATIONAL OLD AGE PENSION (NOAP) :<br />

National Old Age Pension (NOAP) scheme has been implemented in the State since 15 th . August,<br />

1995. Under this scheme destitute elderly of 65 years and above having no subsistence are being<br />

paid with monthly pension @ Rs.200/- per month. A total number of 9850 beneficiaries are<br />

enjoying pension under the scheme in the district.<br />

296


NATIONAL FAMILY BENEFIT SCHEME (NFBS) :<br />

National Family Benefit Scheme is being implemented in the State since 15 th . August, 1995.<br />

Under this scheme a lump sum financial assistance of Rs.10,000/- is provided to a BPL family on<br />

the death of it’s Primary Bread Earner in the age group of 18-65 years of age. Such assistance is<br />

paid to the surviving member of the house hold of the deceased who after local enquiry, is<br />

determined to be the head of the household has includes spouse, minor children, unmarried<br />

daughters and dependant parents.<br />

PH SCHOLARSHIP :<br />

Under this scheme the State Govt. provide scholarship disability children who are studying in the<br />

normal school from Primary level to University level including those perusing Technical and<br />

Vocational Education. The rates of scholarship provided to disability student studying in different<br />

Class are as follows:-<br />

Primary School Class –I to V : Rs.100.00 per month.<br />

Middle and High School Class VI to X : Rs.140.00 per month.<br />

College (+2 and +3 Level) : Rs.160.00 per month.<br />

College P.G. Level : Rs.190.00 per month.<br />

Technical and Vocational Training : Rs.190.00 per month.<br />

SUPPLEMENTARY NUTRITION PROGRAMME (SNP ) :<br />

Under the programme Supplementary Nutrition food is provided to the children below 6 years and<br />

also to the pregnant and nursing mothers.<br />

Mid–Day–Meal ( MDM ):<br />

The government has allotted 184051 no. of student for the year 2008-09 in 2127 schools under this<br />

programme with a monthly allocation of 2485.66 Qtl. of Rice and 500.00 Qtl of Dal. Cooked<br />

meals are being served to the students in all working days and eggs are being provided to the<br />

students @ 7 nos. per month. The Scheme aims to increase enrolment of children and reducing the<br />

school dropouts of children and also improving the nutritional status of the children.<br />

MISSION SHAKTI:<br />

This programme was lunched in 8 th . March, 2001 on International Women’s Day. Under this<br />

programme the women are encouraged for engagement in different income activities like<br />

Pisciculture, Mushroom, cultivation, forest product collection, vegetable cultivation, weaving,<br />

spices making, goatery, dairy and PDS distribution etc.<br />

RGGVY:<br />

Hon. Prime Minister, Dr. Manmohan Singh, Government of India launched the Rajiv Gandhi<br />

Grameen Vidyutikaran Yojana (RGGVY) Scheme for Rural Electricity Infrastructure<br />

Household Electrification on 4th April, 2005 with the objective of providing access to<br />

electricity to all households and improving rural electricity infrastructure.<br />

297


The Ministry of Power, Govt. of India issued an Office Memorandum No. 44/19/2004-D(RE)<br />

dated 18.03.2005, amplifying the features as well as relevant provisions for implementation<br />

of the new RGGVY.<br />

Scheme is for the attainment of the goal set for providing access to electricity to all households in<br />

five years.<br />

Ninety per cent capital subsidy is provided for overall cost of the projects under the scheme.<br />

States must make adequate arrangements for supply of electricity and there should be no<br />

discrimination in the hours of<br />

supply between rural and urban households.<br />

For projects to be eligible for capital subsidy under the scheme, prior commitment of the<br />

States has been obtained before<br />

sanction of projects under the scheme for : -<br />

deployment of franchisees for the management of rural distribution in projects financed<br />

under the scheme, and<br />

the provision of requisite revenue subsidies to the State Utilities as required under the<br />

Electricity Act, 2003.<br />

The scheme is being implemented through the Rural Electrification Corporation (REC).<br />

BGJY:<br />

Biju Grama Jyoti Yojna is the RGGVY counterpart of a state scheme in Odisha though having<br />

much less capacity and diversity in terms of resources and activities. Villagers deprived of the<br />

benefit under RGGVY are supposed to be benefited by this scheme.<br />