15.07.2013 Views

drilling jars and energizers - Wagenborg

drilling jars and energizers - Wagenborg

drilling jars and energizers - Wagenborg

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

‘PD’ DRILLING JAR OPERATION<br />

Jarring Up<br />

To jar up apply overpull at the jar as required <strong>and</strong> wait for jar to fire,<br />

lock will automatically release when lock setting load is exceeded. The<br />

more overpull applied on the jar, the greater impact will be achieved.<br />

To repeat jarring, reset jar into locked position by applying weight on<br />

the jar which then automatically will return to it’s locked position <strong>and</strong><br />

again be ready to be fired up or down as required. Jar lock load will<br />

have to be exceeded for the lock to release <strong>and</strong> hydraulics to be engaged.<br />

Overpull in excess of Max Pre-Jarring should not be applied as it<br />

may damage the hydraulics of the jar.<br />

Jarring Down<br />

To jar down, apply weight on the jar as required <strong>and</strong> wait for jar to<br />

fire, the lock will automatically release when lock setting load is exceeded.<br />

The more weight applied on the jar, the greater impact will be<br />

achieved.<br />

To repeat to jarring, reset jar into locked position by applying overpull<br />

at the jar which then automatically will return to it’s locked position <strong>and</strong><br />

again be ready to be fired up or down as required. Jar lock load will<br />

have to be exceeded for lock to release <strong>and</strong> hydraulics to be engaged.<br />

Energizer Up <strong>and</strong> Down Operation<br />

The energizer will automatically be applied when opening the jar so<br />

fully concentrate on the loads applied on the jar <strong>and</strong> the energizer will<br />

adjust as required.<br />

The energizer will, when operated with the ‘PD’ Jar, increase acceleration<br />

of hammer weight between jar <strong>and</strong> energizer <strong>and</strong> thereby increase<br />

impacts. The impacts will also due to the two-stage design increase impacts<br />

in horizontal wells. This double action energizer will also minimize<br />

jarring shock loads on working string <strong>and</strong> topside equipment.<br />

WAGENBORG OILFIELD SERVICES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!